Multi-type load side resource continuous regulation capability aggregation evaluation method and related device

Through the division and aggregation calculation of the load side resources, the problem that the negative load side resources in the existing technology are difficult to meet the needs of the power grid regulation, and the effective assessment and aggregation of the continuous regulation capacity of the load side resources is realized. Support.

CN119378818APending Publication Date: 2025-01-28CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +4
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411532784.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-30
Publication Date
2025-01-28

AI Technical Summary

Technical Problem

The prior art is difficult to effectively evaluate and aggregate the continuous regulation capabilities of load-side resources, making it difficult for them to meet the power grid regulation needs.

Method used

By dividing the load side resources as different subsets, according to the relationship between the start time, response time, duration time and scene constraints, regulate potential aggregation calculations, and perform complementary aggregation of duration, response time and flexible energy storage. The resource aggregation response potential that meets the constraints of the adjustment scene is produced.

Benefits of technology

The effective assessment and aggregation of the continuous regulation capacity of multi -type load -side resources can be achieved, and it can provide support for the power regulatory decision -making decision -making of the power grid and meet the requirements of the power grid regulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119378818A_ABST
    Figure CN119378818A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-type load side resource continuous adjustment capability aggregation evaluation method and a related device, and the method comprises the steps: dividing load side resources into different resource subsets according to the relation between the adjustment starting time, the adjustment response time, the adjustment duration time and the adjustment scene constraint of each load side resource; performing adjustment potential aggregation calculation on the resource subsets meeting the adjustment scene constraints to obtain direct adaptive resource subset aggregation adjustment potential; for the resource subsets which do not meet the adjustment scene constraints, calculation of duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation is carried out respectively, and adjustment potentials of different complementary sets are obtained; and calculating a load side resource aggregation response potential meeting the adjustment scene constraint according to the direct adaptive resource subset aggregation adjustment potential and the different complementary set adjustment potential. According to the invention, the adaptive resource set and the aggregation adjustment capability thereof can be provided, and support is provided for active power regulation and control decisions of the power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power systems, and in particular to a method for evaluating the continuous regulation capabilities of multiple types of load-side resources and related devices. Background Art

[0002] Although there are many load-side resources with great regulation potential, their individual capacity is small, their distribution is dispersed, and their regulation performance varies greatly. A single resource or a single type of resource is difficult to meet the grid regulation needs in terms of response time, regulation capacity, duration, etc. Therefore, potential assessment of a single or single type of load-side resource cannot directly support grid regulation operations.

[0003] Specifically, current load regulation potential assessment methods mostly focus on the power regulation potential of resources, and do not adequately consider characteristics such as resource regulation duration and response time. In addition, load-side resource aggregation technologies mostly perform direct aggregation according to resource categories or grid topology connection relationships, and fail to fully rely on grid regulation scenarios to constrain response time, duration, and other aspects, resulting in their aggregation results being unable to directly support grid regulation decisions. Summary of the invention

[0004] The purpose of the present invention is to provide a method and related device for aggregating and evaluating the continuous regulation capabilities of multiple types of load-side resources to overcome the defects of the prior art. Under the constraints of given response time, start time, and duration, the present invention screens and constructs an adaptive load-side resource set, and evaluates the aggregate regulation capabilities of multiple types of distributed resources to provide support for active power regulation decisions of the power grid.

[0005] In order to achieve the above object, the present invention adopts the following technical scheme: The method for evaluating the continuous regulation capability of multiple types of load-side resources includes the following steps: Divide the load-side resources into different resource subsets according to the relationship between the regulation start time, regulation response time, regulation duration and regulation scenario constraints of each load-side resource; For the resource subsets that meet the regulation scenario constraints, the regulation potential aggregation calculation is performed to obtain the aggregated regulation potential of the directly adapted resource subsets; For the resource subsets that do not meet the regulation scenario constraints, the duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation are calculated respectively to obtain the regulation potential of different complementary sets. The aggregated response potential of load-side resources that meets the constraints of the regulation scenario is calculated based on the aggregated regulation potential of the directly adapted resource subset and the regulation potential of different complementary sets.

[0006] Furthermore, the load side resources are divided into different resource subsets according to the relationship between the adjustment start time, adjustment response time, adjustment duration and adjustment scenario constraints of each load side resource, specifically: If the relationship meets condition 1:

[0007] The load side resources that meet condition 1 are counted into the first resource subset SET1; If the relationship satisfies condition 2:

[0008] The load side resources satisfying condition 2 are counted into the second resource subset SET2; If the relationship meets condition 3:

[0009] The load side resources that meet condition 3 are counted into the third resource subset SET3; If the relationship meets condition 4:

[0010] The load side resources satisfying condition 4 are counted into the fourth resource subset SET4; If the relationship meets condition 5:

[0011] The load side resources satisfying condition 5 are counted into the fifth resource subset SET5; in, T s Indicates the adjustment start time constraint, T r represents the regulation response time constraint, T c represents the regulation duration constraint, t s_i Indicates i The adjustment start time of each load-side resource, t r_i Indicates i The response time of each load-side resource, t c_i Indicates i The regulation duration of each load-side resource, P st_i Indicates i The energy storage charging and discharging power of each load-side resource, Q i Indicates i The amount of energy storage equipment, S i Indicates i The rated capacity of an energy storage device.

