Coal mine resource reserve dynamic management method and device
By dynamically binding the graph data of coal mine resource reserves and the reserve data, and synchronous updates are performed using GIS platform and spatial database technology, the problems of inconsistent data and untimely updates in coal mine resource reserve management are solved, and dynamic and efficient management of resource reserves is achieved.
Patent Information
- Application Number
- CN202411374825.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2025-02-07
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
There are problems in the dynamic management of coal mine resource reserves such as inconsistent graphs and table data, poor calculation accuracy, and inability to update and guide the next step of production in a timely manner, which seriously restricts the efficient development of coal mine resource reserve management.
By dynamically binding resource reserve graphic data with reserve data, the synchronous update of the mining changes in the comprehensive mining working face to the mine resource reserves is realized. The GIS platform and spatial database technology are used to calculate the three quantities of coal mine reserve management and generate dynamic updates. Resource reserve report.
It realizes dynamic update management of coal mine resource reserves, improves data accuracy and timeliness, solves the problems of inconsistent data and untimely updates under the traditional model, and ensures the efficient development of coal mine resource reserves management.
Smart Images

Figure CN119398379A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of coal mine information construction, and in particular to a method and device for dynamic management of coal mine resource reserves. Background Art
[0002] The dynamic management of mine resource reserves is an important task in the coal mining process, which has the characteristics of complex business processes, large management workload, high timeliness requirements, and high data accuracy requirements. To carry out this work, it is usually necessary to perform a large number of calculations based on the changes in the amount of coal mined, the amount of coal used, and the amount of coal lost in the mine, and generate a series of drawings and reports. In the traditional mode, the management of coal mine resource reserves data is mainly carried out through CAD mapping plus manual calculations, GIS platform-assisted calculations, etc., which not only consumes a lot of human resources, but also has outstanding problems such as inconsistent data in graphs and tables, poor calculation accuracy, and inability to update in time to guide the next step of production, which seriously restricts the efficient development of coal mine resource reserve management.
[0003] With the continuous development of spatial database technology, the current coal mine resource reserves have initially achieved unified management of maps and data, and linkage of charts, but the update linkage is still incomplete, untimely, and unstable, and the usability is poor. Especially in the process of coal mining, with the continuous advancement of the comprehensive mining face, reserve management personnel usually need to update reserve maps and report data for multiple coal seams and multiple working faces on a monthly, annual, and other different time periods according to reporting requirements, and both the workload and accuracy face huge challenges. Summary of the invention
[0004] In response to the above problems, the present application provides a method and device for dynamic management of coal mine resource reserves, which dynamically binds resource reserve graphic data with reserve data, and realizes dynamic update management of coal mine resource reserves by realizing the synchronous update of mining changes to mine resource reserves of the comprehensive mining working face.
[0005] In a first aspect of an embodiment of the present application, a method for dynamic management of coal mine resource reserves is provided, the method comprising:
[0006] Step 1: Based on the coal mine resource reserve spatial database and resource reserve calculation diagram, the three quantities of coal mine reserve management are calculated through the GIS platform, and the resource reserve data is bound to the boundary of the fully mechanized mining face; wherein, the three quantities include: development coal quantity, preparation coal quantity and recovered coal quantity, and the resource reserve data includes three quantity categories, and the three quantity categories include: any one of the development coal quantity, the preparation coal quantity and the recovered coal quantity;
[0007] Step 2: based on the fully mechanized mining face whose three quantity categories are the recovered coal quantity, the basic information of the fully mechanized mining face is initialized, and the return air lane of the fully mechanized mining face, the transport lane of the fully mechanized mining face and the amortized coal pillar range of the mining area are bound;
[0008] Step 3: Based on the mining range of the mining footage, determine the coal volume used in the fully-mechanized mining face, the mine amortization volume, the geological and hydrological losses and the reported losses, generate the fully-mechanized mining face mobilization area, and update the unmined area and goaf area;
[0009] Step 4: Determine resource reserve mining data by multi-dimensionally superimposing the utilization area of the fully mechanized mining face in different time periods and the reserve block boundary in the resource reserve calculation diagram, and dynamically update the resource reserve calculation diagram;
[0010] Step 5: storing resource reserve data of different dimensions into the coal mine resource reserve spatial database, and generating a variety of coal mine resource reserve reports based on different reserve report templates;
[0011] Repeat steps three and four to dynamically update the resource reserve calculation diagram to complete the update of the entire coal mine resource reserves, and when the new comprehensive mining working face division is completed, repeat steps one to five to update the entire coal mine resource reserves, and dynamically update and display the coal mine resource reserves graphical report.
[0012] Furthermore, the three quantities of coal mine reserve management are calculated through the GIS platform based on the resource reserve spatial database and the resource reserve calculation map, and the resource reserve data is bound to the boundary of the fully mechanized mining face, including:
[0013] Obtain the mine name, mining area name and coal seam name in the resource reserve space database; wherein the fully mechanized mining face name uniquely corresponds to one mine;
[0014] Specifying the boundary of the fully mechanized mining face, and performing superposition calculation based on the boundary of the reserve block segment in the resource reserve calculation diagram to determine the resource volume and area of the fully mechanized mining face;
[0015] The average coal thickness of the fully-mechanized mining face is obtained by reverse calculation based on the resource volume of the fully-mechanized mining face, the area of the fully-mechanized mining face, the bulk density and the inclination angle of the fully-mechanized mining face;
[0016] Determine the resource reserve data based on the mine name, the mining area name, the coal seam name, the fully mechanized mining face name, the three quantity categories, the fully mechanized mining face resource quantity, the bulk density, the fully mechanized mining face inclination angle, the average coal thickness and the fully mechanized mining face area;
[0017] The resource reserve data is bound to the boundary of the fully mechanized mining face.
[0018] Furthermore, based on the fully mechanized mining face, the basic information of the fully mechanized mining face is initialized, and the return air lane of the fully mechanized mining face, the transport lane of the fully mechanized mining face and the amortized coal pillar range of the mining area are bound, including:
[0019] The basic information of the fully mechanized mining face is set and bound to the boundary of the fully mechanized mining face; wherein the basic information of the fully mechanized mining face at least includes: the width of the transport lane, the mining thickness of the transport lane, the width of the return air lane, the mining thickness of the return air lane, the length of the working face, the width of the working face, the inclined area, the width of the stage coal pillar, the amortized coal pillar reserves of the mining area, and the amortization coefficient of the permanent coal pillar of the mine;
[0020] Based on the resource reserve data and the basic information of the fully mechanized mining face, the fully mechanized mining face transport tunnel and the fully mechanized mining face return air tunnel are calibrated, and the amortized coal pillar range of the mining area is drawn and bound.
[0021] Furthermore, the drawing and binding of the amortized coal pillar range of the mining area includes:
[0022] Based on the resource reserve data, the mining area amortization area is interactively drawn to calculate the amortized coal pillar reserves of the mining area, the mining area amortization attributes are written into the mining area amortization area boundary, and the comprehensive mining working face is bound to the mining area amortized coal pillar range through the comprehensive mining working face name.
[0023] Furthermore, the mining range based on the mining footage determines the coal volume used in the fully-mechanized mining face, the mine amortization volume, the geological and hydrological loss volume and the loss report volume, and generates the fully-mechanized mining face mobilization area, including:
[0024] Based on the initialized fully mechanized mining face, specifying a mobilization range; wherein the specified mobilization range is interactively specifying the mining footage of the return air lane of the fully mechanized mining face and the transport lane of the fully mechanized mining face, or interactively delineating the boundary of the mobilization range;
[0025] Supplementing the mobilization parameters, calculating the mobilization coal volume of the fully mechanized mining face, and generating the mobilization area of the fully mechanized mining face; wherein the mobilization parameters at least include: actual mining thickness, coal falling thickness, thickness loss, coal falling loss, tunnel top and bottom loss, and stage coal pillar loss;
[0026] The fully-mechanized mining face mobilization attribute data is stored in the fully-mechanized mining face mobilization area, and the fully-mechanized mining face is bound to the fully-mechanized mining face mobilization area based on the fully-mechanized mining face name; wherein the fully-mechanized mining face mobilization attribute data at least includes: fully-mechanized mining face name, fully-mechanized mining face loss amount, mined amount, mobilization amount, recovery rate, mining area loss amount, mining area mined amount, mining area mobilization amount, mining area recovery rate, mine loss amount, mine mined amount, mine mobilization amount, and mine recovery rate;
[0027] The mine amortization amount is calculated based on the amortization coefficient of the mine's permanent coal pillar and the mining area's mobilization amount, and the mine amortization amount, geological and hydrological loss amounts and reported loss amounts are bound to the boundary of the fully mechanized mining face.
