Intelligent power distribution method and device for electric meter box, power distribution meter and electronic equipment

By designing the intelligent power distribution method of the meter box in the intelligent system of the whole house, the energy storage system and power generation system are used to control the power distribution meter to the target power equipment power supply, solve the problem of insufficient power supply voltage during the peak power period, and improve the whole house. Intelligence and user experience.

CN119340991AInactive Publication Date: 2025-01-21SHANTOU LIDE ELECTRIC CO LTD

Patent Information

Application Number
CN202411558686.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-04
Publication Date
2025-01-21
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing whole-house intelligent system, the distribution meter is not intelligently configured, resulting in insufficient power supply voltage during peak electricity consumption, affecting the experience of whole-house intelligent users.

Method used

Design an intelligent power distribution method of a meter box. Through multiple input and output connectors of the distribution meter, combining energy storage systems and power generation systems, obtaining electricity equipment and power supply data, and judging the power supply voltage, controlling the target electricity equipment equipment powered by.

Benefits of technology

It effectively avoids the problem of equipment not working properly due to insufficient power supply voltage during peak periods of electricity consumption, and improves the intelligence and user experience of the whole house.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119340991A_ABST
    Figure CN119340991A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of whole-house intelligent power distribution, and provides an intelligent power distribution method and device for an electric meter box, a power distribution meter and electronic equipment. The method comprises the following steps: acquiring data of electric equipment, wherein the data of the electric equipment comprises the state of the electric equipment and the working voltage of the electric equipment; acquiring power supply data, wherein the power supply data comprises voltage data transmitted to the first input connector by a power grid, voltage data transmitted to the second input connector by a power generation system and voltage data transmitted to the third input connector by an energy storage system; judging whether the power supply voltage is insufficient or not based on the data of the electric equipment and the power supply data; and when determining that the power supply voltage is insufficient, controlling to supply power to the target electric equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of whole-house intelligent power distribution, and in particular to an intelligent power distribution method, device, power distribution meter and electronic equipment for an electric meter box. Background Art

[0002] Whole-house intelligence refers to a system that connects and integrates various devices and systems in the home through intelligent technology and the Internet to achieve intelligent management and control. It covers many aspects of smart homes and aims to improve the convenience, safety and comfort of life.

[0003] In the related technologies, the whole house intelligence mainly configures various electrical equipment intelligently, but does not configure the power distribution meter intelligently. The electrical equipment in the house is powered by the power distribution meter, resulting in the need to improve the intelligence level of the whole house, especially in the peak period of electricity consumption in summer, insufficient power supply voltage may cause the electrical equipment in the house to not work properly, affecting the user experience of the whole house intelligence. Summary of the invention

[0004] The present application aims to solve at least one of the technical problems existing in the related art. To this end, the present application proposes an intelligent power distribution method and device for an electric meter box, a power distribution meter and an electronic device.

[0005] The intelligent power distribution method of an electric meter box according to the first aspect of the present application is applied to an electric distribution meter, wherein the electric distribution meter comprises a first input connector, a second input connector, a third input connector, a first output connector, and a plurality of second output connectors, wherein the first input connector is used to connect to a power grid, the second input connector is used to connect to a power generation system, an energy storage system is connected between the first output connector and the third input connector, and different second output connectors are used to connect to different electrical equipment;

[0006] The electric meter box intelligent power distribution method comprises:

[0007] Acquire data of the electric device, wherein the data of the electric device includes a state of the electric device and an operating voltage of the electric device;

[0008] Acquire power supply data, the power supply data including voltage data transmitted from the power grid to the first input connector, voltage data transmitted from the power generation system to the second input connector, and voltage data transmitted from the energy storage system to the third input connector;

[0009] Based on the data of the electrical equipment and the power supply data, determining whether the power supply voltage is insufficient;

[0010] When it is determined that the power supply voltage is insufficient, the power supply to the target power-consuming device is controlled.

[0011] According to an embodiment of the present application, when it is determined that the power supply voltage is insufficient, the step of controlling the supply of power to the target power-consuming device includes:

[0012] Determine the target electrical device based on the first user input instruction, the location of the electrical device, the location of the user, and environmental data;

[0013] Controlling the supply of power to the target electrical device.

[0014] According to an embodiment of the present application, when it is determined that the power supply voltage is insufficient, the step of controlling the supply of power to the target power-consuming device includes:

[0015] Based on the second user input instruction, determining the first target area and the target environment brightness;

[0016] Determining a target light-emitting component based on the target environment brightness and the current environment brightness of the first target area;

[0017] Controlling the supply of power to the target light emitting element.

[0018] According to an embodiment of the present application, the electrical equipment includes a plurality of fans and a plurality of air conditioners, and when it is determined that the power supply voltage is insufficient, the step of controlling the power supply to the target electrical equipment includes:

[0019] Based on a third user input instruction, determining a second target area and a target ambient temperature;

[0020] determining a target fan and a target air conditioner based on the target ambient temperature and the current ambient temperature of the second target area;

[0021] Control the power supply to the target fan and the target air conditioner.

[0022] According to the distribution meter of the second aspect embodiment of the present application, which is installed on a wall, the distribution meter includes a first input connector, a second input connector, a third input connector, a first output connector and multiple second output connectors, the first input connector is used to connect to the power grid, the second input connector is used to connect to the power generation system, an energy storage system is connected between the first output connector and the third input connector, and different second output connectors are used to connect different electrical equipment.

[0023] According to the third aspect of the embodiment of the present application, the intelligent power distribution device includes a power generation system, an energy storage system and the distribution meter as described in claim 5, the power generation system is connected to the second input connector, the first output connector is connected to the energy storage system, and the energy storage system is connected to the third input connector.

[0024] According to an electronic device of the fourth aspect of the present application, the electronic device includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and the processor implements the above-mentioned control method when executing the computer program.

[0025] According to the non-transitory computer-readable storage medium of the fifth aspect embodiment of the present application, the non-transitory computer-readable storage medium includes a computer program, and the computer program implements the above-mentioned control method when executed by the processor.

[0026] According to the computer program product of the sixth aspect of the present application, the computer program product includes a computer program, and when the computer program is executed by the processor, the above-mentioned control method is implemented.

