Assessment method and device for ancient building garden decoration scheme

Through multi-dimensional information acquisition and comparison of multiple decoration plans, the inaccuracy problem caused by single-dimensional evaluation in the existing technology is solved, a more accurate and objective evaluation of ancient building garden decoration plans is achieved, and the accuracy and accuracy of the evaluation results are improved. Decision-making efficiency.

CN119338311AInactive Publication Date: 2025-01-21WULIN CONSTR ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411423961.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2025-01-21
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When evaluating ancient building garden decoration plans, the results of the prior art often result in inaccurate results due to single-dimensional evaluation standards, making it difficult to comprehensively and objectively reflect the overall effectiveness and potential impact of the decoration plans.

Method used

By obtaining the multi -dimensional target information of the target building garden, generate multiple decorative solutions, and select the first decorative solution from it, determine the first object and target evaluation information, process the first decoration scheme, obtain evaluation data, compare the evaluation The size of the data, verify the evaluation results of the decorative scheme, and determine the display of the optimal solution.

Benefits of technology

It ensures the accuracy of evaluation results, avoids misjudgments caused by improper evaluation standards, and improves the accuracy and efficiency of decision-making.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119338311A_ABST
    Figure CN119338311A_ABST
Patent Text Reader

Abstract

The invention discloses a method and device for evaluating an ancient building garden decoration scheme, and relates to the technical field of ancient building garden decoration evaluation. In the method, target information corresponding to a target architectural garden is acquired, and the target information comprises cultural background information, architectural style characteristic information, spatial layout information and protection demand information; generating a plurality of decoration schemes according to the target information; obtaining a first decoration scheme from the plurality of decoration schemes, determining a first object from the first decoration scheme, and determining target evaluation information according to the first object; processing the first decoration scheme according to the target evaluation information to obtain first evaluation data; and when the first evaluation data is greater than the second evaluation data, confirming that the first decoration scheme is displayed to the target user. By implementing the technical scheme provided by the invention, the problem that a result is inaccurate due to a single-dimensional evaluation standard when an ancient building garden decoration scheme is evaluated at present is effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of ancient building garden decoration evaluation, and in particular to an evaluation method and device for ancient building garden decoration schemes. Background Art

[0002] Ancient buildings and gardens, as treasures in the cultural heritage system, have far-reaching significance for their decorative art and protection strategies. With the leap of science and technology and the improvement of restoration techniques, diversified technical means and materials have been creatively introduced into the decoration and restoration practices of ancient buildings and gardens. However, in this process, how to delicately balance the preservation of the historical features of ancient buildings, the satisfaction of modern aesthetic needs, the guarantee of structural safety, and the harmonious coexistence of the ecological environment constitutes a key problem that needs to be solved in the current field.

[0003] At present, the evaluation system of ancient architectural garden decoration schemes generally tends to adopt fragmented and single-dimensional evaluation standards, such as the compatibility of materials with the original structure, the traditional inheritance of craftsmanship, or the evaluation of structural stability. Although such methods can provide valuable references in specific dimensions, due to their inherent limitations, they are often difficult to fully and objectively reflect the overall effectiveness and potential impact of the decoration scheme, thus affecting the accuracy of the evaluation results.

[0004] Therefore, there is an urgent need for an evaluation method and device for ancient building garden decoration schemes that can solve the above-mentioned technical problems. Summary of the invention

[0005] The present application provides a method and device for evaluating decoration schemes for ancient buildings and gardens. The method obtains multi-dimensional information, generates multiple decoration schemes based on the multi-dimensional information, conducts targeted evaluations on the decoration schemes, obtains evaluation results, and then outputs the decoration schemes after comparison of the evaluation results. This effectively solves the problem of inaccurate results caused by a single-dimensional evaluation standard when currently evaluating decoration schemes for ancient buildings and gardens.

[0006] In a first aspect, the present application provides a method for evaluating decoration schemes of ancient buildings and gardens, which is applied to a server, and the method includes: obtaining target information corresponding to the target building and garden, the target information including cultural background information, architectural style feature information, spatial layout information and protection needs information; generating multiple decoration schemes according to the target information; obtaining a first decoration scheme from the multiple decoration schemes, and determining a first object from the first decoration scheme, and determining target evaluation information according to the first object; processing the first decoration scheme according to the target evaluation information to obtain first evaluation data; when the first evaluation data is greater than the second evaluation data, confirming that the first decoration scheme will be displayed to the target user.

[0007] By adopting the above technical scheme, multi-dimensional target information of the target building and garden is obtained, and then multiple decoration schemes are generated based on the multi-dimensional target information. After the first decoration scheme is selected from the multiple decoration schemes, the first object is determined from the first decoration scheme, and the target evaluation information is determined according to the first object. The first decoration scheme is processed according to the target evaluation information to obtain first evaluation data. The evaluation result of the first decoration scheme is verified by comparing the first evaluation data with the second evaluation data. When the first evaluation data is greater than the second evaluation data, it is confirmed that the first decoration scheme will be displayed to the target user, so as to ensure the accuracy of the evaluation result and avoid misjudgment caused by inappropriate evaluation standards.

[0008] Optionally, multiple decoration schemes are generated according to the target information; specifically including: determining the type to be decorated from the target building garden, the type to be decorated includes building type, garden landscape type, garden facility type and cultural heritage type; generating multiple decoration schemes according to the type to be decorated and the target information.

