A grid structure for a large-span clinker storage production line

By introducing pressure relief, heating and pressure measurement components into the clinker grid structure, the damage to the grid rack caused by snow weight is solved, and stronger support, faster snow melting and more timely safety monitoring are achieved, extending the service life of the grid rack.

CN119352705BActive Publication Date: 2025-04-25ANHUI ZHONGYA STEEL STRUCTURE ENG
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411945762.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-27
Publication Date
2025-04-25
Estimated Expiration
2044-12-27

AI Technical Summary

Technical Problem

In the heavy snow weather in the north in winter, the snow accumulation in the clinker warehouse will increase weight for a long time, resulting in damage to the grid structure and shortening the service life.

Method used

A large-span clinker library production line mesh structure is designed, including pressure relief components, heating components and pressure measurement components. The pressure relief component provides support, the heating component generates heat through friction to accelerate the melting of snow, and the pressure measuring component monitors the weight of snow and promptly notifies and deals with it.

Benefits of technology

It effectively increases the support force of the mesh, accelerates the melting of snow, reduces the damage to the mesh by snow, extends the service life of the mesh, and promptly prevents excessive snow from causing damage to the mesh.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119352705B_ABST
    Figure CN119352705B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, and discloses a grid structure of a large-span clinker storage production line, comprising a grid body, a heating component, a connecting ring, a rubber tube, a copper ring, a copper sheet, a rubber plate, a pulley and a support rod. In the invention, when the sliding column moves, it will drive the fixed ring to slide inside the first sliding rail, thereby squeezing the first spring, and the second spring will also be squeezed by the sliding column. After being squeezed, they shrink and play a buffering role. When the fixed ring slides inside the first sliding rail, it will drive the connecting plate to rotate on the connecting shaft, and the connecting plate will drive the pulley to slide inside the sliding groove, thereby generating friction on the rubber sheet. At this time, the heat generated by the friction will be absorbed by the copper sheet and then transferred to the sliding column through the connecting ring. During the sliding process, the sliding column will also generate friction with the rubber tube. At this time, the heat generated will be absorbed by the sliding column and transferred to the copper plate through the support rod, thereby increasing the temperature of the copper plate and accelerating the melting of snow.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a grid structure of a large-span clinker storage production line. Background Art

[0002] The grid structure of the clinker silo production line can bear the weight of the clinker silo and various loads, ensuring that the silo will not deform or collapse during operation. The design of the grid structure enables the clinker silo to efficiently store and transport clinker, reducing material loss during storage and transportation, thereby improving overall production efficiency. It also has good durability and wind and earthquake resistance, and can remain stable in various harsh environments, ensuring the normal operation of the clinker silo.

[0003] The grid structure of the traditional clinker silo production line can efficiently store and transport clinker. However, when there is heavy snow in the northern winter, a lot of snow will accumulate on the top of the clinker silo. This snow will accumulate on the top of the silo for a long time and will gradually increase in weight, causing a certain degree of damage to the grid structure, shortening the service life of the grid structure. Summary of the invention

[0004] In order to solve the problems existing in the background technology, the present invention provides a large-span clinker storage production line grid structure which can increase the supporting force of the grid and accelerate the melting of snow on the roof.

[0005] In view of the problems in the prior art, the present invention provides a grid structure of a large-span clinker storage production line, including a grid body, the heating component is fixedly installed inside the pressure relief component, the interior of the heating component includes a connecting block, a connecting shaft, a connecting plate, a pulley, a slide groove, a rubber plate, a copper sheet, a copper ring, a connecting ring and a rubber tube, the connecting ring is slidably connected to the side wall of the sliding column, the rubber tube and the sliding column are slidably connected, two groups of the rubber tubes are connected to the upper and lower ends of the connecting ring, one of the copper rings is connected to the side wall of the connecting ring, two groups of the copper sheets are fixedly connected to the inner sides of the slide groove respectively, the copper sheet and the rubber sheet are fixedly connected, the rubber sheet is fixedly installed inside the slide groove, the pulley is slidably connected to the inside of the slide groove, the pulley and the rubber sheet are fitted but not fixedly connected, the two groups of the connecting blocks are fixedly connected to one end of the fixed ring, a group of connecting shafts are fixedly connected between the two groups of the connecting blocks, a group of connecting plates are rotatably connected to the connecting shaft, and a group of pulleys are rotatably connected to one end of the connecting plate.

