Connecting transition device for prestressed concrete tower section and steel tower section of combined wind power tower

By designing a transition device that combines the wind power tower, the coordinated work of the motor-driven tapered tooth system and the arc-shaped support plate is solved, and the stability and durability of the tower are achieved. promote.

CN119467222APending Publication Date: 2025-02-18SHAANXI CONSTR ENG NEW ENERGY (DINGBIAN) FAN EQUIP MFG CO LTD

Patent Information

Application Number
CN202411562014.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2025-02-18

AI Technical Summary

Technical Problem

In existing wind power towers, the connection between the prestressed concrete tower section and the steel tower section depends on bolt connection or welding technology, resulting in problems such as loosening, fatigue cracks, and affecting the stability and durability of the structure.

Method used

A transition device combining wind power towers was designed, including embedded parts, control base, internal support mechanism and second-order tower body reinforcement mechanism. The tower was realized through the coordinated work of the motor-driven tapered tooth system and the arc-shaped support plate. Reinforcement and support of the inner wall of the barrel.

Benefits of technology

It effectively improves the stability and durability of the wind power tower, reduces structural problems caused by bolt loosening or welding fatigue, ensures that the stress is evenly dispersed when the tower is subjected to tensile force, and improves crack resistance and fatigue resistance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119467222A_ABST
    Figure CN119467222A_ABST
Patent Text Reader

Abstract

The invention discloses a combined wind power tower prestressed concrete and steel tower section connection transition device, and relates to the technical field of combined wind power towers, the combined wind power tower prestressed concrete and steel tower section connection transition device comprises an embedded part, a control base is fixedly connected to the middle of the top of the embedded part, and an internal supporting mechanism is movably connected to the top of the inner wall of the control base; the top of the internal supporting mechanism is fixedly connected with a second-order tower body reinforcing mechanism, and the internal supporting mechanism and the second-order tower body reinforcing mechanism are arranged, so that the stability and durability of the wind power tower are effectively improved, and the connection between the concrete tower drum and the steel tower section is firmer; according to the concrete tower drum, the structure problem caused by bolt loosening or welding fatigue cracks is reduced, stress can be evenly dispersed when the concrete tower drum bears pulling force, and therefore the anti-cracking performance and the anti-fatigue performance of the tower drum are improved; and the stability of the tower under the action of complex wind load is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of combined wind power towers, in particular to a combined wind power tower frame prestressed concrete and steel tower section connection transition device. Background Art

[0002] A combined wind turbine tower is a wind turbine tower composed of a prestressed concrete tower section and a steel tower section. Prestressed concrete tower sections usually have high compressive strength and good durability, while steel tower sections have high tensile strength and good flexibility. By combining these two materials, their respective advantages can be fully utilized to improve the overall performance of the wind turbine tower.

[0003] According to the patent document: CN104018724A, a combined wind power tower prestressed concrete tower section and steel tower section connection device is disclosed, and the steel connection member is composed of an upper end connection flange, a connection steel cylinder section, a connection anchor flange, two cylindrical anchor steel plates, a stiffening connection steel plate and a steel anchor bolt, and each part forms a whole. The vertical prestress is applied to the concrete tower section by a prestressing component. The upper end of the prestressed steel strand or prestressed anchor bolt is anchored to the upper surface of the connection anchor flange after being tensioned by the post-tensioning method. The stiffening connection steel plate and the steel anchor bolt are embedded in the concrete. The stiffness of the connection section is increased by stiffening the connection steel plate, so that the stress distribution at the top of the concrete tower section is uniform. The present invention can ensure that the internal space of the tower is not reduced due to the thick wall thickness of the concrete tower, which is of great significance to improving the unevenness of the stress distribution at the connection of the combined tower, effectively controlling the crack width of the concrete tower section, and improving the durability and fatigue resistance of the combined tower.