[0009] By adopting the above technical scheme, the target building garden is subdivided into different types to be decorated, making the design of the decoration scheme more refined and targeted. After determining the multiple types to be decorated, corresponding decoration schemes are generated respectively, ensuring that all important parts of the target building garden are fully considered and planned, which is helpful for subsequent comparison and selection among multiple decoration schemes.

[0010] Optionally, a first object is determined from the first decoration scheme, and target evaluation information is determined based on the first object; specifically comprising: extracting the first decoration scheme to obtain a first object to be decorated and a second object to be decorated; inputting the first object to be decorated into a preset evaluation database for matching to obtain first evaluation information; then inputting the second object to be decorated into a preset evaluation database for matching to obtain second evaluation information, the first object including the first object to be decorated and the second object to be decorated; outputting the first evaluation information and the second evaluation information as target evaluation information, the target evaluation information including structural stability information, environmental information, cost information, material information and structural safety information.

[0011] By adopting the above technical scheme, the first decoration scheme is subdivided into a first object to be decorated and a second object to be decorated, and they are evaluated separately, making the evaluation process more refined and specific. By matching the first object to be decorated and the second object to be decorated using a preset evaluation database, corresponding evaluation information can be obtained. The evaluation information can provide strong support for the evaluation of the first decoration scheme and reduce interference from human factors.

[0012] Optionally, the first decoration scheme is processed according to the target evaluation information to obtain first evaluation data; specifically including: processing the first decoration scheme according to the first evaluation information to obtain first sub-evaluation data; processing the first decoration scheme according to the second evaluation information to obtain second sub-evaluation data; calculating the first sub-evaluation data and the second sub-evaluation data to obtain the first evaluation data.

[0013] By adopting the above technical solution, the first sub-evaluation data is combined with the second sub-evaluation data to obtain the first evaluation data. The first evaluation data can more comprehensively reflect the comprehensive performance of the first decoration scheme. This comprehensive evaluation capability helps to more accurately judge the pros and cons of the first decoration scheme and improve the accuracy of decision-making.

[0014] Optionally, before the first evaluation data is greater than the second evaluation data, the method also includes: determining a second object from the second decoration scheme, determining third evaluation information based on the second object, the second decoration scheme being any one of the multiple decoration schemes except the first decoration scheme; processing the second decoration scheme according to the third evaluation information to obtain second evaluation data, the second evaluation data being the evaluation data ranked first in the target sorting result, the target sorting result being obtained by sorting the multiple evaluation data in descending order, and the multiple evaluation data being the evaluation data obtained by processing the other decoration schemes among the multiple decoration schemes except the first decoration scheme.

[0015] By adopting the above-mentioned technical scheme, the decoration schemes other than the first decoration scheme are evaluated among the multiple decoration schemes to obtain multiple evaluation data, and the multiple evaluation data are sorted from large to small to obtain the target sorting result, and then the second evaluation data ranked first is obtained from the target sorting result. If the second evaluation data is the evaluation result corresponding to the second decoration scheme, the second evaluation data is compared with the first evaluation data to determine that the output first evaluation data is the optimal decoration scheme.

[0016] Optionally, after processing the second decoration scheme according to the third evaluation information to obtain the second evaluation data, the method also includes: obtaining a target difference, the target difference being the difference between the first evaluation data and the second evaluation data; judging whether the target difference is less than or equal to a preset threshold; when the target difference is less than or equal to the preset threshold, confirming to process the first decoration scheme and the second decoration scheme; processing the first decoration scheme to obtain a first decorative picture; processing the second decoration scheme to obtain a second decorative picture; displaying the first decorative picture and the second decorative picture, and if the first score is greater than the second score, confirming to output the first decoration scheme to the target user, the first score being the score corresponding to the first decoration scheme, and the second score being the score corresponding to the second decoration scheme.

[0017] By adopting the above technical solution, the target difference between the first evaluation data and the second evaluation data is calculated, and it is determined whether the target difference is less than or equal to the preset threshold. When the target difference is less than or equal to the preset threshold, the first decoration scheme and the second decoration scheme are processed respectively to generate the first decoration picture and the second decoration picture. Then, the user is allowed to participate in the selection process through display and scoring. Based on the fact that the first score is greater than the second score, it can be confirmed that the first decoration scheme will be displayed to the target user. The entire selection process is processed automatically, shortening the decision-making cycle and improving decision-making efficiency.

[0018] Optionally, after determining whether the target difference is less than or equal to a preset threshold, the method also includes: if the target difference is greater than the preset threshold and the first evaluation data is greater than the second evaluation data, confirming to output the first decoration scheme to the target user; if the target difference is greater than the preset threshold and the first evaluation data is less than the second evaluation data, confirming to output the second decoration scheme to the target user.

[0019] By adopting the above technical solution, when the target difference is greater than the preset threshold, it indicates that there is a significant difference in the evaluation between the first decoration scheme and the second decoration scheme, and when the first evaluation data is greater than the second evaluation data, the first decoration scheme is confirmed to be output, and when the first evaluation data is less than the second evaluation data, the second decoration scheme is confirmed to be output, so that the final output decoration scheme is more in line with the needs.