[0006] Specifically, a group of pressure relief components are fixedly installed on the grid body, and the interior of the pressure relief component includes a first connecting box, a sliding column, a fixed ring, a first slide rail, a first spring, a second set of rods and a second spring. The first connecting box is fixedly installed on the grid body, the upper end of the sliding column is fixedly connected to one end of the support rod, the sliding column is slidably connected to the interior of the first connecting box, the fixed ring is fixedly connected to the outer wall of the sliding column, and the interior of the first slide rail is slidably connected to the fixed ring.

[0007] Specifically, the first slide rail is fixedly installed inside the first connecting box, the upper end of the first spring is fixedly connected to the lower end of the fixing ring, the lower end of the first spring is fixedly connected to the inside of the first connecting box, the telescopic end of the second set of rods is fixedly connected to the lower end of the fixing ring, the base of the second set of rods is fixedly installed inside the first connecting box, the upper end of the second spring is fixedly connected to the lower end of the sliding column, and the lower end of the second spring is fixedly connected to the inside of the second connecting box.

[0008] Specifically, a plurality of pressure measuring assemblies are fixedly installed on the grid body, and the pressure measuring assemblies are located below the pressure relief assemblies. The interior of the pressure measuring assemblies includes a second connection box, a connection sleeve, a sensor, a mounting plate and a fixing block, and the second connection box is fixedly installed on the grid body.

[0009] Specifically, the second connection box is internally slidably connected to the side wall of the sliding column, a group of connection sleeves are fixedly installed on the side wall of the sliding column, a group of sensors are fixedly installed on both sides of the connection sleeves, and the sensors are electrically connected to the control system.

[0010] Specifically, two groups of mounting plates are fixedly installed inside the second connection box. The two groups of mounting plates are respectively located on one side of a group of sensors. Multiple groups of fixing blocks are fixedly installed on the mounting plates.

[0011] Specifically, a group of fixed plates are fixedly installed on the upper end of the grid body, a plurality of groups of first sets of rods are fixedly installed on the fixed plates, and a group of springs are fixedly installed inside the first sets of rods.

[0012] Beneficial effects of the present invention:

[0013] 1. When the copper plate on the roof is filled with a lot of snow, the pressure relief assembly of the present invention provides a certain support force to prevent the snow from being too heavy and causing damage to the grid.

[0014] 2. The heating component in the present invention will continuously generate heat through friction driven by the pressure relief component, and transfer heat to the copper plate on the roof through the sliding column, thereby increasing the temperature of the copper plate and accelerating the melting of snow.

[0015] 3. The pressure measuring component in the present invention can identify whether the weight of the snow on the roof is within its tolerance range. If it exceeds the range, it will promptly notify the staff to handle it to prevent the excessive snow on the roof from damaging the grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0018] Figure 2 A distribution diagram of the connection structure of the internal parts of the pressure relief assembly of the present invention;

[0019] Figure 3 For the present invention Figure 2 Side parts distribution diagram;

[0020] Figure 4 A distribution diagram of the connection structure of the internal parts of the pressure measuring structure of the present invention;

[0021] Figure 5 for Figure 2 Enlarged view of point A in the middle;

[0022] Figure 6 for Figure 3 Enlarged view of point B in the middle;

[0023] Figure 7 for Figure 3 Enlarged view of point C in the middle;

[0024] Figure 8 for Figure 4 Enlarged view of point D in the middle.

[0025] In the figure: 1. grid body; 11. fixed plate; 12. first set of rods; 13. support rod; 2. pressure relief assembly; 21. first connection box; 22. slide column; 23. fixed ring; 24. first slide rail; 25. first spring; 26. second set of rods; 27. second spring; 3. pressure measuring assembly; 31. second connection box; 32. connection sleeve; 33. sensor; 34. mounting plate; 35. fixed block; 4. heating assembly; 41. connection block; 42. connection shaft; 43. connecting plate; 44. pulley; 45. slide groove; 46. rubber plate; 47. copper sheet; 471. copper ring; 48. connection ring; 49. rubber cylinder. DETAILED DESCRIPTION

