By automatically generating fault logs, performing triple safety checks and automatically performing tasks in the power distribution network system, the problems of low fault processing efficiency and lack of automated safety checks in the existing technology are solved, and the automation and intelligence of fault processing are realized. , improves the stability and operation efficiency of the system.

CN119519130APending Publication Date: 2025-02-25YUNNAN POWER GRID CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411619800.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-13
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

The existing power distribution network system has problems such as low processing efficiency, lack of automated safety calibration mechanism, unintelligent task execution process, lagging information feedback and lack of real-time monitoring in terms of fault handling, resulting in failure response and inaccurate failure response, affecting power supply. Recover speed and increase the risk of misoperation.

Method used

By automatically generating fault logs in the distribution network OMS system, generating programmatic instructions and performing triple security verification, orchestrating and automatic execution of tasks, and real-time pushing and monitoring of task status, the automation and intelligence of fault processing are achieved.

Benefits of technology

It improves the efficiency of fault handling, reduces the risk of misoperation, ensures the safety and stability of system operation, and improves the stability and operation efficiency of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119519130A_ABST
    Figure CN119519130A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic fault handling cooperative control method and system, and relates to the technical field of power distribution network scheduling and fault management, and the method comprises the steps: generating a fault log in a distribution network OMS system, or enabling a dispatcher to manually add a log in an OCS system; transmitting the log to an OCS (Online Charging System) of the local and municipal bureau, and generating a programmed operation instruction according to the log; the method comprises the following steps: receiving a programmed instruction in a provincial distribution network OMS system, executing triple review, and then automatically associating the instruction with a fault log work order; arranging according to task operation steps and automatically executing in sequence; and in the task execution process, the operation state is pushed to the field end and the scheduling end in real time, and abnormal information is acquired and processed. The method supports programmed cooperative control, equipment state automatic verification, work order automatic execution and real-time monitoring, distribution network scheduling production efficiency is improved, power grid risks are reduced, power supply reliability is improved, and dispatchers are liberated from heavy instruction issuing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power distribution network dispatching and fault management, and in particular to a method and system for automatic fault handling and coordinated control. Background Art

[0002] In the prior art, the power distribution network system mainly relies on manual operation in fault handling, and has problems such as low processing efficiency, lack of automated safety verification mechanism, difficulty in realizing intelligent task execution process, delayed information feedback and lack of real-time monitoring. These deficiencies lead to the inability of the distribution network system to achieve fast and accurate operation in fault response, affecting the speed of power supply recovery and increasing the risk of misoperation. The present invention realizes the automation and intelligence of fault handling by automatically generating fault logs, generating programmed instructions and performing triple safety verification, arranging and automatically executing tasks, and pushing and monitoring task status in real time, effectively improving the efficiency of fault handling, reducing the risk of misoperation and ensuring the safety and stability of system operation. Summary of the invention

[0003] In view of the above-mentioned problems, the present invention is proposed.

[0004] Therefore, the technical problem solved by the present invention is: how to realize automatic fault handling and intelligent collaborative control in the power distribution network system, improve fault handling efficiency, reduce the complexity of human intervention, ensure the safety and accuracy of operation, and provide real-time task monitoring and information feedback functions to improve the stability and operation efficiency of the power system.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for automatic fault handling and coordinated control, which comprises the following steps:

[0006] Automatically generate fault logs in the distribution network OMS system, or manually add fault logs in the OCS system by the dispatcher;

[0007] The fault log work order and brief information are transferred from the provincial distribution network OMS system to the municipal bureau OCS system. According to the fault log content, click on the single line diagram to generate item-by-item programmed operation instructions;

[0008] In the provincial distribution network OMS system, the programmed operation instructions from the municipal bureau OCS system are received, triple review is performed, and the instructions are automatically associated with the fault log work order;

[0009] Arrange tasks according to the task operation steps and start automatic execution in the arranged order;

[0010] During the task execution process, the operation status is pushed to the on-site and dispatch ends in real time to obtain and process abnormal information.

[0011] As a preferred solution of the collaborative control method for automatic fault handling described in the present invention, the triple review includes safety logic verification, detecting the topology of the power grid before the operation instruction is executed, identifying the loop flow situation, and judging whether current shock or steady-state current exceeds the limit will occur during the operation.

