A ramp bridge small box girder prefabrication template system and method

By designing a prefabricated formwork system for ramp bridge small box girders that includes the main shell, flow guide shell, strain gauge, water droplet sensor and controller, the problem of lack of monitoring and processing functions of existing forms is solved, real-time monitoring and leakage treatment is achieved, and production efficiency and quality are improved.

CN119502092BActive Publication Date: 2025-04-29桐乡市苏台高速公路投资开发有限公司 +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411920211.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-25
Publication Date
2025-04-29
Estimated Expiration
2044-12-25

AI Technical Summary

Technical Problem

The existing prefabricated formwork for small ramp bridges lacks monitoring and processing functions, and cannot alarm and stop loss in time. When the prefabricated formwork deforms or concrete leaks during concrete pouring, it cannot be effectively processed, resulting in reduced use effect and efficiency.

Method used

A prefabricated formwork system including formwork mechanism and auxiliary mechanism is designed. The auxiliary mechanism includes the main shell, the flow guide shell, the strain gauge, the water drop sensor and the controller. Through these components, the deformation of the formwork and the leakage of concrete can be monitored in real time, and the leakage of concrete can be promptly alarmed and handled.

Benefits of technology

Real-time monitoring and leakage treatment of prefabricated formwork during concrete pouring is realized, the use effect and efficiency of formwork are improved, and the high-quality production of small box girders of ramp bridges is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119502092B_ABST
    Figure CN119502092B_ABST
Patent Text Reader

Abstract

The invention discloses a prefabricated formwork system for a small box girder of a ramp bridge, and relates to the technical field of small box girders of ramp bridges, comprising a formwork mechanism, wherein an auxiliary mechanism is arranged on the formwork mechanism, wherein the auxiliary mechanism comprises a main shell, two guide shells and two long strain gauges, an auxiliary shell is arranged on one side of the main shell, the inner wall of the main shell and the inner wall of the auxiliary shell are both bonded and connected with sealing strips, a water drop sensor is installed on the front surface of the auxiliary shell, a delivery pump is installed on the top of the connecting plate, and a controller is installed on the other side of the main shell; the invention, by arranging the auxiliary mechanism, can monitor at all times whether the prefabricated formwork is deformed during the concrete pouring process, and can deal with the leaked concrete at the same time, thereby realizing timely stop of loss, which not only improves the use effect of the prefabricated formwork for the small box girder of the ramp bridge, but also improves the use efficiency of the prefabricated formwork for the small box girder of the ramp bridge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of small box girders of ramp bridges, and in particular to a prefabricated template system and method for small box girders of ramp bridges. Background Art

[0002] The small box girder of ramp bridge is a small box girder structure used for the construction of ramp bridges. It is widely used in the field of highway traffic, especially in the construction of ramps on highways and urban expressways. The prefabricated formwork for the small box girder of ramp bridge is a mold used to make small box girders. It has good advantages in quality, production efficiency and cost control.

[0003] In the existing technology, although the existing prefabricated formwork for small box girders of ramp bridges can produce the required small box girders quickly and with high quality during actual use, it does not have the functions of monitoring and processing. When the prefabricated formwork is deformed due to excessive force during the concrete pouring process, the prefabricated formwork without monitoring and processing functions will not be able to send an alarm prompt to the staff in time, and at the same time, the concrete leaked from the prefabricated formwork will not be processed, and thus timely loss control cannot be achieved, which not only reduces the use effect of the prefabricated formwork for small box girders of ramp bridges, but also reduces the use efficiency of the prefabricated formwork for small box girders of ramp bridges.

[0004] Therefore, we propose a prefabricated formwork system and method for small box beams of ramp bridges to solve the above-mentioned problems. Summary of the invention

[0005] The purpose of the present invention is to provide a system and method for prefabricated formwork of small box girders of ramp bridges, so as to solve the problem that the existing prefabricated formwork of small box girders of ramp bridges proposed in the above-mentioned background technology does not have the monitoring and processing functions. When the prefabricated formwork is deformed due to excessive force during the concrete pouring process, the prefabricated formwork without monitoring and processing functions will not be able to send an alarm prompt to the staff in time, and at the same time, the concrete leaked from the prefabricated formwork will not be processed, and thus timely loss control cannot be achieved, which not only reduces the use effect of the prefabricated formwork of small box girders of ramp bridges, but also reduces the use efficiency of the prefabricated formwork of small box girders of ramp bridges.

[0006] To achieve the above-mentioned object, the present invention provides the following technical solutions: a ramp bridge small box girder prefabricated formwork system, comprising a formwork mechanism, wherein the formwork mechanism is provided with an auxiliary mechanism;