[0027] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0029] Figure 1 It is a flow chart of the intelligent power distribution method of the electric meter box provided by the present invention;

[0030] Figure 2 It is a structural schematic diagram of the power distribution meter provided by the present invention;

[0031] Figure 3 It is a schematic diagram of the structure of the photovoltaic power generation device provided by the present invention;

[0032] Figure 4 This is one of the partial structural schematic diagrams of the photovoltaic power generation device provided by the present invention;

[0033] Figure 5 This is the second schematic diagram of a partial structure of the photovoltaic power generation device provided by the present invention;

[0034] Figure 6 is a schematic diagram of the structure of an electronic device provided by the present invention;

[0035] Figure 7 This is one of the cross-sectional views of the photovoltaic power generation device provided by the present invention;

[0036] Figure 8 is a top view of the photovoltaic power generation device provided by the present invention;

[0037] Fig. 9 This is the second cross-sectional view of the photovoltaic power generation device provided by the present invention. DETAILED DESCRIPTION

[0038] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0039] The embodiments of the present application provide embodiments of the control method. It should be noted that although the logical order is shown in the flow chart, under certain data, the steps shown or described can be completed in an order different from that here.

[0040] Before introducing the control method of the embodiment of the present application, the application scenario of the control method is first explained. The control method of the present application can be applied to smart terminals such as smart phones, tablets and computers, and can also be applied to servers. The present application does not make any special limitations here, as long as the control method of the present application can be carried and implemented.

[0041] The following description will be given by applying the control method to the server side, but it should be understood that the control method is not limited to being applied only to the server side.

[0042] Combine the following Figures 1 to 9 The present invention describes the intelligent power distribution method, device, power distribution meter and electronic equipment of the electric meter box.

[0043] According to the embodiment of the first aspect of the present application, Figure 1 and Figure 2 As shown, the intelligent power distribution method of the meter box is applied to the power distribution meter, which includes a first input connector, a second input connector, a third input connector, a first output connector and a plurality of second output connectors, the first input connector is used to connect to the power grid, the second input connector is used to connect to the power generation system, an energy storage system is connected between the first output connector and the third input connector, and different second output connectors are used to connect to different electrical equipment;

[0044] The intelligent power distribution method of the meter box includes:

[0045] Step 101: Acquire data of an electric device, where the data of the electric device includes a state of the electric device and an operating voltage of the electric device.

[0046] It is understandable that by acquiring the data of the electrical equipment, the status, working voltage, location and other information of the electrical equipment can be determined. Based on the status of the electrical equipment, it can be determined whether the electrical equipment is in working state, and then whether the electrical equipment needs voltage supply; based on the working voltage of the electrical equipment, combined with the working state of the electrical equipment, the total voltage required by the electrical equipment can be determined.

[0047] Step 102 : Acquire power supply data, the power supply data including voltage data transmitted from the power grid to the first input connector, voltage data transmitted from the power generation system to the second input connector, and voltage data transmitted from the energy storage system to the third input connector.

[0048] It can be understood that the power grid transmits voltage to the first input connector, the power generation system transmits voltage to the second input connector, and the energy storage system can transmit voltage to the third input connector. When the power supply voltage of the power grid is insufficient, the power generation system and the energy storage system can be used to supplement the power supply. Therefore, the sum of the input voltages at the first input connector, the second input connector and the third input connector is the total voltage obtained by the distribution meter.

[0049] Step 103: Based on the data of the electrical equipment and the power supply data, determine whether the power supply voltage is insufficient.

[0050] It is understandable that the total voltage required by all electrical devices can be determined based on the data of the electrical devices, and the total power supply voltage can be determined based on the power supply data, and further it can be determined whether the power supply voltage is insufficient.

[0051] Step 104: When it is determined that the power supply voltage is insufficient, control the supply of power to the target electrical equipment.

[0052] It is understandable that when it is determined that the power supply voltage is insufficient, it means that the power supply voltage is insufficient to supply all electrical devices for normal operation, so the power supply to the target electrical device is controlled first to ensure the normal operation of the target electrical device.

[0053] According to the intelligent power distribution method of the meter box of the embodiment of the present application, the total voltage delivered to the distribution meter can be determined based on the power consumption data, and the total voltage required by the power equipment can be determined based on the data of the power equipment. By comparing the two total voltages, it can be determined whether the power supply voltage is insufficient. When the total voltage delivered to the distribution meter is greater than the total voltage required by the power equipment, it means that the power supply voltage is sufficient, and the distribution meter is controlled to supply power to the power equipment normally. When the total voltage delivered to the distribution meter is less than the total voltage required by the power equipment, it means that the power supply voltage is insufficient, and the distribution meter is controlled to supply power to the target power equipment to ensure that the target power equipment can work normally, so as to avoid the power equipment in the house from not working properly during the peak power consumption period, thereby ensuring the experience of smart users throughout the house.

[0054] It is understandable that the target power-consuming equipment list may be preset by the user in advance, or may be determined in real time based on the data of the power-consuming equipment.

[0055] In some embodiments, when it is determined that the power supply voltage is insufficient, the step of controlling the supply of power to the target power-consuming device includes:

[0056] Determine a target electrical device based on the first user input instruction, the location of the electrical device, the location of the user, and environmental data;

[0057] Control the power supply to the target electrical equipment.

[0058] It can be understood that, according to the first user input instruction input by the user, the target type of electrical equipment can be determined, that is, it can be determined which types of electrical equipment the user wants to ensure to operate normally, such as computers or air conditioners.

[0059] Based on the location and environmental data of the electric device, the environmental data of the location of the electric device can be determined, and then it can be determined whether to determine the corresponding electric device as the target electric device. For example, when the electric device is a light bulb, based on the brightness of the ambient light at the location of the light bulb, it can be determined whether to determine the light bulb as the target electric device. When the brightness of the ambient light is greater than a threshold, the light bulb is not determined as the target electric device, and when the brightness of the ambient light is lower than the threshold, the light bulb is determined as the target electric device.

[0060] According to the user's location, the target electrical equipment can be further determined. For example, when the user is in the master bedroom, the light bulb in the master bedroom is determined as the target electrical equipment, while the light bulbs in other rooms are determined as non-target electrical equipment.

[0061] Specifically, the computer, light bulb and air conditioner are first determined as preliminary power-consuming equipment according to the first user input instruction, and then the preliminary power-consuming equipment is further subdivided according to the user's location, and the computer and the light bulb and air conditioner in the user's area are determined as secondary power-consuming equipment. Then, based on the environmental data, it is determined whether the light bulb and air conditioner are the target power-consuming equipment, and then the specific power-consuming equipment is determined.

[0062] In some embodiments, when it is determined that the power supply voltage is insufficient, the step of controlling the supply of power to the target power-consuming device includes:

[0063] Based on the second user input instruction, determining the first target area and the target environment brightness;

[0064] Determining a target light-emitting element based on the target environment brightness and the current environment brightness of the first target area;

[0065] Control the power supply to the target light emitting element.

[0066] It is understandable that the user can determine an area that he wants to prioritize according to his own needs, that is, according to the second user input instruction, the area where the user wants to ensure power supply is determined as the first target area, and at the same time, according to the second user input instruction, the ambient brightness that the user wants, that is, the target ambient brightness, is determined.

