Gravel laying device for river bank protection

By designing a gravel laying device for river bank protection including steel pipes, support seats, mounting seats and storage boxes, the problems of large and low physical energy consumption and low efficiency caused by manual delivery in the prior art are solved, automatic transportation is realized, and construction efficiency is improved.

CN119553628APending Publication Date: 2025-03-04LIAOCHENG YELLOW RIVER ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411968111.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-30
Publication Date
2025-03-04

AI Technical Summary

Technical Problem

During the gravel laying process on existing river guards, the shipment of stone mainly relies on manual labor, resulting in high physical energy consumption and low efficiency for staff.

Method used

A gravel laying device for river bank protection is designed, including two steel pipes arranged in parallel, support seats, mounting seats and storage tanks. The stone material is sent along the steel pipe to the various solid cages by moving the mounting base, without the need for staff to carry it. The connection between the steel pipe and the support seat is connected by a rotating mechanism, allowing the steel pipe and the mounting seat to be turned around the other steel pipe to above the next row of solid cages.

Benefits of technology

It greatly simplifies the stone conveying process, reduces the pressure on staff, improves construction efficiency, and reduces the need for manual handling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119553628A_ABST
    Figure CN119553628A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of bank revetment gravel laying, and discloses a river channel bank revetment gravel laying device which comprises two steel pipes arranged in parallel, and the steel pipes stretch across a bank revetment slope. The supporting seats are installed at the two ends of the steel pipe and arranged on the upper slope surface and the lower slope surface of the revetment in a cushioned mode correspondingly; the mounting seats are mounted on the steel pipe in a sliding manner, and the mounting seats are symmetrically designed by taking the steel pipe as a plane; and the storage box is slidably mounted on the mounting base and used for conveying stones. One steel pipe and the supporting base are detached, the steel pipe and the mounting base rotate around the undetached steel pipe, and the whole steel pipe and the mounting base are turned over to the position above the other row of shore fixing cages and then fixed. And the overturned mounting base can still be provided with the material storage box, and stone conveying continues to be conducted. Adjustment is convenient, the whole revetment slope can be rapidly covered step by step according to procedures, discharging is conducted in the front, and filling and leveling are conducted in the rear. Manual carrying is not needed, the construction efficiency is improved, and the pressure of workers is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of gravel laying for bank protection, in particular to a gravel laying device for river bank protection. Background Art

[0002] The laying of gravel for river bank protection is a protective measure for river bank soil. It can be used in conjunction with plants to build ecological slope protection to ensure the stability of the bank protection. The existing laying of gravel for river bank protection is done by first laying a gravel cushion layer and a layer of geotextile on the slope surface, and then building a shore-fixing cage on the pressed and flat cushion layer of equal thickness to fill large and small gravel fillers. Large stones are thrown into the shore-fixing cage to quickly build a frame. When the large fillers are filled to half the thickness of the shore-fixing cage, small pieces of gravel are thrown in to fill the gaps between the large stones, and then the remaining half thickness is filled. The transportation of stones on the slope is mainly manual. After the shore-fixing cage is hinged, it is difficult for equipment to assist in transportation, so manual handling and filling are required. This consumes a lot of physical energy for the staff and is inefficient.

[0003] In summary, the present application proposes a gravel paving device for river bank protection to overcome the above-mentioned defects. Summary of the invention

[0004] In order to solve the problems raised in the above background technology, the present invention provides a crushed stone paving device for river bank protection.

[0005] To achieve the above-mentioned object, the present invention provides the following technical solution: a crushed stone paving device for river bank protection, comprising two parallel steel pipes, the steel pipes spanning the bank protection slope; Support seats are installed at both ends of the steel pipe and are respectively placed on the upper and lower slopes of the revetment; A mounting seat, which is slidably mounted on the steel pipe, and the mounting seat is symmetrically designed with the steel pipe as a plane; A material storage box is slidably mounted on the mounting seat for transporting stones; The connecting ends of the steel pipe and the support seat are connected through a rotating mechanism, and after the two ends of the same steel pipe are disconnected from the support seat, they can be flipped around another steel pipe as an axis to the next row of cross-fixed cages.

[0006] Preferably, the support seat comprises a pillow block square steel padded on the slope surface, and a square steel block is mounted on the pillow block square steel via threaded steel support; A shaft sleeve is installed at the end of the steel pipe, and the shaft sleeve is fixed on the square steel block through a clamp, and a bottom pad is provided between the square steel block and the shaft sleeve.

