Intelligent earthwork field numerical control management system

The smart earthwork on-site CNC management system realizes intelligent scheduling, intelligent cleaning and intelligent dust reduction through real-time monitoring and analysis of data, solving the problems of excessive vehicle density, traffic accident risk and environmental pollution in traditional earthwork on-site management, and improving construction efficiency and environmental protection effect.

CN119511862APending Publication Date: 2025-02-25HANGZHOU MEYOUNG TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411627452.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-14
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

In traditional earthwork site management, the number of transport vehicles in the earthwork site lacks scientific management, resulting in excessive vehicle density and congestion in the passage, affecting construction efficiency; unstable vehicle driving increases the risk of traffic accidents; and soil pollution leads to environmental pollution.

Method used

The smart earthwork on-site CNC management system includes an automatic monitoring unit, a data acquisition unit, a data transmission module, a data storage module, a data processing unit, an intelligent control unit and a background monitoring unit. Through real-time monitoring and analysis of data, intelligent scheduling, intelligent cleaning and intelligent dust reduction are achieved.

Benefits of technology

Through scientific vehicle scheduling, avoid congestion in transportation vehicles and improve construction efficiency; through intelligent cleaning and treatment, reduce soil drops and road pollution; through intelligent dust reduction, reduce dust dissipation and protect the environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119511862A_ABST
    Figure CN119511862A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of constructional engineering management, and discloses an intelligent earthwork field numerical control management system, which comprises an automatic monitoring unit, a data acquisition unit, a data transmission module, a data storage module, a data processing unit, an intelligent control unit and a background monitoring unit, and the automatic monitoring unit is used for monitoring the weight of a transportation vehicle in the earthwork field, the vertical displacement of vehicle tires and the in-out condition, and monitoring the dust content of a driving road between an earth cutting area in the earthwork field and the entrance and exit of the earthwork field at the same time. The road condition of the transportation road of the earthwork transportation vehicle is studied and judged through a formula algorithm, the pothole position on the road surface can be found in time, workers are dispatched to fill the pothole position, the situation that the earthwork transportation vehicle runs on the pothole road, consequently, the vehicle runs unstably, and the risks of rollover and collision traffic accidents are increased is avoided, and the working efficiency is improved. And the earthwork transportation safety is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction engineering management, and more specifically discloses a smart earthwork site numerical control management system. Background Art

[0002] With the continuous development of the economy, various cities are carrying out a large number of construction projects, and the development of construction projects will inevitably involve earthwork transportation. Earthwork transportation refers to the large amount of earthwork generated by construction projects, which needs to be transported to other places for disposal. The disposal methods include using earthwork for off-site backfilling or transporting excess earthwork to other places for unloading. However, in the traditional earthwork site management process, the number of transportation vehicles in the earthwork site lacks scientific management, which easily leads to too many transportation vehicles in the earthwork site, resulting in too high vehicle density in the earthwork site, frequent congestion in the access channels, and affecting construction efficiency; Moreover, due to the heavy load and high center of gravity of earthwork transportation vehicles, driving on potholes will cause unstable driving of vehicles, increase the risk of traffic accidents such as rollover and collision; At the same time, when vehicles are transporting slag in the earthwork site, the slag is easy to adhere to the vehicle, and the vehicle will bring the slag to the road during driving, causing road pollution and dust pollution, affecting the city's environmental sanitation and air quality. Summary of the invention

[0003] The present invention mainly provides an intelligent earthwork site numerical control management system, which can solve the problem that in the traditional earthwork site management process, the number of transport vehicles in the earthwork site lacks scientific management, which easily leads to an excessive number of transport vehicles in the earthwork site, resulting in an excessively high vehicle density in the earthwork site, frequent congestion in the ingress and egress channels, and affecting the construction efficiency; moreover, since earthwork transport vehicles have a heavy load and a high center of gravity, driving on bumpy roads will cause the vehicle to drive unsteadily, increasing the risk of traffic accidents such as rollover and collision; at the same time, when vehicles are transporting slag in the earthwork site, the slag is easily attached to the vehicle, and the slag will be brought to the road during the driving process of the vehicle, causing road pollution and dust pollution, affecting the city's environmental sanitation and air quality.

