Automatic voltage control active-active method and device for main and standby dispatching system of power grid

By implementing functions such as AVC model maintenance, synchronous checks and optimization operations in the main and backup control system of the power system, the problem of lack of dual-active mechanism in the existing technology is solved, and the dual-active and voltage of the AVC function of the main and backup control system is realized. Reactive power coordination control improves the safety and flexibility of power grid scheduling control.

CN119401429AInactive Publication Date: 2025-02-07GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411529310.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-30
Publication Date
2025-02-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing power system, the main and backup control system lacks a dual-active mechanism when implementing automatic voltage control (AVC), which makes it impossible to achieve real-time information interaction and voltage reactive power coordination control in emergency situations.

Method used

By implementing AVC model maintenance, synchronization verification, automatic synchronization and optimization operations in the main and backup system, we ensure the real-time information interaction between the main network main and backup AVC and the main network backup AVC, and before issuing the control command. Verify the equipment control permissions to ensure safety and effectiveness.

Benefits of technology

The dual activity of the AVC function of the main and backup control system is realized, ensuring that voltage reactive power coordination control can be achieved in emergency situations, and improving the safety and flexibility of power grid scheduling control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119401429A_ABST
    Figure CN119401429A_ABST
Patent Text Reader

Abstract

The invention discloses an active-active automatic voltage control method and device for a main and standby power grid dispatching system, and the method comprises the steps: carrying out the automatic voltage control of the main and standby power grid dispatching system, achieving an AVC model maintenance function, and automatically synchronizing model maintenance information to a system at the other side when the system at one side carries out AVC model maintenance, and when the system on the other side detects the change of the model information in real time, corresponding model maintenance is automatically carried out. And when the parameters influencing the AVC operation safety are inconsistent, stopping the AVC function of the main and standby dispatching system. And performing automatic synchronization of the AVC models of the main and standby dispatching systems according to types or stations in a manual confirmation mode. And the main and standby dispatching system AVC simultaneously performs AVC optimization operation according to the model information and real-time data in each system to generate a control instruction. And when the control instruction is issued, automatically checking whether the equipment corresponding to the control instruction has the control authority or not, issuing and executing the instruction with the control authority, and completing closed-loop control of AVC.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system automation, and in particular to a method and device for automatic voltage control dual-activity of a power grid main and standby modulation system. Background Art

[0002] With the construction of the existing power system backup and dispatch system, the data interaction and emergency support capabilities between the main dispatch system and the backup dispatch system have been fully improved. The main and backup dispatch systems can meet the needs of rapid emergency response, build a dual-active main and backup dispatch system, realize the rapid and flexible deployment of dispatch emergency technical means, and gradually form a dispatch emergency system that meets all-round emergency needs. This is an inevitable requirement for the current development of the main grid.

[0003] As a basic and important function of modern power grid dispatching control, automatic voltage control (AVC) is the most advanced form of voltage / reactive power control currently pursued. It combines safety and economy, can achieve economic closed-loop control under safety constraints, and is recognized as the highest stage of power system dispatching control development.

[0004] The automatic voltage control active-active system is an important component of building active-active primary-standby dispatching.

[0005] Obviously, to establish a dispatching emergency system that can meet all-round emergency needs, it is necessary to realize dual-activity of automatic voltage control for the main and standby dispatching of the power grid. Summary of the invention

[0006] The purpose of the present invention is to solve the above problems and provide a method and device for automatic voltage control dual activity of the main and standby dispatching systems of the power grid. Through the automatic voltage control dual activity of the main and standby dispatching systems, the main dispatching AVC and the main dispatching AVC of the main grid are realized, and real-time information interaction is achieved, thereby realizing the coordinated control of the voltage and reactive power of the main and standby dispatching.

