Interval fault protection area removing method and device for CTCSN and medium
By determining whether the fault protection section of a vehicle can be removed in the CTCSN system, and using the corresponding processing process, the difficulty of resolving the fault protection area caused by the initial registration of the train interval in the CTCSN system is solved, and the rapid recovery of efficient driving modes and functions are achieved. verify.
Patent Information
- Application Number
- CN202411261773.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2025-02-14
AI Technical Summary
The difficulty in resolving fault protection areas caused by initial registration of train intervals in the CTCSN system affects driving efficiency.
By judging whether the CTCSN system can remove the fault protection section of the vehicle, the corresponding processing process is adopted, and the expected results of the operation steps are added during the processing process to ensure the correct release of the fault protection area.
It realizes the rapid release of fault protection zones and the recovery interval is an efficient mobile blocking mode, which improves the efficiency of train driving, and verifies the correctness of the function of the initial tailless screen generation fault protection zone.
Smart Images

Figure CN119428807A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a rail transit signal system, and in particular to a method, a device and a medium for releasing a section fault protection zone of a CTCSN. Background Art
[0002] CTCS (China Train Control System) is a train control system designed to ensure safe train operation and meet the transportation needs of different lines in a graded manner, including ground equipment and on-board equipment. The current mainstream train control systems include CTCS0 (China Train Control System Level 0), CTCS2 (China Train Control System Level 2) and CTCS3 (China Train Control System Level 3). CTCSN (New China Train Control System) is a new train control system developed by China State Railway Group Co., Ltd. Compared with the current mainstream train control system, it uses new technologies such as mobile blocking, Beidou positioning, and 5G communication, and is suitable for freight lines that need to be transformed to improve transportation capacity.
[0003] The no-tail screen in the CTCSN system means that there may be unknown vehicles behind the train in the section where the train is located. Completing the tail screen means confirming that there are no unknown vehicles behind the train by automatic or manual means. The no-tail screen of the train will generate a fault protection zone to ensure the safety of train operation.
[0004] When the train is initially registered to the RBC subsystem in the interval virtual section, the train tail screen state is initial no tail screen. When the train tail screen state is initial no tail screen and there is no fault protection zone behind the train, an initial no tail screen fault protection zone will be generated, the starting point of the protection zone is the interval station boundary and the end point is the rear of the train.
[0005] The initial tailless screen generation fault protection zone in CTCSN is a new function point, which is crucial to the safety of interval driving. Therefore, a detailed test plan needs to be designed for this new function to fully verify its correctness.
[0006] When a train is initially registered in a section, a fault protection zone will be generated in the entire section. When there is a fault protection zone in the section, the train cannot be tracked in the moving block mode, which affects the driving efficiency of the section. To remove the fault protection zone generated by the initial registration of the train section, the train, RBC (Radio Block Center), and CTC (Centralized Control System) subsystems need to cooperate with each other correctly.
[0007] When a train initially registers and generates a fault protection zone in a section, the current common practice is to downgrade the train's operating mode, and restore the section to moving block mode after the train leaves the current section. This will greatly reduce the running efficiency of the section train. In addition, the initial generation of a fault protection zone without a tail screen in CTCSN is a new function, and there is currently no scenario analysis and test verification solution for this function.
[0008] Therefore, how to design a method to release the fault protection zone caused by the initial registration of the train section in CTCSN, so as to quickly restore the section to a moving block mode with high driving efficiency, becomes a technical problem that needs to be solved. Summary of the invention
[0009] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a method, device and medium for removing the interval fault protection zone of CTCSN.
[0010] The purpose of the present invention can be achieved by the following technical solutions:
[0011] According to a first aspect of the present invention, a method for releasing an interval fault protection zone for CTCSN is provided. The method first determines whether the CTCSN system can release the fault protection section with a vehicle. If so, a processing procedure for releasing the fault protection section with a vehicle is adopted. Otherwise, a processing procedure for not releasing the fault protection section with a vehicle is adopted, and an expected result judgment corresponding to the operation steps is added in the two processing procedures.