[0007] The auxiliary mechanism includes a main shell, two guide shells and two long strain gauges. An auxiliary shell is arranged on one side of the main shell. A connecting plate is fixed on one side of the auxiliary shell near the bottom. Connecting blocks are installed on the inner wall of the main shell near the top and the inner wall of the auxiliary shell near the top. An inclined plate is fixed to the bottom of the inner wall of the main shell. The inner walls of the main shell and the auxiliary shell are both bonded with sealing strips. A water drop sensor is installed on the front surface of the auxiliary shell. Two symmetrical L-shaped plates are fixed on the other side of the auxiliary shell. Two symmetrical L-shaped grooves are provided on one side of the main shell. A three-way pipe is installed between the two discharge ends of the auxiliary shell. A delivery pump is installed on the top of the connecting plate. A connecting pipe is installed on the feed end of the delivery pump. A discharge pipe is installed at the discharge end, and a controller is installed on the other side of the main shell; by arranging the auxiliary mechanism, it is possible to monitor at all times whether the precast template is deformed during the concrete pouring process, and at the same time, the leaked concrete can be disposed of, thereby achieving timely stop-loss, which not only improves the use effect of the precast template of the small box girder of the ramp bridge, but also improves the use efficiency of the precast template of the small box girder of the ramp bridge. When the entire precast template is assembled, the controller, the strain threshold set in advance by the controller, the two long strain gauges and the prepared alarm are directly used to know whether concrete leakage occurs during the concrete pouring process of the precast template, and when concrete leakage occurs, an alarm is issued in time to remind the staff.

[0008] Preferably, the bottom of the inclined plate contacts the bottom of the inner wall of the auxiliary shell, the detection end of the water drop sensor is movably sleeved inside the detection port on the front surface of the auxiliary shell, and the two L-shaped plates are movably sleeved inside the two L-shaped grooves respectively.

[0009] Preferably, the main shell and the auxiliary shell are connected by a first bolt and a first nut, the opposite sides of the two sealing strips are in contact, the feed end of the connecting pipe is connected to the discharge end of the three-way pipe, and the discharge ports of the two guide shells are located between the inner wall of the main shell and the interior of the auxiliary shell.

[0010] Preferably, the template mechanism comprises two short side plates, and short support frames are fixed to opposite sides of the two short side plates, and a plurality of first reinforcement members are evenly distributed and fixed on each of the short support frames.

[0011] Preferably, each of the short support frames is fixed with a group of inclined blocks, and the surface of each group of inclined blocks is respectively fixed to the surface of each short side panel, and the number of inclined blocks in each group is two, two symmetrical long side panels are installed between the opposite sides of the two short side panels, and long support frames are fixed to the opposite sides of the two long side panels, and multiple second reinforcement members are evenly distributed and fixed on the two long support frames.

[0012] Preferably, two top plates are slidably embedded between the tops of the two short side plates, and the bottoms of the two top plates are respectively in contact with the tops of the two long side plates, and cover plates are placed on the tops of the two top plates, and the two cover plates are located between the opposite sides of the two short side plates, and auxiliary plates are fixed on the tops of the two long side plates; by utilizing the capacitance value threshold set in advance by the controller, and the cooperation of the controller and the water drop sensor, it is possible to control whether the conveying pump is started, and then by utilizing the cooperation of the started conveying pump, the three-way pipe, the connecting pipe and the discharge pipe, it is possible to extract the concrete inside the space composed of the main shell, the auxiliary shell, the inclined plate, the base and the two sealing strips, and convey it to a box or a collection trough for collecting concrete, thereby reducing resource waste.

[0013] Preferably, the opposite sides of the two auxiliary plates are in contact with the opposite sides of the two cover plates respectively, a bottom plate is installed between the opposite sides of the two short side plates, the opposite sides of the bottom plate are in contact with the opposite sides of the two long side plates respectively, and a base is provided at the bottom of the bottom plate.

[0014] Preferably, short plates are fixed at the four corners of the bottom of the bottom plate and the bottom of the two long side plates near the two ends, and the two contacting short plates are installed by a second bolt and a second nut, and the bottom of the two main shells, the bottom of the two auxiliary shells, the two sealing strips and the bottom of the base are in the same horizontal plane.

[0015] Preferably, the inner surfaces of the two sealing strips are in contact with the surface of the base, the inner surface of the inclined plate is in contact with the surface of the base, the opposite sides of the two guide shells are respectively fixed to the front surface of the base and the rear surface of the base, the two long strain gauges are respectively adhesively connected to the middle position of the opposite sides of the two long side plates, and the opposite sides of the two connecting blocks are respectively fixed to the two sides of the base; by setting up a template mechanism, the production of a small box beam can be realized. When the template mechanism needs to be assembled, at this time, the two long side plates, the two short side plates and the bottom plate can be spliced ​​together by using a special hanger, two long support frames and two short support frames, and then the two long side plates, the two short side plates and the bottom plate can be tightly fixed together by using a plurality of short plates, the second bolts and the second nuts, and then the two short side plates and the two auxiliary plates can be used to fix the two top plates on the tops of the two long side plates, and then the two cover plates are respectively installed on the two bottom plates to complete the composition of the template mechanism.

[0016] A method for using a ramp bridge small box girder prefabricated formwork system comprises the following steps:

[0017] S1. When it is necessary to make a small box girder for a ramp bridge, first move the auxiliary shell with a sealing strip, two L-shaped plates, a connecting plate, an inclined plate and a tee pipe and the main shell with a sealing strip toward each other until the opposite sides of the two are in contact, and then fix the two together with a first bolt and a first nut, and then install the delivery pump, connecting plate, connecting pipe, discharge pipe, water drop sensor and controller, and then connect the controller to an external power supply, turn on the controller, and set the strain threshold, capacitance threshold and basic usage procedures;

[0018] S2. Then, using the cooperation of special lifting equipment, two long support frames and two short support frames, the two long side panels, two short side panels and the bottom panel are spliced ​​together. Then, using the cooperation of multiple short panels, second bolts and second nuts, the two long side panels, two short side panels and the bottom panel are tightly fixed together. Finally, using the cooperation of two short side panels and two auxiliary panels, the two top panels are respectively fixed on the top of the two long side panels. At the same time, the two long strain gauges and two cover plates are also installed in appropriate positions, and the assembly of the prefabricated formwork is completed.

