Electrolytic cell cluster control method and device, electronic equipment and medium

By obtaining and analyzing the status of wind power power and electrolytic groove clusters, the start -stop status instructions and adjustment of target power to the electrolyte cluster solve the problem of random fluctuation power of wind power, realize the stable operation of the electrolytic groove cluster and the efficient utilization of wind power resources Essence

CN119372712APending Publication Date: 2025-01-28北京亿华通氢能科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411491659.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-24
Publication Date
2025-01-28

AI Technical Summary

Technical Problem

In the field of wind power hydrogen production, the prior art is difficult to effectively suppress the random fluctuating power of wind power, resulting in the inability of the battery to assume the main peak-shaving power function, and it is necessary to use electrolytic cell cluster control technology to suppress it.

Method used

By obtaining the current status and wind power prediction of the electrolytic groove cluster, calculate the actual total power of the electrolytic groove group, the power increment of the total target groove group, the operating boundary and start -stop status, and send the start -stop status instruction under the electrolytic slot clus Target power and transition trend adjust the target power of the electrolytic groove group.

Benefits of technology

The effective and flatness of the random fluctuation power of the wind power is achieved, ensuring the stable operation of the electrolytic groove cluster, and avoiding the problem of overload and power unstable battery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119372712A_ABST
    Figure CN119372712A_ABST
Patent Text Reader

Abstract

The invention provides an electrolytic cell cluster control method and device, electronic equipment and a medium. The method comprises the steps that according to the numerical relation between the actual total power of electrolytic cell sets and the operation boundary of the electrolytic cell sets, the planned operation number of the electrolytic cell sets and the actual start-stop state of each electrolytic cell set; issuing a start-stop state instruction to the electrolytic cell group in the electrolytic cell cluster; according to the target total cell group power increment and the actual start-stop state of each cell group, determining the cell group variable load trend corresponding to the cell cluster, the number of the cell groups in each operation state at the next moment and the cell group power change rate; and determining target power corresponding to each electrolytic cell group according to the cell group power change rate, the target total cell group power increment, the actual start-stop state of each electrolytic cell group, the electrolytic cell group variable load trend corresponding to the electrolytic cell cluster and the number of the electrolytic cell groups in each operation state at the next moment. According to the invention, the electrolytic cell cluster can be reasonably controlled, so that the wind power random fluctuation power can be stabilized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of wind power hydrogen production, and in particular to an electrolyzer cluster control method, device, electronic equipment and medium. Background Art

[0002] In the field of wind power hydrogen production, due to the high cost of off-grid power channels, local consumption has become an important solution for the development of wind power resources. Due to the cost control of batteries that are only suitable for short-term energy storage characteristics and the requirements for cycle life, the battery capacity configuration is often reduced, which makes the battery unable to assume the main peak power function. It is necessary to use electrolyzer cluster control technology to achieve the smoothing of random fluctuations in wind power. How to reasonably control the electrolyzer cluster has become an urgent problem to be solved. Summary of the invention

[0003] In view of this, the purpose of the present application is to provide an electrolyzer cluster control method, device, electronic equipment and medium, which can reasonably control the electrolyzer cluster to achieve the stabilization of random fluctuations in wind power.

[0004] In a first aspect, an embodiment of the present application provides an electrolytic cell cluster control method, the method comprising:

[0005] Obtain the actual total power of the current electrolyzer group, the target total power increment of the electrolyzer group, the operation boundary of the electrolyzer group, the planned number of electrolyzer groups to be operated at the next moment, and the actual start and stop status of each electrolyzer group corresponding to the electrolyzer cluster; the target total power increment of the electrolyzer group and the planned number of electrolyzer groups to be operated are planned based on the wind power at the next moment;

[0006] According to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group, the planned operation quantity of the electrolytic cell group and the actual start-stop state of each electrolytic cell group, a start-stop state instruction is issued to the electrolytic cell groups in the electrolytic cell cluster so that the electrolytic cell groups operate according to the start-stop state instruction;

[0007] And according to the target total cell group power increment and the actual start and stop status of each electrolytic cell group, determine the electrolytic cell group load change trend corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the cell group power change rate;

[0008] According to the cell group power change rate, the target total cell group power increment, the actual start and stop status of each electrolytic cell group, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster and the number of electrolytic cell groups in each operating state at the next moment, the target power corresponding to each electrolytic cell group is determined so that each electrolytic cell group can operate according to the corresponding target power.

[0009] In a possible implementation, according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group, the planned operation quantity of the electrolytic cell group and the actual start and stop status of each electrolytic cell group, a start and stop status instruction is issued to the electrolytic cell groups in the electrolytic cell cluster, including:

[0010] Determine the target number of electrolytic cell groups in operation at the next moment of the electrolytic cell cluster according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group and the planned operation number of the electrolytic cell group;

[0011] According to the actual start / stop status of each electrolytic cell group, the numerical relationship between the number of electrolytic cell groups whose actual start / stop status is in operation and the target number of electrolytic cell groups in operation, a start / stop status instruction is issued to the electrolytic cell groups in the electrolytic cell cluster.

[0012] In a possible implementation, the planned operating number of the electrolytic cell group includes a first planned opening number without considering the spare capacity and a second planned opening number considering the spare capacity; determining the target operating number of the electrolytic cell group of the electrolytic cell cluster at the next moment according to the numerical relationship between the actual total power of the electrolytic cell group and the operating boundary of the electrolytic cell group and the planned operating number of the electrolytic cell group includes:

[0013] If the actual total power of the electrolytic cell group is within the operation boundary of the electrolytic cell group, the first planned start-up quantity is increased by one to obtain the first initial electrolytic cell group operation quantity; otherwise, the first planned start-up quantity is determined as the first initial electrolytic cell group operation quantity;

[0014] Determine the second initial electrolytic cell group operation quantity according to the difference between the second planned start-up quantity and the first planned start-up quantity;

[0015] The maximum value of the first initial electrolytic cell group operating number and the second initial electrolytic cell group operating number is determined as the target electrolytic cell group operating number.

[0016] In a possible implementation, according to the target total cell group power increment and the actual start and stop status of each electrolytic cell group, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the cell group power change rate are determined, including:

[0017] If the target total cell group power increment is greater than or equal to 0, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load increase trend; if the target total cell group power increment is less than 0, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load reduction trend;

[0018] According to the number of electrolytic cell groups whose actual start-stop state is the start state and the number of electrolytic cell groups whose actual start-stop state is the target working state, the cell group load-up power deviation and the cell group load-down climbing power boundary corresponding to the electrolytic cell cluster are calculated;

[0019] According to the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster and the numerical relationship among the target total cell group power increment, the cell group load increase power deviation and the cell group load reduction climbing power boundary, the number of electrolytic cell groups in each operating state and the cell group power change rate at the next moment corresponding to the electrolytic cell cluster are determined.