[0028] Further, the updating of unmined areas and goaf areas includes:
[0029] Based on the fully mechanized mining working face, specifying N-times mobilization ranges of the fully mechanized mining working face, and generating N mobilization areas of the fully mechanized mining working face; wherein the value range of N is an integer from 1 to N;
[0030] Based on the N mobilization areas, updating the goaf area of the fully-mechanized mining working face and the un-mined area of the fully-mechanized mining working face until the fully-mechanized mining working face is entirely the goaf area;
[0031] Among them, the goaf area is the union of N mobilization areas, and the unmined area is the area of the comprehensive mining working face excluding the goaf area.
[0032] Further, the resource reserve mining data is determined by multi-dimensionally superimposing the utilization area of the fully mechanized mining face in different time periods and the reserve block boundary in the resource reserve calculation diagram, and the resource reserve calculation diagram is dynamically updated, including:
[0033] Accumulate and calculate the utilization area and utilization data of the fully mechanized mining face in the different time periods, and perform superposition calculation with the reserve block boundary in the resource reserve calculation diagram, and determine the utilization resource quantity, reserve, area and reserve increase and decrease change of each reserve block according to the superposition ratio;
[0034] Generate a reserve production diagram based on the produced resources, reserves, area and reserve increase / decrease variation of each reserve block;
[0035] Based on the reserve legend resources, reserve legend reserves, reserve legend area and the reserve production legend resources, reserve production legend reserves, reserve production legend area of the resource reserve calculation diagram, determine the reserve legend in the resource reserve calculation diagram after production, and dynamically update the resource reserve calculation diagram.
[0036] Furthermore, the dynamically updating resource reserve calculation graph includes at least one of the following methods:
[0037] Method 1: Based on the utilization area of the fully mechanized mining face, the utilization data of the fully mechanized mining face and the stage coal pillar loss, the mining area range of the fully mechanized mining face is drawn, and the mining area range is superimposed with the boundary of the reserve block segment, the increase and decrease change amount and the reserve utilization amount of the reserve block segment within the mining area range of the fully mechanized mining face are obtained, the reserve legend in the resource reserve calculation diagram is updated and the reserve utilization legend is drawn;
[0038] Method 2: Calculate the reserve block amortization amount based on the mining area amortization area of the fully mechanized mining face, the mining area amortization amount of the fully mechanized mining face and the reserve block boundary, update the reserve legend, and reversely calculate the reserve amortization area according to the amortization amount, and draw the reserve production legend;
[0039] Method 3: specify the reserve legend in the resource reserve calculation diagram, amortize the mine amortization amount to the resource amount in the reserve legend, and when the resource amount of the specified reserve legend is insufficient, specify the next reserve legend until the amortization of the mine amortization amount is completed, and simultaneously draw the reserve production legend;
[0040] Method 4: Based on the geological and hydrological amortization of the fully mechanized mining face, specify the geological and hydrological loss area, and perform superposition calculation with the reserve block boundary, amortize the geological and hydrological loss to the resource volume of the reserve legend, and draw a reserve production legend;
[0041] Method 5: Based on the reported loss amount of the comprehensive mining working face, the specified loss amount area is superimposed on the reserve block boundary in the resource reserve calculation diagram, the reported loss amount is amortized to the resource amount in the reserve legend, and a reserve utilization legend is drawn.
[0042] Furthermore, the resource reserve data of different dimensions are stored in the coal mine resource reserve space database, and a variety of coal mine resource reserve reports are generated based on different reserve report templates, including:
[0043] The resource reserve data of different dimensions are stored in the coal mine resource reserve spatial database; wherein the resource reserve data of different dimensions include: reserve graphic data and reserve attribute data of different time periods, and the reserve graphic data and attribute data of different time periods are distinguished by time stamps; the reserve graphic data at least include: resource reserve calculation diagram, reserve three-quantity diagram, reserve production diagram and reserve loss diagram; the reserve attribute data at least include: reserve legend data, reserve three-quantity data and reserve production data;
[0044] Set up reserve report templates based on the report template library;
[0045] Based on the coal mine resource reserve spatial database and the reserve report template, obtaining the target resource reserve data of different dimensions;
[0046] Based on the reserve report template and the target resource reserve data, the coal mine resource reserve report is generated.
[0047] In a second aspect of the embodiment of the present application, a device for dynamic management of coal mine resource reserves is provided, the device comprising:
[0048] The first determination module is used to calculate the three quantities of coal mine reserve management through the GIS platform based on the coal mine resource reserve spatial database and the resource reserve calculation map, and bind the resource reserve data to the boundary of the fully mechanized mining face; wherein the three quantities include: development coal quantity, preparation coal quantity and recovered coal quantity, and the resource reserve data includes three quantity categories, and the three quantity categories include: any one of the development coal quantity, the preparation coal quantity and the recovered coal quantity;
[0049] A binding module is used to initialize the basic information of the fully-mechanized mining face based on the fully-mechanized mining face whose three quantity categories are the recovered coal quantity, and to bind the fully-mechanized mining face return air lane, fully-mechanized mining face transport lane and mining area amortized coal pillar range;
[0050] The second determination module is used to determine the amount of coal used in the fully-mechanized mining face based on the mining range of the mining footage, generate the fully-mechanized mining face mobilization area, and update the unmined area and goaf area;
[0051] An updating module is used to determine resource reserve mining data by multi-dimensionally superimposing the resource reserve block boundaries in the fully mechanized mining face and the resource reserve calculation diagram in different time periods, and dynamically update the resource reserve calculation diagram;
[0052] A generation module, used to determine resource reserve mining data through multi-dimensional superposition of the utilization area of the fully mechanized mining face in different time periods and the reserve block boundary in the resource reserve calculation diagram, and dynamically update the resource reserve calculation diagram;
[0053] Repeat the second determination module and the update module to dynamically update the resource reserve calculation diagram to complete the update of the entire coal mine resource reserves, and when the new comprehensive mining working face division is completed, repeat the first determination module, the binding module, the second determination module, the update module and the generation module to update the entire coal mine resource reserves, and dynamically update and display the coal mine resource reserves graphical report.
[0054] Furthermore, the first determining module includes:
[0055] An acquisition module is used to acquire the mine name, mining area name and coal seam name in the resource reserve space database; wherein the name of the fully mechanized mining face uniquely corresponds to one mine;
[0056] Specifying the boundary of the fully mechanized mining face, and performing superposition calculation based on the boundary of the reserve block segment in the resource reserve calculation diagram to determine the resource volume and area of the fully mechanized mining face;
[0057] The average coal thickness of the fully-mechanized mining face is obtained by reverse calculation based on the resource volume of the fully-mechanized mining face, the area of the fully-mechanized mining face, the bulk density and the inclination angle of the fully-mechanized mining face;
[0058] Determine the resource reserve data based on the mine name, the mining area name, the coal seam name, the fully mechanized mining face name, the three quantity categories, the fully mechanized mining face resource quantity, the bulk density, the fully mechanized mining face inclination angle, the average coal thickness and the fully mechanized mining face area;
[0059] The resource reserve data is bound to the boundary of the fully mechanized mining face.