[0067] Then, the current ambient brightness of the first target area is obtained, and the target ambient brightness is compared with the current ambient brightness of the first target area. When the target ambient brightness is greater than the current ambient brightness, the light-emitting component at the first target area is determined as the target light-emitting component. When the target ambient brightness is not greater than the current ambient brightness, the light-emitting component at the first target area is not determined as the target light-emitting component.

[0068] In some embodiments, the electric device includes a plurality of fans and a plurality of air conditioners, and when it is determined that the power supply voltage is insufficient, the step of controlling the power supply to the target electric device includes:

[0069] Based on a third user input instruction, determining a second target area and a target ambient temperature;

[0070] Determining a target fan and a target air conditioner based on the target ambient temperature and the current ambient temperature of the second target area;

[0071] Control the power supply to the target fan and the target air conditioner.

[0072] It is understandable that the user can determine an area that he wants to prioritize protection according to his own needs, that is, according to the third user input instruction, the area where the user wants to ensure power supply is determined as the second target area, and at the same time, according to the third user input instruction, the user's desired ambient temperature, that is, the target ambient temperature, is determined.

[0073] Then, the current ambient temperature of the second target area is obtained, and the target ambient temperature is compared with the current ambient temperature of the second target area. When the target ambient temperature is greater than the current ambient temperature, the air conditioner and fan in the second target area are determined as target light-emitting components. When the target ambient temperature is not greater than the current ambient temperature, the light-emitting components in the second target area are not determined as target light-emitting components.

[0074] Exemplarily, the second target area includes multiple rooms, and the target ambient temperature and current ambient temperature of each room are obtained to further determine whether the air conditioner and fan in each room are target electrical devices.

[0075] In some embodiments, the electric meter box intelligent power distribution method further includes:

[0076] determining actual power consumption based on the output data of the second output connector;

[0077] Determine that the actual power consumption is greater than the standard power consumption;

[0078] Send out an alarm message and control the power distribution meter to stop supplying power.

[0079] It is understandable that the second output connector mainly supplies power to the electrical equipment, and then the actual power consumption can be determined through the output data of the second output connector. At the same time, the standard power consumption can be determined based on the data of the electrical equipment. It can then be determined whether the actual power consumption is greater than the standard power consumption. When it is determined that the actual power consumption is greater than the standard power consumption, it means that an abnormal situation such as leakage may have occurred at this time, and then the alarm information is controlled to be issued and the power distribution meter is controlled to stop power supply to ensure safety.

[0080] According to an embodiment of the second aspect of the present application, Figure 2 As shown, the distribution meter is installed on the wall, and includes a first input connector, a second input connector, a third input connector, a first output connector and multiple second output connectors. The first input connector is used to connect to the power grid, the second input connector is used to connect to the power generation system, an energy storage system is connected between the first output connector and the third input connector, and different second output connectors are used to connect to different electrical equipment.

[0081] According to the power distribution meter of the embodiment of the present application, the first input connector is connected to the power grid, so that the power distribution meter can use the power supply of the power grid to supply electricity to the electrical equipment. The second input connector is powered by the power generation system, so that the power distribution meter can use the power generation system to supplement the power supply to the electrical equipment, and can also use the power generation system to charge the energy storage system. The energy storage system is connected between the first output connector and the third input connector, so that the energy storage system can not only receive the power from the power generation system to realize power supply, but also transmit its own power to the electrical equipment through the power distribution meter to realize supplementary power supply to the electrical equipment, so as to ensure that the electrical equipment can work normally, reduce the impact of peak power consumption, avoid the electrical equipment in the house from being unable to work normally during peak power consumption, and ensure the user experience of the whole house smart.

[0082] According to an embodiment of the third aspect of the present application, Figure 2 As shown, the intelligent power distribution device includes a power generation system, an energy storage system and the above-mentioned power distribution meter, the power generation system is connected to the second input connector, the first output connector is connected to the energy storage system, and the energy storage system is connected to the third input connector.

[0083] In some embodiments, Figure 3 , Figure 7 and Figure 8 As shown, the power generation system includes a photovoltaic power generation device, and the photovoltaic power generation device includes:

[0084] The main body 1 is suitable for being installed on a roof. The main body 1 is formed with an installation cavity 11. The main body 1 is formed with a first air duct 12. The air outlet of the first air duct 12 is connected to the installation cavity 11.

[0085] The wind power generation module 5 is arranged in the installation cavity 11;

[0086] A first wind collecting cover 6 is installed on the main body 1, and an air outlet of the first wind collecting cover 6 is connected with an air inlet of the first air duct 12, and the first wind collecting cover 6 is suitable for guiding external wind to the first air duct 12;

[0087] A main power supply 7 and a backup power supply 8, both of which are electrically connected to the wind power generation module 5;

[0088] A sound absorbing and sound insulating component 2 is provided on the main body 1;

[0089] An indicator light 9 is provided on the body 1;

[0090] An active vibration reduction component 10 is provided on the body 1, and the active vibration reduction component 10 is used to generate vibration to offset the vibration of the body 1;

[0091] The control component, the wind power generation module 55, the main power supply 7, the backup power supply 8, the indicator light 9 and the active vibration reduction component 10 are all electrically connected to the control component.

[0092] According to the photovoltaic power generation device of the embodiment of the present application, the main body 1 is installed on the roof, so that the first wind collecting cover 6 can collect the wind on the roof, so that the wind on the roof is collected and transported to the installation cavity 11 along the first wind duct 12, so that the wind power generation module 5 can use wind power to generate electricity, and the wind power generation efficiency is improved. After the wind power generation module 5 generates electricity, it can charge the main power supply 7 and / or the backup power supply 8, so that the photovoltaic power generation device has a power generation function. The main power supply 7 and the backup power supply 8 can power the indicator light 9 and the active vibration reduction component 10, so that the indicator light 9 and the active vibration reduction component 10 can rely on the photovoltaic power generation device itself to work normally.

[0093] The sound-absorbing and sound-insulating component 2 can effectively isolate noise. When the noise on the roof is loud, the active vibration reduction component 10 can be controlled to start working. The active vibration reduction component 10 can effectively reduce the vibration of the photovoltaic power generation device, thereby preventing the photovoltaic power generation device from emitting noise, and can effectively block the transmission of noise.

[0094] It can be understood that installing the wind power generation module 5 in the installation cavity 11 of the main body 1 can reduce the impact of the external environment on the wind power generation module 5 and can effectively extend the service life of the wind power generation module 5 .

[0095] It can be understood that the wind on the roof is gathered by the first wind gathering hood 6 so that the wind is more concentratedly delivered to the wind power generation module 5, thereby effectively improving the power generation efficiency.

[0096] In some embodiments, the cross-sectional area of ​​the first air duct 12 gradually decreases along the direction from the first air collecting cover 6 to the installation cavity 11 .