[0004] In the existing wind power tower design, the connection structure between the prestressed concrete tower section and the steel tower section is traditionally realized by bolt connection or welding technology. However, these traditional connection methods have exposed several significant problems in practical applications. Specifically, although bolt connection is widely used, it is easy to loosen after long-term service. When the bolt is subjected to tension, it will indirectly cause the concrete tower tube to be subjected to shear force, which in turn causes the problem of uneven force distribution on the tower tube. On the other hand, although welding connection can achieve strong connection strength, fatigue cracks are easy to occur in the welding parts during long-term service, affecting the durability of the overall structure. In addition, it is worth noting that the bottom of the wind turbine tower often adopts a hollow design inside the tower to optimize the structural weight and performance. When relying solely on bolt connections and welding methods, it is difficult to ensure the stability of the tower under complex wind loads. The continuous action of wind loads will cause the tower to continuously bear alternating tensile and compressive stresses, which will pose a severe test to its crack resistance and fatigue resistance. Summary of the invention

[0005] The purpose of the present invention is to provide a combined wind power tower prestressed concrete and steel tower section connection transition device to solve the problem that the bolt connection proposed in the prior art is prone to loosening after long-term service. When the bolt is subjected to tension, it will indirectly cause the concrete tower to be subjected to shear force, thereby causing the problem of uneven force distribution on the tower. On the other hand, although the welding connection can achieve a strong connection strength, fatigue cracks are prone to occur at the welding part during long-term service, affecting the durability of the overall structure. The interior of the tower body at the bottom of the wind power tower often adopts a hollow design to optimize the structural weight and performance. When relying solely on bolt connection and welding methods, it is difficult to ensure the stability of the tower under complex wind loads. The continuous action of wind loads will cause the tower to continuously bear alternating tension and compression stresses, thereby posing a severe test to its crack resistance and fatigue resistance.

[0006] To achieve the above-mentioned object, the present invention provides the following technical solutions: a combined wind power tower prestressed concrete and steel tower section connection transition device, comprising an embedded part, a control base is fixedly connected to the middle of the top of the embedded part, an internal support mechanism is movably connected to the top of the inner wall of the control base, and a second-order tower body reinforcement mechanism is fixedly connected to the top of the internal support mechanism; The internal support mechanism comprises an internal support mechanism chassis, a plurality of support mechanism control disks are fixedly connected to the top inner wall of the internal support mechanism chassis, and a plurality of transmission frames are fixedly connected to the top annular array of the support mechanism control disks; The internal support mechanism chassis includes a base, and base slide grooves are respectively opened on the front and rear sides of the bottom of the base. A motor is fixedly connected to the bottom of the inner wall of the base, and a conical tooth is fixedly connected to the output end of the motor. The outer wall of the conical tooth engages with a second conical tooth, and the top of the second conical tooth is fixedly connected to a rotating rod, and the top of the rotating rod extends to the outer wall of the base.

[0007] Preferably, a plurality of connecting frame uprights are fixedly connected to the top annular array of the base, and a plurality of arc-shaped connecting plates are fixedly connected to the inner sides of the plurality of connecting frame uprights.

[0008] Preferably, the support mechanism control panel includes a control panel body, the outer wall of the control panel body is provided with a plurality of connecting grooves in an annular array, the top of the control panel body is rotatably connected to a control panel top plate, the top of the control panel top plate is provided with a plurality of arc grooves in an annular array, and the inner wall of the control panel top plate is fixedly connected to the outer wall of the rotating rod extending to the top side of the base.

[0009] Preferably, the bottom of the control panel body is fixedly connected to a chassis, a plurality of slide grooves are provided in a circular array at the bottom of the chassis, the inner wall of the chassis is rotatably connected to the outside of a rotating rod extending to one side of the top of the movable plate connecting block, and the bottom of the control panel body is fixedly connected to the top of one group of arc-shaped connecting plates.

[0010] Preferably, the inner walls of multiple connecting grooves are slidably connected with push rods, multiple push rods are fixedly connected with sliders at one end of the inner wall of the control panel body, multiple push rods extending to one end of the outer wall of the control panel body are fixedly connected with arc-shaped support plates, the tops of multiple sliders are fixedly connected with top sliding rods, the outer walls of multiple top sliding rods are slidably connected to the inner wall of the arc-shaped grooves, the bottoms of multiple sliders are fixedly connected with bottom sliding rods, and the outer walls of multiple bottom sliding rods are slidably connected to the inner wall of the sliding grooves.

[0011] Preferably, multiple transmission frames include a movable plate connecting block, the bottoms of multiple movable plate connecting blocks are fixedly connected to the tops of the arc-shaped support plates, the tops of multiple movable plate connecting blocks are fixedly connected with movable plates, multiple movable plates and the inner sides of the movable plate connecting blocks are fixedly connected with diagonal support rods, and the tops of multiple movable plates are fixedly connected with racks.

[0012] Preferably, the second-stage tower body reinforcement mechanism comprises a reinforcement mechanism support frame, and a top annular array of the reinforcement mechanism support frame is rotatably connected to a plurality of rotating pressure rods.