[0060] Furthermore, the binding module includes:
[0061] A setting module is used to set the basic information of the fully mechanized mining face and bind the basic information of the fully mechanized mining face to the boundary of the fully mechanized mining face; wherein the basic information of the fully mechanized mining face at least includes: the width of the transport lane, the mining thickness of the transport lane, the width of the return air lane, the mining thickness of the return air lane, the length of the working face, the width of the working face, the inclined area, the width of the stage coal pillar, the amortized coal pillar reserves of the mining area, and the amortization coefficient of the permanent coal pillar of the mine;
[0062] Based on the resource reserve data and the basic information of the fully mechanized mining face, the fully mechanized mining face transport tunnel and the fully mechanized mining face return air tunnel are calibrated, and the amortized coal pillar range of the mining area is drawn and bound.
[0063] Furthermore, the binding module includes:
[0064] A drawing module is used to interactively draw the mining area amortization area based on the resource reserve data to calculate the amortized coal pillar reserves of the mining area, write the mining area amortization attributes into the mining area amortization area boundary, and bind the comprehensive mining working face and the mining area amortized coal pillar range through the comprehensive mining working face name.
[0065] Furthermore, the second determining module includes:
[0066] A designation module is used to designate a mobilization range based on the initialized fully mechanized mining face; wherein the designated mobilization range is to interactively designate the mining footage of the return air lane of the fully mechanized mining face and the transport lane of the fully mechanized mining face, or to interactively delineate the boundary of the mobilization range;
[0067] Supplementing the mobilization parameters, calculating the mobilization coal volume of the fully mechanized mining face, and generating the mobilization area of the fully mechanized mining face; wherein the mobilization parameters at least include: actual mining thickness, coal falling thickness, thickness loss, coal falling loss, tunnel top and bottom loss, and stage coal pillar loss;
[0068] The fully-mechanized mining face mobilization attribute data is stored in the fully-mechanized mining face mobilization area, and the fully-mechanized mining face is bound to the fully-mechanized mining face mobilization area based on the fully-mechanized mining face name; wherein the fully-mechanized mining face mobilization attribute data at least includes: fully-mechanized mining face name, fully-mechanized mining face loss amount, mined amount, mobilization amount, recovery rate, mining area loss amount, mining area mined amount, mining area mobilization amount, mining area recovery rate, mine loss amount, mine mined amount, mine mobilization amount, and mine recovery rate;
[0069] The mine amortization amount is calculated based on the amortization coefficient of the mine's permanent coal pillar and the mining area's mobilization amount, and the mine amortization amount, geological and hydrological loss amounts and reported loss amounts are bound to the boundary of the fully mechanized mining face.
[0070] Furthermore, the second determining module includes:
[0071] A designation module, used to designate N-times mobilization ranges of the fully mechanized mining working face based on the fully mechanized mining working face, and generate N mobilization areas of the fully mechanized mining working face; wherein the value range of N is an integer from 1 to N;
[0072] Based on the N mobilization areas, updating the goaf area of the fully-mechanized mining working face and the un-mined area of the fully-mechanized mining working face until the fully-mechanized mining working face is entirely the goaf area;
[0073] Among them, the goaf area is the union of N mobilization areas, and the unmined area is the area of the comprehensive mining working face excluding the goaf area.
[0074] Furthermore, the update module includes:
[0075] A calculation module is used to cumulatively calculate the utilization area and utilization data of the fully mechanized mining face in different time periods, and to perform superposition calculation with the reserve block boundary in the resource reserve calculation diagram, and to determine the utilization resource quantity, reserve, area and reserve increase and decrease change of each reserve block according to the superposition ratio;
[0076] Generate a reserve production diagram based on the produced resources, reserves, area and reserve increase / decrease variation of each reserve block;
[0077] Based on the reserve legend resources, reserve legend reserves, reserve legend area and the reserve production legend resources, reserve production legend reserves, reserve production legend area of the resource reserve calculation diagram, determine the reserve legend in the resource reserve calculation diagram after production, and dynamically update the resource reserve calculation diagram.
[0078] Furthermore, the update module includes:
[0079] Method 1: Based on the utilization area of the fully mechanized mining face, the utilization data of the fully mechanized mining face and the stage coal pillar loss, the mining area range of the fully mechanized mining face is drawn, and the mining area range is superimposed with the boundary of the reserve block segment, the increase and decrease change amount and the reserve utilization amount of the reserve block segment within the mining area range of the fully mechanized mining face are obtained, the reserve legend in the resource reserve calculation diagram is updated and the reserve utilization legend is drawn;
[0080] Method 2: Calculate the reserve block amortization amount based on the mining area amortization area of the fully mechanized mining face, the mining area amortization amount of the fully mechanized mining face and the reserve block boundary, update the reserve legend, and reversely calculate the reserve amortization area according to the amortization amount, and draw the reserve production legend;
[0081] Method 3: specify the reserve legend in the resource reserve calculation diagram, amortize the mine amortization amount to the resource amount in the reserve legend, and when the resource amount of the specified reserve legend is insufficient, specify the next reserve legend until the amortization of the mine amortization amount is completed, and simultaneously draw the reserve production legend;
[0082] Method 4: Based on the geological and hydrological amortization of the fully mechanized mining face, specify the geological and hydrological loss area, and perform superposition calculation with the reserve block boundary, amortize the geological and hydrological loss to the resource volume of the reserve legend, and draw a reserve production legend;
[0083] Method 5: Based on the reported loss amount of the comprehensive mining working face, the specified loss amount area is superimposed on the reserve block boundary in the resource reserve calculation diagram, the reported loss amount is amortized to the resource amount in the reserve legend, and a reserve utilization legend is drawn.
[0084] Furthermore, the generation module includes:
[0085] The second acquisition module is used to store the resource reserve data of different dimensions into the coal mine resource reserve spatial database; wherein the resource reserve data of different dimensions include: reserve graphic data and reserve attribute data of different time periods, and the reserve graphic data and attribute data of different time periods are distinguished by time stamps; the reserve graphic data at least includes: resource reserve calculation diagram, reserve three-quantity diagram, reserve production diagram and reserve loss diagram; the reserve attribute data at least includes: reserve legend data, reserve three-quantity data and reserve production data;
[0086] Set up reserve report templates based on the report template library;
[0087] Based on the coal mine resource reserve spatial database and the reserve report template, obtaining the target resource reserve data of different dimensions;
[0088] Based on the reserve report template and the target resource reserve data, the coal mine resource reserve report is generated.
[0089] A method for dynamic management of coal mine resource reserves provided by this embodiment first calculates three quantities of coal mine reserve management through a GIS platform based on a coal mine resource reserve spatial database and a resource reserve calculation diagram, and binds the resource reserve data to the boundary of a fully-mechanized mining face; wherein the three quantities include: development coal quantity, preparation coal quantity and recovered coal quantity, and the resource reserve data includes three quantity categories, and the three quantity categories include: any one of development coal quantity, preparation coal quantity and recovered coal quantity; then, based on the fully-mechanized mining face whose three quantity categories are recovered coal quantity, the basic information of the fully-mechanized mining face is initialized, and the return air lane of the fully-mechanized mining face, the transport lane of the fully-mechanized mining face and the amortized coal pillar range of the mining area are bound; then, based on the mining range of the recovery footage, the coal quantity used by the fully-mechanized mining face and the amortized amount of the mine are determined. , geological and hydrological losses and reported losses, and generate the mobilization area of the fully-mechanized mining face, update the un-mined area and goaf area; determine the resource reserve mining data through the multi-dimensional superposition of the mobilization area of the fully-mechanized mining face in different time periods and the boundaries of the reserve blocks in the resource reserve calculation diagram, and dynamically update the resource reserve calculation diagram; finally, store the resource reserve data of different dimensions into the coal mine resource reserve space database, and generate a variety of coal mine resource reserve reports based on different reserve report templates; repeat steps three and four to dynamically update the resource reserve calculation diagram to complete the update of the entire coal mine resource reserve, and when the new fully-mechanized mining face division is completed, repeat steps one to five to update the entire coal mine resource reserve, as well as dynamically update and display the coal mine resource reserve graphic report.