[0004] To solve the above technical problems, according to one aspect of the present invention, more specifically, a smart earthwork site numerical control management system includes: an automatic monitoring unit, a data acquisition unit, a data transmission module, a data storage module, a data processing unit, an intelligent control unit and a background monitoring unit; wherein:

[0005] Automatic monitoring unit: used to monitor the weight of the earthwork transport vehicles, the vertical displacement of the vehicle tires, and the entry and exit conditions, and also monitor the dust content of the road between the excavation area in the earthwork site and the entrance and exit of the earthwork site;

[0006] Data collection unit: used to collect information data on the weight of transport vehicles in the earthwork yard, the number of vehicles entering and leaving the yard, the floor area, the pixel value of the captured image, the dust content, wind speed, temperature, vehicle fuel consumption, and transportation routes;

[0007] Data transmission module: used for real-time transmission of information data collected by the data acquisition unit;

[0008] Data storage module: used to store the information data transmitted in real time by the data transmission module;

[0009] Data processing unit: used to acquire and analyze the information data stored in the data storage module, obtain the processing and analysis results, generate an earthwork site management report based on the processing and analysis results, and issue control instructions to the intelligent control unit based on the processing and analysis results;

[0010] Intelligent control unit: used to receive instructions after the analysis result obtained by the analysis and judgment module is abnormal, and to perform intelligent dust reduction on the earthwork site and intelligent cleaning on the transport vehicles;

[0011] Background monitoring unit: used to display the analysis results of the analysis and judgment module and the information data stored in the data storage unit in real time. At the same time, when the analysis result obtained by the analysis and judgment module is an abnormal result, an alarm can be sent to the background terminal.

[0012] Furthermore, the automatic monitoring unit includes: a vehicle identification module, a weighing module and a dust detection module;

[0013] Vehicle identification module: It is used to capture images of vehicles entering and leaving the site using the built-in high-definition camera and, combined with the license plate recognition algorithm, automatically record the number, size and time of vehicles entering and leaving the site and driving, as well as the area occupied by the vehicle with the corresponding license plate;

[0014] Weighing module of the scale: used to weigh the weight of earth-moving transport vehicles entering and leaving the earth-moving site;

[0015] Dust detection module: used to monitor the dust content of the road between the excavation area and the entrance and exit of the earthwork site. At the same time, according to the total distance of the road between the excavation area and the entrance and exit of the earthwork site, multiple dust detection modules are set for monitoring;

[0016] Displacement monitoring module: used to monitor the vertical displacement data of the tires of transport vehicles traveling on the transport road. The displacement monitoring modules are set on the transport road at certain intervals, and each displacement monitoring module is numbered.

[0017] Furthermore, the data acquisition unit includes: a temperature acquisition module, a pixel acquisition module, a weight acquisition module, a wind speed acquisition module, a dust quantity acquisition module, a vehicle acquisition module, a fuel consumption acquisition module and a route acquisition module;

[0018] Temperature collection module: used to collect the actual temperature information data on the earthwork transportation section in real time;

[0019] Pixel acquisition module: used to collect pixel value information data of images taken by earth-moving vehicles when they enter and leave the earth-moving site in real time;

[0020] Weight collection module: used to collect the weighing information data of the weighing module of the scale in real time;

[0021] Wind speed collection module: used to collect the actual wind speed information data at the earthwork site in real time;

[0022] Dust quantity collection module: used for real-time collection of dust content information data detected by the dust detection module;

[0023] Vehicle collection module: used to collect the number and time information of vehicles entering and leaving the site and traveling recorded by the vehicle identification module in real time;

[0024] Displacement acquisition module: used to collect vertical displacement information data of the tires of transport vehicles traveling on the transport road in real time;

[0025] Vibration collection module: used to collect vibration intensity information data of earth-moving transport vehicles during transportation.

[0026] Furthermore, the data processing unit includes: a data acquisition module, an analysis and judgment module, a report generation module and an instruction issuing module;

[0027] Data acquisition module: used for real-time acquisition of information data stored in the data storage unit;

[0028] Analysis and judgment module: used to analyze and judge the information data obtained by the data acquisition module, so as to obtain the results of the analysis and judgment;

[0029] Report generation module: used to generate earthwork site management reports based on the results of analysis and judgment;

[0030] Instruction issuing module: When an abnormal situation occurs in the results of analysis and judgment, it will issue control instructions to the abnormal alarm module to issue an alarm, and will issue control instructions to the intelligent control unit to perform intelligent dust reduction on the earthwork site and intelligent cleaning on the transport vehicles based on the results of analysis and judgment.

