A road bridge crack repair fixing structure
By opening embedded grooves and clamping grooves at road bridge cracks, prefabricated fixed hollow pipes and other components, the connection strength is strengthened by clamping and pouring, and the stress is adjusted by nuts, the problems of insufficient connection strength of fixed structures and the impact of thermal expansion and contraction in the existing technology are solved, and the repair effect and safety are improved.
Patent Information
- Application Number
- CN202411976052.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2044-12-31
AI Technical Summary
In the prior art, after the road bridge pavement cracks, the connection method between the fixed structure and the pavement is easily loosened, resulting in insufficient connection strength, especially when the gap is large or structural changes caused by thermal expansion and contraction, it affects the repair effect and safety.
By opening embedded grooves and clamping grooves on both sides of the edges of the road bridge cracks, prefabricated fixed hollow tubes, fixing rods and docking rods, the connection strength is strengthened by clamping and then pouring, and the force of the clamping plate is adjusted through nuts to adapt to cracks of different sizes and seasonal changes.
It is realized that cracks of different sizes are adapted without affecting the connection strength, and by adjusting the force magnitude, it avoids thermal expansion and contraction affecting the strength of the fixed structure, thereby improving the repair effect and safety.
Smart Images

Figure CN119392578B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of road bridge crack repair, and in particular to a road bridge crack repair fixing structure. Background Art
[0002] Repairing road and bridge cracks is a complex and important engineering process. In the early stage, it is necessary to accurately measure the width, length and depth of the cracks to determine the nature of the cracks, evaluate the impact of the cracks on the safety of the road and bridge structure, and remove debris, dust and oil stains on the surface of the cracks. The cracks must be polished and cleaned as necessary so that the repair materials can adhere better. Finally, the repair method should be selected according to the actual situation to achieve the effect of road repair.
[0003] The Chinese invention patent application with the announcement number CN114214973B discloses a road bridge crack repair fixing structure, comprising a horizontally arranged receiving plate, the lower surface of which is horizontally slidably connected to two tightening plates, the two ends of which are vertically slidably penetrated by receiving columns, the ends of the two tightening plates which are far from each other are respectively provided with receiving grooves for the corresponding receiving columns to be inserted, and a locking piece is arranged between the two tightening plates, which is used to fix the two tightening plates. By tightening the two sides of the crack with two tightening plates, this design can reduce the risk of concrete cracking compared to simply filling with concrete, thereby reducing the risk of gradual expansion of cracks in roads and bridges, and thus improving the repair effect of roads and bridges.
[0004] After the existing road bridge pavement cracks, a fixed structure is generally installed at the crack and then the inside is filled, so that the repaired crack maintains a high strength to meet the road surface strength requirements. However, the existing fixed structure is generally connected to the road bridge pavement by ground nails. This method is prone to loosening during later use, thereby affecting the stability of the fixed structure, and the secondary repair needs to be re-fixed, which causes certain damage to the facade. In addition, since the gaps at the gaps are large and small, the ground nail fixation method cannot guarantee the fixing strength at larger gaps, so that it can only meet the repair work of smaller gaps. In addition, since the road surface will expand and contract when it is warm in winter and cool in summer, the bridge pavement is generally provided with a buffer gap. However, if the repaired road surface is under this premise, it is easy to cause the risk of fracture of the concrete layer and the fixed structure poured at the repair site, thereby affecting the safety of use inside.
[0005] Therefore, it is necessary to invent a road bridge crack repair fixing structure to solve the above problems. Summary of the invention
[0006] The purpose of the present invention is to provide a fixed structure for repairing cracks in a road bridge. The fixed structure is prefabricated as a whole, so that corresponding adjustments can be made according to the size of the gap. The fixed structure is first clamped and then cast to ensure the connection strength during later use. Finally, the force applied to the gap connection is changed by adjustment, so that corresponding adjustments can be made according to seasonal changes to avoid thermal expansion and contraction affecting the strength of the fixed structure, so as to solve the problems in the prior art of low strength of the connection between the fixed structure body and the crack, decreased connection strength when the gap is large, and the problem that thermal expansion and contraction of the road surface easily affect the strength of the fixed structure.