[0020] In a second aspect of the present application, an evaluation device for decoration schemes of ancient buildings and gardens is provided, the device is a server, and the server includes an acquisition unit, a processing unit and a confirmation unit; the acquisition unit acquires target information corresponding to the target building and garden, the target information includes cultural background information, architectural style feature information, spatial layout information and protection demand information; the processing unit generates multiple decoration schemes according to the target information; acquires a first decoration scheme from the multiple decoration schemes, and determines a first object from the first decoration scheme, and determines target evaluation information according to the first object; processes the first decoration scheme according to the target evaluation information to obtain first evaluation data; the confirmation unit confirms that the first decoration scheme will be displayed to the target user when the first evaluation data is greater than the second evaluation data.

[0021] Optionally, the processing unit is used to determine the type to be decorated from the target building garden, the type to be decorated including building type, garden landscape type, garden facility type and cultural heritage type; and generate multiple decoration schemes according to the type to be decorated and the target information.

[0022] Optionally, the processing unit is used to extract the first decoration scheme to obtain a first object to be decorated and a second object to be decorated; input the first object to be decorated into a preset evaluation database for matching to obtain first evaluation information; then input the second object to be decorated into the preset evaluation database for matching to obtain second evaluation information, the first object includes the first object to be decorated and the second object to be decorated; output the first evaluation information and the second evaluation information as target evaluation information, the target evaluation information includes structural stability information, environmental information, cost information, material information and structural safety information.

[0023] Optionally, the processing unit is used to process the first decoration scheme according to the first evaluation information to obtain first sub-evaluation data; process the first decoration scheme according to the second evaluation information to obtain second sub-evaluation data; calculate the first sub-evaluation data and the second sub-evaluation data to obtain first evaluation data.

[0024] Optionally, the processing unit is used to determine a second object from the second decoration scheme, determine third evaluation information based on the second object, the second decoration scheme being any one of the multiple decoration schemes except the first decoration scheme; process the second decoration scheme according to the third evaluation information to obtain second evaluation data, the second evaluation data being the evaluation data ranked first in the target sorting result, the target sorting result being obtained by sorting multiple evaluation data in descending order, and the multiple evaluation data being the evaluation data obtained by processing other decoration schemes among the multiple decoration schemes except the first decoration scheme.

[0025] Optionally, the acquisition unit is used to obtain a target difference, which is the difference between the first evaluation data and the second evaluation data; the processing unit is used to determine whether the target difference is less than or equal to a preset threshold; the confirmation unit is used to confirm processing of the first decoration scheme and the second decoration scheme when the target difference is less than or equal to the preset threshold; the processing unit is used to process the first decoration scheme to obtain a first decorative picture; the second decoration scheme is processed to obtain a second decorative picture; the confirmation unit is used to display the first decorative picture and the second decorative picture, and if the first score is greater than the second score, confirm outputting the first decoration scheme to the target user, the first score is the score corresponding to the first decoration scheme, and the second score is the score corresponding to the second decoration scheme.

[0026] Optionally, the confirmation unit is used to confirm that the first decoration scheme is output to the target user if the target difference is greater than a preset threshold and the first evaluation data is greater than the second evaluation data; the confirmation unit is used to confirm that the second decoration scheme is output to the target user if the target difference is greater than a preset threshold and the first evaluation data is less than the second evaluation data.

[0027] In a third aspect of the present application, an electronic device is provided, which includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory, so that an electronic device executes any one of the methods described above in the present application.

[0028] In a fourth aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores instructions, and when the instructions are executed, any one of the above methods of the present application is executed.

[0029] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. Acquire multi-dimensional target information of the target building and garden, generate multiple decoration schemes based on the multi-dimensional target information, select a first decoration scheme from the multiple decoration schemes, determine a first object from the first decoration scheme, and determine target evaluation information based on the first object, process the first decoration scheme based on the target evaluation information to obtain first evaluation data, and verify the evaluation result of the first decoration scheme by comparing the first evaluation data with the second evaluation data. When the first evaluation data is greater than the second evaluation data, confirm that the first decoration scheme will be displayed to the target user to ensure the accuracy of the evaluation result and avoid misjudgment caused by inappropriate evaluation standards.

[0030] 2. Calculate the target difference between the first evaluation data and the second evaluation data, and determine whether the target difference is less than or equal to a preset threshold. When the target difference is less than or equal to the preset threshold, process the first decoration scheme and the second decoration scheme respectively to generate a first decoration picture and a second decoration picture. Then, let the user participate in the selection process through display and scoring. Based on the fact that the first score is greater than the second score, it can be confirmed that the first decoration scheme will be displayed to the target user. The entire selection process is automatically processed to shorten the decision-making cycle and improve decision-making efficiency.

[0031] 3. When the target difference is greater than the preset threshold, it means that there is a significant difference in the evaluation between the first decoration scheme and the second decoration scheme. When the first evaluation data is greater than the second evaluation data, the first decoration scheme is confirmed to be output; when the first evaluation data is less than the second evaluation data, the second decoration scheme is confirmed to be output, so that the final output decoration scheme is more in line with the needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a flow chart of a method for evaluating an ancient building garden decoration scheme provided by an embodiment of the present application; Figure 2 It is a structural schematic diagram of an evaluation device for ancient building garden decoration schemes provided in an embodiment of the present application; Figure 3 It is a structural schematic diagram of an electronic device disclosed in an embodiment of the present application.