[0013] Preferably, the reinforcement mechanism support frame includes a reinforcement mechanism chassis, a top annular array of the reinforcement mechanism chassis is fixedly connected to a plurality of reinforcement mechanism uprights, a plurality of inner tops of the reinforcement mechanism uprights are fixedly connected to a top plate, a plurality of top plates are provided with a plurality of hinge grooves in the top annular array, a plurality of inner wall annular arrays of the reinforcement mechanism chassis are fixedly connected to hinge blocks, a plurality of inner walls of the hinge blocks are rotatably connected to gears, a plurality of outer wall sides of the gears are fixedly connected to a rotating rod, a plurality of rotating rods are rotatably connected to a rotating pressure rod slider on a side away from the gear, and the outer walls of the plurality of gears are meshed with racks.

[0014] Preferably, the plurality of rotating pressure rods each include a pressure rod body, the middle portions of the outer walls of the plurality of pressure rod bodies are rotatably connected to the inner walls of the hinge grooves, the bottoms of the plurality of pressure rod bodies are fixedly connected to slide plates, and the inner walls of the plurality of slide plates are slidably connected to the outer walls of the rotating pressure rod sliders.

[0015] Preferably, the control base includes a control base shell, and control base slide grooves are respectively opened on the front and rear sides of the bottom of the inner wall of the control base shell, and the left and right sides of the inner walls of the two control base slide grooves are slidably connected with articulated sliders, the inner walls of the front and rear groups of the articulated sliders are rotatably connected with articulated rods, the middle parts of the front and rear groups of the articulated rods are rotatably connected, and the sides of the front and rear groups of the articulated rods away from the articulated sliders are rotatably connected with the second articulated slider, the outer walls of the front and rear groups of the second articulated sliders are respectively slidably connected to the inner walls of the two base slide grooves, the left and right sides of the inner bottom of the front and rear groups of the articulated rods are fixedly connected with connecting cross bars, and the front and rear sides of the inner sides of the two connecting cross bars are respectively fixedly connected with hydraulic push rods.

[0016] Compared with the prior art, the present invention has the following beneficial effects: 1. The present application is provided with an internal support mechanism and a second-stage tower reinforcement mechanism, which can effectively improve the stability and durability of the wind power tower, make the connection between the concrete tower and the steel tower section more secure, reduce the structural problems caused by loose bolts or welding fatigue cracks, and make the concrete tower evenly disperse the stress when subjected to tension, avoiding stress concentration, thereby improving the crack resistance and fatigue resistance of the tower. The internal support mechanism ensures the stability of the tower under complex wind loads through the coordinated work of multiple transmission frames and support mechanism control panels. The second-stage tower reinforcement mechanism further strengthens the reinforcement effect of the tower through the uniform distribution of the rotating pressure rod, so that the connection between the bottom tower and the second-stage tower is reinforced, ensuring the structural integrity of the tower during long-term service. 2. The present application is provided with a support mechanism control panel. The coordinated work of these components can ensure the stability of the tower under the action of wind. The annular array of the support mechanism control panel is provided with a design of multiple arc-shaped support plates, so that each support point can independently respond to wind changes, further improving the crack resistance and fatigue resistance of the tower; 3. The present application is provided with a rotating pressure rod, a transmission frame, and a rotating rod, so that when the tower body is subjected to wind force, the rotating pressure rod can be flexibly adjusted to improve the stability of the overall structure. In addition, the uniform distribution of the rotating pressure rod ensures the uniform reinforcement of the tower body under the action of wind force in different directions, avoids structural damage caused by excessive local force, and reinforces the connection between the bottom tower and the second tower section, and reinforces the connection between the bottom tower, the second tower section and the embedded parts; 4. The present application is provided with a control base, so that the entire device can adjust the position of the internal support mechanism and the second-order tower body reinforcement mechanism inside the tower tube when it is necessary to adjust the position reinforced by the internal support mechanism and the second-order tower body reinforcement mechanism according to the support requirements of the tower body, thereby effectively reducing the impact force of wind on the tower frame. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the main body three-dimensional structure of a combined wind power tower prestressed concrete and steel tower section connection transition device of the present invention; Figure 2 It is a schematic diagram of the three-dimensional structure of the main part of a combined wind power tower prestressed concrete and steel tower section connection transition device of the present invention; Figure 3 It is a schematic diagram of the three-dimensional separation structure of the internal support mechanism of the combined wind power tower prestressed concrete and steel tower section connection transition device of the present invention; Figure 4 It is a three-dimensional cross-sectional structural schematic diagram of the internal support mechanism base frame of a combined wind power tower prestressed concrete and steel tower section connection transition device of the present invention; Figure 5 It is a schematic diagram of the three-dimensional structure of a control panel and a transmission frame of a supporting mechanism of a combined wind power tower prestressed concrete and steel tower section connection transition device of the present invention; Figure 6 It is a schematic diagram of the three-dimensional separation structure of the control panel and the transmission frame of the support mechanism of the prestressed concrete and steel tower section connection transition device of a combined wind power tower according to the present invention; Figure 7 It is a three-dimensional structural schematic diagram of a two-stage tower body reinforcement mechanism of a combined wind power tower prestressed concrete and steel tower section connection transition device of the present invention; Figure 8 It is a schematic diagram of the three-dimensional structure of a reinforcement mechanism support frame of a combined wind power tower prestressed concrete and steel tower section connection transition device of the present invention; Fig. 9 It is a schematic diagram of the three-dimensional structure of a rotating compression rod of a combined wind power tower prestressed concrete and steel tower section connection transition device of the present invention; Fig.10 The present invention is a schematic diagram of a three-dimensional cross-sectional structure of a control base of a combined wind power tower prestressed concrete and steel tower section connection transition device.