[0007] Preferably, a disc is movably mounted on the pillow block square steel, the square steel block is fixedly supported on the disc by threaded steel, and the disc can rotate freely on the pillow block square steel through a shaft sleeve.

[0008] Preferably, the mounting seat comprises two symmetrically arranged bottom plates, both bottom plates are provided with rollers, and the rollers are rollingly mounted on the steel pipe; The mounting seat also includes a discharge pipe arranged in the middle and communicating with the interior of the storage box; The bottom plate is also provided with hanging ears.

[0009] Preferably, the material storage box comprises a box body and slide rails installed on both sides of the box body, and sliders that can be slidably connected to the slide rails are installed on the two base plates.

[0010] Preferably, the interior of the storage box is evenly divided into compartments of equal volume by partitions, a notch is provided at the bottom of each compartment, and a layer of partition cloth is provided at the bottom of the compartment to cover the notch before stones are filled upward.

[0011] Preferably, the separator is a redundant geotextile at the construction site or a waste fabric with sufficient area.

[0012] Preferably, both ends of the two steel pipes are fixedly connected by a cross beam.

[0013] Preferably, brake mechanisms are provided on both sides of the mounting seat for fixing the position of the mounting seat on the steel pipe.

[0014] Preferably, the brake mechanism comprises a brake shoe clamped on the outer periphery of the steel pipe, a guide rod installed between two base plates, a spring elastically supported between the base plate and the brake shoe, a support block supported between the two brake shoes, and a handle installed on the side channel steel and fixed to the support block; The brake shoe is slidably mounted on the guide rod Compared with the prior art, the present invention has the following beneficial effects: The present invention delivers stones along the steel pipes to each shore-fixing cage by moving the mounting seat, without the need for workers to carry the materials, which greatly simplifies the transportation process and the pressure on the workers. By disassembling one of the steel pipes from the support seat, the steel pipe and the mounting seat are rotated around the undisassembled steel pipe, and the whole is flipped over to the top of another row of shore-fixing cages and then fixed. The flipped mounting seat can still be installed with a storage box to continue the transportation of stones. It is easy to adjust, and the entire bank slope can be quickly covered step by step according to the process, with unloading in the front and filling in the back. No manual handling is required, which improves construction efficiency and reduces the pressure on workers.

[0015] The inner cavity of the storage box is divided into individual cavities by a detachable partition, and the staff can deliver the appropriate amount of stone in each solid cage unit into the individual cavity. The box body is in a slidable state as a whole, which is used to feed the separated cavities into the solid cage unit through the conveying channel on the mounting seat. A slidable structure is set between the storage box and the mounting seat to adjust the alignment of each cavity with the conveying pipeline. The storage box and the mounting seat are easy to assemble, and can also be used for unloading materials in the cavity. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 It is a side view schematic diagram of the present invention located above the solid cage; Figure 3 For the present invention Figure 2 A magnified schematic diagram of part A; Figure 4 It is a top view schematic diagram of the present invention; Figure 5 It is a front view schematic diagram of the present invention; Figure 6 For the present invention Figure 5 A magnified schematic diagram of part B; Figure 7 It is a schematic diagram of the overturning of the steel pipe and the mounting seat of the present invention; Figure 8 It is a schematic diagram of the turning over of the steel pipe and the mounting seat and the rotation of the pillow block square steel of the present invention; Fig. 9 It is a structural schematic diagram of the brake mechanism of the present invention.

[0017] In the figure: 100, steel pipe; 101, crossbeam; 102, bushing; 200, support seat; 201, pillow block square steel; 202, disc; 203, threaded steel; 204, square steel block; 205, clamp; 206, bottom pad; 300, mounting seat; 301, bottom plate; 302, roller; 303, slider; 304, unloading pipe; 305, brake mechanism; 3051, brake shoe; 3052, guide rod; 3053, spring; 3054, support block; 3055, handle; 306, hanging ear; 400, storage box; 401, box body; 402, partition cloth; 403, slide rail. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] like Figures 1 to 9 As shown, the present invention provides a crushed stone laying device for river bank protection, comprising two parallel steel pipes 100, wherein the steel pipes 100 span the bank protection slope; Support seats 200 are installed at both ends of the steel pipe 100 and are respectively placed on the upper and lower slopes of the revetment; The mounting seat 300 is slidably mounted on the steel pipe 100, and the mounting seat 300 is symmetrically designed with the steel pipe 100 as a plane; A material storage box 400 is slidably mounted on the mounting seat 300 for transporting stones; The connecting ends of the steel pipe 100 and the support seat 200 are connected through a rotating mechanism, and after the two ends of the same steel pipe 100 are disconnected from the support seat 200, they can be flipped around another steel pipe 100 as an axis to the next row of cross-fixed cages.

