Energy-saving sewage treatment recycling device

By designing a sewage treatment device that contains multiple unit treatment blocks and automatic maintenance mechanisms, the problem of interrupting sewage treatment in existing technologies is solved, and high -efficiency, energy -saving sewage treatment and recycling use.

CN119345758APending Publication Date: 2025-01-24NANTAH ENVIRONMENTAL PLANNING & DESIGN INST (JIANGSU) CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411687975.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-25
Publication Date
2025-01-24

AI Technical Summary

Technical Problem

The existing inclined plate sedimentation tank needs to be inspected, flushed and replaced after a long period of operation, but these tasks will interrupt the sewage treatment process, resulting in inefficiency and inability to comprehensively inspect and replace the filler, affecting the treatment effect.

Method used

Design a energy -saving sewage treatment recycling device, which uses multiple unit processing blocks. Each unit is processed in the block with a sedimentation chamber, the inclined plate filler unit, and the maintenance change mechanism. The automatic extraction, inspection, rinse and replacement of the filler unit avoid interruption of sewage treatment.

Benefits of technology

It achieves uninterrupted maintenance of the inclined plate filler, improves sewage treatment efficiency, simplifies the disassembly and installation of the filler, extends the service life of the equipment, and achieves energy conservation and environmental protection through photovoltaic power generation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119345758A_ABST
    Figure CN119345758A_ABST
Patent Text Reader

Abstract

The invention discloses an energy-saving sewage treatment recycling device, which comprises a sewage treatment device, the sewage treatment device comprises five unit treatment blocks, the five unit treatment blocks are sequentially connected end to end, and the five unit treatment blocks are sequentially arranged from left to right. An intelligent control box is mounted on the front surface of the first unit processing block; the one-way driver can drive the maintenance changing mechanism to rotate in one direction, the maintenance changing mechanism can drive the filler framework assembly to rotate, the filler framework assembly can drive the inclined plate filler unit to rotate, and the inclined plate filler unit is lifted out of water to be checked, washed and replaced. The sewage treatment process cannot be interrupted by maintenance work, the sewage treatment efficiency is improved, meanwhile, people can disassemble and assemble the inclined plate filler unit more conveniently, the inclined plate filler unit is more time-saving and labor-saving to replace, and the practicability of the wastewater recycling device for sewage treatment is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of sewage treatment equipment, and more specifically, to an energy-saving sewage treatment and recycling device. Background Art

[0002] Sewage treatment is the process of purifying sewage to make it meet the water quality requirements for discharge into a certain water body or reuse. Water treatment is widely used in various fields such as construction, agriculture, transportation, energy, petrochemical, environmental protection, urban landscape, medical care, catering, etc., and is increasingly entering the daily life of ordinary people. Sedimentation tank is a commonly used equipment in the sewage treatment process. Inclined plate sedimentation tank is a type of sedimentation tank, which includes inlet and outlet pipes, inclined plate fillers, sedimentation tanks, sludge pipes, etc.

[0003] The existing inclined plate sedimentation tank needs to inspect and flush the inclined plate filler after long-term operation, and if necessary, the inclined plate filler needs to be replaced to ensure its normal operation and long-term use. However, the inspection, flushing and replacement of the inclined plate filler will interrupt the sewage treatment process, resulting in low sewage treatment efficiency, and the inclined plate filler cannot be fully inspected. The inspection work is not in place, resulting in the continued use of damaged inclined plate filler, resulting in poor treatment effect, and it is inconvenient to replace the inclined plate filler. At the same time, its volume is too large, which is inconvenient to transport and install. Therefore, there is an urgent need to design an energy-saving sewage treatment recycling device. Summary of the invention

[0004] 1. Technical problems to be solved

[0005] In view of the existing inclined plate sedimentation tank in the prior art, it is necessary to inspect and flush the inclined plate filler after long-term operation, and replace the inclined plate filler when necessary to ensure its normal operation and long-term use. However, the inspection, flushing and replacement of the inclined plate filler will interrupt the sewage treatment process, resulting in low sewage treatment efficiency, and the inclined plate filler cannot be comprehensively inspected. The inspection work is not in place, resulting in the continued use of damaged inclined plate filler, causing the treatment effect to deteriorate, and it is inconvenient to replace the inclined plate filler. At the same time, it is too large to be transported and installed. The purpose of the present invention is to provide an energy-saving sewage treatment and recycling device, which can well solve the problems raised in the background technology.

[0006] 2. Technical solution

[0007] To solve the above problems, the present invention adopts the following technical solutions.

[0008] An energy-saving sewage treatment and recycling device comprises a sewage treatment device, wherein the sewage treatment device comprises a unit treatment block, wherein the number of the unit treatment blocks is five, the five unit treatment blocks are connected end to end in sequence, and the five unit treatment blocks are arranged in sequence from left to right. An intelligent control box is installed on the front of the first unit treatment block, and a photovoltaic panel is connected to the intelligent control box through a battery. A lifting leg is fixedly connected to the bottom surface of the unit treatment block, a sewage input pipe located at the top of the first unit treatment block is connected to the left side surface, and a clean water drainage pipe is fixedly plugged into the right side surface of the fifth unit treatment block. A sedimentation chamber is provided inside the unit processing block, an inclined plate packing unit is provided on the upper right side of the sedimentation chamber, a mud discharge branch pipe is fixedly plugged on the bottom surface of the unit processing block, the mud discharge branch pipe is connected with the sedimentation chamber, a mud discharge solenoid valve is installed on the mud discharge branch pipe, the bottom end of the mud discharge branch pipe is connected with a quick assembly joint, the bottom end of the quick assembly joint is connected with the mud discharge main pipe, a packing frame assembly is provided on the top surface of the unit processing block, the packing frame assembly includes an overflow groove, the overflow groove is provided on the top surface of the unit processing block and is located at its right end, a maintenance change mechanism is provided inside the sedimentation chamber, the maintenance change mechanism The structure includes a maintenance change block, which is fixedly connected to the top surface of the inner cavity of the precipitation chamber, and the bottom end of the maintenance change block is fixedly connected to an anti-disturbance vertical plate, and a maintenance change shaft is movably inserted on the maintenance change block, and one end of the maintenance change shaft extends from the surface of the unit processing block, and a one-way transmission is arranged on the outside of the maintenance change shaft, and the one-way transmission includes a one-way drive disk, and a center through hole is opened on the one-way drive disk, and the maintenance change shaft is movably inserted in the inside of the center through hole, and a maintenance driver is arranged on the front of the fifth unit processing block, and the maintenance driver includes a maintenance support plate, a maintenance The protective support plate is fixedly connected to the surface of the fifth unit processing block. The unit processing block is provided with a maintenance auxiliary mechanism, which includes a maintenance gathering groove. The maintenance gathering groove is opened on the top surface of the unit processing block and is located at its left end. The overflow groove is connected to the maintenance gathering groove. A residual scraping mechanism is provided on the surface of the unit processing block. The residual scraping mechanism includes a residual scraping plate. The residual scraping plate is slidably inserted into the interior of the maintenance gathering groove. An assembling mechanism is provided on the left side surface of the unit processing block. The assembling mechanism includes an assembling boss. The assembling boss is fixedly connected to the left side surface of the unit processing block.