[0007] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a road bridge crack repair fixing structure, comprising an embedded groove one opened around the road bridge crack, the embedded groove one side is provided with an embedded groove two, the embedded groove two side is provided with a clamping groove, and the embedded groove two and the clamping groove are both opened around the road bridge crack, a connecting groove is opened between the embedded groove one, the embedded groove two and the clamping groove, and the embedded groove one, the embedded groove two and the clamping groove are symmetrically opened on both sides of the crack, and the embedded groove one needs to be greater than ten centimeters away from the edge of the road bridge crack, and a protective plate is installed on the road bridge pavement, and the protective plate covers the embedded groove one, the embedded groove two and the clamping groove;
[0008] The fixing assembly arranged inside the connecting groove includes a fixing hollow tube, the fixing hollow tube penetrates and is connected in the connecting groove, two sets of positioning rings 1 are sleeved and fixed on the fixing hollow tube, the two sets of positioning rings 1 are clamped with a clamping plate 1, and the two sets of clamping plates 1 are clamped with the embedded groove 1 and the embedded groove 2 respectively;
[0009] The driving component arranged in the crack of the road bridge includes a fixing frame symmetrically installed in the crack of the road bridge, and connecting hollow tubes are installed in two groups of the fixing frames. A docking hollow tube is connected through the top of the connecting hollow tube, and a rotating shaft is rotatably connected in the docking hollow tube. A nut is installed above the rotating shaft, and the horizontal position of the nut is higher than the depth of the crack.
[0010] As a preferred solution of the present invention, the fixing assembly further comprises a fixing rod, the fixing rod penetrates and is connected to the interior of the fixing hollow tube, and a threaded hole 1 is formed on one side of the fixing rod.
[0011] As a preferred solution of the present invention, a docking rod is connected through the fixed hollow tube, a bolt one is installed on a side of the docking rod close to the fixed hollow tube, and the bolt one is threadedly connected to the threaded hole one.
[0012] As a preferred solution of the present invention, a second positioning ring is sleeved and fixed on the docking rod, a second clamping disc is clamped on the second positioning ring, and the second clamping disc is clamped with the clamping groove.
[0013] As a preferred solution of the present invention, the driving assembly further comprises a bevel gear 1, wherein the bevel gear 1 is mounted below the rotating shaft, and a screw is symmetrically rotatably connected in the connecting hollow tube.
[0014] As a preferred solution of the present invention, bevel gears 2 are installed on one side of the two groups of screws, and the two groups of bevel gears 2 are symmetrically arranged, and the two groups of bevel gears 2 are respectively meshed with bevel gears 1.
[0015] As a preferred solution of the present invention, a threaded sleeve is threadedly connected to the screw rod, and a limit block is symmetrically installed on the threaded sleeve.
[0016] As a preferred solution of the present invention, limiting grooves are symmetrically arranged on the inner wall of the connecting hollow tube, and the limiting blocks are slidably connected to the corresponding limiting grooves.
[0017] As a preferred solution of the present invention, a threaded hole 2 is opened on one side of the threaded sleeve, a bolt 2 is threaded inside the threaded hole 2, and the bolt 2 is fixedly connected to the fixing rod, and the thread direction of the bolt 1 and the bolt 2 is opposite to the thread direction of the screw rod.
[0018] In the above technical solution, compared with the prior art, the technical effects and advantages provided by the present invention are as follows:
[0019] By opening a corresponding number of embedded grooves and clamping grooves on both sides of the edge of the crack according to needs, and prefabricating fixed hollow tubes, fixed rods and docking rods of corresponding sizes, it is possible to adapt to cracks of different sizes without affecting the connection strength, and the overall installation method of the fixed structure adopts a method of clamping and then pouring, which strengthens the strength of the connection between the fixed structure and the crack, thereby ensuring the overall strength of the road surface after repair. Finally, by actively rotating the nuts, the force of the clamping plates 2 on both sides is changed, so that it can be adjusted according to seasonal temperature changes, avoiding the problem of damage to the fixed structure and the pouring gap due to thermal expansion and contraction of the road surface. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0021] Figure 1 It is a schematic diagram of the structure of the protective plate of the present invention;
[0022] Figure 2 It is a schematic diagram of the layout structure of each group of embedded grooves of the present invention;
[0023] Figure 3It is a schematic diagram of the internal structure of the embedded slot of the present invention;
[0024] Figure 4 It is a schematic diagram of the disassembled structure of the fixed hollow tube and the clamping plate 1 of the present invention;
[0025] Figure 5 It is a schematic diagram of the planing structure of the fixed hollow tube of the present invention;
[0026] Figure 6 It is a schematic diagram of the structure of each type of docking rod of the present invention;
[0027] Figure 7 It is a schematic diagram of the fixed hollow tube structure of various types of the present invention;
[0028] Figure 8 For the present invention Figure 4 The enlarged structural diagram at A in the middle;
[0029] Fig. 9 For the present invention Figure 3 Enlarged structural diagram at B in the middle.
