Filling slope stability evaluation method and system

By analyzing the history and real -time data of the slope monitoring system, calculating stable basic data and impact data, evaluating the stability of the slope and proposing survey suggestions, solving the problem of difficulty evaluating the stability of the slope in the existing technology, improved The safety and service life of the slope.

CN119378401AActive Publication Date: 2025-01-28XIAN UNIV OF SCI & TECH +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411651767.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-28
Publication Date
2025-01-28
Estimated Expiration
2044-11-28

AI Technical Summary

Technical Problem

The prior art is difficult to effectively evaluate the stability of the filling slope, especially when the slope deformation but the three main parameters (displacement, settlement, and cracks) do not reach abnormal conditions.

Method used

By obtaining the history and real -time data of the slope monitoring system, calculate the stable basic data of the slope, and analyze the stability affecting data in history and real -time data, and finally determine the comprehensive evaluation data of the stability of the slope to make a survey suggestion.

Benefits of technology

The accuracy of the stability of the slope is improved, and preventive reinforcement measures can be taken before the slope occurs before the slope, and the service life of the slope is extended and the safety of the slope is extended and the safety of the slope is procished.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119378401A_ABST
    Figure CN119378401A_ABST
Patent Text Reader

Abstract

The invention provides a filled slope stability evaluation method and system, and belongs to the technical field of civil geological engineering safety evaluation. The method for evaluating the stability of the filled side slope comprises the following steps: acquiring historical monitoring data of a side slope monitoring system on a to-be-evaluated side slope and monitoring acquisition data of the side slope monitoring system on the to-be-evaluated side slope in a preset time period; calculating slope stability basic data according to the monitoring acquisition data; analyzing slope stability influence data according to the historical monitoring data and the monitoring acquisition data; slope stability comprehensive evaluation data are determined according to the slope stability basic data and the slope stability influence data, and a slope survey suggestion is determined based on the slope stability comprehensive evaluation data; by adopting the technical scheme, the slope stability can be evaluated, and corresponding reinforcement measures and schemes can be taken based on the evaluation of the stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of civil geological engineering safety assessment, and in particular to a method and system for evaluating the stability of a fill slope. Background Art

[0002] The stability evaluation of fill slopes is a key link in civil engineering and geological engineering. It aims to evaluate the stability of fill slopes under different conditions and ensure their safety during long-term service. Generally speaking, the slope displacement deformation data, settlement deformation data and the number of cracks in the slope can be collected through the slope monitoring system. The stability trend of the slope can be analyzed based on the above parameters. When any data is abnormal, the slope monitoring system will issue a warning to the background. At this time, it is necessary to dispatch staff to conduct field surveys to ensure the stability of the slope. However, when the slope is deformed, it is possible that none of the above three parameters have reached an abnormal state. In order to ensure the stability of the slope, it is necessary to evaluate the stability of the slope in combination with the parameters collected by the slope monitoring system. Summary of the invention

[0003] The present application provides a method for evaluating the stability of a fill slope, which can evaluate the stability of a fill slope to improve the overall stability of the slope and take corresponding reinforcement measures and plans for the slope.

[0004] In a first aspect, the present application provides a method for evaluating the stability of a fill slope. The method comprises: Obtain historical monitoring data of the slope to be evaluated by the slope monitoring system and monitoring and collection data of the slope to be evaluated by the slope monitoring system within a preset time period; the historical monitoring data includes historical displacement data, historical settlement data, historical crack data and historical warning data; the preset time period is the time period from the last warning to the current time; the monitoring and collection data includes slope displacement data, slope settlement data and slope crack data; Calculate the basic slope stability data according to the monitoring and collection data; the basic slope stability data is negatively correlated with the slope displacement data, slope settlement data and slope crack data; Analyze slope stability impact data according to the historical monitoring data and the monitoring collection data; the slope stability impact data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data; Comprehensive evaluation data of slope stability are determined according to the basic slope stability data and the slope stability influencing data, and slope survey suggestions are determined based on the comprehensive evaluation data of slope stability.

[0005] Furthermore, the slope stability basic data is calculated according to the monitoring and collection data; the slope stability basic data is negatively correlated with the slope displacement data, slope settlement data and slope crack data and includes: Calculating displacement deviation data based on the slope displacement data of the first day and the slope displacement data of the last day within the preset time period; Calculating settlement deviation data based on the slope settlement data of the first day and the slope settlement data of the last day within the preset time period; Calculating crack deviation data based on the slope crack data of the first day and the slope crack data of the last day within the preset time period; The basic slope stability data is calculated according to the preset original slope stability value, the displacement deviation data, the settlement deviation data and the crack deviation data.

