Safety acceptance method and system for pushing acceptance content based on regional configuration

By adopting a safety acceptance method and system based on regional configuration push acceptance content at the construction site, the problem of low safety acceptance efficiency is solved, the acceptance work is refined and standardized, and the traceability of safety management control and acceptance results is improved.

CN119515125APending Publication Date: 2025-02-25CHINA TRANSPORT INFORMATION TECH GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411315676.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

Safety acceptance at the construction site is inefficient, especially when conducted by safety officers with less work experience and other department personnel, with slow progress and low efficiency.

Method used

The security acceptance method and system based on regional configuration push acceptance content is adopted. By dividing the project work area into multiple responsibility partitions, binding responsibility positions, determining acceptance projects and content, generating an acceptance task list and pushing it to the acceptance terminal, the collaborative work and efficiency improvement of acceptance tasks are achieved.

Benefits of technology

The acceptance work is refined and decomposed into various jurisdictions, which improves the efficiency and standardization of the acceptance work, ensures safety management and control at the construction site, reduces human errors, and realizes the traceability of acceptance results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119515125A_ABST
    Figure CN119515125A_ABST
Patent Text Reader

Abstract

The invention discloses a safety acceptance method and system for pushing acceptance content based on regional configuration, and relates to the technical field of project safety acceptance, and the method comprises the steps: dividing a project work area into a plurality of responsibility subareas according to user settings, and binding responsibility posts; determining a plurality of acceptance items corresponding to the responsibility partition, and binding an acceptance post and acceptance content for each acceptance item; the acceptance post is one or more of responsible posts; the acceptance post is bound with one or more acceptance personnel; according to the target responsibility partition and the target acceptance item selected by the user, determining a corresponding target acceptance post and target acceptance content; generating an acceptance task list according to the target acceptance post and the target acceptance content, and sending the acceptance task list to an acceptance terminal of a target acceptance person corresponding to the target acceptance post; and receiving an acceptance record uploaded by the acceptance terminal, and generating an acceptance result form based on the acceptance record. By implementing the method, personnel of all departments can be guided to perform cooperative work of safety acceptance, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of project security acceptance, and in particular to a security acceptance method and system based on regional configuration push acceptance content. Background Art

[0002] The main purpose of the safety acceptance of the construction site is to ensure that the safety facilities, equipment, management and other aspects of the construction site meet the requirements of relevant laws and standards, and prevent unqualified products and equipment from entering the construction site and causing adverse effects. Safety acceptance needs to be carried out in strict accordance with relevant laws and standards, and through comprehensive inspections and timely rectification measures, effectively prevent and control safety risks in the construction process and protect the lives and property of construction workers.

[0003] In relevant technologies, the safety acceptance of construction projects, such as various safety precautions tools, facilities, frames and equipment, is generally initiated by the responsible engineer before entering the construction site or being put into use. The relevant departments of the project department (such as engineering technology department, safety supervision department, quality department, material department, etc.) and project leaders will conduct in-depth inspections and acceptances at the construction site. They can only be put into use after passing the acceptance. At the same time, paper materials shall be retained according to the requirements of the superior unit for inspection by the superior unit.

[0004] However, for safety officers with less work experience, as well as personnel from other departments whose usual work focus is not safety management, their safety acceptance work progresses slowly and is inefficient due to their lack of safety-related professional capabilities. Summary of the invention

[0005] This application provides a security acceptance method and system based on regional configuration push acceptance content, which is used to guide personnel from various departments to carry out collaborative work on security acceptance and improve work efficiency.

[0006] In the first aspect, the present application provides a security acceptance method for pushing acceptance content based on regional configuration, which is applied to a security acceptance system. The method includes: dividing the project work area into multiple responsibility zones according to user settings, and binding responsibility positions to each responsibility zone; determining multiple acceptance items corresponding to the responsibility zones, and binding acceptance positions and acceptance content to each acceptance project; the acceptance position is one or more of the responsibility positions; determining the corresponding target acceptance position and target acceptance content according to the target responsibility zone and target acceptance item selected by the user; generating an acceptance task list according to the target acceptance position and target acceptance content, and sending the acceptance task list to the acceptance terminal of the target acceptance personnel corresponding to the target acceptance position; receiving the acceptance record uploaded by the acceptance terminal, and generating an acceptance result form based on the acceptance record.

[0007] In the above embodiment, the safety acceptance system divides the project work area into multiple responsibility zones according to user settings, determines multiple acceptance projects according to the responsibility zones, binds acceptance positions and acceptance content to each acceptance project, and then determines the corresponding target acceptance position and acceptance content according to the user's selection, generates an acceptance task list and sends it to the target acceptance personnel corresponding to the target acceptance position, and finally receives the acceptance records uploaded by the target acceptance personnel and generates an acceptance result form. Assigning acceptance tasks in different regions and professions to specific responsible persons can guide personnel from various departments to collaborate on safety acceptance and improve work efficiency.

[0008] In combination with some embodiments of the first aspect, in some embodiments, before the step of determining the corresponding target acceptance posts and target acceptance contents according to the target responsibility zones and target acceptance items selected by the user, the method also includes: obtaining the actual construction progress of the project work area; determining the safety acceptance time according to the actual construction progress; and sending a safety acceptance reminder to the user terminal used by the user at the preset lead time of the safety acceptance time.

[0009] In the above embodiment, the safety acceptance system obtains the actual construction progress of the project, predicts the time of safety acceptance, and sends acceptance reminders to managers in advance, so that the acceptance work can be carried out synchronously with the construction progress to avoid the delay of acceptance affecting the construction. Advance notification can also reserve preparation time for managers to reasonably arrange the acceptance plan and improve the efficiency of acceptance.

[0010] In combination with some embodiments of the first aspect, in some embodiments, the corresponding target acceptance posts and target acceptance contents are determined according to the target responsibility partitions and target acceptance items selected by the user, specifically including: determining multiple target responsibility partitions selected by the user and the corresponding multiple target acceptance items; determining the target acceptance posts corresponding to the multiple target acceptance projects; generating an acceptance project sequence list according to the preset priorities of the multiple target acceptance projects and the work schedule of the target acceptance personnel corresponding to the target acceptance posts; and respectively determining the acceptance times, target acceptance posts and target acceptance contents corresponding to the multiple target acceptance items in the acceptance project sequence list.

[0011] In the above embodiment, the safety acceptance task automatically determines the corresponding target acceptance posts by supporting managers to select multiple target responsibility zones and multiple acceptance projects, and generates an orderly acceptance plan based on the priority of the acceptance projects and the work arrangement of the acceptance posts, and determines the specific execution time, personnel and content of each acceptance project. It centrally optimizes and allocates resources, takes into account the safety acceptance needs of different regions and professions, and improves the acceptance efficiency.

[0012] In combination with some embodiments of the first aspect, in some embodiments, multiple acceptance items corresponding to the responsibility zone are determined, and acceptance positions and acceptance contents are bound to each acceptance item, specifically including: obtaining the engineering construction type corresponding to the responsibility zone, and determining the standard acceptance items corresponding to the engineering construction type; generating a standard acceptance template based on the standard acceptance items; the standard acceptance template includes standard acceptance contents corresponding to each standard acceptance item; updating the standard acceptance template based on user editing input, and generating acceptance items and acceptance contents corresponding to the responsibility zone; user editing input includes adding, deleting or modifying standard acceptance items and standard acceptance contents; obtaining the personnel position list of the responsibility positions associated with the responsibility zone, and screening the acceptance positions from the personnel position list according to the acceptance contents, and binding the acceptance contents and acceptance positions to the corresponding acceptance items.

[0013] In the above embodiment, the safety acceptance system obtains the project type of the responsibility zone, matches the standard acceptance items corresponding to the project type, and generates a standard acceptance template; based on the standard template, it allows management personnel to edit and modify to form a personalized acceptance plan; at the same time, it selects acceptance positions and corresponding personnel with professional acceptance capabilities from the list of personnel positions in the responsibility zone to achieve accurate matching of acceptance content and personnel. While improving the efficiency of acceptance plan formulation, it also improves the adaptability of the plan.