[0018] Numbers in the figure: 1, embedded parts; 2, control base; 21, control base shell; 22, control base slide; 23, hinged slider; 24, hinged rod; 25, second hinged slider; 26, connecting cross bar; 27, hydraulic push rod; 3, internal support mechanism; 31, internal support mechanism chassis; 311, base; 312, base slide; 313, motor; 314, conical teeth; 315, second conical teeth; 316, rotating rod; 317, connecting frame upright rod; 318, arc-shaped connecting plate; 32, support mechanism control panel; 321, control panel body; 322, connecting groove; 323, chassis; 324, slide; 325 , control panel top plate; 326, arc groove; 327, slider; 328, top slide bar; 329, bottom slide bar; 3210, push rod; 3211, arc support plate; 33, transmission frame; 331, moving plate connecting block; 332, oblique support rod; 333, moving plate; 334, rack; 4, second-order tower body reinforcement mechanism; 41, reinforcement mechanism support frame; 411, reinforcement mechanism chassis; 412, reinforcement mechanism vertical rod; 413, top plate; 414, hinge groove; 415, hinge block; 416, gear; 417, rotating rod; 418, rotating pressure rod slider; 42, rotating pressure rod; 421, pressure rod body; 422, slide plate. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] Example: Figure 1 As shown, the present invention provides a technical solution for a combined wind power tower prestressed concrete and steel tower segment connection transition device, comprising an embedded part 1, a control base 2 is fixedly connected to the top middle of the embedded part 1, an internal support mechanism 3 is movably connected to the top of the inner wall of the control base 2, and a second-order tower body reinforcement mechanism 4 is fixedly connected to the top of the internal support mechanism 3; When the bottom tower body is connected with the embedded part 1, the bottom tower is lifted by a hoisting machine to the top of the embedded part 1 and the screw groove opened on the bottom outer wall is aligned with the bolt provided on the top of the embedded part 1, and the tower body is placed on the top of the embedded part 1. Thereafter, the bottom tower is connected with the embedded part 1 by nuts and welding, thereby connecting the bottom tower to the top of the embedded part 1, and the control base 2, the internal support mechanism 3 and the second-order tower body reinforcement mechanism 4 provided on the top of the embedded part 1 are put onto the inner wall of the tower.