[0006] Furthermore, the calculation method of the slope stability basic data includes: Assuming that the preset time period is n days, the slope displacement data of the i-th day is , then the slope settlement data on the i-th day is , then the slope crack data on the i-th day is ; ; ; In the formula, is the basic data of slope stability, is the preset original stability value of the slope; is the intermediate value calculated in place of the others; is the displacement deviation data, is the settlement deviation data, is the crack deviation data; are respectively a preset first weight, a preset second weight and a preset third weight; and, .

[0007] Furthermore, the slope stability impact data is analyzed based on the historical monitoring data and the monitoring collection data; the slope stability impact data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data and includes: Determine a historical displacement time period, a historical settlement time period and a historical crack time period according to the historical monitoring data and the monitoring collection data; the historical displacement time period is a time period in which the displacement deviation data of any time period in the historical monitoring data is the same as the displacement deviation data of the preset time period; the historical settlement time period is a time period in which the settlement deviation data of any time period in the historical monitoring data is the same as the settlement deviation data of the preset time period; the historical crack time period is a time period in which the crack deviation data of any time period in the historical monitoring data is the same as the crack deviation data within the preset time period; Calculate the historical settlement deviation data and the historical crack deviation data for the historical displacement time period; Calculate the historical displacement deviation data and the historical crack deviation data for the historical settlement time period; Calculate the historical displacement deviation data and the historical settlement deviation data for the historical crack time period; Calculate the settlement crack influence data according to the historical settlement deviation data and the historical crack deviation data of the historical displacement time period and the settlement deviation data and the crack deviation data of the preset time period; calculate the displacement crack influence data according to the historical displacement deviation data and the historical crack deviation data of the historical settlement time period and the displacement deviation data and the crack deviation data of the preset time period; calculate the displacement settlement influence data according to the historical displacement deviation data and the historical settlement deviation data of the historical crack time period and the displacement deviation data and the settlement deviation data of the preset time period; The slope stability influence data is calculated based on the settlement crack influence data, the displacement crack influence data and the displacement settlement influence data.

[0008] Furthermore, the calculation method of the slope stability influence data includes: Assuming there are n historical displacement time periods, the historical settlement deviation data of the i-th historical displacement time period is: , the historical crack deviation data of the i-th historical displacement time period is ; Calculate the displacement duration deviation data according to the duration of the historical displacement time period and the duration of the preset time period; then the displacement duration deviation data corresponding to the i-th historical displacement time period is ; Assuming there are m historical settlement time periods, the historical displacement deviation data of the jth historical settlement time period is: , the historical crack deviation data of the jth historical settlement period is ; Calculate the settlement duration deviation data according to the duration of the historical settlement time period and the duration of the preset time period; then the settlement duration deviation data corresponding to the jth historical settlement time period is ; Assuming there are q historical crack time periods, the historical displacement deviation data of the pth historical crack time period is: , the historical settlement deviation data of the pth historical crack time period is ; Calculate the crack duration deviation data according to the duration of the historical crack time period and the duration of the preset time period; then the crack duration deviation data corresponding to the pth historical crack time period is ; ; In the formula, is the slope stability impact data, is the displacement deviation data, is the settlement deviation data, is the crack deviation data; For the data on the impact of settlement cracks, is the displacement crack impact data, The displacement and settlement impact data; are respectively a preset fourth weight, a preset fifth weight and a preset sixth weight; and, .

[0009] In a second aspect, the present application provides a system for evaluating the stability of a fill slope, the system comprising: An acquisition module is used to acquire historical monitoring data of the slope to be evaluated by the slope monitoring system and monitoring and collection data of the slope to be evaluated by the slope monitoring system within a preset time period; the historical monitoring data includes historical displacement data, historical settlement data, historical crack data and historical warning data; the preset time period is the time period from the last warning to the current time; the monitoring and collection data includes slope displacement data, slope settlement data and slope crack data; A calculation module, used for calculating basic slope stability data according to the monitoring and collection data; the basic slope stability data is negatively correlated with the slope displacement data, slope settlement data and slope crack data; An analysis module, used for analyzing slope stability impact data according to the historical monitoring data and the monitoring collection data; the slope stability impact data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data; A determination module is used to determine slope stability comprehensive evaluation data according to the slope stability basic data and the slope stability influencing data, and to determine slope survey suggestions based on the slope stability comprehensive evaluation data.

[0010] Furthermore, the calculation module is further configured to calculate the basic slope stability data according to the monitoring and collection data; the basic slope stability data is negatively correlated with the slope displacement data, slope settlement data and slope crack data and includes: Calculating displacement deviation data based on the slope displacement data of the first day and the slope displacement data of the last day within the preset time period; Calculating settlement deviation data based on the slope settlement data of the first day and the slope settlement data of the last day within the preset time period; Calculating crack deviation data based on the slope crack data of the first day and the slope crack data of the last day within the preset time period; The basic slope stability data is calculated according to the preset original slope stability value, the displacement deviation data, the settlement deviation data and the crack deviation data.