[0009] Preferably, the packing structure component also includes an adapting groove, which is arranged on the bottom surface of the inner cavity of the overflow groove, the adapting groove is connected with the precipitation chamber, a conversion cone is slidably inserted into the interior of the adapting groove, the top of the conversion cone passes through the overflow groove and the maintenance gathering groove and extends upward, the central axis of the conversion cone is low on the left and high on the right, a deep groove is arranged on the right end surface of the conversion cone, an embedded through hole is arranged on the inner wall of the deep groove, the number of the embedded through holes is six, the six embedded through holes are evenly distributed on the inner wall of the deep groove, the left end of the embedded through hole is open and the opening is On the left end face of the conversion cone, a load-bearing bar located at the left end is fixedly connected to the inner wall of the embedded through hole, the inclined plate filling unit is filled in the embedded through hole and sits on the load-bearing bar, and a directional central axis located in the middle is fixedly inserted on the conversion cone, the right end of the directional central axis extends to the interior of the depth groove and is movably connected to the depth bridge box, the right end of the depth bridge box extends from the interior of the depth groove and extends to the interior of the overflow groove and is fixedly connected to a transition bridge box, the transition bridge box is fixedly connected to the right side surface of the inner cavity of the overflow groove, and the left end of the directional central axis passes through the maintenance change block.

[0010] Preferably, the maintenance change mechanism also includes a cylindrical chamber, which is opened inside the maintenance change block, and the maintenance change shaft passes through the cylindrical chamber. An expansion groove is opened on the inner wall of the cylindrical chamber, and the directional center axis passes through the expansion groove. A transmission spiral strip located inside the cylindrical chamber is fixedly sleeved on the surface of the maintenance change shaft, and a transmission gear plate is provided inside the expansion groove. The transmission gear plate is fixedly sleeved on the outside of the directional center axis, and a linkage gear plate is fixedly sleeved on the outside of the maintenance change shaft. The number of linkage gear plates is five, and the five linkage gear plates are connected through a linkage chain transmission.

[0011] Preferably, the one-way transmission device also includes an expansion ring groove, which is provided on the inner wall of the center through hole, and a transmission ratchet gear is slidably inserted into the interior of the expansion ring groove, and the transmission ratchet gear is fixedly sleeved on the outside of the maintenance change shaft, and a transmission elastic strip is fixedly connected to the inner wall of the expansion ring groove, and the other end of the transmission elastic strip is unidirectionally meshed with the transmission ratchet gear, and two winding ring grooves are provided on the surface of the one-way drive disk, and a pull-back lead is fixedly connected to the inner wall of one winding ring groove, and a drive pull wire is fixedly connected to the inner wall of the other winding ring groove, and the pull-back lead and the drive pull wire are wound around the interior of the corresponding winding ring grooves.

[0012] Preferably, the maintenance driver also includes an electric telescopic rod and a driving force storage spring. The electric telescopic rod is fixedly mounted on the top surface of the maintenance tray. The top end of the electric telescopic rod is fixedly connected to the end of the driving pull wire. The driving force storage spring is fixedly connected to the top surface of the maintenance tray. The top end of the driving force storage spring is fixedly connected to the end of the pull-back lead wire.

[0013] Preferably, the maintenance auxiliary mechanism also includes a maintenance guide pipe, which is fixedly inserted on the surface of the unit processing block and connected to the maintenance gathering groove. The other end of the maintenance guide pipe is bent downward and connected to the maintenance delivery pipe, and the maintenance delivery pipe is inclined with the left side higher and the right side lower.

[0014] Preferably, the residual scraping mechanism also includes a bent opening hole, which is opened on the residual scraping plate and located at its upper left corner, and a shielding bent plate is slidably inserted inside the bent opening hole, and the left end of the shielding bent plate is fixedly connected to the left side surface of the inner cavity of the maintenance gathering groove, and the front and rear ends of the shielding bent plate are fixedly connected to the inner wall of the maintenance gathering groove, and a power threaded rod is movably inserted on the residual scraping plate, and the power threaded rod is located below the shielding bent plate, and the power threaded rod is threadedly matched with the residual scraping plate, and the end of the power threaded rod extends to the outside of the unit processing block and is fixedly sleeved with a driving gear, and the number of the driving gears is five, and the five driving gears are connected by The driving chain is connected for transmission, and the residual scraping mechanism also includes a feed hanging bar, which is placed on the top surface of the unit processing block. An anti-slip through hole is opened on the feed hanging bar, and an anti-slip boss is movably inserted inside the anti-slip through hole. The anti-slip boss is fixedly connected to the top surface of the unit processing block. The left end of the feed hanging bar is fixedly connected to a protective shell, which is pressed on the surface of the unit processing block. The end of the power threaded rod, the driving gear, and the driving chain are all located inside the protective shell. A driving motor located at the right end of the protective shell is fixedly installed on the surface of the protective shell, and the end of the output shaft on the driving motor extends to the interior of the protective shell and is fixedly connected to the end of a power threaded rod.

[0015] Preferably, the assembling mechanism also includes a plurality of assembling slots, which are provided on the top surface of the assembling boss, and a propulsion chamber is provided inside the assembling boss, the propulsion chamber is located below the assembling slot and the two are connected, a gradually expanding liquid distribution pipe is fixedly inserted on the right side surface of the inner cavity of the propulsion chamber, and the other end of the gradually expanding liquid distribution pipe extends to the interior of the unit treatment block and is connected to the sedimentation chamber, the assembling mechanism also includes an assembling groove, and the right side surfaces of the first, second, third and fourth unit treatment blocks are all provided with assembling grooves, and an assembling plug is fixedly inserted on the top surface of the inner cavity of the assembling groove, and the top end of the assembling plug extends upward to the interior of the overflow groove, an external plug is movably inserted in the assembling slot corresponding to the first unit treatment block, and the top end of the external plug is connected to a laying transverse pipe, and the laying transverse pipe is connected to the sewage input pipe, the assembling mechanism also includes a clean water chamber, which is provided inside the fifth unit treatment block and located at its right end, the clean water drainage pipe is connected to the clean water chamber, and the clean water chamber is connected to the overflow groove above it through a pipeline.