[0031] Furthermore, the intelligent control unit includes: an instruction receiving module, an intelligent dust reduction module and an intelligent cleaning module;

[0032] Instruction receiving module: used to receive control instructions issued by the instruction issuing module;

[0033] Intelligent dust reduction module: used for automatic dust reduction at earthwork sites;

[0034] Intelligent cleaning module: used for automatic cleaning of earth-moving transport vehicles.

[0035] Furthermore, the background monitoring unit includes: a real-time data receiving module, a terminal display module and an abnormal alarm module;

[0036] Real-time data receiving module: used for receiving in real time the information data stored in the data storage module and the information data of the analysis and processing results of the data processing unit;

[0037] Terminal display module: used to display the information data received by the real-time data receiving module; abnormal alarm module: used to alarm the background terminal after the result obtained by the analysis and judgment module is abnormal.

[0038] Furthermore, the analysis and judgment module can obtain from the data receiving module the weight of the earth-moving transport vehicle before entering the earth-moving yard without loading earth, the pixel value of the image taken when the earth-moving transport vehicle enters and leaves the earth-moving yard, and the actual total weight of the earth-moving transport vehicle after loading earth according to the rated amount, and can analyze the data obtained above to obtain the cleanliness index of the earth-moving transport vehicle, if:

[0039]

[0040] Among them, α is the cleanliness index, M is the actual total weight of the earthwork transport vehicle after loading the earthwork according to the rated amount, m is the weight of the earthwork transport vehicle before entering the earthwork site without loading earthwork, and m e is the rated earthwork load value of the earthwork transport vehicle, I (x,y) is the pixel value at the coordinate (x, y) of the image taken when the earth-moving vehicle enters the earth-moving field, K (x,y) is the pixel value at the coordinate (x, y) of the image taken when the earth-moving truck leaves the earth-moving site, A and B are the width and height of the image respectively, τ is the pixel conversion coefficient, and δ is the preset threshold parameter.

[0041] Furthermore, the analysis and judgment module can obtain the area occupied by the transport vehicles, the number of earthwork transport vehicles entering and leaving the earthwork yard, and the time information data from the data receiving module, and can analyze the data obtained above to determine whether the number of transport vehicles in the earthwork yard is too large. If:

[0042]

[0043] Among them, J i is the number of earthwork trucks entering the earthwork site at the i-th second, C i is the number of earthmoving vehicles leaving the earthmoving yard at the i-th second, R is the number of earthmoving vehicles in the earthmoving yard, S c is the area occupied by the cth earthmoving vehicle in the earthmoving yard, S is the total area occupied by the earthmoving yard, R max is the maximum number of earthmoving vehicles that the earthmoving yard can accommodate, t is the preset single-day working time, and A is the number of earthmoving vehicles stranded in the earthmoving yard on the previous day.

[0044] Furthermore, the analysis and judgment module can obtain the wind speed and temperature in the earthwork field, the total number of dust detection modules and temperature detection modules arranged on the earthwork field transportation section, and the information data of the dust content in the air actually measured by the dust detection module from the data receiving module, and can analyze the above acquired data to obtain the dust reduction index of the road between the excavation area in the earthwork field and the entrance and exit of the earthwork field, if:

[0045]

[0046] in, is the dust fall index, P is the total number of temperature detection modules arranged on the earthwork site transportation section, T a is the temperature value actually measured by the ath temperature detection module, T e is the preset standard temperature value, v is the wind speed actually measured in the earthwork field, and v e is the preset standard wind speed, N is the total number of dust detection modules arranged on the earthwork site transportation section, ω j is the dust content in the air actually measured by the jth dust detection module, It is the preset dust fall threshold parameter.