[0020] The mounting seat 300 is slidably mounted on the steel pipe 100, and the storage box 400 is mounted on the mounting seat 300. The stone is delivered along the steel pipe 100 through each solid shore cage through the movement of the mounting seat 300, without the need for staff to carry it, which greatly simplifies the transportation process and the pressure on the staff. After the stone delivery in one row of cross solid shore cages is completed, the stone delivery of the next row of cross solid shore cages begins. The present application disassembles one of the steel pipes 100 from the support seat 200, rotates the steel pipe 100 and the mounting seat 300 around the undisassembled steel pipe 100, and flips the whole to the top of another row of solid shore cages and then fixes them. The mounting seat 300 after flipping over can still install the storage box 400 to continue the stone delivery. It is easy to adjust, and the entire revetment slope can be quickly covered step by step according to the process, unloading in the front and filling in the back. No manual handling is required, which improves efficiency and reduces the pressure on staff.

[0021] like Figure 4-Figure 6 As shown, the support seat 200 includes a pillow block square steel 201 padded on the slope, and a square steel block 204 is supported and installed on the pillow block square steel 201 through a threaded steel bar 203; A shaft sleeve 102 is installed at the end of the steel pipe 100 . The shaft sleeve 102 is fixed on a square steel block 204 through a clamp 205 . A bottom pad 206 is provided between the square steel block 204 and the shaft sleeve 102 .

[0022] The threaded steel bar 203 is used for padding, the height can be adjusted and a stable support is formed. The sleeve 102 is fixed on the steel pipe 100, and then installed on the square steel block 204 through the clamp 205 and the bottom pad 206. The steel pipe 100 can rotate around the axis, and the two fixedly connected steel pipes 100 can carry the mounting seat 300 to turn over directly.

[0023] like Figure 4 and Figure 8 As shown, a disc 202 is movably mounted on the pillow block square steel 201 , and a square steel block 204 is fixedly supported on the disc 202 by means of threaded steel 203 , and the disc 202 can freely rotate on the pillow block square steel 201 through a shaft sleeve.

[0024] The above is an implementation method of the connection between the threaded steel 203 and the pillow block square steel 201. The threaded steel 203 can rotate relative to the pillow block square steel 201 through the disc 202. When the steel pipe 100 needs to be turned over, one of the steel pipes 100 is directly disconnected from the support seat 200, and the pillow block square steel 201 is rotated to connect with the turned steel pipe 100 while turning over. The operation is simple and efficient. It can quickly adapt to the construction site environment.

[0025] like Figure 2 , Figure 3 , Figure 5 and Figure 7 As shown, the mounting seat 300 includes two symmetrically arranged bottom plates 301, and rollers 302 are arranged on the two bottom plates 301, and the rollers 302 are rollingly installed on the steel pipe 100; The mounting base 300 further includes a discharge pipe 304 disposed in the middle and communicating with the interior of the storage box 400; The bottom plate 301 is further provided with a hanging ear 306 .

[0026] The bottom plate 301 is designed symmetrically, so that after the steel pipe 100 and the mounting seat 300 are turned over as a whole, the storage box 400 can be directly assembled on the other bottom plate 301, and then the gravel unloading and paving task can be directly carried out above the next row of cement cages. A discharge pipe 304 is arranged between the two bottom plates 301, and the discharge pipe 304 runs through the planes of the two bottom plates 301, and is used to communicate and dock with the inside of the storage box 400 assembled above the bottom plate 301, and the stone is discharged downward from the storage box 400 along the discharge pipe 304, and is discharged into the cement cage through the bottom plate 301 below.

[0027] The bottom plate 301 is provided with a hanging ear 306 for hanging ropes and cables. A worker releases the ropes and cables from above to control the mounting seat 300 to slide downward.

[0028] A valve plate is provided in the discharge pipe 304 for controlling the material discharge rate and stopping the material discharge. The valve plate in the discharge pipe 304 is controlled by rotating a handle provided on its surface.

[0029] like Figure 5 As shown, the material storage box 400 includes a box body 401 and slide rails 403 installed on both sides of the box body 401, and sliders 303 that can be slidably connected to the slide rails 403 are installed on the two bottom plates 301.