[0014] In combination with some embodiments of the first aspect, in some embodiments, an acceptance task list is generated according to the target acceptance position and the target acceptance content, and the acceptance task list is sent to the acceptance terminal of the target acceptance personnel corresponding to the target acceptance position, specifically including: generating an acceptance task list for multiple acceptance tasks corresponding to the target acceptance position according to the target acceptance content; sending the acceptance task list to the acceptance terminal of the target acceptance personnel corresponding to the target acceptance position; receiving the execution status information corresponding to the acceptance task sent by the acceptance terminal, and updating the acceptance task list based on the execution status information.

[0015] In the above embodiment, the safety acceptance system intelligently disassembles the target acceptance content into several acceptance tasks, forms a structured acceptance task list, and pushes it to the acceptance terminal in real time; during the acceptance process, the dynamic execution status of the acceptance task is fed back through the acceptance terminal to achieve control over the entire acceptance process. This simplifies the operation process of the acceptance site, and can effectively supervise the acceptance personnel to prevent omissions and ensure the completion quality of the acceptance work.

[0016] In combination with some embodiments of the first aspect, in some embodiments, the execution status information includes the overall completion progress and the pass rate; the execution status information corresponding to the acceptance task sent by the acceptance terminal is received, and the acceptance task list is updated based on the execution status information, specifically including: receiving the acceptance time of the acceptance task including the start time and the completion time; receiving the acceptance results of each checkpoint of the acceptance task including the qualified status or unqualified status; receiving the supporting materials of the acceptance task including on-site photos and video evidence; determining the overall completion progress and the pass rate of the acceptance task based on the acceptance time, acceptance results and supporting materials of the acceptance task; marking the acceptance task based on the overall completion progress and the pass rate, and updating the acceptance task list.

[0017] In the above embodiment, the safety acceptance system collects on-site photos, videos and other image materials of the acceptance task through the acceptance terminal as acceptance evidence, and accurately records the time and qualified status of each inspection item of the acceptance. The system automatically calculates the overall completion progress and qualified rate of the acceptance task, and intuitively reflects the acceptance execution effect. By constructing acceptance big data, an objective basis is provided for the safety management decision-making of the project.

[0018] In combination with some embodiments of the first aspect, in some embodiments, after receiving the acceptance records uploaded by the acceptance terminal and generating an acceptance result form based on the acceptance records, the method also includes: extracting the acceptance records with unqualified acceptance results in the acceptance result form, and generating an acceptance problem list including multiple acceptance problems; determining the rectification responsibility areas, rectification responsibility positions, rectification deadlines and rectification requirements for each acceptance problem, and generating a rectification notice; sending the rectification notice to the corresponding rectification responsibility position, and receiving the problem rectification results reported by the rectification responsibility position; and updating the acceptance problem list and the acceptance result form according to the problem rectification results.

[0019] In the above embodiment, the safety acceptance system extracts the unqualified problem records in the acceptance results and summarizes them to form an acceptance problem list, automatically matches the rectification responsibility positions, rectification deadlines and rectification requirements corresponding to the problem points to form a rectification notice, tracks the rectification progress, and dynamically updates the acceptance problem status based on the rectification results. A continuous improvement mechanism of acceptance, rectification and review can be established to ensure project safety.

[0020] In a second aspect, an embodiment of the present application provides a security acceptance system, which includes: one or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code includes computer instructions, and the one or more processors call the computer instructions to enable the security acceptance system to perform the method described in the first aspect and any possible implementation method of the first aspect.

[0021] In a third aspect, an embodiment of the present application provides a computer program product comprising instructions. When the above-mentioned computer program product runs on a safety acceptance system, the above-mentioned safety acceptance system executes the method described in the first aspect and any possible implementation method of the first aspect.

[0022] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, comprising instructions. When the instructions are executed on a security acceptance system, the security acceptance system executes the method described in the first aspect and any possible implementation method of the first aspect.

[0023] It can be understood that the safety acceptance system provided in the second aspect, the computer program product provided in the third aspect, and the computer storage medium provided in the fourth aspect are all used to execute the method provided in the embodiment of the present application. Therefore, the beneficial effects that can be achieved can refer to the beneficial effects in the corresponding method, which will not be repeated here.

[0024] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. Due to the adoption of the method of pushing acceptance content based on regional configuration, the safety acceptance work can be finely decomposed into each jurisdiction area, and refined to each specific acceptance project, job position and personnel. It effectively solves the problems of unclear division of labor and non-standard implementation of acceptance work in the existing technology, and strengthens the safety management and control of the project site. Using information technology to drive process operation and providing mobile applications to assist on-site acceptance, it not only improves the acceptance efficiency, but also standardizes the acceptance standards.

[0025] 2. Due to the adoption of the acceptance task priority sorting mechanism, by analyzing the importance and urgency of different acceptance projects and combining the work plans of the corresponding personnel in the acceptance positions, the acceptance tasks are scientifically sorted, so that limited time, manpower and other resources are reasonably allocated, ensuring that key projects and high-risk areas are controlled first.

[0026] 3. Since the acceptance work is carried out in a human-computer interaction mode, through the reasonable division of human-computer responsibilities, repetitive tasks such as acceptance content organization, task decomposition, plan generation, etc. are handed over to the computer system, and unstructured tasks such as on-site investigation, problem judgment, and evidence collection are left to people to complete. This effectively solves the problems of acceptance personnel's inaccurate grasp of acceptance standards, non-standard operations, and lack of process control in existing technologies. Acceptance personnel only need to refer to the task details on the mobile terminal to clarify the acceptance focus and avoid omissions. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a flowchart of a method for secure acceptance of push acceptance content based on regional configuration in an embodiment of the present application; Figure 2This is another flowchart of a method for secure acceptance of push acceptance content based on regional configuration in an embodiment of the present application; Figure 3 It is a schematic diagram of the structure of a physical device of the safety acceptance system in the embodiment of the present application. DETAILED DESCRIPTION

[0028] The terms used in the following embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification of the present application, the singular expressions "one", "a kind of", "above", "the" and "this" are intended to also include plural expressions, unless there is a clear indication to the contrary in the context. It should also be understood that the term "and / or" used in the present application refers to any or all possible combinations comprising one or more of the listed items.

[0029] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features, and in the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.

[0030] For ease of understanding, the application scenarios of the embodiments of the present application are introduced below.

[0031] A certain construction project is undergoing main structure construction. There are frequent cross-operations between different disciplines on site, a large number of machinery and personnel entering and exiting, and many and complex safety risk factors. The general contractor of the project needs to strengthen safety management and control. However, due to the large number of project staff and the wide distribution of the site, it is difficult to fully investigate safety hazards by relying solely on the daily inspections of safety officers. At the same time, the professional capabilities of managers of different professions vary, and there is a lack of professional acceptance inspections and guidance, so the acceptance work becomes a formality. How to organize and carry out comprehensive, detailed, and professional safety acceptance has become a major problem facing the project leader.

[0032] In related technologies, personnel can be organized to conduct on-site inspections regularly to inspect and accept safety protection facilities at the construction site, and rectification notices can be issued for problems found to require rectification within a time limit. The following describes scenarios where the safety acceptance method in related technologies is used.

[0033] The project department adopted the traditional method of regularly convening personnel from various departments to conduct inspections, and checked the edge protection, mechanical equipment, scaffolding, temporary electricity, etc. at the construction site one by one, and summarized the inspection results into a table and issued a rectification notice. However, in actual implementation, it was found that due to the lack of unified deployment and effective guidance, the inspection content and focus of different regions and different professions were different, and omissions or duplications often occurred. The professional backgrounds of the acceptance personnel were different, and their understanding of safety regulations was inconsistent, making it difficult to unify the acceptance standards. Due to unclear or incomplete hidden danger inspections, the project department often needs to re-arrange personnel for inspections, resulting in inefficient safety inspections and poor results.

