Production device for steel belt reinforced corrugated pipe of side-by-side binding system

By designing a side-by-side bundling system steel belt reinforced corrugated pipe production device, the existing corrugated pipe connection structure is solved, and efficient and reliable corrugated pipe connection is achieved, reducing the risk of failure.

CN119502384AInactive Publication Date: 2025-02-25EVOLUTION OF YUNNAN PIPE TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411753263.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2025-02-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing bellows connection structure is simple, the installation part is weak, and there is a high risk of failure. It is difficult to ensure that the joint part is clean under the construction environment, which is prone to pollution, affecting the reliability of the connection.

Method used

A side-by-side bundling system steel belt reinforced corrugated pipe production device is designed. Through this device, the banding and assembly of multiple corrugated pipes can be efficiently and quickly completed to ensure that the interface part is clean before installation and avoid contamination caused by unclean cleaning on site.

Benefits of technology

This device can reduce the difficulty of on-site bandaging operations, improve production efficiency, avoid exposure and contamination at the interface, enhance connection reliability, and reduce failure risk.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119502384A_ABST
    Figure CN119502384A_ABST
Patent Text Reader

Abstract

The invention discloses a production device for a side-by-side binding system steel belt reinforced corrugated pipe. The production device comprises a plurality of sections of conveyors, a positioning seat and a plurality of hanging rods, a positioning seat is arranged on the conveyor; the binding belt, the geogrid, the geotechnical cloth and the polyethylene steel wire mesh pipe are superposed and pre-arranged on the positioning seat in the direction from the positioning seat to the top surface of the corrugated pipe; the conveyor pushes the corrugated pipe to a positioning seat between the polyethylene steel wire mesh pipes; the extending ends of the two sides of the geogrid and the geotextile extend out of the positioning seats and are hung on the opposite side surfaces of the hanging rods; after the corrugated pipe is fed, filling the polyethylene steel wire mesh pipe in a gap of the corrugated pipe; and the extending ends on the two sides of the geogrid and the geotextile are lapped and then bound by a binding belt. By the adoption of the device, binding and assembling of the multiple corrugated pipes can be efficiently and rapidly completed, site construction is not needed, site binding operation difficulty is reduced, efficiency is improved, and meanwhile the problem that connector connection reliability is reduced due to the fact that connector ends are polluted by environmental pollutants is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of corrugated pipe production, and in particular to a production device for corrugated pipes reinforced with steel strips in a side-by-side bundling system. Background Art

[0002] Steel belt reinforced polyethylene (PE) spiral corrugated pipe is a pipe structure with a corrugated structure made by compounding steel belt and PE. With high-density polyethylene (PE) as the matrix, the wavy structure formed by high steel belt coated with adhesive resin on the surface is used as the main supporting component, and the polyethylene composite material is interwoven with each other, and the steel belts are welded and connected through PE to form a complete double-wall spiral corrugated pipe. This pipe has the ultra-high rigidity and high strength of ordinary steel, and also has the flexibility, corrosion resistance and wear resistance of polyethylene composite materials. Due to its advanced material, simple implementation method, high construction efficiency, and material cost saving, it is widely used in municipal drainage pipe networks.

[0003] When the drainage network is used, it is necessary to connect the corrugated pipe to the other end of the pipe, the corrugated pipe to the inspection well, and the wellbore pipe to the well seat. The commonly used connection methods for these parts are: socket connection, welding connection and heat shrink tape connection, but the existing connection structure is simple, the installation part is weak, and there is a high risk of failure.

[0004] The existing connection methods are subject to the constraints of the construction environment. It is difficult to obtain a clean construction environment. It is impossible to ensure that the joint parts after the pollutants have been removed are clean before construction. The contaminated joints are used for subsequent connection construction, which will lead to a decrease in the reliability of the connection at the joint. The existing heat-shrinkable protective sleeves are all made of plastic, which easily react with the PE surface when heated, resulting in damage to the pipe surface when the protective sleeve is removed, increasing the risk of corrosion. When the local connection position of the underground pipeline fails, it will cause sewage and groundwater leakage, pollute the soil, and waste water resources.