[0030] Slide rails 403 are arranged on both sides of the box 401 to cooperate with the slider 303 so that the box 401 can slide on the bottom plate 301. This design makes the box 401 easy to disassemble and assemble. The box 401 can be disassembled from the top by removing the latch and sliding directly. It can be assembled on another bottom plate 301, and can also be used to adjust the position of the box 401 on the bottom plate 301, and cooperate with the unloading notch opened on the box 401 to unload the stone downwards.

[0031] like Figure 4 As shown, the interior of the storage box 400 is evenly divided into compartments of equal volume by partitions, and a notch is opened at the bottom of each compartment. A layer of partition cloth 402 is placed at the bottom of the compartment to cover the notch and then fill it with stones.

[0032] This implementation method is used to isolate and block the discharge pipe 304 and the compartment, so as to prevent the compartment located in the middle that was originally aligned with the discharge pipe 304 from being directly connected to it and unloading during transportation. Secondly, during the sliding process of the box body 401, the internal stone is allowed to directly pass through the bottom gap of the compartment and slide in contact with the top surface of the bottom plate 301, which will cause the problem of stone jamming between the box body 401 and the bottom plate 301, resulting in poor sliding of the box body 401 and damage to the components. Therefore, a partition cloth 402 is laid at the bottom of each compartment in advance, and then crushed stones are filled in the compartment to separate the stone and the bottom plate 301. After arriving at the designated workstation, the staff will pull off the end of the partition cloth 402 that extends outward and drag the partition cloth 402 out. The stone inside the compartment can be reconnected with the discharge pipe 304, and the stone can be directly poured into the solid cage.

[0033] The partition cloth 402 is a geotextile that is redundant at the construction site or a waste cloth with a sufficient area.

[0034] The partition cloth 402 can be obtained on site and recycled without prior preparation. The redundant geotextile cut from the construction site or the discarded bags originally used to hold materials can be directly used under the condition of reaching the area, and can be folded into an appropriate shape and laid on the bottom of the partition cavity.

[0035] like Figure 1 As shown, both ends of the two steel pipes 100 are fixedly connected by a cross beam 101 .

[0036] In this embodiment, the crossbeam 101 is fixed on the steel pipe 100 to connect the two steel pipes 100, and when the laying device composed of the steel pipe 100, the mounting seat 300 and the storage box 400 is turned over, the fixed state between them is further stabilized to prevent the two steel pipes 100 from being offset and causing inconvenience in installation at the next fixing cage position. A stable rectangular structure can be formed between the steel pipe 100 and the crossbeam 101.

[0037] like Figure 8 As shown, brake mechanisms 305 are provided on both sides of the mounting seat 300 for fixing the position of the mounting seat 300 on the steel pipe 100 .

[0038] The brake mechanism 305 is used to position the laying device on the steel pipe 100 before the staff unloads the stone into the solid cage, which includes a variety of implementation methods that can be generally thought of, including bolt positioning and bayonet pins. This implementation method does not limit its specific scheme. However, the staff in the relevant field can think of that in order to achieve the purpose of stable unloading, the position of the laying device is limited by general positioning means.

[0039] like Figure 8 and Fig. 9 As shown, the brake mechanism 305 includes a brake shoe 3051 clamped on the outer periphery of the steel pipe 100, a guide rod 3052 installed between the two bottom plates 301, a spring 3053 elastically supported between the bottom plate 301 and the brake shoe 3051, a support block 3054 supported between the two brake shoes 3051, and a handle 3055 installed on the side channel steel and fixed to the support block 3054; The brake shoe 3051 is slidably mounted on the guide rod 3052 .

[0040] The above scheme is one of the implementation modes of the brake device of the laying device on the steel pipe 100 of the present application, wherein the staff located on the slope lowers the laying device from the steel pipe 100 and slides it downward to the top of the designated solid cage, and then the staff located at the designated solid cage position positions the laying device on the steel pipe 100 before starting to unload the stones, and by rotating the handles 3055 on both sides of the laying device, the brake shoe 3051 that was originally supported by the support block 3054 is closed downward again to clamp the circumference of the steel pipe 100, thereby completing the brake positioning.

[0041] The support block 3054 is an eccentric component, which can push the two support blocks 3054 apart or reduce the distance between the two support blocks 3054 when the brake shoe 3051 rotates, thereby achieving the purpose of braking. When the laying device is released and continues to go down, it is only necessary to turn the handle 3055 again to push the brake shoe 3051 apart. The operation is simple and the structure is simple and reliable.