[0034] By adopting the security acceptance method based on regional configuration and acceptance content push in the embodiment of this application, the responsibility area is divided by digital means, the corresponding responsibility positions are matched, and the task list is sent to the mobile terminal according to the acceptance indicators to assist on-site acceptance, which can achieve fine control of the acceptance work and improve efficiency. The following introduces the scenario of using the security acceptance method based on regional configuration and acceptance content push in this application.

[0035] The project department used the safety acceptance system of this application. The system first delineated the jurisdiction of each area in the project work area and bound each area to a responsible position. When carrying out specific acceptance work, the system will trigger the acceptance task of the corresponding area, and match the relevant acceptance content and acceptance positions according to the characteristics of the engineering type in each area, generate an acceptance task list and push it to the mobile terminal of the corresponding personnel of each acceptance position. The acceptance personnel carry mobile terminals to conduct item-by-item inspections on site, and collect on-site pictures, videos and other image materials and upload them to the system. After the acceptance is completed, the safety acceptance system will submit various acceptance records to the acceptance form for archiving, which is convenient for subsequent responsibility tracing. It realizes the standardized control of safety acceptance work and effectively improves the efficiency of safety acceptance.

[0036] It should be noted that the safety acceptance system described in this article refers to a computer with data collection and processing functions. Its specific implementation method is similar to that of a server. For the sake of convenience, it will be abbreviated as a system in some cases.

[0037] It can be seen that the use of the security acceptance method based on regional configuration to push acceptance content in the embodiment of the present application can not only improve the acceptance efficiency, but also solve the problem of strong subjectivity in traditional manual inspections based on experience, that is, the problem of inconsistent reference standards, thereby achieving an improvement in the acceptance quality.

[0038] For ease of understanding, the following describes the process of the method provided by this implementation in combination with the above scenario. Figure 1 , which is a flow chart of a security acceptance method based on regional configuration push acceptance content in an embodiment of the present application.

[0039] S101. Divide the project work area into multiple responsibility zones according to user settings, and bind a responsibility position to each responsibility zone.

[0040] Among them, the user refers to the management personnel who plans and arranges the overall acceptance process, and can use the safety acceptance system in the present invention, that is, the specific software APP or applet to perform safety acceptance processing. The project work area represents the work area at the construction project site, which usually includes functional areas such as the main building area, temporary facilities area, material storage area, office and living area. The responsibility area is a number of management units divided within the project work area according to the needs of construction organization and management. Each responsibility area corresponds to a specific management department, that is, a responsibility post. The responsibility post is a position that is responsible for supervising the safe production work within the responsibility area. The position includes multiple types of personnel, such as construction workers, technicians, safety officers, etc. For example, in a construction project, several responsibility areas can be divided according to buildings or areas, and each responsibility area is responsible for daily safety inspections by a construction worker or safety officer of the project department.

[0041] Specifically, before the project starts or when the project enters a new construction phase, the safety acceptance system can receive the responsibility zoning division plan submitted by the project manager through the management end. The plan divides the overall project work area into several responsibility zones, and clarifies the scope, jurisdiction, management department and other attribute information of each responsibility zone. Then, the safety acceptance system will match the personnel position list under the management department of the responsibility zone, so that the manager can select one or more positions in each responsibility zone and establish a binding relationship between the responsibility area and the responsibility position. After the responsibility zone division is completed, the safety acceptance system will associate its zone data and position binding data and save it to the system database.

[0042] In some embodiments, the division of responsibility zones of the project work area can be achieved in a variety of ways: optionally, the manager uses a drawing tool on the project plan to manually draw the scope of the responsibility zone, and the system generates a polygonal area based on the drawn closed figure; optionally, the manager uses a dedicated modeling software to pre-create the responsibility zone in the project's BIM model, and the system reads the responsibility zone information in the BIM model and converts it for application; optionally, the system automatically splits the project work area according to the project construction schedule and refers to the division requirements of common sub-projects in the construction specifications to form a proposed responsibility zone plan, and the manager reviews and adjusts it on this basis. It is understandable that other manual or intelligent model automated area division methods can also be used to achieve the conversion of project work areas to responsibility zones, as long as the spatial scope and management ownership of each responsibility zone can be clearly defined, and this is not limited here.

[0043] S102. Determine multiple acceptance items corresponding to the responsibility zones, and bind acceptance positions and acceptance contents to each acceptance item.

[0044] Among them, the acceptance items represent the inspection objects that need to be inspected for safety acceptance within the scope of the responsibility zone, usually including multiple categories such as safety protection facilities, construction machinery and equipment, temporary power facilities, etc. Each acceptance item corresponds to specific inspection content and acceptance standards. The acceptance content is the specific items that need to be verified for the safety inspection of the acceptance project, and is the direct basis for implementing the acceptance operation. The acceptance post is one or more of the responsibility posts, and the acceptance post is bound to one or more acceptance personnel responsible for implementing on-site safety inspections on specific acceptance projects; in some embodiments, the acceptance personnel may also be other personnel designated by the corresponding responsible personnel in the responsibility post. For example, the permanent safety acceptance items at the construction site include scaffolding, foundation pit support, tower cranes, etc. The corresponding acceptance contents include frame erection, verticality of poles, firmness of support, etc., and professional engineers or technicians in the responsibility zone serve as acceptance personnel; in addition, the acceptance personnel may also be safety officers, construction workers, and mechanics.

[0045] Specifically, after the division of responsibility zones is completed, the safety acceptance system will select a list of applicable acceptance items from the system's preset general acceptance item library based on the construction tasks and possible safety risks within each responsibility zone, and form an initial acceptance plan corresponding to the responsibility zone; the initial acceptance plan can be modified according to the needs of users (managers). On this basis, the safety acceptance system will determine the acceptance positions of one or more personnel with corresponding skills from the list of personnel positions in this responsibility area based on the professional content of the acceptance project, and establish a binding relationship between the acceptance project and the acceptance position. At the same time, the system generates detailed inspection content for each acceptance project based on the acceptance specifications and expert knowledge base for reference by the acceptance personnel.

[0046] S103. Determine the corresponding target acceptance position and target acceptance content according to the target responsibility division and target acceptance item selected by the user.

[0047] Among them, the target responsibility zone is a specific responsibility zone that the user currently selects to carry out safety acceptance. By selecting in the responsibility zone list, you can quickly locate the area where the acceptance work is to be carried out. The target acceptance project is one or more specific projects selected in the target responsibility zone that need to be inspected for acceptance. The target acceptance content is the specific checkpoints that need to be inspected and verified for the selected target acceptance project, including the qualification requirements and judgment criteria for each checkpoint. The target acceptance position is a list of positions that are directly associated with the actual execution of the acceptance task after the target acceptance project is determined, based on the binding relationship between the acceptance project and the position recorded in the system.

[0048] Specifically, after receiving the user (manager)'s request to initiate an acceptance task, the safety acceptance system will first pop up a responsibility partition directory for the user to select the target responsibility partition; then, based on the acceptance plan of the selected responsibility partition, the system extracts all acceptance items in the partition and presents them in a list for the user to select one or more target acceptance items; then, the system obtains the detailed acceptance content of each target acceptance item from the acceptance plan and generates a complete acceptance checklist; at the same time, the system directly determines the list of positions for executing this acceptance task based on the preset binding relationship between the acceptance items and the acceptance positions. After the target responsibility partition, acceptance items, acceptance content, and acceptance positions are determined, the system will generate a complete acceptance task list as a basis for issuing tasks and guiding on-site acceptance.