[0026] In order to make the technical methods, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0027] like Figure 2 ,3 , 5, 6 and Figure 7 As shown, in view of the problems in the prior art, the present invention provides a grid structure of a large-span clinker storage production line, including a grid body 1, the heating component 4 is fixedly installed inside the pressure relief component 2, the interior of the heating component 4 includes a connecting block 41, a connecting shaft 42, a connecting plate 43, a pulley 44, a slide groove 45, a rubber plate 46, a copper sheet 47, a copper ring 471, a connecting ring 48 and a rubber tube 49, the connecting ring 48 is slidably connected to the side wall of the sliding column 22, the rubber tube 49 and the sliding column 22 are slidably connected, the two groups of rubber tubes 49 respectively fix the upper and lower ends of the connecting ring 48, and one end of the copper ring 471 is fixed to the upper and lower ends of the connecting ring 48. The side wall of the end fixing connecting ring 48, the two groups of copper sheets 47 are respectively fixedly connected to the inner sides of the slide groove 45, the copper sheet 47 and the rubber sheet 46 are fixedly connected, the rubber sheet 46 is fixedly installed inside the slide groove 45, the pulley 44 is slidably connected inside the slide groove 45, the pulley 44 and the rubber sheet 46 are fitted but not fixedly connected, the two groups of connecting blocks 41 are fixedly connected to one end of the fixing ring 23, a group of connecting shafts 42 are fixedly connected between the two groups of connecting blocks 41, a group of connecting plates 43 are rotatably connected to the connecting shaft 42, and a group of pulleys 44 are rotatably connected to one end of the connecting plate 43;

[0028] A set of pressure relief components 2 is fixedly installed on the grid body 1, and the interior of the pressure relief component 2 includes a first connection box 21, a slide column 22, a fixing ring 23, a first slide rail 24, a first spring 25, a second sleeve rod 26 and a second spring 27. The first connection box 21 is fixedly installed on the grid body 1, and the upper end of the slide column 22 is fixedly connected to one end of the support rod 13, and the slide column 22 is slidably connected to the interior of the first connection box 21, and the fixing ring 23 is fixedly connected to the outer wall of the slide column 22. The interior of the first slide rail 24 is slidably connected to The fixing ring 23, the first slide rail 24 is fixedly installed inside the first connection box 21, the upper end of the first spring 25 is fixedly connected to the lower end of the fixing ring 23, the lower end of the first spring 25 is fixedly connected to the inside of the first connection box 21, the telescopic end of the second sleeve rod 26 is fixedly connected to the lower end of the fixing ring 23, the base of the second sleeve rod 26 is fixedly installed inside the first connection box 21, the upper end of the second spring 27 is fixedly connected to the lower end of the slide column 22, and the lower end of the second spring 27 is fixedly connected to the inside of the second connection box 31.

[0029] (1) In the present invention, when the slide column 22 moves, it will drive the fixing ring 23 to slide inside the first slide rail 24, thereby squeezing the first spring 25. The second spring 27 will also be squeezed by the slide column 22. After being squeezed, they shrink and play a buffering role, which can effectively prevent the roof from being damaged instantly when it reaches its bearing limit. When the fixing ring 23 slides inside the first slide rail 24, it will drive the connecting plate 43 to rotate on the connecting shaft 42, and the connecting plate 43 will drive the pulley 44 to slide inside the slide groove 45, thereby generating friction with the rubber plate 46. At this time, the heat generated by the friction will be absorbed by the copper sheet 47, and then transferred to the slide column 22 through the connecting ring 48. During the sliding process, friction will also be generated with the rubber tube 49. The heat generated at this time will also be absorbed by the sliding column 22, and finally transferred to the copper plate through the support rod 13, thereby increasing the temperature of the copper plate and accelerating the melting of snow. As the heavy snow continues to fall, part of the snow on the copper plate will fall off due to excessive accumulation. At this time, the sliding column 22 will rise driven by the first spring 25 and the second spring 27. After a period of time, the snow will accumulate again, thereby driving the sliding column 22 to slide downward. In the process of continuous up and down friction, a large amount of heat will be generated, thereby ensuring the melting efficiency of the snow on the roof, and reducing the amount of snow accumulation on the roof, thereby preventing excessive snow from damaging the grid.

[0030] like Figure 4 as well as Figure 8 As shown, a plurality of pressure measuring assemblies 3 are fixedly installed on the grid body 1, and the pressure measuring assemblies 3 are located below the pressure relief assembly 2. The interior of the pressure measuring assembly 3 includes a second connecting box 31, a connecting sleeve 32, a sensor 33, a mounting plate 34 and a fixing block 35. The second connecting box 31 is fixedly installed on the grid body 1, and the interior of the second connecting box 31 is slidably connected to the side wall of the sliding column 22, and a group of connecting sleeves 32 are fixedly installed on the side wall of the sliding column 22, and a group of sensors 33 are fixedly installed on both sides of the connecting sleeves 32, and the sensors 33 are electrically connected to the control system. Two groups of mounting plates 34 are fixedly installed inside the second connecting box 31, and the two groups of mounting plates 34 are respectively located on one side of a group of sensors 33, and a plurality of fixing blocks 35 are fixedly installed on the mounting plate 34.