[0016] 3. Beneficial effects

[0017] Compared with the prior art, the advantages of the present invention are:

[0018] ① Through the sewage treatment device, the wastewater recycling device of the sewage treatment can treat the sewage, the maintenance driver can drive the one-way transmission to rotate, the one-way transmission can drive the maintenance change mechanism to rotate unidirectionally, the maintenance change mechanism can drive the filler frame assembly to rotate, and the filler frame assembly can rotate with the inclined plate filler unit, so as to lift the inclined plate filler unit out of the water for inspection, flushing and replacement, so that the maintenance work will not interrupt the sewage treatment process, which helps to increase the sewage treatment efficiency, and at the same time it is more convenient for people to disassemble and install the inclined plate filler unit, so that the replacement of the inclined plate filler unit is more time-saving and labor-saving, thereby improving the practicality of the wastewater recycling device of the sewage treatment, and photovoltaic power generation is carried out through photovoltaic panels, thereby achieving energy saving and environmental protection.

[0019] ② Through the packing structure assembly, people can more conveniently disassemble the inclined plate packing unit. After disassembling the inclined plate packing unit, people can conduct a more thorough inspection of the inclined plate packing unit to avoid continued use of the damaged inclined plate packing unit, which is helpful to increase the quality of sewage treatment. Through the arrangement of multiple packing structure assemblies, the sewage can flow through a longer distance inside the inclined plate packing unit, thereby making the sewage stay longer inside the inclined plate packing unit, which is helpful to further increase the quality of sewage treatment. The muddy water generated by flushing the inclined plate packing unit can be discharged through the maintenance auxiliary mechanism, and the maintenance auxiliary mechanism can be cleaned through the residual scraping mechanism, so that no muddy water will remain in the maintenance auxiliary mechanism, avoiding the muddy water staying in the maintenance auxiliary mechanism for a long time and being dried by wind to block the maintenance auxiliary mechanism. Through the assembly mechanism, the wastewater recycling device for sewage treatment can be split into smaller units to facilitate people to transport and install the wastewater recycling device for sewage treatment, thereby improving the practicality of the wastewater recycling device for sewage treatment. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the present invention;

[0021] Figure 2 For the present invention Figure 1 A schematic diagram of the internal structure of the middle protective shell from the right side;

[0022] Figure 3 For the present invention Figure 1 Rear view of

[0023] Figure 4 For the present invention Figure 3 A schematic diagram of the structure of the one-way transmission;

[0024] Figure 5 For the present invention Figure 4 Schematic diagram of the internal structure;

[0025] Figure 6For the present invention Figure 1 Schematic diagram of the internal structure;

[0026] Figure 7 For the present invention Figure 6 Schematic diagram of the internal structure of the middle unit processing block;

[0027] Figure 8 For the present invention Figure 6 Schematic diagram of the internal structure of the maintenance change mechanism;

[0028] Fig. 9 For the present invention Figure 6 Schematic diagram of the internal structure of the middle filler frame assembly;

[0029] Fig.10 For the present invention Fig. 9 A top view of

[0030] Fig.11 For the present invention Figure 6 Schematic diagram of the internal structure of the assembly mechanism.

[0031] Description of the numbers in the figure:

[0032] 1. Sewage treatment device; 101. Unit treatment block; 102. Lifting legs; 103. Sewage inlet pipe; 104. Clean water drainage pipe; 105. Sedimentation chamber; 106. Inclined plate filler unit; 107. Mud discharge branch pipe; 108. Mud discharge solenoid valve; 109. Quick assembly connector; 110. Mud discharge main pipe; 2. Filler frame assembly; 21. Overflow groove; 22. Adapter groove; 23. Conversion cone; 24. Depth groove; 25. Embedded through hole; 26, load-bearing bar; 27, transition bridge box; 28, deep bridge box; 29, directional center axis; 3, maintenance change mechanism; 31, maintenance change block; 32, anti-disturbance vertical plate; 33, cylindrical chamber; 34, expansion groove; 35, maintenance change shaft; 36, transmission spiral strip; 37, transmission gear plate; 38, linkage gear plate; 39, linkage chain; 4, one-way transmission; 41, one-way drive plate; 42, center through hole; 43 , expansion ring groove; 44, transmission ratchet gear; 45, transmission elastic strip; 46, winding ring groove; 47, pull-back lead wire; 48, drive pull wire; 5, maintenance driver; 51, maintenance support plate; 52, electric telescopic rod; 53, drive storage spring; 6, maintenance auxiliary mechanism; 61, maintenance gathering groove; 62, maintenance guide tube; 63, maintenance delivery tube; 7, residual scraping mechanism; 71, residual scraping plate; 72, bending opening hole; 73, shielding Bending plate; 74, power threaded rod; 75, driving gear; 76, driving chain; 77, feeding hanging bar; 78, anti-slip through hole; 79, anti-slip boss; 710, protective shell; 711, driving motor; 8, assembly mechanism; 81, assembly boss; 82, assembly slot; 83, propulsion chamber; 84, gradually expanding liquid distribution pipe; 85, assembly groove; 86, assembly plug; 87, external plug; 88, laying horizontal pipe; 89, water purification chamber. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without creative work are within the scope of protection of the present invention.