[0047] Furthermore, the analysis and judgment module can obtain the vertical displacement data of the earth-moving transport vehicle tire when it is running on the transport road that is initially free of potholes from the data receiving module, and can obtain the standard displacement value of the earth-moving transport vehicle through the analysis of the above-obtained data:

[0048]

[0049] Furthermore, the displacement monitoring module is labeled Q = {e1, e2, ..., e QThe analysis and judgment module can obtain the real-time vertical displacement of the earth-moving vehicle tires when running on the transport road, the vehicle vibration intensity and the weight data of the vehicle leaving the earth-moving site from the data receiving module, and can analyze the above acquired data to obtain the displacement index of the earth-moving vehicle:

[0050]

[0051] Among them, h avg is the standard displacement value of the earth-moving transport vehicle, Q is the number of displacement monitoring modules set on the transport road of the earth-moving transport vehicle, and h k is the vertical displacement value of the earth-moving vehicle tire monitored by the kth displacement monitoring module on the initially flat transport road, h max h is the maximum vertical displacement value of the earth-moving vehicle tire monitored by the displacement monitoring module on the initially flat transport road, min is the minimum value of the vertical displacement of the earth-moving vehicle tires monitored by the displacement monitoring module on the initially flat transport road, γ car is the displacement index of a single earth-moving transport vehicle, For the label e i The vertical displacement value of the tire of the earth-moving transport vehicle measured by the displacement monitoring module, E is the average vibration intensity of a single earth-moving transport vehicle after driving on the transport road, m g is the mass of the g-th transport vehicle that has left the earthwork site, Z is the total number of transport vehicles that have left the earthwork site, α is the conversion coefficient, γ e is the threshold parameter of the displacement index of a single earth-moving transport vehicle.

[0052] The beneficial effects of the intelligent earthwork site numerical control management system of the present invention are: the high-definition camera built into the vehicle identification module captures the image of the vehicle entering and leaving the site, and the license plate recognition algorithm is combined to automatically and accurately record the number and time of the vehicle entering and leaving the site. Further, the number of transport vehicles in the earthwork site is scientifically judged by the formula algorithm, and the efficient dispatch of the transport vehicles is realized, so as to avoid congestion of the transport vehicles in the earthwork site during driving. Moreover, according to the formula algorithm, the earthwork transport vehicle can be automatically cleaned after the earthwork transport vehicle is loaded with earthwork according to the rated amount, and the vehicle with too much soil attached to it can be effectively prevented from falling off during the transportation process after the earthwork transport vehicle leaves the earthwork site, resulting in pollution of the transportation road surface, and increasing the difficulty and cost of cleaning work. In addition, according to the wind speed in the earthwork site, the total number of dust detection modules arranged on the earthwork site transportation section, and the information data of the dust content in the air actually measured by the dust detection module, the dust escape situation is judged. When the dust escape is more serious, water is automatically sprinkled to reduce dust, thereby avoiding the pollution of the surrounding environment by the dust in the earthwork site. Finally, the road conditions of the earth-moving transport vehicles' transport roads are analyzed through formula algorithms, so that potholes on the road can be discovered in time, and staff can be dispatched to fill the potholes, preventing earth-moving transport vehicles from driving on pothole-prone roads, causing unstable vehicle driving, and increasing the risk of rollover and collision traffic accidents, effectively improving the safety of earth-moving transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] The present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods.

[0054] Figure 1 This is a schematic diagram of the system principle. DETAILED DESCRIPTION

[0055] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0056] According to one aspect of the present invention, Figure 1As shown, a smart earthwork site CNC management system is provided. First, the weight of the earthwork site transport vehicles, the vertical displacement of the vehicle tires, and the entry and exit conditions are monitored through the vehicle identification module, the weighing module, the dust detection module, and the displacement monitoring module. At the same time, the dust content of the road between the excavation area in the earthwork site and the entrance and exit of the earthwork site is monitored, and the monitoring data is collected through the weight collection module, the dust volume collection module, the displacement collection module, and the vibration collection module. At the same time, the wind speed collection module can collect the wind speed meteorological data of the earthwork site area released in real time by the meteorological department as the actual wind speed data of the earthwork site, and the vertical displacement information data of the transport vehicle tires traveling on the transport road are collected in real time through the displacement collection module, the vibration intensity information data of the earthwork transport vehicle during the transportation process is collected through the vibration collection module, the pixel value information data of the image taken by the earthwork transport vehicle when entering and exiting the earthwork site is collected through the pixel collection module, the actual temperature information data on the earthwork site transportation section is collected in real time through the temperature collection module, and multiple temperature collection modules and displacement monitoring modules are set on the transportation section for monitoring and collection.

[0057] Then, the collected information data is transmitted to the data storage module for storage through the data transmission module, the information data is acquired through the data acquisition module, and the data analysis and judgment are performed through the analysis and judgment module.