[0097] It can be understood that the wind from the roof enters the first air duct 12 after passing through the first wind collecting hood 6, and then the wind will flow along the first air duct 12 to the installation cavity 11. Since the cross-sectional area of ​​the first air duct 12 gradually decreases along the flow direction of the wind, the wind speed gradually increases, thereby increasing the wind speed flowing into the installation cavity 11, which can improve the efficiency of wind power generation.

[0098] In some embodiments, the air inlet of the first air collecting cover 6 faces a first direction, and the first direction is the same as the length direction of the main body 1 .

[0099] In some embodiments, the photovoltaic power generation device includes a second wind concentrator, which is connected to the main body 1. The air inlet of the second wind concentrator faces a second direction, the second direction is perpendicular to the length direction of the main body 1, and the air outlet of the second wind concentrator is connected to the first air duct 12.

[0100] It is understandable that when the photovoltaic power generation device is located at a location with crosswind, a second wind collecting hood can be set at the main body 1 so that the second wind collecting hood can collect wind whose flow direction is perpendicular to the length direction of the main body 1, so that the photovoltaic power generation device can make full use of wind resources to generate electricity.

[0101] In some embodiments, Fig. 9 As shown, the body 1 is formed with a second air duct 13 , and the guide section 121 of the first air duct 12 is connected to the outside through the second air duct 13 , and the cross-sectional area of ​​the guide section 121 is smaller than the cross-sectional area of ​​the air outlet of the first air duct 12 .

[0102] It can be understood that the cross-sectional area of ​​the air outlet of the first air duct 12 is larger than the cross-sectional area of ​​the guide section 121 of the first air duct 12, and the gas flow rate at the air outlet of the first air duct 12 will be smaller than the gas flow rate at the guide section 121. The second air duct 13 is connected to the guide section 121 of the first air duct 12. Then, under the action of negative pressure, the external air flow will flow into the first air duct 12 through the second air duct 13, and then flow out from the air outlet of the first air duct 12 together, thereby increasing the air outlet at the air outlet of the first air duct 12, which can effectively improve the wind power generation effect.

[0103] In some embodiments, the guide section 121 is located at a position where the cross-sectional area of ​​the first air duct 12 is the smallest.

[0104] It can be understood that the second air duct 13 connects the position with the smallest cross-sectional area of ​​the first air duct 12 and the outside world, thereby ensuring that the gas flow rate at the drainage section 121 is the fastest in the entire first air duct 12, so that a negative pressure can be formed in the second air duct 13, ensuring that the external gas can flow into the first air duct 12 through the second air duct 13 under the action of negative pressure.

[0105] In some embodiments, Figure 3 , Figure 4 and Figure 5 As shown, the sound absorbing and sound insulating assembly 2 includes a sound absorbing structure and a sound insulating structure, the sound insulating structure is located between the sound absorbing structure and the body 1, the sound absorbing structure includes a sound absorbing shell 3, the sound absorbing shell 3 forms a sound absorbing cavity, the side wall surface of the sound absorbing shell 3 is provided with an opening, along the direction from the opening to the sound insulating structure, a foam aluminum plate 31, an air layer 32 and a partition 33 are sequentially arranged in the sound absorbing cavity, the partition 33 is provided with an opening, and a cavity 34 is formed between the partition 33 and the side wall surface of the sound absorbing shell 3;

[0106] The sound insulation structure includes a plurality of sound insulation tubes 4 arranged side by side. At least one sound insulation cavity 41 is formed in the sound insulation tubes 4. The inner wall surface of the sound insulation cavity 41 is provided with a through hole 42. The through hole 42 connects the sound insulation cavity 41 with the outside. The volume of each sound insulation cavity 41 is different.

[0107] It can be understood that when noise is transmitted to the foam aluminum plate 31, the foam aluminum plate 31 and the air layer 32 work together to absorb medium and high frequency noise, and the partition 33 with an opening and the cavity 34 form a Helmholtz resonator, thereby effectively controlling low-frequency noise and improving the low-frequency sound absorption performance of the sound-absorbing and sound-insulating component 2.

[0108] It can be understood that the sound insulation cavity 41 and the through hole 42 constitute a Helmholtz resonator structure, and the sound insulation cavities 41 of different volumes and their corresponding through holes 42 constitute a plurality of different Helmholtz resonance structures, thereby being able to isolate low-frequency noise of different frequencies, thereby achieving effective isolation of low-frequency noise and having excellent low-frequency sound insulation performance.

[0109] In some embodiments, the active vibration reduction component 10 includes an exciter, a vibration sensor and an acoustic sensor. The exciter, the vibration sensor and the acoustic sensor are all electrically connected to the control component. The exciter and the vibration sensor are both installed on the photovoltaic panel or the sound-absorbing and sound-insulating component 2. The acoustic sensor is arranged on the main body 1. The vibration sensor is used to detect vibration at the photovoltaic panel or the sound-absorbing and sound-insulating component 2. The acoustic sensor is used to detect vibration radiation sound of the photovoltaic power generation device.

[0110] It can be understood that the vibration sensor detects the vibration of the photovoltaic power generation device and transmits the detection data to the control component, and the acoustic sensor detects the vibration radiation sound of the photovoltaic power generation device and transmits the detection data to the control component, so that the control component can control the operation of the exciter according to the vibration and vibration radiation sound of the photovoltaic power generation device, so that the vibration emitted by the exciter offsets the vibration of the photovoltaic power generation device and reduces the vibration of the photovoltaic power generation device as much as possible.

[0111] In some embodiments, the control component is used to execute a control method, the control method comprising:

[0112] Obtain the power generation of different photovoltaic power generation devices;

[0113] It is understandable that the server side can actively or passively obtain the power generation of the photovoltaic power generation device, that is, the server side can actively use sensors to detect the power generation of the photovoltaic power generation device, or receive the power generation data sent by the photovoltaic power generation device to determine the power generation.

[0114] Obtain the remaining power of energy storage modules of different photovoltaic power generation devices;

[0115] It is understandable that each photovoltaic power generation device is provided with a corresponding energy storage module for storing electricity, and the remaining power of the energy storage module is closely related to the stable and continuous operation of the photovoltaic power generation device.

[0116] Determine the power consumption of the photovoltaic power generation device based on the working status of the power consumption equipment connected to the photovoltaic power generation device;

[0117] It is understandable that when the electrical equipment is working, the power consumption of the photovoltaic power generation device can be determined based on the power consumption of the electrical equipment.

[0118] Based on the power generation, remaining power and power consumption, the charging and discharging between different photovoltaic power generation devices and the charging and discharging between the photovoltaic power generation devices and the power grid are controlled.