[0011] Furthermore, the calculation module is further configured such that the calculation method of the slope stability basic data includes: Assuming that the preset time period is n days, the slope displacement data of the i-th day is , then the slope settlement data on the i-th day is , then the slope crack data on the i-th day is ; ; ; In the formula, is the basic data of slope stability, is the preset original stability value of the slope; is the intermediate value calculated in place of the others; is the displacement deviation data, is the settlement deviation data, is the crack deviation data; are respectively a preset first weight, a preset second weight and a preset third weight; and, .

[0012] Furthermore, the analysis module is further configured to analyze the slope stability impact data according to the historical monitoring data and the monitoring collection data; the slope stability impact data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data and includes: Determine a historical displacement time period, a historical settlement time period and a historical crack time period according to the historical monitoring data and the monitoring collection data; the historical displacement time period is a time period in which the displacement deviation data of any time period in the historical monitoring data is the same as the displacement deviation data of the preset time period; the historical settlement time period is a time period in which the settlement deviation data of any time period in the historical monitoring data is the same as the settlement deviation data of the preset time period; the historical crack time period is a time period in which the crack deviation data of any time period in the historical monitoring data is the same as the crack deviation data within the preset time period; Calculate the historical settlement deviation data and the historical crack deviation data for the historical displacement time period; Calculate the historical displacement deviation data and the historical crack deviation data for the historical settlement time period; Calculate the historical displacement deviation data and the historical settlement deviation data for the historical crack time period; Calculate the settlement crack influence data according to the historical settlement deviation data and the historical crack deviation data of the historical displacement time period and the settlement deviation data and the crack deviation data of the preset time period; calculate the displacement crack influence data according to the historical displacement deviation data and the historical crack deviation data of the historical settlement time period and the displacement deviation data and the crack deviation data of the preset time period; calculate the displacement settlement influence data according to the historical displacement deviation data and the historical settlement deviation data of the historical crack time period and the displacement deviation data and the settlement deviation data of the preset time period; The slope stability influence data is calculated based on the settlement crack influence data, the displacement crack influence data and the displacement settlement influence data.

[0013] Furthermore, the analysis module is further configured such that the calculation method of the slope stability influence data includes: Assuming there are n historical displacement time periods, the historical settlement deviation data of the i-th historical displacement time period is: , the historical crack deviation data of the i-th historical displacement time period is ; Calculate the displacement duration deviation data according to the duration of the historical displacement time period and the duration of the preset time period; then the displacement duration deviation data corresponding to the i-th historical displacement time period is ; Assuming there are m historical settlement time periods, the historical displacement deviation data of the jth historical settlement time period is: , the historical crack deviation data of the jth historical settlement period is ; Calculate the settlement duration deviation data according to the duration of the historical settlement time period and the duration of the preset time period; then the settlement duration deviation data corresponding to the jth historical settlement time period is ; Assuming there are q historical crack time periods, the historical displacement deviation data of the pth historical crack time period is: , the historical settlement deviation data of the pth historical crack time period is ; Calculate the crack duration deviation data according to the duration of the historical crack time period and the duration of the preset time period; then the crack duration deviation data corresponding to the pth historical crack time period is ; ; In the formula, is the slope stability impact data, is the displacement deviation data, is the settlement deviation data, is the crack deviation data; For the data on the impact of settlement cracks, is the displacement crack impact data, The displacement and settlement impact data; are respectively a preset fourth weight, a preset fifth weight and a preset sixth weight; and, .

[0014] It should be understood that the contents described in the Summary of the Invention are not intended to limit the key or important features of the embodiments of the present application, nor are they intended to limit the scope of the present application. Other features of the present application will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The above and other features, advantages and aspects of the embodiments of the present application will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. In the accompanying drawings, the same or similar reference numerals represent the same or similar elements, wherein: Figure 1 A flow chart of a method for evaluating the stability of a fill slope in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0016] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0017] In addition, the term "and / or" in this article is only a description of the association relationship between the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0018] The present application provides a method for evaluating the stability of a fill slope, which can analyze and evaluate the stability of a fill slope, so as to determine the state of the fill slope and take corresponding reinforcement measures and plans.

[0019] In a first aspect, the present application provides a method for evaluating the stability of a fill slope. Figure 1 ,The specific steps included in a method for evaluating the stability of fill slope are as follows.

[0020] Step S110: Obtain historical monitoring data of the slope to be evaluated by the slope monitoring system and monitoring and collection data of the slope to be evaluated by the slope monitoring system within a preset time period; the historical monitoring data includes historical displacement data, historical settlement data, historical crack data and historical warning data; the preset time period is the time period from the last warning to the current time; the monitoring and collection data includes slope displacement data, slope settlement data and slope crack data.