[0005] At the same time, the existing corrugated pipes are also used in road drainage pipes. As pointed out in "[1] Dong Hanlin. Research on the mechanical properties of polyethylene spiral corrugated pipe culverts reinforced with soil-covered steel belts [D]. Beijing Jiaotong University, 2022. DOI: 10.26944 / d.cnki.gbfju.2022.001756.", under the same deformation rate, the corrugated pipes set up in a side-by-side bundling system have the highest arch soil bearing capacity. However, to obtain this structure, three steel belt-reinforced PE corrugated pipes must be arranged side by side on the construction site, and a polyethylene steel wire mesh pipe with a diameter of 125 mm must be filled in the gap between adjacent corrugated pipes. The pipes are wrapped and bundled with geotextiles and geogrids laid on their outer walls. This makes operation difficult and construction difficult in a construction environment. At the same time, it is easy for the interface of the structure to be adhered to by environmental pollutants, reducing the reliability of the interface connection and increasing the risk of leakage at the interface after construction.

[0006] The information disclosed in the background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an admission or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art. Summary of the invention

[0007] In view of the above-mentioned technical problems, the present application provides a production device for a side-by-side bundling system steel belt reinforced corrugated pipe. The device can effectively realize the production of side-by-side bundling system steel belt reinforced corrugated pipes in the production stage. The pipe has good stress-bearing characteristics, and after bundling, the interface of this type of pipe can be avoided from being exposed. Before installation, the interface part can be kept clean to avoid contamination caused by unclean on-site cleaning, which affects the reliability of the interface connection.

[0008] The present application provides a production device for a side-by-side bundling system steel belt reinforced corrugated pipe, which comprises: a plurality of corrugated pipes arranged close to the side walls side by side, a polyethylene steel wire mesh pipe filled in the gaps between the upper and lower parts of any two corrugated pipes, a geotextile arranged close to the pipe body, a geogrid arranged on the outer wall of the geotextile, and a binding belt; the binding belt is arranged outside the geogrid;

[0009] It includes: a multi-stage conveyor, a positioning seat, and a plurality of hanging rods; the positioning seat is arranged on the conveyor; the binding belt, geogrid, geotextile, and polyethylene steel wire mesh pipe are pre-placed on the positioning seat in a stacked manner from the positioning seat to the top surface of the corrugated pipe; the conveyor pushes the corrugated pipe to the positioning seat between the polyethylene steel wire mesh pipes;

[0010] The extended ends on both sides of the geogrid and geotextile extend out of the positioning seat and are hung on the opposite sides of the hanging rod;

[0011] After the corrugated pipe is fed, the polyethylene wire mesh pipe is filled in the gap of the corrugated pipe; the extended ends on both sides of the geogrid and geotextile are overlapped and tied with binding belts.

[0012] Preferably, the conveyor comprises: a feed section conveyor, a middle conveyor, and a discharge section conveyor; the discharge end of the feed section conveyor is aligned with the bottom of the positioning seat groove arranged on the middle conveyor; the discharge end of the middle conveyor is aligned with the feed end of the discharge section conveyor.

[0013] Preferably, a gantry crane is suspended on the discharge end of the discharge section conveyor.

[0014] Preferably, the positioning seat comprises: a wide groove, a narrow groove, and a base; the base is provided with a wide groove and a narrow groove symmetrically arranged in pairs along the central axis; the polyethylene steel wire mesh tube support is arranged in the narrow groove; the corrugated tube support is arranged in the wide groove.

[0015] Preferably, the hanging rod comprises: a mounting seat and a hook; the mounting seat is arranged on the opposite surface of the hanging rod; and the hook is arranged on the mounting seat.

[0016] Preferably, after the edges and corners of the geogrid and geotextile are aligned and stacked, a plurality of hanging holes are opened through the geogrid and geotextile; hanging belts are hung on the hanging holes; the free end of the hanging belt is hung on the hook; and the free end of the hanging belt is tied to the binding belt plate.

[0017] Preferably, a breeding block is arranged on the free end of the hanging belt.