[0020] In a possible implementation, according to the number of electrolytic cell groups whose actual start-stop state is the start state and the number of electrolytic cell groups whose actual start-stop state is the target working state, the cell group load increase power deviation and the cell group load reduction climbing power boundary corresponding to the electrolytic cell cluster are calculated, including:

[0021] The product of the number of electrolytic cell groups whose actual start-stop state is the start state and the upper limit load ramp rate of the electrolytic cell group is determined as the cell group load power deviation corresponding to the electrolytic cell cluster;

[0022] The product of the number of electrolytic cell groups whose actual start-stop state is the target working state and the upper limit load reduction climbing rate of the electrolytic cell group is determined as the cell group load reduction climbing power boundary corresponding to the electrolytic cell cluster; the upper limit load increase climbing rate of the electrolytic cell group and the upper limit load reduction climbing rate of the electrolytic cell group are vectors.

[0023] In a possible implementation, according to the cell group power change rate, the target total cell group power increment, the actual start and stop status of each electrolytic cell group, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster, and the number of electrolytic cell groups in each operating state at the next moment, the target power corresponding to each electrolytic cell group is determined so that each electrolytic cell group operates according to the corresponding target power, including:

[0024] Determine the target power change rate or target power of each electrolytic cell group at the next moment according to the cell group power change rate, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the actual start and stop state of each electrolytic cell group;

[0025] For each electrolytic cell group whose target power change rate at the next moment has been determined, the sum of the target power change rate of each electrolytic cell group at the next moment and the target total cell group power increment is determined as the target power corresponding to each electrolytic cell group.

[0026] In a second aspect, an embodiment of the present application further provides an electrolytic cell cluster control device, the device comprising:

[0027] The acquisition module is used to obtain the actual total power of the current electrolyzer group, the target total power increment of the electrolyzer group, the operation boundary of the electrolyzer group, the planned operation number of the electrolyzer group at the next moment, and the actual start and stop status of each electrolyzer group corresponding to the electrolyzer cluster; the target total power increment of the electrolyzer group and the planned operation number of the electrolyzer group are planned based on the wind power at the next moment;

[0028] A sending module, used for sending start-stop state instructions to the electrolytic cell groups in the electrolytic cell cluster according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group, the planned operation number of the electrolytic cell group and the actual start-stop state of each electrolytic cell group, so that the electrolytic cell group operates according to the start-stop state instructions;

[0029] A determination module is used to determine the load variation trend of the electrolytic cell group corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the rate of change of the cell group power according to the target total cell group power increment and the actual start and stop status of each electrolytic cell group;

[0030] The determination module is also used to determine the target power corresponding to each electrolytic cell group based on the cell group power change rate, the target total cell group power increment, the actual start and stop status of each electrolytic cell group, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster and the number of electrolytic cell groups in each operating state at the next moment, so that each electrolytic cell group operates according to the corresponding target power.

[0031] In one possible implementation, the sending module is specifically used to determine the target number of operating electrolytic cell groups in the electrolytic cell cluster at the next moment based on the numerical relationship between the actual total power of the electrolytic cell group and the operating boundary of the electrolytic cell group and the planned operating number of the electrolytic cell groups; and to send start-stop status instructions to the electrolytic cell groups in the electrolytic cell cluster based on the actual start-stop status of each electrolytic cell group, the numerical relationship between the number of electrolytic cell groups whose actual start-stop status is the operating status and the target number of electrolytic cell groups.

[0032] In one possible implementation, the planned operating number of the electrolytic cell group includes a first planned start-up number without considering the backup capacity and a second planned start-up number considering the backup capacity; a sending module is specifically used to add one to the first planned start-up number to obtain a first initial electrolytic cell group operating number if the actual total power of the electrolytic cell group is within the operating boundary of the electrolytic cell group; otherwise, the first planned start-up number is determined as the first initial electrolytic cell group operating number; the second initial electrolytic cell group operating number is determined according to the difference between the second planned start-up number and the first planned start-up number; and the maximum value of the first initial electrolytic cell group operating number and the second initial electrolytic cell group operating number is determined as the target electrolytic cell group operating number.

[0033] In one possible implementation, a determination module is specifically used to determine if the target total cell group power increment is greater than or equal to 0, then the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load increase trend; if the target total cell group power increment is less than 0, then the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load reduction trend; according to the number of electrolytic cell groups whose actual start / stop states are the start state and the number of electrolytic cell groups whose actual start / stop states are the target working state, calculate the cell group load increase power deviation and the cell group load reduction climbing power boundary corresponding to the electrolytic cell cluster; according to the numerical relationship among the electrolytic cell group load change trend corresponding to the electrolytic cell cluster and the target total cell group power increment, the cell group load increase power deviation and the cell group load reduction climbing power boundary, determine the number of electrolytic cell groups in each operating state and the cell group power change rate corresponding to the electrolytic cell cluster at the next moment.

[0034] In one possible implementation, a determination module is specifically used to determine the product of the number of electrolytic cell groups whose actual start-stop state is the start state and the upper limit load-up climbing rate of the electrolytic cell group as the cell group load-up power deviation corresponding to the electrolytic cell cluster; the product of the number of electrolytic cell groups whose actual start-stop state is the target working state and the upper limit load-down climbing rate of the electrolytic cell group is determined as the cell group load-down climbing power boundary corresponding to the electrolytic cell cluster; the upper limit load-up climbing rate of the electrolytic cell group and the upper limit load-down climbing rate of the electrolytic cell group are vectors.

[0035] In one possible implementation, a determination module is specifically used to determine the target power change rate or target power of each electrolytic cell group at the next moment based on the cell group power change rate, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the actual start and stop state of each electrolytic cell group; for each electrolytic cell group whose target power change rate at the next moment has been determined, the sum of the target power change rate of each electrolytic cell group at the next moment and the target total cell group power increment is determined as the target power corresponding to each electrolytic cell group.

[0036] In a third aspect, an embodiment of the present application further provides an electronic device, comprising: a processor, a storage medium and a bus, wherein the storage medium stores machine-readable instructions executable by the processor. When the electronic device is running, the processor and the storage medium communicate via the bus, and the processor executes the machine-readable instructions to perform the steps of any electrolytic cell cluster control method of the first aspect.

[0037] In a fourth aspect, an embodiment of the present application further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the electrolytic cell cluster control method as described in any one of the first aspects are executed.