[0007] The technical solution adopted by the present invention to solve the technical problem is:

[0008] In a first aspect, a dual-active method for automatic voltage control of a main and standby dispatching system of a power grid is applied to a voltage and reactive power coordinated control system; the system includes a main dispatching AVC of a main grid and a main standby dispatching AVC of a main grid; the method steps include:

[0009] Model maintenance: The main and standby AVC systems also have the AVC model maintenance function. When one system performs AVC model maintenance, the model maintenance information is automatically synchronized to the other system. When the other system detects changes in model information in real time, it automatically performs corresponding model maintenance.

[0010] Model synchronization verification: The coordination control layer performs the AVC model synchronization verification function of the main and standby dispatching systems in real time, obtains the main and standby dispatching models for comparison, and displays inconsistent model information. When there is a parameter inconsistency that affects the safe operation of AVC, the AVC function of the main and standby dispatching systems is stopped.

[0011] Model synchronization: Automatically synchronize the AVC models of the main and standby dispatching systems by type or by plant through manual confirmation.

[0012] AVC optimization calculation: The main and standby control systems AVC perform AVC optimization calculations simultaneously based on the model information and real-time data within their respective systems to generate control instructions.

[0013] AVC control execution: When a control instruction is issued, it automatically checks whether the device corresponding to the control instruction has control authority, and issues instructions with control authority for execution to complete AVC closed-loop control.

[0014] Optionally, model maintenance includes, in addition to regular model parameters:

[0015] AVC interface unlocking operation information: AVC system function on / off, blocking; AVC area on / off, blocking; AVC plant on / off, blocking; control equipment (including transformers, reactive power compensation equipment, generators, etc.) on / off, blocking, etc.

[0016] AVC device adjustment times information: device adjustment times, rejection times, preset failure times

[0017] AVC power plant planning curve information: today's voltage curve and tomorrow's voltage curve.

[0018] Optionally, the synchronization verification information includes:

[0019] Model information: AVC system, region, plant, equipment and other parameter information;

[0020] Operation information: AVC system, area, plant, station, equipment startup, shutdown, and locking information;

[0021] Equipment adjustment information; current adjustment times, rejection times, preset failure times, etc.

[0022] Optionally, the inconsistent parameters affecting AVC safety include: inconsistent number of main and standby AVC models, inconsistent AVC system operating status, inconsistent regional operating status, inconsistent plant and station operating status, inconsistent control authority status of equipment, etc.

[0023] The AVC algorithm optimization operation is active-active, and the main and standby AVCs perform AVC algorithm optimization operations according to the AVC models of their respective systems and real-time grid data, and each generates a control instruction. After the main and standby systems are switched, the AVC operation does not need to be manually switched.

[0024] The control is active-active. After the main and backup AVCs each generate control instructions based on the AVC algorithm optimization, they obtain the control authority of the control object corresponding to the instruction, whether it is the main control or the backup control, and then according to the current system status, whether it is the main control or the backup control. When the control authority of the device matches the system status, control can be issued. AVC control is active-active. The same control device can only be controlled on one side of the system, ensuring the security of control.

[0025] In a second aspect, the present invention further provides a power grid main and standby automatic voltage control dual-active device, which is applied to a voltage and reactive power coordinated control system; the system includes a main grid main adjustment AVC and a main grid standby adjustment AVC; the method steps include:

[0026] The model maintenance active-active module is used for real-time synchronization maintenance of the active and standby AVC models to ensure the consistency of the active and standby models.

[0027] The model synchronization verification module is used to determine whether the main and standby AVC models are consistent and to detect whether there are parameters that affect the safe operation of AVC. If so, the main and standby AVC functions are exited.

[0028] A model synchronization module, used for performing synchronization of the main and standby models of the relevant models according to the plant or type after manual confirmation when the synchronization verification results of the main and standby AVC models are inconsistent;

[0029] An AVC optimization operation module is used for the main AVC and the standby AVC to perform AVC optimization operations based on the model and real-time data of the response system and generate a control strategy;

[0030] The AVC control execution module is used to determine whether the active and standby states of the current system are consistent with the control authority of the control device corresponding to the control instruction after the active AVC and the standby AVC generate the control instruction. If they are consistent, the module issues the control instruction for execution.