[0021] In the embodiment of the present application, the stability of the slope is specifically analyzed based on the three types of data of slope displacement, settlement and cracks collected by the slope monitoring system; it can be understood that the relevant data collected by the slope monitoring system are stored in the cloud server; specifically, the slope monitoring system such as the HC-GBSAR synthetic aperture radar slope monitoring system can realize the collection of the above-mentioned slope displacement, settlement, cracks and other data.

[0022] It is understandable that when any of the displacement data, settlement data and crack data of the slope reaches the preset warning threshold, the system will issue a warning to the background to indicate that the slope has deformed and that staff need to be dispatched for field surveys; in this application, the preset time period is a comprehensive analysis of the current stability of the slope based on the three deformation data.

[0023] Step S120: calculating basic slope stability data according to the monitoring and collected data; the basic slope stability data is negatively correlated with the slope displacement data, slope settlement data and slope crack data.

[0024] In an embodiment of the present application, calculating the basic slope stability data based on the monitoring and collected data specifically includes calculating displacement deviation data based on the slope displacement data of the first day and the slope displacement data of the last day within the preset time period; calculating settlement deviation data based on the slope settlement data of the first day and the slope settlement data of the last day within the preset time period; calculating crack deviation data based on the slope crack data of the first day and the slope crack data of the last day within the preset time period; calculating the basic slope stability data based on a preset slope original stability value, the displacement deviation data, the settlement deviation data and the crack deviation data.

[0025] The calculation method of basic slope stability data specifically includes: Assuming that the preset time period is n days, the slope displacement data of the i-th day is , then the slope settlement data on the i-th day is , then the slope crack data on the i-th day is ; ; ; In the formula, is the basic data of slope stability, is the preset original stability value of the slope; is the intermediate value calculated in place of the others; is the displacement deviation data, is the settlement deviation data, is the crack deviation data; are respectively a preset first weight, a preset second weight and a preset third weight; and, .

[0026] It is understandable that the crack data here can adopt the data of changes in the number of cracks; for example, there is 1 crack on the first day, and 4 cracks on the last day, etc.; it is understandable that for the slope, its deformation time may be very long or very short, depending on the specific situation.

[0027] It should be noted that the preset original slope stability value here is the default initial value, which is a conventional parameter and a fixed value for the convenience of calculation; the V here is used as an intermediate parameter for calculation and has no practical significance.

[0028] Step S130: analyzing slope stability impact data according to the historical monitoring data and the monitoring collection data; the slope stability impact data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data.

[0029] In an embodiment of the present application, analyzing the slope stability influencing data according to the historical monitoring data and the monitoring and acquisition data specifically includes: determining a historical displacement time period, a historical settlement time period and a historical crack time period according to the historical monitoring data and the monitoring and acquisition data; the historical displacement time period is a time period in which the displacement deviation data of any time period in the historical monitoring data is the same as the displacement deviation data of the preset time period; the historical settlement time period is a time period in which the settlement deviation data of any time period in the historical monitoring data is the same as the settlement deviation data of the preset time period; the historical crack time period is a time period in which the crack deviation data of any time period in the historical monitoring data is the same as the crack deviation data within the preset time period; calculating the historical settlement deviation data and the historical crack deviation data of the historical displacement time period; calculating the historical settlement deviation data and the historical crack deviation data of the historical settlement time period. The historical displacement deviation data and historical crack deviation data of the historical crack time period are calculated; the historical displacement deviation data and historical settlement deviation data of the historical crack time period are calculated; the settlement crack influence data are calculated according to the historical settlement deviation data and historical crack deviation data of the historical displacement time period and the settlement deviation data and crack deviation data of the preset time period; the displacement crack influence data are calculated according to the historical displacement deviation data and historical crack deviation data of the historical settlement time period and the displacement deviation data and crack deviation data of the preset time period; the displacement-settlement influence data are calculated according to the historical displacement deviation data and historical settlement deviation data of the historical crack time period and the displacement deviation data and settlement deviation data of the preset time period; the slope stability influence data are calculated based on the settlement crack influence data, the displacement crack influence data and the displacement-settlement influence data.