[0049] In some embodiments, the selection of target acceptance objects and contents can be achieved in a variety of ways: Optionally, the user selects the responsibility partition and acceptance items in the visual interface of the mobile terminal applet, and the system matches the corresponding acceptance content and positions in real time, and dynamically generates an acceptance task list; Optionally, the user selects the responsibility partition by clicking the mouse through the Web management page, and the acceptance items, etc., use fuzzy search boxes and keyword screening, and the system asynchronously returns the matching acceptance content and position list; Optionally, the user talks to the system and directly describes the area and object that he wants to check in voice or text, and the system uses natural language understanding technology to parse semantics and reason, intelligently matches the acceptance plan to generate a structured acceptance task. It can be understood that as long as the target area and object that the user wants to check can be accurately obtained, and the corresponding execution content and position are matched according to the preset acceptance plan, it can be regarded as meeting the implementation requirements of this step, and it is not limited here.

[0050] S104. Generate an acceptance task list according to the target acceptance position and the target acceptance content, and send the acceptance task list to the acceptance terminal of the target acceptance personnel corresponding to the target acceptance position.

[0051] Among them, the acceptance task list is a detailed description of the acceptance work, mainly including the time, location, object, content, requirements, executor and other elements of the acceptance, which is the direct basis for the target acceptance personnel corresponding to the target acceptance position to carry out on-site inspections. The acceptance terminal is a mobile operating device carried by the target acceptance personnel to receive acceptance instructions, record the acceptance process and feedback the acceptance results. It is usually a smart phone or tablet computer with a matching acceptance operation applet or APP installed.

[0052] Specifically, the safety acceptance system combs through the target acceptance content one by one, describes the acceptance requirements of the checkpoints in structured language, and forms an operational guide for acceptance; at the same time, the system sets the corresponding acceptance duration and completion deadline requirements according to the importance and difficulty of each checkpoint. On the other hand, the system generates a unique identification code for this acceptance task, associates the object and executor of the acceptance, and avoids duplication or omission. After the task list is generated, the system pushes the acceptance task sheet to the acceptance terminal bound to each target acceptance personnel, and prompts the target acceptance personnel to complete the task in time in the form of push notifications or to-do items. The target acceptance personnel sign for the task through the acceptance applet, conduct on-site inspections according to the task list, and upload the qualified status of each checkpoint and related photo evidence to the system. When all checkpoints are qualified or the acceptance task times out, the system automatically marks the acceptance task as completed.

[0053] In some embodiments, the generation and distribution of the acceptance task list can be achieved in a variety of ways: Optionally, the system exports the acceptance content into a structured electronic spreadsheet, manually edits it into a task guide that is easy for the acceptance personnel to understand and operate, and then sends it to the acceptance personnel through instant messaging tools; Optionally, the system converts the acceptance content into an H5 page, generates a QR code or a short link, and the acceptance personnel can view the acceptance requirements in the browser by scanning the code with a mobile phone, and fill in the acceptance results online; Optionally, the system calls the API interface of the company's existing task management or workflow system, writes the acceptance task list into a third-party platform, and the acceptance personnel receive and execute the tasks in the original tool to maintain usage habits. It is understandable that the form and distribution channel of the acceptance task list can be flexibly designed. As long as the acceptance personnel can be clearly informed of the content and requirements that need to be checked, and the feedback on the acceptance results can be tracked, it can be regarded as meeting the implementation requirements of this step, and there is no limitation here.

[0054] S105: receiving the acceptance record uploaded by the acceptance terminal, and generating an acceptance result form based on the acceptance record.

[0055] Among them, the acceptance record is the original information related to the acceptance content collected by the target acceptance personnel through the acceptance terminal during the on-site inspection, usually including on-site photos, qualified status determination, measurement data and problem descriptions. The original acceptance record proves the actual completion of the on-site acceptance work and is the basic basis for the acceptance results. The acceptance result form is a structured acceptance report automatically generated by the system after the acceptance records are summarized and processed. It generally uses general formats such as EXCEL and PDF to clearly record the qualified or unqualified status of the acceptance object, as well as the specific problems that need to be rectified, and can be used as the formal delivery results of the acceptance work.

[0056] Specifically, when the target acceptance personnel complete the on-site inspection, they will upload the acceptance records such as the acceptance status and supporting evidence to the security acceptance system through the acceptance terminal, and confirm the submission of the acceptance results. After the system receives the acceptance records, it first encrypts and stores the uploaded pictures, data and other information; then, the system reviews the acceptance records one by one, reviews the acceptance results reported by the target acceptance personnel, and focuses on the checkpoints that failed the acceptance; for checkpoints with abnormal acceptance results or insufficient evidence, the system can make a secondary judgment through manual or algorithm, classify and summarize the final acceptance results according to the checkpoints, and fill in the corresponding fields of the acceptance task form. At the same time, the system extracts the problem description of the unqualified checkpoints, and forms a list of problems and rectification suggestions in the acceptance result form. After the acceptance result is confirmed, the system will synchronously return the acceptance form to the target acceptance personnel and trigger the end of the acceptance task process.

[0057] In some embodiments, the collection and recording of acceptance results can be achieved in a variety of ways: Optionally, the acceptance personnel use the acceptance terminal to take photos manually, directly make a qualified or unqualified judgment and text description for each checkpoint, and all contents are summarized and uploaded in batches at one time; Optionally, the system sends the acceptance form to the acceptance terminal, and the acceptance personnel check each item against the electronic form. The form fields support text, pictures, audio and other forms of input. The acceptance personnel complete the form and submit it online; Optionally, the acceptance personnel can even wear AR glasses to conduct on-site inspections. The glasses automatically take photos and identify the status of the checkpoints, and synchronously record the acceptance personnel's explanations with voice. The system summarizes the acceptance records generated by human-machine collaboration in real time to generate an acceptance report. It is understandable that the collection method of acceptance records and the generation method of acceptance reports can be combined with the latest mobile application technology and artificial intelligence algorithms to continuously simplify on-site acceptance operations and improve the standardization of acceptance results. This is not limited here.

[0058] The following is a more detailed description of the process of the method provided by this implementation. Figure 2 , which is another flow chart of the security acceptance method based on regional configuration push acceptance content in an embodiment of the present application.

[0059] S201. Divide the project work area into multiple responsibility zones according to user settings, and bind a responsibility position to each responsibility zone.

[0060] Referring to step S101, the safety acceptance system divides the project work area into multiple responsibility zones and binds the responsibility positions.

[0061] S202. Determine multiple acceptance items corresponding to the responsibility zones, and bind acceptance positions and acceptance contents to each acceptance item.

[0062] Referring to step S102, the safety acceptance system will bind the acceptance position and acceptance content to the acceptance project.

[0063] In some embodiments, the safety acceptance system obtains the type of engineering construction corresponding to the responsibility zone, determines the standard acceptance items corresponding to the engineering construction type; generates a standard acceptance template based on the standard acceptance items; the standard acceptance template includes standard acceptance content corresponding to each standard acceptance item; updates the standard acceptance template based on user editing input, and generates acceptance items and acceptance content corresponding to the responsibility zone; user editing input includes adding, deleting or modifying standard acceptance items and standard acceptance content; obtains the personnel position list of responsibility positions associated with the responsibility zone, and selects the acceptance position from the personnel position list based on the acceptance content, and binds the acceptance content and acceptance position to the corresponding acceptance project.

[0064] Among them, the construction type refers to the different construction stages or professional fields of the construction project, such as civil engineering, installation, decoration, etc. Standard acceptance items refer to the general acceptance items that are generally applicable to a certain type of project, which can be extracted from national or industry standards. The standard acceptance template is a working draft that solidifies the standard acceptance items and their acceptance contents in the form of a table, which is used to guide the actual safety acceptance operation. User editing input means that managers are allowed to perform secondary processing on the standard acceptance template to meet the personalized needs of the project.