[0033] Explanation of the reference numerals: 201, acquisition unit; 202, processing unit; 203, confirmation unit; 300, electronic device; 301, processor; 302, communication bus; 303, user interface; 304, network interface; 305, memory. DETAILED DESCRIPTION

[0034] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0035] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.

[0036] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0037] Ancient buildings and gardens, as treasures in the cultural heritage system, have far-reaching significance for their decorative art and protection strategies. With the leap of science and technology and the improvement of restoration techniques, diversified technical means and materials have been creatively introduced into the decoration and restoration practices of ancient buildings and gardens. However, in this process, how to delicately balance the preservation of the historical features of ancient buildings, the satisfaction of modern aesthetic needs, the guarantee of structural safety, and the harmonious coexistence of the ecological environment constitutes a key problem that needs to be solved in the current field.

[0038] At present, the evaluation system of ancient architectural garden decoration schemes generally tends to adopt fragmented and single-dimensional evaluation standards, such as the compatibility of materials with the original structure, the traditional inheritance of craftsmanship, or the evaluation of structural stability. Although such methods can provide valuable references in specific dimensions, due to their inherent limitations, they are often difficult to fully and objectively reflect the overall effectiveness and potential impact of the decoration scheme, thus affecting the accuracy of the evaluation results.

[0039] Therefore, how to solve the problem of inaccurate results due to the single-dimensional evaluation criteria when evaluating the decoration schemes of ancient buildings and gardens. The present application provides an evaluation method for the decoration schemes of ancient buildings and gardens, which is applied to a server. The server of the present application can be a platform that provides decoration scheme evaluation services for ancient buildings and gardens. Figure 1 This is a flow chart of a method for evaluating ancient building garden decoration schemes provided by the present application embodiment, with reference to Figure 1 The method includes the following steps S101-S105.

[0040] S101: Obtain target information corresponding to a target building or garden, where the target information includes cultural background information, architectural style feature information, spatial layout information, and protection demand information.

[0041] In the above S101, before obtaining the target information corresponding to the target building garden, the location of the ancient building garden to be decorated must be determined first, and the target building garden is determined according to the location of the ancient building garden. One ancient building garden location corresponds to one target building garden, and the target building garden is any garden to be evaluated for the decoration scheme. The target information includes cultural background information, architectural style characteristics information, spatial layout information and protection demand information. The historical evolution, cultural significance and relationship with the surrounding environment of the target building garden can be collected by using professional websites, museum official websites and other network resources, so as to determine the cultural background information corresponding to the target building garden. The target building garden can be inspected in detail in advance to record its architectural form, materials, colors and decoration characteristics. The target building garden is compared with buildings of the same period or the same type, and its unique features are analyzed to obtain architectural style characteristics information. According to the results of on-site inspection and technical mapping, a plan of the target building garden can also be drawn, and each functional area and landscape node can be marked. The spatial structure, streamline organization, sight relationship, etc. of the target building garden are analyzed using spatial analysis software to obtain the spatial layout information of the target building garden. Then evaluate the preservation status of the target buildings and gardens, identify existing diseases, damage and other problems. Study national and local policies and regulations on cultural heritage protection, clarify protection requirements and standards, and then determine the protection needs information for the target buildings and gardens.

[0042] S102: Generate multiple decoration schemes according to the target information.

[0043] In the above S102, after obtaining the target information corresponding to the target building and garden, multiple decoration schemes are generated according to the target information; specifically including: determining the type to be decorated from the target building and garden, the type to be decorated includes the building type, the garden landscape type, the garden facility type and the cultural heritage type; generating multiple decoration schemes according to the type to be decorated and the target information. Specifically, a comprehensive survey of the target building and garden is conducted, including various aspects such as buildings, garden landscapes, garden facilities and cultural heritage. The current status, characteristics, existing problems and potential decoration value of each type of element are recorded. According to the survey results, the elements in the target building and garden are divided into building types, garden landscape types, garden facility types and cultural heritage types. The value of each type of element is evaluated, including historical value, cultural value, artistic value, scientific value and practical value. According to the evaluation results, combined with the protection needs and decoration goals, determine which types of elements need to be decorated. Those elements with significant value, which can enhance the overall landscape effect or have special significance can be given priority as the type to be decorated. After determining the type to be decorated, a decoration scheme design team composed of experts in multiple fields such as garden designers, architects, cultural scholars, and cultural relics protection experts needs to be formed. Ensure that team members have rich professional knowledge and practical experience, can accurately understand the target information and develop a scientific and reasonable decoration plan. Conduct in-depth analysis of the target information that has been obtained, including cultural background, architectural style characteristics, spatial layout and protection needs. Identify the key elements and constraints in the target information to provide strong support for the formulation of the decoration plan. Then for each type of decoration, team members conduct creative ideas and preliminary designs. The design process should fully consider the requirements of the target information, while incorporating innovative elements and contemporary characteristics. The preliminary design should include design concepts, design principles, design plans and expected effects. On the basis of the preliminary design, the decoration plan is refined and adjusted. During the refinement process, attention should be paid to issues such as detail processing, material selection, color matching and construction technology. After the adjustment is completed, multiple decoration plans can be obtained. When obtaining the decoration plan, it is also necessary to pay attention to the requirements of cultural heritage protection and sustainable development to ensure that the decoration plan will not cause irreversible damage or negative impact on the target building garden.