[0034] An energy-saving sewage treatment and recycling device, comprising a sewage treatment device 1, see Figure 1The sewage treatment device 1 includes a unit treatment block 101. The number of the unit treatment blocks 101 is five. The five unit treatment blocks 101 are connected end to end in sequence. The five unit treatment blocks 101 are arranged in sequence from left to right. An intelligent control box is installed on the front of the first unit treatment block 101. The photovoltaic panel is connected to the intelligent control box through a battery. The photovoltaic panel receives solar energy to generate electricity and stores it in the battery. The battery supplies power to the device, thereby achieving energy saving and environmental protection. A lifting leg 102 is fixedly connected to the bottom surface of the unit treatment block 101. A sewage input pipe 103 located at the top of the first unit treatment block 101 is connected to the left side surface. A clean water drainage pipe 104 is fixedly plugged into the right side surface of the fifth unit treatment block 101. Please refer to Figure 7 The unit treatment block 101 has a sedimentation chamber 105 disposed inside, and an inclined plate packing unit 106 disposed on the upper right side of the sedimentation chamber 105. Figure 1 A mud discharge branch pipe 107 is fixedly connected to the bottom surface of the unit treatment block 101, and the mud discharge branch pipe 107 is connected to the sedimentation chamber 105. A mud discharge solenoid valve 108 is installed on the mud discharge branch pipe 107. The mud discharge solenoid valve 108 is controlled by the intelligent control box and is used to discharge sludge. The bottom end of the mud discharge branch pipe 107 is connected to a quick assembly joint 109, and the bottom end of the quick assembly joint 109 is connected to a mud discharge main pipe 110, so that the wastewater recycling device for sewage treatment can treat sewage. A packing frame component 2 is provided on the top surface of the unit treatment block 101. A plurality of packing frame components 2 are provided on the top surface of a unit treatment block 101, and the plurality of packing frame components 2 are arranged in a direction perpendicular to the paper surface and inwardly, please refer to Figure 7 The packing frame assembly 2 includes an overflow groove 21, which is opened on the top surface of the unit processing block 101 and is located at the right end thereof. Figure 6 The interior of the sedimentation chamber 105 is provided with a maintenance change mechanism 3, which includes a maintenance change block 31, which is fixedly connected to the top surface of the inner cavity of the sedimentation chamber 105, and the bottom end of the maintenance change block 31 is fixedly connected to an anti-disturbance vertical plate 32, see Figure 8 The maintenance change block 31 is movably connected with a maintenance change shaft 35, see Figure 3 One end of the maintenance change shaft 35 extends from the surface of the unit processing block 101, see Figure 3 , a maintenance change shaft 35 is provided with a one-way transmission 4 on the outside, see Figure 4 The one-way transmission device 4 includes a one-way drive disk 41, and a central through hole 42 is formed on the one-way drive disk 41. The maintenance change shaft 35 is movably inserted into the interior of the central through hole 42. Figure 3 A maintenance driver 5 is provided on the front of the fifth unit processing block 101. The maintenance driver 5 includes a maintenance support plate 51. The maintenance support plate 51 is fixedly connected to the surface of the fifth unit processing block 101. Please refer to Figure 1The unit processing block 101 is provided with a maintenance auxiliary mechanism 6, see Figure 7 The maintenance auxiliary mechanism 6 includes a maintenance collection groove 61, which is opened on the top surface of the unit processing block 101 and is located at its left end. The overflow groove 21 is connected to the maintenance collection groove 61. Please refer to Figure 1 The surface of the unit processing block 101 is provided with a residual scraping mechanism 7, see Figure 7 The residual cleaning mechanism 7 includes a residual cleaning plate 71, which is slidably inserted into the interior of the maintenance gathering groove 61. Figure 6 The left side of the unit processing block 101 is provided with an assembly mechanism 8, see Fig.11 The assembling mechanism 8 includes an assembling boss 81, and the assembling boss 81 is fixedly connected to the left side surface of the unit processing block 101.

[0035] See also Figure 7 The packing frame component 2 also includes an adapting groove 22, which is opened on the bottom surface of the inner cavity of the overflow groove 21, and the adapting groove 22 is connected to the precipitation chamber 105. A conversion cone 23 is slidably inserted into the interior of the adapting groove 22, and the top of the conversion cone 23 passes through the overflow groove 21, the maintenance and gathering groove 61 and extends upward. The central axis of the conversion cone 23 is low on the left and high on the right. Please refer to Fig. 9A deep groove 24 is provided on the right end surface of the conversion cone 23, and an embedded through hole 25 is provided on the inner wall of the deep groove 24. The number of the embedded through holes 25 is six, and the six embedded through holes 25 are evenly distributed on the inner wall of the deep groove 24. The left end of the embedded through hole 25 is open and the opening is provided on the left end surface of the conversion cone 23. A load-bearing bar 26 located at the left end thereof is fixedly connected to the inner wall of the embedded through hole 25. The inclined plate filler unit 106 is filled in the embedded through hole 25 and is located on the load-bearing bar 26. The conversion cone 23 The upper portion is fixedly plugged with an orientation center axis 29 located in the middle thereof, the right end of the orientation center axis 29 extends to the interior of the deep groove 24 and is movably connected to a depth bridge box 28, the right end of the depth bridge box 28 extends from the interior of the deep groove 24 and extends to the interior of the overflow groove 21 and is fixedly connected to a transition bridge box 27, the transition bridge box 27 is fixedly connected to the right side surface of the inner cavity of the overflow groove 21, the left end of the orientation center axis 29 passes through a maintenance change block 31, and is used to set a plurality of inclined plate filler units 106, some of which are immersed in During sewage purification, some inclined plate packing units 106 are placed above the water surface as spares. The arrangement of the packing structure assembly 2 enables the spare inclined plate packing units 106 and the inclined plate packing units 106 immersed in sewage to be replaced, and is used to lift the inclined plate packing units 106 out of the water for inspection, flushing and replacement, so that maintenance work will not interrupt the sewage treatment process, which helps to increase the sewage treatment efficiency. At the same time, it is more convenient for people to disassemble and install the inclined plate packing units 106, making the replacement of the inclined plate packing units 106 more time-saving and labor-saving, thereby improving the practicality of the wastewater recycling device for sewage treatment. After the inclined plate packing units 106 are disassembled, people can conduct a more thorough inspection of the inclined plate packing units 106 to avoid the continued use of damaged inclined plate packing units 106, which helps to increase the quality of sewage treatment. The arrangement of multiple packing structure assemblies 2 arranged left and right allows the sewage to flow through the inclined plate packing units 106 for a longer distance, thereby allowing the sewage to stay in the inclined plate packing units 106 for a longer time, which helps to further increase the quality of sewage treatment.

[0036] See also Figure 8 The maintenance change mechanism 3 also includes a cylindrical chamber 33, which is opened inside the maintenance change block 31, and a maintenance change shaft 35 passes through the cylindrical chamber 33. An expansion groove 34 is opened on the inner wall of the cylindrical chamber 33, and the directional center axis 29 passes through the expansion groove 34. A transmission spiral strip 36 located inside the cylindrical chamber 33 is fixedly sleeved on the surface of the maintenance change shaft 35, and a transmission gear plate 37 is provided inside the expansion groove 34. The transmission gear plate 37 is fixedly sleeved on the outside of the directional center axis 29. Please refer to Figure 3The external fixed sleeve of the maintenance change shaft 35 is connected with a linkage gear plate 38. The number of the linkage gear plates 38 is five. The five linkage gear plates 38 are connected through a linkage chain 39. The top of the linkage gear plate 38 is meshed with the linkage chain 39, and the bottom of the linkage gear plate 38 is not meshed with the linkage chain 39. It is used to drive the packing frame assembly 2 to rotate, so as to achieve the purpose of replacing the inclined plate packing unit 106. At the same time, the self-locking function between the transmission spiral bar 36 and the transmission gear plate 37 is used to limit the packing frame assembly 2 to fix the state of the packing frame assembly 2.