[0012] Furthermore, the adjustment potential aggregation calculation is performed on the resource subsets that meet the adjustment scenario constraints to obtain the aggregated adjustment potential of the directly adapted resource subsets, specifically: The first resource subset SET1 is a resource subset that satisfies the adjustment scenario constraint. Based on the first resource subset SET1, the aggregation adjustment potential of the directly adapted resource subset is calculated according to the following formula:

[0013] in, Indicates the first resource subset SET1 i The upward regulation potential of load-side resources, Indicates the aggregate adjustment potential of the directly adapted resource subset of the first resource subset.

[0014] Furthermore, for the resource subsets that do not meet the regulation scenario constraints, duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation calculations are performed respectively to obtain the complementary set regulation potential in different time periods, specifically: The second resource subset SET2, the third resource subset SET3, the fourth resource subset SET4 and the fifth resource subset SET5 are all resource subsets that do not meet the adjustment scenario constraints; Based on the second resource subset SET2 and the third resource subset SET3, a duration complementary aggregation calculation is performed to obtain the first complementary set regulation potential and the remaining load side resources in the second resource subset SET2 after the duration complementary aggregation calculation is performed between the second resource subset SET2 and the third resource subset SET3, and the set of the remaining load side resources in the second resource subset SET2 is recorded as the sixth resource subset SET2'; Based on the fourth resource subset SET4 and the sixth resource subset SET2', a response time complementary aggregation calculation is performed to obtain the second complementary set regulation potential, and the remaining load side resources in the fourth resource subset SET4 after the fourth resource subset SET4 and the sixth resource subset SET2 are performed on the duration complementary aggregation calculation; Based on the remaining load-side resources in the fourth resource subset SET4 and the fifth resource subset SET5, flexible energy storage complementary aggregation calculation is performed to obtain the regulation potential of the third complementary set.

[0015] Further, the performing of duration complementary aggregation calculation based on the second resource subset SET2 and the third resource subset SET3 to obtain the first complementary set regulation potential and the remaining load side resources in the second resource subset SET2 after the duration complementary aggregation calculation between the second resource subset SET2 and the third resource subset SET3 specifically includes: Step 3-1: Initialize parameters, let i=1, N CO23= 0, where i is the number of the i-th load-side resource in the second resource subset SET2, N CO23 is the number of first complementary units; Step 3-2: Arrange the load-side resources in the second resource subset SET2 from large to small according to the adjustment duration, and take the i-th load-side resource; Step 3-3: In response to the start time, the third resource subset SET3 is traversed, and the load side resource j that meets the first preset condition and has the smallest start time difference is selected from the third resource subset SET3 as a complementary resource and is placed in the first complementary unit; the first preset condition is: and , the starting time difference is expressed as: ,in, represents the start time of load-side resource j; Step 3-4: Calculate the upregulation potential of the first complementary unit , update the second resource subset SET2 and the third resource subset SET3, remove the load side resources i and load side resources j of this complementation in the second resource subset SET2 and the third resource subset SET3, and count the number of first complementary units N CO23 ,in, represents the upward adjustment potential of load-side resource i, represents the upward adjustment potential of load-side resource j; Step 3-5: Determine whether i>NSET2 is satisfied. If not, i=i+1, and jump to step 3-2; if satisfied, jump to step 3-6, where NSET2 represents the number of load-side resources in the second resource subset; Step 3-6: Calculate the first complementary set regulatory potential of the first complementary unit: , and at the same time, the set of remaining load-side resources in the second resource subset SET2 is recorded as the sixth resource subset SET2'.

[0016] Further, the response time complementary aggregation calculation is performed based on the fourth resource subset SET4 and the sixth resource subset SET2' to obtain the second complementary set regulation potential, and the remaining load side resources in the fourth resource subset SET4 after the duration complementary aggregation calculation is performed between the fourth resource subset SET4 and the sixth resource subset SET2, specifically including: Step 4-1: Initialize parameters, let i=1, N CO24 = 0, where i is the number of the i-th load-side resource in the sixth resource subset SET2', N CO24 is the number of the second complementary units; Step 4-2: Take the load-side resource i in the sixth resource subset SET2' and calculate the complementary resource response time constraint: ; Step 4-3: traverse the fourth resource subset SET4, select the load side resource j that meets the second preset condition and has the smallest adjustment power difference as the complementary resource of the load side resource i, and put it into the second complementary unit; the second preset condition is: , the adjusted power difference is expressed as: ,in, represents the response time of load-side resource j; Step 4-4: Calculate the regulatory potential of the second complementary unit , update the fourth resource subset SET4, remove the load side resource j of this complementation in the fourth resource subset SET4, and count the number of second complementary units N CO24 ; Step 4-5: Determine whether i>NSET2' is satisfied. If not, i=i+1, and jump to step 4-2; if satisfied, jump to step 4-6, where NSET2' represents the number of load-side resources in the sixth resource subset; Sub-step 4-6: Calculate the second complementary set regulatory potential of the second complementary unit: .