[0044] S103: Acquire a first decoration scheme from a plurality of decoration schemes, determine a first object from the first decoration scheme, and determine target evaluation information according to the first object.

[0045] In the above S103, after generating multiple decoration schemes according to the target information, a first decoration scheme can be obtained from the multiple decoration schemes. Then, the design focus is determined from the first decoration scheme, and the first object of important decoration is determined according to the design focus. Then, specific evaluation indicators are formulated for the first object, and the evaluation indicators refer to the target evaluation information.

[0046] In addition, the first object is determined from the first decoration scheme, and the target evaluation information is determined according to the first object; specifically, the first decoration scheme is extracted to obtain the first object to be decorated and the second object to be decorated; the first object to be decorated is input into the preset evaluation database for matching to obtain the first evaluation information; the second object to be decorated is input into the preset evaluation database for matching to obtain the second evaluation information, the first object includes the first object to be decorated and the second object to be decorated; the first evaluation information and the second evaluation information are output as the target evaluation information, and the target evaluation information includes structural stability information, environmental information, cost information, material information and structural safety information. Specifically, the first decoration scheme is deeply analyzed to understand its overall design concept, layout planning and decoration details. The various decorative elements involved in the scheme and their mutual relationships are identified. Then, according to the nature, function and importance of the decorative elements in the scheme, they are divided into different objects to be decorated. If the first object to be decorated and the second object to be decorated are determined from the first decoration scheme, assuming that the first object to be decorated and the second object to be decorated have been determined, the two objects may be part of a building (such as a wall, a roof), a certain area of ​​a garden landscape (such as a flower bed, a fountain) or a specific garden facility (such as a seat, a lighting facility), etc. Determine the name of the object to be decorated, and then input the name of the object to be decorated into a preset evaluation database for matching. The preset evaluation database is an evaluation index containing multiple aspects. Different objects to be decorated correspond to different evaluation indexes. The corresponding evaluation index can be output based on the name of the object to be decorated. The evaluation index can be understood as a factor that affects whether the object to be decorated is feasible. The name of the first object to be decorated is input into the preset evaluation database for matching, and finally the first evaluation information of the first object to be decorated is generated. For example, when the first object to be decorated is the wall of a building, when decorating the wall of the building, the material, structural safety and environment will affect the wall of the building, so the first object to be decorated is input into the preset evaluation database, and the first evaluation information is output. At this time, the first evaluation information refers to the material, structural safety and environmental information. Then the name of the second object to be decorated is input into the preset evaluation database for matching, and the second evaluation information of the second object to be decorated is generated. Since the first decoration scheme includes the first object to be decorated and the second object to be decorated, the first evaluation information and the second evaluation information are integrated to obtain complete target evaluation information.

[0047] S104: Processing the first decoration scheme according to the target evaluation information to obtain first evaluation data.

[0048] In the above S104, the first decoration scheme is processed according to the target evaluation information to obtain the first evaluation data; specifically including: processing the first decoration scheme according to the first evaluation information to obtain the first sub-evaluation data; processing the first decoration scheme according to the second evaluation information to obtain the second sub-evaluation data; calculating the first sub-evaluation data and the second sub-evaluation data to obtain the first evaluation data. Specifically, the first evaluation information corresponding to the first object to be decorated is obtained, and then the first decoration scheme is processed according to the first evaluation information, that is, different weights are assigned to multiple evaluation indicators in the first evaluation information, and then the first object to be decorated in the first decoration scheme is calculated according to the weights in turn to obtain the first sub-evaluation data corresponding to the first object to be decorated. For example, if the total weight is 1, the first evaluation information includes material information, environmental information and structural safety information, if the weight corresponding to the material information is 0.4, the weight corresponding to the environmental information is 0.3, and the weight corresponding to the structural safety information is 0.3, then the material-related data, environmental-related index and structural safety-related data of the first object to be decorated after the first decoration scheme is used to decorate the first object to be decorated are obtained, and then the weighted sum of each data and the corresponding weights are performed in turn to obtain the first sub-evaluation data. Referring to the above calculation steps for the first object to be decorated, the calculation is performed for the second object to be decorated, and the first decoration scheme is calculated according to the second evaluation information to obtain the second sub-evaluation data. Since there are the first object to be decorated and the second object to be decorated in the first decoration scheme, the first sub-evaluation data corresponding to the first object to be decorated and the second sub-evaluation data corresponding to the second object to be decorated are obtained in turn, and the first sub-evaluation data and the second sub-evaluation data are added to obtain the first evaluation data. At this time, the first evaluation data can fully reflect the overall evaluation score of the corresponding decoration scheme.

[0049] S105: When the first evaluation data is greater than the second evaluation data, confirming that the first decoration scheme is to be displayed to the target user.

[0050] In the above S105, after determining the first evaluation data corresponding to the first decoration scheme, before judging whether the first evaluation data is greater than the second evaluation data, the second evaluation data must be determined first, and the second evaluation data is the evaluation data corresponding to the best decoration scheme among multiple decoration schemes except the first decoration scheme.