[0019] S3. When the entire prefabricated template is assembled, the controller, the strain threshold value set in advance by the controller, the two long strain gauges and the prepared alarm are used to monitor whether concrete leakage occurs during the concrete pouring process of the prefabricated template. Then, the capacitance value threshold value set in advance by the controller, the controller and the water drop sensor are used to control whether the delivery pump is started.

[0020] S4. When concrete leakage occurs in the precast formwork, the two guide shells are used to directly guide the concrete into the space composed of the main shell, the auxiliary shell, the inclined plate, the base and the two sealing strips. Then, the started delivery pump, the three-way pipe, the connecting pipe and the discharge pipe are used to extract the concrete in the space and deliver it to the box or collection tank for collecting concrete.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] 1. The present invention, by setting an auxiliary mechanism, can always monitor whether the precast template is deformed during the concrete pouring process, and at the same time, the leaked concrete can be disposed of, thereby achieving timely stop-loss, which not only improves the use effect of the precast template of the small box girder of the ramp bridge, but also improves the use efficiency of the precast template of the small box girder of the ramp bridge. When the entire precast template is assembled, the controller, the strain threshold value set in advance by the controller, the two long strain gauges and the prepared alarm are directly used to know whether concrete leakage occurs during the concrete pouring process of the precast template, and when concrete leakage occurs, an alarm is promptly sounded to remind the staff.

[0023] 2. The present invention utilizes the capacitance value threshold value pre-set by the controller, the cooperation between the controller and the water drop sensor, so as to control whether the delivery pump is started. Subsequently, by utilizing the cooperation of the started delivery pump, the tee pipe, the connecting pipe and the discharge pipe, the concrete inside the space composed of the main shell, the auxiliary shell, the inclined plate, the base and the two sealing strips can be extracted and delivered to a box or a collection tank for collecting concrete, thereby reducing waste of resources.

[0024] 3. The present invention can realize the production of small box beams by setting up a formwork mechanism. When the formwork mechanism needs to be assembled, the two long side panels, the two short side panels and the bottom panel can be spliced ​​together by first using a special hanger, two long support frames and two short support frames. Then, the two long side panels, the two short side panels and the bottom panel can be tightly fixed together by using a plurality of short panels, a second bolt and a second nut. Then, the two short side panels and the two auxiliary panels can be used to fix the two top panels on the tops of the two long side panels, respectively. Then, the two cover panels are respectively installed on the two bottom panels to complete the composition of the formwork mechanism. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 A three-dimensional diagram of a prefabricated template system for a small box girder of a ramp bridge according to the present invention;

[0026] Figure 2 It is a schematic diagram of the partial structure of a ramp bridge small box girder prefabricated template system from an upward angle according to the present invention;

[0027] Figure 3 It is a schematic diagram of the partial structure from a side view of a prefabricated template system for a small box girder of a ramp bridge according to the present invention;

[0028] Figure 4 It is a structural schematic diagram of a main shell, a sealing strip and an L-shaped groove of a prefabricated template system for a small box girder of a ramp bridge of the present invention;

[0029] Figure 5 It is a structural schematic diagram of a main shell, an auxiliary shell, a connecting block and an inclined plate of a prefabricated template system for a small box girder of a ramp bridge of the present invention;

[0030] Figure 6 A top-down perspective view of a prefabricated template system for a small box girder of a ramp bridge according to the present invention;

[0031] Figure 7 It is a schematic diagram of the structure of a small box girder prefabricated template system for a ramp bridge according to the present invention from another angle;

[0032] Figure 8 It is a schematic diagram of the partial structure of a template mechanism of a ramp bridge small box girder prefabricated template system from a side view of the present invention;

[0033] Fig. 9 It is a schematic diagram of the partial structure of a prefabricated template system for a small box girder of a ramp bridge according to the present invention from a side view;

[0034] Fig.10 It is a schematic diagram of the structure of the auxiliary mechanism of a ramp bridge small box girder prefabricated template system of the present invention;

[0035] Fig.11 It is a partial structural cross-sectional view of a prefabricated template system for a small box girder of a ramp bridge according to the present invention;

[0036] Fig.12 It is a partial structural sectional view of a prefabricated formwork system for a small box girder of a ramp bridge according to the present invention.