[0030] Description of reference numerals:
[0031] 101. Embedded groove one; 102. Embedded groove two; 103. Snap-on groove; 104. Connecting groove; 105. Protective plate; 002. Fixing assembly; 201. Fixing hollow tube; 202. Positioning ring one; 203. Snap-on disc one; 204. Fixing rod; 205. Threaded hole one; 206. Docking rod; 207. Bolt one; 208. Positioning ring two; 209. Snap-on disc two; 003. Driving assembly; 301. Fixing frame; 302. Connecting hollow tube; 303. Docking hollow tube; 304. Rotating shaft; 305. Nut; 306. Bevel gear one; 307. Screw; 308. Bevel gear two; 309. Threaded sleeve; 310. Limit block; 311. Limiting groove; 312. Threaded hole two; 313. Bolt two. DETAILED DESCRIPTION
[0032] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.
[0033] The present invention provides Figure 1-9A road bridge crack repair fixing structure shown includes an embedded groove 101 opened around the road bridge crack, an embedded groove 102 is arranged on one side of the embedded groove 101, a clamping groove 103 is arranged on one side of the embedded groove 102, and the embedded groove 102 and the clamping groove 103 are both opened around the road bridge crack, a connecting groove 104 is opened between the embedded groove 101, the embedded groove 102 and the clamping groove 103, and the embedded groove 101, the embedded groove 102 and the clamping groove 103 are symmetrically opened on both sides of the crack, and the embedded groove 101 needs to be greater than ten centimeters away from the edge of the road bridge crack, and a protective plate 105 is installed on the road bridge pavement, and the protective plate 105 covers the embedded groove 101, the embedded groove 102 and the clamping groove 103;
[0034] The embedded groove 101, the embedded groove 102 and the clamping groove 103 can be opened by the cutting machine, and the distance between the embedded groove 101 and the edge of the crack is more than ten centimeters, so as to ensure the overall strength of the fixed structure, and the width of the clamping groove 103 is greater than the width of the embedded groove 101 and the embedded groove 102, and the embedded groove 101 and the embedded groove 102 need to be poured and backfilled after the fixed structure is installed, while the clamping groove 103 does not need to be poured and backfilled, and the protective plate 105 is fixed in position by expansion bolts, so as to form the effect of protecting the road surface at this place, and the top of the protective plate 105 can be set to a straight plate shape or an arc shape of a speed bump, so as to meet different needs;
[0035] The fixing assembly 002 disposed inside the connecting groove 104 includes a fixing hollow tube 201, which penetrates and is connected in the connecting groove 104, and two sets of positioning rings 1 202 are sleeved and fixed on the fixing hollow tube 201, and the two sets of positioning rings 1 202 are clamped with a clamping plate 1 203, and the two sets of clamping plates 1 203 are clamped with the embedded groove 1 101 and the embedded groove 2 102 respectively;
[0036] By clamping the positioning ring 1 202 and the clamping plate 1 203, and the two sets of clamping plates 1 203 and the embedded groove 1 101 and the embedded groove 2 102, the fixed hollow tube 201 can be firmly fixed in the connecting groove 104, and the fixing strength of the fixed hollow tube 201 can be further guaranteed by pouring backfilling, and the length of the fixed hollow tube 201 can be customized according to the gap of the gap, and the number of the positioning ring 1 202 and the clamping plate 1 203 above and the embedded groove 2 102 on the ground is increased simultaneously, so that different repair plans can be formulated according to the width of the crack, so as to ensure the strength after repair;
[0037] The driving assembly 003 arranged in the crack of the road bridge includes a fixing frame 301 symmetrically installed in the crack of the road bridge, and two sets of fixing frames 301 are installed with connecting hollow tubes 302, and a butt-joint hollow tube 303 is connected through the top of the connecting hollow tube 302, and a rotating shaft 304 is rotatably connected in the butt-joint hollow tube 303, and a nut 305 is installed above the rotating shaft 304, and the horizontal position of the nut 305 is higher than the depth of the crack;
[0038] The fixing frame 301 can ensure that the position of the connecting hollow tube 302 is stably installed, and the nut 305 can drive the rotating shaft 304 to rotate in the connecting hollow tube 303. When the gap is backfilled, the nut 305 can still rotate without affecting the normal rotation of the rotating shaft 304.
[0039] Furthermore, in the above structure, the fixing assembly 002 also includes a fixing rod 204 , which penetrates and is connected to the inside of the fixing hollow tube 201 , and a threaded hole 205 is provided on one side of the fixing rod 204 .