[0018] Preferably, the hanging holes are respectively opened on the top corners of the stacked geogrids and geotextiles.

[0019] Preferably, the wide grooves are arranged on the base at intervals from each other; and the narrow grooves are arranged in pairs between adjacent wide grooves.

[0020] Preferably, the bellows comprises: a first bellows, a second bellows, and a third bellows; the first bellows, the second bellows, and the third bellows are supported and placed in the wide groove at intervals from each other;

[0021] The polyethylene steel wire mesh pipe includes: a first polyethylene steel wire mesh pipe, a second polyethylene steel wire mesh pipe, a third polyethylene steel wire mesh pipe, and a fourth polyethylene steel wire mesh pipe; the first polyethylene steel wire mesh pipe and the second polyethylene steel wire mesh pipe are supported and arranged in a narrow groove; the third polyethylene steel wire mesh pipe and the fourth polyethylene steel wire mesh pipe are placed in the first corrugated pipe, the second corrugated pipe and the upper part of the connecting grooves of the second corrugated pipe and the third corrugated pipe.

[0022] The beneficial effects of this application include:

[0023] 1) The side-by-side bundling system steel belt reinforced corrugated pipe production device provided in the present application can efficiently and quickly complete the packaging and assembly of multiple corrugated pipes without the need for on-site construction, thereby reducing the difficulty of on-site packaging operations and improving efficiency, while avoiding the problem of reduced interface connection reliability caused by contamination of the interface ends by environmental pollutants. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 A schematic front view of a device for producing a steel strip reinforced corrugated pipe in a side-by-side bundling system in at least one embodiment provided in the present application;

[0025] Figure 2 A schematic diagram of a side view and a front view of a hitch rod in at least one embodiment provided in the present application;

[0026] Figure 3 A schematic side view of a steel belt reinforced corrugated pipe in a side-by-side bundling system in at least one embodiment provided in the present application;

[0027] Figure 4 A schematic side view of a steel belt reinforced corrugated pipe in a conveying state of a side-by-side bundling system in at least one embodiment provided in the present application;

[0028] Figure 5 A schematic side view of a positioning seat in at least one embodiment provided in the present application;

[0029] Figure 6 A schematic diagram of a geotextile and a geogrid in at least one embodiment provided in the present application;

[0030] Legend:

[0031] Positioning seat 2, conveyor 3, feed section conveyor 321, middle conveyor 322, discharge section conveyor 323, wide slot 21, narrow slot 22, base 23, first corrugated pipe 111, second corrugated pipe 112, third corrugated pipe 113, first polyethylene steel wire mesh tube 121, second polyethylene steel wire mesh tube 122, third polyethylene steel wire mesh tube 123, fourth polyethylene steel wire mesh tube 124, hanging rod 31, mounting seat 312, hook 313, binding belt 14, geotextile 131, geogrid 132, hanging hole 133, hanging belt 134, counterweight 135. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0033] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] The technical means that are not described in detail in this application and are not used to solve the technical problems of this application are all set according to the common knowledge in the field, and can be implemented in a variety of common knowledge settings.

[0035] See also Figures 1 to 6 The application provides a production device for a steel belt reinforced corrugated pipe with a side-by-side bundling system.

[0036] The device is used to produce Figure 3The side-by-side bundled steel belt reinforced corrugated pipe shown in the figure comprises: a first corrugated pipe 111, a second corrugated pipe 112, a third corrugated pipe 113, a first polyethylene steel wire mesh pipe 121, a second polyethylene steel wire mesh pipe 122, a third polyethylene steel wire mesh pipe 123, a fourth polyethylene steel wire mesh pipe 124, a geotextile 131, and a geogrid 132;

[0037] The pipe body includes: a first polyethylene steel wire mesh pipe 121 arranged in the lower gap between the first corrugated pipe 111 and the second corrugated pipe 112; a second polyethylene steel wire mesh pipe 122 arranged in the lower gap between the second corrugated pipe 112 and the third corrugated pipe 113; a third polyethylene steel wire mesh pipe 123 arranged in the upper gap between the first corrugated pipe 111 and the second corrugated pipe 112; and a fourth polyethylene steel wire mesh pipe 124 arranged in the upper gap between the second corrugated pipe 112 and the third corrugated pipe 113.