[0037] In the figure:

[0038] 1. Template mechanism; 101. Short side plate; 102. Short support frame; 103. First reinforcement member; 104. Oblique block; 105. Long support frame; 106. Second reinforcement member; 107. Long side plate; 108. Top plate; 109. Cover plate; 110. Auxiliary plate; 111. Base; 112. Bottom plate; 113. Short plate; 2. Auxiliary mechanism; 201. Main shell; 202. Auxiliary shell; 203. Connecting plate; 204. Connecting block; 205. Oblique plate; 206. Sealing strip; 207. Guide shell; 208. Water drop sensor; 209. L-shaped plate; 210. L-shaped groove; 211. Tee pipe; 212. Delivery pump; 213. Connecting pipe; 214. Discharge pipe; 215. Controller; 216. Long strain gauge. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] Example 1: Please refer to Figure 1-Figure 12As shown, the present invention provides a technical solution: a prefabricated formwork system for a small box girder of a ramp bridge, comprising a formwork mechanism 1, the formwork mechanism 1 comprising two short side plates 101, short support frames 102 are fixed to opposite sides of the two short side plates 101, a plurality of first reinforcement members 103 are evenly distributed and fixed on each short support frame 102, a group of inclined blocks 104 are fixed on each short support frame 102, and the surfaces of each group of inclined blocks 104 are respectively fixed to the surfaces of each short side plate 101, and each The number of the inclined blocks 104 is two, and two symmetrical long side plates 107 are installed between the opposite sides of the two short side plates 101. Long support frames 105 are fixed to the opposite sides of the two long side plates 107. Multiple second reinforcement members 106 are evenly distributed and fixed on the two long support frames 105. Two top plates 108 are slidably embedded between the tops of the two short side plates 101, and the bottoms of the two top plates 108 are respectively in contact with the tops of the two long side plates 107, and the tops of the two top plates 108 are A cover plate 109 is placed on each of the two short side plates 101, and the two cover plates 109 are located between the opposite sides of the two short side plates 101. Auxiliary plates 110 are fixed on the tops of the two long side plates 107, and the opposite sides of the two auxiliary plates 110 are respectively in contact with the opposite sides of the two cover plates 109. A bottom plate 112 is installed between the opposite sides of the two short side plates 101, and the opposite sides of the bottom plate 112 are respectively in contact with the opposite sides of the two long side plates 107. A base 111 is provided at the bottom of the bottom plate 112. Short plates 113 are fixed at the four bottom corners of 112 and the bottoms of the two long side plates 107 near the two ends, and the two contacting short plates 113 are installed by a second bolt and a second nut. The bottoms of the two main shells 201, the bottoms of the two auxiliary shells 202, the two sealing strips 206 and the bottom of the base 111 are in the same horizontal plane. An auxiliary mechanism 2 is arranged on the template mechanism 1, and the auxiliary mechanism 2 includes a main shell 201, two guide shells 207 and two long strain gauges 216.

[0041] In this embodiment, when the components of the auxiliary mechanism 2 (except the two long strain gauges 216) are assembled, the two long side plates 107 are first moved by using the cooperation of the special lifting device and the two long support frames 105 until the opposite sides of the two long side plates 107 are in contact with the front surface of the bottom plate 112 and the rear surface of the bottom plate 112, and then the two short side plates 101 are moved by using the cooperation of the special lifting device and the two short support frames 102 until the opposite sides of the two short side plates 101 are in contact with the two sides of the bottom plate 112 respectively, and the two sides of each long side plate 107 are in contact with the opposite sides of the two short side plates 101 respectively, and then the prepared second bolts, multiple short plates 113 and second nuts are used to cooperate. Fix the bottom plate 112, the two short side plates 101 and the two long side plates 107 together, then symmetrically install the two top plates 108 between the two short side plates 101, and then install the two cover plates 109 on the two top plates 108 respectively, to complete the assembly of the formwork mechanism 1, and then install the two long strain gauges 216 on the two long side plates 107 respectively. When the precast formwork of the small box girder of the ramp bridge is assembled, the tied steel bar frame is directly placed inside the precast formwork, and then a proper amount of concrete is injected into the precast formwork. When the concrete in the precast formwork in normal use has been standing for a period of time, the precast formwork can be directly removed from the formed small box girder.