[0038] The embodiment of the present application provides a control method, device, electronic device and medium for an electrolyzer cluster, the method comprising: according to the numerical relationship between the actual total power of the electrolyzer group and the operation boundary of the electrolyzer group, the planned operation number of the electrolyzer group and the actual start-stop state of each electrolyzer group, the start-stop state instruction is issued to the electrolyzer group in the electrolyzer cluster, so that the electrolyzer group operates according to the start-stop state instruction; and according to the target total tank group power increment and the actual start-stop state of each electrolyzer group, the electrolyzer group load change trend corresponding to the electrolyzer cluster, the number of electrolyzer groups in each operating state at the next moment and the tank group power change rate are determined; according to the tank group power change rate, the target total tank group power increment, the actual start-stop state of each electrolyzer group, the electrolyzer group load change trend corresponding to the electrolyzer cluster and the number of electrolyzer groups in each operating state at the next moment, the target power corresponding to each electrolyzer group is determined, so that each electrolyzer group operates according to the corresponding target power. Through the method of the present application, the electrolyzer cluster can be reasonably controlled to achieve the stabilization of the random fluctuation power of wind power. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0040] Figure 1 A flow chart of an electrolytic cell cluster control method provided in an embodiment of the present application is shown;

[0041] Figure 2 A flow chart of another electrolytic cell cluster control method provided in an embodiment of the present application is shown;

[0042] Figure 3 A schematic structural diagram of an electrolytic cell cluster control device provided in an embodiment of the present application is shown;

[0043] Figure 4 A schematic structural diagram of an electronic device provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0044] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It should be understood that the drawings in the present application only serve the purpose of explanation and description and are not used to limit the scope of protection of the present application. In addition, it should be understood that the schematic drawings are not drawn in real proportion. The flowchart used in this application shows the operations implemented according to some embodiments of the present application. It should be understood that the operations of the flowchart can be implemented out of sequence, and the steps without logical context can be reversed in order or implemented simultaneously. In addition, those skilled in the art can add one or more other operations to the flowchart under the guidance of the content of the present application, or remove one or more operations from the flowchart.

[0045] In addition, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.

[0046] In order to enable those skilled in the art to use the contents of this application, the following implementation is provided in conjunction with the specific application scenario "wind power hydrogen production field". For those skilled in the art, the general principles defined herein can be applied to other embodiments and application scenarios without departing from the spirit and scope of this application. Although this application is mainly described around the "wind power hydrogen production field", it should be understood that this is only an exemplary embodiment.

[0047] It should be noted that the term "comprising" will be used in the embodiments of the present application to indicate the existence of the features declared thereafter, but does not exclude the addition of other features.

[0048] The following is a detailed description of an electrolytic cell cluster control method provided in an embodiment of the present application.

[0049] Reference Figure 1 As shown, it is a flow chart of a method for controlling an electrolytic cell cluster provided in an embodiment of the present application. The exemplary steps of the embodiment of the present application are described below:

[0050] S101, obtaining the actual total power of the current electrolytic cell group corresponding to the electrolytic cell cluster, the target total cell group power increment, the electrolytic cell group operation boundary, the planned operation number of the electrolytic cell group at the next moment, and the actual start and stop status of each electrolytic cell group.

[0051] In an embodiment of the present application, the electrolytic cell cluster includes at least one electrolytic cell group, and each electrolytic cell group includes a plurality of electrolytic cells. The actual total power of the electrolytic cell group corresponding to the electrolytic cell cluster refers to the sum of the actual powers of all electrolytic cell groups in the electrolytic cell cluster, which can be converted by the current actual wind power. The target total cell group power increment and the planned operation number of the electrolytic cell group are obtained by planning based on the wind power at the next moment; the target total cell group power increment refers to the value obtained by subtracting the actual total power of the electrolytic cell group from the planned total power of the electrolytic cell group at the next moment of the upper-level planning corresponding to the electrolytic cell cluster (planned based on the wind power at the next moment). The planned operation number of the electrolytic cell group refers to the number of electrolytic cell groups running at the next moment in the electrolytic cell cluster planned by the upper layer. The start-stop state includes the shutdown state and the running state; the running state includes the startup state (the state in which the target power cannot be received) and the target working state (the state in which the target power can be received); the target working state includes the static tank state and the dynamic tank state; the dynamic tank state includes the dynamic tank load increase and decrease state, and the dynamic tank leveling state.

[0052] Among them, the static tank state means that the target power assigned to the tank group does not change over time. The dynamic tank state means that the target power assigned to the electrolytic cell group changes over time. Dynamic tank leveling means that the electrolytic cell group is assigned a leveling function, and the power change is random. The dynamic tank load-up and load-down state means that a fixed load-up and load-down rate is assigned, and the power change is determined.

[0053] In addition, the electrolytic cell group operating boundaries include an upper operating power limit power boundary, a lower operating power limit power boundary, a load-up ramp power boundary, and a load-down ramp power boundary.

[0054] Among them, the upper limit power boundary of operating power = the number of electrolytic cell groups currently in operation * the rated power of the electrolytic cell group + the number of electrolytic cell groups currently in the startup state * the startup power of the electrolytic cell group. The lower limit power boundary of operating power = the number of electrolytic cell groups currently in operation * the lower limit power of the electrolytic cell group + the number of electrolytic cell groups currently in the startup state * the startup power. The load-up ramp power boundary = the number of electrolytic cell groups currently in operation * the maximum load-up ramp rate of the electrolytic cell group. The load-down ramp power boundary = the number of electrolytic cell groups currently in operation * the maximum load-down ramp power of the electrolytic cell group.

[0055] S102. According to the numerical relationship between the actual total power of the electrolytic cell group and the operating boundary of the electrolytic cell group, the planned operating number of the electrolytic cell group and the actual start / stop status of each electrolytic cell group, a start / stop status instruction is issued to the electrolytic cell groups in the electrolytic cell cluster, so that the electrolytic cell groups operate according to the start / stop status instruction.

[0056] In the implementation manner of the present application, the start-stop state instruction includes a start instruction, a shutdown instruction and a normal operation instruction. The normal operation instruction refers to an instruction to operate within a normal power working range.

[0057] Specifically, the start and stop status instructions are issued to the electrolytic cell groups in the electrolytic cell cluster through the following steps:

[0058] Step 1: Determine the target number of electrolytic cell groups in operation at the next moment in the electrolytic cell cluster according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group and the planned operation number of the electrolytic cell group.

[0059] In the embodiment of the present application, the target number of electrolytic cell groups in operation at the next moment refers to the number of electrolytic cell groups in operation in the electrolytic cell cluster at the next moment.

[0060] Here, the target number of electrolytic cell groups in operation at the next moment is determined by the following steps:

[0061] a. If the actual total power of the electrolytic cell group is within the operating boundary of the electrolytic cell group, the first planned start-up quantity is increased by one to obtain the first initial electrolytic cell group operating quantity; otherwise, the first planned start-up quantity is determined as the first initial electrolytic cell group operating quantity.