[0051] In addition, the second object is determined from the second decoration scheme, and the third evaluation information is determined according to the second object. The second decoration scheme is any one of the multiple decoration schemes except the first decoration scheme; the second decoration scheme is processed according to the third evaluation information to obtain the second evaluation data, and the second evaluation data is the evaluation data ranked first in the target sorting result. The target sorting result is obtained by sorting the multiple evaluation data in order from large to small, and the multiple evaluation data are the evaluation data obtained by processing the other decoration schemes except the first decoration scheme in the multiple decoration schemes. Specifically, one is selected from the multiple decoration schemes as the second decoration scheme, and the second decoration scheme is any one of the decoration schemes except the first decoration scheme. The second decoration scheme is then parsed to determine one or more key objects as the second object. The second object may be a part of a building, a certain area of ​​a garden landscape, a specific garden facility, etc. The third evaluation information is then determined according to the second object, and the corresponding evaluation indicators are determined according to the characteristics and decoration requirements of the second object. The evaluation indicators include structural stability, environmental adaptability, cost-effectiveness, and rationality of material selection. The collected evaluation indicators are then used to generate the third evaluation information. The second object can also be extracted to obtain the corresponding third object to be decorated, and then the third object to be decorated is input into the preset evaluation database for matching to obtain the third evaluation information. Different weights are then assigned to the corresponding indicators of the third evaluation information, and then the data obtained after the second decoration scheme is carried out on the target building and garden are obtained, and the data are calculated with the corresponding weights to obtain the second evaluation data. At this time, the second evaluation data can also generate multiple evaluation data by performing similar evaluations on other decoration schemes except the first decoration scheme in multiple decoration schemes. Then, the multiple evaluation data are sorted according to the predetermined sorting criteria, and the sorting results should be arranged in order from large to small. Find the evaluation data corresponding to the first one in the sorting results, and define the data as the second evaluation data. The second decoration scheme corresponding to the second evaluation data performs best among all the evaluated decoration schemes (except the first decoration scheme).

[0052] Further, after determining the second evaluation data, when comparing the size relationship between the first evaluation data and the second evaluation data, it is necessary to first determine whether there is a small difference between the evaluation results corresponding to the first decoration scheme and the second decoration scheme, and then display the pictures corresponding to each decoration scheme to the user based on the small difference, obtain feedback scores through display, and finally output the corresponding decoration scheme based on the scores, specifically including: obtaining a target difference, the target difference is the difference between the first evaluation data and the second evaluation data; judging whether the target difference is less than or equal to a preset threshold; when the target difference is less than or equal to the preset threshold, confirming to process the first decoration scheme and the second decoration scheme; processing the first decoration scheme to obtain a first decoration picture; processing the second decoration scheme to obtain a second decoration picture; displaying the first decoration picture and the second decoration picture, if the first score is greater than the second score, confirming to output the first decoration scheme to the target user, the first score is the score corresponding to the first decoration scheme, and the second score is the score corresponding to the second decoration scheme. Specifically, first obtain the first evaluation data and the second evaluation data, and then calculate the difference between the first evaluation data and the second evaluation data to obtain the final target difference. Then determine whether the target difference is less than or equal to a preset threshold value, which is a standard for determining whether the difference between the two decoration schemes is small enough. When the target difference is less than or equal to the preset threshold value, that is, the two decoration schemes are very close in evaluation, then the two schemes need to be further processed for more detailed comparison and selection. Design software and tools can be used to generate a detailed decoration picture according to the specific content of the first decoration scheme. This picture should be able to intuitively show the effect of the decoration scheme. Based on the specific requirements of the first decoration scheme, material selection, color matching, space layout and other designs can be carried out. After the design is completed, rendering is performed to generate a high-quality first decoration picture. Similar to the first decoration scheme, the above processing of the first decoration scheme is repeated, and the second decoration scheme is processed to generate a second decoration picture. The two decoration pictures are displayed to the target users, and the decoration pictures can be displayed in various ways such as online platforms, virtual reality devices, and physical displays. Then design a reasonable scoring questionnaire or scoring standard to ensure the objectivity and fairness of the scoring. Then obtain the first score corresponding to the first decoration scheme and the second score corresponding to the second decoration scheme respectively. The first score is compared with the second score, and when the first score is greater than the second score, the first decoration scheme is output to the target user. When the first score is less than the second score, the second decoration scheme is output to the target user.

[0053] For example, if the target difference is 4, the preset threshold is set to 5, and the target difference is less than or equal to the preset threshold, corresponding decorative pictures are generated for the first decoration scheme and the second decoration scheme respectively, and then the first decoration picture a and the second decoration picture b are displayed using a questionnaire, and a preset time period for the display is set. After the preset time period, the first score corresponding to the first decoration picture a and the second score corresponding to the second decoration picture b are obtained, and then the first score is compared with the second score, and the corresponding decoration scheme is output according to the score comparison result.

[0054] Furthermore, if the target difference is greater than the preset threshold and the first evaluation data is greater than the second evaluation data, it is confirmed that the first decoration scheme is output to the target user; if the target difference is greater than the preset threshold and the first evaluation data is less than the second evaluation data, it is confirmed that the second decoration scheme is output to the target user. Specifically, when the target difference is greater than the preset threshold, the size of the first evaluation data and the second evaluation data needs to be compared, and which evaluation data is larger is determined according to the comparison result. When the first evaluation data is greater than the second evaluation data, it is confirmed that the first decoration scheme is output to the target user. This means that in the comprehensive evaluation, the performance of the first decoration scheme is better than that of the second decoration scheme. On the contrary, if the first evaluation data is less than the second evaluation data, it is confirmed that the second decoration scheme is output to the target user. This means that in the comprehensive evaluation, the performance of the second decoration scheme is better. According to the selected decoration scheme (the first decoration scheme or the second decoration scheme), prepare relevant design documents, material lists, construction instructions, etc. Output the decoration scheme to the target user in an appropriate manner. This may include sending an email, providing a download link, printing into a book, etc. After outputting the scheme, feedback from the target user can be collected to further improve and optimize the decoration scheme.