[0065] Specifically, after clarifying the jurisdiction of the responsibility zone, the safety acceptance system accesses the engineering type knowledge base and automatically maps the main construction content of each zone; then, the system retrieves the preset standard acceptance project library according to the construction content, matches the general acceptance items with the characteristics of the zone, and preliminarily generates a standard acceptance template for the zone; then, the system provides managers with a graphical template editing interface, supports customized needs, and fills personalized acceptance elements into the standard template to form a final acceptance plan; finally, the system sorts out the personnel structure of each responsibility zone, takes inventory of available human resources, evaluates the professional expertise of personnel through questionnaires, competency assessments, and other methods, and screens acceptance personnel.

[0066] In some embodiments, the standard acceptance items can be personalized in a variety of ways: Optionally, the system reads the design briefing materials of the project where the responsible area is located, extracts atypical sub-items with special safety requirements such as underground projects and high-support formwork projects, and expands the standard acceptance items accordingly; the management personnel then review the deviation between the standard items and the actual project, and manually adjusts the acceptance granularity. Optionally, the system distributes survey questionnaires to the departments to which the responsible areas belong, collects the experience and judgment of front-line managers on potential safety hazards; conducts qualitative analysis of the survey results, and reflects the key issues of concern to all parties in the acceptance content; and then the system generates a personalized acceptance questionnaire for the management personnel to fill in and confirm. It is understandable that the customization process of the acceptance plan can also introduce technical means such as big data analysis and artificial intelligence to fully explore the characteristics of the partition, fully absorb the demands of all parties, and maximize the scientific nature of the acceptance plan, which will not be expanded here.

[0067] S203. Obtain the actual construction progress of the project work area.

[0068] Among them, the actual construction progress refers to the dynamic construction status of each sub-project in the project work area, including the production status data such as the completed project volume, the construction process in progress, and the tasks to be constructed. Safety acceptance needs to be synchronized with the construction progress, and the acceptance of completed projects should be organized in time, and the acceptance plan for the projects under construction should be made in advance.

[0069] Specifically, the safety acceptance system obtains real-time project production progress data by connecting with the information management system of the construction site; or, by linking with the mobile terminal applet (or APP) of the construction management personnel, it receives the construction log information filled in manually; or, through intelligent sensing equipment, it collects the dynamics of personnel, machinery, etc., and evaluates the progress of the project after analysis and processing. After obtaining the construction progress data, the system compares it with the construction progress plan to determine the completion status of the sub-projects in each responsible area, and uses it to predict the time window for acceptance.

[0070] S204. Determine the safety acceptance time based on the actual construction progress.

[0071] Among them, the safety acceptance time refers to the time node or period when the safety acceptance work is formally organized. Determining the safety acceptance time requires comprehensive consideration of multiple factors such as construction progress, management needs, and external environment.

[0072] There are usually two situations when the safety acceptance system executes this step: one is that when the actual construction progress is consistent with the planned progress, routine acceptance is carried out according to the original planned time; the other is that in the event of unplanned situations, such as the discovery of major safety hazards, regulatory agency requirements, etc., it is necessary to immediately initiate "emergency acceptance". Specifically, after mastering the construction progress status of each area of ​​the project, the safety acceptance system analyzes the lag time of completed projects that have not yet been accepted, and combines the overall construction schedule to estimate the latest time limit for acceptance of each acceptance project; at the same time, the system reads the regular acceptance time regulations in the project management system, and takes into account statutory holidays, bad weather and other non-construction factors, and finally determines the safety acceptance time for each responsible area. For temporarily increased acceptance requirements, the system will refer to the severity of the problem and available resources, and arrange the acceptance time in line, or directly advance the acceptance time according to the user's settings.

[0073] In some embodiments, the following strategies can be adopted to determine the safety acceptance time: Optionally, the safety acceptance system presets static rules for acceptance time based on the process chain characteristics and construction period requirements of the acceptance project, such as "acceptance will be carried out within XX days after the completion of the underground project", "comprehensive acceptance will be carried out at the end of each month", etc., and manually configures them into the acceptance plan. Optionally, the safety acceptance system analyzes historical acceptance data, conducts statistical learning on the acceptance preparation time, organizational cycle, problem rectification time, etc. of different types of acceptance projects, constructs an acceptance time prediction model, and dynamically generates it in combination with real-time construction progress. It is understandable that the determination of the acceptance timing can also introduce more expert experience, such as analogy based on similar project cases, artificial intelligence-assisted time optimization, etc., in the hope of achieving the best balance between construction control and safety supervision, which will not be expanded here.

[0074] S205: Send a safety acceptance reminder to a user terminal used by the user at a preset lead time of the safety acceptance time.

[0075] The preset lead time refers to the time point when an acceptance reminder is sent to the management personnel a certain amount of time in advance before the official acceptance time. The user terminal usually refers to the office computer or mobile device used by project managers on a daily basis, which is installed with the client program supporting the safety acceptance system and can receive various notification reminder messages from the system.

[0076] The timing of executing this step by the safety acceptance system is usually slightly earlier than the planned safety acceptance time, but sufficient reminder preparation time must be left, generally 3-7 days in advance, so as to facilitate the advance planning of the time of each acceptance personnel. Specifically, after determining the specific time point for the safety acceptance of each responsible area, the system will estimate the preparation time for the acceptance work based on factors such as the complexity of the acceptance task and the number of departments involved, and send an acceptance reminder to the manager's PC or mobile terminal a corresponding number of days in advance. The reminder content includes key elements such as the time, location, object, and executor of the proposed acceptance, and if necessary, the regulations and standards for safety acceptance will be attached. At the same time, the system will set preset reminder push rules, such as pushing once at 9 am every day 3 days before the acceptance, and reminding again 1 hour in advance on the day of the acceptance, etc., to strengthen the acceptance awareness of managers through multiple frequencies and channels.

[0077] In some embodiments, the following methods can be used to send acceptance reminders: Optionally, the system automatically generates and prints an acceptance notice, which is delivered to the manager by a dedicated person, and the electronic version of the document is simultaneously sent to his mailbox; to ensure that the notification arrives, the system also pushes the acceptance reminder information to the manager's instant messaging tool. Optionally, the system calls the schedule management service of the enterprise intranet to create an acceptance task reminder event in the manager's work schedule; before the task expires, the office software will automatically pop up a prompt box, accompanied by sound and light vibration to attract the manager's attention. It is understandable that the creation and push of acceptance reminders can also be embedded in various business processes of project management, such as linkage with material planning, risk warning and other links, and multi-dimensional control of acceptance work is not omitted, which will not be elaborated here.

[0078] S206: Determine multiple target responsibility partitions and corresponding multiple target acceptance items selected by the user.

[0079] Among them, the target responsibility zone refers to one or more responsibility areas that the management personnel currently choose to carry out safety acceptance. Each acceptance can be for one responsibility area, or a joint acceptance can be carried out for multiple responsibility areas. The target acceptance project refers to the specific list of projects that need to be inspected and accepted within the target responsibility area, which is selected and confirmed by the management personnel based on the acceptance focus.

[0080] The timing for the safety acceptance system to execute this step is usually when the manager responds to the acceptance reminder and enters the acceptance task management link. Specifically, when the manager clicks on the upcoming acceptance task in "My To-Do" or the acceptance task list, the system will pop up the responsibility area selection box corresponding to the task. The default check is consistent with the target responsibility area selected when the acceptance task was initiated. At the same time, it supports managers to manually add or delete responsibility areas. After clarifying the acceptance area, the system will pop up the acceptance project selection interface for each responsibility area. Managers can select multiple specific acceptance projects across regions to form a target task list for this acceptance. The system will also intelligently recommend commonly used area combinations and hot acceptance projects based on the historical behavior of managers.

[0081] In some embodiments, the following interactive methods can be used to select target responsibility areas and acceptance items: Optionally, the overall project plan is embedded in the acceptance task interface, and the manager can click on one or more responsibility areas in the plan with the mouse, and the selected area is automatically highlighted; then, a bubble box of acceptance items for each area appears on the plan, and you can click on the bubble to view the specific project and add it to the acceptance list. Optionally, long press on the electronic map interface of the mobile mini program to initiate acceptance, the screen focuses and switches to the project map, and the manager can slide his finger on the screen to select the target responsibility area; then, combined with the real-life street view picture, the system determines the acceptance object of interest to the manager based on the position of his line of sight, and dynamically generates a list of alternative projects.