[0042] Embodiment 2: According to Figure 1-Figure 10 and Fig.12As shown, the template mechanism 1 is provided with an auxiliary mechanism 2, which includes a main shell 201, two guide shells 207 and two long strain gauges 216. An auxiliary shell 202 is provided on one side of the main shell 201. A connecting plate 203 is fixed near the bottom of one side of the auxiliary shell 202. Connecting blocks 204 are installed near the top of the inner wall of the main shell 201 and the inner wall of the auxiliary shell 202. An inclined plate 205 is fixed at the bottom of the inner wall of the main shell 201. A sealing strip 206 is bonded to the inner wall of the main shell 201 and the inner wall of the auxiliary shell 202. A water drop sensor 208 is installed on the surface, two symmetrical L-shaped plates 209 are fixed on the other side of the auxiliary shell 202, two symmetrical L-shaped grooves 210 are opened on one side of the main shell 201, a three-way pipe 211 is installed between the two discharge ends of the auxiliary shell 202, a delivery pump 212 is installed on the top of the connecting plate 203, a connecting pipe 213 is installed on the feed end of the delivery pump 212, and a discharge pipe 214 is installed on the discharge end of the delivery pump 212. A controller 215 is installed on the other side of the main shell 201, and the bottom of the inclined plate 205 contacts the bottom of the inner wall of the auxiliary shell 202. The water drop sensor 208 is installed on the surface of the auxiliary shell 202, two symmetrical L-shaped plates 209 are fixed on the other side of the auxiliary shell 202, and two symmetrical L-shaped grooves 210 are opened on one side of the main shell 201. A three-way pipe 211 is installed between the two discharge ends of the auxiliary shell 202, a delivery pump 212 is installed on the top of the connecting plate 203, a connecting pipe 213 is installed on the feed end of the delivery pump 212, and a discharge pipe 214 is installed on the discharge end of the delivery pump 212. A controller 215 is installed on the other side of the main shell 201, and the bottom of the inclined plate 205 contacts the bottom of the inner wall of the auxiliary shell 202. The detection end of 08 is movably sleeved inside the detection port on the front surface of the auxiliary shell 202, and the two L-shaped plates 209 are movably sleeved inside the two L-shaped grooves 210 respectively. The main shell 201 and the auxiliary shell 202 are connected by the first bolt and the first nut. The opposite sides of the two sealing strips 206 are in contact with each other. The feed end of the connecting pipe 213 is connected to the discharge end of the three-way pipe 211. The discharge ports of the two guide shells 207 are located between the inner wall of the main shell 201 and the inside of the auxiliary shell 202. The template mechanism 1 includes two short side plates 101, and two short side plates 101 are installed between the opposite sides. A bottom plate 112 is installed between the symmetrical long side plates 107 and the opposite sides of the short side plates 101, and a base 111 is arranged at the bottom of the bottom plate 112. The inner surfaces of the two sealing strips 206 are in contact with the surface of the base 111, and the inner surface of the inclined plate 205 is in contact with the surface of the base 111. The opposite sides of the two guide shells 207 are respectively fixed to the front surface of the base 111 and the rear surface of the base 111. The two long strain gauges 216 are respectively bonded and connected to the middle position of the opposite sides of the two long side plates 107, and the opposite sides of the two connecting blocks 204 are respectively fixed to the two sides of the base 111.

[0043] In this embodiment, when it is necessary to make a small box girder of a ramp bridge, the auxiliary shell 202 is first moved by a professional tool, so that the moving auxiliary shell 202 drives the sealing strip 206 connected thereto, the two L-shaped plates 209 connected thereto, the connecting plate 203 connected thereto, the inclined plate 205 connected thereto, and the three-way pipe 211 connected thereto to move synchronously, until the inner surface of the moving sealing strip 206 and the inner surface of the inclined plate 205 are in contact with the surface of the base 111, and then the main shell 201 is driven to move by a professional tool, so that the moving main shell 201 drives the sealing strip 206 connected thereto to move, until the inner surface of the moving sealing strip 206 is in contact with the surface of the base 111, and the opposite sides of the two sealing strips 206 are in contact ... and then the sealing strip 206 is driven to move by the moving main shell 201, and the sealing strip 206 is driven to move by the moving main shell 201, and the sealing strip 206 is driven to move by the moving main shell 201, and the sealing strip 206 is driven to move by the moving main shell 201, and the sealing strip 206 is driven to move by the moving main shell 201, and the sealing strip 206 is driven to move by the moving main shell 201, and the sealing strip 206 is driven to The first bolt and the first nut cooperate to fix the main shell 201 and the auxiliary shell 202 together, and at the same time, the main shell 201 and the auxiliary shell 202 are respectively installed together with the two connecting blocks 204, and then the delivery pump 212 is installed on the connecting plate 203, and the controller 215 and the water drop sensor 208 are installed on the auxiliary shell 202, and then the feed end of the connecting pipe 213 connected to the feed end of the delivery pump 212 is installed together with the discharge end of the three-way pipe 211, and then the discharge end of the discharge pipe 214 connected to the discharge end of the delivery pump 212 is placed in a box or collection tank for collecting concrete, and finally the controller 215 is connected to the external power supply through the prepared power cord, and the controller 215 is also connected to the prepared alarm. Together, and after completing the connection operation, turn on the controller 215, set the strain threshold, capacitance value threshold and basic usage procedures, when everything is ready, assemble the template mechanism 1, and then install the two long strain gauges 216 on the two long side plates 107 respectively. When the entire prefabricated template is assembled, the tied steel bar frame is directly placed inside the prefabricated template, and then a proper amount of concrete is injected into the interior of the prefabricated template. At the same time, the water drop sensor 208 and the two long strain gauges 216 are turned on by the controller 215. At this time, the turned-on water drop sensor 208 and the two long strain gauges 216 will continuously detect, and transmit the strain data and the two capacitance value data detected each time to the controller 215, and then the controller 215 The strain data and two capacitance value data received each time will be compared with the strain threshold and capacitance value threshold set in advance by the controller 215 respectively. When the strain data received by the controller 215 is less than the strain threshold set in advance by the controller 215, and the capacitance value data received by the controller 215 is less than the capacitance value threshold set in advance by the controller 215, it means that the prefabricated template is used normally and the controller 215 will not start the delivery pump 212. When the strain data received by the controller 215 is less than the strain threshold set in advance by the controller 215, and the capacitance value data received by the controller 215 is greater than the capacitance value threshold set in advance by the controller 215, it means that the prefabricated template is used normally and the controller 215 will not start the delivery pump 212.When the strain data received by the controller 215 is greater than the strain threshold value set in advance by the controller 215, and the capacitance value data received by the controller 215 is less than the capacitance value threshold value set in advance by the controller 215, it means that the precast template cannot be used normally. At this time, the controller 215 will send an alarm prompt to the staff through the alarm to remind the staff to stop injecting concrete into the precast template. At the same time, the concrete leaked from the gap between the long side plate 107 and the bottom plate 112 will directly enter the interior of the corresponding guide shell 207, and then be diverted to the space composed of the main shell 201, the auxiliary shell 202, the inclined plate 205, the base 111 and the two sealing strips 206 for storage, but the controller 215 will not start the delivery pump 212. When the strain data received by the controller 215 is greater than the strain threshold value set in advance by the controller 215, and the capacitance value data received by the controller 215 is less than the capacitance value threshold value set in advance by the controller 215, it means that the precast template cannot be used normally. At this time, the controller 215 will send an alarm prompt to the staff through the alarm to remind the staff to stop injecting concrete into the precast template. At the same time, the concrete leaked from the gap between the long side plate 107 and the bottom plate 112 will directly enter the interior of the corresponding guide shell 207, and then be diverted to the interior of the space composed of the main shell 201, the auxiliary shell 202, the inclined plate 205, the base 111 and the two sealing strips 206 for storage, but the controller 215 will not start the delivery pump 212. When the data is greater than the strain threshold value set in advance by the controller 215, and the capacitance value data received by the controller 215 is greater than the capacitance value threshold value set in advance by the controller 215, it means that the prefabricated template cannot be used normally. At this time, the controller 215 will send an alarm prompt to the staff through the alarm to remind the staff to stop injecting concrete into the prefabricated template. At the same time, the controller 215 will directly start the delivery pump 212. The delivery pump 212 that is subsequently started will, with the cooperation of the connecting pipe 213 and the three-way pipe 211, pump out the concrete that has reached the space composed of the main shell 201, the auxiliary shell 202, the inclined plate 205, the base 111 and the two sealing strips 206, and deliver it to the inside of the discharge pipe 214, and then deliver it to the box or collection tank for collecting concrete, that is, reduce resource waste.