[0090] Through the above-mentioned coal mine resource reserve dynamic management method, by binding the resource reserve data to the boundary of the comprehensive mining working face, the unified management of the resource reserve graphic data and the resource reserve report data is realized, and the resource reserve mining data is determined by multi-dimensional superposition of the utilization area of the comprehensive mining working face in different time periods and the boundary of the reserve block segment in the resource reserve calculation diagram, and the resource reserve calculation diagram is dynamically updated; finally, the resource reserve data of different dimensions are stored in the coal mine resource reserve spatial database, and a variety of coal mine resource reserve reports are generated based on different reserve report templates, and resource reserve report data of different styles can be dynamically updated and generated, ensuring the accuracy and timeliness of the mine resource reserve data, ensuring the efficient development of coal mine resource reserve management, and effectively solving the problems of incomplete, untimely and unstable linkage of reserve chart data in the spatial database, and providing solid technical support for realizing high-quality dynamic update management of coal mine resource reserves. BRIEF DESCRIPTION OF THE DRAWINGS
[0091] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0092] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0093] Figure 1 A flow chart of the steps of a method for dynamic management of coal mine resource reserves provided in an embodiment of the present application;
[0094] Figure 2 A schematic diagram of a working face utilization list data provided in an embodiment of the present application;
[0095] Figure 3 A schematic diagram of a display method of a reserve diagram provided in an embodiment of the present application;
[0096] Figure 4 An example diagram of the reserve diagram provided for the embodiments of the present application;
[0097] Figure 5 An example diagram of a comparison diagram of a reserve legend and a reserve production legend provided in an embodiment of the present application;
[0098] Figure 6 A schematic diagram of a device for dynamic management of coal mine resource reserves provided in an embodiment of the present application. DETAILED DESCRIPTION
[0099] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0100] To solve the above problems, the present invention has designed a new set of processing logic and calculation methods, and designed and developed specific devices, which effectively solve the problems of incomplete, untimely and unstable linkage of reserve chart data in spatial databases, and provide solid technical support for the high-quality dynamic update management of coal mine resource reserves.
[0101] In the present application, refer to Figure 1 , Figure 1 A flow chart of the steps of a method for dynamic management of coal mine resource reserves provided in an embodiment of the present application, from Figure 1 It can be seen that the method steps include:
[0102] This application shows a flow chart of a method for dynamic management of coal mine resource reserves, including the following steps:
[0103] Step S101: Based on the coal mine resource reserve spatial database and the resource reserve calculation diagram, the three quantities of coal mine reserve management are calculated through the GIS platform, and the resource reserve data is bound to the boundary of the comprehensive mining working face; wherein, the three quantities include: development coal quantity, preparation coal quantity and recovered coal quantity, and the resource reserve data includes three quantity categories, and the three quantity categories include: any one of the development coal quantity, the preparation coal quantity and the recovered coal quantity.
[0104] In this embodiment, the mine name, mining area name and coal seam name in the resource reserve space database are obtained; and the name of the comprehensive mining face uniquely corresponds to a mine, and the boundary of the comprehensive mining face is specified to be superimposed with the boundary of the reserve block segment in the resource reserve calculation diagram to obtain the resource volume and area of the comprehensive mining face; the average coal thickness of the comprehensive mining face is obtained by inverse calculation based on the resource volume, area, bulk density and inclination parameters of the comprehensive mining face; then the mine name, mining area name, coal seam name, comprehensive mining face name, three quantity categories, comprehensive mining face resource volume, bulk density, inclination, average coal thickness and comprehensive mining face area are determined to determine the resource reserve data; finally, the resource reserve data of the comprehensive mining face is bound to the boundary of the comprehensive mining face, and the resource reserve data includes at least the mine name, mining area name, coal seam name, comprehensive mining face name, three quantity categories, mining reserves, bulk density, inclination, average coal thickness and area.
[0105] Step S102: Based on the fully mechanized mining face whose three quantity categories are the recovered coal quantity, the basic information of the fully mechanized mining face is initialized, and the return air lane of the fully mechanized mining face, the transport lane of the fully mechanized mining face and the amortized coal pillar range of the mining area are bound.
[0106] In this embodiment, the basic information of the comprehensive mining working face includes at least: the width of the transport lane, the mining thickness of the transport lane, the width of the return air lane, the mining thickness of the return air lane, the length of the working face, the width of the working face, the inclined area, the width of the stage coal pillar, the amortized coal pillar reserves of the mining area, and the amortization coefficient of the permanent coal pillar of the mine; then based on the resource reserve data and the basic information of the comprehensive mining working face, the transport lane and the return air lane of the comprehensive mining working face are calibrated, and the range of the amortized coal pillar in the mining area is drawn and bound.
[0107] In this embodiment, the calibration method of the transport lane and the return air lane of the comprehensive mining working face is to interactively specify the lanes and draw the marking lines of the transport lane and the return air lane of the comprehensive mining working face, wherein the transport lane and the return air lane marking lines of the comprehensive mining working face contain the lane identification and identification point coordinate attributes, which can be used for the calculation of the mobilization amount of the comprehensive mining working face to automatically update the mobilization area of the comprehensive mining working face.
[0108] Based on the resource reserve data, the drawing and binding of the amortized coal pillar area in the mining area refers to interactively drawing the amortized area to calculate the amortized coal pillar reserves in the mining area, writing the amortized attributes of the mining area into the boundary of the amortized area of the mining area, and realizing the binding of the fully mechanized mining working face and the amortized coal pillar area in the mining area through the name of the fully mechanized mining working face.
[0109] Among them, the amortization attributes of the mining area include at least the name of the comprehensive mining face, the area of the amortization area, the coal thickness, and the amortized coal pillar reserves of the mining area.
[0110] Step S103: Based on the mining range of the mining footage, determine the amount of coal used in the fully-mechanized mining face, the amount of mine amortization, the amount of geological and hydrological losses and the amount of reported losses, generate the fully-mechanized mining face mobilization area, and update the unmined area and goaf area.
[0111] Based on the initialization of the fully mechanized mining face, specify the mobilization range; wherein, the specified mobilization range is to interactively specify the mining footage of the return air lane and the transport lane of the fully mechanized mining face, or interactively delineate the mobilization range; supplement the mobilization parameters, calculate the coal mobilization amount of the fully mechanized mining face, and generate the mobilization area of the fully mechanized mining face; wherein, the mobilization parameters at least include: actual mining thickness, coal falling thickness, thickness loss, coal falling loss, roadway top and bottom loss and stage coal pillar loss; store the mobilization attribute data of the fully mechanized mining face in the mobilization area of the fully mechanized mining face, and realize the binding of the fully mechanized mining face and the mobilization area of the fully mechanized mining face based on the name of the fully mechanized mining face. The mobilization attribute data of the fully mechanized mining face at least include: the name of the fully mechanized mining face, loss amount, mining amount, mobilization amount, mining rate, mining area loss amount, mining area mining amount, mining area mobilization amount, mining area recovery rate, mine loss amount, mine mining amount, mine mobilization amount, and mine recovery rate. The mine amortization amount is calculated based on the mine's permanent coal pillar amortization coefficient and the mining area's mobilization amount, and the mine amortization amount, geological and hydrological losses and reported losses are bound to the boundary of the fully mechanized mining face.
[0112] In addition, the specific method of updating the unmined area and the goaf area is: based on the fully mechanized mining working face, specify the N-times mobilization range of the fully mechanized mining working face, and generate N mobilization areas of the fully mechanized mining working face; wherein, the value range of N is an integer from 1 to N; based on the N mobilization areas, update the goaf area of the fully mechanized mining working face and the unmined area of the fully mechanized mining working face until the fully mechanized mining working face is all goaf areas; wherein, the goaf area is the union of N mobilization areas, and the unmined area is the area of the fully mechanized mining working face excluding the goaf area.