[0012] As a preferred solution of the collaborative control method for automatic fault handling described in the present invention, the triple review includes equipment status verification, which verifies the consistency of the equipment status in the operation ticket, and determines whether the equipment status is consistent with the operation requirements by comparing the equipment card name, GISID and the equipment name on the operation ticket.

[0013] As a preferred solution of the collaborative control method for automatic fault handling described in the present invention, the triple review also includes operating condition verification to determine whether the operating conditions meet the execution requirements by verifying the operating authority, working status and operating ticket requirements of the equipment switch.

[0014] As a preferred solution of the collaborative control method for automatic fault handling described in the present invention, the task scheduling is to associate the tasks with dependencies according to the task nodes, subdivide the tasks into multiple nodes such as power outage operation, start-up application, completion permit, and power restoration operation, and enable each node to automatically enter the next task after completing the previous task.

[0015] As a preferred solution of the collaborative control method for automatic fault handling described in the present invention, the task operation steps include scheduling power outage operations, permission to start work, completion application, and power restoration operation tasks, using a sorting algorithm based on task priority to perform dependency associations on tasks, and completing each task node in order of priority.

[0016] As a preferred solution of the collaborative control method for automatic fault handling described in the present invention, the task execution process includes real-time recording and analysis of the power equipment status, operation progress and timestamp during the operation, and generating a detailed operation report when the operation is completed or abnormally interrupted, and pushing it to the on-site end and the dispatching end via SMS or push notification.

[0017] Another object of the present invention is to provide a collaborative control system for automatic fault handling, which can solve the problems of low fault handling efficiency, cumbersome manual operation, lack of safety verification mechanism, unintelligent task execution process, delayed information feedback and lack of real-time monitoring in the existing power distribution network system by automatically generating fault logs, transmitting and generating programmed operation instructions, performing triple safety verification, task scheduling and automatic execution, and real-time push and monitoring of task status.

[0018] In order to solve the above technical problems, the present invention provides the following technical solutions: a fault automatic handling collaborative control system, comprising: a fault log management module, an instruction generation and transmission module, a safety verification and triple review module, and a task scheduling and monitoring module;

[0019] The fault log management module generates a fault log. In the distribution network OMS system, a fault log is generated through an automated alarm mechanism, or a dispatcher manually creates a fault log in the OCS system;

[0020] The instruction generation and transmission module transmits the fault log work order and brief information from the provincial distribution network OMS system to the municipal bureau OCS system, and generates programmatic operation instructions item by item based on the fault content, forms programmatic instructions by clicking on the single line diagram, and transmits the instructions to the fault log work order in the distribution network OMS system;

[0021] The safety check and triple review module is responsible for safety logic check, equipment status check and operation condition check. Before the operation instruction is executed, the grid topology is analyzed, the loop current is identified, and it is determined whether the operation will cause current shock or steady-state current over-limit. The equipment card name, GISID and operation ticket equipment name are compared to check whether the equipment status is consistent with the operation requirements, check the equipment switch operation authority, working status and specific requirements of the operation ticket to ensure that the operation meets the execution conditions;

[0022] The task scheduling and monitoring module schedules power outage operations, work permits, completion applications, and power restoration operations according to task steps, establishes task nodes through dependency associations, and ensures that each task is automatically executed in sequence.

[0023] A computer device includes a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above-mentioned automatic fault handling collaborative control method when executing the computer program.

[0024] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned automatic fault handling collaborative control method.

[0025] The beneficial effects of the present invention are as follows: the automatic fault driving supports automatic programmed collaborative control, automatic verification of equipment status, automatic review of start and completion applications, automatic execution of work orders, real-time monitoring of execution status, etc. The production efficiency of distribution network dispatching is improved, and a new solution is provided to meet the challenges and requirements currently faced by distribution network dispatching. The production efficiency of distribution network dispatching is improved, the risk of power grid is further reduced, the reliability of power supply is further improved, and the level of intelligence of distribution network dispatching is improved. Dispatchers are freed from the heavy work of issuing dispatching instructions, and their time and energy are invested in work that requires more professional knowledge. The use of this programmed collaborative control method will enable a qualitative improvement in the production efficiency of distribution network regulation.