[0062] In an embodiment of the present application, it is determined whether the actual total power of the electrolytic cell group is greater than the upper limit power boundary of the operating power or less than the lower limit power boundary of the operating power; if the actual total power of the electrolytic cell group is greater than the upper limit power boundary of the operating power or less than the lower limit power boundary of the operating power, the first planned opening quantity is increased by one to obtain the first initial electrolytic cell group operation quantity; if the actual total power of the electrolytic cell group is less than or equal to the upper limit power boundary of the operating power and greater than or equal to the lower limit power boundary of the operating power, it is determined whether the actual total power of the electrolytic cell group is greater than the load climbing power boundary or less than the load reducing climbing power boundary; if the actual total power of the electrolytic cell group is greater than the load climbing power boundary or less than the load reducing climbing power boundary, the first planned opening quantity is increased by one to obtain the first initial electrolytic cell group operation quantity; if the actual total power of the electrolytic cell group is less than or equal to the load climbing power boundary and greater than or equal to the load reducing climbing power boundary, the first planned opening quantity is determined as the first initial electrolytic cell group operation quantity.

[0063] b. Determine the second initial electrolytic cell group operation quantity based on the difference between the second planned start-up quantity and the first planned start-up quantity.

[0064] In an embodiment of the present application, the difference obtained by subtracting the first planned start-up number from the second planned start-up number is determined as the standby number of the electrolytic cell group; if the standby number of the electrolytic cell group is equal to 0, the first planned start-up number is determined as the second initial electrolytic cell group operation number; if the standby number of the electrolytic cell group is greater than 0, the predicted wind power after the shortest time for the electrolytic cell group with the standby number of the electrolytic cell group to run from the startup state to the target working state is predicted based on the wind force prediction model; the predicted wind power is subtracted from the current actual wind power to obtain the wind power fluctuation power; the total fluctuating power of the electrolytic cell group corresponding to the wind power fluctuation power is determined from the historical fluctuation data; if the total fluctuating power of the electrolytic cell group is greater than 0 and the actual total power of the electrolytic cell group does not meet the upper limit power boundary and the upper limit climbing capacity under the first planned start-up number, the first planned start-up number is increased by one to obtain the second initial electrolytic cell group operation number; if the total fluctuating power of the electrolytic cell group is less than or equal to 0 or the actual total power of the electrolytic cell group meets the upper limit power boundary and the upper limit climbing capacity under the first planned start-up number, the first planned start-up number is determined as the second initial electrolytic cell group operation number.

[0065] The historical fluctuation data includes the total fluctuating power of the electrolyzer group corresponding to each wind power fluctuation power.

[0066] c. Determine the maximum value of the first initial electrolytic cell group operating quantity and the second initial electrolytic cell group operating quantity as the target electrolytic cell group operating quantity.

[0067] Step 2: according to the actual start / stop status of each electrolytic cell group, the numerical relationship between the number of electrolytic cell groups whose actual start / stop status is the running status and the target number of running electrolytic cell groups, a start / stop status instruction is issued to the electrolytic cell groups in the electrolytic cell cluster.

[0068] In an embodiment of the present application, if the number of electrolytic cell groups whose actual start-stop state is the running state is greater than the target number of running electrolytic cell groups, it is determined whether there is an electrolytic cell group whose actual start-stop state is the starting state. If there is an electrolytic cell group whose actual start-stop state is the starting state, a shutdown command is issued to any electrolytic cell group in the starting state; if there is no electrolytic cell group whose actual start-stop state is the starting state, a shutdown command will be issued to the electrolytic cell group in the running state with the shortest shutdown time.

[0069] In addition, when the electrolytic cell group is required to stop urgently due to sudden failure of the wind turbine, sudden weather causing serious shortage of wind power load, etc., it is determined whether there is an electrolytic cell group that needs to enter the shutdown state and is currently in the operating state in the current electrolytic cell group scheduling information planned by the upper layer. If there is an electrolytic cell group that needs to enter the shutdown state and is currently in the operating state, a shutdown command is issued to any electrolytic cell group that needs to enter the shutdown state and is currently in the operating state; if there is no electrolytic cell group that needs to enter the shutdown state, a shutdown command is issued to the electrolytic cell group in the operating state with the shortest remaining life.

[0070] The remaining life of the electrolytic cell group is calculated based on the number of starts and stops and the operating time of the electrolytic cell group.

[0071] If the number of electrolytic cell groups in the actual start-stop state is equal to the target number of electrolytic cell groups in operation, a normal operation instruction is issued to the electrolytic cell groups in the electrolytic cell cluster.

[0072] If the number of electrolytic cell groups in the actual start-stop state is less than the target number of electrolytic cell groups in operation, determine whether there is an electrolytic cell group that needs to enter the operating state and is currently in the shutdown state in the current electrolytic cell group scheduling information planned by the upper layer. If there is an electrolytic cell group that needs to enter the operating state and is currently in the shutdown state, a startup instruction is issued to any electrolytic cell group that needs to enter the operating state and is currently in the shutdown state; if there is no electrolytic cell group that needs to enter the operating state and is currently in the shutdown state, a startup instruction is issued to the electrolytic cell group that has the shortest running time from the startup state to the target working state and is currently in the shutdown state.

[0073] In addition, when the electrolytic cell group is required to start up quickly due to sudden failure of the wind turbine group, sudden weather causing serious overload of wind power, etc., a startup command is issued to the electrolytic cell group that has the shortest running time from the startup state to the target working state and is currently in the shutdown state.

[0074] The running time from the start-up state to the target working state is determined according to the temperature of the electrolytic cell group. The running time from the start-up state to the target working state is different for different temperatures.

[0075] S103, and according to the target total cell group power increment and the actual start and stop status of each electrolytic cell group, determine the electrolytic cell group load change trend corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the cell group power change rate.

[0076] The following steps are used to determine the load variation trend of the electrolytic cell group corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the power variation rate of the cell group:

[0077] Step 1: If the target total cell group power increment is greater than or equal to 0, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is an increasing trend; if the target total cell group power increment is less than 0, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a decreasing trend.

[0078] In the implementation mode of the present application, if the target total cell group power increment is greater than or equal to 0, it means that the electrolytic cell cluster needs to be loaded up to reach the total power of the electrolytic cell group planned by the upper layer, so the electrolytic cell group load change trend corresponding to the electrolytic cell cluster is a load increase trend. If the target total cell group power increment is less than 0, it means that the electrolytic cell cluster needs to be loaded down to reach the total power of the electrolytic cell group planned by the upper layer, so the electrolytic cell group load change trend corresponding to the electrolytic cell cluster is a load reduction trend.

[0079] Step 2: Calculate the cell group load-up power deviation and cell group load-down climbing power boundary corresponding to the electrolytic cell cluster according to the number of electrolytic cell groups whose actual start-stop state is the start state and the number of electrolytic cell groups whose actual start-stop state is the target working state.