[0017] Furthermore, the flexible energy storage complementary aggregation calculation is performed based on the fourth resource subset SET4 and the fifth resource subset SET5 to obtain the third complementary set regulation potential, which specifically includes: Step 5-1: Initialize parameters, let i=1, N CO45 = 0, where i is the number of the i-th load-side resource in the fourth resource subset SET4, N CO45 is the number of the third complementary unit; Step 5-2: Take the load-side resource i in the fourth resource subset SET4 and calculate the response time deviation: , calculate the energy storage capacity requirement: ,in, represents the charging and discharging power of the energy storage device that complements the load-side resource i; Step 5-3: traverse the fifth resource subset SET5, select the energy storage device j that meets the third preset condition and has the smallest power deviation as a complementary resource, and put it into the third complementary unit; the third preset condition is: , the power deviation is expressed as: ,in, is the power of energy storage device j; Step 5-4: Calculate the adjustment amount of the third complementary unit , update the fourth resource subset SET4 and the fifth resource subset SET5, remove the load side resource i and energy storage device j of this complementation in the fourth resource subset SET4 and the fifth resource subset SET5, and count the number of the third complementary units N CO45 ; Step 5-5: Determine whether i>NSET4 is satisfied. If not, i=i+1, and jump to step 5-2; if satisfied, jump to step 5-6, where NSET4 represents the number of resources in the fourth resource subset; Step 5-6: Calculate the third complementary set regulatory potential of the third complementary unit: .

[0018] Furthermore, the load-side resource aggregation response potential that satisfies the regulation scenario constraints is calculated based on the aggregation regulation potential of the directly adapted resource subset and the regulation potential of different complementary sets, specifically: The aggregated regulation potential of the directly adapted resource subset, the regulation potential of the first complementary set, the regulation potential of the second complementary set and the regulation potential of the third complementary set are added together to obtain the aggregated response potential of the load-side resources that meets the regulation scenario constraints.

[0019] The continuous regulation capability aggregation evaluation system of multiple types of load-side resources includes: Load side resource division module: used to divide the load side resources into different resource subsets according to the relationship between the adjustment start time, adjustment response time, adjustment duration and adjustment scenario constraints of each load side resource; Directly adapted resource subset aggregate regulation potential calculation module: used to perform regulation potential aggregation calculation on resource subsets that meet regulation scenario constraints, and obtain the aggregate regulation potential of directly adapted resource subsets; Different complementary set regulation potential calculation module: used to perform duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation calculations on resource subsets that do not meet the regulation scenario constraints, and obtain different complementary set regulation potentials; Load-side resource aggregation response potential calculation module: used to calculate the load-side resource aggregation response potential that meets the regulation scenario constraints based on the aggregation regulation potential of the directly adapted resource subset and the regulation potential of different complementary sets.

[0020] Furthermore, in the load side resource division module, the load side resources are divided into different resource subsets according to the relationship between the adjustment start time, adjustment response time, adjustment duration and adjustment scenario constraints of each load side resource, specifically: If the relationship meets condition 1:

[0021] The load side resources that meet condition 1 are counted into the first resource subset SET1; If the relationship satisfies condition 2:

[0022] The load side resources satisfying condition 2 are counted into the second resource subset SET2; If the relationship meets condition 3:

[0023] The load side resources that meet condition 3 are counted into the third resource subset SET3; If the relationship meets condition 4:

[0024] The load side resources satisfying condition 4 are counted into the fourth resource subset SET4; If the relationship meets condition 5:

[0025] The load side resources satisfying condition 5 are counted into the fifth resource subset SET5; in, T s Indicates the adjustment start time constraint, T r represents the regulation response time constraint, T c represents the regulation duration constraint, t s_i Indicates i The adjustment start time of each load-side resource, t r_i Indicates i The response time of each load-side resource, t c_i Indicates i The regulation duration of each load-side resource, P st_i Indicates i The energy storage charging and discharging power of each load-side resource, Q i Indicates i The amount of energy storage equipment, S i Indicates i The rated capacity of an energy storage device.

[0026] Furthermore, in the directly adapted resource subset aggregated regulation potential calculation module, the resource subset that meets the regulation scenario constraint is subjected to regulation potential aggregate calculation to obtain the directly adapted resource subset aggregated regulation potential, which is specifically: The first resource subset SET1 is a resource subset that satisfies the adjustment scenario constraint. Based on the first resource subset SET1, the aggregation adjustment potential of the directly adapted resource subset is calculated according to the following formula:

[0027] in, Indicates the first resource subset SET1 i The upward regulation potential of load-side resources, Indicates the aggregate adjustment potential of the directly adapted resource subset of the first resource subset.