[0026] The realization of the automatic driving function of the grid fault log is of great significance for improving the power supply reliability of the power grid, reducing operation and maintenance costs, and improving user experience. It can not only reduce the possibility of manual operation errors and improve the efficiency and accuracy of fault handling; it can also provide strong guarantees for the safe and stable operation of the power grid and reduce the risk and loss of power outages caused by faults. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0028] Figure 1 An overall flow chart of a collaborative control method for automatic fault handling provided in the first embodiment of the present invention. DETAILED DESCRIPTION

[0029] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0030] Example 1, reference Figure 1 According to an embodiment of the present invention, a method for automatic fault handling and coordinated control is provided, comprising:

[0031] The present invention uses the automatic driving function of the fault log, which runs through the provincial distribution network OMS, the provincial network command system, and the municipal bureau OCS system, breaks through the system interaction barriers and ultimately realizes the full-process intelligent execution and full-process monitoring of the fault log automatic driving work.

[0032] Use the collaborative interface between the provincial distribution network OMS and the municipal bureau OCS system to transfer the fault log work order and brief work order information from the distribution network OMS system to the municipal bureau distribution network OCS system. Click the single line diagram to generate a programmed item-by-item order or instruction based on the fault log and other business document information. In the distribution network OMS system pushed after the municipal bureau OCS successfully completes the ticket,

[0033] The distribution network OMS system automatically links the programmed item-by-item commands or instructions with the corresponding fault log work orders, and coordinates the programmed operation commands for power outage operations, programmed operation commands for power restoration operations, programmed operation commands for transfer-out operations, and programmed operation commands for transfer-in operations to the fault log business work order business module. The corresponding programmed tickets are subject to three reviews, and during the monitoring review stage, they interact with the distribution network OCS to verify the equipment status. The programmed operation commands that have passed the three reviews have the basic programmed operation conditions, and the ticket preparation work is completed.

[0034] Task scheduling is carried out according to steps such as load transfer, power outage operation, start-up application, permission to start work, completion application, permission termination, power restoration operation, and load restoration, and in accordance with the operation items involved in the actual work.

[0035] In task association, the tasker can start the automatic driving of the fault log, and the automatic driving of the fault log starts to execute automatically. The execution progress, intelligent command abnormal monitoring and operation status link monitoring can be viewed in real time in the whole process intelligent monitoring.

[0036] Equipment safety logic verification:

[0037] Error prevention check function strategy error prevention: when the operation simulation is executed, topology error prevention, loop flow verification error prevention and operation logic rule error prevention are carried out. In the OMS system: (1) After the ticket is generated in the point diagram ticket module, click preview. (2) The operation ticket that has passed the preview and the third review enters the programmed operation part. In the OCS system: (1) Topology error prevention check: check abnormal operations such as closing the switch with grounding, closing the knife switch with grounding, closing the knife switch with power on, closing the grounding switch (ground knife) with power on, and closing the grounding switch (ground knife) with knife switch. It can automatically perform a comprehensive error prevention check on the operator's operation based on the topological relationship of the power grid, combined with user-defined rules, and based on the real-time telesignaling and telemetry information of the steady-state data monitoring application. (2) Loop flow verification: the impact current and steady-state current do not exceed the limit; the operation process does not allow more than two lines to close the loop at the same time; the operation process requires closing the loop first and then opening the loop. (3) Operation rule verification: in order to prevent operations not being performed in the order of the operation ticket, the system provides an operation sequence verification function.

[0038] Equipment consistency check: During the operation simulation, check the equipment card name, GISID, equipment name on the operation ticket, and other information. If there is any inconsistency, a prompt will be output. In the OMS system: (1) After the ticket is generated in the point-to-point ticket module, click Preview to output the equipment parameter information. (2) Perform a third review of the ticket. (3) The dispatcher reviews it, manually modifies it, and clicks Preview to enter the 1st loop. In the OCS system: (1) Check the equipment card name, GISID, equipment name on the operation ticket, and other information: Check for consistency. If there is any inconsistency (output the reason).