[0082] S207. Determine target acceptance posts corresponding to multiple target acceptance items.

[0083] Specifically, the safety acceptance system is based on the cross-regional target acceptance projects selected by managers, and cross-comparison is performed on the acceptance positions pre-bound to each acceptance project to form a preliminary job selection list; then, the system accesses the enterprise organizational structure data, analyzes the characteristics of the departments, professions, roles, etc. covered by the job selection list, and evaluates the professional capabilities of the acceptance team; combined with the historical acceptance experience and performance evaluation of the acceptance personnel corresponding to the acceptance position, members who meet the requirements are selected to form an acceptance team.

[0084] S208. Generate an acceptance project sequence list according to the preset priorities of multiple target acceptance projects and the work schedule of target acceptance personnel corresponding to target acceptance positions.

[0085] The preset priority refers to the inspection order set in advance according to the importance and urgency of the project in the target acceptance project set. The work schedule refers to the original working time usage of each person in the acceptance position, and records the personal schedules of each person such as meetings, business trips, vacations, etc., in addition to the acceptance tasks, and the time usage in multiple acceptance tasks.

[0086] Specifically, after clarifying the target acceptance items and acceptance positions, the safety acceptance system first extracts the three preset ABC levels of each acceptance item, sets priorities according to indicators such as the project's risk level and management level requirements, and sorts the projects; at the same time, the system reads the schedule of each acceptance personnel in the office system or personal social software at the acceptance position, and the occupancy of other acceptance tasks, and marks the usage status of their time; the system uses the job scheduling algorithm to allocate inspection tasks, taking into account the priority and personnel work time ratio constraints, to form the selection of target acceptance personnel and a preliminary acceptance schedule; finally, the system automatically creates inspection tasks on the project calendar, and synchronizes them with the personal schedule of the target acceptance personnel to form an acceptance project sequence list.

[0087] It should be noted that the working principle of the job scheduling algorithm is: first collect the priority information of all acceptance projects, and high-priority projects need to be arranged for acceptance as soon as possible; secondly, obtain the personnel list of each acceptance position and the original work schedule of each person; then establish a multi-dimensional optimization model, the goal is to reasonably sort the acceptance projects according to priority, and try to compress the total planned occupancy time of personnel in different positions; finally, solve the optimal time allocation plan under the conditions of project priority and personnel time constraints, match each acceptance project to the corresponding position and personnel in sequence, and output the final acceptance task schedule.

[0088] The training of this multi-dimensional optimization model uses historical acceptance plan data for supervised learning. The input is a list of acceptance projects from previous projects, including the priority of each project, the region it belongs to, and other attributes; a list of personnel in acceptance positions, including the role, skills, and other attributes of each person; and the final acceptance plan schedule that is actually executed. The output is multiple time allocation plans. The training goal is to minimize the total time of the acceptance plan while meeting the constraints of project priority and personnel time constraints. The internal parameters of the model are gradually adjusted through the gradient descent method to make the acceptance plan time result predicted by the model as close as possible to the actual optimal plan time.

[0089] The constraints of this job scheduling algorithm include: high-priority projects will be arranged at earlier positions in the chronological order; the idle time of people in the same position will be reasonably utilized; the time utilization of people in different positions will be balanced; a single person will be allowed to accept combinations of projects with adjacent areas as much as possible; and avoiding assigning multiple projects to the same person at the same time.

[0090] In some embodiments, the following method can be used to generate a sequence list of acceptance items: Optionally, the system manually judges the importance and urgency of each item based on a preset acceptance item weight template, directly calculates the comprehensive priority score of the item, and arranges the items in a row according to the total score to form a sequence list. Optionally, the system analyzes the inspection order, problem discovery rate, accident hazard correlation and other data of the items in previous acceptances, uses an association rule mining algorithm to find the optimal inspection path for different types of items, and then substitutes it into the current acceptance object for dynamic solution.

[0091] It should be noted that for a certain responsibility zone, the ordering rules of its acceptance items need to be logical and follow the logical order of basic acceptance work. That is, the inspection of each zone can be arranged in parallel, but the use of personnel cannot be parallel, and the target acceptance personnel cannot be arranged to inspect two zones at the same time; for example, if a person is assigned to a zone at a certain acceptance post at the same time, and the project acceptance of another zone requires the person at that acceptance post, then another person should be assigned at this time, or the acceptance of the project should be postponed when there are no idle personnel at the acceptance post.

[0092] S209, respectively determine the acceptance time, target acceptance position and target acceptance content corresponding to multiple target acceptance items in the acceptance item sequence table.

[0093] Among them, the acceptance time refers to the specific time point or period when the on-site inspection work of each acceptance project is actually carried out.

[0094] Specifically, the safety acceptance system takes the acceptance project sequence as the basis, analyzes factors such as the workload, number of personnel, spatial distance, etc. of each project, and calculates the time required for a single acceptance task; at the same time, the system sorts out the idle time of each person in the acceptance position, such as lunch breaks, work breaks and other free time periods, and fills the acceptance projects into the free time slots one by one to form a preliminary allocation plan; then, the preliminary plan is imported into the intelligent planning engine for optimization, and the time and space costs of each person corresponding to the acceptance position are compressed according to the principle of proximity, forming the final execution schedule of the acceptance project; finally, the system reads the historical inspection records of each acceptance project, extracts vulnerable items that have had problems many times, and forms a list of target acceptance content for the project.

[0095] In some embodiments, the following technical means can be used to arrange the acceptance plan: Optionally, the system uses visualization tools such as Gantt charts to match the acceptance sequence table with the personnel schedule in a two-dimensional matrix. The time dimension shows the continuity of the task, and the personnel dimension reflects the execution order of the task. Manually dragging and adjusting the task bar in the Gantt chart can make a decision. Optionally, the system uses operations optimization models such as integer programming and genetic algorithms to set variables such as the duration, personnel, and path of the acceptance task as constraints, and constructs a mathematical model with the shortest total acceptance time as the objective function to solve the relatively optimal acceptance plan. It is understandable that the arrangement process of the acceptance plan involves a combinatorial optimization problem with multiple objectives and multiple constraints. In the future, machine learning algorithms can be further introduced to establish lightweight heuristic rules to seek a balance between the quality of the solution and the generation efficiency. This will not be expanded here.

[0096] S210. Generate an acceptance task list of multiple acceptance tasks corresponding to the target acceptance position according to the target acceptance content.

[0097] Among them, the acceptance task list is a detailed breakdown of this acceptance work, which clearly stipulates the specific requirements of each acceptance task, such as the execution time, executor, and execution content. Each acceptance personnel selected for the target acceptance position will receive a collection of several acceptance tasks for which he is responsible.

[0098] Specifically, the safety acceptance system reads the acceptance plan output in the previous step, aggregates the planned tasks according to the acceptance position dimension, and then generates a personal acceptance task list; for each task assigned to the list, the system extracts the corresponding target acceptance content and converts it into colloquial acceptance step instructions, such as "check the XX part of the main body of the XX area that has been completed", "check whether the XX process used in the XX process meets the requirements", etc.; at the same time, the system sets the expected completion time of the acceptance task according to the amount of acceptance content; in addition, the system also embeds the acceptance-based clauses, specifications, form templates, etc. into the corresponding tasks, so that the acceptance personnel can call them at any time.