[0021] See also Figure 2-9The internal support mechanism 3 includes an internal support mechanism chassis 31, a plurality of support mechanism control disks 32 are fixedly connected to the top inner wall of the internal support mechanism chassis 31, a plurality of transmission frames 33 are fixedly connected to the top annular array of the top support mechanism control disk 32, the internal support mechanism chassis 31 includes a base 311, a base slide 312 is respectively provided on the front and rear sides of the bottom of the base 311, a motor 313 is fixedly connected to the bottom of the inner wall of the base 311, a conical tooth 314 is fixedly connected to the output end of the motor 313, the outer wall of the conical tooth 314 meshes with the second conical tooth 315, the top of the second conical tooth 315 is fixedly connected to a rotating rod 316, the top of the rotating rod 316 extends to the outer wall of the base 311, and the top annular array of the base 311 is fixedly connected to the outer wall of the base 311. The support mechanism control panel 32 comprises a control panel body 321, and a plurality of connecting frame uprights 317 are fixedly connected, and a plurality of arc-shaped connecting plates 318 are fixedly connected to the inner sides of the plurality of connecting frame uprights 317. The support mechanism control panel 32 comprises a control panel body 321, and a plurality of connecting grooves 322 are provided in an annular array on the outer wall of the control panel body 321. The top of the control panel body 321 is rotatably connected to a control panel top panel 325, and a plurality of arc-shaped grooves 326 are provided in an annular array on the top of the control panel top panel 325. The inner wall of the control panel top panel 325 is fixedly connected to the outer wall extending from the rotating rod 316 to the top side of the base 311. The bottom of the control panel body 321 is fixedly connected to a chassis 323, and a plurality of sliding grooves 324 are provided in an annular array on the bottom of the chassis 323. The inner wall of the chassis 323 is rotatably connected to the rotating rod 316. The top of the control panel body 321 is fixedly connected to the top of one group of arc-shaped connecting plates 318, and the inner walls of the plurality of connecting grooves 322 are slidably connected with push rods 3210. The plurality of push rods 3210 are fixedly connected with sliders 327 at one end of the inner wall of the control panel body 321. The plurality of push rods 3210 extend to one end of the outer wall of the control panel body 321 and are fixedly connected with arc-shaped support plates 3211. The tops of the plurality of sliders 327 are fixedly connected with top slide rods 328. The outer walls of the plurality of top slide rods 328 are slidably connected to the inner wall of the arc-shaped groove 326. The bottoms of the plurality of sliders 327 are fixedly connected with bottom slide rods 329. The outer walls of the plurality of bottom slide rods 329 are slidably connected to the slide grooves 324. The inner wall of the tower body, the plurality of transmission frames 33 all include a moving plate connecting block 331, the bottoms of the plurality of moving plate connecting blocks 331 are all fixedly connected to the top of the arc-shaped support plate 3211, the tops of the plurality of moving plate connecting blocks 331 are all fixedly connected with moving plates 333, the inner sides of the plurality of moving plates 333 and the moving plate connecting blocks 331 are all fixedly connected with diagonal support rods 332, the tops of the plurality of moving plates 333 are all fixedly connected with racks 334, the second-order tower body reinforcement mechanism 4 includes a reinforcement mechanism support frame 41, the top annular array of the reinforcement mechanism support frame 41 is rotatably connected with a plurality of rotating pressure rods 42, the reinforcement mechanism support frame 41 includes a reinforcement mechanism chassis 411, the top annular array of the reinforcement mechanism chassis 411 is fixedly connected with a plurality of reinforcement mechanism vertical rods 412,A top plate 413 is fixedly connected to the inner top of the plurality of reinforcement mechanism uprights 412, a plurality of hinge grooves 414 are provided in a circular array on the top of the plurality of top plates 413, a hinge block 415 is fixedly connected to the inner wall circular array of the plurality of reinforcement mechanism chassis 411, the inner walls of the plurality of hinge blocks 415 are rotatably connected to gears 416, a rotating rod 417 is fixedly connected to one side of the outer wall of the plurality of gears 416, a rotating rod slider 418 is rotatably connected to the side of the plurality of rotating rods 417 away from the gear 416, the outer walls of the plurality of gears 416 are meshed with the rack 334, the plurality of rotating pressure rods 42 include a pressure rod body 421, the middle part of the outer wall of the plurality of pressure rod bodies 421 is rotatably connected to the inner wall of the hinge groove 414, the bottom of the plurality of pressure rod bodies 421 is fixedly connected to a slide plate 422, the inner walls of the plurality of slide plates 422 are slidably connected to the outer wall of the rotating pressure rod slider 418; When the inside of the tower needs to be supported, the motor 313 is first started, and the rotation of the motor is transmitted to the rotating rod 316 through the conical teeth 314 and the second conical teeth 315, so that the rotating rod rotates, and the top of the rotating rod extends to the outer wall of the base 311, driving the control panel top plate 325 on the top of the multiple control panel bodies 321 to rotate, and the control panel top plate 325 rotates accordingly, and through the sliding connection of the arc groove 326 and the top sliding rod 328, the push rod 3210 and the slider 327 in the control panel body 321 produce corresponding displacements; As the top plates 325 of the control plates rotate, the bottom slide bars 329 slide in the slide grooves 324, pushing the push rods 3210 and the arc-shaped support plates 3211 to move to one side, and then the arc-shaped support plates 3211 expand and support the inner wall of the tower. At the same time, when the multiple arc-shaped support plates 3211 at the top expand outward, they drive the multiple moving plate connecting blocks 331 to move, thereby driving the multiple moving plates 333 to move. The multiple moving plates 333 move and then mesh with the gears 416 hinged to the inner walls of the multiple reinforcement mechanism chassis 411 through the racks 334 at the top, so that the multiple gears 416 rotate and drive the rotating pressure rod slider 418 on one side of the outer wall to rotate, and the rotating rod 417 rotates to change the angle to drive the rotating pressure rod slider 418 on the other side to slide on the inner wall of the slide plate 422, thereby pushing the pressure rod body 421 to rotate on the inner wall of the hinge groove 414, so that the pressure rod body 421 rotates outward, and finally realizes the connection reinforcement support between the second section tower and the bottom tower, and gives a certain pressure to the second section tower and the bottom tower through the pressure rod body 421, so that they are firmly connected to the top of the embedded part 1. In this way, the entire support mechanism can effectively reinforce the tower to ensure the stability and safety of its structure; The entire support and reinforcement process is precisely controlled by the control system to ensure the stability and safety of the internal structure of the tower. Through the coordinated work of the internal support mechanism 3 and the second-order tower body reinforcement mechanism 4, it can effectively cope with various load changes during construction and use, and ensure the integrity and reliability of the tower structure.