[0039] Equipment consistency check: Automatically determine whether there is a power transfer operation in the operation ticket. If there is a power transfer, automatically identify the operating mode of the two lines, and determine whether the conditions for loop closing are met based on preset conditions such as flow and power grid parameters. If the conditions for loop closing are met, automatically prompt to modify the operation ticket to loop closing and power transfer. In the OMS system: (1) If the OCS output can close the loop, the dispatcher asks the site whether the conditions for loop closing are met and then clicks the rehearsal link loop, (2) enters the programmed operation part. In the OCS system: (1) The point-to-map ticket module selects to adjust the rear section of a certain line to a certain pole to be powered by a certain line, automatically determines whether the loop closing and power adjustment can be output to OMS, and generates the corresponding ticket. (2) Output the rehearsal results.

[0040] Remote control operation error prevention: During the remote control execution of programmed operations, the status of the remotely controlled equipment and the flow check are checked before the remote control is executed, and the switch is automatically judged to have abnormal information such as abnormal information of the sign hanging and closing the loop after remote control. In the OMS system: (1) The remote control operation command required in the network command is sent to the OCS: After receiving the remote control success information, proceed to the next step; after receiving the remote control failure information, the dispatch order is transferred to the on-site operation and the on-site operation is ordered after three reviews. In the OCS system: (1) The telemetering and telesignaling check whether the remote control is possible, and the remote control is automatically disconnected / closed after confirming that the remote control is possible. (2) The remote control result is checked according to the telemetering and telesignaling current and other parameters. Remote control success; remote control failure (output the reason, and automatically form the automatic switch remote control failure account). When the control is closed, check: (1) If there is only a G011 disconnector, the normal operation mode detects whether there is pressure on the power supply side before closing (2) If there are disconnectors on both sides, both can be closed only when there is pressure. When the control is divided, check: (1) If there is a fault defect, the network command on the on-site end pops up whether to notify the user, and the emergency repair personnel selects yes and then automatically disconnects.

[0041] Live earthing / grounding switch verification: Check data: read switch position, whether the switch is disconnected before turning on the maintenance and closing the earthing switch, whether the isolation switch is opened, and whether there are other power supply points (contact switch, small power plant). Data acquisition system: OCS system, OMS system power management module and ticket logic.

[0042] Verification of power transmission with ground wire, verification data: read the grounding card, read the ticket to see if all "...transfer to maintenance" have corresponding "transfer to maintenance..."; verification of circuit breakers with incorrect opening and closing, verification data: OCS verifies before remote control; single-step verification in ticket opening, ticket review, and execution status, verification data: add verification buttons to instructions (fault defects) and instruction groups, and support safety logic verification. Data acquisition system: OCS system and ticket logic.

[0043] B. Automatic driving of distribution network fault log service (see the attached Figure 1 ):

[0044] General principles: Based on the safety logic verification settings, the system automatically reviews, processes, and permits the start and completion applications of faulty businesses, and automatically stops and reminds the dispatcher in the event of an abnormality. The reminder functions of the on-site and dispatching ends are optimized, combined with the intelligent network command function, to ultimately achieve full-process intelligent execution of the faulty business after the fault point is found.

[0045] Source of fault log data: The intelligent alarm module in the distribution network OMS system automatically generates fault logs by publishing equipment alarm information, or the dispatcher manually adds fault logs based on equipment fault information in the OCS system.

[0046] In the distribution network OMS fault log work order details, click OCS ticketing for each link and module, and generate a ticketing request based on the basic information of the work order. The distribution network OMS transmits the fault log work order and brief information to the distribution network OCS system through the interface.

[0047] In the distribution network OCS system, based on the distribution network log work order information, compare it with the detailed fault information of the equipment in the fault log, and according to the equipment fault handling requirements, click on the single-line diagram to generate various types of programmed operation tickets or programmed instructions.

[0048] The programmed ticket generated by the OCS system is sent to the programmed operation control module of the distribution network OMS system through the interface between systems, and the programmed operation ticket is automatically associated with the distribution network fault log work order in the distribution network OMS. The programmed instructions for handling faulty equipment are also subject to three reviews in the OMS system to confirm that the invoicing information meets the fault requirements, and at the same time, the equipment information involved in the remote control item is verified to ensure the feasibility of remote control operation and the safety of equipment and personnel.

[0049] During equipment verification: the distribution network OMS sends the equipment status request information in the remote control item to the OCS, performs a programmable operation requirement check in the distribution network OCS system, and sends the equipment status check information to the distribution network OMS. The distribution network OMS system sends a programmable operation instruction to the distribution network OCS system through the interface, and the distribution network OCS system verifies it after receiving it. If it meets the operation requirements, the programmable ticket is approved and the ticket preparation operation is completed.