[0037] See also Figure 5 The one-way transmission device 4 also includes an expansion ring groove 43, which is provided on the inner wall of the center through hole 42. A transmission ratchet gear 44 is slidably inserted into the interior of the expansion ring groove 43. The transmission ratchet gear 44 is fixedly sleeved on the outside of the maintenance change shaft 35. A transmission elastic strip 45 is fixedly connected to the inner wall of the expansion ring groove 43. The other end of the transmission elastic strip 45 is unidirectionally meshed with the transmission ratchet gear 44. Two winding ring grooves 46 are provided on the surface of the one-way driving disk 41. A pull-back lead 47 is fixedly connected to the inner wall of one winding ring groove 46, and a drive pull wire 48 is fixedly connected to the inner wall of the other winding ring groove 46. The pull-back lead 47 and the drive pull wire 48 are wound around the corresponding winding ring groove 46 to drive the maintenance change mechanism 3 to rotate in one direction.

[0038] See also Figure 3 The maintenance driver 5 also includes an electric telescopic rod 52 and a driving force storage spring 53. The electric telescopic rod 52 is fixedly mounted on the top surface of the maintenance support plate 51. The top end of the electric telescopic rod 52 is fixedly connected to the end of the driving pull wire 48. The driving force storage spring 53 is fixedly connected to the top surface of the maintenance support plate 51. The top end of the driving force storage spring 53 is fixedly connected to the end of the pull-back lead 47, which is used to drive the one-way transmission device 4 to reciprocate.

[0039] See also Figure 1 The maintenance auxiliary mechanism 6 also includes a maintenance guide pipe 62, which is fixedly inserted on the surface of the unit processing block 101 and connected to the maintenance gathering groove 61. The other end of the maintenance guide pipe 62 is bent downward and connected to the maintenance delivery pipe 63. A quick assembly joint 109 is provided between the maintenance guide pipe 62 and the maintenance delivery pipe 63. The maintenance delivery pipe 63 is inclined with the left side higher and the right side lower, and is used to discharge the muddy water generated by flushing the inclined plate filler unit 106.

[0040] See also Figure 7The residual scraping mechanism 7 also includes a bent opening hole 72, which is opened on the residual scraping plate 71 and located at its upper left corner. A shielding bent plate 73 is slidably inserted inside the bent opening hole 72. The left end of the shielding bent plate 73 is fixedly connected to the left side surface of the inner cavity of the maintenance gathering groove 61, which is used to block mud for the power threaded rod 74. The front and rear ends of the shielding bent plate 73 are fixedly connected to the inner wall of the maintenance gathering groove 61. A power threaded rod 74 is movably inserted on the residual scraping plate 71. The power threaded rod 74 is located below the shielding bent plate 73. The power threaded rod 74 is threadedly matched with the residual scraping plate 71. Please refer to Figure 2 The end of the power threaded rod 74 extends to the outside of the unit processing block 101 and is fixedly sleeved with a driving gear 75. The number of driving gears 75 is five, and the five driving gears 75 are connected by a driving chain 76. The residual scraping mechanism 7 also includes a feeding hanging bar 77, which is placed on the top surface of the unit processing block 101. The feeding hanging bar 77 is provided with an anti-slip through hole 78, and the inside of the anti-slip through hole 78 is movably inserted with an anti-slip boss 79, which is fixedly connected to the top surface of the unit processing block 101. The left end of the feeding hanging bar 77 is fixedly connected to a protective shell 710, and the protective shell 710 is pressed on the surface of the unit processing block 101. The end of the power threaded rod 74, the driving gear 75, and the driving chain 76 are all located inside the protective shell 710. Please refer to Figure 1 A driving motor 711 is fixedly installed on the surface of the protective shell 710 at its right end. The end of the output shaft on the driving motor 711 extends to the interior of the protective shell 710 and is fixedly connected to the end of a power threaded rod 74. The output shaft and the end of the power threaded rod 74 are connected in a detachable manner, which is used to clean the maintenance auxiliary mechanism 6 so that no muddy water will remain in the maintenance auxiliary mechanism 6, and to prevent muddy water from staying in the maintenance auxiliary mechanism 6 for a long time and being dried by wind, thereby blocking the maintenance auxiliary mechanism 6.

[0041] See also Fig.11 The assembly mechanism 8 further includes a plurality of assembly slots 82, the assembly slots 82 are provided on the top surface of the assembly boss 81, a propulsion chamber 83 is provided inside the assembly boss 81, the propulsion chamber 83 is located below the assembly slots 82 and the two are connected, a gradually expanding liquid distribution pipe 84 is fixedly connected to the right side surface of the inner cavity of the propulsion chamber 83, the other end of the gradually expanding liquid distribution pipe 84 extends to the interior of the unit processing block 101 and is connected to the precipitation chamber 105, please refer to Figure 7 The assembly mechanism 8 also includes an assembly groove 85. The right side surfaces of the first, second, third, and fourth unit processing blocks 101 are all provided with an assembly groove 85. An assembly insert 86 is fixedly inserted on the top surface of the inner cavity of the assembly groove 85. The top of the assembly insert 86 extends upward to the inside of the overflow groove 21. Please refer to Fig.11The first unit treatment block 101 corresponds to the assembly slot 82 in which an external plug 87 is movably inserted. The top of the external plug 87 is connected to a horizontal pipe 88, which is connected to the sewage input pipe 103. Figure 6 The assembly mechanism 8 also includes a clean water chamber 89, which is opened inside the fifth unit processing block 101 and located at its right end. The clean water drainage pipe 104 is connected to the clean water chamber 89, and the clean water chamber 89 is connected to the overflow groove 21 above it through a pipeline, so that the wastewater recycling device for sewage treatment can be split into smaller units to facilitate people to transport and install the wastewater recycling device for sewage treatment, thereby improving the practicability of the wastewater recycling device for sewage treatment.

