Large bulk cargo ship bottom side cabin and top side cabin carrying construction method

By assembling the extended construction platform in the bottom side compartment of a large bulk carrier, the problem of traditional methods not being able to penetrate deep into the blind spots between the ribs is solved, and closer construction is achieved, reducing construction difficulty and time.

CN119611690APending Publication Date: 2025-03-14CHINA SHIPPING IND JIANGSU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411855812.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-17
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

Traditional elevated vehicle operation methods cannot penetrate into the blind spots between the ribs of the bottom cabin of large bulk carriers, resulting in long construction distances and difficult construction.

Method used

A construction method is adopted to extend the construction platform between the ribs of the bottom side cabin, and a stretchable construction platform is formed by combining scaffolding ear plates, web scaffolding support components and longitudinal and transverse scaffolding panels.

Benefits of technology

The construction distance is shortened, the construction difficulty is reduced, and the construction platform can extend to the work blind spots between the ribs, improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119611690A_ABST
    Figure CN119611690A_ABST
Patent Text Reader

Abstract

The invention discloses a carrying construction method for a bottom side cabin and a top side cabin of a large bulk cargo ship. The construction method comprises the following steps: S1, a segmentation stage: fixedly connecting a scaffold lug plate with a rib web plate of an outer plate rib on a bottom side tank, and fixedly connecting an outer plate scaffold supporting assembly with a hull outer plate of the bottom side tank; s2, before the carrying stage, longitudinal scaffold boards, transverse scaffold boards and web scaffold supporting assemblies are assembled in advance for standby application; s3, carrying stage: connecting web scaffold supporting assemblies to the scaffold ear plates through bolts, sequentially mounting transverse scaffold boards on the web scaffold supporting assemblies, connecting the adjacent transverse scaffold boards through fixing bolts, sequentially mounting handrails after the transverse scaffold boards are mounted, mounting longitudinal scaffold boards on the outer board scaffold supporting assemblies, and mounting the outer board scaffold supporting assemblies on the outer board scaffold supporting assemblies. One end of the longitudinal scaffold board is connected with the outer board scaffold supporting assembly through a steel wire, and the other end of the longitudinal scaffold board is in lap joint with the transverse scaffold board. The construction platform extends between the outer plate ribs, and the construction distance is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of shipbuilding, and in particular to a method for mounting and constructing hopper tanks and topside tanks of a large bulk carrier. Background Art

[0002] The loading method of the topside tanks and hopper tanks of large bulk carriers is that the topside tanks and hopper tanks are respectively formed into blocks in the block stage, and then the corresponding blocks are hoisted into the dock for loading, and the positioning of the blocks, welding, grinding, painting and other operations of the loading seams are completed. Figure 6 to Figure 7 As shown, since the ribs installed on the hull outer plate are at a certain distance from the outer plate, the traditional elevated vehicle operation method cannot penetrate into the operation blind area between the two ribs, resulting in the problems of long construction distance and difficult construction. Summary of the invention

[0003] The purpose of the present invention is to address the deficiencies in the prior art and to provide a method for carrying construction on the hopper tanks and topside tanks of a large bulk carrier, in which a construction platform is extended between the ribs of the hopper tanks.

[0004] To achieve the above object, the technical solution adopted by the present invention is: a method for loading and constructing hopper tanks and topside tanks of a large bulk carrier, comprising the following steps:

[0005] S1, block stage: fix the scaffolding ear plate to the rib web plate of the upper shell plate rib of the hopper tank, and fix the outer plate scaffolding support assembly to the hull outer plate of the hopper tank;

[0006] S2. Before the loading stage: assemble the longitudinal scaffolding board, transverse scaffolding board and belly scaffolding support components in advance and keep them ready for use;

[0007] S3, loading stage: bolt the web scaffolding support assembly to the scaffolding ear board, install the transverse scaffolding boards on the web scaffolding support assembly in turn, connect adjacent transverse scaffolding boards by fixing bolts, install the railings in turn after the transverse scaffolding boards are installed, install the longitudinal scaffolding boards on the outer board scaffolding support assembly, and connect one end of the longitudinal scaffolding board to the outer board scaffolding support assembly with steel wire, and overlap the other end of the longitudinal scaffolding board on the transverse scaffolding board, and the transverse scaffolding board and the longitudinal scaffolding board together form a construction platform.