[0031] Optionally, the device further comprises:

[0032] Active-active information specification module, used to standardize the interactive information between the main AVC and the backup AVC. Active-active information includes

[0033] AVC basic model information: AVC system, region, plant, equipment and other model parameter information

[0034] AVC interface unlocking operation information: AVC system function on / off, blocking; AVC area on / off, blocking; AVC plant on / off, blocking; control equipment (including transformers, reactive power compensation equipment, generators, etc.) on / off, blocking, etc.

[0035] AVC device adjustment times information: device adjustment times, rejection times, preset failure times

[0036] AVC power plant planning curve information: today's voltage curve and tomorrow's voltage curve.

[0037] The AVC control execution module includes:

[0038] The controllable determination submodule is used to obtain the control device to which the control instruction belongs after the main and standby AVC control strategy is generated, and to check whether the device is controllable;

[0039] The first judgment submodule is used to obtain the main and backup control states of the system and the control authority state (main control or backup control) of the object to which the control instruction belongs when a control instruction exists, and to determine whether the two states are consistent; if not, no control is issued; if so, control is issued for execution.

[0040] In a third aspect, the present invention provides an electronic device comprising a processor, a memory, and a program or instruction stored in the memory and executable on the processor, wherein the program or instruction, when executed by the processor, implements the steps of the method described in the first aspect.

[0041] In a fourth aspect, the present invention provides a readable storage medium, on which a program or instruction is stored, and when the program or instruction is executed by a processor, the steps of the method described in the first aspect are implemented.

[0042] It can be seen from the above technical solutions that the present invention has the following advantages:

[0043] The present invention has the AVC model maintenance function through the main and standby adjustment system AVC. When one side system performs AVC model maintenance, the model maintenance information is automatically synchronized to the other side system. When the other side system detects the model information change in real time, it automatically performs the corresponding model maintenance. The coordination control layer performs the AVC model synchronization verification function of the main and standby adjustment system in real time, obtains the main and standby adjustment models for comparison, and displays inconsistent model information. When there is a parameter inconsistency that affects the safety of AVC operation, the AVC function of the main and standby adjustment system is stopped. Through manual confirmation, the AVC model of the main and standby adjustment system is automatically synchronized according to type or plant station. The main and standby adjustment system AVC performs AVC optimization operations simultaneously according to the model information and real-time data in each system to generate control instructions. When the control instruction is issued, it automatically verifies whether the device corresponding to the control instruction has control authority, and issues the instruction with control authority for execution to complete the closed-loop control of AVC. Through the dual active of AVC model, dual active of algorithm, and dual active of control, the dual active of the AVC function of the main and standby adjustment system is realized. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative work.

[0045] Figure 1 It is a flowchart of the steps of Embodiment 1 of a method for automatic voltage control dual-active of a power grid main and standby modulation system of the present invention;

[0046] Figure 2 This is a flowchart of the steps of Embodiment 2 of a method for automatic voltage control dual-active of a power grid main and standby modulation system of the present invention;

[0047] Figure 3 It is a structural block diagram of an embodiment of an automatic voltage control dual-active device of a power grid main and standby modulation system of the present invention;

[0048] Figure 4 The present invention is a structural block diagram of an embodiment of an AVC active-active device for power grid master-standby regulation. DETAILED DESCRIPTION

[0049] The embodiment of the present invention provides a dual-active method and device for automatic voltage control of a power grid main and standby dispatching system, which realizes real-time information interaction between the main grid main dispatching AVC and the main grid standby dispatching AVC through a voltage and reactive power coordination control system, thereby realizing the control of the main and standby dispatching voltage and reactive power coordination.

[0050] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] See also Figure 1 , Figure 1 This is a flowchart of the steps of a first embodiment of a method for automatic voltage control dual-active of a power grid main and standby dispatching system of the present invention, which is applied to a voltage and reactive power coordinated control system; the system includes a main grid main dispatching AVC and a main grid standby dispatching AVC; the method steps include:

[0052] Step S101, the main and standby dispatching systems AVC also have the AVC model maintenance function. When one system performs AVC model maintenance, the model maintenance information is automatically synchronized to the other system. When the other system detects the model information change in real time, it automatically performs the corresponding model maintenance.