[0042] Working principle:

[0043] First, move the five unit processing blocks 101 to the installation destination, then place and fix the fifth unit processing block 101, then lift the fourth unit processing block 101, and then adjust the direction and position of the fourth unit processing block 101 until the assembly boss 81 on the left side of the fifth unit processing block 101 is aligned with the assembly groove 85 on the right side of the fourth unit processing block 101, then move the fourth unit processing block 101 horizontally, and then insert the assembly boss 81 on the left side of the fifth unit processing block 101 into the assembly groove 85 on the right side of the fourth unit processing block 101, and then lower the fourth unit processing block 101, and then the assembly plug 86 on the fourth unit processing block 101 moves downward and is inserted into the assembly slot 82 on the top surface of the assembly boss 81 , then the fourth unit treatment block 101 is put on the ground, and then the fourth unit treatment block 101 is fixed, and then the third, second and first unit treatment blocks 101 are assembled in turn according to the above method. After the assembly is completed, the external plug 87 is inserted into the assembly slot 82 corresponding to the first unit treatment block 101, and then the intelligent control box is powered, and then the linkage gear plate 38 is connected through the linkage chain 39, and the drive gear 75 is connected through the drive chain 76, and then the maintenance delivery pipe 63 and the mud discharge main pipe 110 are installed. At this point, the assembly is completed. After being put into use, the sewage enters the sedimentation chamber inside the first unit treatment block 101 through the sewage input pipe 103, the horizontal pipe 88, the external plug 87, the propulsion chamber 83, and the gradually expanding liquid distribution pipe 84. Chamber 105, then the sewage inside the sedimentation chamber 105 gradually increases, and then the sewage passes through the inclined plate filler unit 106 and enters the overflow groove 21. During this process, the inclined plate filler unit 106 treats the sewage to settle the particles in the sewage, and then the sewage inside the overflow groove 21 enters the sedimentation chamber 105 inside the second unit treatment block 101 through the assembled insert 86, the propulsion chamber 83, and the gradually expanding liquid distribution pipe 84, and then the sewage in the sedimentation chamber 105 gradually increases, and then the sewage passes through the corresponding inclined plate filler unit 106 and enters the corresponding overflow groove 21, and then the sewage enters the sedimentation chamber 105 inside the third unit treatment block 101 through the assembled insert 86, the propulsion chamber 83, and the gradually expanding liquid distribution pipe 84, and then The sewage passes through the corresponding inclined plate filler unit 106 into the overflow groove 21 and enters the sedimentation chamber 105 inside the fourth unit treatment block 101 through the assembled insert 86, the propulsion chamber 83, and the gradually expanding liquid distribution pipe 84. Then the sewage passes through the corresponding inclined plate filler unit 106 into the overflow groove 21 and enters the sedimentation chamber 105 inside the fifth unit treatment block 101 through the assembled insert 86, the propulsion chamber 83, and the gradually expanding liquid distribution pipe 84. Then the sewage passes through the corresponding inclined plate filler unit 106 and forms purified water. Then the purified water enters the overflow groove 21 and enters the clean water chamber 89 through the pipeline. Then the purified water is discharged through the clean water drain pipe 104. Then, when the inclined plate filler unit 106 needs to be maintained, the intelligent control box is controlled.Then the intelligent control box controls the electric telescopic rod 52 to slowly shorten, and then the electric telescopic rod 52 shortens and pulls the driving wire 48, and then the driving wire 48 is released from the inside of the winding ring groove 46 and drives the one-way driving disk 41 to rotate clockwise, and then the pull-back lead 47 is wound around the inside of the corresponding winding ring groove 46, and then the one-way driving disk 41 rotates the maintenance change shaft 35 clockwise through the meshing action between the transmission elastic strip 45 and the transmission ratchet gear 44, and then the maintenance change shaft 35 rotates with the transmission spiral strip 36, and then the transmission spiral strip 36 drives the directional central shaft 29 to rotate through the meshing action between it and the transmission gear disk 37, and then the directional central shaft 29 rotates with the conversion cone 23, and then the conversion cone 23 rotates through the embedded through hole 25. The inclined plate filling unit 106 is slowly rotated with the inclined plate filling unit 106, and then the inclined plate filling unit 106 in the water moves upward, and the inclined plate filling unit 106 above the water surface is immersed in the water, and then the electric telescopic rod 52 is shortened to the shortest state. At this time, the conversion cone 23 rotates one hundred and eighty degrees, and then the intelligent control box controls the electric telescopic rod 52 to extend, and then the driving pull wire 48 is gradually relaxed, and then the driving storage spring 53 is driven to pull the pull-back lead 47, and then the pull-back lead 47 is released from the corresponding winding ring groove 46 and drives the one-way driving disk 41 to rotate counterclockwise, and then the driving pull wire 48 is wound around the corresponding winding ring groove 46, and then the one-way driving disk 41 rotates counterclockwise with the transmission elastic strip 45, and then the transmission elastic strip 45 is in the transmission ratchet gear 44 The electric telescopic rod 52 is extended to its longest state, and then the newly immersed inclined plate filling unit 106 continuously treats the sewage. Then stand on the top surface of the transition bridge box 27 and move to the position corresponding to the target inclined plate filling unit 106. Then use a high-pressure water gun to flush the target inclined plate filling unit 106. Then the muddy water generated by the flushing flows out from the left end of the inclined plate filling unit 106 and enters the interior of the maintenance gathering tank 61. Then, the muddy water enters the maintenance delivery pipe 63 through the maintenance guide pipe 62 under the action of the potential energy difference. Then, the muddy water is discharged along the maintenance delivery pipe 63 until the target inclined plate filling unit 106 is flushed clean. Then, a pulling force to the right is applied to the target inclined plate filling unit 106. Then, the target inclined plate filling unit 106 is flushed clean. The plate filling unit 106 is pulled out from the inside of the corresponding embedded through hole 25 and slid to the top surface of the depth bridge box 28, and then the target inclined plate filling unit 106 is inspected. During the inspection process, the inclined plate filling unit 106 can be turned over and turned around for inspection, so that the inspection is more comprehensive. After the inspection, if the inclined plate filling unit 106 is intact, the inclined plate filling unit 106 is installed back into its corresponding embedded through hole 25. If the inclined plate filling unit 106 is damaged, replace the damaged inclined plate filling unit 106 with an intact inclined plate filling unit 106, and install the intact inclined plate filling unit 106 back into the corresponding embedded through hole 25. Repeat the above until the inclined plate filling unit 106 that has just come out of the water is rinsed and inspected.Then it comes down from the transition bridge box 27 and controls the driving motor 711 to run through the intelligent control box. Then the driving motor 711 rotates with a power threaded rod 74, and then the power threaded rod 74 rotates synchronously with the rest of the power threaded rods 74 through the driving gear 75 and the driving chain 76. Then the residual cleaning scraper 71 moves slowly toward the direction of the maintenance guide pipe 62 under the action of the threaded fit between it and the power threaded rod 74. Then the muddy water remaining in the maintenance gathering tank 61 gradually gathers under the push of the residual cleaning scraper 71 and is discharged through the maintenance guide pipe 62 and the maintenance delivery pipe 63. Then, when the residual cleaning scraper 71 reaches the vicinity of the port of the maintenance guide pipe 62, the intelligent control box controls the driving motor 711 to run in the reverse direction, and then the power threaded rod 74 rotates in the reverse direction. Then the residual cleaning scraper 71 gradually resets under the action of the threaded fit between it and the power threaded rod 74. When the residual cleaning scraper 71 resets, the intelligent control box controls the driving motor 711 to stop. At this point, the maintenance work is completed.