[0113] For example, in this embodiment, based on the fully mechanized mining face, when the fully mechanized mining face is calculated for the first time, the fully mechanized mining face mobilization range is specified to calculate and generate the first mobilization area of the fully mechanized mining face, and the unmined area and the goaf area of the fully mechanized mining face are updated;
[0114] Then, after the first mobilization calculation, based on the updated comprehensive mining working face, the second mobilization calculation is performed on the comprehensive mining working face, the second mobilization range is specified and the second mobilization area of the comprehensive mining working face is generated after calculation, the first mobilization area and the second mobilization area of the comprehensive mining working face are merged to update the goaf area of the comprehensive mining working face, and the unmined area of the comprehensive mining working face is also updated synchronously; by analogy, when the comprehensive mining working face is calculated for the Nth time, the Nth mobilization range is specified and the Nth mobilization area of the comprehensive mining working face is generated after calculation, the first mobilization area to the Nth mobilization area of the comprehensive mining working face are merged to update the goaf area of the comprehensive mining working face, and the unmined area of the comprehensive mining working face is updated synchronously until the comprehensive mining working face is mined and the comprehensive mining working face is entirely a goaf area.
[0115] Step S104: Determine resource reserve mining data by multi-dimensionally superimposing the utilization area of the fully mechanized mining face in different time periods and the reserve block boundaries in the resource reserve calculation diagram, and dynamically update the resource reserve calculation diagram.
[0116] In this embodiment, the resource reserve mining data is determined by multi-dimensional superposition of the utilization area of the comprehensive mining face in different time periods and the reserve block boundaries in the resource reserve calculation diagram, and the resource reserve calculation diagram is dynamically updated. Specifically, the utilization area of the comprehensive mining face and the utilization data of the comprehensive mining face in different time periods are cumulatively calculated and superimposed with the reserve block boundaries in the resource reserve calculation diagram, and the mobilized resources, reserves, area and reserve increase and decrease changes of each reserve block are calculated according to the superposition ratio. Then, based on the mobilized resources, reserves, area and reserve increase and decrease changes of each reserve block, a reserve utilization legend is generated, and based on the reserve legend resources, reserve legend reserves, reserve legend area of the resource reserve calculation diagram and the reserve utilization legend resources, reserve utilization legend reserves, and reserve utilization legend area, the reserve legend in the resource reserve calculation diagram after mobilization is determined, and the resource reserve calculation diagram is dynamically updated.
[0117] In this embodiment, the reserve legend in the resource reserve calculation diagram after mobilization is determined specifically by: subtracting the reserve legend resource volume, reserve legend reserve, and reserve legend area of the resource reserve calculation diagram from the reserve legend resource volume, reserve legend reserve, and reserve legend area of the resource reserve calculation diagram, respectively, to obtain the reserve legend in the resource reserve calculation diagram after mobilization, thereby completing the dynamic update of the resource reserve calculation diagram.
[0118] In addition, the different time periods in this embodiment can be ten days, months, quarters, half years, and years. The utilization data of the comprehensive mining face include the sum of the utilization of the comprehensive mining face in different time periods, the sum of the amortization of the coal pillars in the mining area, the sum of the amortization of the permanent coal pillars in the mine, the sum of the geological and hydrological losses, and the sum of the reported losses. The resource reserve mining data include the utilization or amortization or loss of the reserve block segment, the reserves, the area, and the change in the increase or decrease of the reserves. The boundary of the reserve block segment is the range delineated according to certain rules, and the reserve legend is a composite entity with information such as name, coal type, resource, resource level, reserves, reserve level, area, coal thickness, inclination, bulk density, etc. The reserve block segment and the reserve legend are in a one-to-one correspondence. The units of resources and reserves can be tons, thousands of tons, and ten thousand tons. The unit of area can be square meters, thousands of square meters, and ten thousand square meters.
[0119] In addition, the dynamic update of the resource reserve calculation map includes at least one of the following methods:
[0120] Method 1: Based on the utilization area of the fully-mechanized mining face, the utilization data of the fully-mechanized mining face and the stage coal pillar loss, the mining area scope of the fully-mechanized mining face is drawn, and the increase and decrease of the reserve blocks and the reserve utilization amount within the mining area scope of the fully-mechanized mining face are obtained based on the overlay calculation of the mining area scope and the reserve block boundaries in the resource reserve calculation diagram, the reserve legend in the resource reserve calculation diagram is updated and the reserve utilization legend is drawn.
[0121] Method 2: Calculate the reserve block amortization amount based on the current mining area amortization region of the comprehensive mining working face, the mining area amortization amount of the comprehensive mining working face and the reserve block boundary in the resource reserve calculation diagram, update the reserve legend in the resource reserve calculation diagram, and reversely calculate the reserve amortization area based on the amortization amount, and draw the reserve utilization legend.
[0122] Method 3: Specify the reserve legend in the resource reserve calculation diagram, and directly amortize the mine amortization to the resource volume in the reserve legend in the resource reserve calculation diagram. When the resource volume in the specified reserve legend is insufficient, specify the next reserve legend until the mine amortization is completed, and draw the reserve utilization legend synchronously.
[0123] Method 4: Based on the geological and hydrological amortization of the comprehensive mining face, specify the geological and hydrological loss areas, and superimpose the calculations with the reserve block boundaries in the resource reserve calculation diagram, amortize the geological and hydrological losses to the resource volume in the reserve legend of the resource reserve calculation diagram, and draw a reserve utilization legend.
[0124] Method 5: Based on the reported loss volume of the fully mechanized mining face, specify the reported loss volume area and the reserve block boundary in the resource reserve calculation diagram for superposition calculation, amortize the reported loss volume to the resource volume in the reserve legend in the resource reserve calculation diagram and draw the reserve utilization legend.
[0125] In the above five methods, the increase or decrease variation is the difference between the actual production of the reserve block and the production of the reserve block. The actual production of the reserve block is the actual production calculated by multiplying the ratio of the area of the reserve block within the mining area to the mining area by the superimposed calculation and the production of the mining area; the production of the reserve block is the mining area calculated by the ratio of the area of the reserve block within the mining area to the mining area, and is calculated by the coal thickness and bulk density in the reserve legend in the resource reserve calculation diagram. The calculation formula is reserve block production = coal thickness in the reserve legend * bulk density in the reserve legend * mining area.
[0126] In addition, the reserve production legend can be the style of the reserve legend, and the specific generation method is: the position of the reserve production legend is based on the original reserve legend and moved around a certain distance, which can be the distance of a reserve legend radius. The resource volume of the reserve production legend is the reserve production volume, or the amortization volume, or the loss volume; the reserve volume of the reserve production legend is the calculated resource volume*(original reserve volume / original resource volume), especially, when the amortization volume or loss volume is calculated, the reserve volume is 0; the area of the reserve production legend is the production area, amortization area, or loss area, the name of the reserve production legend is the name of the original reserve legend plus "production" or "loss" for identification, and the coal type, resource level, reserve level, coal thickness, inclination, etc. of the reserve production legend are the values corresponding to the original reserves. The increase and decrease changes are written into the reserve production legend in the form of attributes. The amortization of permanent coal pillars in a mine includes the amortization of coal pillars at the boundary of the mine, the amortization of coal pillars in the industrial square of the mine, and the amortization of other permanent coal pillars in the mine. The amortization of the amortization or loss amount to the resource amount in the reserve legend of the resource reserve calculation diagram is the resource amount in the reserve legend minus the amortization or loss amount.
[0127] Step S105: storing resource reserve data of different dimensions into the coal mine resource reserve spatial database, and generating a variety of coal mine resource reserve reports based on different reserve report templates.
[0128] The resource reserve data of different dimensions are stored in the coal mine resource reserve spatial database; wherein the resource reserve data of different dimensions include: reserve graphic data and reserve attribute data of different time periods, and the reserve graphic data and attribute data of different time periods are distinguished by time stamps; the reserve graphic data at least include: resource reserve calculation diagram, reserve three-quantity diagram, reserve production diagram and reserve loss diagram; the reserve attribute data at least include: reserve legend data, reserve three-quantity data and reserve production data
[0129] The report template library stores templates of various styles, and the reserve report template can be set based on the report template library; then, based on the coal mine resource reserve space database and the reserve report template, target resource reserve data of different dimensions can be obtained;
[0130] Since the target resource reserve data of different dimensions include reserve graphic data and reserve attribute data of different time periods, the reserve graphic data and attribute data of different time periods are distinguished by time stamps.
[0131] Therefore, based on the reserve report template and the target resource reserve data, a coal mine resource reserve report is generated.