[0038] The geotextile 131 is arranged close to the pipe body; the geogrid 132 is arranged to cover the outer wall of the geotextile 131, and the stacked geotextile 131 and geogrid 132 are arranged to wrap the pipe body.

[0039] The device includes: a positioning seat 2, a multi-section conveyor 3, and a plurality of hanging rods 31; the conveyor 3 includes: a feed section conveyor 321, a middle conveyor 322, and a discharge section conveyor 323; the feed section conveyor 321, the middle conveyor 322, and the discharge section conveyor 323 are connected end to end; a positioning seat 2 is arranged on the middle conveyor 322; the conveying plane of the discharge end of the feed section conveyor 321 is aligned with the groove bottom of the positioning seat 2 on the middle conveyor 322; and the first corrugated pipe 111, the second corrugated pipe 112, and the third corrugated pipe 113 can be pushed into the groove of the positioning seat 2 respectively by a separate feeding method.

[0040] After laying the binding belt 14 , geogrid 132 , and geotextile 131 in the groove of the positioning seat 2 , the binding belt 14 contacts the bottom of the groove of the positioning seat 2 ; the geogrid 132 is placed on the binding belt 14 ; and the geotextile 131 is placed on the geogrid 132 .

[0041] Both ends of the binding belt 14, geogrid 132 and geotextile 131 extend out of the positioning seat 2, and the two protruding ends of the geogrid 132 and geotextile 131 are hung on the opposite sides of the hanging rods 31 symmetrically arranged on both sides of the conveyor 3; the geotextile 131 is laid on the geogrid 132, and both ends of the geotextile 131 extend out of the positioning seat 2 and are hung on the opposite sides of the hanging rods 31 symmetrically arranged on both sides of the conveyor 3, and overlap with the geogrid 132.

[0042] According to production needs, the first polyethylene steel wire mesh tube 121 and the second polyethylene steel wire mesh tube 122 are pre-placed in the positioning seat 2; the first polyethylene steel wire mesh tube 121 and the second polyethylene steel wire mesh tube 122 are pre-placed on the geotextile 131 and crimped with the geotextile 131. After the first corrugated tube 111, the second corrugated tube 112 and the third corrugated tube 113 are pushed into the positioning seat 2, the third polyethylene steel wire mesh tube 123 and the fourth polyethylene steel wire mesh tube 124 are filled in the grooves on the upper parts of the first corrugated tube 111, the second corrugated tube 112 and the third corrugated tube 113; after the extended ends of the stacked materials of the geotextile 131 and the geogrid 132 are removed and thrown to the opposite side, they are covered on the tops of the first corrugated tube 111, the second corrugated tube 112, the third corrugated tube 113, the third polyethylene steel wire mesh tube 123 and the fourth polyethylene steel wire mesh tube 124, and then tied to obtain the structure. After the assembly is completed, the middle conveyor 322 is started to convey the assembled side-by-side bundling system steel belt reinforced corrugated pipe to the discharge section conveyor 323. After being hoisted by the gantry crane, it is transported and sold.

[0043] The device can be used to quickly realize the production of corrugated pipes reinforced with steel strips in a side-by-side bundling system. At the same time, there is less pollution in the factory environment, which can avoid residual pollutants on the interface end faces of the structure, resulting in reduced connection reliability after connection.

[0044] The third polyethylene steel wire mesh pipe 123 and the fourth polyethylene steel wire mesh pipe 124 can be placed using a gantry crane according to the diameter of the corrugated pipe used.