[0119] It can be understood that when the remaining power of the energy storage modules of different photovoltaic power generation devices is different, the photovoltaic power generation device with more remaining power can be controlled to charge the photovoltaic power generation device with less remaining power, so that the remaining power of the energy storage modules of different photovoltaic power generation devices remains consistent, thereby ensuring that the sustainable working time of different photovoltaic power generation devices remains the same.

[0120] It is understandable that when the power generation of the photovoltaic power generation device is less than the power consumption and the remaining power of the photovoltaic power generation device is less than a predetermined value, the power grid can be controlled to charge the photovoltaic power generation device to ensure that the photovoltaic power generation device can operate normally.

[0121] It can be understood that when the remaining power of the energy storage modules of different photovoltaic power generation devices is different, and the power generation is greater than the power consumption, the difference between the remaining power of the different photovoltaic power generation devices and the predetermined value can be determined first. If the difference between the remaining power of the photovoltaic power generation device with more remaining power and the predetermined value is small or even the remaining power is greater than the predetermined value, and the remaining power of the photovoltaic power generation device with less remaining power is less than the predetermined value, and the difference is large, the photovoltaic power generation device with more power can be controlled to charge the photovoltaic power generation device with less power; if the remaining power of the photovoltaic power generation device with less remaining power is less than the predetermined value, but the difference is small, and the power generation of the photovoltaic power generation device with less remaining power is greater than the power consumption at this time, the photovoltaic power generation device with more remaining power can be controlled to transmit the excess power generation to the power grid.

[0122] It is understandable that when the remaining power of the energy storage modules of different photovoltaic power generation devices is the same and greater than a certain value, the photovoltaic power generation devices can be controlled to transmit the difference between the power generation and the power consumption to the power grid to improve energy utilization.

[0123] In some embodiments, controlling the charging and discharging between different photovoltaic power generation devices and controlling the charging and discharging between the photovoltaic power generation device and the power grid includes:

[0124] The first photovoltaic power generation component group is controlled to charge the second photovoltaic power generation component group, wherein the power level of the energy storage module of the photovoltaic power generation component of the first photovoltaic power generation component group is greater than a threshold value, and the power level of the energy storage module of the photovoltaic power generation component of the second photovoltaic power generation component group is lower than the threshold value.

[0125] It can be understood that the photovoltaic power generation devices with energy storage module power greater than a threshold value are determined as the first photovoltaic power generation device group, and the photovoltaic power generation devices with energy storage module power less than a threshold value are determined as the second photovoltaic power generation device group. The first photovoltaic power generation device group is controlled to charge the second photovoltaic power generation device group, so that the photovoltaic power generation devices with more power can be used to charge the photovoltaic power generation devices with less power, thereby achieving uniform distribution of resources.

[0126] In some embodiments, controlling the first photovoltaic power generation device group to charge the second photovoltaic power generation device group includes:

[0127] Determining the available power of the first photovoltaic power generation component group based on the power generation and power consumption of the first photovoltaic power generation component group;

[0128] The available electricity is delivered to the second photovoltaic power generation device group.

[0129] It can be understood that when controlling the first photovoltaic power generation device group to charge the second photovoltaic power generation device group, the power generation and power consumption of the first photovoltaic power generation device group will be obtained first. The available power can be obtained by subtracting the power consumption from the power generation. The available power is used to charge the second photovoltaic power generation device group, thereby realizing the use of excess power to charge the second photovoltaic power generation device group and avoiding the power of the first photovoltaic power generation device group from becoming low.

[0130] In some embodiments, after the available electricity is transmitted to the second photovoltaic power generation device group, the method includes:

[0131] Determining that the available power is below a preset value;

[0132] Determining that the power consumption of the second photovoltaic power generation device group is greater than the power generation;

[0133] The control grid supplies power to the second photovoltaic power generation device group.

[0134] It is understandable that when the available power is lower than the preset value, it means that the surplus power of the first photovoltaic power generation group is insufficient, and the power consumption of the second photovoltaic power generation group is greater than the power generation, which means that the power generation of the second photovoltaic power generation group is insufficient at this time, and the remaining power of the energy storage module is needed to meet the usage demand. At this time, it may be difficult to increase the power of the second photovoltaic power generation group by only using the surplus power of the first photovoltaic power generation group, so the control grid directly supplies power to the second photovoltaic power generation group to ensure that the second photovoltaic power generation group has enough power to maintain normal operation.

[0135] In some embodiments, the photovoltaic power generation device includes a main body, which includes a mounting seat, a photovoltaic device and a telescopic drive member. One end of the photovoltaic device is connected to the mounting seat, the telescopic drive member is installed on the mounting seat, and the other end of the photovoltaic device is connected to the telescopic drive member. The telescopic drive member is used to drive the other end of the photovoltaic device to move closer to or away from the mounting seat to change the area of ​​the photovoltaic device that receives light.

[0136] It can be understood that the area of ​​the photovoltaic component receiving light can be changed by the telescopic driving member, that is, the power generation of the photovoltaic component can be adjusted. When the power generation of the photovoltaic component cannot meet the usage requirements, the area of ​​the photovoltaic component receiving light can be increased.

[0137] In some embodiments, the method comprises:

[0138] Obtain environmental data of the location of the photovoltaic power generation device;

[0139] Based on environmental data, determine the real-time predicted power consumption and real-time predicted power generation of photovoltaic power generation devices;

[0140] When the real-time predicted power consumption is greater than the real-time predicted power generation, the telescopic drive member is controlled to drive the other end of the photovoltaic member to move away from the mounting seat to increase the area of ​​the photovoltaic member that receives light.

[0141] It can be understood that by analyzing the environmental data of the location of the photovoltaic power generation device, the real-time predicted power consumption and real-time predicted power generation of the photovoltaic power generation device can be determined. When the real-time predicted power consumption is greater than the real-time predicted power generation, the telescopic drive member can be controlled to drive the photovoltaic device to move away from the mounting base, thereby increasing the area of ​​the photovoltaic device that receives light, and thereby increasing the power generation of the photovoltaic device, so that the power generation of the photovoltaic device will be greater than the power consumption.

[0142] In some embodiments, the control method further comprises:

[0143] Obtain environmental data of the location of the photovoltaic power generation device;

[0144] It can be understood that the server first obtains the environmental data of the location of the photovoltaic power generation device, such as the intensity of natural light, the angle between the sun and the photovoltaic power generation device, etc.

[0145] For example, by setting a sensor module at the photovoltaic power generation device, the sensor module can detect environmental data, and the server side can obtain the environmental data of the location of the photovoltaic power generation device by acquiring the detection data of the sensor module.

[0146] For example, after determining the angle between the photovoltaic power generation device and the sun, it is possible to further obtain whether there is an obstruction between the photovoltaic power generation device and the sun at the current angle and the obstruction area, thereby more accurately determining the real-time predicted power generation of the photovoltaic power generation device.