[0080] In an embodiment of the present application, the product of the number of electrolytic cell groups whose actual start-stop state is the start state and the upper limit of the electrolytic cell group load-up climbing rate is determined as the cell group load-up power deviation Del_P1 corresponding to the electrolytic cell cluster; the product of the number of electrolytic cell groups whose actual start-stop state is the target working state and the upper limit of the electrolytic cell group load-down climbing rate is determined as the cell group load-down climbing power boundary Del_P2 corresponding to the electrolytic cell cluster; the upper limit of the electrolytic cell group load-up climbing rate and the upper limit of the electrolytic cell group load-down climbing rate are vectors, that is, the cell group load-up power deviation Del_P1 and the cell group load-down climbing power boundary Del_P2 are also vectors.

[0081] Step three, according to the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster and the numerical relationship among the target total cell group power increment, the cell group load increase power deviation and the cell group load reduction climbing power boundary, determine the number of electrolytic cell groups and the cell group power change rate in each operating state at the next moment corresponding to the electrolytic cell cluster.

[0082] In the implementation manner of the present application, the number of electrolytic cell groups in each operating state includes the number of electrolytic cell groups in the load-down state, the number of electrolytic cell groups in the static state, and the number of electrolytic cell groups in the dynamic state. The cell group power change rate refers to the cell group power change rate of the electrolytic cell group at the next moment.

[0083] Specifically, the number of electrolytic cell groups and the cell group power change rate of each operating state at the next moment corresponding to the electrolytic cell cluster are determined by the following steps:

[0084] (1) If the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load increase trend, determine whether the cell group load reduction and climbing power boundary Del_P2 is less than or equal to the value obtained by subtracting the cell group load increase power deviation Del_P1 from the target total cell group power increment Del_P, and obtain a first judgment result.

[0085] (2) If the cell group load reduction and ramping power boundary Del_P2 is greater than the value obtained by subtracting the cell group load increase power deviation Del_P1 from the target total cell group power increment Del_P, it means that the target total cell group power increment exceeds the smoothing capacity of the electrolytic cell cluster. Then, the upper limit load reduction and ramping rate of the electrolytic cell group is determined as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the target working state; the value obtained by (Del_P-Del_P2) / the number of electrolytic cell groups whose actual start-stop state is the start state is determined as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the start state.

[0086] (3) If the cell group load reduction and ramping power boundary Del_P2 is less than or equal to the value obtained by subtracting the cell group load increase power deviation Del_P1 from the target total cell group power increment Del_P, it means that the target total cell group power increment is within the range of the electrolytic cell cluster's smoothing capability. Then, the electrolytic cell group upper limit load increase and ramping rate is determined as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the start state; the value obtained by (Del_P-Del_P1) / the number of electrolytic cell groups whose actual start-stop state is the target working state is determined as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the target working state;

[0087] (4) Determine the number of electrolytic cell groups in each operating state at the next moment based on the first judgment result and the actual start / stop status of each electrolytic cell group, so that the electrolytic cell cluster can operate according to the planned total power of the electrolytic cell group at the next moment.

[0088] (5) If the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load reduction trend, the target total cell group power increment Del_P is deducted from the value of the cell group load reduction climbing power boundary Del_P1 to determine the target smoothing power Del_P3; and determine whether the cell group load increase power deviation Del_P1 is greater than the target total cell group power increment Del_P.

[0089] (6) If the cell group load power deviation Del_P1 is less than or equal to the target total cell group power increment Del_P, determine whether the cell group load power deviation Del_P1 is greater than the target smoothing power Del_P3; if the cell group load power deviation Del_P1 is greater than the target smoothing power Del_P3, it means that all electrolytic cell groups can meet the allocated power requirements when they are loaded. Then, according to the principle of taking the electrolytic cell group upper limit load ramp rate as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the start state, and the target smoothing power Del_P3 as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the target working state, the number of electrolytic cell groups in each operating state at the next moment and the cell group power change rate are determined according to the actual start-stop state of each electrolytic cell group, so that the electrolytic cell cluster can operate according to the planned total power of the electrolytic cell group at the next moment.

[0090] (7) If the cell group load power deviation Del_P1 is less than or equal to the target smoothing power Del_P3, it means that all electrolytic cell groups can meet the allocated power requirements when they are loaded, otherwise it means that all electrolytic cell groups cannot meet the allocated power requirements when they are loaded. In this case, according to the principle of taking the upper limit load ramp rate of the electrolytic cell group as the load ramp rate of all electrolytic cell groups, the number of electrolytic cell groups in each operating state and the cell group power change rate at the next moment are determined according to the actual start and stop status of each electrolytic cell group, so that the electrolytic cell cluster can operate according to the planned total power of the electrolytic cell group and the cell group power change rate at the next moment; the power beyond the smoothing capacity range is compensated by the battery charging and discharging power correction. If it still cannot be smoothed, the power beyond the smoothing capacity range is requested to be abandoned.

[0091] (8) If the cell group load-up power deviation Del_P1 is greater than the target total cell group power increment Del_P, determine whether the cell group load-down climbing power boundary Del_P2 is greater than the target smoothing power Del_P3, and obtain a second judgment result; if the cell group load-down climbing power boundary Del_P2 is greater than the target smoothing power Del_P3, it means that the target total cell group power increment exceeds the smoothing capacity of the electrolytic cell cluster, and the electrolytic cell group upper limit load-down climbing rate is determined as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the target working state; the value obtained by (Del_P-Del_P2) / the number of electrolytic cell groups whose actual start-stop state is the start state is determined as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the start state.

[0092] (9) If the cell group load reduction climbing power boundary Del_P2 is less than or equal to the target smoothing power Del_P3, it means that the target total cell group power increment is within the smoothing capacity of the electrolytic cell cluster, and the upper limit load reduction climbing rate of the electrolytic cell group is determined as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the shutdown state; when the electrolytic cell group whose actual start-stop state is the shutdown state is loaded down according to the upper limit load reduction climbing rate of the electrolytic cell group, the target smoothing power Del_P3 is determined as the cell group power change rate of the electrolytic cell group whose actual start-stop state is the target working state.

[0093] (10) Determine the number of electrolytic cell groups in each operating state at the next moment based on the second judgment result and the actual start / stop state of each electrolytic cell group, so that the electrolytic cell cluster can operate according to the planned total power of the electrolytic cell group at the next moment.

[0094] S104. Determine the target power corresponding to each electrolytic cell group according to the cell group power change rate, the target total cell group power increment, the actual start and stop status of each electrolytic cell group, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster, and the number of electrolytic cell groups in each operating state at the next moment, so that each electrolytic cell group operates according to the corresponding target power.

[0095] Step 1: Determine the power change rate or target power of each electrolytic cell group at the next moment according to the power change rate of the cell group, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the actual start and stop state of each electrolytic cell group.

[0096] (1) If the number of electrolytic cell groups in the load-down state at the next moment is greater than 0, and the load-change trend of the electrolytic cell groups is a load-down trend, the power change rate is preferentially allocated to the electrolytic cell groups whose actual start-stop state is the shutdown state according to the power change rate of the cell groups.

