The combination of modular drainage ditch assembly unit and porous connectivity solves the problem of connection between the ductile drainage structure between the temporary and permanent use of the residue field, realize the flexibility and persistence of the residue drainage system, and improve the slag field. Safety and environmental protection level.

CN119352628APending Publication Date: 2025-01-24POWERCHINA HUADONG ENG CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411698367.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-26
Publication Date
2025-01-24

AI Technical Summary

Technical Problem

The existing slag yard drainage structure has connection problems between temporary and permanent use, resulting in poor drainage or waste of resources, making it difficult to adapt to the settlement deformation of the slag yard.

Method used

The modular drainage ditch assembly unit is adopted, and the bearing hinge is connected by the bearing hinge composed of pipe grooves, shaft tubes, groove holes, and porous pipes to form temporary drainage grooves. It is expected to gradually transition to permanent drainage facilities.

Benefits of technology

It achieves rapid construction and flexible adjustment of temporary drainage ditches to adapt to the settlement of the slag yard, reduces secondary construction and resource waste, and improves the safety and environmental protection level of the slag yard.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119352628A_ABST
    Figure CN119352628A_ABST
Patent Text Reader

Abstract

The invention relates to a permanent and temporary combined slag yard drainage structure, and belongs to the technical field of water and soil conservation, the permanent and temporary combined slag yard drainage structure comprises a slag body, during temporary fixing, the slag body is provided with a drainage ditch assembly and an anti-skid ridge, the drainage ditch assembly is formed by assembling at least two drainage ditch assembly units, and each drainage ditch assembly unit comprises a module body; the left side wall and the right side wall of each module body are provided with staggered connecting teeth and sliding grooves respectively, the front side wall and the rear side wall of each module body are provided with staggered pipe grooves and shaft pipes respectively, shaft holes are formed in the shaft pipes, and every two adjacent module bodies are arranged at intervals. Wherein the shaft tube on one module main body is embedded into the tube groove in the other module main body and is connected with the tube groove in the other module main body through a porous communicating tube, and the connecting teeth on one module main body are embedded into the sliding grooves in the other module main body; during permanent fixation, a reinforcing mesh layer is laid on the drainage ditch assembly, and a concrete surface layer is poured on the reinforcing mesh layer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a permanent and temporary combined slag yard drainage structure, belonging to the technical field of soil and water conservation. Background Art

[0002] With the rapid development of the economy, production activities in the fields of mining, construction, and water conservancy are increasing. Slag yards, as important facilities for treating and storing waste, are widely used in these industries. Slag yards are mainly used to store solid wastes such as slag, construction waste, and excavated earth and stone. However, with the increase in the amount of accumulated objects in the slag yard and the complexity of the natural environment in which they are located, the drainage problem of the slag yard has gradually become an important link that cannot be ignored. Especially in rainy seasons or sudden extreme weather conditions, water accumulation in the slag yard will not only affect the stability of the waste slag stacking, but may even cause secondary disasters such as mudslides and slag landslides, which seriously threaten the safety of downstream areas. Therefore, the reasonable design of the slag yard drainage system and the effective water and soil control combined with the long-term use needs of the slag yard have become the core issues in the design and management of modern slag yards.

[0003] Traditional slag dump drainage structures include two types: temporary drainage and permanent drainage. Temporary drainage structures are generally used in the slag dump process, usually using simple drainage ditches, diversion pipes and other facilities, with the characteristics of low cost and convenient construction, but the long-term use effect is poor, the drainage capacity is limited, and it is difficult to cope with large-scale precipitation. The permanent drainage structure is mainly used in the long-term operation stage of the slag dump, usually using reinforced concrete structure, complex design, long construction period and high cost. In actual projects, since most of the slag dump process is not compacted, the settlement deformation of the slag dump is large, and the existing permanent drainage structure cannot adapt to the deformation of the slag dump. There are often problems in the connection between temporary drainage and permanent drainage structures, resulting in poor drainage or waste of engineering resources. Therefore, how to achieve an effective combination of temporary drainage and permanent drainage in slag dump construction has become a technical problem that needs to be solved urgently.

[0004] In order to solve the above problems, the present invention proposes a permanent and temporary combined slag dump drainage structure. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention aims to provide a permanent and temporary combined slag dump drainage structure.