[0030] The calculation method of slope stability influence data specifically includes: Assuming there are n historical displacement time periods, the historical settlement deviation data of the i-th historical displacement time period is: , the historical crack deviation data of the i-th historical displacement time period is ; Calculate the displacement duration deviation data according to the duration of the historical displacement time period and the duration of the preset time period; then the displacement duration deviation data corresponding to the i-th historical displacement time period is ; Assuming there are m historical settlement time periods, the historical displacement deviation data of the jth historical settlement time period is: , the historical crack deviation data of the jth historical settlement period is ; Calculate the settlement duration deviation data according to the duration of the historical settlement time period and the duration of the preset time period; then the settlement duration deviation data corresponding to the jth historical settlement time period is ; Assuming there are q historical crack time periods, the historical displacement deviation data of the pth historical crack time period is: , the historical settlement deviation data of the pth historical crack time period is ; Calculate the crack duration deviation data according to the duration of the historical crack time period and the duration of the preset time period; then the crack duration deviation data corresponding to the pth historical crack time period is ; ; In the formula, is the slope stability impact data, is the displacement deviation data, is the settlement deviation data, is the crack deviation data; For the data on the impact of settlement cracks, is the displacement crack impact data, The displacement and settlement impact data; are respectively a preset fourth weight, a preset fifth weight and a preset sixth weight; and, .

[0031] It can be understood that for the displacement deviation data, settlement deviation data and crack deviation data of the preset time period, in the historical monitoring data, there must be any displacement deviation data, settlement deviation data and crack deviation data of any time period of indefinite length that are the same as any of the three data of the above-mentioned preset time period; therefore, by controlling one of the variables to be the same, analyzing the similarity of the other two data, and then combining the similarity of the time length, it is possible to calculate the impact of similar time periods on the preset time period in the historical monitoring data.

[0032] The calculation method of the displacement time deviation data here is to divide the length of the historical displacement time period by the length of the preset time period; the settlement time deviation data and the crack time deviation data can be obtained in the same way.

[0033] Step S140: determining slope stability comprehensive evaluation data according to the slope stability basic data and the slope stability influencing data, and determining slope survey suggestions based on the slope stability comprehensive evaluation data.

[0034] It can be understood that the comprehensive evaluation data of slope stability = basic slope stability data * slope stability influencing data; after obtaining the comprehensive evaluation data of slope stability, the comprehensive evaluation data of slope stability is compared with the preset data comparison table, which contains the correspondence between the comprehensive evaluation data of slope stability and the slope survey suggestions; thereby, the survey suggestions for the slope can be determined; and based on the survey suggestions, it is determined whether to dispatch staff to conduct on-site surveys to ensure the stability of the slope, and to maintain the slope before problems occur on the slope and before the slope monitoring system issues a warning, so as to extend the service life, safety and stability of the slope.

[0035] It can be understood that the method of the present application is essentially a machine learning model, in which the stability of the slope is calculated to achieve continuous training of trainable parameters; wherein the trainable parameters include preset original stability value of the slope, preset data comparison table, preset first weight, preset second weight, preset third weight, preset fourth weight, preset fifth weight and preset sixth weight, etc.; by training the above parameters, the calculation accuracy of the slope stability data is improved, thereby improving the accuracy of the slope stability assessment and improving the safety of the slope.

[0036] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the embodiments of the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.

[0037] In the second aspect, the present application provides a system for evaluating the stability of a fill slope. Figure 2 As shown, the system comprises: The acquisition module 210 is used to acquire the historical monitoring data of the slope to be evaluated by the slope monitoring system and the monitoring and collection data of the slope to be evaluated by the slope monitoring system within a preset time period; the historical monitoring data includes historical displacement data, historical settlement data, historical crack data and historical warning data; the preset time period is the time period between the last warning and the current time; the monitoring and collection data includes slope displacement data, slope settlement data and slope crack data; the calculation module 220 is used to calculate the basic slope stability data according to the monitoring and collection data; the basic slope stability data is negatively correlated with the slope displacement data, slope settlement data and slope crack data; the analysis module 230 is used to analyze the slope stability influence data according to the historical monitoring data and the monitoring and collection data; the slope stability influence data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data; the determination module 240 is used to determine the comprehensive evaluation data of the slope stability according to the basic slope stability data and the slope stability influence data, and determine the slope survey suggestion based on the comprehensive evaluation data of the slope stability.

[0038] Among them, the calculation module 220 is further configured to calculate the basic slope stability data based on the monitoring and collected data; the basic slope stability data is negatively correlated with the slope displacement data, slope settlement data and slope crack data, including calculating the displacement deviation data based on the slope displacement data of the first day and the slope displacement data of the last day within the preset time period; calculating the settlement deviation data based on the slope settlement data of the first day and the slope settlement data of the last day within the preset time period; calculating the crack deviation data based on the slope crack data of the first day and the slope crack data of the last day within the preset time period; calculating the basic slope stability data based on the preset slope original stability value, the displacement deviation data, the settlement deviation data and the crack deviation data.