[0097] (2) If the number of electrolytic cell groups in the load-changing state at the next moment is greater than 0, and the load-changing trend of the electrolytic cell groups is an increasing trend, the power change rate is preferentially allocated to the electrolytic cell groups whose actual start-stop state is the start-up state according to the power change rate of the cell groups; if the number of electrolytic cell groups whose actual start-stop state is the start-up state is 0, the power change rate is preferentially allocated to the electrolytic cell groups with small actual operating power according to the power change rate of the cell groups.

[0098] (3) If the number of electrolytic cell groups in the static state at the next moment is greater than 0, determine whether the number of cell groups in the static state at the actual start / stop state is less than the number of electrolytic cell groups in the static state at the next moment; if the number of cell groups in the static state at the actual start / stop state is less than the number of electrolytic cell groups in the static state at the next moment, determine whether there is a moving cell group whose actual operating power is within a preset operating power threshold; if there is a target moving cell group whose actual operating power is within the preset operating power threshold, jump the target moving cell group within the preset operating power threshold to a static cell group, that is, determine the actual operating power of the target moving cell group as the target power of the target moving cell group.

[0099] The preset operating power threshold is [the planned power distribution of the electrolyzer group in the static state planned by the upper layer - the preset threshold, the planned power distribution of the electrolyzer group in the static state planned by the upper layer + the preset threshold]. The planned power distribution of the electrolyzer group in the static state planned by the upper layer is obtained by planning based on the wind power at the next moment, and refers to the power of the electrolyzer group in the static state planned by the upper layer at the next moment;

[0100] (4) If the number of electrolytic cell groups in the dynamic tank suppression state at the next moment is greater than 0, determine whether there is an electrolytic cell group whose actual start-stop state is the dynamic tank suppression state; if there is an electrolytic cell group whose actual start-stop state is the dynamic tank suppression state, the power change rate is preferentially allocated to the electrolytic cell group whose actual start-stop state is the dynamic tank suppression state according to the power change rate of the cell group.

[0101] (5) If there is no electrolytic cell group whose actual start-stop state is in the dynamic cell stabilization state, then when the electrolytic cell cluster has sufficient upper standby power to cope with random fluctuations, the power change rate is allocated to the electrolytic cell group whose actual start-stop state is in the load-increasing state and whose actual operating power is large, priority is given to allocating the power change rate according to the cell group power change rate; when the electrolytic cell cluster has sufficient lower standby power to cope with random fluctuations, the power change rate is allocated to the electrolytic cell group whose actual start-stop state is in the load-increasing state and whose actual operating power is small, priority is given to allocating the power change rate according to the cell group power change rate.

[0102] Step 2: for each electrolytic cell group whose power change rate at the next moment has been determined, the sum of the power change rate of each electrolytic cell group at the next moment and the target total cell group power increment is determined as the target power corresponding to each electrolytic cell group.

[0103] In an embodiment of the present application, for an electrolytic cell group assigned a power change rate, the sum of the power change rate of the electrolytic cell group at the next moment and the target total cell group power increment is determined as the target power corresponding to each electrolytic cell group.

[0104] The embodiment of the present application provides a control method for an electrolyzer cluster, the method comprising: according to the numerical relationship between the actual total power of the electrolyzer group and the operating boundary of the electrolyzer group, the planned operating number of the electrolyzer group and the actual start-stop state of each electrolyzer group, a start-stop state instruction is issued to the electrolyzer group in the electrolyzer cluster, so that the electrolyzer group operates according to the start-stop state instruction; and according to the target total tank group power increment and the actual start-stop state of each electrolyzer group, the electrolyzer group load change trend corresponding to the electrolyzer cluster, the number of electrolyzer groups in each operating state at the next moment, and the tank group power change rate are determined; according to the tank group power change rate, the target total tank group power increment, the actual start-stop state of each electrolyzer group, the electrolyzer group load change trend corresponding to the electrolyzer cluster and the number of electrolyzer groups in each operating state at the next moment, the target power corresponding to each electrolyzer group is determined, so that each electrolyzer group operates according to the corresponding target power. Through the method of the present application, the electrolyzer cluster can be reasonably controlled to achieve the stabilization of the random fluctuation power of wind power.

[0105] Reference Figure 2 As shown, it is a flow chart of another electrolytic cell cluster control method provided in an embodiment of the present application. The exemplary steps of the embodiment of the present application are described below:

[0106] S201. Determine the target number of operating electrolytic cell groups of the electrolytic cell cluster at the next moment according to the numerical relationship between the actual total power of the electrolytic cell group and the operating boundary of the electrolytic cell group and the planned operating number of the electrolytic cell group.

[0107] S202, according to the actual start / stop status of each electrolytic cell group, the numerical relationship between the number of electrolytic cell groups whose actual start / stop status is in operation and the target number of electrolytic cell groups in operation, issuing start / stop status instructions to the electrolytic cell groups in the electrolytic cell cluster.

[0108] An embodiment of the present application provides another electrolytic cell cluster control method, which can issue start and stop status instructions to the electrolytic cell groups in the electrolytic cell cluster to reasonably control the electrolytic cell cluster.

[0109] Based on the same inventive concept, an electrolytic cell cluster control device corresponding to the electrolytic cell cluster control method is also provided in the embodiment of the present application. Since the principle of solving the problem by the device in the embodiment of the present application is similar to the above-mentioned electrolytic cell cluster control method in the embodiment of the present application, the implementation of the device can refer to the implementation of the method, and the repeated parts will not be repeated.

[0110] Reference Figure 3 FIG. 1 is a schematic diagram of an electrolytic cell cluster control device provided in an embodiment of the present application, the device comprising:

[0111] The acquisition module 301 is used to obtain the actual total power of the current electrolytic cell group, the target total cell group power increment, the electrolytic cell group operation boundary, the planned operation number of the electrolytic cell group at the next moment, and the actual start and stop status of each electrolytic cell group corresponding to the electrolytic cell cluster; the target total cell group power increment and the planned operation number of the electrolytic cell group are planned based on the wind power at the next moment;

[0112] The sending module 302 is used to send the start-stop state instruction to the electrolytic cell groups in the electrolytic cell cluster according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group, the planned operation number of the electrolytic cell group and the actual start-stop state of each electrolytic cell group, so that the electrolytic cell group operates according to the start-stop state instruction;

[0113] The determination module 303 is used to determine the load variation trend of the electrolytic cell group corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the rate of change of the cell group power according to the target total cell group power increment and the actual start and stop status of each electrolytic cell group;

[0114] The determination module 303 is also used to determine the target power corresponding to each electrolytic cell group based on the cell group power change rate, the target total cell group power increment, the actual start and stop status of each electrolytic cell group, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster and the number of electrolytic cell groups in each operating state at the next moment, so that each electrolytic cell group operates according to the corresponding target power.