[0006] A permanent and temporary combined slag yard drainage structure comprises a slag body, wherein a drainage ditch assembly and an anti-skid step are arranged on the slag body when the slag body is temporarily solidified, wherein the drainage ditch assembly is composed of at least two drainage ditch assembly units, wherein the drainage ditch assembly unit comprises a module body, wherein left and right side walls of the module body are respectively provided with staggered connecting teeth and slide grooves, and front and rear side walls of the module body are respectively provided with staggered pipe grooves and shaft tubes, wherein shaft holes are arranged in the shaft tubes, and two adjacent module bodies are arranged at intervals from each other, wherein the shaft tube on one module body is engaged with the pipe groove on another module body, and the two modules are connected by a multi-hole connecting pipe, wherein the connecting teeth on one module body are engaged with the slide groove on another module body; During permanent consolidation, a steel mesh layer is laid on the drainage ditch assembly, and a concrete surface layer is poured on the steel mesh layer.

[0007] Furthermore, a first gravel cushion layer, a geomembrane layer and a second gravel cushion layer are laid in sequence from bottom to top between the drainage ditch assembly unit and the slag body.

[0008] Furthermore, the anti-skid sill is arranged at intervals along the length direction of the drainage ditch assembly, and one is arranged at the starting point and the end point. The anti-skid sill is composed of a bottom trapezoidal sill and backfill concrete cast in one piece. The cross-section of the bottom trapezoidal sill is a right-angled trapezoid and is embedded in the slag body.

[0009] Furthermore, the anti-slip step is arranged at the intersection of the drainage ditch assembly units of the ditch assembly body.

[0010] Furthermore, the cross-section of the slide groove is trapezoidal, and the width of the slide groove gradually increases inwardly, and the shape of the connecting tooth is adapted to the shape of the slide groove.

[0011] Furthermore, the shaft tube is a cylinder, the cross-section of the tube groove is an arc surface, the cylinder is embedded in the arc surface, the shaft tube and the shaft hole are arranged concentrically with the tube groove, and the tube groove and the shaft tube have the same length.

[0012] Furthermore, a full-length steel bar is arranged in the porous connecting pipe, and backfill slurry is poured into it.

[0013] Furthermore, a normal cast-in-place section is arranged at the rear non-slag section of the drainage ditch assembly.

[0014] Compared with the prior art, the present invention has the following advantages and beneficial effects: (1) The adjacent modular drainage ditch assembly units are connected by bearing hinges composed of pipe grooves, shaft pipes, slot holes and porous connecting pipes to form a typical cross-section of the drainage ditch. They are assembled and extended along the water flow direction through the chute and connecting teeth to form a temporary drainage ditch for the slag yard. The construction speed is fast and can be flexibly adjusted at different construction stages to adapt to the settlement of the slag yard. In addition, they are designed according to the size of the permanent drainage ditch and have strong temporary drainage capacity during construction. (2) After the temporary drainage ditch formed by assembly has settled steadily in the slag dump, full-length steel bars are inserted into the porous connecting pipes and backfilled with slurry. A steel mesh is laid on the surface of the temporary drainage ditch and a concrete surface layer is cast in situ to enhance the integrity and durability of the structure. The drainage system can be directly transitioned to permanent drainage facilities, reducing secondary construction and resource waste; (3) The construction method is simple and economical, and is suitable for slag dump environments with various geological and climatic conditions. The design and application of the drainage structure of this scheme can significantly improve the safety and environmental protection level of the slag dump. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a typical cross-sectional schematic diagram of the drainage ditch assembly of the present invention during the slag settling period; Figure 2 It is a schematic longitudinal section of the drainage ditch assembly of the present invention during the slag settling period; Figure 3 is an axonometric view of a gutter assembly unit of the present invention; Figure 4 is a top view of a gutter assembly unit of the present invention; Figure 5 is a left side view of the gutter assembly unit of the present invention; Figure 6 is an axonometric view of a drainage ditch assembly of the present invention; Figure 7 is a top view of the drainage ditch assembly of the present invention; Figure 8 It is a schematic diagram of the processing of the anti-skid step assembly unit of the drainage ditch assembly of the present invention; Fig. 9 It is a top view of the anti-skid step of the drainage ditch assembly of the present invention; Fig.10 This is the AA section of the anti-skid step of the drainage ditch assembly of the present invention; Fig.11 The anti-skid sill BB section of the drainage ditch assembly of the present invention; Fig.12 It is a schematic diagram of the modification of the drainage ditch assembly of the present invention after the slag body has settled and stabilized. DETAILED DESCRIPTION

[0016] In order to enable those skilled in the art to better understand the technical solution of the present invention, the implementation scheme of the present invention is described below in conjunction with specific embodiments. However, it should be understood that the drawings are only used for illustrative purposes and cannot be understood as a limitation on this patent. In order to better illustrate this embodiment, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted. The positional relationship described in the drawings is only for illustrative purposes and cannot be understood as a limitation on this patent.