[0053] Step S102: The coordination control layer performs the AVC model synchronization verification function of the main and standby systems in real time, obtains the main and standby models for comparison, and displays inconsistent model information. When there is a parameter inconsistency that affects the safe operation of AVC, the AVC function of the main and standby systems is stopped;

[0054] Step S103, automatically synchronizing the AVC model of the main and standby dispatching systems by type or by plant through manual confirmation;

[0055] Step S104, the main and standby control systems AVC perform AVC optimization operations simultaneously according to the model information and real-time data in their respective systems to generate control instructions;

[0056] Step S105, AVC control execution: when a control instruction is issued, it is automatically checked whether the device corresponding to the control instruction has control authority, and the instruction with control authority is issued for execution to complete the AVC closed-loop control.

[0057] In an embodiment of the present invention, the main and standby dispatching system AVC also has an AVC model maintenance function. When one side system performs AVC model maintenance, the model maintenance information is automatically synchronized to the other side system. When the other side system detects the model information change in real time, it automatically performs the corresponding model maintenance. The coordination control layer performs the AVC model synchronization verification function of the main and standby dispatching system in real time, obtains the main and standby dispatching models for comparison, and displays inconsistent model information. When there is a parameter inconsistency that affects the safety of AVC operation, the AVC function of the main and standby dispatching system is stopped. Through manual confirmation, the AVC model of the main and standby dispatching system is automatically synchronized according to type or plant station. The main and standby dispatching system AVC performs AVC optimization operations simultaneously according to the model information and real-time data in each system to generate control instructions. When the control instruction is issued, it automatically verifies whether the device corresponding to the control instruction has control authority, and issues the instruction with control authority for execution to complete the closed-loop control of AVC. Through the dual active of AVC model, dual active of algorithm, and dual active of control, the dual active of the AVC function of the main and standby dispatching system is realized.

[0058] See also Figure 2 , which is a flowchart of the steps of Embodiment 2 of a method for adjusting the active / standby AVC dual active of a power grid according to the present invention, and is applied to Figure 3 The schematic diagram of the voltage-reactive coordinated control system shown in the figure; the system includes the main grid main dispatching AVC and the main grid backup dispatching AVC, and the main grid main dispatching AVC and the main grid backup dispatching AVC are connected through the coordination control layer; wherein, the main and backup systems simultaneously perform AVC algorithm optimization operations in real time, and can simultaneously perform the operating state and locking state operations of the AVC system, plant, equipment, etc., and automatically synchronize to the opposite system through the coordination layer. The coordination layer provides tools to periodically compare the strategies and models of the main and backup dispatching systems. The method steps include:

[0059] Step S201, the main and standby dispatching systems AVC also have the AVC model maintenance function. When one system performs AVC model maintenance, the model maintenance information is automatically synchronized to the other system. When the other system detects the model information change in real time, it automatically performs the corresponding model maintenance.

[0060] In the embodiment of the present invention, in addition to conventional model parameters, model maintenance also includes:

[0061] AVC interface unlocking operation information: AVC system function on / off, blocking; AVC area on / off, blocking; AVC plant on / off, blocking; control equipment (including transformers, reactive power compensation equipment, generators, etc.) on / off, blocking, etc.

[0062] AVC device adjustment times information: device adjustment times, rejection times, preset failure times

[0063] AVC power plant planning curve information: today's voltage curve and tomorrow's voltage curve.

[0064] In step S202, the coordination control layer performs the AVC model synchronization verification function of the main and standby systems in real time, obtains the main and standby models for comparison, and displays inconsistent model information.

[0065] In the embodiment of the present invention, the synchronization check information mainly includes AVC model information, AVC operation information and AVC adjustment information.