[0044] The effect and working principle of the whole mechanism are as follows: when it is necessary to make a small box girder of a ramp bridge, the auxiliary shell 202 is first moved by a professional tool, so that the moving auxiliary shell 202 drives the sealing strip 206 connected thereto, the two L-shaped plates 209 connected thereto, the connecting plate 203 connected thereto, the inclined plate 205 connected thereto and the three-way pipe 211 connected thereto to move synchronously, until the inner surface of the moving sealing strip 206 and the inner surface of the inclined plate 205 are in contact with the surface of the base 111, and then the main shell 201 is driven to move by a professional tool, so that the moving main shell 201 drives the sealing strip 206 connected thereto to move, until the inner surface of the moving sealing strip 206 is in contact with the surface of the base 111, and the two sealing strips 206 are in contact with the inner surface of the moving sealing strip 206. The two sides are in contact with each other, and then the main shell 201 and the auxiliary shell 202 are fixed together by the cooperation of the first bolt and the first nut, and the main shell 201 and the auxiliary shell 202 are respectively installed together with the two connecting blocks 204, and then the delivery pump 212 is installed on the connecting plate 203, and the controller 215 and the water drop sensor 208 are installed on the auxiliary shell 202, and then the feed end of the connecting pipe 213 connected to the feed end of the delivery pump 212 is installed together with the discharge end of the three-way pipe 211, and then the discharge end of the discharge pipe 214 connected to the discharge end of the delivery pump 212 is placed in a box or collection tank for collecting concrete, and finally the controller 215 is connected to the external power supply through the prepared power cord, and the controller is 215 is also connected to the prepared alarm, and after completing the connection operation, turn on the controller 215, set the strain threshold, capacitance threshold and basic usage procedures, and when everything is ready, first use the special lifting device and the two long support frames 105 to move the two long side panels 107 until the opposite sides of the two long side panels 107 are in contact with the front surface of the bottom plate 112 and the rear surface of the bottom plate 112, and then use the special lifting device and the two short support frames 102 to move the two short side panels 101 until the opposite sides of the two short side panels 101 are in contact with the two sides of the bottom plate 112 respectively, and the two sides of each long side panel 107 are in contact with the opposite sides of the two short side panels 101 respectively, and then use the prepared second bolts, multiple The bottom plate 112, the two short side plates 101 and the two long side plates 107 are fixed together by the cooperation of the short plate 113 and the second nut, and then the two top plates 108 are symmetrically installed between the two short side plates 101, and then the two cover plates 109 are respectively installed on the two top plates 108, and then the two long strain gauges 216 are respectively installed on the two long side plates 107. When the prefabricated formwork of the small box girder of the ramp bridge is assembled, the tied steel bar frame is directly placed inside the prefabricated formwork, and then a proper amount of concrete is injected into the inside of the prefabricated formwork, and at the same time, the water drop sensor 208 and the two long strain gauges 216 are turned on by the controller 215. At this time, the opened water drop sensor 208 and the two long strain gauges 216 will continuously detect,The strain data and two capacitance value data detected each time are transmitted to the controller 215, and then the controller 215 will compare the strain data and two capacitance value data received each time with the strain threshold value and capacitance value threshold value set in advance by the controller 215, respectively. When the strain data received by the controller 215 is less than the strain threshold value set in advance by the controller 215, and the capacitance value data received by the controller 215 is less than the capacitance value threshold value set in advance by the controller 215, it means that the prefabricated template is used normally, and the controller 215 will not start the delivery pump 212. When the strain data received by the controller 215 is less than the strain threshold value set in advance by the controller 215, When the strain threshold value set by the controller 215 is exceeded, and the capacitance value data received by the controller 215 is greater than the capacitance value threshold value set in advance by the controller 215, it indicates that the prefabricated template is used normally, and the controller 215 will not start the delivery pump 212. When the strain data received by the controller 215 is greater than the strain threshold value set in advance by the controller 215, and the capacitance value data received by the controller 215 is less than the capacitance value threshold value set in advance by the controller 215, it indicates that the prefabricated template cannot be used normally. At this time, the controller 215 will send an alarm prompt to the staff through the alarm to remind the staff to stop injecting concrete into the prefabricated template, and at the same time, the long side plate 107 and the bottom plate 108 are used to inject concrete into the prefabricated template. The concrete leaking out from the gaps between the plates 112 will directly enter the interior of the corresponding guide shell 207, and then be diverted to the space composed of the main shell 201, the auxiliary shell 202, the inclined plate 205, the base 111 and the two sealing strips 206 for storage, but the controller 215 will not start the delivery pump 212. When the strain data received by the controller 215 is greater than the strain threshold value set in advance by the controller 215, and the capacitance value data received by the controller 215 is greater than the capacitance value threshold value set in advance by the controller 215, it means that the prefabricated template cannot be used normally. At this time, the controller 215 will send an alarm prompt to the staff through the alarm. , reminding the staff to stop injecting concrete into the precast formwork. At the same time, the controller 215 will directly start the delivery pump 212. The delivery pump 212 that is subsequently started will, with the cooperation of the connecting pipe 213 and the three-way pipe 211, pump out the concrete that has reached the space composed of the main shell 201, the auxiliary shell 202, the inclined plate 205, the base 111 and the two sealing strips 206, and deliver it to the inside of the discharge pipe 214, and then to the box or collection tank for collecting concrete, that is, to reduce resource waste. When the concrete in the precast formwork in normal use has completed a period of static operation, the precast formwork can be directly removed from the formed small box beam. ,