[0132] The reserve legend data includes at least the name, coal type, resource quantity, resource quantity level, reserves, reserve level, area, coal thickness, inclination, bulk density, and whether it is retained.
[0133] The three-quantity reserve data include at least: year and month, mine name, coal seam name, level name, mining area name, working face name, three-quantity category, geological reserves, recoverable reserves, coal seam inclination, coal seam thickness, bulk density, and plane area.
[0134] The reserve utilization data include at least: year, month, mine name, coal seam name, level name, mining area name, working face name, coal mining method, bulk density, utilization area, coal thickness, actual mining thickness, coal thickness, other losses of working face, loss of working face, utilization of working face, mining volume of working face, amortization coefficient of coal pillar in mining area, coal output of mining area tunnel, stage coal pillar loss, top and bottom loss of tunnel, other losses of mining area, loss of mining area, mining volume of mining area, utilization of mining area, amortization coefficient of coal pillar at mine boundary, amortization coefficient of coal pillar in mine industrial square, amortization of permanent coal pillar in mine, geological and hydrogeological loss, loss report, mine loss, mining volume and utilization of mine. The types of reserve report templates include at least three reserve tables, monthly working face utilization table, end-of-period reserve table, annual utilization table, annual increase and decrease table and dynamic table of mine resources. Repeat steps S103 and S104 to dynamically update the resource reserve calculation diagram to complete the update of the entire coal mine resource reserves, and when the new comprehensive mining working face division is completed, repeat steps S101 to S105 to update the entire coal mine resource reserves, and dynamically update and display the coal mine resource reserves graphical report.
[0135] For example, refer to Figure 2-Figure 5 , the method for dynamic management of reserves of coal mine fully mechanized mining working face provided in this embodiment is described in detail:
[0136] Figure 2 A schematic diagram of a working face utilization list data provided in an embodiment of the present application; Figure 3 A schematic diagram of a display method of a reserve diagram provided in an embodiment of the present application; Figure 4 An example diagram of the reserve diagram provided for the embodiments of the present application; Figure 5 This is an example diagram of the reserve legend and reserve utilization legend comparison diagram provided in the embodiments of the present application.
[0137] exist Figure 2 The working face in the mine is a fully mechanized mining face. Figure 2 It includes the working face mobilization volume, working face loss volume, mining area mobilization volume, mining area loss volume, mine mobilization volume and mine loss volume, working face output, working face recovery rate, mining area output, mining area recovery rate, mine output and mine recovery rate. Figure 3 Including block number, coal type, resource type, resource quantity, reserve category, reserves, average thickness and area, Figure 4 This is an example diagram of block number 17, where BN is a type of coal, KZ is the controlled resource in the resource type, and KX is the credible reserve in the reserve type.
[0138] Figure 5 These are the reserve legend and reserve utilization legend. The left one is the reserve legend for block number 18, and the right one is the reserve utilization legend for block number 18.
[0139] Reference Figure 6 , Figure 6 A schematic diagram of a coal mine resource reserve dynamic management device provided in an embodiment of the present application, the device comprising:
[0140] The first determination module 601 is used to calculate three quantities of coal mine reserve management through the GIS platform based on the coal mine resource reserve spatial database and the resource reserve calculation map, and bind the resource reserve data to the boundary of the fully mechanized mining face; wherein the three quantities include: development coal quantity, preparation coal quantity and recovered coal quantity, and the resource reserve data includes three quantity categories, and the three quantity categories include: any one of the development coal quantity, the preparation coal quantity and the recovered coal quantity;
[0141] The binding module 602 initializes the basic information of the fully-mechanized mining face based on the fully-mechanized mining face whose three quantity categories are the recovered coal quantity, and binds the fully-mechanized mining face return air lane, the fully-mechanized mining face transport lane and the amortized coal pillar range of the mining area;
[0142] The second determination module 603 is used to determine the amount of coal used in the fully-mechanized mining face based on the mining range of the mining footage, generate a fully-mechanized mining face mobilization area, and update the unmined area and goaf area;
[0143] An updating module 604 is used to determine resource reserve mining data by multi-dimensionally superimposing the resource reserve block boundaries in the fully mechanized mining face and the resource reserve calculation diagram in different time periods, and dynamically update the resource reserve calculation diagram;
[0144] A generating module 605 is used to determine resource reserve mining data by multi-dimensionally superimposing the resource reserve block boundaries in the fully mechanized mining face and the resource reserve calculation diagram in different time periods, and dynamically update the resource reserve calculation diagram;
[0145] Repeat the second determination module 603 and the update module 604 to dynamically update the resource reserve calculation diagram to complete the update of the entire coal mine resource reserves, and when the new comprehensive mining working face division is completed, repeat the first determination module 601, the binding module 602, the second determination module 603, the update module 604 and the generation module 605 to update the entire coal mine resource reserves, and dynamically update and display the coal mine resource reserves graphical report.
[0146] In this embodiment, the first determination module includes: an acquisition module, which is used to obtain the mine name, mining area name and coal seam name in the resource reserve space database; wherein the name of the comprehensive mining face uniquely corresponds to a mine; specifying the boundary of the comprehensive mining face, and performing superposition calculation based on the boundary of the reserve block segment in the resource reserve calculation diagram to determine the resource volume and area of the comprehensive mining face; based on the resource volume of the comprehensive mining face, the area of the comprehensive mining face, the bulk density and the inclination of the comprehensive mining face, the average coal thickness of the comprehensive mining face is obtained by reverse calculation; based on the mine name, the mining area name, the coal seam name, the comprehensive mining face name, the three quantity categories, the resource volume of the comprehensive mining face, the bulk density, the inclination of the comprehensive mining face, the average coal thickness and the area of the comprehensive mining face, the resource reserve data is determined; and the resource reserve data is bound to the boundary of the comprehensive mining face.
[0147] In this embodiment, the binding module includes:
[0148] A setting module is used to set the basic information of the comprehensive mining working face and bind the basic information of the comprehensive mining working face to the boundary of the comprehensive mining working face; wherein, the basic information of the comprehensive mining working face at least includes: width of transport lane, mining thickness of transport lane, width of return air lane, mining thickness of return air lane, length of working face, width of working face, inclined area, width of stage coal pillar, amortized coal pillar reserves of mining area, amortization coefficient of permanent coal pillar of mine; based on the resource reserve data and the basic information of the comprehensive mining working face, the transport lane of the comprehensive mining working face and the return air lane of the comprehensive mining working face are calibrated, and the range of amortized coal pillar of mining area is drawn and bound.
[0149] In this embodiment, the binding module 602 includes:
[0150] A drawing module is used to interactively draw the mining area amortization area based on the resource reserve data to calculate the amortized coal pillar reserves of the mining area, write the mining area amortization attributes into the mining area amortization area boundary, and bind the comprehensive mining working face and the mining area amortized coal pillar range through the comprehensive mining working face name.
[0151] In this embodiment, the second determining module 603 includes:
[0152] A designation module is used to designate a mobilization range based on the initialized fully mechanized mining face; wherein the designated mobilization range is to interactively designate the mining footage of the return air lane and the transport lane of the fully mechanized mining face, or to interactively define the boundary of the mobilization range; supplement mobilization parameters, calculate the amount of coal mobilized by the fully mechanized mining face, and generate a mobilization area of the fully mechanized mining face; wherein the mobilization parameters at least include: actual mining thickness, coal falling thickness, thickness loss, coal falling loss, roadway top and bottom loss, and stage coal pillar loss; store the mobilization attribute data of the fully mechanized mining face in the mobilization area of the fully mechanized mining face, and The comprehensive mining working face and the mobilization area of the comprehensive mining working face are bound based on the name of the comprehensive mining working face; wherein, the mobilization attribute data of the comprehensive mining working face at least include: the name of the comprehensive mining working face, the loss amount of the comprehensive mining working face, the mined amount, the mobilization amount, the recovery rate, the loss amount of the mining area, the mined amount of the mining area, the mobilization amount of the mining area, the recovery rate of the mining area, the loss amount of the mine, the mined amount of the mine, the mobilization amount of the mine, and the recovery rate of the mine; the mine amortization amount is calculated based on the amortization coefficient of the mine permanent coal pillar and the mobilization amount of the mining area, and the mine amortization amount, the geological and hydrological loss amount and the reported loss amount are bound to the boundary of the comprehensive mining working face.