[0066] The data that needs to be obtained and compared are shown in the following table:

[0067]

[0068]

[0069] Step S203, information inconsistency processing, when the synchronization verification information has inconsistent parameters that affect the safe operation of AVC, the AVC function of the main and standby systems is stopped;

[0070] In the embodiment of the present invention, the information that affects the safe operation of AVC mainly includes: inconsistent number of main and standby AVC models, inconsistent AVC system operating status, inconsistent regional operating status, inconsistent plant operating status, equipment operating status, inconsistent equipment control authority status, etc.

[0071] Step S204: When the main and standby AVC models received by the main network main and standby AVC are inconsistent, the main and standby AVC models are synchronized. The synchronization is performed according to the information type and the plant to which it belongs.

[0072] Step S205, the main grid main adjustment AVC and the standby adjustment AVC receive the main and standby adjustment AVC to respectively obtain the AVC model and the real-time data of the power grid, and perform AVC optimization calculation;

[0073] Step S206, when the main grid has voltage and reactive power regulation requirements, the main AVC and the standby AVC are optimized and calculated simultaneously to generate control instructions;

[0074] Step S207, the main network main AVC and the standby AVC obtain the control authority of the control object to which the control instruction belongs, whether it is the main control or the standby control;

[0075] Step S208, the main network main adjustment AVC and the backup adjustment AVC obtain the current system status, whether it is the main adjustment or the backup adjustment;

[0076] Step S209, the main network main AVC and the standby AVC determine whether the control instruction control authority and the system status are consistent, and if they are consistent, the control is issued.

[0077] In the embodiment of the present invention, voltage-reactive power coordinated control can be achieved through the voltage-reactive power coordinated control system with the assistance of the main grid main dispatching AVC and the main grid standby dispatching AVC.

[0078] In a power grid main and standby dispatching AVC dual active control method provided in an embodiment of the present invention, the main and standby dispatching system AVC has an AVC model maintenance function at the same time. When one side system performs AVC model maintenance, the model maintenance information is automatically synchronized to the other side system. When the other side system detects the model information change in real time, it automatically performs the corresponding model maintenance. The coordination control layer performs the AVC model synchronization verification function of the main and standby dispatching system in real time, obtains the main and standby dispatching models respectively for comparison, and displays inconsistent model information. When there is a parameter inconsistency that affects the safety of AVC operation, the AVC function of the main and standby dispatching system is stopped. Through manual confirmation, the AVC model of the main and standby dispatching system is automatically synchronized according to type or plant station. The main and standby dispatching system AVC performs AVC optimization operations simultaneously according to the model information and real-time data in each system to generate control instructions. When the control instruction is issued, it automatically verifies whether the device corresponding to the control instruction has control authority, and issues the instruction with control authority for execution to complete the closed-loop control of AVC. Through the dual active of AVC model, dual active of algorithm, and dual active of control, the dual active of the AVC function of the main and standby dispatching system is realized.

[0079] See also Figure 4 , shows a structural block diagram of an embodiment of a power grid main and standby AVC dual-active device, which is applied to a voltage and reactive power coordinated control system; the system includes a main grid main AVC and a main grid standby AVC; and includes the following modules:

[0080] Model maintenance active-active module 401 is used for real-time synchronous maintenance of the active and standby AVC models to ensure the consistency of the active and standby models;

[0081] The model synchronization verification module 402 is used to verify whether the main and standby AVC models are consistent, and to detect whether there are parameters that affect the safe operation of AVC. If so, the main and standby AVC function is exited.

[0082] Model synchronization module 403, used for performing synchronization of the main and standby models of the relevant models according to the plant or type after manual confirmation when the synchronization verification results of the main and standby AVC models are inconsistent;

[0083] AVC optimization operation module 404, used for the main AVC and the standby AVC, respectively performs AVC optimization operation based on the model and real-time data of the response system to generate a control strategy;

[0084] The AVC control execution module 405 is used to determine whether the active and standby states of the current system are consistent with the control authority of the control device corresponding to the control instruction after the active AVC and the standby AVC generate the control instruction, and if they are consistent, issue it for execution.