[0055] The present application also provides a device for evaluating ancient building garden decoration schemes. Figure 2 This is a schematic diagram of a device for evaluating ancient building garden decoration schemes provided by the present application, with reference to Figure 2 The device is a server, and the server includes an acquisition unit 201, a processing unit 202 and a confirmation unit 203.

[0056] The acquisition unit 201 acquires target information corresponding to the target building and garden, wherein the target information includes cultural background information, architectural style feature information, spatial layout information, and protection demand information.

[0057] The processing unit 202 generates multiple decoration schemes according to the target information; obtains a first decoration scheme from the multiple decoration schemes, determines a first object from the first decoration scheme, and determines target evaluation information according to the first object; processes the first decoration scheme according to the target evaluation information to obtain first evaluation data.

[0058] The confirmation unit 203 confirms that the first decoration scheme is displayed to the target user when the first evaluation data is greater than the second evaluation data.

[0059] In a possible implementation, the processing unit 202 is used to determine the type to be decorated from the target building garden, the type to be decorated including building type, garden landscape type, garden facility type and cultural heritage type; and generate multiple decoration schemes according to the type to be decorated and the target information.

[0060] In a possible implementation, the processing unit 202 is used to extract the first decoration scheme to obtain a first object to be decorated and a second object to be decorated; the first object to be decorated is input into a preset evaluation database for matching to obtain first evaluation information; the second object to be decorated is then input into the preset evaluation database for matching to obtain second evaluation information, and the first object includes the first object to be decorated and the second object to be decorated; the first evaluation information and the second evaluation information are output as target evaluation information, and the target evaluation information includes structural stability information, environmental information, cost information, material information and structural safety information.

[0061] In a possible implementation, the processing unit 202 is used to process the first decoration scheme according to the first evaluation information to obtain first sub-evaluation data; process the first decoration scheme according to the second evaluation information to obtain second sub-evaluation data; calculate the first sub-evaluation data and the second sub-evaluation data to obtain first evaluation data.

[0062] In a possible implementation, the processing unit 202 is used to determine a second object from a second decoration scheme, determine third evaluation information based on the second object, the second decoration scheme being any one of a plurality of decoration schemes except the first decoration scheme; the second decoration scheme is processed according to the third evaluation information to obtain second evaluation data, the second evaluation data being the evaluation data ranked first in a target sorting result, the target sorting result being obtained by sorting a plurality of evaluation data in descending order, and the plurality of evaluation data being evaluation data obtained by processing other decoration schemes among a plurality of decoration schemes except the first decoration scheme.

[0063] In a possible implementation, the acquisition unit 201 is used to acquire a target difference, where the target difference is the difference between the first evaluation data and the second evaluation data; the processing unit 202 is used to determine whether the target difference is less than or equal to a preset threshold; the confirmation unit 203 is used to confirm that the first decoration scheme and the second decoration scheme are to be processed when the target difference is less than or equal to the preset threshold; the processing unit 202 is used to process the first decoration scheme to obtain a first decorative picture; the second decoration scheme is processed to obtain a second decorative picture; the confirmation unit 203 is used to display the first decorative picture and the second decorative picture, and if the first score is greater than the second score, it is confirmed that the first decoration scheme is output to the target user, the first score is the score corresponding to the first decoration scheme, and the second score is the score corresponding to the second decoration scheme.

[0064] In one possible implementation, the confirmation unit 203 is used to confirm that the first decoration scheme is output to the target user if the target difference is greater than a preset threshold and the first evaluation data is greater than the second evaluation data; the confirmation unit 203 is used to confirm that the second decoration scheme is output to the target user if the target difference is greater than a preset threshold and the first evaluation data is less than the second evaluation data.

[0065] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0066] The present application also discloses an electronic device. Figure 3 , Figure 3 The electronic device 300 may include: at least one processor 301 , at least one network interface 304 , a user interface 303 , a memory 305 , and at least one communication bus 302 .

[0067] The communication bus 302 is used to realize the connection and communication between these components.

[0068] The user interface 303 may include a display screen (Display) and a camera (Camera). Optionally, the user interface 303 may also include a standard wired interface and a wireless interface.

[0069] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0070] Among them, the processor 301 may include one or more processing cores. The processor 301 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the processor 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application requests; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 301, and it can be implemented separately through a chip.

[0071] Among them, the memory 305 may include a random access memory (RAM) or a read-only memory (Read-Only Memory). Optionally, the memory 305 includes a non-transitory computer-readable storage medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area. Instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc. can be stored; the data storage area can store data involved in the above-mentioned various method embodiments, etc. The memory 305 can also be optionally at least one storage device located away from the aforementioned processor 301.

[0072] like Figure 3 As shown, the memory 305 as a computer storage medium may include an operating system, a network communication module, a user interface module, and an application program for evaluating the ancient building garden decoration scheme.