[0099] In some embodiments, the following method can be used to generate an acceptance task list: Optionally, the system associates and matches the acceptance plan table with the organizational structure data, and drills down the planned tasks layer by layer according to the dimensions of department, role, etc., until it is refined to each specific executor; then, the system calls the work order task business logic, and collects the decomposed inspection items under the name of the corresponding acceptance personnel to form a personal to-do list. Optionally, the system reads the structured indicators in the target acceptance content library and dynamically generates a template sentence for the acceptance operation steps; then, the task attributes in the acceptance plan are matched with the template sentences to fill in the blanks, and a friendly and easy-to-understand natural language task guide is output; and then it is pushed to the mobile task panel of each acceptance personnel. It is understandable that the generation process of the acceptance task can also preset multiple sets of strategies and support flexible customization, such as one-click switching of concise / detailed mode, and the ability to independently select the object of assignment, etc., to meet the differentiated needs of different enterprises or projects, which will not be elaborated here.

[0100] S211. Send the acceptance task list to the acceptance terminal of the target acceptance personnel corresponding to the target acceptance post.

[0101] The acceptance terminal refers to the mobile operating equipment used by the target acceptance personnel when performing inspection tasks on site, usually a smartphone or tablet computer with a dedicated acceptance APP (or mini program) installed. Sending to the acceptance terminal means pushing the task list from the system background to the mobile application carried by the target acceptance personnel, which is convenient for on-site operation.

[0102] Specifically, after generating a personalized acceptance task list, the system will synchronize the list contents to the acceptance APP server through the data interface; the server will rely on the mobile message push mechanism to send the task list contents in the form of messages to the acceptance terminal bound to each target acceptance personnel in real time; the target acceptance personnel can see the assigned tasks in the to-do task list when they open the APP, and can also click on the task card to expand and view the details of the inspection items; at the same time, the system will set up the first push reminder, such as automatically popping up a notification bar reminder half an hour before the start of the task, accompanied by sound, light and vibration to remind the target acceptance personnel to start work in time; for tasks that the target acceptance personnel have not signed for in time, the system will also remind them repeatedly at intervals to urge them to complete them on time.

[0103] S212: Receive execution status information corresponding to the acceptance task sent by the acceptance terminal, and update the acceptance task list based on the execution status information.

[0104] Among them, execution status information refers to the immediate feedback such as task execution progress and problems found reported by the (target) acceptance personnel through the acceptance terminal during the process from the start to the completion of the acceptance task. Common statuses include "started", "in progress", "completed", "terminated", etc.

[0105] The purpose of the safety acceptance system to perform this step is to establish a two-way feedback mechanism for the acceptance process. Specifically, when the acceptance personnel use the mobile terminal to conduct on-site inspections, the acceptance APP will first automatically record the actual start time of the acceptance task and change the task status to "in progress"; during the inspection process, if the acceptance personnel find any hidden problems, they can take photos and upload pictures of the problems, and briefly describe the problems. The system will summarize the number of problems in real time and associate them with the acceptance tasks; after the acceptance personnel complete all the inspections, click the "Complete Task" button, and the APP will automatically record the completion time. The acceptance terminal will transmit the above process data back to the system in real time, which will be reflected as a change in the percentage of task progress in the management personnel's acceptance overview interface. For tasks completed on schedule, the system automatically updates the status to "Completed".

[0106] In some embodiments, the safety acceptance system receives the acceptance time of the acceptance task, including the start time and the completion time; receives the acceptance results of each checkpoint of the acceptance task, including the qualified status or unqualified status; receives supporting materials for the acceptance task, including on-site photos and video evidence; determines the overall completion progress and pass rate of the acceptance task based on the acceptance time, acceptance results and supporting materials of the acceptance task; marks the acceptance task based on the overall completion progress and pass rate, and updates the acceptance task list.

[0107] Among them, the acceptance time includes the start and end time of each acceptance task, which is the basic constraint condition to ensure the inspection is completed on schedule. Checkpoints refer to the specific inspection items that need to be verified one by one for each acceptance task, and each checkpoint has a clear qualification standard. Supporting materials refer to the image data collected during the acceptance process to support the inspection results, usually including on-site photos, videos, problem recordings, etc. The completion progress and qualification rate of the acceptance task are used to measure the completion status and quality status of the task respectively.

[0108] After the acceptance task is issued, the safety acceptance system starts continuous monitoring of the acceptance process. Specifically, when the acceptance personnel start the on-site inspection, the system automatically collects the start time through the acceptance terminal; after checking each item one by one, the acceptance personnel enter the pass / fail status of each checkpoint through the terminal, and take photos or record short videos in time to upload as supporting evidence; after completing all the content, the terminal APP automatically records the completion time. When the acceptance task is in execution, the system counts the number of completed checkpoints in real time, combines the weight of the inspection content, calculates the overall completion percentage, and intuitively feedbacks the progress; and the pass rate of each checkpoint is used as a key indicator for the quality of task completion. For abnormal deviations of progress or quality from expectations, the system will issue timely warnings and urge rectification. After the acceptance is completed, you can also overview the acceptance results on the task panel, reward excellent tasks, and initiate a review mechanism for problematic tasks.

[0109] S213. Receive the acceptance record uploaded by the acceptance terminal, and generate an acceptance result form based on the acceptance record.

[0110] Referring to step S105, the safety acceptance system will generate an acceptance result form.

[0111] In some embodiments, the safety acceptance system will extract the acceptance records with unqualified acceptance results in the acceptance result form, and generate an acceptance problem list including multiple acceptance issues; determine the rectification responsibility areas, rectification responsibility positions, rectification deadlines and rectification requirements for each acceptance problem, and generate a rectification notice; send the rectification notice to the corresponding rectification responsibility position, and receive the problem rectification results reported by the corresponding rectification responsible personnel of the rectification responsibility position; update the acceptance problem list and acceptance result form according to the problem rectification results.

[0112] Among them, the acceptance problem list summarizes all the unqualified items found in this acceptance and their detailed information, which is the source of triggering the subsequent problem rectification work. The rectification notice is a rectification plan task list formulated for each problem, which must clearly specify the person responsible for rectification of each problem, the rectification time limit and specific requirements. The rectification result refers to the feedback submitted by the person responsible for the problem after completing the rectification, including the rectification process record and photos after the rectification.

[0113] Specifically, the system first filters and screens the acceptance records, extracts all the items with "unqualified" acceptance results, and forms a list of potential problems; then, classifies the problem items by professional category, and automatically matches them to the corresponding rectification responsible departments and persons in charge based on the analysis of the reasons for the unqualified items; then, the system comprehensively evaluates the urgency of the rectification work based on the criticality of the problem, and sets a deadline for the completion of the rectification; then, based on the specific description of the unqualified items and referring to the safety standards, practical and feasible rectification measures are proposed. The system pushes the rectification notice to the corresponding personnel and simultaneously requires online feedback on the rectification results. After receiving the feedback, the system updates the rectification status of the acceptance problem to form a closed-loop management.

[0114] In the embodiment of the present application, since the project site is divided into units and visual responsibility allocation is carried out, the acceptance management line is opened up, comprehensive performance supervision is achieved, and the problem of insufficient implementation of acceptance responsibilities in traditional acceptance work is effectively solved, thereby realizing collaborative work of acceptance business. At the same time, since the mobile Internet model is adopted, the acceptance standards are dynamically transmitted to the mobile terminal of each acceptance personnel, the operation is simplified through human-computer interaction, and the process guides standardized behavior, so the hands of front-line employees are liberated to the greatest extent, human errors are reduced, and the acceptance process is traceable, and the acceptance results are traceable, which effectively improves the digitalization and standardization of construction project safety management.

[0115] The following describes the safety acceptance system in the embodiment of the present invention from the perspective of hardware processing. Figure 3 , which is a schematic diagram of a physical device structure of a safety acceptance system in an embodiment of the present application.

[0116] It should be noted that Figure 3 The structure of the safety acceptance system shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0117] like Figure 3 As shown, the safety acceptance system includes a central processing unit (CPU) 301, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 302 or the program loaded from the storage part 308 to the random access memory (RAM) 303, such as executing the method described in the above embodiment. In RAM 303, various programs and data required for system operation are also stored. CPU 301, ROM 302 and RAM 303 are connected to each other through bus 304. Input / output (I / O) interface 305 is also connected to bus 304.