[0012] As a preferred technical solution, before the CTCSN system determines whether to release the fault protection section with a train, this method first runs the train to the virtual section of the interval for initial registration, and automatically sets the entire section as a fault protection section, that is, the system generates fault protection for the entire section by itself without manual setting.
[0013] As a preferred technical solution, the process of removing the fault protection section with a vehicle specifically includes the following steps:
[0014] Step 101, sequentially issuing virtual section idle commands to release the section fault protection behind the section where the train is located;
[0015] Step 102, issuing a virtual section idle command, releasing the fault protection of the section where the train is located, and regenerating a fault protection zone behind the train;
[0016] Step 103, a command to complete the tail screen is issued to the train, and the train completes the tail screen;
[0017] Step 104, the virtual section idle command is issued again in sequence, and the rear section fault protection of the section where the train is located is released again;
[0018] Step 105, issuing a virtual section idle command again, releasing the fault protection of the section where the train is located, and no fault protection zone is regenerated behind the train;
[0019] Step 106, issuing a virtual section idle command to sequentially release the fault protection of the section ahead of the train;
[0020] Step 107, a command to complete the first screening is issued to the train, and the train completes the first screening and enters the normal operation mode; the rear train can depart from the rear station and enter the section in the moving block mode, and can closely track the front train.
[0021] As a preferred technical solution, in steps 101 and 104, a virtual segment idle command is issued from the CTC.
[0022] As a preferred technical solution, the order in steps 101 and 104 is from the station boundary to the train direction.
[0023] As a preferred technical solution, in step 103, a tail screen command is issued from the CTC to release the train's initial tail screen-free state.
[0024] As a preferred technical solution, the process of handling the fault protection section where the vehicle cannot be released specifically includes the following steps:
[0025] Step 201, sequentially issuing virtual section idle commands to release the rear section fault protection of the section where the train is located;
[0026] Step 202, a command to complete the tail screening is issued to the train, and the train completes the tail screening;
[0027] Step 203, a command to complete the first screening is issued to the train, and the train completes the first screening;
[0028] Step 204, issue a virtual section idle command, sequentially release the fault protection of the section ahead of the train; the train enters the normal operation mode; the rear train can depart from the rear station and enter the section in the moving block mode, and can closely track the front train.
[0029] As a preferred technical solution, in steps 201 and 204, a virtual segment idle command is issued from the CTC.
[0030] As a preferred technical solution, in step 202, a tail screen command is issued from the CTC to release the train's initial tail screen-free state.
[0031] As a preferred technical solution, the expected result corresponding to the operation steps is specifically determined as follows:
[0032] When the execution results of the corresponding steps in the processing flow are completely consistent with expectations, it means that the function of generating fault protection zones by the initial tailless screen of the interval in the CTCSN system under test is correct.
[0033] According to a second aspect of the present invention, there is provided an electronic device, comprising a memory and a processor, wherein a computer program is stored in the memory, and the method described above is implemented when the processor executes the program.
[0034] According to a third aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the program implements the method described above when executed by a processor.
[0035] Compared with the prior art, the present invention has the following advantages:
[0036] 1) The present invention proposes a method for removing the fault protection zone caused by the initial registration of a train section in CTCSN. The method can smoothly remove the fault protection zone caused by the initial registration of a train section in CTCSN systems under two different configurations, and quickly restore the section to a moving block mode with high driving efficiency.
[0037] 2) The present invention designs a method for removing the fault protection zone caused by the initial registration of the train section, and divides the method into two types according to whether the CTCSN system can remove the fault protection of the section with vehicles. This method can be used to manually and quickly remove the section fault protection, so that the section can quickly return to the moving block mode. Compared with the original scheme of driving out of the section in a downgraded train mode, the present invention can greatly improve the traffic efficiency of the section train.
[0038] 3) The present invention analyzes the characteristics of the fault protection zone generated by the initial tailless screen, and by adding the expected result judgment corresponding to each step in the fault removal method, the fault removal method also becomes a test method for verifying the new functional point of the initial tailless screen generating the fault protection zone. The present invention can be executed to verify whether the function of the initial tailless screen generating the fault protection zone in the CTCSN system is correct.