[0045] Among them, the first bolt, the first nut, the second bolt and the second nut are all commonly used parts in reality.

[0046] The water drop sensor 208 , the delivery pump 212 and the two long strain gauges 216 are all electrically connected to the controller 215 .

[0047] Wherein, both the short support frame 102 and the long support frame 105 have a leveling function.

[0048] Among them, the short support frame 102, the long support frame 105, the water drop sensor 208 (capacitive), the delivery pump 212, the controller 215 (PLC controller) and the long strain gauge 216 are all existing technologies, and their models can be selected according to actual conditions, and no further explanation is given here.

[0049] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A ramp bridge small box girder prefabricated formwork system, comprising a formwork mechanism (1), characterized in that: The template mechanism (1) is provided with an auxiliary mechanism (2); The auxiliary mechanism (2) comprises a main shell (201), two flow guide shells (207) and two long strain gauges (216); an auxiliary shell (202) is arranged on one side of the main shell (201); a connecting plate (203) is fixed near the bottom of one side of the auxiliary shell (202); connecting blocks (204) are installed near the top of the inner wall of the main shell (201) and near the top of the inner wall of the auxiliary shell (202); an inclined plate (205) is fixed at the bottom of the inner wall of the main shell (201); the inner wall of the main shell (201) and the inner wall of the auxiliary shell (202) are both bonded and connected with sealing strips (206); a water drop sensor (208) is installed on the front surface of the auxiliary shell (202); and two symmetrical L-shaped plates (208) are fixed on the other side of the auxiliary shell (202). 209), two symmetrical L-shaped grooves (210) are provided on one side of the main shell (201), a three-way pipe (211) is installed between the two discharge ends of the auxiliary shell (202), a delivery pump (212) is installed on the top of the connecting plate (203), a connecting pipe (213) is installed at the feed end of the delivery pump (212), and a discharge pipe (214) is installed at the discharge end of the delivery pump (212), a controller (215) is installed on the other side of the main shell (201), the bottom of the inclined plate (205) is in contact with the bottom of the inner wall of the auxiliary shell (202), the detection end of the water drop sensor (208) is movably sleeved inside the detection port on the front surface of the auxiliary shell (202), and the two L-shaped plates (209) are movably sleeved inside the two L-shaped grooves (210) respectively; The controller (215) is connected to the alarm. The controller (215), the strain threshold value set in advance by the controller (215), the two long strain gauges (216) and the prepared alarm are used to monitor whether concrete leakage occurs during the concrete pouring process of the prefabricated template. Then, the capacitance value threshold value set in advance by the controller (215), the controller (215) and the water drop sensor (208) are used to control whether the delivery pump (212) is started.

2. The ramp bridge small box girder prefabricated formwork system according to claim 1 is characterized in that: The main shell (201) and the auxiliary shell (202) are connected by a first bolt and a first nut, the opposite sides of the two sealing strips (206) are in contact with each other, the feed end of the connecting pipe (213) is connected to the discharge end of the three-way pipe (211), and the discharge ports of the two guide shells (207) are located between the inner wall of the main shell (201) and the interior of the auxiliary shell (202).