[0044] The above is only a preferred specific implementation manner of the present invention; but the protection scope of the present invention is not limited thereto; any technician familiar with the technical field within the technical scope disclosed by the present invention; any equivalent replacement or change based on the technical solution and improved concept of the present invention shall be covered by the protection scope of the present invention.

Claims

1. An energy-saving sewage treatment and recycling device, comprising a sewage treatment device (1), characterized in that: The sewage treatment device (1) comprises a unit treatment block (101), the number of the unit treatment blocks (101) is five, the five unit treatment blocks (101) are connected end to end in sequence, and the five unit treatment blocks (101) are arranged in sequence from left to right, an intelligent control box is installed on the front of the first unit treatment block (101), the photovoltaic panel is connected to the intelligent control box via a storage battery, a lifting leg (102) is fixedly connected to the bottom surface of the unit treatment block (101), a sewage input pipe (103) located at the top of the first unit treatment block (101) is connected to the left side surface, a clean water drainage pipe (104) is fixedly plugged into the right side surface of the fifth unit treatment block (101), and a sedimentation chamber (105) is opened inside the unit treatment block (101) to sediment. A sloping plate packing unit (106) is provided at the upper right of the sedimentation chamber (105); a mud discharge branch pipe (107) is fixedly plugged on the bottom surface of the unit processing block (101); the mud discharge branch pipe (107) is connected to the sedimentation chamber (105); a mud discharge solenoid valve (108) is installed on the mud discharge branch pipe (107); a quick assembly joint (109) is connected to the bottom end of the mud discharge branch pipe (107); and a mud discharge main pipe (110) is connected to the bottom end of the quick assembly joint (109); a packing frame assembly (2) is provided on the top surface of the unit processing block (101); the packing frame assembly (2) includes an overflow groove (21); the overflow groove (21) is opened on the top surface of the unit processing block (101) and is located at the right end thereof; and a packing frame assembly (2) is provided inside the sedimentation chamber (105). A maintenance change mechanism (3), the maintenance change mechanism (3) comprising a maintenance change block (31), the maintenance change block (31) being fixedly connected to the top surface of the inner cavity of the precipitation chamber (105), the bottom end of the maintenance change block (31) being fixedly connected to an anti-disturbance vertical plate (32), a maintenance change shaft (35) being movably plugged into the maintenance change block (31), one end of the maintenance change shaft (35) extending from the surface of the unit processing block (101), a one-way transmission (4) being arranged outside the maintenance change shaft (35), the one-way transmission (4) comprising a one-way drive disk (41), a central through hole (42) being opened on the one-way drive disk (41), the maintenance change shaft (35) being movably plugged into the inside of the central through hole (42), the fifth unit being arranged A maintenance driver (5) is provided on the front of the processing block (101), the maintenance driver (5) comprising a maintenance support plate (51), the maintenance support plate (51) being fixedly connected to the surface of the fifth unit processing block (101), the unit processing block (101) being provided with a maintenance auxiliary mechanism (6), the maintenance auxiliary mechanism (6) comprising a maintenance gathering groove (61), the maintenance gathering groove (61) being opened on the top surface of the unit processing block (101) and being located at the left end thereof, the overflow groove (21) being connected to the maintenance gathering groove (61), a residual scraping mechanism (7) being provided on the surface of the unit processing block (101), the residual scraping mechanism (7) comprising a residual scraping plate (71), the residual scraping plate (71) being slidably inserted into the interior of the maintenance gathering groove (61),An assembling mechanism (8) is provided on the left side surface of the unit processing block (101), wherein the assembling mechanism (8) comprises an assembling boss (81), and the assembling boss (81) is fixedly connected to the left side surface of the unit processing block (101).

2. The energy-saving sewage treatment and recycling device according to claim 1 is characterized in that: The packing frame component (2) further comprises an adapting groove (22), the adapting groove (22) being arranged on the bottom surface of the inner cavity of the overflow groove (21), the adapting groove (22) being communicated with the precipitation chamber (105), a conversion cone (23) being slidably inserted inside the adapting groove (22), the top of the conversion cone (23) passing through the overflow groove (21) and the maintenance gathering groove (61) and extending upward, the central axis of the conversion cone (23) being lower on the left and higher on the right, a deep groove (24) being arranged on the right end surface of the conversion cone (23), an embedded through hole (25) being arranged on the inner wall of the deep groove (24), the number of the embedded through holes (25) being six, the six embedded through holes (25) being evenly distributed on the inner wall of the deep groove (24), the left end of the embedded through hole (25) being open and the opening being arranged On the left end surface of the conversion cone (23), a load-bearing bar (26) located at the left end is fixedly connected to the inner wall of the embedded through hole (25), and the inclined plate filling unit (106) is filled in the embedded through hole (25) and is located on the load-bearing bar (26). The conversion cone (23) is fixedly plugged with a directional central axis (29) located in the middle thereof. The right end of the directional central axis (29) extends to the inside of the depth groove (24) and is movably connected to a depth bridge box (28). The right end of the depth bridge box (28) extends from the inside of the depth groove (24) and extends to the inside of the overflow groove (21) and is fixedly connected to a transition bridge box (27). The transition bridge box (27) is fixedly connected to the right side surface of the inner cavity of the overflow groove (21). The left end of the directional central axis (29) passes through a maintenance change block (31).