[0017] Unless otherwise specified, in the present invention, if there are terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the orientation or position relationship in the present invention are only used for exemplary description and cannot be understood as a limitation of this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood in combination with the drawings and according to the specific circumstances. In addition, the terms "first", "second", "third", "fourth", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0018] Unless otherwise clearly specified and limited, in the present invention, the terms "disposed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0019] The following is attached to the instruction manual Figures 1 to 12 The present invention is further described with reference to the specific embodiments, but is not intended to limit the present invention. Embodiment 1:

[0020] like Figures 1 to 12As shown, the present invention provides a permanent and temporary combined slag field drainage structure, comprising a drainage ditch assembly unit 2, a porous connecting pipe 15, a geomembrane layer 12, a first gravel cushion layer 11, a second gravel cushion layer 13, a slag body 1, an anti-slip step 02, a normal cast-in-place section 03, a steel mesh layer 9, a concrete surface layer 10, a full-length steel bar 16 and a backfill slurry 17, wherein the slag body 1 is compacted waste slag, wherein the lower part of the flood drainage assembly unit 2 is the slag body 1, the first gravel cushion layer 11, the geomembrane layer 12 and the second gravel cushion layer 13 from bottom to top, that is, the geomembrane layer 12 is buried in the first gravel cushion layer 11 and the second gravel cushion layer 13; like Figures 3-5 As shown, the drainage ditch assembly unit 2 is a prefabricated concrete structure, which consists of a module body 3, a connecting tooth 4, a slide groove 5, a pipe groove 6, an axle tube 7 and an axle hole 8. The module body 3 is a rectangular parallelepiped structure, and a slide groove 5 with a trapezoidal cross-section is provided on its side, and the width of the slide groove 5 gradually increases from the side of the module body 3 to the inside; the connecting tooth 4 is a straight quadrangular prism with a trapezoidal cross-section, and is symmetrical with the slide groove 5 at the center point of the side of the top surface of the module body 3, and the connecting tooth 4 on the opposite side of the module body 3 is symmetrical with the slide groove 5; the axle tube 7 is a cylinder arranged at intervals on the adjacent side of the slide groove 5, embedded in the pipe groove 6 with an arc section, and the axle hole 8 is set at its center, the axle tube 7, the axle hole 8 and the pipe groove 6 are arranged concentrically, and the pipe groove 6 and the axle tube 7 have the same length, and the two are arranged at intervals; the axle tube 7 arranged on the opposite side of the module body 3 is staggered with the pipe groove 6, and the axle tube 7 on the opposite side can fit tightly with the pipe groove 6; like Figures 6 and 7 As shown, adjacent drainage ditch assembly units 2 are engaged with the shaft tubes 7 and the pipe grooves 6 arranged at intervals, assembled according to the designed section to form a typical section, and then assembled along the flow direction through the connecting teeth 4 and the slide grooves 5 to form a drainage ditch assembly 1. The porous connecting pipe 15 is a hollow porous stainless steel pipe, and its outer diameter is consistent with the shaft hole 8. After assembly, it is concentric with the shaft hole 8 of the drainage ditch assembly unit 2. The porous connecting pipe 15 is inserted into the shaft hole 8 and serves as a rotation axis to form a bearing hinge with the adjacent drainage ditch assembly unit 2; like Figure 2 As shown, anti-skid steps 02 are arranged at intervals along the length direction of the drainage ditch assembly 1. The anti-skid steps 02 are arranged at the intersection of the drainage ditch assembly units 2, and one anti-skid step 02 is arranged at the starting point and the end point.