[0147] Based on environmental data, determine the real-time predicted power consumption and real-time predicted power generation of photovoltaic power generation devices;

[0148] It is understandable that the server can determine the real-time predicted power consumption and real-time predicted power generation of the photovoltaic power generation device based on the environmental data. For example, based on the intensity of natural light, it can be determined whether the environment in which the photovoltaic power generation device is located is daytime. If it is daytime, the photovoltaic power generation device does not need to use electricity to emit light, but can use light to generate electricity, and based on the light intensity, the real-time predicted power consumption and real-time predicted power generation can be determined.

[0149] It is understandable that when it is determined that the photovoltaic power generation device is in the daytime, the angle between the photovoltaic power generation device and the sun can also be obtained, and then it can be determined whether the sun is directly shining on the photovoltaic power generation device, and it can also be determined whether the sun is in the noon period with strong light or the sunset period with weak light, and then the real-time power generation can be determined.

[0150] Based on the real-time prediction of power consumption and power generation, the charging and discharging of the energy storage module of the photovoltaic power generation device is controlled.

[0151] It is understandable that when the real-time predicted power consumption is greater than the real-time predicted power generation, the power generation of the photovoltaic power generation device is controlled to charge the energy storage module, and the energy storage module is controlled to supply power to the photovoltaic power generation device's light lamp and other electrical components, ensuring that the photovoltaic power generation device can be used normally. It is also possible to control the power generation of the photovoltaic power generation device to supply power to the light lamp and other electrical components, and at the same time, according to the difference between the real-time predicted power consumption and the real-time predicted power generation, control the energy storage module to provide additional power to ensure that the photovoltaic power generation device can work normally.

[0152] It can be understood that when the real-time predicted power consumption is equal to the real-time predicted power generation, the power generation of the photovoltaic power generation device is directly controlled to supply power to electrical components such as light bulbs.

[0153] It is understandable that when the real-time predicted power is less than the real-time predicted power generation, the power generation of the photovoltaic power generation device is controlled to charge the energy storage module, and the energy storage module is controlled to power the photovoltaic power generation device's light-emitting lamp and other electrical components to avoid waste of power generation. It is also possible to control the power generation of the photovoltaic power generation device to power the light-emitting lamp and other electrical components, and at the same time, according to the difference between the real-time predicted power consumption and the real-time predicted power generation, use the power generation of the photovoltaic power generation device to charge the energy storage module to avoid waste of power generation.

[0154] According to the control method of the present application, the real-time predicted power consumption and the real-time predicted power generation of the photovoltaic power generation device can be determined by analyzing the environmental data of the location of the photovoltaic power generation device. According to the real-time predicted power consumption and the real-time predicted power generation, the charging and discharging of the energy storage module can be controlled. When the power generation is not enough to offset the power consumption, the energy storage module is controlled to discharge to ensure that the photovoltaic power generation device can work normally. When the power generation is greater than the power consumption, the energy storage module can be controlled to be charged to avoid waste of power generation.

[0155] It can be understood that when controlling the light of the photovoltaic power generation device, the light intensity of the light will be determined according to the light intensity of natural light. The light intensity of natural light is inversely proportional to the light intensity of the light. That is, after controlling the light of the photovoltaic power generation device, the light intensity of the environment in which the photovoltaic power generation device is located is within the preset range, thereby ensuring the lighting effect and reducing energy consumption.

[0156] In some embodiments, based on the real-time predicted power consumption and the real-time predicted power generation, controlling the charging and discharging of the energy storage module of the photovoltaic power generation device includes:

[0157] Determine that the real-time predicted power generation is greater than the real-time predicted power consumption, and control the charging of the energy storage module.

[0158] Specifically, all the generated electricity can be used to charge the energy storage module, or part of the generated electricity can be used to charge the energy storage module and the other part can be used to power the photovoltaic power generation device.

[0159] In some embodiments, the photovoltaic power generation element includes a voltage-dividing resistor and a short-circuit switch, one end of the short-circuit switch is electrically connected to one end of the voltage-dividing resistor, the other end of the short-circuit switch is electrically connected to the other end of the voltage-dividing resistor, the voltage-dividing resistor is electrically connected to the energy storage module, and it is determined that the real-time predicted power generation is greater than the real-time predicted power consumption, and the energy storage module is controlled to be charged, including:

[0160] Determining that the difference between the real-time predicted power generation and the real-time predicted power consumption is greater than a preset value;

[0161] Control the short-circuit switch to open.

[0162] It is understandable that the difference between the real-time predicted power generation and the real-time predicted power consumption is greater than the preset value, which means that even if part of the power generation is used for the power consumption of the photovoltaic power generation device, the remaining power generation is still too large to directly charge the energy storage module. In this case, the short-circuit switch is controlled to be disconnected so that the power generation needs to pass through the voltage-dividing resistor and the energy storage module in sequence, so as to realize the voltage division by the voltage-dividing resistor and avoid the voltage that charges the energy storage module being too high.

[0163] In some embodiments, the control method includes:

[0164] Obtain the remaining power of the energy storage module at the current time point;

[0165] Obtain the minimum power generation and maximum power consumption of the photovoltaic power generation device within a preset time after the current time point;

[0166] Control the interaction between photovoltaic power generation devices and the power grid based on the remaining power, minimum power generation and maximum power consumption.

[0167] It is understandable that when it is determined that the remaining power and the minimum power generation are less than or equal to the maximum power consumption, the power grid is used to charge the energy storage module or to power the power modules such as the light-emitting lamps of the photovoltaic power generation device to ensure that the photovoltaic power generation device can operate normally within a preset time after the current time point.

[0168] Specifically, the output power of the energy storage module is determined based on the remaining power. The more the remaining power is, the greater the output power of the energy storage module is, so that the energy storage module remains powered within a preset time.

[0169] In some embodiments, controlling the interaction between the photovoltaic power generation device and the power grid includes:

[0170] Determining that the remaining power is greater than a first threshold and the minimum power generation is greater than the maximum power consumption;

[0171] The difference between the minimum power generation and the maximum power consumption is transmitted to the grid.

[0172] It can be understood that if the remaining power is greater than the first threshold, it means that the energy storage module has more remaining power, and the minimum power generation is greater than the maximum power consumption, which means that the power of the energy storage module is not needed to power the power-consuming components, and the energy storage does not need to be charged temporarily. Then, the difference between the minimum power generation and the maximum power consumption, that is, the excess power, is transmitted to the power grid to avoid energy waste.

[0173] In some embodiments, controlling the interaction between the photovoltaic power generation device and the power grid includes:

[0174] Determining that the remaining power is less than a second threshold and the minimum power generation is greater than the maximum power consumption;

[0175] The difference between the minimum power generation and the maximum power consumption is transmitted to the energy storage module.