[0073] exist Figure 3In the electronic device 300 shown, the user interface 303 is mainly used to provide an input interface for the user and obtain data input by the user; and the processor 301 can be used to call the application for evaluating the ancient building garden decoration scheme stored in the memory 305. When executed by one or more processors, the electronic device executes one or more methods described in the above embodiments.

[0074] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the order of the actions described, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0075] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0076] In the several embodiments provided in the present application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0077] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0078] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0079] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.

[0080] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, it will be easy for those skilled in the art to think of other embodiments of the present disclosure. This application is intended to cover any variation, use or adaptive change of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field that are not recorded in the present disclosure.

Claims

1. A method for evaluating ancient architectural garden decoration schemes, characterized in that: Applied in a server, the method comprises: Obtaining target information corresponding to the target building and garden, wherein the target information includes cultural background information, architectural style feature information, spatial layout information, and protection demand information; generating a plurality of decoration schemes according to the target information; Acquire a first decoration scheme from the plurality of decoration schemes, determine a first object from the first decoration scheme, and determine target evaluation information according to the first object; Processing the first decoration scheme according to the target evaluation information to obtain first evaluation data; When the first evaluation data is greater than the second evaluation data, it is confirmed that the first decoration scheme is displayed to the target user.

2. The method according to claim 1, characterized in that The step of generating a plurality of decoration schemes according to the target information specifically includes: Determining the type to be decorated from the target building and garden, the type to be decorated including building type, garden landscape type, garden facility type and cultural heritage type; A plurality of decoration schemes are generated according to the type to be decorated and the target information.

3. The method according to claim 2, characterized in that The step of determining a first object from the first decoration scheme and determining target evaluation information according to the first object specifically includes: Extract the first decoration scheme to obtain a first object to be decorated and a second object to be decorated; Inputting the first object to be decorated into a preset evaluation database for matching to obtain first evaluation information; Then, the second object to be decorated is input into the preset evaluation database for matching to obtain second evaluation information, wherein the first object includes the first object to be decorated and the second object to be decorated; The first evaluation information and the second evaluation information are output as the target evaluation information, and the target evaluation information includes structural stability information, environmental information, cost information, material information and structural safety information.

4. The method according to claim 3, characterized in that The processing of the first decoration scheme according to the target evaluation information to obtain first evaluation data specifically includes: Processing the first decoration scheme according to the first evaluation information to obtain first sub-evaluation data; Processing the first decoration scheme according to the second evaluation information to obtain second sub-evaluation data; The first sub-evaluation data and the second sub-evaluation data are calculated to obtain the first evaluation data.

5. The method according to claim 1, characterized in that Before the first evaluation data is greater than the second evaluation data, the method further includes: Determine a second object from a second decoration scheme, and determine third evaluation information according to the second object, wherein the second decoration scheme is any one of the plurality of decoration schemes except the first decoration scheme; The second decoration scheme is processed according to the third evaluation information to obtain the second evaluation data, the second evaluation data is the evaluation data ranked first in the target sorting result, the target sorting result is obtained by sorting multiple evaluation data in order from large to small, and the multiple evaluation data are the evaluation data obtained by processing other decoration schemes among the multiple decoration schemes except the first decoration scheme.

6. The method according to claim 5, characterized in that After the second decoration scheme is processed according to the third evaluation information to obtain the second evaluation data, the method further includes: Acquire a target difference, where the target difference is the difference between the first evaluation data and the second evaluation data; Determining whether the target difference is less than or equal to a preset threshold; When the target difference is less than or equal to the preset threshold, confirming to process the first decoration scheme and the second decoration scheme; Processing the first decoration scheme to obtain a first decoration picture; Processing the second decoration scheme to obtain a second decoration picture; The first decoration picture and the second decoration picture are displayed. If the first score is greater than the second score, it is confirmed that the first decoration scheme is output to the target user. The first score is the score corresponding to the first decoration scheme, and the second score is the score corresponding to the second decoration scheme.

7. The method according to claim 6, characterized in that After determining whether the target difference is less than or equal to a preset threshold, the method further includes: If the target difference is greater than the preset threshold, and the first evaluation data is greater than the second evaluation data, confirming to output the first decoration scheme to the target user; If the target difference is greater than the preset threshold and the first evaluation data is less than the second evaluation data, it is confirmed to output the second decoration scheme to the target user.

8. An evaluation device for ancient building garden decoration schemes, characterized in that: The device is a server, and the server comprises an acquisition unit (201), a processing unit (202) and a confirmation unit (203); The acquisition unit (201) acquires target information corresponding to the target building and garden, wherein the target information includes cultural background information, architectural style feature information, spatial layout information and protection demand information; The processing unit (202) generates a plurality of decoration schemes according to the target information; Acquire a first decoration scheme from the plurality of decoration schemes, determine a first object from the first decoration scheme, and determine target evaluation information according to the first object; process the first decoration scheme according to the target evaluation information to obtain first evaluation data; The confirmation unit (203) confirms that the first decoration scheme is to be displayed to a target user when the first evaluation data is greater than the second evaluation data.

9. An electronic device, characterized in that: The electronic device (300) comprises a processor (301), a memory (305), a user interface (303) and a network interface (304), wherein the memory (305) is used to store instructions, the user interface (303) and the network interface (304) are used to communicate with other devices, and the processor (301) is used to execute the instructions stored in the memory (305) so that the electronic device (300) executes the method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores instructions, and when the instructions are executed, the method according to any one of claims 1 to 7 is executed.