[0039] Furthermore, the calculation method of the basic slope stability data includes: Assuming that the preset time period is n days, the slope displacement data of the i-th day is , then the slope settlement data on the i-th day is , then the slope crack data on the i-th day is ; ; ; In the formula, is the basic data of slope stability, is the preset original stability value of the slope; is the intermediate value calculated in place of the others; is the displacement deviation data, is the settlement deviation data, is the crack deviation data; are respectively a preset first weight, a preset second weight and a preset third weight; and, .

[0040] Wherein, the analysis module 230 is further configured to analyze the slope stability impact data according to the historical monitoring data and the monitoring and acquisition data; the slope stability impact data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data, including determining the historical displacement time period, historical settlement time period and historical crack time period according to the historical monitoring data and the monitoring and acquisition data; the historical displacement time period is the time period in which the displacement deviation data of any time period in the historical monitoring data is the same as the displacement deviation data of the preset time period; the historical settlement time period is the time period in which the settlement deviation data of any time period in the historical monitoring data is the same as the settlement deviation data of the preset time period; the historical crack time period is the time period in which the crack deviation data of any time period in the historical monitoring data is the same as the crack deviation data within the preset time period; the historical displacement time period is calculated. historical settlement deviation data and historical crack deviation data; calculate the historical displacement deviation data and historical crack deviation data of the historical settlement time period; calculate the historical displacement deviation data and historical settlement deviation data of the historical crack time period; calculate the settlement crack influence data based on the historical settlement deviation data and historical crack deviation data of the historical displacement time period and the settlement deviation data and crack deviation data of the preset time period; calculate the displacement crack influence data based on the historical displacement deviation data and historical crack deviation data of the historical settlement time period and the displacement deviation data and crack deviation data of the preset time period; calculate the displacement-settlement influence data based on the historical displacement deviation data and historical settlement deviation data of the historical crack time period and the displacement deviation data and settlement deviation data of the preset time period; analyze and calculate the slope stability influence data based on the settlement crack influence data, the displacement crack influence data and the displacement-settlement influence data.

[0041] Furthermore, the calculation method of slope stability influence data includes: Assuming there are n historical displacement time periods, the historical settlement deviation data of the i-th historical displacement time period is: , the historical crack deviation data of the i-th historical displacement time period is ; Calculate the displacement duration deviation data according to the duration of the historical displacement time period and the duration of the preset time period; then the displacement duration deviation data corresponding to the i-th historical displacement time period is ; Assuming there are m historical settlement time periods, the historical displacement deviation data of the jth historical settlement time period is: , the historical crack deviation data of the jth historical settlement period is ; Calculate the settlement duration deviation data according to the duration of the historical settlement time period and the duration of the preset time period; then the settlement duration deviation data corresponding to the jth historical settlement time period is ; Assuming there are q historical crack time periods, the historical displacement deviation data of the pth historical crack time period is: , the historical settlement deviation data of the pth historical crack time period is ; Calculate the crack duration deviation data according to the duration of the historical crack time period and the duration of the preset time period; then the crack duration deviation data corresponding to the pth historical crack time period is ; ; In the formula, is the slope stability impact data, is the displacement deviation data, is the settlement deviation data, is the crack deviation data; For the data on the impact of settlement cracks, is the displacement crack impact data, The displacement and settlement impact data; are respectively a preset fourth weight, a preset fifth weight and a preset sixth weight; and, .

[0042] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the described device can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0043] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other to form a technical solution.

Claims

1. A method for evaluating the stability of a fill slope, characterized in that: include: Obtain historical monitoring data of the slope to be evaluated by the slope monitoring system and monitoring and collection data of the slope to be evaluated by the slope monitoring system within a preset time period; The historical monitoring data includes historical displacement data, historical settlement data, historical crack data and historical warning data; the preset time period is the time period between the last warning and the current time; the monitoring collection data includes slope displacement data, slope settlement data and slope crack data; Calculate the basic slope stability data according to the monitoring and collection data; the basic slope stability data is negatively correlated with the slope displacement data, slope settlement data and slope crack data; Analyze slope stability impact data according to the historical monitoring data and the monitoring collection data; the slope stability impact data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data; Comprehensive evaluation data of slope stability are determined according to the basic slope stability data and the slope stability influencing data, and slope survey suggestions are determined based on the comprehensive evaluation data of slope stability.

2. The method for evaluating the stability of a fill slope according to claim 1, characterized in that: The slope stability basic data is calculated according to the monitoring and collection data; the slope stability basic data is negatively correlated with the slope displacement data, slope settlement data and slope crack data and includes: Calculating displacement deviation data based on the slope displacement data of the first day and the slope displacement data of the last day within the preset time period; Calculating settlement deviation data based on the slope settlement data of the first day and the slope settlement data of the last day within the preset time period; Calculating crack deviation data based on the slope crack data of the first day and the slope crack data of the last day within the preset time period; The basic slope stability data is calculated according to the preset original slope stability value, the displacement deviation data, the settlement deviation data and the crack deviation data.