[0085] In an optional embodiment, the device further comprises:

[0086] Active-active information specification module, used to standardize the interactive information between the main AVC and the backup AVC. Active-active information includes

[0087] AVC basic model information: AVC system, region, plant, equipment and other model parameter information

[0088] AVC interface unlocking operation information: AVC system function on / off, blocking; AVC area on / off, blocking; AVC plant on / off, blocking; control equipment (including transformers, reactive power compensation equipment, generators, etc.) on / off, blocking, etc.

[0089] AVC device adjustment times information: device adjustment times, rejection times, preset failure times

[0090] AVC power plant planning curve information: today's voltage curve and tomorrow's voltage curve.

[0091] In an optional embodiment, the device further comprises:

[0092] The controllable determination submodule is used to obtain the control device to which the control instruction belongs after the main and standby AVC control strategy is generated, and to check whether the device is controllable;

[0093] The first judgment submodule is used to obtain the main and backup control states of the system and the control authority state (main control or backup control) of the object to which the control instruction belongs when a control instruction exists, and to determine whether the two states are consistent; if not, no control is issued; if so, control is issued for execution.

[0094] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0095] An embodiment of the present invention also provides an electronic device, including a memory and a processor, wherein the memory stores an analysis machine program, and when the analysis machine program is executed by the processor, the processor executes the steps of the control method for grid voltage and reactive power coordination as described in any of the above embodiments.

[0096] An embodiment of the present invention further provides an analysis machine readable storage medium on which an analysis machine program is stored. When the analysis machine program is executed by the processor, the control method for grid voltage and reactive power coordination as described in any of the above embodiments is implemented.

[0097] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0098] In the several embodiments provided in the present application, it should be understood that the methods, devices, electronic devices and storage media disclosed in the present invention can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0099] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0100] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0101] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a readable storage medium that can be read by an analyzer. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The analyzer software product is stored in a readable storage medium, including several instructions to enable an analyzer device (which can be a personal analyzer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned readable storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), disk or optical disk and other media that can store program codes.

[0102] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A dual-active automatic voltage control method for a power grid main and standby dispatching system, characterized in that: Applied to voltage-reactive power coordinated control system; the system includes main grid main adjustment AVC and main grid standby adjustment AVC; the method steps include: Model maintenance: The main and standby dispatching systems AVC also have the AVC model maintenance function. When one system performs AVC model maintenance, the model maintenance information is automatically synchronized to the other system. When the other system detects changes in model information in real time, it automatically performs corresponding model maintenance. Model synchronization verification: The coordination control layer performs the AVC model synchronization verification function of the main and backup systems in real time, obtains the main and backup models for comparison, and displays inconsistent model information. When there is a parameter inconsistency that affects the safe operation of AVC, the AVC function of the main and backup systems is stopped; Model synchronization: Automatically synchronize the AVC models of the main and standby dispatching systems by type or plant through manual confirmation; AVC optimization calculation: The main and standby AVC systems perform AVC optimization calculations simultaneously based on the model information and real-time data in their respective systems to generate control instructions; AVC control execution: When a control instruction is issued, it automatically checks whether the device corresponding to the control instruction has control authority, and issues instructions with control authority for execution to complete AVC closed-loop control.

2. A dual-active automatic voltage control method for a power grid main and standby dispatching system according to claim 1, characterized in that: Model maintenance includes, in addition to regular model parameters: AVC interface unlocking operation information: AVC system function on / off, blocking; AVC area on / off, blocking; AVC plant / station on / off, blocking; control equipment (including transformers, reactive power compensation equipment, generators, etc.) on / off, blocking, etc.; AVC equipment adjustment times information: equipment adjustment times, rejection times, and preset failure times; AVC power plant planning curve information: today's voltage curve and tomorrow's voltage curve.