[0028] Furthermore, in the different complementary set regulation potential calculation modules, for the resource subsets that do not meet the regulation scenario constraints, duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation calculations are performed respectively to obtain the complementary set regulation potentials in different time periods, specifically: The second resource subset SET2, the third resource subset SET3, the fourth resource subset SET4 and the fifth resource subset SET5 are all resource subsets that do not meet the adjustment scenario constraints; Based on the second resource subset SET2 and the third resource subset SET3, a duration complementary aggregation calculation is performed to obtain the first complementary set regulation potential and the remaining load side resources in the second resource subset SET2 after the duration complementary aggregation calculation is performed between the second resource subset SET2 and the third resource subset SET3, and the set of the remaining load side resources in the second resource subset SET2 is recorded as the sixth resource subset SET2'; Based on the fourth resource subset SET4 and the sixth resource subset SET2', a response time complementary aggregation calculation is performed to obtain the second complementary set regulation potential, and the remaining load side resources in the fourth resource subset SET4 after the fourth resource subset SET4 and the sixth resource subset SET2 are performed on the duration complementary aggregation calculation; Based on the remaining load-side resources in the fourth resource subset SET4 and the fifth resource subset SET5, flexible energy storage complementary aggregation calculation is performed to obtain the regulation potential of the third complementary set.

[0029] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method for aggregating and evaluating the continuous regulation capability of multiple types of load-side resources when executing the computer program.

[0030] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the method for aggregating and evaluating the continuous regulation capabilities of multiple types of load-side resources.

[0031] Compared with the prior art, the present invention has the following beneficial technical effects: The present invention is a method for evaluating the continuous regulation capability aggregation of multiple types of load-side resources taking into account their complementary characteristics. The method considers the differences and complementary characteristics of multiple types of load-side resources in terms of response time, regulation capacity, duration, etc. Under given response time, start time, and duration constraints, it screens and constructs an adaptive resource set, and evaluates the aggregate regulation capability of multiple types of distributed resources, providing support for active power regulation decisions of the power grid.

[0032] Specifically, the present invention takes into account the problems that the single capacity of load-side resources is small, the distribution is dispersed, the adjustment performance varies greatly, and a single load-side resource or a single type of load-side resource is difficult to meet the power grid regulation needs in terms of response time, adjustment capacity, duration, etc., and takes into account the differences and complementary characteristics of multiple types of load-side resources in response time, adjustment capacity, duration, etc., and proposes a continuous regulation capability calculation method that takes into account the flexible integration of multiple types of distributed resources. Under the constraints of given response time, start time, and duration, the present invention can provide an adaptive resource set and its aggregated regulation capability, thereby providing support for active power regulation decisions of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The drawings in the specification are used to provide further understanding of the present invention and constitute a part of the present invention. The schematic embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0034] Figure 1 It is a flow chart of the method for aggregated evaluation of continuous regulation capability of multiple types of load-side resources of the present invention; Figure 2 It is a schematic diagram of the structure of the continuous regulation capability aggregation evaluation system of multiple types of load-side resources of the present invention. DETAILED DESCRIPTION

[0035] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0036] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0037] Embodiment 1 See also Figure 1 The present invention provides a method for evaluating the continuous regulation capability of multiple types of load-side resources, comprising the following steps: Divide the load-side resources into different resource subsets according to the relationship between the regulation start time, regulation response time, regulation duration and regulation scenario constraints of each load-side resource; For the resource subsets that meet the regulation scenario constraints, the regulation potential aggregation calculation is performed to obtain the aggregated regulation potential of the directly adapted resource subsets; For the resource subsets that do not meet the regulation scenario constraints, the duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation are calculated respectively to obtain the regulation potential of different complementary sets. The aggregated response potential of load-side resources that meets the constraints of the regulation scenario is calculated based on the aggregated regulation potential of the directly adapted resource subset and the regulation potential of different complementary sets.

[0038] The present invention takes into account the differences and complementary characteristics of multiple types of load-side resources in terms of response time, regulation capacity, duration, etc., screens and constructs an adaptive resource set under given response time, start time, and duration constraints, and evaluates the aggregate regulation capabilities of multiple types of distributed resources to provide support for active power regulation decisions of the power grid.

[0039] Embodiment 2 The present invention provides an aggregation evaluation method for continuous regulation capability of multiple types of load-side resources. First, the load-side resources are divided into different resource subsets according to the relationship between the regulation start time, response time, regulation duration and regulation scenario constraints of each load-side resource. Then, the regulation potential aggregation calculation is performed on the load-side resources that meet the regulation scenario constraints. For the load-side resources that do not meet the regulation scenario constraints, duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation calculation are performed respectively. Finally, the aggregation response potential of the load-side resources that meet the regulation scenario constraints is calculated.

[0040] The input data involved in the present invention include: Adjust scene constraint parameters: Adjust the start time constraint T s , Adjust response time constraints T r , Adjust duration constraints T c ; Load side resource parameters: Adjustment start time t s_i , response time t r_i , adjust the duration t c_i , power regulation capability dp up_i , power down regulation capability dp dw_i , energy storage charging and discharging power P st_i , energy storage state of charge SOC st_i , energy storage capacity Q st_i .

[0041] Step 1: Screen and divide multiple types of load-side resources into subsets Obtain the regulation scenario constraint parameters and load-side resource constraint parameters, and classify each load-side resource into a corresponding resource subset according to the following conditions.

[0042] Condition 1:

[0043] The load side resources that meet condition 1 are included in the first resource subset SET1. Such load side resources meet the regulation requirements and are directly aggregated.

[0044] Condition 2:

[0045] The resources that meet condition 2 are included in the second resource subset SET2. The duration of this type of load-side resources is insufficient and needs to be complementary and aggregated.