[0058] Furthermore, when an abnormal situation is found in the results of the analysis and judgment, a control instruction will be sent to the abnormal alarm module to issue an alarm, and a control instruction will be sent to the intelligent control unit to perform intelligent dust reduction on the earthwork site and intelligent cleaning on the transport vehicles based on the results of the analysis and judgment.

[0059] Afterwards, the analysis and judgment module can obtain the weight of the earth-moving vehicle before entering the earth-moving yard without loading earth, the pixel value of the image taken when the earth-moving vehicle enters and leaves the earth-moving yard, and the actual total weight of the earth-moving vehicle after loading the rated amount of earth from the data receiving module, and can analyze the above acquired data to obtain the cleanliness index of the earth-moving vehicle, if:

[0060]

[0061] If α>1+δ, it means that after the earth-moving vehicle is loaded with earth according to the rated amount, there is not too much soil attached to the vehicle, and its cleanliness index meets the requirements, so it can leave the earth-moving yard for earth-moving transportation; if α>1+δ, it means that after the earth-moving vehicle is loaded with earth according to the rated amount, there is too much soil attached to the vehicle, and its cleanliness index does not meet the requirements. It is necessary to clean the earth-moving vehicle through the intelligent cleaning module to prevent the soil attached to the vehicle from falling off during transportation after the earth-moving vehicle leaves the earth-moving yard, causing pollution of the transportation road surface and increasing the difficulty and cost of cleaning work. Among them, α is the cleanliness index, M is the actual total weight of the earth-moving vehicle after loading the earth according to the rated amount, m is the weight of the earth-moving vehicle before entering the earth-moving yard without loading earth, and m e is the rated earthwork load value of the earthwork transport vehicle, I (x,y) is the pixel value at the coordinate (x, y) of the image taken when the earth-moving vehicle enters the earth-moving field, K (x,y) is the pixel value at the coordinate (x, y) of the image taken when the earth-moving truck leaves the earth-moving site, A and B are the width and height of the image respectively, τ is the pixel conversion coefficient, and δ is the preset threshold parameter.

[0062] The analysis and judgment module can obtain the area occupied by the transport vehicles, the number of earthwork transport vehicles entering and leaving the earthwork yard, and the time information data from the data receiving module, and can analyze the above acquired data to determine whether the number of transport vehicles in the earthwork yard is too much. If:

[0063]

[0064] This means that the number of transport vehicles in the earthwork yard is appropriate and there will be no congestion when the transport vehicles in the earthwork yard are driving; if This means that there are too many transport vehicles in the earthwork yard, and congestion will occur during the driving process of the transport vehicles in the earthwork yard. The staff needs to dispatch the transport vehicles, stop more transport vehicles from entering the earthwork yard, and guide the transport vehicles in the yard to fill the earthwork as soon as possible and leave the earthwork yard. i is the number of earthwork trucks entering the earthwork site at the i-th second, C i is the number of earthmoving vehicles leaving the earthmoving yard at the i-th second, R is the number of earthmoving vehicles in the earthmoving yard, S c is the area occupied by the cth earthmoving vehicle in the earthmoving yard, S is the total area occupied by the earthmoving yard, R max is the maximum number of earthmoving vehicles that the earthmoving yard can accommodate, t is the preset single-day working time, and A is the number of earthmoving vehicles stranded in the earthmoving yard on the previous day.

[0065] The analysis and judgment module can obtain the wind speed and temperature in the earthwork field, the total number of dust detection modules and temperature detection modules arranged on the earthwork field transportation section, and the information data of the dust content in the air actually measured by the dust detection module from the data receiving module, and can analyze the above acquired data to obtain the dust reduction index of the road between the excavation area in the earthwork field and the entrance and exit of the earthwork field, if:

[0066]

[0067] This means that the dust reduction index of the road between the excavation area in the earthwork site and the entrance and exit of the earthwork site is qualified and no dust reduction treatment is required; if This means that the dust reduction index of the road between the excavation area in the earthwork site and the entrance and exit of the earthwork site is not up to standard. The dust in the air of the road is large and easy to escape. It is necessary to use the intelligent dust reduction module to spray water to reduce dust, or cover the earthwork transport vehicle with a tarpaulin to avoid pollution to the surrounding environment. is the dust fall index, P is the total number of temperature detection modules arranged on the earthwork site transportation section, T a is the temperature value actually measured by the ath temperature detection module, T e is the preset standard temperature value, which is 20℃, v is the wind speed actually measured in the earthwork field, v e is the preset standard wind speed, whose value is 0.2, N is the total number of dust detection modules arranged on the earthwork site transportation section, ω j is the dust content in the air actually measured by the jth dust detection module, It is the preset dust fall threshold parameter.