[0176] It is understandable that the minimum power generation is greater than the maximum power consumption, indicating that the power of the energy storage module is not used to power the electrical components. If the remaining power is less than the second threshold, it means that the remaining power of the energy storage module is not much at this time, then the difference between the minimum power generation and the maximum power consumption, that is, the excess power, can be transmitted to the energy storage module to charge the energy storage module and increase the power of the energy storage module for subsequent use.

[0177] In some embodiments, controlling the interaction between the photovoltaic power generation device and the power grid includes:

[0178] If it is determined that the remaining power is greater than the preset maximum power consumption value, the power generated by the photovoltaic power generation device is controlled to be fully transmitted to the power grid.

[0179] It is understandable that if the remaining power is greater than the preset maximum power consumption value, it means that the energy storage module has more power, which is sufficient for power consumption by electrical components, and the power generated by the photovoltaic power generation device is fully transmitted to the power grid.

[0180] In some embodiments, the photovoltaic power generation device includes a wind power generation module, and based on the environmental data, determining the real-time predicted power consumption and the real-time predicted power generation of the photovoltaic power generation device includes:

[0181] Based on environmental data, determine the photovoltaic power generation and wind power generation of the photovoltaic power generation device;

[0182] Based on the photovoltaic power generation and wind power generation, the real-time power generation of the photovoltaic power generation device is determined.

[0183] In some embodiments, determining the photovoltaic power generation and wind power generation of the photovoltaic power generation device based on the environmental data includes:

[0184] Determine wind power generation based on real-time wind speed;

[0185] Based on the light intensity, the photovoltaic power generation is determined.

[0186] In some embodiments, the method comprises

[0187] Determining that the power level of the main power supply 7 is lower than a threshold;

[0188] The wind power generation module 5 is controlled to charge the main power supply 7 .

[0189] It can be understood that the server side obtains the data sent by the main power supply 7, and then determines whether the power level of the main power supply 7 is lower than the threshold. When it is determined that the power level of the main power supply 7 is lower than the threshold, the wind power generation module 5 is controlled to charge the main power supply 7, so that the power level of the main power supply 7 is sufficient to power the indicator light 9 and the active vibration reduction component 10.

[0190] It can be understood that when the power of the main power supply 7 is greater than or equal to the threshold, the wind power generation module 5 can be controlled to charge the backup power supply 8.

[0191] In some embodiments, controlling the wind power generation module 5 to charge the main power source 7 includes:

[0192] Obtaining the working status of the indicator light 9 and the active vibration reduction component 10;

[0193] Determine the total power required by the indicator light 9 and the active vibration reduction assembly 10 based on the working states of the indicator light 9 and the active vibration reduction assembly 10;

[0194] Determining that the power generation of the wind power generation module 5 is less than the total power;

[0195] The backup power supply 8 is controlled to supply power to the indicator light 9 and the active vibration reduction component 10 .

[0196] It is understandable that when the server controls the wind power generation module 5 to charge the main power supply 7, it will first obtain the working status of the indicator light 9 and the active vibration reduction component 10 to determine whether the indicator light 9 and the active vibration reduction component 10 are in working state, and then determine the total amount of electricity required for the indicator light 9 and the active vibration reduction component 10 to work. Then the server compares the power generation of the wind power generation module 5 with the total amount of electricity. When it is determined that the power generation of the wind power generation module 5 is less than the total amount of electricity, it means that even if the wind power generation module 5 is used to charge the main power supply 7, the electricity of the main power supply 7 is difficult to supply power to the indicator light 9 and the active vibration reduction component 10. Then the server controls the backup power supply 8 to supply power to the indicator light 9 and the active vibration reduction component 10, ensuring that the indicator light 9 and the active vibration reduction component 10 can work normally.

[0197] It can be understood that when it is determined that the power generation of the wind power generation module 5 is greater than or equal to the total power, it means that when the wind power generation module 5 charges the main power supply 7, the main power supply 7 can supply power to the indicator light 9 and the active vibration reduction component 10, and then the server side controls the main power supply 7 to continue to supply power to the indicator light 9 and the active vibration reduction component 10.

[0198] It can be understood that the amount of electricity required by the indicator light 9 and the active vibration reduction component 10 within a preset time period can be determined as the total electricity, and the power generation of the wind power generation module 5 within the preset time period can be compared with the total electricity to determine whether it is necessary to control the backup power supply 8 to power the indicator light 9 and the active vibration reduction component 10.

[0199] It is understandable that when determining the power generation of the wind power generation module 5, the instantaneous power generation of the current wind power generation module 5 can be obtained, and the power generation of the wind power generation module 5 within a preset time period can be determined using the instantaneous power generation as a standard value.

[0200] In some embodiments, a control method includes:

[0201] Determine that the noise value at the body 1 is greater than a second preset value;

[0202] Based on the vibration signal of the photovoltaic power generation device, the operation of the active vibration reduction component 10 is controlled.

[0203] According to the control method of the embodiment of the present application, when the noise is transmitted to the sound absorbing and sound insulating component 2, the sound absorbing and sound insulating component 2 will process the noise. The server side obtains the noise value at the main body 1, and the noise value at the main body 1 is the noise that will be transmitted to the house. When it is determined that the noise value at the main body 1 is greater than the second preset value, it means that the sound absorption effect of the sound absorbing and sound insulating component 2 is not enough at this time, then the server side will obtain the vibration signal of the photovoltaic power generation device, and control the operation of the active vibration reduction component 10 according to the vibration signal, so that the active vibration reduction component 10 offsets the vibration of the photovoltaic power generation device, thereby reducing the generation of noise, and can effectively block the transmission of noise, thereby improving the sound insulation effect.

[0204] In some embodiments, a control method includes:

[0205] Control photovoltaic panels to charge the power supply;

[0206] It is determined that the power of the power source is greater than a third threshold value, and the photovoltaic panel is controlled to transmit the power to the power grid.

[0207] It is understandable that the server controls the photovoltaic panel to charge the power source with the generated electric energy and obtains the electric energy of the power source at the same time. When the electric energy of the power source is greater than the third threshold value, it means that the electric energy of the power source is sufficient at this time, and the power source does not need to be charged again. At this time, the power source can supply power to the indicator light 9, the active vibration reduction component 10 and other components for a certain period of time. At this time, the server controls the photovoltaic panel to transmit the generated electric energy to the power grid to avoid wasting electric energy.

[0208] In some embodiments, a control method includes:

[0209] Control photovoltaic panels to charge the power supply;

[0210] Determine that the power supply is low;

[0211] Control photovoltaic panels to obtain electrical energy from the grid.