[0021] like Figures 8 to 11As shown, the anti-skid step 02 is composed of a bottom trapezoidal step 021 and backfill concrete 022, which are cast in one piece. The bottom trapezoidal step 021 is a cast-in-place concrete structure with a right-angle trapezoidal cross-section, embedded in the bottom slag body 1; the connecting teeth 4 of the drainage ditch assembly unit 2 at the anti-skid step 02 are cut off, and the backfill concrete 022 is cast in the chute 5 after assembly; the porous connecting pipe 15 can be disconnected at the anti-skid step 02, but the slot holes are all connected; a normal cast-in-place section 03 is set at the non-slag section behind the drainage ditch assembly 1, and normal construction is carried out according to the size and requirements of the permanent drainage ditch; like Fig.12 As shown, the full-length steel bars 16 are arranged along the flow direction of the drainage ditch assembly 1. After the bottom slag body 1 settles and stabilizes, the full-length steel bars 16 are inserted into the porous connecting pipe 15, and then backfill slurry 17 is poured into the porous connecting pipe 15. The backfill slurry 17 is composed of cement mortar, pure cement slurry and other consolidating materials; a steel mesh layer 9 is laid on the surface of the temporary drainage ditch assembly 1 formed by assembling the drainage ditch assembly unit 2, and then a concrete surface layer 10 is poured to form a permanent drainage ditch.

[0022] According to the description and drawings of the present invention, those skilled in the art can easily manufacture or use the permanent and temporary combined slag dump drainage structure of the present invention, and can produce the positive effects recorded in the present invention.

[0023] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent change made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. A permanent and temporary combined slag dump drainage structure, comprising a slag body (1), characterized in that: During the solidification process, a drainage ditch assembly (01) and an anti-skid step (02) are arranged on the slag body (1), the drainage ditch assembly (01) being composed of at least two drainage ditch assembly units (2) being assembled, the drainage ditch assembly unit (2) comprising a module body (3), the left and right side walls of the module body (3) being respectively provided with staggered connecting teeth (4) and slide grooves (5), the front and rear side walls of the module body (3) being respectively provided with staggered pipe grooves (6) and shaft tubes (7), the shaft tubes (7) being provided with shaft holes (8), the two adjacent module bodies (3) being arranged at intervals from each other, the shaft tube (7) on one module body (3) being engaged with the pipe groove (6) on the other module body (3), and being connected by a multi-hole connecting tube (15), the connecting teeth (4) on one module body (3) being engaged with the slide grooves (5) on the other module body (3); During permanent consolidation, a steel mesh layer (9) is laid on the drainage ditch assembly (01), and a concrete surface layer (10) is poured on the steel mesh layer (9).

2. A permanent and temporary combined slag dump drainage structure as claimed in claim 1, characterized in that: A first gravel cushion layer (11), a geomembrane layer (12) and a second gravel cushion layer (13) are laid in sequence from bottom to top between the drainage ditch assembly unit (2) and the slag body (1).

3. A permanent and temporary combined slag dump drainage structure as claimed in claim 1, characterized in that: The anti-skid sill (02) is arranged at intervals along the length direction of the drainage ditch assembly (01), and is arranged at a starting point and an end point, respectively. The anti-skid sill (02) is composed of a bottom trapezoidal sill (021) and backfill concrete (022) cast in one piece. The cross section of the bottom trapezoidal sill (021) is a right-angled trapezoid and is embedded in the slag body (1).

4. A permanent and temporary combined slag dump drainage structure as claimed in claim 3, characterized in that: The anti-slip step (02) is arranged at the junction of the drainage ditch assembly unit (2) of the ditch assembly (01).

5. The permanent and temporary combined slag dump drainage structure according to claim 1, characterized in that: The cross section of the slide groove (5) is trapezoidal, and the width of the slide groove (5) gradually increases inwardly, and the shape of the connecting tooth (4) is compatible with the shape of the slide groove (5).

6. The permanent and temporary combined slag dump drainage structure according to claim 1, characterized in that: The shaft tube (7) is a cylinder, the cross section of the tube groove (6) is an arc surface, the cylinder is embedded in the arc surface, the shaft tube (7) and the shaft hole (8) are arranged concentrically with the tube groove (6), and the tube groove (6) and the shaft tube (7) have the same length.

7. The permanent and temporary combined slag dump drainage structure according to claim 1, characterized in that: A full-length steel bar (16) is arranged in the porous connecting pipe (15), and backfill slurry (17) is poured into it.

8. The permanent and temporary combined slag dump drainage structure according to claim 1, characterized in that: A normal cast-in-place section (03) is arranged at the rear non-slag section of the drainage ditch assembly (01).