3. The energy-saving sewage treatment and recycling device according to claim 2 is characterized in that: The maintenance change mechanism (3) further comprises a cylindrical chamber (33), the cylindrical chamber (33) being arranged inside the maintenance change block (31), the maintenance change shaft (35) penetrating the cylindrical chamber (33), an expansion groove (34) being arranged on the inner wall of the cylindrical chamber (33), the directional center shaft (29) penetrating the expansion groove (34), a transmission spiral strip (36) located inside the cylindrical chamber (33) being fixedly sleeved on the surface of the maintenance change shaft (35), a transmission gear plate (37) being fixedly sleeved on the inside of the directional center shaft (29), a linkage gear plate (38) being fixedly sleeved on the outside of the maintenance change shaft (35), the number of the linkage gear plates (38) being five, and the five linkage gear plates (38) being transmission-connected via a linkage chain (39).

4. The energy-saving sewage treatment and recycling device according to claim 3 is characterized in that: The one-way transmission device (4) further comprises an expansion ring groove (43), the expansion ring groove (43) being arranged on the inner wall of the central through hole (42), a transmission ratchet gear (44) being slidably inserted into the interior of the expansion ring groove (43), the transmission ratchet gear (44) being fixedly sleeved on the exterior of the maintenance change shaft (35), a transmission elastic strip (45) being fixedly connected to the inner wall of the expansion ring groove (43), the other end of the transmission elastic strip (45) being unidirectionally meshed with the transmission ratchet gear (44), two winding ring grooves (46) being arranged on the surface of the one-way driving disk (41), a pull-back lead wire (47) being fixedly connected to the inner wall of one winding ring groove (46), a drive pull wire (48) being fixedly connected to the inner wall of the other winding ring groove (46), the pull-back lead wire (47) and the drive pull wire (48) being wound around the interior of the corresponding winding ring groove (46).

5. The energy-saving sewage treatment and recycling device according to claim 4 is characterized in that: The maintenance driver (5) further comprises an electric telescopic rod (52) and a driving force storage spring (53); the electric telescopic rod (52) is fixedly mounted on the top surface of the maintenance support plate (51); the top end of the electric telescopic rod (52) is fixedly connected to the end of the driving pull wire (48); the driving force storage spring (53) is fixedly connected to the top surface of the maintenance support plate (51); and the top end of the driving force storage spring (53) is fixedly connected to the end of the pull-back lead wire (47).

6. An energy-saving sewage treatment and recycling device according to any one of claims 1 to 5, characterized in that: The maintenance auxiliary mechanism (6) further comprises a maintenance guide pipe (62), the maintenance guide pipe (62) being fixedly plugged into the surface of the unit processing block (101) and being connected to the maintenance gathering groove (61), the other end of the maintenance guide pipe (62) being bent downward and being connected to a maintenance delivery pipe (63), the maintenance delivery pipe (63) being inclined with the left side higher and the right side lower.

7. An energy-saving sewage treatment and recycling device according to any one of claims 1 to 5, characterized in that: The residual scraping mechanism (7) further comprises a bent opening hole (72), which is formed on the residual scraping plate (71) and located at the upper left corner thereof; a shielding bent plate (73) is slidably inserted into the interior of the bent opening hole (72); the left end of the shielding bent plate (73) is fixedly connected to the left side surface of the inner cavity of the maintenance gathering groove (61); the front and rear ends of the shielding bent plate (73) are fixedly connected to the inner wall of the maintenance gathering groove (61); a power threaded rod (74) is movably inserted into the residual scraping plate (71); the power threaded rod (74) is located below the shielding bent plate (73); the power threaded rod (74) is threadedly matched with the residual scraping plate (71); the end of the power threaded rod (74) extends to the outside of the unit processing block (101) and is fixedly sleeved with a driving gear (75); the number of the driving gears (75) is five, and the five driving gears (75) are connected in transmission through a driving chain (76); The residual scraping mechanism (7) also includes a feed hanging bar (77), which is placed on the top surface of the unit processing block (101), and a stop-slip through hole (78) is provided on the feed hanging bar (77), and a stop-slip boss (79) is movably inserted inside the stop-slip through hole (78), and the stop-slip boss (79) is fixedly connected to the top surface of the unit processing block (101), and the left end of the feed hanging bar (77) is fixedly connected to a protective shell (710), and the protective shell (710) is pressed on the surface of the unit processing block (101), and the end of the power threaded rod (74), the driving gear (75), and the driving chain (76) are all located inside the protective shell (710), and a driving motor (711) located at the right end of the protective shell (710) is fixedly installed on the surface of the protective shell (710), and the end of the output shaft on the driving motor (711) extends into the interior of the protective shell (710) and is fixedly connected to the end of a power threaded rod (74).

8. An energy-saving sewage treatment and recycling device according to any one of claims 1 to 5, characterized in that: The assembling mechanism (8) further comprises a plurality of assembling slots (82), wherein the assembling slots (82) are arranged on the top surface of the assembling boss (81), wherein a propulsion chamber (83) is arranged inside the assembling boss (81), wherein the propulsion chamber (83) is located below the assembling slots (82) and the two are communicated with each other, wherein a gradually expanding liquid distribution pipe (84) is fixedly inserted on the right side surface of the inner cavity of the propulsion chamber (83), wherein the other end of the gradually expanding liquid distribution pipe (84) extends to the inside of the unit processing block (101) and is communicated with the precipitation chamber (105), wherein the assembling mechanism (8) further comprises an assembling groove (85), wherein the right side surfaces of the first, second, third and fourth unit processing blocks (101) are all provided with the assembling groove (85), wherein the assembling groove (85) is arranged on the right side surfaces of the first, second, third and fourth unit processing blocks (101 ... 5) An assembly insert (86) is fixedly inserted on the top surface of the inner cavity, and the top of the assembly insert (86) extends upward to the inside of the overflow groove (21). An external insert (87) is movably inserted in the assembly slot (82) corresponding to the first unit processing block (101), and the top of the external insert (87) is connected to a layout transverse pipe (88), and the layout transverse pipe (88) is connected to the sewage input pipe (103). The assembly mechanism (8) also includes a clean water chamber (89), which is opened inside the fifth unit processing block (101) and located at its right end. The clean water drainage pipe (104) is connected to the clean water chamber (89), and the clean water chamber (89) is connected to the overflow groove (21) above it through a pipeline.

Citation Information

Patent Citations

  • Rotational micro electrolytic industrial wastewater treatment device and treatment method

    CN106430432A

  • Efficient and environment-friendly precipitation device for urban sewage treatment

    CN111714937A

  • Environment-friendly sewage treatment filler inclined plate type sewage sedimentation tank

    CN213555521U

  • Inclined tube mounting structure of inclined tube sedimentation tank

    CN217449071U

  • Liftable integrated inclined tube packing device for wastewater treatment

    CN221296376U