[0068] The analysis and judgment module can obtain the vertical displacement data of the earth-moving transport vehicle tires when running on the transport road without potholes at the beginning from the data receiving module, and can analyze the above acquired data to obtain the standard displacement value of the earth-moving transport vehicle:

[0069]

[0070] Furthermore, the displacement monitoring module is labeled Q = {e1, e2, ..., e Q The analysis and judgment module can obtain the real-time vertical displacement of the earth-moving vehicle tires when running on the transport road, the vehicle vibration intensity and the weight data of the vehicle leaving the earth-moving site from the data receiving module, and can analyze the above acquired data to obtain the displacement index of the earth-moving vehicle:

[0071]

[0072] This means that the displacement index of the earth-moving transport vehicle is within a reasonable range, the transport road is flat, and the earth-moving transport vehicle is running stably. car >γ e , it means that the displacement index of the earthwork transport vehicle exceeds the reasonable range, and there are potholes on the transport road, which will trigger the abnormal alarm module to issue an alarm and dispatch staff to fill the potholes on the transport road. At the same time, the numbered displacement monitoring module can quickly find the location of the potholes and improve the efficiency of pothole filling. Among them, h avg is the standard displacement value of the earth-moving transport vehicle, Q is the number of displacement monitoring modules set on the transport road of the earth-moving transport vehicle, and the displacement monitoring modules are set on the transport road at a certain interval (such as every meter), h k is the vertical displacement value of the earth-moving vehicle tire monitored by the kth displacement monitoring module on the initially flat transport road, h max h is the maximum vertical displacement value of the earth-moving vehicle tire monitored by the displacement monitoring module on the initially flat transport road, min is the minimum value of the vertical displacement of the earth-moving vehicle tires monitored by the displacement monitoring module on the initially flat transport road, γ car is the displacement index of a single earth-moving transport vehicle, For the label e i The vertical displacement value of the tire of the earth-moving transport vehicle measured by the displacement monitoring module, E is the average vibration intensity of a single earth-moving transport vehicle after driving on the transport road, m g is the mass of the g-th transport vehicle that has left the earthwork site, Z is the total number of transport vehicles that have left the earthwork site, α is the conversion coefficient, γ e is the threshold parameter of the displacement index of a single earth-moving transport vehicle.

[0073] Finally, the analysis results of the analysis and judgment module and the information data stored in the data storage unit are displayed in real time through the background monitoring unit. At the same time, when the results obtained by the analysis and judgment module are abnormal, an alarm can be sent to the background terminal to allow management personnel to grasp the earthwork site situation in a timely manner.

[0074] The electrical components that appear in this article are all electrical components that exist in reality.

[0075] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.

Claims

1. Intelligent earthwork site CNC management system, characterized by: include: Automatic monitoring unit, data acquisition unit, data transmission module, data storage module, data processing unit, intelligent control unit and background monitoring unit; wherein: Automatic monitoring unit: used to monitor the weight of earthmoving yard transport vehicles, the vertical displacement of vehicle tires, and the entry and exit conditions, and to monitor the dust content of the roads between the excavation area in the earthmoving yard and the entrance and exit of the earthmoving yard; Data collection unit: used to collect information data on the weight of transport vehicles in the earthwork yard, the number of vehicles entering and leaving the yard, the floor area, the pixel value of the captured image, the dust content, wind speed, temperature, vehicle fuel consumption, and transportation routes; Data transmission module: used for real-time transmission of information data collected by the data acquisition unit; Data storage module: used to store the information data transmitted in real time by the data transmission module; Data processing unit: used to acquire and analyze the information data stored in the data storage module, obtain the processing and analysis results, generate an earthwork site management report based on the processing and analysis results, and issue control instructions to the intelligent control unit based on the processing and analysis results; Intelligent control unit: used to receive instructions after the analysis result obtained by the analysis and judgment module is abnormal, and to perform intelligent dust reduction on the earthwork site and intelligent cleaning on the transport vehicles; Background monitoring unit: used to display the analysis results of the analysis and judgment module and the information data stored in the data storage unit in real time. At the same time, when the analysis result obtained by the analysis and judgment module is an abnormal result, an alarm can be sent to the background terminal.