[0046] Condition 3:

[0047] The load side resources that meet condition 3 are included in the third resource subset SET3. The starting time of this type of load side resources is delayed and needs to be complementary and aggregated.

[0048] Condition 4:

[0049] The load side resources satisfying condition 4 are included in the fourth resource subset SET4. The response time of such load side resources is not satisfied and resource complementation needs to be adjusted quickly.

[0050] Condition 5:

[0051] in,

[0052] The load-side resources satisfying condition 5 (the load-side resources are energy storage devices, hereinafter referred to as energy storage devices) are included in the fifth resource subset SET5, and the energy storage devices are used for complementary use of resources in the fourth resource subset SET4.

[0053] Step 2: Processing the first resource subset SET1 directly adapted; The direct adaptation subset aggregation regulation potential was calculated according to the following formula:

[0054] Step 3: Processing the complementary set of time periods (the second resource subset SET2 and the third resource subset SET3); Step 3-1: Initialize parameters, i=1, N CO23 = 0, where i is the number of the i-th load-side resource in the second resource subset SET2, N CO23 is the number of first complementary units.

[0055] Step 3-2: Arrange the load-side resources in the second resource subset SET2 from large to small according to the adjustment duration, and take the i-th load-side resource; Step 3-3: To respond to the start time, traverse the third resource subset SET3 and select the one that meets the condition ( and ), and the start time difference The smallest load-side resource j is used as a complementary resource and placed in the first complementary unit, where: represents the start time of load-side resource j; Step 3-4: Calculate the upregulation potential of the first complementary unit , update the second resource subset SET2 and the third resource subset SET3, remove the load side resources i and load side resources j of this complementation in the second resource subset SET2 and the third resource subset SET3, and count the number of first complementary units N CO23 ,in, represents the upward adjustment potential of load-side resource i, Represents the upward adjustment potential of load-side resource j.

[0056] Step 3-5: Determine whether i>NSET2 is satisfied. If not, i=i+1, and jump to step 3-2; if satisfied, jump to step 3-6, where NSET2 represents the number of load-side resources in the second resource subset; Step 3-6: Calculate the first complementary set regulatory potential of the first complementary unit: At the same time, the set of remaining load-side resources in the second resource subset SET2 is recorded as the sixth resource subset SET2'; Step 4: Processing complementary sets (fourth resource subset SET4 and sixth resource subset SET2') Step 4-1: Initialize parameters, i=1, N CO24 = 0, where i is the number of the i-th load-side resource in the sixth resource subset SET2', N CO24 is the number of the second complementary units; Step 4-2: Take the load-side resource i in the sixth resource subset SET2' and calculate the complementary resource response time constraint ; Step 4-3: Traverse the fourth resource subset SET4 and select , and the load-side resource j with the smallest adjustment power difference is used as the complementary resource of the load-side resource i and is placed in the second complementary unit. The adjustment potential difference is calculated according to the following formula: ,in, Represents the response time of load-side resource j.

[0057] Step 4-4: Calculate the regulatory potential of the second complementary unit , update the fourth resource subset SET4, remove the load side resource j of this complementation in the fourth resource subset SET4, and count the number of second complementary units N CO24 .

[0058] Step 4-5: Determine whether i>NSET2' is satisfied. If not, i=+1, and jump to step 4-2; if satisfied, jump to step 4-6, where NSET2' represents the number of load-side resources in the sixth resource subset; Step 4-6: Calculate the second complementary set regulatory potential of the second complementary unit: .

[0059] Step 5: Processing the energy storage complementary set (the fourth resource subset SET4 and the fifth resource subset SET5) Step 5-1: Initialize parameters, i=1, N CO45 = 0, where i is the number of the i-th load-side resource in the fourth resource subset SET4, N CO45 is the number of the third complementary unit; Step 5-2: Take the load side resource i in the fourth resource subset SET4 and calculate the response time deviation , calculate the energy storage capacity requirement ,in, represents the charging and discharging power of the energy storage device that complements the load-side resource i; Step 5-3: Traverse the fifth resource subset SET5 and select , and the power deviation The smallest energy storage device j is placed in the third complementary unit as a complementary resource, where: is the power of energy storage device j; Step 5-4: Calculate the adjustment amount of the third complementary unit , update the fourth resource subset SET4 and the fifth resource subset SET5, remove the load side resource i and energy storage device j of this complementation in the fourth resource subset SET4 and the fifth resource subset SET5, and count the number of the third complementary units N CO45 .

[0060] Step 5-5: Determine whether i>NSET4 is satisfied. If not, i=i+1, and jump to step 5-2; if satisfied, jump to step 5-6, where NSET4 represents the number of load-side resources in the fourth resource subset; Step 5-6: Calculate the third complementary set regulatory potential of the third complementary unit: .