[0050] After completing the various ticket preparation operations for fault handling, it is necessary to arrange the tasks of autonomous driving according to the business operation items involved in the fault log. After completing the task arrangement, the fault log autonomous driving can be started within the planned time. According to the task arrangement, the fault log autonomous driving is automatically executed, and the whole process is intelligently monitored to check the execution progress and whether there are any abnormalities.

[0051] During the execution of autonomous driving, the system pushes reminders of various operation information on the on-site and dispatching ends in real time. Various programmed operation tickets and instructions are intelligently issued through the network and automatically notified for execution according to the set planned operation time. All aspects of the execution are fully intelligently monitored, such as various execution information, abnormal information, etc.

[0052] Embodiment 2 is an embodiment of the present invention, which provides a system for a collaborative control method for automatic fault handling, including: a fault log management module, an instruction generation and transmission module, a safety verification and triple review module, and a task scheduling and monitoring module.

[0053] The fault log management module generates fault logs. In the distribution network OMS system, fault logs are generated through an automated alarm mechanism, or manually created by the dispatcher in the OCS system.

[0054] The instruction generation and transmission module transmits the fault log work order and brief information from the provincial distribution network OMS system to the municipal bureau OCS system, and generates item-by-item programmed operation instructions based on the fault content. The programmed instructions are formed by clicking on the single-line diagram, and the instructions are transmitted to the fault log work order in the distribution network OMS system.

[0055] The safety verification and triple review module is responsible for safety logic verification, equipment status verification and operating condition verification. Before the operation instruction is executed, the grid topology is analyzed, the loop flow situation is identified, and it is determined whether the operation will cause current shock or steady-state current exceeding the limit. The equipment card name, GISID and equipment name on the operation ticket are compared, and the equipment status is checked to see if it is consistent with the operation requirements. The equipment switch operation authority, working status and specific requirements of the operation ticket are checked to ensure that the operation meets the execution conditions.

[0056] The task scheduling and monitoring module schedules power outage operations, work permits, completion applications, and power restoration operations according to task steps, and establishes task nodes through dependency associations to ensure that each task is automatically executed in sequence.

[0057] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program code.

[0058] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0059] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0060] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0061] Embodiment 3: In this embodiment, in order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments. This embodiment experiments the existing traditional method and the method of this embodiment respectively.

[0062] Verify the scheduling efficiency and execution cost of the automatic fault handling collaborative control method of the present invention under different task loads, and analyze its performance advantages in real-time monitoring and intelligent task scheduling.

[0063] To compare the method of the present invention with the traditional manual operation method, the following three experiments were conducted:

[0064] Under the same task request, the load balancing rates of different methods in a multi-task environment are compared, the average execution time of tasks is recorded under different numbers of repetitions, and the execution costs of each method are compared under different numbers of tasks.

[0065] The experiment was conducted in a simulated distribution network system, simulating common fault types and dispatching operations, including power outage operations, start-up applications, completion permits, and power restoration operations.

[0066] Table 1 Task load balancing rate comparison table

[0067]

[0068] Under 50 identical task requests, the traditional manual operation method and the automatic handling method of the present invention were applied respectively, and the load balancing rate was recorded. The load balancing rate of the traditional manual operation method fluctuated between 60% and 70%, and some task nodes were prone to overload; while the load balancing rate of the method of the present invention was stable at more than 90%, significantly improving the distribution balance of tasks.

[0069] Table 2 Task execution time comparison table

[0070]

[0071] The average execution time of the two methods was recorded under the conditions of 20, 50 and 100 task repetitions.

[0072] When the task is repeated 20 times, the average execution time of the method of the present invention is 30 seconds, while that of the traditional method is 50 seconds; when the task is repeated 100 times, the execution time of the method of the present invention is stable at about 35 seconds, while that of the traditional method is extended to more than 70 seconds. The present invention shows higher execution efficiency in the case of highly repeated tasks.