2. The intelligent earthwork site numerical control management system according to claim 1 is characterized by: The automatic monitoring unit includes: a vehicle identification module, a weighing module and a dust detection module; Vehicle identification module: It is used to capture images of vehicles entering and leaving the site using the built-in high-definition camera, and combined with the license plate recognition algorithm, automatically record the number of vehicles entering and leaving the site and driving, the size of the vehicle model, and the time, and also record the area occupied by the vehicle with the corresponding license plate; Weighing module of the scale: used to weigh the weight of earth-moving transport vehicles entering and leaving the earth-moving site; Dust detection module: used to monitor the dust content of the road between the excavation area and the entrance and exit of the earthwork site. At the same time, according to the total distance of the road between the excavation area and the entrance and exit of the earthwork site, multiple dust detection modules are set for monitoring; Displacement monitoring module: used to monitor the vertical displacement data of the tires of transport vehicles traveling on the transport road. The displacement monitoring modules are set on the transport road at certain intervals, and each displacement monitoring module is numbered.

3. The intelligent earthwork site numerical control management system according to claim 2 is characterized in that: The data acquisition unit includes: a temperature acquisition module, a pixel acquisition module, a weight acquisition module, a wind speed acquisition module, a dust quantity acquisition module, a vehicle acquisition module, a displacement acquisition module and a vibration acquisition module; Temperature collection module: used to collect the actual temperature information data on the earthwork transportation section in real time; Pixel acquisition module: used to collect pixel value information data of images taken by earth-moving vehicles when they enter and leave the earth-moving site in real time; Weight collection module: used to collect the weighing information data of the weighing module of the scale in real time; Wind speed collection module: used to collect the actual wind speed information data at the earthwork site in real time; Dust quantity collection module: used for real-time collection of dust content information data detected by the dust detection module; Vehicle collection module: used to collect the number and time information of vehicles entering and leaving the site and traveling recorded by the vehicle identification module in real time; Displacement acquisition module: used to collect vertical displacement information data of the tires of transport vehicles traveling on the transport road in real time; Vibration collection module: used to collect vibration intensity information data of earth-moving transport vehicles during transportation.

4. The intelligent earthwork site numerical control management system according to claim 3 is characterized by: The data processing unit includes: a data acquisition module, an analysis and judgment module, a report generation module and an instruction issuing module; Data acquisition module: used for real-time acquisition of information data stored in the data storage unit; Analysis and judgment module: used to analyze and judge the information data obtained by the data acquisition module, so as to obtain the results of the analysis and judgment; Report generation module: used to generate earthwork site management reports based on the results of analysis and judgment; Instruction issuing module: When an abnormal situation occurs in the results of analysis and judgment, it will issue control instructions to the abnormal alarm module to issue an alarm, and will issue control instructions to the intelligent control unit to perform intelligent dust reduction on the earthwork site and intelligent cleaning on the transport vehicles based on the results of analysis and judgment.

5. The intelligent earthwork site numerical control management system according to claim 4 is characterized in that: The intelligent control unit includes: an instruction receiving module, an intelligent dust reduction module and an intelligent cleaning module; Instruction receiving module: used to receive control instructions issued by the instruction issuing module; Intelligent dust reduction module: used for automatic dust reduction at earthwork sites; Intelligent cleaning module: used for automatic cleaning of earth-moving transport vehicles.

6. The intelligent earthwork site numerical control management system according to claim 5 is characterized by: The background monitoring unit includes: a real-time data receiving module, a terminal display module and an abnormal alarm module; Real-time data receiving module: used for receiving in real time the information data stored in the data storage module and the information data of the analysis and processing results of the data processing unit; Terminal display module: used to display the information data received by the real-time data receiving module; Abnormal alarm module: It is used to send an alarm to the background terminal after the result obtained by the analysis and judgment module is abnormal.