[0115] In one possible implementation, the sending module 302 is specifically used to determine the target number of operating electrolytic cell groups in the electrolytic cell cluster at the next moment based on the numerical relationship between the actual total power of the electrolytic cell group and the operating boundary of the electrolytic cell group and the planned operating number of the electrolytic cell groups; and to send start / stop status instructions to the electrolytic cell groups in the electrolytic cell cluster based on the actual start / stop status of each electrolytic cell group, the numerical relationship between the number of electrolytic cell groups whose actual start / stop status is the operating status and the target number of electrolytic cell groups.

[0116] In one possible implementation, the planned operating number of the electrolytic cell group includes a first planned start-up number without considering the backup capacity and a second planned start-up number considering the backup capacity; the sending module 302 is specifically used to increase the first planned start-up number by one to obtain a first initial electrolytic cell group operating number if the actual total power of the electrolytic cell group is within the operating boundary of the electrolytic cell group; otherwise, the first planned start-up number is determined as the first initial electrolytic cell group operating number; the second initial electrolytic cell group operating number is determined according to the difference between the second planned start-up number and the first planned start-up number; and the maximum value of the first initial electrolytic cell group operating number and the second initial electrolytic cell group operating number is determined as the target electrolytic cell group operating number.

[0117] In one possible implementation, the determination module 303 is specifically used to determine if the target total cell group power increment is greater than or equal to 0, then the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load increase trend; if the target total cell group power increment is less than 0, then the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load reduction trend; according to the number of electrolytic cell groups whose actual start / stop states are the start state and the number of electrolytic cell groups whose actual start / stop states are the target working state, calculate the cell group load increase power deviation and the cell group load reduction climbing power boundary corresponding to the electrolytic cell cluster; according to the numerical relationship among the electrolytic cell group load change trend corresponding to the electrolytic cell cluster and the target total cell group power increment, the cell group load increase power deviation and the cell group load reduction climbing power boundary, determine the number of electrolytic cell groups in each operating state corresponding to the electrolytic cell cluster at the next moment and the cell group power change rate.

[0118] In one possible implementation, the determination module 303 is specifically used to determine the product of the number of electrolytic cell groups whose actual start-stop state is the start state and the upper limit load-up climbing rate of the electrolytic cell group as the cell group load-up power deviation corresponding to the electrolytic cell cluster; the product of the number of electrolytic cell groups whose actual start-stop state is the target working state and the upper limit load-down climbing rate of the electrolytic cell group is determined as the cell group load-down climbing power boundary corresponding to the electrolytic cell cluster; the upper limit load-up climbing rate of the electrolytic cell group and the upper limit load-down climbing rate of the electrolytic cell group are vectors.

[0119] In one possible implementation, the determination module 303 is specifically used to determine the target power change rate or target power of each electrolytic cell group at the next moment based on the cell group power change rate, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the actual start and stop state of each electrolytic cell group; for each electrolytic cell group whose target power change rate at the next moment has been determined, the sum of the target power change rate of each electrolytic cell group at the next moment and the target total cell group power increment is determined as the target power corresponding to each electrolytic cell group.

[0120] The embodiment of the present application provides an electrolytic cell cluster control device, which includes: an acquisition module 301, which is used to obtain the current actual total power of the electrolytic cell group corresponding to the electrolytic cell cluster, the target total cell group power increment, the electrolytic cell group operation boundary, the planned operation number of the electrolytic cell group at the next moment, and the actual start-stop status of each electrolytic cell group; the target total cell group power increment and the planned operation number of the electrolytic cell group are planned based on the wind power at the next moment; a sending module 302 is used to send the electrolytic cell group in the electrolytic cell cluster according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group, the planned operation number of the electrolytic cell group and the actual start-stop status of each electrolytic cell group. Send a start-stop state instruction so that the electrolyzer group operates according to the start-stop state instruction; determine module 303, which is used to determine the electrolyzer group load change trend corresponding to the electrolyzer cluster, the number of electrolyzer groups in each operating state at the next moment, and the rate of change of the power of the electrolyzer group according to the target total cell group power increment and the actual start-stop state of each electrolyzer group; determine module 303, which is also used to determine the target power corresponding to each electrolyzer group according to the rate of change of cell group power, the target total cell group power increment, the actual start-stop state of each electrolyzer group, the electrolyzer group load change trend corresponding to the electrolyzer cluster, and the number of electrolyzer groups in each operating state at the next moment, so that each electrolyzer group operates according to the corresponding target power. Through the method of the present application, the electrolyzer cluster can be reasonably controlled to achieve the stabilization of the random fluctuation power of wind power.

[0121] like Figure 4 As shown, an electronic device 400 provided in an embodiment of the present application includes: a processor 401, a memory 402 and a bus, the memory 402 stores machine-readable instructions executable by the processor 401, when the electronic device is running, the processor 401 and the memory 402 communicate through the bus, and the processor 401 executes the machine-readable instructions to perform the steps of the electrolytic cell cluster control method as described above.

[0122] Specifically, the memory 402 and the processor 401 can be general-purpose memories and processors, which are not specifically limited here. When the processor 401 runs the computer program stored in the memory 402, the electrolytic cell cluster control method can be executed.

[0123] Corresponding to the above-mentioned electrolytic cell cluster control method, an embodiment of the present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned electrolytic cell cluster control method are executed.

[0124] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, the specific working process of the system and device described above can refer to the corresponding process in the method embodiment, and will not be repeated in this application. In the several embodiments provided in this application, it should be understood that the disclosed system, device and method can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the modules is only a logical function division. There may be other division methods in actual implementation. For example, multiple modules or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, indirect coupling or communication connection of devices or modules, which can be electrical, mechanical or other forms.

[0125] The modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, each functional unit in each embodiment of the present application may be integrated into a processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0126] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a non-volatile computer-readable storage medium that is executable by a processor. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the information processing method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as USB flash drives, mobile hard drives, ROM, RAM, magnetic disks, or optical disks.

[0127] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A method for controlling an electrolytic cell cluster, characterized in that: The method comprises: Obtain the actual total power of the current electrolytic cell group, the target total cell group power increment, the electrolytic cell group operation boundary, the planned operation number of the electrolytic cell group at the next moment, and the actual start and stop status of each electrolytic cell group corresponding to the electrolytic cell cluster; the target total cell group power increment and the planned operation number of the electrolytic cell group are planned based on the wind power at the next moment; According to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group, the planned operation quantity of the electrolytic cell group and the actual start-stop state of each electrolytic cell group, a start-stop state instruction is issued to the electrolytic cell groups in the electrolytic cell cluster, so that the electrolytic cell groups operate according to the start-stop state instruction; And according to the target total cell group power increment and the actual start and stop status of each electrolytic cell group, determine the electrolytic cell group load change trend corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the cell group power change rate; According to the cell group power change rate, the target total cell group power increment, the actual start and stop status of each electrolytic cell group, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster and the number of electrolytic cell groups in each operating state at the next moment, the target power corresponding to each electrolytic cell group is determined so that each electrolytic cell group operates according to the corresponding target power.