[0040] Furthermore, in the above structure, a docking rod 206 is connected through the fixed hollow tube 201 , a bolt 207 is installed on one side of the docking rod 206 close to the fixed hollow tube 201 , and the bolt 207 is threadedly connected to the threaded hole 205 .
[0041] Through the cooperation of the bolt 207 and the threaded hole 205 , the docking rod 206 can be firmly fixed to the fixing rod 204 .
[0042] Furthermore, in the above structure, a second positioning ring 208 is sleeved and fixed on the docking rod 206 , a second clamping plate 209 is clamped on the second positioning ring 208 , and the second clamping plate 209 is clamped with the clamping groove 103 .
[0043] The second clamping plate 209 can be firmly fixed to the fixing rod 204 by the second positioning ring 208, and the second clamping plate 209 cooperates with the clamping groove 103 when moving, so that the ground on both sides of the crack is subjected to force, and because the clamping groove 103 is not backfilled, the second clamping plate 209 can move freely, and the second clamping plate 209 can be tightened and loosened according to the change of seasons, thereby avoiding the whole fixed structure from breaking due to seasonal thermal expansion and contraction.
[0044] Furthermore, in the above structure, the driving assembly 003 also includes a bevel gear 306 , which is installed below the rotating shaft 304 and is connected to a screw 307 in the hollow tube 302 for symmetrical rotation.
[0045] The rotating shaft 304 can drive the bevel gear 1 306 to rotate, and the screw 307 can freely rotate at a fixed point in the connecting hollow tube 302 .
[0046] Furthermore, in the above structure, bevel gear 2 308 is installed on one side of the two sets of screw rods 307 , and the two sets of bevel gear 2 308 are symmetrically arranged, and the two sets of bevel gear 2 308 are respectively meshed with bevel gear 1 306 .
[0047] By rotating the bevel gear 1 306 , the bevel gear 1 306 can simultaneously drive the two sets of bevel gear 2 308 to rotate, thereby driving the screw 307 to rotate.
[0048] Furthermore, in the above structure, a threaded sleeve 309 is threadedly connected to the screw rod 307 , and a limit block 310 is symmetrically mounted on the threaded sleeve 309 .
[0049] The threaded sleeve 309 can be moved by rotating the screw rod 307 .
[0050] Furthermore, in the above structure, the inner wall of the connecting hollow tube 302 is symmetrically provided with limiting grooves 311 , and the limiting blocks 310 are slidably connected to the corresponding limiting grooves 311 .
[0051] Through the cooperation between the limiting block 310 and the limiting groove 311 , the threaded sleeve 309 can slide stably in the connecting hollow tube 302 .
[0052] Furthermore, in the above structure, a threaded hole 212 is opened on one side of the threaded sleeve 309, a bolt 213 is threaded in the threaded hole 212, and the bolt 213 is fixedly connected to the fixing rod 204, and the thread direction of the bolt 217 and the bolt 213 is opposite to the thread direction of the screw rod 307.
[0053] The fixing rod 204 and the threaded sleeve 309 are connected by the cooperation of the bolt 2 313 and the threaded hole 2 312, and the thread direction of the bolt 1 207 and the bolt 2 313 can ensure that when the screw rod 307 drives the threaded sleeve 309 to move, the bolt 1 207 and the bolt 2 313 will not loosen or fall off.
[0054] like Figure 1-9As shown, according to the specific size of the gap in the road bridge pavement, a road surface cutting machine is used to open the embedded groove 101, the embedded groove 2 102, the clamping groove 103 and the connecting groove 104, and at the same time, the docking rod 206, the fixing rod 204 and the fixed hollow tube 201 of corresponding sizes are prefabricated according to the needs. At this time, the docking rod 206 and the fixing rod 204 are docked, and the two are passed through the interior of the fixed hollow tube 201. At the same time, the threaded sleeve 309 is used to fix the fixing rod 204, and the fixed hollow tube 201 and the connecting hollow tube 302 are docked and fixed. At this time, the connecting hollow tube 302 is fixed in the crack through the fixing frame 301, and the fixing frame 301 can be selectively installed according to the actual situation. At the same time, the fixed hollow tube 201 and the clamping plate 1 203 are docked and then clamped into the corresponding embedded groove 101, embedded groove 2 102, clamping groove 103 and connecting groove 104. At this time, the embedded groove 101, the embedded groove 2 102 and the road surface are backfilled and poured, and the nut 305 is rotated at the same time, so that the nut 305 drives the bevel gear 1 306 under the rotating shaft 304 to rotate, so that the screw 307 drives the threaded sleeve 309 to move, so that the fixed rod 204 drives the docking rod 206 to slide in the fixed hollow tube 201, so that the clamping plate 209 and the clamping groove 103 are in contact with each other, so that the road surfaces on both sides of the gap are mutually stressed, and finally the protective plate 105 is installed and covered on the road surface through the expansion bolts, thereby completing the road surface repair work. Through this method of structural pouring and backfilling, a stable fit between the fixed structure and the road surface can be ensured to avoid looseness, and this method can be customized according to the size of the gap, so that cracks of different gap sizes can be effectively repaired. Finally, this method can adjust the force of the fixed structure according to the seasonal changes in the later period, so as to ensure the strength of the overall structure.