[0042] The working principle and use process of the present invention: The mounting seat 300 is slidably mounted on the steel pipe 100, and the storage box 400 is mounted on the mounting seat 300. The stone is delivered into the steel pipe 100 through each solid cage through the movement of the mounting seat 300. After the stone delivery in one row of cross solid cages is completed, the stone delivery of the next row of cross solid cages is started. The present application disassembles one of the steel pipes 100 from the support seat 200, rotates the steel pipe 100 and the mounting seat 300 around the undisassembled steel pipe 100, and flips the whole to the top of another row of solid cages and then fixes them. The mounting seat 300 after flipping over can still be installed with the storage box 400, and the stone transportation continues.

[0043] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0044] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A crushed stone laying device for river bank protection, characterized in that: It comprises two parallel steel pipes (100), wherein the steel pipes (100) span the bank slope; Support seats (200) are installed at both ends of the steel pipe (100) and are respectively placed on the upper and lower slopes of the revetment; A mounting seat (300) is slidably mounted on the steel pipe (100), wherein the mounting seat (300) is symmetrically designed with the steel pipe (100) as a plane; A material storage box (400) is slidably mounted on the mounting seat (300) for transporting stones; The connecting ends of the steel pipe (100) and the support seat (200) are connected via a rotating mechanism, and after the two ends of the same steel pipe (100) are disconnected from the support seat (200), they can be flipped around another steel pipe (100) as an axis to the next row of cross-fixing cages.

2. The crushed stone paving device for river bank protection according to claim 1 is characterized in that: The support seat (200) comprises a pillow block square steel (201) padded on the slope surface, and a square steel block (204) is supported and mounted on the pillow block square steel (201) via a threaded steel bar (203); A shaft sleeve (102) is installed at the end of the steel pipe (100); the shaft sleeve (102) is fixed to a square steel block (204) via a clamp (205); a bottom pad (206) is provided between the square steel block (204) and the shaft sleeve (102).

3. The crushed stone paving device for river bank protection according to claim 2 is characterized in that: A disc (202) is movably mounted on the pillow block square steel (201), and the disc (202) fixes and supports the square steel block (204) via threaded steel (203). The disc (202) can freely rotate on the pillow block square steel (201) via a shaft sleeve.

4. The crushed stone paving device for river bank protection according to claim 1 is characterized in that: The mounting seat (300) comprises two symmetrically arranged bottom plates (301), and rollers (302) are arranged on the two bottom plates (301). The rollers (302) are rollingly mounted on the steel pipe (100); The mounting seat (300) further includes a discharge pipe (304) disposed in the middle and communicating with the interior of the storage box (400); The bottom plate (301) is also provided with a hanging ear (306).

5. The crushed stone laying device for river bank protection according to claim 4 is characterized in that: The material storage box (400) comprises a box body (401) and slide rails (403) installed on both sides of the box body (401), and sliding blocks (303) capable of being slidably connected to the slide rails (403) are installed on the two bottom plates (301).

6. The crushed stone paving device for river bank protection according to claim 5, characterized in that: The interior of the storage box (400) is evenly divided into compartments of equal volume by partitions, and a notch is provided at the bottom of each compartment. A layer of partition cloth (402) is provided at the bottom of the compartment to cover the notch before stones are filled upward.

7. The crushed stone paving device for river bank protection according to claim 6, characterized in that: The partition cloth (402) is a geotextile that is redundant at the construction site or a waste cloth with a sufficient area.

8. A crushed stone laying device for river bank protection according to any one of claims 1 to 7, characterized in that: Both ends of the two steel pipes (100) are fixedly connected via a crossbeam (101).

9. A crushed stone laying device for river bank protection according to any one of claims 1 to 7, characterized in that: Braking mechanisms (305) are provided on both sides of the mounting seat (300) for fixing the position of the mounting seat (300) on the steel pipe (100).

10. The crushed stone paving device for river bank protection according to claim 9, characterized in that: The brake mechanism (305) comprises a brake shoe (3051) clamped on the outer circumference of the steel pipe (100), a guide rod (3052) installed between the two bottom plates (301), a spring (3053) elastically supported between the bottom plates (301) and the brake shoe (3051), a support block (3054) supported between the two brake shoes (3051), and a handle (3055) installed on the side channel steel and fixedly connected to the support block (3054); The brake shoe (3051) is slidably mounted on the guide rod (3052).