[0061] Step 6: Calculate the duration constraints Tc The continuous regulation capability of load-side resource aggregation

[0062] Embodiment 3 See also Figure 2 The present invention provides a multi-type load-side resource continuous regulation capability aggregation evaluation system, comprising: Load side resource division module: used to divide the load side resources into different resource subsets according to the relationship between the adjustment start time, adjustment response time, adjustment duration and adjustment scenario constraints of each load side resource; Directly adapted resource subset aggregate regulation potential calculation module: used to perform regulation potential aggregation calculation on resource subsets that meet regulation scenario constraints, and obtain the aggregate regulation potential of directly adapted resource subsets; Different complementary set regulation potential calculation module: used to perform duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation calculations on resource subsets that do not meet the regulation scenario constraints, and obtain different complementary set regulation potentials; Load-side resource aggregation response potential calculation module: used to calculate the load-side resource aggregation response potential that meets the regulation scenario constraints based on the aggregation regulation potential of the directly adapted resource subset and the regulation potential of different complementary sets.

[0063] Embodiment 4 The present invention provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method for aggregating and evaluating the continuous regulation capabilities of multiple types of load-side resources when executing the computer program.

[0064] Embodiment 5 The present invention provides a computer-readable storage medium, which stores a computer program, and is characterized in that when the computer program is executed by a processor, the steps of the method for aggregating and evaluating the continuous regulation capabilities of multiple types of load-side resources are implemented.

[0065] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0066] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0067] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0068] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0069] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit its protection scope. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the field should understand that after reading the present invention, those skilled in the art can still make various changes, modifications or equivalent substitutions to the specific implementation methods of the invention, but these changes, modifications or equivalent substitutions are all within the protection scope of the pending claims of the invention.

Claims

1. An aggregated evaluation method for continuous regulation capability of multi-type load-side resources, characterized in that: The steps include: Divide the load-side resources into different resource subsets according to the relationship between the regulation start time, regulation response time, regulation duration and regulation scenario constraints of each load-side resource; For the resource subsets that meet the regulation scenario constraints, the regulation potential aggregation calculation is performed to obtain the aggregated regulation potential of the directly adapted resource subsets; For the resource subsets that do not meet the regulation scenario constraints, the duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation are calculated respectively to obtain the regulation potential of different complementary sets. The aggregated response potential of load-side resources that meets the constraints of the regulation scenario is calculated based on the aggregated regulation potential of the directly adapted resource subset and the regulation potential of different complementary sets.

2. The method for evaluating the continuous regulation capability of multiple types of load-side resources according to claim 1, characterized in that: According to the relationship between the adjustment start time, adjustment response time, adjustment duration and adjustment scenario constraints of each load-side resource, the load-side resources are divided into different resource subsets, specifically: If the relationship meets condition 1: The load side resources that meet condition 1 are counted into the first resource subset SET1; If the relationship satisfies condition 2: The load side resources satisfying condition 2 are counted into the second resource subset SET2; If the relationship meets condition 3: The load side resources that meet condition 3 are counted into the third resource subset SET3; If the relationship meets condition 4: The load side resources satisfying condition 4 are counted into the fourth resource subset SET4; If the relationship satisfies condition 5: The load side resources satisfying condition 5 are counted into the fifth resource subset SET5; in, T s Indicates the adjustment start time constraint, T r represents the regulation response time constraint, T c represents the regulation duration constraint, t s_i Indicates i The adjustment start time of each load-side resource, t r_i Indicates i The response time of each load-side resource, t c_i Indicates i The regulation duration of each load-side resource, P st_i Indicates i The energy storage charging and discharging power of each load-side resource, Q i Indicates i The amount of energy storage equipment, S i Indicates i The rated capacity of an energy storage device.

3. The method for evaluating the continuous regulation capability of multiple types of load-side resources according to claim 2 is characterized in that: The adjustment potential aggregation calculation is performed on the resource subsets that meet the adjustment scenario constraints to obtain the aggregated adjustment potential of the directly adapted resource subsets, specifically: The first resource subset SET1 is a resource subset that satisfies the adjustment scenario constraint. Based on the first resource subset SET1, the aggregation adjustment potential of the directly adapted resource subset is calculated according to the following formula: in, Indicates the first resource subset SET1 i The upward regulation potential of load-side resources, Indicates the aggregate adjustment potential of the directly adapted resource subset of the first resource subset.

4. The method for evaluating the continuous regulation capability of multiple types of load-side resources according to claim 2 is characterized in that: For the resource subsets that do not meet the regulation scenario constraints, duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation calculations are performed respectively to obtain the complementary set regulation potential in different time periods, specifically: The second resource subset SET2, the third resource subset SET3, the fourth resource subset SET4 and the fifth resource subset SET5 are all resource subsets that do not meet the adjustment scenario constraints; Based on the second resource subset SET2 and the third resource subset SET3, a duration complementary aggregation calculation is performed to obtain the first complementary set regulation potential and the remaining load side resources in the second resource subset SET2 after the duration complementary aggregation calculation is performed between the second resource subset SET2 and the third resource subset SET3, and the set of the remaining load side resources in the second resource subset SET2 is recorded as the sixth resource subset SET2'; Based on the fourth resource subset SET4 and the sixth resource subset SET2', a response time complementary aggregation calculation is performed to obtain the second complementary set regulation potential, and the remaining load side resources in the fourth resource subset SET4 after the fourth resource subset SET4 and the sixth resource subset SET2 are performed on the duration complementary aggregation calculation; Based on the remaining load-side resources in the fourth resource subset SET4 and the fifth resource subset SET5, flexible energy storage complementary aggregation calculation is performed to obtain the regulation potential of the third complementary set.