[0022] See also Fig.10 The control base 2 includes a control base shell 21, and control base slide grooves 22 are respectively opened on the front and rear sides of the bottom of the inner wall of the control base shell 21, and the left and right sides of the inner walls of the two control base slide grooves 22 are slidably connected with articulated sliders 23, and the inner walls of the front and rear two groups of articulated sliders 23 are rotatably connected with articulated rods 24, and the middle parts of the front and rear two groups of articulated rods 24 are rotatably connected, and the sides of the front and rear two groups of articulated rods 24 away from the articulated sliders 23 are rotatably connected with second articulated sliders 25, and the outer walls of the front and rear two groups of second articulated sliders 25 are respectively slidably connected to the inner walls of the two base slide grooves 312, and the left and right sides of the inner bottom of the front and rear two groups of articulated rods 24 are fixedly connected with connecting cross bars 26, and the front and rear sides of the inner sides of the two connecting cross bars 26 are respectively fixedly connected with hydraulic push rods 27; When it is necessary to adjust the position of the internal support mechanism 3 and the second-stage tower body reinforcement mechanism 4 on the inner wall of the tower tube so as to reinforce it more firmly, the hydraulic push rod 27 can perform telescopic movement to push the connecting cross bar 26 to move forward or backward. The movement of the connecting cross bar 26 drives the articulated rod 24 to rotate around the articulated slider 23, thereby causing the second articulated slider 25 to slide in the base slide groove 312, thereby changing the angle between the two sets of articulated rods 24 and pushing the internal support mechanism 3 and the second-stage tower body reinforcement mechanism 4 to rise and fall on the inner wall of the tower tube. In this way, the control base 2 can realize precise position adjustment of the internal support mechanism 3 and the second-stage tower body reinforcement mechanism 4 to ensure that they can be reinforced at the required position on the inner wall of the tower tube; In summary, the control base 2 provided in the present application has the characteristics of compact structure, easy operation, flexible adjustment, and safety and reliability. It can effectively and precisely adjust the support and reinforcement mechanisms inside the tower, thereby improving the overall stability and safety of the tower.