[0039] 4) The present invention analyzes in detail the characteristics of the new function of generating fault protection zone by initial tailless screen during train section registration in CTCSN, and proposes a test verification method for this function point, filling the gap in the current CTCSN system's initial tailless screen generating fault protection zone function test method. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 This is a schematic diagram of two stations and one section;
[0041] Figure 2 It is a specific flow chart of the method of the present invention. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0043] The present invention deeply studies the relevant schemes for releasing the fault protection zone in CTCSN, designs a method for manually releasing the fault protection zone generated by the initial registration of the train section; at the same time, the expected results of the relevant operations are added to the steps of the method to verify the correctness of the function of generating the fault protection zone by the initial tailless screen in the CTCSN system.
[0044] The present invention analyzes the functional characteristics of the initial tailless screen generating fault protection zone for interval trains in the CTCSN system, analyzes various operation commands for manually releasing the fault protection zone, designs a method for releasing the fault protection zone generated by the initial registration of the train interval, and verifies the correctness of the function of the initial tailless screen generating fault protection zone.
[0045] like Figure 1 As shown, it is used as an example to illustrate the train operation line scenario of the present invention.
[0046] The train departs from station 1 and runs to the virtual section X3G. After the initial registration with RBC, the tail screen status is initially no tail screen.
[0047] At this time, if there is no fault protection zone behind the train, the initial tailless screen will generate a fault protection zone, with the starting point being the station boundary between station 1 and the section and the end point being the rear of the train.
[0048] If there is a fault protection zone behind the train when registering to RBC, the initial fault protection zone without tail screen will not be generated first. The initial fault protection zone without tail screen will be generated after the original fault protection zone is released.
[0049] If a section is occupied by a fault, the CTC can manually send a section idle command to release the fault occupation of the section. When multiple consecutive sections need to be released, they need to be released in the order of the direction of the train running.
[0050] Manually issuing the tail screen command from CTC can release the fault protection zone from the start point to the rear of the train section. Manually issuing the head screen command from CTC can release the fault protection zone from the front of the train to the end of the train section. When issuing the head screen and tail screen commands through CTC to release the fault protection zone of the train section, it is necessary to release the tail screen first and then the head screen in this order.
[0051] In addition, when removing the faulty section, if there is a car in the section, whether the CTC issues the section idle command successfully or not can be configured in the CTCSN system. According to the two different configurations, two different solutions need to be designed to remove the initial tailless screen.
[0052] The specific process of the present invention is as follows:
[0053] According to whether the CTCSN system can release the fault protection section with a vehicle, the initial fault relief without a tail screen is divided into two schemes: Scheme A corresponds to the fault protection section with a vehicle and scheme B corresponds to the fault protection section with a vehicle.
[0054] Add the expected results corresponding to the operation steps in the plan. When the execution results of the corresponding steps are completely consistent with the expectations when the plan is executed, it means that the function of generating fault protection zone by initial tailless screen of interval in the CTCSN system under test is correct, and the fault elimination plan also becomes the test method of this function.
[0055] Initial scenario: The train runs to the initial registration of the virtual section X3G in the interval. At this time, because the train enters the interval, the CTCSN system detects that there is a car in the interval, and will first set the entire interval to fault protection. X1G, X2G, X3G, and X4G will all generate fault protection areas. At this time, the tail screen state of the train is the initial no tail screen.
[0056] Option A:
[0057] The virtual section idle command is issued from CTC, and the faulty sections are released in sequence from the station boundary to the train direction, and the X1G and X2G sections are released in turn. The virtual sections are changed from fault protection to idle in sequence.
[0058] After the train section X3G is released, since there is no fault protection at the rear of the train, the initial fault protection without tail screen will be generated and extended to the station boundary behind the train, that is, X1G, X2G, and X3G become fault protection areas again.
[0059] The tail screen command is issued from CTC to release the train's initial tail screen-free state, and the train completes the tail screen.