[0118] The following components are connected to the I / O interface 305: an input section 306 including an audio input device, a button switch, etc.; an output section 307 including a liquid crystal display (LCD) and an audio output device, an indicator light, etc.; a storage section 308 including a hard disk, etc.; and a communication section 309 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 309 performs communication processing via a network such as the Internet. A drive 310 is also connected to the I / O interface 305 as needed. A removable medium 311, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 310 as needed so that a computer program read therefrom is installed into the storage section 308 as needed.

[0119] In particular, according to an embodiment of the present invention, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present invention includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a computer program for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through the communication part 309, and / or installed from a removable medium 311. When the computer program is executed by the central processing unit (CPU) 301, various functions defined in the present invention are performed.

[0120] It should be noted that specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in combination with an instruction execution system, apparatus, or device.

[0121] The flowcharts and block diagrams in the accompanying drawings illustrate the possible architecture, functions and operations of the systems, methods and computer program products according to various embodiments of the present invention. Each box in the flowchart or block diagram may represent a module, a program segment, or a part of a code, and the above-mentioned module, program segment, or a part of a code contains one or more executable instructions for implementing the specified logical functions. It should also be noted that in some alternative implementations, the functions marked in the box may also occur in an order different from that marked in the accompanying drawings.

[0122] Specifically, the security acceptance system of this embodiment includes a processor and a memory. The memory stores a computer program. When the computer program is executed by the processor, the security acceptance method for pushing acceptance content based on regional configuration provided in the above embodiment is implemented.

[0123] As another aspect, the present invention further provides a computer-readable storage medium, which may be included in the security acceptance system described in the above embodiment; or may exist independently without being assembled into the security acceptance system. The above storage medium carries one or more computer programs, and when the above one or more computer programs are executed by a processor of the security acceptance system, the security acceptance system implements the security acceptance method based on regional configuration push acceptance content provided in the above embodiment.

[0124] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

[0125] As used in the above embodiments, the term "when..." may be interpreted to mean "if..." or "after..." or "in response to determining..." or "in response to detecting...", depending on the context. Similarly, the phrases "upon determining..." or "if (the stated condition or event) is detected" may be interpreted to mean "if determining..." or "in response to determining..." or "upon detecting (the stated condition or event)" or "in response to detecting (the stated condition or event)", depending on the context.

[0126] Those skilled in the art can understand that to implement all or part of the processes in the above-mentioned embodiments, the processes can be completed by computer programs to instruct related hardware, and the programs can be stored in computer-readable storage media. When the programs are executed, they can include the processes of the above-mentioned method embodiments. The aforementioned storage media include: ROM or random access memory RAM, magnetic disk or optical disk and other media that can store program codes.

Claims

1. A security acceptance method for pushing acceptance content based on regional configuration, characterized in that: Applied to a safety acceptance system, the method comprises: According to user settings, the project work area is divided into multiple responsibility zones, and each responsibility zone is bound to a responsibility position; Determine multiple acceptance items corresponding to the responsibility zones, and bind acceptance posts and acceptance contents to each of the acceptance items; the acceptance posts are one or more of the responsibility posts; and the acceptance posts are bound to one or more acceptance personnel; Determine the corresponding target acceptance positions and target acceptance contents according to the target responsibility divisions and target acceptance items selected by the user; Generate an acceptance task list according to the target acceptance post and the target acceptance content, and send the acceptance task list to the acceptance terminal of the target acceptance personnel corresponding to the target acceptance post; The acceptance record uploaded by the acceptance terminal is received, and an acceptance result form is generated based on the acceptance record.

2. The method according to claim 1, characterized in that Before the step of determining the corresponding target acceptance posts and target acceptance contents according to the target responsibility zones and target acceptance items selected by the user, the method further includes: Obtain the actual construction progress of the project work area; Determine the safety acceptance time based on the actual construction progress; At a preset lead time of the safety acceptance time, a safety acceptance reminder is sent to a user terminal used by the user.

3. The method according to claim 1 or 2, characterized in that: The target acceptance post and target acceptance content are determined according to the target responsibility division and target acceptance item selected by the user, specifically including: Determine multiple target responsibility partitions and corresponding multiple target acceptance items selected by the user; Determine target acceptance positions corresponding to the multiple target acceptance items; Generate an acceptance project sequence list according to the preset priorities of the multiple target acceptance projects and the work schedule of the target acceptance personnel corresponding to the target acceptance positions; The acceptance time, target acceptance position and target acceptance content corresponding to the plurality of target acceptance items in the acceptance item sequence table are determined respectively.

4. The method according to claim 1, characterized in that: Determining a plurality of acceptance items corresponding to the responsibility zones and binding acceptance positions and acceptance contents to each of the acceptance items specifically includes: Obtain the engineering construction type corresponding to the responsibility zone, and determine the standard acceptance items corresponding to the engineering construction type; Generate a standard acceptance template according to the standard acceptance items; the standard acceptance template includes the standard acceptance content corresponding to each of the standard acceptance items; Based on the user editing input, the standard acceptance template is updated to generate the acceptance items and acceptance contents corresponding to the responsibility partition; the user editing input includes adding, deleting or modifying the standard acceptance items and the standard acceptance contents; Obtain a personnel position list of responsibility positions associated with the responsibility zone, select acceptance positions from the personnel position list according to the acceptance content, and bind the acceptance content and the acceptance position to the corresponding acceptance project.

5. The method according to claim 1, characterized in that The generating of the acceptance task list according to the target acceptance post and the target acceptance content, and sending the acceptance task list to the acceptance terminal of the target acceptance personnel corresponding to the target acceptance post, specifically includes: Generate an acceptance task list of multiple acceptance tasks corresponding to the target acceptance post according to the target acceptance content; Sending the acceptance task list to the acceptance terminal of the target acceptance personnel corresponding to the target acceptance post; Receive execution status information corresponding to the acceptance task sent by the acceptance terminal, and update the acceptance task list based on the execution status information.

6. The method according to claim 5, characterized in that The execution status information includes the overall completion progress and the qualified rate; the receiving the execution status information corresponding to the acceptance task sent by the acceptance terminal, and updating the acceptance task list based on the execution status information specifically includes: Receive the acceptance time of the acceptance task including the start time and the completion time; Receiving acceptance results including qualified or unqualified status of each checkpoint of the acceptance task; Receive supporting materials including on-site photos and video evidence of the said acceptance task; Determine the overall completion progress and pass rate of the acceptance task based on the acceptance time, acceptance results and supporting materials of the acceptance task; According to the overall completion progress and the pass rate, the acceptance tasks are marked and the acceptance task list is updated.

7. The method according to claim 1, characterized in that After the step of receiving the acceptance record uploaded by the acceptance terminal and generating an acceptance result form based on the acceptance record, the method further includes: Extracting acceptance records with unqualified acceptance results in the acceptance result form, and generating an acceptance problem list including multiple acceptance problems; Determine the rectification responsibility areas, rectification responsible positions, rectification deadlines and rectification requirements for each of the acceptance issues, and generate rectification notices; Send the rectification notice to the corresponding rectification responsible position, and receive the rectification results of the problems reported by the rectification responsible position; According to the problem rectification results, update the acceptance problem list and the acceptance result form.

8. A safety acceptance system, characterized in that: The safety acceptance system includes: one or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code includes computer instructions, and the one or more processors call the computer instructions to enable the safety acceptance system to perform the method described in any one of claims 1-7.

9. A computer-readable storage medium comprising instructions, characterized in that: When the instruction is executed on a safety acceptance system, the safety acceptance system is caused to execute the method according to any one of claims 1 to 7.

10. A computer program product, characterized in that When the computer program product runs on a safety acceptance system, the safety acceptance system is enabled to execute the method according to any one of claims 1 to 7.