[0153] In this embodiment, the second determining module 603 includes:
[0154] A designation module is used to specify the N-times mobilization range of the comprehensive mining working face based on the comprehensive mining working face, and generate N mobilization areas of the comprehensive mining working face; wherein the value range of N is an integer from 1 to N; based on the N mobilization areas, the goaf area of the comprehensive mining working face and the unmined area of the comprehensive mining working face are updated until the comprehensive mining working face is entirely the goaf area; wherein the goaf area is the union of N mobilization areas, and the unmined area is the area of the comprehensive mining working face excluding the goaf area.
[0155] In this embodiment, the updating module 604 includes:
[0156] A calculation module is used to cumulatively calculate the utilization area and utilization data of the comprehensive mining working face in different time periods, and to perform superimposed calculations with the boundaries of the reserve blocks in the resource reserve calculation diagram, and to determine the mobilized resources, reserves, area and reserve increase or decrease changes of each reserve block according to the superposition ratio; to generate a reserve utilization legend based on the mobilized resources, reserves, area and reserve increase or decrease changes of each reserve block; based on the reserve legend resources, reserve legend reserves, reserve legend area of the resource reserve calculation diagram and the reserve utilization legend resources, reserve utilization legend reserves, and reserve utilization legend area, the reserve legend in the resource reserve calculation diagram after utilization is determined, and the resource reserve calculation diagram is dynamically updated.
[0157] In this embodiment, the updating module 604 includes:
[0158] Method 1: Based on the utilization area of the fully mechanized mining face, the utilization data of the fully mechanized mining face and the stage coal pillar loss, the mining area range of the fully mechanized mining face is drawn, and the mining area range is superimposed with the boundary of the reserve block segment, the increase and decrease change amount and the reserve utilization amount of the reserve block segment within the mining area range of the fully mechanized mining face are obtained, the reserve legend in the resource reserve calculation diagram is updated and the reserve utilization legend is drawn;
[0159] Method 2: Calculate the reserve block amortization amount based on the mining area amortization area of the fully mechanized mining face, the mining area amortization amount of the fully mechanized mining face and the reserve block boundary, update the reserve legend, and reversely calculate the reserve amortization area according to the amortization amount, and draw the reserve production legend;
[0160] Method 3: specify the reserve legend in the resource reserve calculation diagram, amortize the mine amortization amount to the resource amount in the reserve legend, and when the resource amount of the specified reserve legend is insufficient, specify the next reserve legend until the amortization of the mine amortization amount is completed, and simultaneously draw the reserve production legend;
[0161] Method 4: Based on the geological and hydrological amortization of the fully mechanized mining face, specify the geological and hydrological loss area, and perform superposition calculation with the reserve block boundary, amortize the geological and hydrological loss to the resource volume of the reserve legend, and draw a reserve production legend;
[0162] Method 5: Based on the reported loss amount of the comprehensive mining working face, the specified loss amount area is superimposed on the reserve block boundary in the resource reserve calculation diagram, the reported loss amount is amortized to the resource amount in the reserve legend, and a reserve utilization legend is drawn.
[0163] In this embodiment, the generating module 605 includes:
[0164] The second acquisition module is used to store the resource reserve data of different dimensions into the coal mine resource reserve spatial database; wherein the resource reserve data of different dimensions include: reserve graphic data and reserve attribute data of different time periods, and the reserve graphic data and attribute data of different time periods are distinguished by timestamps; the reserve graphic data at least includes: resource reserve calculation diagram, reserve three-quantity diagram, reserve production diagram and reserve loss diagram; the reserve attribute data at least includes: reserve legend data, reserve three-quantity data and reserve production data; a reserve report template is set based on a report template library; based on the coal mine resource reserve spatial database and the reserve report template, the target resource reserve data of different dimensions are acquired; based on the reserve report template and the target resource reserve data, the coal mine resource reserve report is generated.
[0165] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the elements.
[0166] The above is a detailed introduction to a method and device for dynamic management of coal mine resource reserves provided by the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for general technical personnel in this field, according to the idea of the present invention, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.
Claims
1. A method for dynamic management of coal mine resource reserves, characterized in that: The method comprises: Step 1: Based on the coal mine resource reserve spatial database and resource reserve calculation diagram, the three quantities of coal mine reserve management are calculated through the GIS platform, and the resource reserve data is bound to the boundary of the fully mechanized mining face; wherein, the three quantities include: development coal quantity, preparation coal quantity and recovered coal quantity, and the resource reserve data includes three quantity categories, and the three quantity categories include: any one of the development coal quantity, the preparation coal quantity and the recovered coal quantity; Step 2: based on the fully mechanized mining face whose three quantity categories are the recovered coal quantity, the basic information of the fully mechanized mining face is initialized, and the return air lane of the fully mechanized mining face, the transport lane of the fully mechanized mining face and the amortized coal pillar range of the mining area are bound; Step 3: Based on the mining range of the mining footage, determine the coal volume used in the fully-mechanized mining face, the mine amortization volume, the geological and hydrological losses and the reported losses, generate the fully-mechanized mining face mobilization area, and update the unmined area and goaf area; Step 4: Determine resource reserve mining data by multi-dimensionally superimposing the utilization area of the fully mechanized mining face in different time periods and the reserve block boundary in the resource reserve calculation diagram, and dynamically update the resource reserve calculation diagram; Step 5: storing resource reserve data of different dimensions into the coal mine resource reserve spatial database, and generating a variety of coal mine resource reserve reports based on different reserve report templates; Repeat steps three and four to dynamically update the resource reserve calculation diagram to complete the update of the entire coal mine resource reserves, and when the new comprehensive mining working face division is completed, repeat steps one to five to update the entire coal mine resource reserves, and dynamically update and display the coal mine resource reserves graphical report.
2. The method according to claim 1, characterized in that The three quantities of coal mine reserve management are calculated through the GIS platform based on the resource reserve spatial database and resource reserve calculation map, and the resource reserve data is bound to the boundary of the fully mechanized mining face, including: Obtain the mine name, mining area name and coal seam name in the resource reserve space database; wherein the fully mechanized mining face name uniquely corresponds to one mine; Specifying the boundary of the fully mechanized mining face, and performing superposition calculation based on the boundary of the reserve block segment in the resource reserve calculation diagram to determine the resource volume and area of the fully mechanized mining face; The average coal thickness of the fully-mechanized mining face is obtained by reverse calculation based on the resource volume of the fully-mechanized mining face, the area of the fully-mechanized mining face, the bulk density and the inclination angle of the fully-mechanized mining face; Determine the resource reserve data based on the mine name, the mining area name, the coal seam name, the fully mechanized mining face name, the three quantity categories, the fully mechanized mining face resource quantity, the bulk density, the fully mechanized mining face inclination angle, the average coal thickness and the fully mechanized mining face area; The resource reserve data is bound to the boundary of the fully mechanized mining face.
3. The method according to claim 1, characterized in that The fully mechanized mining face based on the three quantity categories of the recovered coal quantity initializes the basic information of the fully mechanized mining face, and binds the fully mechanized mining face return air lane, fully mechanized mining face transport lane and mining area amortized coal pillar range, including: The basic information of the fully mechanized mining face is set and bound to the boundary of the fully mechanized mining face; wherein the basic information of the fully mechanized mining face at least includes: the width of the transport lane, the mining thickness of the transport lane, the width of the return air lane, the mining thickness of the return air lane, the length of the working face, the width of the working face, the inclined area, the width of the stage coal pillar, the amortized coal pillar reserves of the mining area, and the amortization coefficient of the permanent coal pillar of the mine; Based on the resource reserve data and the basic information of the fully mechanized mining face, the fully mechanized mining face transport tunnel and the fully mechanized mining face return air tunnel are calibrated, and the amortized coal pillar range of the mining area is drawn and bound.