[0060] The virtual section idle command is issued from CTC again, and the faulty sections are released in sequence from the station boundary to the train direction, and the X1G and X2G sections are released in turn. The X1G and X2G virtual sections are changed from fault protection to idle in turn.
[0061] After releasing the X3G section where the train is located, the fault protection section will no longer be regenerated.
[0062] Continue to send virtual segment idle commands from CTC to release the fault protection of X4G, and X4G becomes idle.
[0063] Then the CTC issues the first screening command. After the train completes the first screening, it can enter the normal operation mode. The rear train can depart from station 1 to the section in the moving block mode and closely follow the front train.
[0064] Option B:
[0065] The virtual section idle command is issued from CTC, and the faulty sections are released in sequence from the station boundary to the train direction, and the X1G and X2G sections are released in turn. The virtual sections are changed from fault protection to idle in sequence.
[0066] The tail screen command is issued from CTC to release the train's initial tail screen-free state, and the train completes the tail screen.
[0067] The first screening command continues to be issued from CTC and the train completes the first screening.
[0068] The virtual section idle command is continuously issued from CTC to release the fault protection of X4G. After X4G becomes idle, the train can enter the normal operation mode. The rear train can depart from station 1 to the section in the moving block mode and closely follow the front train.
[0069] like Figure 2 As shown, the implementation process of the present invention is described in detail:
[0070] Step 100: The train runs to the virtual section X3G for initial registration.
[0071] Depending on whether the system can clear the faulty section with a vehicle, this solution is divided into two: Solution A (step 101-step 107) and Solution B (step 201-step 204).
[0072] Step 101: In the direction of X1G-X4G, a virtual section idle command is issued sequentially to release the fault protection of the sections X1G and X2G behind the section where the train is located;
[0073] Step 102: After issuing the virtual section idle command of X3G and releasing the fault protection of X3G, the fault protection zone is regenerated at the rear of the train, that is, X1G, X2G, and X3G become the fault protection zone again;
[0074] Step 103: Send a tail screening command to the train, and the train completes the tail screening;
[0075] Step 104: again in the direction of X1G-X4G, the virtual section idle command is issued sequentially to release the fault protection of the sections X1G and X2G behind the section where the train is located;
[0076] Step 105: the virtual section idle command of X3G is issued again. After the X3G fault protection is released, the fault protection zone is no longer generated behind the train, that is, the X1G, X2G, and X3G fault protection zones are released;
[0077] Step 106: Issue a virtual section idle command of X4G to release the fault protection of the section X4G in front of the section where the train is located.
[0078] Step 107: Issue the first screening command to the train, the train completes the first screening and enters the normal operation mode, the rear train can depart from station 1 to the section in the moving block mode and can closely follow the front train. Solution A ends.
[0079] Step 201: In the direction of X1G-X4G, a virtual section idle command is issued sequentially to release the fault protection of the sections X1G and X2G behind the section where the train is located;
[0080] Step 202: Send a tail screening command to the train, and the train completes the tail screening;
[0081] Step 203: Send a first screening command to the train, and the train completes the first screening;
[0082] Step 204: Issue the virtual section idle command of X4G to release the fault protection of the section X4G in front of the section where the train is located. The train enters the normal operation mode, and the rear train can depart from station 1 to the section in the moving block mode and can closely follow the front train. Solution B ends.
[0083] The above is an introduction to the method embodiment. The following is a further explanation of the scheme of the present invention through electronic equipment and storage medium embodiments.
[0084] The embodiment of the present invention also provides an electronic device including a central processing unit (CPU), which can perform various appropriate actions and processes according to computer program instructions stored in a read-only memory (ROM) or computer program instructions loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for device operation can also be stored. The CPU, ROM, and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.
[0085] Multiple components in the device are connected to the I / O interface, including: input units, such as keyboards, mice, etc.; output units, such as various types of displays, speakers, etc.; storage units, such as disks, optical disks, etc.; and communication units, such as network cards, modems, wireless communication transceivers, etc. The communication unit allows the device to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunication networks.