[0055] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. A road bridge crack repair fixing structure, comprising an embedded groove (101) opened around the road bridge crack, characterized in that: The embedded groove one (101) is provided with an embedded groove two (102) on one side, the embedded groove two (102) is provided with a snap-in groove (103) on one side, and the embedded groove two (102) and the snap-in groove (103) are both opened around the crack of the road bridge, a connecting groove (104) is opened between the embedded groove one (101), the embedded groove two (102) and the snap-in groove (103), and the embedded groove one (101), the embedded groove two (102) and the snap-in groove (103) are opened symmetrically on both sides of the crack, and the embedded groove one (101) needs to be more than ten centimeters away from the edge of the road bridge crack, and a protective plate (105) is installed on the road bridge pavement, and the protective plate (105) covers the embedded groove one (101), the embedded groove two (102) and the snap-in groove (103); The fixing assembly (002) disposed inside the connecting groove (104) comprises a fixing hollow tube (201), the fixing hollow tube (201) penetrates and is connected inside the connecting groove (104), two groups of positioning rings (202) are sleeved and fixed on the fixing hollow tube (201), the two groups of positioning rings (202) are clamped with clamping plates (203), and the two groups of clamping plates (203) are clamped with the embedded groove (101) and the embedded groove (102) respectively; The driving assembly (003) disposed in the crack of the road bridge comprises a fixing frame (301) symmetrically installed in the crack of the road bridge, wherein two groups of the fixing frames (301) are installed with connecting hollow tubes (302), the connecting hollow tubes (302) are connected with a butt-joint hollow tube (303) through the top, the butt-joint hollow tube (303) is rotatably connected with a rotating shaft (304), a nut (305) is installed above the rotating shaft (304), and the horizontal position of the nut (305) is higher than the depth of the crack; The fixing assembly (002) further comprises a fixing rod (204), the fixing rod (204) being connected through the inside of the fixing hollow tube (201), a threaded hole (205) being provided on one side of the fixing rod (204), a docking rod (206) being connected through the inside of the fixing hollow tube (201), a bolt (207) being installed on the side of the docking rod (206) close to the fixing hollow tube (201), and the bolt (207) being threadedly connected to the threaded hole (205), a positioning ring (208) being sleeved and fixed on the docking rod (206), a clamping plate (209) being clamped on the positioning ring (208), and the clamping plate (209) being clamped to the clamping groove (103); The driving assembly (003) further comprises a bevel gear 1 (306), wherein the bevel gear 1 (306) is mounted below the rotating shaft (304), a screw rod (307) is symmetrically rotatably connected in the connecting hollow tube (302), a bevel gear 2 (308) is mounted on one side of the two sets of screw rods (307), and the two sets of bevel gear 2 (308) are symmetrically arranged, and the two sets of bevel gear 2 (308) are respectively meshed with the bevel gear 1 (306), and a threaded sleeve (309) is threadedly connected to the screw rod (307), and the threaded sleeve (309) A limit block (310) is symmetrically installed on the upper surface, a limit groove (311) is symmetrically provided on the inner wall of the connecting hollow tube (302), and the limit block (310) is slidably connected to the corresponding limit groove (311), a threaded hole (312) is provided on one side of the threaded sleeve (309), a bolt (313) is threadedly connected in the threaded hole (312), and the bolt (313) is fixedly connected to the fixing rod (204), and the thread direction of the bolt (207) and the bolt (313) is opposite to the thread direction of the screw rod (307).
Citation Information
Patent Citations
A road bridge crack repair fixing structure
CN114214973B
Guide vehicle for machine cutting concrete carriageway joints - has transverse framework on guide wheels and steering connection to cutting machine
CH606627A5
Crack concrete reinforcing device for bridge construction and implementation method thereof
CN115506273A