4. The method according to claim 3, characterized in that The drawing and binding of the amortized coal pillar range of the mining area includes: Based on the resource reserve data, the mining area amortization area is interactively drawn to calculate the amortized coal pillar reserves of the mining area, the mining area amortization attributes are written into the mining area amortization area boundary, and the comprehensive mining working face is bound to the mining area amortized coal pillar range through the comprehensive mining working face name.
5. The method according to claim 1, characterized in that: The mining range based on the mining footage determines the coal volume used in the fully-mechanized mining face, the mine amortization volume, the geological and hydrological loss volume and the loss report volume, and generates the fully-mechanized mining face mobilization area, including: Based on the initialized fully mechanized mining face, specifying a mobilization range; wherein the specified mobilization range is interactively specifying the mining footage of the return air lane of the fully mechanized mining face and the transport lane of the fully mechanized mining face, or interactively delineating the boundary of the mobilization range; Supplementing the mobilization parameters, calculating the mobilization coal volume of the fully mechanized mining face, and generating the mobilization area of the fully mechanized mining face; wherein the mobilization parameters at least include: actual mining thickness, coal falling thickness, thickness loss, coal falling loss, tunnel top and bottom loss, and stage coal pillar loss; The fully-mechanized mining face mobilization attribute data is stored in the fully-mechanized mining face mobilization area, and the fully-mechanized mining face is bound to the fully-mechanized mining face mobilization area based on the fully-mechanized mining face name; wherein the fully-mechanized mining face mobilization attribute data at least includes: fully-mechanized mining face name, fully-mechanized mining face loss amount, mined amount, mobilization amount, recovery rate, mining area loss amount, mining area mined amount, mining area mobilization amount, mining area recovery rate, mine loss amount, mine mined amount, mine mobilization amount, and mine recovery rate; The mine amortization amount is calculated based on the amortization coefficient of the mine's permanent coal pillar and the mining area's mobilization amount, and the mine amortization amount, geological and hydrological loss amounts and reported loss amounts are bound to the boundary of the fully mechanized mining face.
6. The method according to claim 1, characterized in that The updating of unmined areas and goaf areas includes: Based on the fully mechanized mining working face, specifying N-times mobilization ranges of the fully mechanized mining working face, and generating N mobilization areas of the fully mechanized mining working face; wherein the value range of N is an integer from 1 to N; Based on the N mobilization areas, updating the goaf area of the fully-mechanized mining working face and the un-mined area of the fully-mechanized mining working face until the fully-mechanized mining working face is entirely the goaf area; Among them, the goaf area is the union of N mobilization areas, and the unmined area is the area of the comprehensive mining working face excluding the goaf area.
7. The method according to claim 1, characterized in that: The method of determining resource reserve mining data by multi-dimensionally superimposing the utilization area of the fully mechanized mining face in different time periods and the reserve block boundary in the resource reserve calculation diagram, and dynamically updating the resource reserve calculation diagram, comprises: Accumulate and calculate the utilization area and utilization data of the fully mechanized mining face in the different time periods, and perform superposition calculation with the reserve block boundary in the resource reserve calculation diagram, and determine the utilization resource quantity, reserve, area and reserve increase and decrease change of each reserve block according to the superposition ratio; Generate a reserve production diagram based on the produced resources, reserves, area and reserve increase / decrease variation of each reserve block; Based on the reserve legend resources, reserve legend reserves, reserve legend area and the reserve production legend resources, reserve production legend reserves, reserve production legend area of the resource reserve calculation diagram, determine the reserve legend in the resource reserve calculation diagram after production, and dynamically update the resource reserve calculation diagram.
8. The method according to claim 7, characterized in that The dynamically updating resource reserve calculation graph includes at least one of the following methods: Method 1: Based on the utilization area of the fully mechanized mining face, the utilization data of the fully mechanized mining face and the stage coal pillar loss, the mining area range of the fully mechanized mining face is drawn, and the mining area range is superimposed with the boundary of the reserve block segment, the increase and decrease change amount and the reserve utilization amount of the reserve block segment within the mining area range of the fully mechanized mining face are obtained, the reserve legend in the resource reserve calculation diagram is updated and the reserve utilization legend is drawn; Method 2: Calculate the reserve block amortization amount based on the mining area amortization area of the fully mechanized mining face, the mining area amortization amount of the fully mechanized mining face and the reserve block boundary, update the reserve legend, and reversely calculate the reserve amortization area according to the amortization amount, and draw the reserve production legend; Method 3: specify the reserve legend in the resource reserve calculation diagram, amortize the mine amortization amount to the resource amount in the reserve legend, and when the resource amount of the specified reserve legend is insufficient, specify the next reserve legend until the amortization of the mine amortization amount is completed, and simultaneously draw the reserve production legend; Method 4: Based on the geological and hydrological amortization of the fully mechanized mining face, specify the geological and hydrological loss area, and perform superposition calculation with the reserve block boundary, amortize the geological and hydrological loss to the resource volume of the reserve legend, and draw a reserve production legend; Method 5: Based on the reported loss amount of the comprehensive mining working face, the specified loss amount area is superimposed on the reserve block boundary in the resource reserve calculation diagram, the reported loss amount is amortized to the resource amount in the reserve legend, and a reserve utilization legend is drawn.
9. The method according to claim 1, characterized in that: The resource reserve data of different dimensions are stored in the coal mine resource reserve space database, and a variety of coal mine resource reserve reports are generated based on different reserve report templates, including: The resource reserve data of different dimensions are stored in the coal mine resource reserve spatial database; wherein the resource reserve data of different dimensions include: reserve graphic data and reserve attribute data of different time periods, and the reserve graphic data and attribute data of different time periods are distinguished by time stamps; the reserve graphic data at least include: resource reserve calculation diagram, reserve three-quantity diagram, reserve production diagram and reserve loss diagram; the reserve attribute data at least include: reserve legend data, reserve three-quantity data and reserve production data; Set up reserve report templates based on the report template library; Based on the coal mine resource reserve spatial database and the reserve report template, obtaining the target resource reserve data of different dimensions; Based on the reserve report template and the target resource reserve data, the coal mine resource reserve report is generated.
10. A coal mine resource reserve dynamic management device, characterized in that: The device comprises: The first determination module is used to calculate the three quantities of coal mine reserve management through the GIS platform based on the coal mine resource reserve spatial database and the resource reserve calculation map, and bind the resource reserve data to the boundary of the fully mechanized mining face; wherein the three quantities include: development coal quantity, preparation coal quantity and recovered coal quantity, and the resource reserve data includes three quantity categories, and the three quantity categories include: any one of the development coal quantity, the preparation coal quantity and the recovered coal quantity; A binding module is used to initialize the basic information of the fully mechanized mining face based on the fully mechanized mining face, and bind the return air lane of the fully mechanized mining face, the transport lane of the fully mechanized mining face and the amortized coal pillar range of the mining area; The second determination module is used to determine the amount of coal used in the fully-mechanized mining face based on the mining range of the mining footage, generate the fully-mechanized mining face mobilization area, and update the unmined area and goaf area; An updating module is used to determine resource reserve mining data by multi-dimensionally superimposing the resource reserve block boundaries in the fully mechanized mining face and the resource reserve calculation diagram in different time periods, and dynamically update the resource reserve calculation diagram; A generation module, used to determine resource reserve mining data through multi-dimensional superposition of the utilization area of the fully mechanized mining face in different time periods and the reserve block boundary in the resource reserve calculation diagram, and dynamically update the resource reserve calculation diagram; Repeat the second determination module and the update module to dynamically update the resource reserve calculation diagram to complete the update of the entire coal mine resource reserves, and when the new comprehensive mining working face division is completed, repeat the first determination module, the binding module, the second determination module, the update module and the generation module to update the entire coal mine resource reserves, and dynamically update and display the coal mine resource reserves graphical report.
Citation Information
Patent Citations
Mine reserve management system and method
CN103971291A
Mine geological resource reserve management method
CN106529755A
Big data-based dynamic mineral reserve management method and system thereof
CN107908784A
Control method of coal mine mining working face outburst elimination and extraction up-to-standard dynamic visualization system
CN111425185A
Intelligent mine management system and method
CN113706122A