[0031] (2) In the present invention, when the connecting sleeve 32 on the sliding column 22 slides downward and the sensor 33 contacts the first three groups of fixing blocks 35, it will send a signal to the central control system to remind the staff that there is too much snow and it needs to be cleared in time after the snow stops. When the sensor 33 contacts the last group of fixing blocks 35, the sensor 33 will immediately transmit a signal to the central control system and sound an alarm to indicate that the snow has reached the bearing limit of the grid and needs to be cleared immediately. This can prevent the staff from being unable to judge that the snow is too heavy, causing damage to the grid and shortening its service life.

[0032] like Figure 1 As shown, a set of fixing plates 11 are fixedly mounted on the upper end of the grid body 1, and a plurality of first sets of rods 12 are fixedly mounted on the fixing plates 11, and a set of springs are fixedly mounted inside the first sets of rods 12.

[0033] (3) In the present invention, one end of the grid body 1 is fixed on the ground to complete the fixing of the grid, and then the wall construction is carried out. After the construction is completed, a copper plate is welded on the multiple groups of support rods 13. The copper plate and the wall are not connected, and the radius of the conical copper plate is greater than the radius of the cylindrical wall. The copper plate can be slidably connected to the wall.

[0034] Working principle: First, fix one end of the grid body 1 on the ground to complete the fixing of the grid, and then carry out the wall construction. After the construction is completed, weld the copper plate on the multiple groups of support rods 13. The copper plate and the wall are not connected, and the radius of the conical copper plate is greater than the radius of the cylindrical wall. The copper plate can be slidably connected to the wall. When a large amount of snow accumulates on the copper plate on the roof, the multiple groups of support rods 13 will be forced to slide downward, and the sliding column 22 will also slide downward. When the sliding column 22 moves, it will drive the fixing ring 23 to slide inside the first slide rail 24, thereby squeezing the first spring 25. When the first slide rail 24 is pressed, the second spring 27 at the bottom of the slide column 22 will also be squeezed. After being squeezed, they will form an elastic force to offset the pressure, thereby allocating part of the pressure to the copper plate on the roof and playing a buffering role. When the fixing ring 23 slides inside the first slide rail 24, it will drive the connecting plate 43 to rotate on the connecting shaft 42, and the connecting plate 43 will drive the pulley 44 to slide inside the slide groove 45, thereby generating friction with the rubber plate 46. At this time, the heat generated by the friction will be absorbed by the copper sheet 47 and then transferred to the slide column 22 through the connecting ring 48. The rubber cylinder 49 will also generate friction, and the heat generated at this time will also be absorbed by the slide column 22, and finally transferred to the copper plate through the support rod 13, thereby increasing the temperature of the copper plate and accelerating the melting of snow. As the heavy snow continues to fall, the snow on the copper plate will fall off due to excessive accumulation. At this time, the slide column 22 will rise driven by the first spring 25 and the second spring 27, and after a period of time, the snow will accumulate again, thereby driving the slide column 22 to slide downward. In the process of continuous up and down friction, a large amount of heat will be generated, thereby ensuring the melting efficiency of snow on the roof and reducing the accumulation of snow on the roof. The amount of snow accumulation can be prevented to prevent excessive snow accumulation from causing damage to the grid. When the connecting sleeve 32 on the sliding column 22 slides downward and the sensor 33 contacts the first three groups of fixed blocks 35, it will send a signal to the central control system to remind the staff that there is too much snow accumulation and it needs to be cleaned up in time after the snow stops. When the sensor 33 contacts the last group of fixed blocks 35, the sensor 33 will immediately transmit a signal to the central control system and sound an alarm to prompt that the snow has reached the bearing limit of the grid and needs to be cleaned up immediately. This can prevent the staff from being unable to judge that the snow is too heavy, which will cause damage to the grid and shorten its service life.

[0035] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention.