[0023] Working principle: when it is necessary to support the inside of the tower, the motor 313 is first started, and the rotation of the motor is transmitted to the rotating rod 316 through the conical teeth 314 and the second conical teeth 315, so that the rotating rod rotates, and the top end of the rotating rod extends to the outer wall of the base 311, driving the control panel top plate 325 on the top of the multiple control panel bodies 321 to rotate, and the control panel top plate 325 rotates accordingly, and the sliding connection of the arc groove 326 and the top slide bar 328 causes the push rod 3210 and the slider 327 in the control panel body 321 to produce corresponding displacement. As the multiple control panel top plates 325 rotate, the multiple bottom slide bars 329 slide in the slide groove 324, pushing the multiple push rods 3210 and the arc support plates 3211 to move to one side, and then the multiple arc support plates 3211 expand and support the inner wall of the tower. At the same time, when the multiple arc support plates 3211 at the top expand outward, they drive multiple moving The plate connecting block 331 moves, thereby driving the multiple moving plates 333 to move. The multiple moving plates 333 move and then mesh with the gears 416 hinged to the inner wall of the multiple reinforcement mechanism chassis 411 through the rack 334 at the top, so that the multiple gears 416 rotate and drive the rotating pressure rod slider 418 on one side of the outer wall to rotate. The rotating rod 417 rotates to change the angle and drives the rotating pressure rod slider 418 on the other side to slide on the inner wall of the slide plate 422, thereby pushing the pressure rod body 421 to rotate on the inner wall of the hinge groove 414, so that the pressure rod body 421 rotates outward, and finally realizes the connection reinforcement support of the second-stage tower and the bottom tower, and gives a certain pressure to the second-stage tower and the bottom tower through the pressure rod body 421, so that they are firmly connected to the top of the embedded part 1. In this way, the entire support mechanism can effectively reinforce the tower to ensure the stability and safety of its structure. When it is necessary to adjust the position of the internal support mechanism 3 and the second-order tower body reinforcement mechanism 4 on the inner wall of the tower so as to reinforce it more firmly, the hydraulic push rod 27 can perform telescopic movement to push the connecting cross bar 26 to move forward or backward. The movement of the connecting cross bar 26 drives the articulated rod 24 to rotate around the articulated slider 23, and then the second articulated slider 25 slides in the base slide groove 312, thereby changing the angle between the two sets of articulated rods 24 and pushing the internal support mechanism 3 and the second-order tower body reinforcement mechanism 4 to rise and fall on the inner wall of the tower. In this way, the control base 2 can realize precise position adjustment of the internal support mechanism 3 and the second-order tower body reinforcement mechanism 4 to ensure that they can be reinforced at the required position on the inner wall of the tower.

[0024] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. A combined wind power tower prestressed concrete and steel tower section connection transition device, characterized in that: It comprises an embedded part (1), the middle part of the top of the embedded part (1) is fixedly connected to a control base (2), the top of the inner wall of the control base (2) is movably connected to an internal support mechanism (3), and the top of the internal support mechanism (3) is fixedly connected to a second-order tower body reinforcement mechanism (4); The internal support mechanism (3) comprises an internal support mechanism base frame (31), a plurality of support mechanism control disks (32) are fixedly connected to the top inner wall of the internal support mechanism base frame (31), and a plurality of transmission frames (33) are fixedly connected to the top annular array of the support mechanism control disks (32); The internal support mechanism chassis (31) comprises a base (311), the front and rear sides of the bottom of the base (311) are respectively provided with base sliding grooves (312), the bottom of the inner wall of the base (311) is fixedly connected to a motor (313), the output end of the motor (313) is fixedly connected to a conical tooth (314), the outer wall of the conical tooth (314) is meshed with a second conical tooth (315), the top of the second conical tooth (315) is fixedly connected to a rotating rod (316), and the top of the rotating rod (316) extends to the outer wall of the base (311).

2. A combined wind power tower prestressed concrete and steel tower section connection transition device according to claim 1, characterized in that: A plurality of connection frame uprights (317) are fixedly connected to the top annular array of the base (311), and a plurality of arc-shaped connection plates (318) are fixedly connected to the inner sides of the plurality of connection frame uprights (317).

3. A combined wind power tower prestressed concrete and steel tower section connection transition device according to claim 1, characterized in that: The support mechanism control disk (32) comprises a control disk body (321), the outer wall of the control disk body (321) is provided with a plurality of connection grooves (322) in an annular array, the top of the control disk body (321) is rotatably connected to a control disk top disk (325), the top of the control disk top disk (325) is provided with a plurality of arc grooves (326) in an annular array, and the inner wall of the control disk top disk (325) is fixedly connected to the outer wall of the rotating rod (316) extending to the top side of the base (311).

4. A combined wind power tower prestressed concrete and steel tower section connection transition device according to claim 3, characterized in that: The bottom of the control panel body (321) is fixedly connected to a chassis (323), a plurality of slide grooves (324) are provided in a circular array at the bottom of the chassis (323), an inner wall of the chassis (323) is rotatably connected to the outside of a rotating rod (316) extending to the top side of a movable plate connecting block (331), and the bottom of the control panel body (321) is fixedly connected to the top of one of the sets of arc-shaped connecting plates (318).