[0073] Table 3. Comparison of task execution costs

[0074]

[0075] The execution costs of the two methods were calculated under 20, 40, 60, 80 and 100 tasks (estimated by man-hours and power consumption). As the number of tasks increases, the execution cost of the traditional method increases linearly, while the execution cost of the method of the present invention increases slightly. Under a high-load environment of 100 tasks, the execution cost of the method of the present invention is about 60% of that of the traditional method, effectively reducing labor costs and resource consumption.

[0076] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for automatic fault handling and coordinated control, characterized in that: include: Automatically generate fault logs in the distribution network OMS system, or manually add fault logs in the OCS system by the dispatcher; The fault log work order and brief information are transferred from the provincial distribution network OMS system to the municipal bureau OCS system. According to the fault log content, click on the single line diagram to generate item-by-item programmed operation instructions; In the provincial distribution network OMS system, the programmed operation instructions from the municipal bureau OCS system are received, triple review is performed, and the instructions are automatically associated with the fault log work order; Arrange tasks according to the task operation steps and start automatic execution in the arranged order; During the task execution process, the operation status is pushed to the on-site and dispatch ends in real time to obtain and process abnormal information.

2. A method for automatic fault handling and coordinated control according to claim 1, characterized in that: The triple review includes safety logic verification, detecting the topology of the power grid before the operation instruction is executed, identifying the loop power flow situation, and judging whether current shock or steady-state current exceeds the limit will occur during the operation.

3. A method for automatic fault handling and coordinated control as claimed in claim 2, characterized in that: The triple review includes equipment status verification, which verifies the consistency of the equipment status in the operation ticket. By comparing the equipment card name, GISID and the equipment name in the operation ticket, it is determined whether the equipment status is consistent with the operation requirements.

4. A method for automatic fault handling and coordinated control as claimed in claim 3, characterized in that: The triple review also includes operating condition verification to determine whether the operating conditions meet the execution requirements by verifying the operating authority, working status and operating ticket requirements of the equipment switch.

5. A method for automatic fault handling and coordinated control as claimed in claim 4, characterized in that: The task scheduling is to associate the tasks with dependencies according to the task nodes, subdivide the tasks into multiple nodes such as power outage operation, start application, completion permit, and power restoration operation, and make each node automatically enter the next task after completing the previous task.

6. A method for automatic fault handling and coordinated control as claimed in claim 5, characterized in that: The task operation steps include scheduling power outage operations, permission to start work, completion application, and power restoration operation tasks, using a sorting algorithm based on task priority to associate tasks with dependencies, and completing each task node in order of priority.

7. A method for automatic fault handling and coordinated control according to claim 6, characterized in that: The task execution process includes real-time recording and analysis of the power equipment status, operation progress and timestamp during the operation, and generating a detailed operation report when the operation is completed or abnormally interrupted, and pushing it to the site and dispatch end via SMS or push notification.

8. A system using a fault automatic handling collaborative control method as claimed in any one of claims 1 to 7, characterized in that: It includes fault log management module, instruction generation and transmission module, safety verification and triple review module, task scheduling and monitoring module; The fault log management module generates a fault log. In the distribution network OMS system, a fault log is generated through an automated alarm mechanism, or a dispatcher manually creates a fault log in the OCS system; The instruction generation and transmission module transmits the fault log work order and brief information from the provincial distribution network OMS system to the municipal bureau OCS system, and generates programmatic operation instructions item by item based on the fault content, forms programmatic instructions by clicking on the single line diagram, and transmits the instructions to the fault log work order in the distribution network OMS system; The safety check and triple review module is responsible for safety logic check, equipment status check and operation condition check. Before the operation instruction is executed, the grid topology is analyzed, the loop current is identified, and it is determined whether the operation will cause current shock or steady-state current over-limit. The equipment card name, GISID and operation ticket equipment name are compared to check whether the equipment status is consistent with the operation requirements, check the equipment switch operation authority, working status and specific requirements of the operation ticket to ensure that the operation meets the execution conditions; The task scheduling and monitoring module schedules power outage operations, work permits, completion applications, and power restoration operations according to task steps, establishes task nodes through dependency associations, and ensures that each task is automatically executed in sequence.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the automatic fault handling collaborative control method described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the automatic fault handling collaborative control method described in any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • Automatic scheduling operation ticket forming method and system for regional linkage of smart power grid

    CN121966027A

  • Dispatching operation ticket automatic ticketing method and system for smart grid regional linkage

    CN121966027B