[0086] The processing unit performs the various methods and processes described above, such as the method of the present invention. For example, in some embodiments, the method of the present invention can be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit. In some embodiments, part or all of the computer program can be loaded and / or installed on the device via a ROM and / or a communication unit. When the computer program is loaded into RAM and executed by the CPU, one or more steps of the method of the present invention described above can be performed. Alternatively, in other embodiments, the CPU can be configured to perform the method of the present invention by any other appropriate means (e.g., by means of firmware).
[0087] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0088] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.
[0089] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0090] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A method for removing a section fault protection zone for CTCSN, characterized in that: This method first determines whether the CTCSN system can release the fault protection section with a vehicle. If so, the processing process of the fault protection section with a vehicle can be used. Otherwise, the processing process of the fault protection section with a vehicle cannot be used, and the expected result judgment corresponding to the operation steps is added in the two processing processes.
2. A method for removing a section fault protection zone for CTCSN according to claim 1, characterized in that: Before determining whether the CTCSN system can release the fault protection section with a train, the method first runs the train to the virtual section of the interval for initial registration, and automatically sets the entire interval as a fault protection section.
3. A method for removing a section fault protection zone for CTCSN according to claim 1, characterized in that: The process of removing the fault protection section with a vehicle specifically comprises the following steps: Step 101, sequentially issuing virtual section idle commands to release the section fault protection behind the section where the train is located; Step 102, issuing a virtual section idle command, releasing the fault protection of the section where the train is located, and regenerating a fault protection zone behind the train; Step 103, a command to complete the tail screen is issued to the train, and the train completes the tail screen; Step 104, the virtual section idle command is issued again in sequence, and the rear section fault protection of the section where the train is located is released again; Step 105, issuing a virtual section idle command again, releasing the fault protection of the section where the train is located, and no fault protection zone is regenerated behind the train; Step 106, issuing a virtual section idle command to sequentially release the fault protection of the section ahead of the train; Step 107, a command to complete the first screening is issued to the train, and the train completes the first screening and enters the normal operation mode; the rear train can depart from the rear station and enter the section in the moving block mode, and can closely track the front train.
4. A method for removing a section fault protection zone for CTCSN according to claim 3, characterized in that: In steps 101 and 104, a virtual segment idle command is issued from the CTC.
5. A method for removing a section fault protection zone for CTCSN according to claim 4, characterized in that: The order in steps 101 and 104 is from the station boundary to the train direction.
6. A method for removing a section fault protection zone for CTCSN according to claim 4, characterized in that: In step 103, a tail screen command is issued from the CTC to release the initial tail screen-free state of the train.
7. A method for removing a section fault protection zone for CTCSN according to claim 1, characterized in that: The process of handling the fault protection section where the vehicle cannot be removed specifically includes the following steps: Step 201, sequentially issuing virtual section idle commands to release the rear section fault protection of the section where the train is located; Step 202, a command to complete the tail screening is issued to the train, and the train completes the tail screening; Step 203, a command to complete the first screening is issued to the train, and the train completes the first screening; Step 204, issue a virtual section idle command, sequentially release the fault protection of the section ahead of the train; the train enters the normal operation mode; the rear train can depart from the rear station and enter the section in the moving block mode, and can closely track the front train.
8. A method for removing a section fault protection zone for CTCSN according to claim 7, characterized in that: In steps 201 and 204, a virtual segment idle command is issued from the CTC.
9. A method for removing a section fault protection zone for CTCSN according to claim 7, characterized in that: In step 202, a tail screen command is issued from the CTC to release the initial tail screen-free state of the train.
10. A method for removing a section fault protection zone for CTCSN according to claim 1, characterized in that: The expected results corresponding to the operation steps are specifically determined as follows: When the execution results of the corresponding steps in the processing flow are completely consistent with expectations, it means that the function of generating fault protection zones by the initial tailless screen of the interval in the CTCSN system under test is correct.
11. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory, wherein: When the processor executes the program, the method according to any one of claims 1 to 10 is implemented.
12. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 10 is implemented.