3. The method for controlling active-active voltage of a power grid main-standby dispatching system according to claim 1, characterized in that: The synchronization verification information includes: Model information: AVC system, region, plant, equipment and other parameter information; Operation information: AVC system, area, plant, station, equipment startup, shutdown, and locking information; Equipment adjustment information; current adjustment times, rejection times, preset failure times, etc.

4. The method for controlling active-active voltage of a power grid main-standby dispatching system according to claim 1, characterized in that: When the model synchronization verifies that the parameters are inconsistent, the parameters that affect AVC safety are automatically screened and identified, and the AVC function is exited. The inconsistent parameters that affect AVC safety include: inconsistent number of main and standby AVC models, inconsistent AVC system operating status, inconsistent regional operating status, inconsistent plant and station operating status, inconsistent equipment control authority status, etc.

5. The method for controlling active-active voltage of a power grid main-standby dispatching system according to claim 1, characterized in that: The AVC algorithm optimizes the operation of dual-activity. The main and standby AVCs perform AVC algorithm optimization operations according to the AVC models of their respective systems and real-time grid data, and each generates control instructions. After the main and standby systems are switched, the AVC operation does not need to be manually switched.

6. The method for controlling active-active voltage of a power grid main-standby dispatching system according to claim 1, characterized in that: Control dual-active, the main and backup AVCs each generate control instructions based on the AVC algorithm optimization, and then obtain the control authority of the control object corresponding to the instruction, whether it is the main control or the backup control, and then according to the current system status, it is the main control or the backup control. When the control authority of the device matches the system status, control can be issued. AVC controls dual-active, and the same control device can only be controlled on one side of the system, ensuring the security of control.

7. A dual-active device for automatic voltage control of a power grid, characterized in that: Applied to voltage-reactive power coordinated control system; the system includes main grid main adjustment AVC and main grid standby adjustment AVC; including: The model maintenance active-active module is used for real-time synchronization maintenance of the active and standby AVC models to ensure the consistency of the active and standby models. The model synchronization verification module is used to determine whether the main and standby AVC models are consistent and detect whether there are parameters that affect the safe operation of AVC. If so, the main and standby AVC functions are exited; A model synchronization module, used for performing synchronization of the main and standby models of the relevant models according to the plant or type after manual confirmation when the synchronization verification results of the main and standby AVC models are inconsistent; An AVC optimization operation module is used for the main AVC and the standby AVC to perform AVC optimization operations based on the model and real-time data of the response system and generate a control strategy; The AVC control execution module is used to determine whether the active and standby states of the current system are consistent with the control authority of the control device corresponding to the control instruction after the active AVC and the standby AVC generate the control instruction. If they are consistent, the module issues the control instruction for execution.

8. The power grid automatic voltage control dual-active device according to claim 7, characterized in that: The device also includes: Active-active information specification module, used to standardize the interactive information between the main AVC and the backup AVC. Active-active information includes AVC basic model information: AVC system, region, plant, equipment and other model parameter information AVC interface unlocking operation information: AVC system function on / off, blocking; AVC area on / off, blocking; AVC plant on / off, blocking; control equipment (including transformers, reactive power compensation equipment, generators, etc.) on / off, blocking, etc. AVC device adjustment times information: device adjustment times, rejection times, preset failure times AVC power plant planning curve information: today's voltage curve and tomorrow's voltage curve.

9. The power grid automatic voltage control dual-active device according to claim 7, characterized in that; The AVC control execution module includes: The controllable determination submodule is used to obtain the control device to which the control instruction belongs after the main and standby AVC control strategy is generated, and to check whether the device is controllable; The first judgment submodule is used to obtain the main and backup control states of the system and the control authority state (main control or backup control) of the object to which the control instruction belongs when a control instruction exists, and to determine whether the two states are consistent; if not, no control is issued; if so, control is issued for execution.

Citation Information

Patent Citations

  • Coordination control method for combined operation of regional and county automatic voltage control (AVC) systems

    CN105515011A

  • Power dispatching system operation method based on master-slave mode

    CN114493097A