3. The method for evaluating the stability of a fill slope according to claim 2, characterized in that: The calculation method of the slope stability basic data includes: Assuming that the preset time period is n days, the slope displacement data of the i-th day is , then the slope settlement data on the i-th day is , then the slope crack data on the i-th day is ; ; ; In the formula, is the basic data of slope stability, is the preset original stability value of the slope; is the intermediate value calculated in place of the others; is the displacement deviation data, is the settlement deviation data, is the crack deviation data; are respectively a preset first weight, a preset second weight and a preset third weight; and, .

4. The method for evaluating the stability of a fill slope according to claim 2, characterized in that: said analyzing slope stability impact data according to said historical monitoring data and said monitoring collection data; The slope stability impact data associated with the historical displacement data, historical settlement data, historical crack data and historical warning data include: Determine a historical displacement time period, a historical settlement time period and a historical crack time period according to the historical monitoring data and the monitoring collection data; the historical displacement time period is a time period in which the displacement deviation data of any time period in the historical monitoring data is the same as the displacement deviation data of the preset time period; the historical settlement time period is a time period in which the settlement deviation data of any time period in the historical monitoring data is the same as the settlement deviation data of the preset time period; the historical crack time period is a time period in which the crack deviation data of any time period in the historical monitoring data is the same as the crack deviation data within the preset time period; Calculate the historical settlement deviation data and the historical crack deviation data for the historical displacement time period; Calculate the historical displacement deviation data and the historical crack deviation data for the historical settlement time period; Calculate the historical displacement deviation data and the historical settlement deviation data for the historical crack time period; Calculate the settlement crack influence data according to the historical settlement deviation data and the historical crack deviation data of the historical displacement time period and the settlement deviation data and the crack deviation data of the preset time period; calculate the displacement crack influence data according to the historical displacement deviation data and the historical crack deviation data of the historical settlement time period and the displacement deviation data and the crack deviation data of the preset time period; calculate the displacement settlement influence data according to the historical displacement deviation data and the historical settlement deviation data of the historical crack time period and the displacement deviation data and the settlement deviation data of the preset time period; The slope stability influence data is calculated based on the settlement crack influence data, the displacement crack influence data and the displacement settlement influence data.

5. The method for evaluating the stability of a fill slope according to claim 4, characterized in that: The calculation method of the slope stability influence data includes: Assuming there are n historical displacement time periods, the historical settlement deviation data of the i-th historical displacement time period is: , the historical crack deviation data of the i-th historical displacement time period is ; Calculate the displacement duration deviation data according to the duration of the historical displacement time period and the duration of the preset time period; then the displacement duration deviation data corresponding to the i-th historical displacement time period is ; Assuming there are m historical settlement time periods, the historical displacement deviation data of the jth historical settlement time period is: , the historical crack deviation data of the jth historical settlement period is ; Calculate the settlement duration deviation data according to the duration of the historical settlement time period and the duration of the preset time period; then the settlement duration deviation data corresponding to the jth historical settlement time period is ; Assuming there are q historical crack time periods, the historical displacement deviation data of the pth historical crack time period is: , the historical settlement deviation data of the pth historical crack time period is ; Calculate the crack duration deviation data according to the duration of the historical crack time period and the duration of the preset time period; then the crack duration deviation data corresponding to the pth historical crack time period is ; ; In the formula, is the slope stability impact data, is the displacement deviation data, is the settlement deviation data, is the crack deviation data; For the data on the impact of settlement cracks, is the displacement crack impact data, The displacement and settlement impact data; are respectively a preset fourth weight, a preset fifth weight and a preset sixth weight; and, .

6. A system for evaluating the stability of a fill slope, characterized in that: include: An acquisition module (210) is used to acquire historical monitoring data of the slope to be evaluated by the slope monitoring system and monitoring and collection data of the slope to be evaluated by the slope monitoring system within a preset time period; the historical monitoring data includes historical displacement data, historical settlement data, historical crack data and historical warning data; the preset time period is the time period from the last warning to the current time; the monitoring and collection data includes slope displacement data, slope settlement data and slope crack data; A calculation module (220) is used to calculate basic slope stability data based on the monitoring and collected data; the basic slope stability data is negatively correlated with the slope displacement data, slope settlement data and slope crack data; An analysis module (230) is used to analyze slope stability impact data based on the historical monitoring data and the monitoring collection data; the slope stability impact data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data; A determination module (240) is used to determine slope stability comprehensive evaluation data according to the slope stability basic data and the slope stability influencing data, and to determine slope survey suggestions based on the slope stability comprehensive evaluation data.