[0212] It can be understood that the server side controls the photovoltaic panels to charge the power supply with the electricity generated. When it is determined that the power of the power supply has decreased, it means that the electricity generated by the photovoltaic panels is too little. Then the server side controls the photovoltaic panels to obtain electricity from the power grid, thereby ensuring that the photovoltaic panels can charge the power supply, thereby increasing the power of the power supply.

[0213] According to an embodiment of the fourth aspect of the present application, Figure 6As shown, the electronic device may include: a processor 310, a communication interface 320, a memory 330 and a communication bus 340, wherein the processor 310, the communication interface 320 and the memory 330 communicate with each other through the communication bus 340. The processor 310 may call the logic instructions in the memory 330 to execute the control method, which includes:

[0214] Acquire data of the electrical equipment, the data of the electrical equipment including the state of the electrical equipment and the working voltage of the electrical equipment;

[0215] Acquire power supply data, the power supply data including voltage data transmitted from the power grid to the first input connector, voltage data transmitted from the power generation system to the second input connector, and voltage data transmitted from the energy storage system to the third input connector;

[0216] Based on the data of the power-consuming equipment and the power supply data, determine whether the power supply voltage is insufficient;

[0217] When it is determined that the power supply voltage is insufficient, the power supply to the target power-consuming device is controlled.

[0218] In addition, the logic instructions in the above-mentioned memory 330 can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0219] On the other hand, the present application also provides a computer program product, the computer program product includes a computer program stored on a non-transitory computer-readable storage medium, the computer program includes program instructions, when the program instructions are executed by a computer, the computer can execute the control method provided by the above methods, the method includes:

[0220] Acquire data of the electrical equipment, the data of the electrical equipment including the state of the electrical equipment and the working voltage of the electrical equipment;

[0221] Acquire power supply data, the power supply data including voltage data transmitted from the power grid to the first input connector, voltage data transmitted from the power generation system to the second input connector, and voltage data transmitted from the energy storage system to the third input connector;

[0222] Based on the data of the power-consuming equipment and the power supply data, determine whether the power supply voltage is insufficient;

[0223] When it is determined that the power supply voltage is insufficient, the power supply to the target power-consuming device is controlled.

[0224] According to an embodiment of the fifth aspect of the present application, the present application also includes a non-transitory computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, it is implemented to perform the above-mentioned control methods, and the method includes:

[0225] Acquire data of the electrical equipment, the data of the electrical equipment including the state of the electrical equipment and the working voltage of the electrical equipment;

[0226] Acquire power supply data, the power supply data including voltage data transmitted from the power grid to the first input connector, voltage data transmitted from the power generation system to the second input connector, and voltage data transmitted from the energy storage system to the third input connector;

[0227] Based on the data of the power-consuming equipment and the power supply data, determine whether the power supply voltage is insufficient;

[0228] When it is determined that the power supply voltage is insufficient, the power supply to the target power-consuming device is controlled.

[0229] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, i.e., they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without creative effort.

[0230] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods of each embodiment or some parts of the embodiment.

[0231] Finally, it should be noted that the above implementation modes are only used to illustrate the present application, rather than to limit the present application. Although the present application is described in detail with reference to the embodiments, a person skilled in the art should understand that various combinations, modifications or equivalent substitutions of the technical solutions of the present application do not depart from the spirit and scope of the technical solutions of the present application, and should be included in the scope of the claims of the present application.

Claims

1. An intelligent power distribution method for an electric meter box, characterized in that: Applied to a power distribution meter, the power distribution meter comprises a first input connector, a second input connector, a third input connector, a first output connector and a plurality of second output connectors, the first input connector is used to connect to a power grid, the second input connector is used to connect to a power generation system, an energy storage system is connected between the first output connector and the third input connector, and different second output connectors are used to connect to different electrical equipment; The electric meter box intelligent power distribution method comprises: Acquire data of the electric device, wherein the data of the electric device includes a state of the electric device and an operating voltage of the electric device; Acquire power supply data, the power supply data including voltage data transmitted from the power grid to the first input connector, voltage data transmitted from the power generation system to the second input connector, and voltage data transmitted from the energy storage system to the third input connector; Based on the data of the electrical equipment and the power supply data, determining whether the power supply voltage is insufficient; When it is determined that the power supply voltage is insufficient, the power supply to the target power-consuming device is controlled.

2. The intelligent power distribution method of an electric meter box according to claim 1, characterized in that: When it is determined that the power supply voltage is insufficient, the step of controlling the power supply to the target power-consuming device comprises: Determine the target electrical device based on the first user input instruction, the location of the electrical device, the location of the user, and environmental data; Controlling the supply of power to the target electrical device.

3. The intelligent power distribution method of an electric meter box according to claim 1, characterized in that: When it is determined that the power supply voltage is insufficient, the step of controlling the power supply to the target power-consuming device comprises: Based on the second user input instruction, determining the first target area and the target environment brightness; Determining a target light-emitting component based on the target environment brightness and the current environment brightness of the first target area; Controlling the supply of power to the target light emitting element.

4. The intelligent power distribution method of an electric meter box according to claim 1, characterized in that: The electric equipment includes a plurality of fans and a plurality of air conditioners. When it is determined that the power supply voltage is insufficient, the step of controlling the power supply to the target electric equipment includes: Based on a third user input instruction, determining a second target area and a target ambient temperature; determining a target fan and a target air conditioner based on the target ambient temperature and the current ambient temperature of the second target area; Control the power supply to the target fan and the target air conditioner.

5. A power distribution meter, characterized in that: Installed on a wall, the power distribution meter includes a first input connector, a second input connector, a third input connector, a first output connector and multiple second output connectors, the first input connector is used to connect to a power grid, the second input connector is used to connect to a power generation system, an energy storage system is connected between the first output connector and the third input connector, and different second output connectors are used to connect to different electrical equipment.

6. An intelligent power distribution device, characterized in that: It comprises a power generation system, an energy storage system and the power distribution meter as claimed in claim 5, wherein the power generation system is connected to the second input connector, the first output connector is connected to the energy storage system, and the energy storage system is connected to the third input connector.

7. An electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the computer program, the intelligent power distribution method for the electric meter box according to any one of claims 1 to 4 is implemented.

8. A non-transitory computer-readable storage medium, the non-transitory computer-readable storage medium comprising a computer program, characterized in that: When the computer program is executed by a processor, the intelligent power distribution method for an electric meter box according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Alternating current energy storage system capable of preventing air conditioner from being shut down

    CN114977474A

  • Energy scheduling method and device based on micro-grid, electronic equipment and storage medium

    CN117293878A

  • Energy storage control method and device of photovoltaic sound barrier and electronic equipment

    CN118353071A

  • Intelligent control method for electric quantity in motor home and related device

    CN118412974A

Cited By

  • Acoustic superstructure noise reduction device for transformer substation

    CN120748353A