[0008] Preferably, in step S2, the web scaffolding support assembly includes a carrying connecting plate, a scaffolding support plate and a railing sleeve, the head of the carrying connecting plate is provided with a first fixed carrying hole and a plurality of second carrying holes rotated and offset with the first carrying hole as the center and at the same radius, the scaffolding support plate is fixedly connected to the carrying connecting plate, and the side of the railing sleeve is fixedly connected to the scaffolding support plate and the carrying connecting plate at the same time.

[0009] Preferably, the second mounting holes include a second mounting hole a and a second mounting hole b.

[0010] Preferably, the second mounting hole a is located at a position rotated 2° below the center of the first mounting hole.

[0011] Preferably, the second mounting hole b is located at a position centered on the first mounting hole and rotated 30° away from the second mounting hole a.

[0012] Preferably, the scaffolding ear plate is provided with two connecting holes, and the distance between the two connecting holes is the same as the distance between the first mounting hole and the second mounting hole.

[0013] Preferably, the middle and tail portions of the mounting connecting plate are in the form of a rake-like structure, the bottom edge of the scaffolding support plate is fixedly connected to the rake-like structure, and the side of the scaffolding support plate is fixedly connected to the head portion of the mounting connecting plate.

[0014] Preferably, in step S1, a scaffolding ear plate is provided on the outer plate ribs at intervals of three, and an outer plate scaffolding supporting assembly is provided on the outer plate of the hull between every two adjacent outer plate ribs.

[0015] Preferably, in step S2, two longitudinal scaffolding board single boards are spliced ​​into a whole longitudinal scaffolding board in advance, and two transverse scaffolding board single boards are staggered and spliced ​​into a whole transverse scaffolding board.

[0016] Compared with the prior art, the present invention has the following advantages:

[0017] 1. The scaffolding ear plate and the web scaffolding support assembly cooperate to form the bottom support for the transverse scaffolding board. The outer plate scaffolding support assembly is used to fix and connect the longitudinal scaffolding board and extend the construction platform to the blind area between the ribs, shortening the construction distance and reducing the construction difficulty;

[0018] 2. All scaffolding ears and outer plate scaffolding support components are installed and retained inside the structure of the hopper tank, and will not have any impact on the ship's operation in the later stage; the scaffolding ears and outer plate scaffolding support components are pre-installed in the block stage and will not affect the loading construction; after the block painting is completed, the web scaffolding support components can be pre-erected, and the loading work of the construction platform can be carried out after the hopper tank section is hoisted into the dock, which enables the process to be migrated and saves the time of on-site erection. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a cross-sectional view at a first angle of the present invention.

[0020] Figure 2 It is a partial cross-sectional view of the second angle of the present invention.

[0021] Figure 3 It is a side view of the web scaffolding support assembly of the present invention.

[0022] Figure 4 It is a side view of the scaffolding ear plate in the present invention.

[0023] Figure 5 It is an enlarged schematic diagram of the connection between adjacent transverse scaffolding boards in the present invention.

[0024] Figure 6 It is a schematic diagram of the loading of the top side tank and the bottom side tank in the present invention.

[0025] Figure 7 It is a schematic diagram of the top side tank and the bottom side tank after being loaded in the present invention.

[0026] Among them, 11-scaffolding ear plate, 111-connecting hole, 12-outer plate scaffolding support assembly, 13-web scaffolding support assembly, 131-carrying connecting plate, 132-scaffolding support plate, 133-railing sleeve, 134-first carrying hole, 135-second carrying hole a, 136-second carrying hole b, 14-transverse scaffolding plate, 141-fixing bolt, 15-longitudinal scaffolding plate, 16-railing, 17-steel wire, 20-bottom side tank section, 21-hull outer plate, 22-outer plate rib, 23-rib web, 24-rib panel, 30-top side tank section, 40-carrying seam. DETAILED DESCRIPTION

[0027] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, various equivalent forms of modifications to the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

[0028] like Figures 1 to 5 The method for loading and constructing the hopper tank and topside tank of a large bulk carrier shown in the figure comprises the following steps:

[0029] S1, segmentation stage: weld the scaffolding ear plate 11 to the rib web plate 23 of the outer plate rib 22 on the hopper tank, weld the outer plate scaffolding support assembly 12 to the hull outer plate 21 of the hopper tank, and set the scaffolding ear plate 11 every three on the outer plate rib 22. The vertical distance between the scaffolding ear plate 11 and the loading seam is 1000mm, which is convenient for construction workers to work. The horizontal distance between the scaffolding ear plate 11 and the rib panel is 100mm. The outer plate scaffolding support assembly 12 is set every two adjacent outer plate ribs 22. An outer plate scaffolding support assembly 12 is provided on the middle hull outer plate 21. The two tail ends of the outer plate scaffolding support assembly 12 are welded to the hull outer plate 21. The front end of the outer plate scaffolding support assembly 12 is used as a support part and is wound with the steel wire 17. The outer plate scaffolding support assembly 12 is 940mm vertically away from the mounting seam, so that a height difference is formed between the outer plate scaffolding support assembly 12 and the scaffolding ear plate 11, which is convenient for the subsequent installation of the transverse scaffolding board 14 and the longitudinal scaffolding board 15;

[0030] S2, before the loading stage: since the single board of the horizontal scaffolding board 14 is a standard part of 4000mm*300mm, and the single board of the longitudinal scaffolding board 15 is a standard part of 1300mm*300mm, the two longitudinal scaffolding boards 15 are spliced ​​into a whole longitudinal scaffolding board 15 in advance, and the two horizontal scaffolding boards 14 are staggered and spliced ​​into a whole horizontal scaffolding board 14; secondly, the web scaffolding support assembly 13 is assembled in advance, and the web scaffolding support assembly 13 includes a loading connection plate 131, a scaffolding support plate 132 and a railing sleeve 133. The head of the loading connection plate 131 is provided with a first loading hole 134 with a fixed position and two second loading holes with the first loading hole 134 as the center and the same radius as the rotation deviation setting, the second loading hole includes a second loading hole a135 and a second loading hole b136, the second loading hole a135 is located at a position rotated 2° directly below the first loading hole 134 as the center, and the deviation angle here is to The end of the scaffolding support assembly 13 is formed with a certain upward tilt to ensure the safety of the workers. The second mounting hole b136 is located at a position with the first mounting hole 134 as the center and rotated 30° away from the second mounting hole a135. The scaffolding ear plate 11 is provided with two connecting holes 111. The distance between the two connecting holes 111 is the same as the distance between the first mounting hole 134 and the second mounting hole. The scaffolding support plate 132 is welded to the mounting connecting plate 131. The side of the railing sleeve 133 is welded to the scaffolding support plate 132 and the mounting connecting plate 131 at the same time. The middle and tail of the mounting connecting plate 131 are in the shape of a nail rake. The bottom edge of the scaffolding support plate 132 is welded with a nail rake structure. The side of the scaffolding support plate 132 is welded with the head of the mounting connecting plate 131. It should be noted that the second mounting hole can be set with multiple different rotation angles for adjustment according to the on-site working angle and erection deviation. The mounting connecting plate 131 is set to be in the shape of a nail rake to reduce its own weight.

[0031] S3, loading stage: bolt the web scaffolding support assembly 13 to the scaffolding ear plate 11, install the transverse scaffolding boards 14 on the web scaffolding support assembly 13 in turn, connect adjacent transverse scaffolding boards 14 by fixing bolts 141, after the transverse scaffolding boards 14 are installed, install the handrails 16 in turn, install the longitudinal scaffolding boards 15 on the outer plate scaffolding support assembly 12, and connect one end of the longitudinal scaffolding board 15 to the outer plate scaffolding support assembly 12 with the steel wire 17, and the other end of the longitudinal scaffolding board 15 is overlapped on the transverse scaffolding board 14, and the transverse scaffolding board 14 and the longitudinal scaffolding board 15 together form a construction platform, and the steel wire 17 is used for fixing to facilitate the adjustment of the loading deviation and the subsequent dismantling.

[0032] After completing the welding, grinding, painting and other operations of the mounting seam 40 between the top side tank section 30 and the bottom side tank section 20, untie the steel wires 17 one by one from one end and remove the longitudinal scaffolding boards 15. After all the longitudinal scaffolding boards 15 are removed, untie the fixing bolts 141 one by one from one end, remove the transverse scaffolding boards 14 and release the web scaffolding support assembly 13.