7. The method for evaluating the stability of a fill slope according to claim 6, characterized in that: The calculation module (220) is further configured to calculate basic slope stability data based on the monitoring and collected data; the basic slope stability data is negatively correlated with the slope displacement data, slope settlement data and slope crack data and includes: Calculating displacement deviation data based on the slope displacement data of the first day and the slope displacement data of the last day within the preset time period; Calculating settlement deviation data based on the slope settlement data of the first day and the slope settlement data of the last day within the preset time period; Calculating crack deviation data based on the slope crack data of the first day and the slope crack data of the last day within the preset time period; The basic slope stability data is calculated according to the preset original slope stability value, the displacement deviation data, the settlement deviation data and the crack deviation data.

8. The method for evaluating the stability of a fill slope according to claim 7, characterized in that: The calculation module (220) is further configured such that the calculation method of the slope stability basic data comprises: Assuming that the preset time period is n days, the slope displacement data of the i-th day is , then the slope settlement data on the i-th day is , then the slope crack data on the i-th day is ; ; ; In the formula, is the basic data of slope stability, is the preset original stability value of the slope; is the intermediate value calculated in place of the others; is the displacement deviation data, is the settlement deviation data, is the crack deviation data; are respectively a preset first weight, a preset second weight and a preset third weight; and, .

9. The method for evaluating the stability of a fill slope according to claim 7, characterized in that: The analysis module (230) is further configured to analyze slope stability impact data based on the historical monitoring data and the monitoring collection data; the slope stability impact data is associated with the historical displacement data, historical settlement data, historical crack data and historical warning data and includes: Determine a historical displacement time period, a historical settlement time period and a historical crack time period according to the historical monitoring data and the monitoring collection data; the historical displacement time period is a time period in which the displacement deviation data of any time period in the historical monitoring data is the same as the displacement deviation data of the preset time period; the historical settlement time period is a time period in which the settlement deviation data of any time period in the historical monitoring data is the same as the settlement deviation data of the preset time period; the historical crack time period is a time period in which the crack deviation data of any time period in the historical monitoring data is the same as the crack deviation data within the preset time period; Calculate the historical settlement deviation data and the historical crack deviation data for the historical displacement time period; Calculate the historical displacement deviation data and the historical crack deviation data for the historical settlement time period; Calculate the historical displacement deviation data and the historical settlement deviation data for the historical crack time period; Calculate the settlement crack influence data according to the historical settlement deviation data and the historical crack deviation data of the historical displacement time period and the settlement deviation data and the crack deviation data of the preset time period; calculate the displacement crack influence data according to the historical displacement deviation data and the historical crack deviation data of the historical settlement time period and the displacement deviation data and the crack deviation data of the preset time period; calculate the displacement settlement influence data according to the historical displacement deviation data and the historical settlement deviation data of the historical crack time period and the displacement deviation data and the settlement deviation data of the preset time period; The slope stability influence data is calculated based on the settlement crack influence data, the displacement crack influence data and the displacement settlement influence data.

10. The method for evaluating the stability of a fill slope according to claim 9, characterized in that: The analysis module (230) is further configured such that the calculation method of the slope stability influence data comprises: Assuming there are n historical displacement time periods, the historical settlement deviation data of the i-th historical displacement time period is: , the historical crack deviation data of the i-th historical displacement time period is ; Calculate the displacement duration deviation data according to the duration of the historical displacement time period and the duration of the preset time period; then the displacement duration deviation data corresponding to the i-th historical displacement time period is ; Assuming there are m historical settlement time periods, the historical displacement deviation data of the jth historical settlement time period is: , the historical crack deviation data of the jth historical settlement period is ; Calculate the settlement duration deviation data according to the duration of the historical settlement time period and the duration of the preset time period; then the settlement duration deviation data corresponding to the jth historical settlement time period is ; Assuming there are q historical crack time periods, the historical displacement deviation data of the pth historical crack time period is: , the historical settlement deviation data of the pth historical crack time period is ; Calculate the crack duration deviation data according to the duration of the historical crack time period and the duration of the preset time period; then the crack duration deviation data corresponding to the pth historical crack time period is ; ; In the formula, is the slope stability impact data, is the displacement deviation data, is the settlement deviation data, is the crack deviation data; For the data on the impact of settlement cracks, is the displacement crack impact data, The displacement and settlement impact data; are respectively a preset fourth weight, a preset fifth weight and a preset sixth weight; and, .

Citation Information

Patent Citations

  • Landslide overall stability safety early warning system applying synergistic effect of multiple monitoring points

    CN113295212A

  • Strip mine slope stability prediction device and prediction method thereof

    CN113639651A

  • Slope stability evaluation method based on multi-source data fusion and related equipment

    CN116167135A

  • Method and device for predicting slope deformation, storage medium and processor

    CN118779608A