7. The intelligent earthwork site numerical control management system according to claim 6 is characterized in that: The analysis and judgment module can obtain from the data receiving module the weight of the earth-moving vehicle before entering the earth-moving yard without loading earth, the pixel value of the image taken when the earth-moving vehicle enters and leaves the earth-moving yard, and the actual total weight of the earth-moving vehicle after loading earth according to the rated amount, and can analyze the above acquired data to obtain the cleanliness index of the earth-moving vehicle, if: Among them, α is the cleanliness index, M is the actual total weight of the earthwork transport vehicle after loading the earthwork according to the rated amount, m is the weight of the earthwork transport vehicle before entering the earthwork site without loading earthwork, and m e is the rated earthwork load value of the earthwork transport vehicle, I (x,y) is the pixel value at the coordinate (x, y) of the image taken when the earth-moving vehicle enters the earth-moving field, K (x,y) is the pixel value at the coordinate (x, y) of the image taken when the earth-moving truck leaves the earth-moving site, A and B are the width and height of the image respectively, τ is the pixel conversion coefficient, and δ is the preset threshold parameter.

8. The intelligent earthwork site numerical control management system according to claim 7 is characterized in that: The analysis and judgment module can obtain the area occupied by the transport vehicles, the number of earthwork transport vehicles entering and leaving the earthwork yard, and the time information data from the data receiving module, and can analyze the data obtained above to determine whether the number of transport vehicles in the earthwork yard is too large. If: Among them, J i is the number of earthwork trucks entering the earthwork site at the i-th second, C i is the number of earthmoving vehicles leaving the earthmoving yard at the i-th second, R is the number of earthmoving vehicles in the earthmoving yard, S c is the area occupied by the cth earthmoving vehicle in the earthmoving yard, S is the total area occupied by the earthmoving yard, R max is the maximum number of earthmoving vehicles that the earthmoving yard can accommodate, t is the preset single-day working time, and A is the number of earthmoving vehicles stranded in the earthmoving yard on the previous day.

9. The intelligent earthwork site numerical control management system according to claim 8 is characterized in that: The analysis and judgment module can obtain the wind speed and temperature in the earthwork field, the total number of dust detection modules and temperature detection modules arranged on the earthwork field transportation section, and the information data of the dust content in the air actually measured by the dust detection module from the data receiving module, and can analyze the above acquired data to obtain the dust reduction index of the road between the excavation area in the earthwork field and the entrance and exit of the earthwork field, if: in, is the dust fall index, P is the total number of temperature detection modules arranged on the earthwork site transportation section, T a is the temperature value actually measured by the ath temperature detection module, T e is the preset standard temperature value, v is the wind speed actually measured in the earthwork field, and v e is the preset standard wind speed, N is the total number of dust detection modules arranged on the earthwork site transportation section, ω j is the dust content in the air actually measured by the jth dust detection module, It is the preset dust fall threshold parameter.

10. The intelligent earthwork site numerical control management system according to claim 9 is characterized in that: The analysis and judgment module can obtain the vertical displacement data of the earth-moving transport vehicle tires when running on the transport road without potholes initially from the data receiving module, and can obtain the standard displacement value of the earth-moving transport vehicle through the analysis of the above-obtained data: Furthermore, the displacement monitoring module is labeled Q = {e1, e2, ..., e Q The analysis and judgment module can obtain the real-time vertical displacement of the earth-moving vehicle tires when running on the transport road, the vehicle vibration intensity and the weight data of the vehicle leaving the earth-moving site from the data receiving module, and can analyze the above acquired data to obtain the displacement index of the earth-moving vehicle: Among them, h avg is the standard displacement value of the earth-moving transport vehicle, Q is the number of displacement monitoring modules set on the transport road of the earth-moving transport vehicle, and h k is the vertical displacement value of the earth-moving vehicle tire monitored by the kth displacement monitoring module on the initially flat transport road, h max h is the maximum vertical displacement value of the earth-moving vehicle tire monitored by the displacement monitoring module on the initially flat transport road, min is the minimum value of the vertical displacement of the earth-moving vehicle tires monitored by the displacement monitoring module on the initially flat transport road, γ car is the displacement index of a single earth-moving transport vehicle, For the label e i The vertical displacement value of the tire of the earth-moving transport vehicle measured by the displacement monitoring module, E is the average vibration intensity of a single earth-moving transport vehicle after driving on the transport road, m g is the mass of the g-th transport vehicle that has left the earthwork site, Z is the total number of transport vehicles that have left the earthwork site, α is the conversion coefficient, γ e is the threshold parameter of the displacement index of a single earth-moving transport vehicle.