3. The ramp bridge small box girder prefabricated formwork system according to claim 2 is characterized in that: The template mechanism (1) comprises two short side plates (101), and short support frames (102) are fixed on opposite sides of the two short side plates (101), and a plurality of first reinforcement members (103) are evenly distributed and fixed on each of the short support frames (102).

4. The ramp bridge small box girder prefabricated formwork system according to claim 3 is characterized in that: A group of inclined blocks (104) is fixed on each of the short support frames (102), and the surface of each group of inclined blocks (104) is respectively fixed to the surface of each short side plate (101), and the number of each group of inclined blocks (104) is two, and two symmetrical long side plates (107) are installed between the opposite sides of the two short side plates (101), and the opposite sides of the two long side plates (107) are fixed with long support frames (105), and multiple second reinforcement members (106) are evenly distributed and fixed on the two long support frames (105).

5. The ramp bridge small box girder prefabricated formwork system according to claim 4 is characterized in that: Two top plates (108) are slidably embedded between the tops of the two short side plates (101), and the bottoms of the two top plates (108) are respectively in contact with the tops of the two long side plates (107), and cover plates (109) are placed on the tops of the two top plates (108), and the two cover plates (109) are located between the opposite sides of the two short side plates (101), and auxiliary plates (110) are fixed on the tops of the two long side plates (107).

6. The ramp bridge small box girder prefabricated formwork system according to claim 5 is characterized in that: The opposite sides of the two auxiliary plates (110) are in contact with the opposite sides of the two cover plates (109), a bottom plate (112) is installed between the opposite sides of the two short side plates (101), the opposite sides of the bottom plate (112) are in contact with the opposite sides of the two long side plates (107), and a base (111) is provided at the bottom of the bottom plate (112).

7. The ramp bridge small box girder prefabricated formwork system according to claim 6 is characterized in that: Short plates (113) are fixed at the four corners of the bottom of the bottom plate (112) and the bottoms of the two long side plates (107) near both ends, and the two short plates (113) in contact are mounted via a second bolt and a second nut. The bottoms of the two main shells (201), the bottoms of the two auxiliary shells (202), the two sealing strips (206) and the bottom of the base (111) are in the same horizontal plane.

8. The ramp bridge small box girder prefabricated formwork system according to claim 7 is characterized in that: The inner surfaces of the two sealing strips (206) are in contact with the surface of the base (111), the inner surface of the inclined plate (205) is in contact with the surface of the base (111), the opposite sides of the two guide shells (207) are respectively fixed to the front surface of the base (111) and the rear surface of the base (111), the two long strain gauges (216) are respectively bonded to the middle position of the opposite sides of the two long side plates (107), and the opposite sides of the two connecting blocks (204) are respectively fixed to the two sides of the base (111).

9. A method for prefabricating a small box girder formwork system for a ramp bridge, characterized in that: The ramp bridge small box girder prefabricated template system according to claim 8 is used, comprising the following steps: S1. When it is necessary to manufacture a small box girder for a ramp bridge, first move the auxiliary shell (202) with a sealing strip (206), two L-shaped plates (209), a connecting plate (203), an inclined plate (205) and a three-way pipe (211) and the main shell (201) with a sealing strip (206) toward each other until the opposite sides of the two are in contact, and then fix the two together with a first bolt and a first nut, and then install the delivery pump (212), the connecting plate (203), the connecting pipe (213), the discharge pipe (214), the water drop sensor (208) and the controller (215), and then connect the controller (215) to an external power supply, turn on the controller (215), and set the strain threshold, capacitance threshold and basic usage procedures; S2. Then, using a special hanger, two long support frames (105) and two short support frames (102), the two long side plates (107), the two short side plates (101) and the bottom plate (112) are spliced ​​together. Then, using a plurality of short plates (113), a second bolt and a second nut, the two long side plates (107), the two short side plates (101) and the bottom plate (112) are tightly fixed together. Finally, using the two short side plates (101) and two auxiliary plates (110), the two top plates (108) are respectively fixed on the top of the two long side plates (107). At the same time, the two long strain gauges (216) and the two cover plates (109) are also installed in appropriate positions. Thus, the assembly of the prefabricated template is completed. S3, when the entire prefabricated template is assembled, the controller (215), the strain threshold value set in advance by the controller (215), the two long strain gauges (216) and the prepared alarm are used to monitor whether concrete leakage occurs during the concrete pouring process of the prefabricated template, and then the capacitance value threshold value set in advance by the controller (215), the controller (215) and the water drop sensor (208) are used to control whether the delivery pump (212) is started; S4. When concrete leakage occurs in the precast formwork, the two guide shells (207) are directly used to guide the concrete into the space composed of the main shell (201), the auxiliary shell (202), the inclined plate (205), the base (111) and the two sealing strips (206). Then, the started delivery pump (212), the three-way pipe (211), the connecting pipe (213) and the discharge pipe (214) are used to extract the concrete in the space and deliver it to a box or a collection tank for collecting concrete.

Citation Information

Patent Citations

  • Building concrete wallboard pouring device

    CN116533370A

  • Steel formwork device with adjustable transverse width

    CN118046466A