2. The electrolytic cell cluster control method according to claim 1, characterized in that: The issuing of a start / stop state instruction to the electrolytic cell groups in the electrolytic cell cluster according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group, the planned operation quantity of the electrolytic cell group and the actual start / stop state of each electrolytic cell group comprises: Determine the target number of electrolytic cell groups in operation at the next moment of the electrolytic cell cluster according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group and the planned operation number of the electrolytic cell group; According to the actual start / stop status of each electrolytic cell group, the numerical relationship between the number of electrolytic cell groups whose actual start / stop status is the operating status and the target number of operating electrolytic cell groups, a start / stop status instruction is issued to the electrolytic cell groups in the electrolytic cell cluster.

3. The electrolytic cell cluster control method according to claim 2, characterized in that: The planned operating number of the electrolytic cell group includes a first planned opening number without considering the spare capacity and a second planned opening number considering the spare capacity; the determining the target operating number of the electrolytic cell group of the electrolytic cell cluster at the next moment according to the numerical relationship between the actual total power of the electrolytic cell group and the operating boundary of the electrolytic cell group and the planned operating number of the electrolytic cell group includes: If the actual total power of the electrolytic cell group is within the operation boundary of the electrolytic cell group, the first planned start-up number is increased by one to obtain a first initial electrolytic cell group operation number; otherwise, the first planned start-up number is determined as the first initial electrolytic cell group operation number; Determining the second initial electrolytic cell group operation quantity according to the difference between the second planned start-up quantity and the first planned start-up quantity; The maximum value of the first initial electrolytic cell group operating number and the second initial electrolytic cell group operating number is determined as the target electrolytic cell group operating number.

4. The electrolytic cell cluster control method according to claim 1, characterized in that: The method of determining the load variation trend of the electrolytic cell group corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the rate of change of the cell group power according to the target total cell group power increment and the actual start and stop status of each electrolytic cell group includes: If the target total cell group power increment is greater than or equal to 0, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load increase trend; if the target total cell group power increment is less than 0, the load change trend of the electrolytic cell group corresponding to the electrolytic cell cluster is a load reduction trend; According to the number of electrolytic cell groups whose actual start-stop state is the start state and the number of electrolytic cell groups whose actual start-stop state is the target working state, the cell group load-up power deviation and the cell group load-down climbing power boundary corresponding to the electrolytic cell cluster are calculated; According to the load variation trend of the electrolytic cell group corresponding to the electrolytic cell cluster and the numerical relationship among the target total cell group power increment, the cell group load increase power deviation and the cell group load reduction climbing power boundary, the number of electrolytic cell groups and the cell group power change rate in each operating state at the next moment corresponding to the electrolytic cell cluster are determined.

5. The electrolytic cell cluster control method according to claim 4, characterized in that: The calculating of the cell group load-up power deviation and the cell group load-down climbing power boundary corresponding to the electrolytic cell cluster according to the number of electrolytic cell groups whose actual start-stop state is the start state and the number of electrolytic cell groups whose actual start-stop state is the target working state includes: The product of the number of electrolytic cell groups whose actual start-stop state is the start state and the upper limit load ramp rate of the electrolytic cell group is determined as the cell group load power deviation corresponding to the electrolytic cell cluster; The product of the number of electrolytic cell groups whose actual start-stop state is the target working state and the upper limit load reduction climbing rate of the electrolytic cell group is determined as the cell group load reduction climbing power boundary corresponding to the electrolytic cell cluster; the upper limit load increase climbing rate of the electrolytic cell group and the upper limit load reduction climbing rate of the electrolytic cell group are vectors.

6. The electrolytic cell cluster control method according to claim 1, characterized in that: The method of determining the target power corresponding to each electrolytic cell group according to the cell group power change rate, the target total cell group power increment, the actual start / stop state of each electrolytic cell group, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster, and the number of electrolytic cell groups in each operating state at the next moment, so that each electrolytic cell group operates according to the corresponding target power, includes: Determine the target power change rate or target power of each electrolytic cell group at the next moment according to the cell group power change rate, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the actual start and stop state of each electrolytic cell group; For each electrolytic cell group whose target power change rate at the next moment has been determined, the sum of the target power change rate of each electrolytic cell group at the next moment and the target total cell group power increment is determined as the target power corresponding to each electrolytic cell group.

7. An electrolytic cell cluster control device, characterized in that: The device comprises: An acquisition module is used to obtain the actual total power of the current electrolytic cell group, the target total cell group power increment, the electrolytic cell group operation boundary, the planned operation number of the electrolytic cell group at the next moment, and the actual start and stop status of each electrolytic cell group corresponding to the electrolytic cell cluster; the target total cell group power increment and the planned operation number of the electrolytic cell group are planned based on the wind power at the next moment; A sending module, used for sending a start-stop state instruction to the electrolytic cell groups in the electrolytic cell cluster according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group, the planned operation quantity of the electrolytic cell group and the actual start-stop state of each electrolytic cell group, so that the electrolytic cell group operates according to the start-stop state instruction; A determination module is used to determine the load variation trend of the electrolytic cell group corresponding to the electrolytic cell cluster, the number of electrolytic cell groups in each operating state at the next moment, and the rate of change of the cell group power according to the target total cell group power increment and the actual start and stop status of each electrolytic cell group; The determination module is also used to determine the target power corresponding to each electrolytic cell group based on the cell group power change rate, the target total cell group power increment, the actual start and stop status of each electrolytic cell group, the electrolytic cell group load change trend corresponding to the electrolytic cell cluster and the number of electrolytic cell groups in each operating state at the next moment, so that each electrolytic cell group operates according to the corresponding target power.

8. The electrolytic cell cluster control device according to claim 7, characterized in that: The sending module is specifically used for: Determine the target number of electrolytic cell groups in operation at the next moment of the electrolytic cell cluster according to the numerical relationship between the actual total power of the electrolytic cell group and the operation boundary of the electrolytic cell group and the planned operation number of the electrolytic cell group; According to the actual start / stop status of each electrolytic cell group, the numerical relationship between the number of electrolytic cell groups whose actual start / stop status is the operating status and the target number of operating electrolytic cell groups, a start / stop status instruction is issued to the electrolytic cell groups in the electrolytic cell cluster.

9. An electronic device, characterized in that: include: A processor, a storage medium and a bus, wherein the storage medium stores machine-readable instructions executable by the processor. When the electronic device is running, the processor communicates with the storage medium via the bus, and the processor executes the machine-readable instructions to perform the steps of the electrolytic cell cluster control method as described in any one of claims 1 to 6.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the electrolytic cell cluster control method according to any one of claims 1 to 6 are executed.