[0045] In a specific embodiment, the positioning seat 2 includes: a wide groove 21, a narrow groove 22, and a base 23; the top surface of the base 23 is symmetrically provided with a pair of wide grooves 21 and narrow grooves 22 along the central axis; the wide grooves 21 and narrow grooves 22 in this application are relative, and the groove width of the wide groove 21 is wider than the narrow groove 22, so it is the wide groove 21. The bottom surface of the corrugated pipe is placed in the wide groove 21; the polyethylene steel wire mesh pipe is placed in the narrow groove 22; the bottom surface of the wide groove 21 and the narrow groove 22 is flush with the top surface of the feed section conveyor 321, and a guide plate can also be provided according to the need of the setting position to facilitate the first corrugated pipe 111, the second corrugated pipe 112, and the third corrugated pipe 113 to enter the wide groove 21 under the push of the feed section conveyor 321.

[0046] In a specific embodiment, a mounting seat 312 and a hook 313 are provided on opposite surfaces of the hanging rod 31 ; the mounting seat 312 is provided on the upper portion of the hanging rod 31 ; the hook 313 is provided on the outer side wall of the mounting seat 312 and is hooked with the extended ends of the geotextile 131 and the geogrid 132 .

[0047] In a specific embodiment, a plurality of hanging holes 133 are aligned on the geotextile 131 and the geogrid 132; a hanging belt 134 is inserted into the hanging hole 133; a counterweight 135 is arranged on the free end of the hanging belt 134; the length of the hanging belt 134 can be adjusted according to the specific environment, so that after the geotextile 131 and the geogrid 132 are pre-laid, the extended end of the geotextile 131 and the geogrid 132 can be hung on the hook 313. After the counterweight 135 is arranged, when the extended end of the geotextile 131 and the geogrid 132 is overlapped, the operator drives the hanging belt 134 to move in a directional manner by throwing the counterweight 135, thereby driving the extended end of the geotextile 131 and the geogrid 132 to move in a directional manner.

[0048] In a specific embodiment, the overlapping operation can also be completed by the operator hooking the hanging belt 134 on the opposite side of the geotextile 131 and the geogrid 132 through a hook, dragging the geotextile 131 and the geogrid 132 to move to the opposite side. The pre-set hanging belt 134 facilitates the subsequent tying operation.

[0049] The specific operation is to lay the geogrid 132 after laying the binding belt 14 on the positioning seat 2, and lay other components according to the structure. The two ends of the binding belt 14 pre-placed on the positioning seat 2 extend out of the geogrid 132. After the assembly is completed, the hanging belt 134 set on the extended end of the geotextile 131 and the geogrid 132 is tied with the pre-placed binding belt 14 to complete the binding operation.

[0050] In a specific embodiment, the hook holes 133 simultaneously penetrate the top corners or the middle of the sides of the stacked geotextiles 131 and geogrids 132, and this arrangement can improve the convenience of the overlapping operation. The hook rod 31 is arranged directly opposite the hook hole 133, so that the extended end of the geotextile 131 can be hung during assembly to avoid blocking the corrugated pipe from entering the pipe.

[0051] In a specific embodiment, the corrugated pipe is a steel belt reinforced PE corrugated pipe.

[0052] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A production device for a side-by-side bundling system steel strip reinforced corrugated pipe, the side-by-side bundling system steel strip reinforced corrugated pipe comprising: A plurality of corrugated pipes arranged near the side walls, a polyethylene steel wire mesh pipe filled in the gaps at the upper and lower parts of any two corrugated pipes, a geotextile (131) arranged near the pipe body, a geogrid (132) arranged on the outer wall of the geotextile (131), and a binding belt (14); the binding belt is arranged outside the geogrid (132); The invention is characterized in that it comprises: a multi-stage conveyor (3), a positioning seat (2), and a plurality of hanging rods (31); a positioning seat (2) is arranged on the conveyor (3); a binding belt (14), a geogrid (132), a geotextile (131), and a polyethylene steel wire mesh pipe are pre-placed on the positioning seat (2) in a stacked manner from the positioning seat (2) toward the top surface of the corrugated pipe; and the conveyor (3) pushes the corrugated pipe onto the positioning seat (2) between the polyethylene steel wire mesh pipes; The extended ends on both sides of the geogrid (132) and the geotextile (131) extend out of the positioning seat (2) and are hung on the opposite sides of the hanging rod (31); After the corrugated pipe is fed, the polyethylene steel wire mesh pipe is filled in the gap of the corrugated pipe; the extended ends of the geogrid (132) and the geotextile (131) on both sides are overlapped and tied with a tying belt (14).