5. The method for evaluating the continuous regulation capability of multi-type load-side resources according to claim 4 is characterized in that: The performing duration complementary aggregation calculation based on the second resource subset SET2 and the third resource subset SET3 to obtain the first complementary set regulation potential and the remaining load side resources in the second resource subset SET2 after the duration complementary aggregation calculation between the second resource subset SET2 and the third resource subset SET3 specifically includes: Step 3-1: Initialize parameters, let i=1, N CO23 = 0, where i is the number of the i-th load-side resource in the second resource subset SET2, N CO23 is the number of first complementary units; Step 3-2: Arrange the load-side resources in the second resource subset SET2 from large to small according to the adjustment duration, and take the i-th load-side resource; Step 3-3: In response to the start time, the third resource subset SET3 is traversed, and the load side resource j that meets the first preset condition and has the smallest start time difference is selected from the third resource subset SET3 as a complementary resource and is placed in the first complementary unit; the first preset condition is: and , the starting time difference is expressed as: ,in, represents the start time of load-side resource j; Step 3-4: Calculate the upregulation potential of the first complementary unit , update the second resource subset SET2 and the third resource subset SET3, remove the load side resources i and load side resources j of this complementation in the second resource subset SET2 and the third resource subset SET3, and count the number of first complementary units N CO23 ,in, represents the upward adjustment potential of load-side resource i, represents the upward adjustment potential of load-side resource j; Step 3-5: Determine whether i>NSET2 is satisfied. If not, i=i+1, and jump to step 3-2; if satisfied, jump to step 3-6, where NSET2 represents the number of load-side resources in the second resource subset; Step 3-6: Calculate the first complementary set regulatory potential of the first complementary unit: , and at the same time, the set of remaining load-side resources in the second resource subset SET2 is recorded as the sixth resource subset SET2'.

6. The method for evaluating the continuous regulation capability of multiple types of load-side resources according to claim 4 is characterized in that: The step of performing response time complementary aggregation calculation based on the fourth resource subset SET4 and the sixth resource subset SET2' to obtain the second complementary set regulation potential and the remaining load side resources in the fourth resource subset SET4 after performing duration complementary aggregation calculation on the fourth resource subset SET4 and the sixth resource subset SET2 specifically includes: Step 4-1: Initialize parameters, let i=1, N CO24 = 0, where i is the number of the i-th load-side resource in the sixth resource subset SET2', N CO24 is the number of the second complementary units; Step 4-2: Take the load-side resource i in the sixth resource subset SET2' and calculate the complementary resource response time constraint: ; Step 4-3: traverse the fourth resource subset SET4, select the load side resource j that meets the second preset condition and has the smallest adjustment power difference as the complementary resource of the load side resource i, and put it into the second complementary unit; the second preset condition is: , the adjusted power difference is expressed as: ,in, represents the response time of load-side resource j; Step 4-4: Calculate the regulatory potential of the second complementary unit , update the fourth resource subset SET4, remove the load side resource j of this complementation in the fourth resource subset SET4, and count the number of second complementary units N CO24 ; Step 4-5: Determine whether i>NSET2' is satisfied. If not, i=i+1, and jump to step 4-2; if satisfied, jump to step 4-6, where NSET2' represents the number of load-side resources in the sixth resource subset; Sub-step 4-6: Calculate the second complementary set regulatory potential of the second complementary unit: .

7. The method for evaluating the continuous regulation capability of multiple types of load-side resources according to claim 4 is characterized in that: The flexible energy storage complementary aggregation calculation is performed based on the fourth resource subset SET4 and the fifth resource subset SET5 to obtain the third complementary set regulation potential, specifically including: Step 5-1: Initialize parameters, let i=1, N CO45 = 0, where i is the number of the i-th load-side resource in the fourth resource subset SET4, N CO45 is the number of the third complementary unit; Step 5-2: Take the load-side resource i in the fourth resource subset SET4 and calculate the response time deviation: , calculate the energy storage capacity requirement: ,in, represents the charging and discharging power of the energy storage device that complements the load-side resource i; Step 5-3: traverse the fifth resource subset SET5, select the energy storage device j that meets the third preset condition and has the smallest power deviation as a complementary resource, and put it into the third complementary unit; the third preset condition is: , the power deviation is expressed as: ,in, is the power of energy storage device j; Step 5-4: Calculate the adjustment amount of the third complementary unit , update the fourth resource subset SET4 and the fifth resource subset SET5, remove the load side resource i and energy storage device j of this complementation in the fourth resource subset SET4 and the fifth resource subset SET5, and count the number of the third complementary units N CO45 ; Step 5-5: Determine whether i>NSET4 is satisfied. If not, i=i+1, and jump to step 5-2; if satisfied, jump to step 5-6, where NSET4 represents the number of resources in the fourth resource subset; Step 5-6: Calculate the third complementary set regulatory potential of the third complementary unit: .