Claims

1. A grid structure for a large-span clinker storage production line, characterized in that: It comprises a grid main body (1); A heating component (4), wherein the heating component (4) is fixedly mounted inside the pressure relief component (2), and the interior of the heating component (4) includes a connecting block (41), a connecting shaft (42), a connecting plate (43), a pulley (44), a slide groove (45), a rubber plate (46), a copper sheet (47), a copper ring (471), a connecting ring (48), and a rubber tube (49); A connecting ring (48), wherein the connecting ring (48) is slidably connected to a side wall of the sliding column (22); A rubber tube (49), wherein the rubber tube (49) and the sliding column (22) are slidably connected, and two groups of the rubber tubes (49) are respectively fixed to the upper and lower ends of the connecting ring (48); A copper ring (471), one end of which is fixed to the side wall of the connecting ring (48); Copper sheets (47), two groups of the copper sheets (47) are respectively fixedly connected to two sides of the interior of the slide groove (45), and the copper sheets (47) and the rubber sheet (46) are fixedly connected; A rubber plate (46), wherein the rubber plate (46) is fixedly mounted inside the slide groove (45); A pulley (44), wherein the pulley (44) is slidably connected inside the slide groove (45), and the pulley (44) and the rubber plate (46) are in close contact but not fixedly connected; A support rod (13), one end of the support rod (13) being fixedly connected to the upper end of the sliding column (22), one ends of a plurality of groups of the support rods (13) being welded together, and a copper plate being welded to the support rod (13); A group of pressure relief components (2) are fixedly mounted on the grid body (1); the interior of the pressure relief component (2) comprises a first connection box (21), a slide column (22), a fixing ring (23), a first slide rail (24), a first spring (25), a second set of rods (26) and a second spring (27); the first connection box (21) is fixedly mounted on the grid body (1); the upper end of the slide column (22) is fixedly connected to one end of the support rod (13); the slide column (22) is slidably connected to the interior of the first connection box (21); the fixing ring (23) is fixedly connected to the outer wall of the slide column (22); and the interior of the first slide rail (24) is slidably connected to the fixing ring (23).

2. According to claim 1, a large-span clinker storage production line grid structure is characterized by: The two groups of connection blocks (41) are fixedly connected to one end of the fixing ring (23), a group of connection shafts (42) are fixedly connected between the two groups of connection blocks (41), a group of connection plates (43) are rotatably connected to the connection shafts (42), and one end of the connection plates (43) is rotatably connected to a group of pulleys (44).

3. The grid structure of a large-span clinker storage production line according to claim 2 is characterized in that: The first slide rail (24) is fixedly mounted inside the first connection box (21); the upper end of the first spring (25) is fixedly connected to the lower end of the fixing ring (23); the lower end of the first spring (25) is fixedly connected to the inside of the first connection box (21); the telescopic end of the second sleeve rod (26) is fixedly connected to the lower end of the fixing ring (23); the base of the second sleeve rod (26) is fixedly mounted inside the first connection box (21); the upper end of the second spring (27) is fixedly connected to the lower end of the slide column (22); and the lower end of the second spring (27) is fixedly connected to the inside of the second connection box (31).

4. The grid structure of a large-span clinker storage production line according to claim 1 is characterized in that: A plurality of pressure measuring assemblies (3) are fixedly mounted on the grid body (1); the pressure measuring assemblies (3) are located below the pressure relief assembly (2); the interior of the pressure measuring assemblies (3) comprises a second connection box (31), a connection sleeve (32), a sensor (33), a mounting plate (34) and a fixing block (35); the second connection box (31) is fixedly mounted on the grid body (1).

5. The grid structure of a large-span clinker storage production line according to claim 4 is characterized in that: The interior of the second connection box (31) is slidably connected to the side wall of the sliding column (22), a group of connection sleeves (32) are fixedly mounted on the side wall of the sliding column (22), and a group of sensors (33) are fixedly mounted on both sides of the connection sleeve (32), and the sensors (33) are electrically connected to the control system.

6. The grid structure of a large-span clinker storage production line according to claim 5 is characterized by: Two groups of mounting plates (34) are fixedly mounted inside the second connection box (31), the two groups of mounting plates (34) are respectively located on one side of a group of sensors (33), and a plurality of groups of fixing blocks (35) are fixedly mounted on the mounting plates (34).

7. The grid structure of a large-span clinker storage production line according to claim 6 is characterized by: A set of fixing plates (11) are fixedly mounted on the upper end of the grid body (1), a plurality of sets of first rods (12) are fixedly mounted on the fixing plates (11), and a set of springs are fixedly mounted inside the first rods (12).