2. The device for producing a steel strip reinforced corrugated pipe in a side-by-side bundling system according to claim 1 is characterized in that: The conveyor (3) comprises: a feed section conveyor (321), a middle conveyor (322), and a discharge section conveyor (323); the discharge end of the feed section conveyor (321) is aligned with the bottom of a groove of a positioning seat (2) arranged on the middle conveyor (322); and the discharge end of the middle conveyor (322) is aligned with the feed end of the discharge section conveyor (323).

3. The device for producing a corrugated pipe reinforced with steel strips in a side-by-side bundling system according to claim 2 is characterized in that: A gantry crane is suspended on the discharge end of the discharge section conveyor (323).

4. The device for producing a steel strip reinforced corrugated pipe in a side-by-side bundling system according to claim 1 is characterized in that: The positioning seat (2) comprises: a wide groove (21), a narrow groove (22), and a base (23); the base (23) is provided with a pair of wide grooves (21) and narrow grooves (22) symmetrically arranged along a central axis; a polyethylene steel wire mesh pipe support is arranged in the narrow groove (22); and a corrugated pipe support is arranged in the wide groove (21).

5. The device for producing a steel strip reinforced corrugated pipe in a side-by-side bundling system according to claim 1 is characterized in that: The hooking rod (31) comprises: a mounting seat (312) and a hook (313); the mounting seat (312) is arranged on the opposite surface of the hooking rod (31); and the hook (313) is arranged on the mounting seat (312).

6. The device for producing a steel strip reinforced corrugated pipe in a side-by-side bundling system according to claim 5 is characterized in that: After the edges and corners of the geogrid (132) and the geotextile (131) are aligned and stacked, a plurality of hanging holes (133) are opened through the geogrid (132) and the geotextile (131); a hanging belt (134) is hung on the hanging holes (133); the free end of the hanging belt (134) is hung on the hook (313); and the free end of the hanging belt (134) is tied to the binding belt (14).

7. The device for producing a steel strip reinforced corrugated pipe in a side-by-side bundling system according to claim 6 is characterized in that: A breeding block (135) is arranged on the free end of the hanging belt (134).

8. The device for producing a steel strip reinforced corrugated pipe in a side-by-side bundling system according to claim 5 is characterized in that: The hanging holes (133) are respectively arranged on the top corners of the stacked geogrids (132) and geotextiles (131).

9. The device for producing a steel strip reinforced corrugated pipe in a side-by-side bundling system according to claim 4 is characterized in that: The wide grooves (21) are arranged on the base (23) at intervals from each other; and the narrow grooves (22) are arranged in pairs between adjacent wide grooves (21).

10. The device for producing a steel strip reinforced corrugated pipe in a side-by-side bundling system according to claim 9 is characterized in that: The bellows comprises: a first bellows (111), a second bellows (112), and a third bellows (113); the first bellows (111), the second bellows (112), and the third bellows (113) are supported and placed in the wide groove (21) at intervals from each other; The polyethylene steel wire mesh pipe comprises: a first polyethylene steel wire mesh pipe (121), a second polyethylene steel wire mesh pipe (122), a third polyethylene steel wire mesh pipe (123), and a fourth polyethylene steel wire mesh pipe (124); the first polyethylene steel wire mesh pipe (121) and the second polyethylene steel wire mesh pipe (122) are supported and arranged in a narrow groove (22); the third polyethylene steel wire mesh pipe (123) and the fourth polyethylene steel wire mesh pipe (124) are placed in the first corrugated pipe (111), the second corrugated pipe (112) and the upper part of the connecting grooves of the second corrugated pipe (112) and the third corrugated pipe (113).

Citation Information

Patent Citations

  • Electric hot melting belt welding device for steel belt reinforced polyethylene (PE) spiral corrugated pipe

    CN212219317U

  • Steel strip reinforced polyethylene spiral corrugated pipe butt joint device

    CN217704770U

  • Device for the production of bellows

    EP0528132A1