5. A combined wind power tower prestressed concrete and steel tower section connection transition device according to claim 3, characterized in that: The inner walls of the plurality of connecting grooves (322) are slidably connected to push rods (3210), one end of the plurality of push rods (3210) is fixedly connected to a slider (327) on the inner wall of the control panel body (321), one end of the plurality of push rods (3210) extending to the outer wall of the control panel body (321) is fixedly connected to an arc-shaped support plate (3211), the tops of the plurality of sliders (327) are fixedly connected to a top slider (328), the outer walls of the plurality of top sliders (328) are slidably connected to the inner wall of the arc-shaped groove (326), the bottoms of the plurality of sliders (327) are fixedly connected to a bottom slider (329), and the outer walls of the plurality of bottom sliders (329) are slidably connected to the inner wall of the slide groove (324).

6. A combined wind power tower prestressed concrete and steel tower section connection transition device according to claim 1, characterized in that: The plurality of transmission frames (33) each comprise a moving plate connecting block (331); the bottoms of the plurality of moving plate connecting blocks (331) are fixedly connected to the top of the arc-shaped support plate (3211); the tops of the plurality of moving plate connecting blocks (331) are fixedly connected to a moving plate (333); the inner sides of the plurality of moving plates (333) and the moving plate connecting blocks (331) are fixedly connected to an oblique support rod (332); and the tops of the plurality of moving plates (333) are fixedly connected to a rack (334).

7. A combined wind power tower prestressed concrete and steel tower section connection transition device according to claim 1, characterized in that: The second-order tower body reinforcement mechanism (4) comprises a reinforcement mechanism support frame (41), and a top annular array of the reinforcement mechanism support frame (41) is rotatably connected to a plurality of rotational pressure rods (42).

8. A combined wind power tower prestressed concrete and steel tower section connection transition device according to claim 7, characterized in that: The reinforcement mechanism support frame (41) comprises a reinforcement mechanism chassis (411), a plurality of reinforcement mechanism uprights (412) are fixedly connected to a top annular array on the top of the reinforcement mechanism chassis (411), a top plate (413) is fixedly connected to the inner top of the plurality of reinforcement mechanism uprights (412), a plurality of hinge grooves (414) are provided on the top annular array of the plurality of top plates (413), a plurality of hinge blocks (415) are fixedly connected to the inner wall annular array of the plurality of reinforcement mechanism chassis (411), the inner walls of the plurality of hinge blocks (415) are rotatably connected to gears (416), a rotating rod (417) is fixedly connected to one side of the outer wall of the plurality of gears (416), a rotating pressure rod slider (418) is rotatably connected to the side of the plurality of rotating rods (417) away from the gear (416), and the outer walls of the plurality of gears (416) are meshed with the rack (334).

9. A combined wind power tower prestressed concrete and steel tower section connection transition device according to claim 7, characterized in that: The plurality of rotating pressure rods (42) each comprise a pressure rod body (421), the middle portions of the outer walls of the plurality of pressure rod bodies (421) are rotatably connected to the inner wall of the hinge groove (414), the bottoms of the plurality of pressure rod bodies (421) are fixedly connected to a slide plate (422), and the inner walls of the plurality of slide plates (422) are slidably connected to the outer wall of the rotating pressure rod slider (418).

10. A combined wind power tower prestressed concrete and steel tower section connection transition device according to claim 1, characterized in that: The control base (2) comprises a control base shell (21), the front and rear sides of the bottom of the inner wall of the control base shell (21) are respectively provided with control base slide grooves (22), the left and right sides of the inner walls of the two control base slide grooves (22) are slidably connected with hinged sliders (23), the inner walls of the front and rear groups of the hinged sliders (23) are rotatably connected with hinged rods (24), the middle parts of the front and rear groups of the hinged rods (24) are rotatably connected, the sides of the front and rear groups of the hinged rods (24) away from the hinged sliders (23) are rotatably connected with second hinged sliders (25), the outer walls of the front and rear groups of the second hinged sliders (25) are respectively slidably connected to the inner walls of the two base slide grooves (312), the left and right sides of the inner bottom of the front and rear groups of the hinged rods (24) are fixedly connected with connecting cross bars (26), and the front and rear sides of the inner sides of the two connecting cross bars (26) are respectively fixedly connected with hydraulic push rods (27).

Citation Information

Patent Citations

  • Connecting device of prestress concrete tower section and steel tower section of combination wind power tower

    CN104018724A

Cited By

  • Multi-point gradient detection device for fan tower drum

    CN121702344A