8. The method for aggregated evaluation of continuous regulation capability of multi-type load-side resources according to claim 4 is characterized in that: The calculation of the load-side resource aggregation response potential that meets the regulation scenario constraints based on the aggregation regulation potential of the directly adapted resource subset and the regulation potential of different complementary sets is specifically: The aggregated regulation potential of the directly adapted resource subset, the regulation potential of the first complementary set, the regulation potential of the second complementary set and the regulation potential of the third complementary set are added together to obtain the aggregated response potential of the load-side resources that meets the regulation scenario constraints.

9. The continuous regulation capability aggregation evaluation system of multi-type load-side resources is characterized by: include: Load side resource division module: used to divide the load side resources into different resource subsets according to the relationship between the adjustment start time, adjustment response time, adjustment duration and adjustment scenario constraints of each load side resource; Directly adapted resource subset aggregate regulation potential calculation module: used to perform regulation potential aggregation calculation on resource subsets that meet regulation scenario constraints, and obtain the aggregate regulation potential of directly adapted resource subsets; Different complementary set regulation potential calculation module: used to perform duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation calculations on resource subsets that do not meet the regulation scenario constraints, and obtain different complementary set regulation potentials; Load-side resource aggregation response potential calculation module: used to calculate the load-side resource aggregation response potential that meets the regulation scenario constraints based on the aggregation regulation potential of the directly adapted resource subset and the regulation potential of different complementary sets.

10. The multi-type load-side resource continuous regulation capability aggregation evaluation system according to claim 9 is characterized in that: In the load side resource division module, the load side resources are divided into different resource subsets according to the relationship between the adjustment start time, adjustment response time, adjustment duration and adjustment scenario constraints of each load side resource, specifically: If the relationship meets condition 1: The load side resources that meet condition 1 are counted into the first resource subset SET1; If the relationship satisfies condition 2: The load side resources satisfying condition 2 are counted into the second resource subset SET2; If the relationship meets condition 3: The load side resources that meet condition 3 are counted into the third resource subset SET3; If the relationship meets condition 4: The load side resources satisfying condition 4 are counted into the fourth resource subset SET4; If the relationship satisfies condition 5: The load side resources satisfying condition 5 are counted into the fifth resource subset SET5; in, T s Indicates the adjustment start time constraint, T r represents the regulation response time constraint, T c represents the regulation duration constraint, t s_i Indicates i The adjustment start time of each load-side resource, t r_i Indicates i The response time of each load-side resource, t c_i Indicates i The regulation duration of each load-side resource, P st_i Indicates i The energy storage charging and discharging power of each load-side resource, Q i Indicates i The amount of energy storage equipment, S i Indicates i The rated capacity of an energy storage device.

11. The multi-type load-side resource continuous regulation capability aggregation evaluation system according to claim 10 is characterized in that: In the direct adaptation resource subset aggregate adjustment potential calculation module, the adjustment potential aggregate calculation is performed on the resource subset that meets the adjustment scenario constraint to obtain the direct adaptation resource subset aggregate adjustment potential, which is specifically: The first resource subset SET1 is a resource subset that satisfies the adjustment scenario constraint. Based on the first resource subset SET1, the aggregation adjustment potential of the directly adapted resource subset is calculated according to the following formula: in, Indicates the first resource subset SET1 i The upward regulation potential of load-side resources, Indicates the aggregate adjustment potential of the directly adapted resource subset of the first resource subset.

12. The multi-type load-side resource continuous regulation capability aggregation evaluation system according to claim 10 is characterized in that: In the different complementary set regulation potential calculation modules, for the resource subsets that do not meet the regulation scenario constraints, duration complementary aggregation, response time complementary aggregation and flexible energy storage complementary aggregation calculations are performed respectively to obtain the complementary set regulation potentials in different time periods, specifically: The second resource subset SET2, the third resource subset SET3, the fourth resource subset SET4 and the fifth resource subset SET5 are all resource subsets that do not meet the adjustment scenario constraints; Based on the second resource subset SET2 and the third resource subset SET3, a duration complementary aggregation calculation is performed to obtain the first complementary set regulation potential and the remaining load side resources in the second resource subset SET2 after the duration complementary aggregation calculation is performed between the second resource subset SET2 and the third resource subset SET3, and the set of the remaining load side resources in the second resource subset SET2 is recorded as the sixth resource subset SET2'; Based on the fourth resource subset SET4 and the sixth resource subset SET2', a response time complementary aggregation calculation is performed to obtain the second complementary set regulation potential, and the remaining load side resources in the fourth resource subset SET4 after the fourth resource subset SET4 and the sixth resource subset SET2 are performed on the duration complementary aggregation calculation; Based on the remaining load-side resources in the fourth resource subset SET4 and the fifth resource subset SET5, flexible energy storage complementary aggregation calculation is performed to obtain the regulation potential of the third complementary set.

13. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method for aggregating and evaluating the continuous regulation capabilities of multiple types of load-side resources as described in any one of claims 1 to 9 are implemented.

14. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method for aggregating and evaluating the continuous regulation capability of multiple types of load-side resources as described in any one of claims 1 to 9 are implemented.

Citation Information

Cited By

  • Power grid regulation method and device based on polymorphic resources, and electronic equipment

    CN121461349A

  • A power grid regulation method and device based on multi-form resources and electronic equipment

    CN121461349B