[0033] It should be easily understood that “on,” “above,” and “over” in the present disclosure should be interpreted in the broadest manner, so that “on” not only means “directly on something,” but also includes the meaning of “on something” with intervening features or layers therebetween, and “above” or “over” not only includes the meaning of “above” or “over,” but also may include the meaning of “above” or “over something” with no intervening features or layers therebetween (i.e., directly on something).

[0034] In addition, spatially relative terms, such as "below," "below," "beneath," "above," "above," etc., may be used herein for ease of description to describe the relationship of one element or feature relative to other elements or features as shown in the figures. Spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation shown in the figures. The device may have other orientations (rotated 90 degrees or at other orientations), and the spatially relative descriptors used herein may likewise be interpreted accordingly.

[0035] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0036] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

Claims

1. A method for loading and constructing hopper tanks and topside tanks of a large bulk carrier, characterized in that: The following steps are involved: S1, block stage: fix the scaffolding ear plate to the rib web plate of the upper shell plate rib of the hopper tank, and fix the outer plate scaffolding support assembly to the hull outer plate of the hopper tank; S2. Before the loading stage: assemble the longitudinal scaffolding board, transverse scaffolding board and belly scaffolding support components in advance and keep them ready for use; S3, loading stage: bolt the web scaffolding support assembly to the scaffolding ear board, install the transverse scaffolding boards on the web scaffolding support assembly in turn, connect adjacent transverse scaffolding boards by fixing bolts, install the railings in turn after the transverse scaffolding boards are installed, install the longitudinal scaffolding boards on the outer board scaffolding support assembly, and connect one end of the longitudinal scaffolding board to the outer board scaffolding support assembly with steel wire, and overlap the other end of the longitudinal scaffolding board on the transverse scaffolding board, and the transverse scaffolding board and the longitudinal scaffolding board together form a construction platform.

2. The method for loading and constructing the hopper tank and topside tank of a large bulk carrier according to claim 1, characterized in that: In step S2, the web scaffolding support assembly includes a carrying connecting plate, a scaffolding support plate and a railing sleeve. The head of the carrying connecting plate is provided with a first fixed carrying hole and a plurality of second carrying holes which are rotated and deviated with the first carrying hole as the center and have the same radius. The scaffolding support plate is fixedly connected to the carrying connecting plate, and the side of the railing sleeve is fixedly connected to the scaffolding support plate and the carrying connecting plate at the same time.

3. The method for loading and constructing the hopper tank and topside tank of a large bulk carrier according to claim 1, characterized in that: The second mounting holes include a second mounting hole a and a second mounting hole b.

4. The method for loading and constructing the hopper tank and topside tank of a large bulk carrier according to claim 3, characterized in that: The second mounting hole a is located at a position 2° below the center of the first mounting hole.

5. The method for loading and constructing the hopper tank and topside tank of a large bulk carrier according to claim 3, characterized in that: The second mounting hole b is located at a position with the first mounting hole as the center and rotated 30 degrees away from the second mounting hole a.

6. The method for loading and constructing the hopper tank and topside tank of a large bulk carrier according to any one of claims 2 to 5, characterized in that: The scaffolding ear plate is provided with two connecting holes, and the distance between the two connecting holes is the same as the distance between the first mounting hole and the second mounting hole.

7. The method for loading and constructing the hopper tank and topside tank of a large bulk carrier according to claim 2, characterized in that: The middle and tail of the carrying connection plate are in a rake-like structure, the bottom edge of the scaffolding support plate is fixedly connected to the rake-like structure, and the side of the scaffolding support plate is fixedly connected to the head of the carrying connection plate.

8. The method for loading and constructing the hopper tank and topside tank of a large bulk carrier according to claim 1, characterized in that: In step S1, a scaffolding ear plate is provided on the outer plate ribs every three, and an outer plate scaffolding supporting assembly is provided on the outer plate of the hull between every two adjacent outer plate ribs.

9. The method for loading and constructing the hopper tank and topside tank of a large bulk carrier according to claim 1, characterized in that: In step S2, two longitudinal scaffolding board single boards are spliced ​​into a whole longitudinal scaffolding board in advance, and two transverse scaffolding board single boards are spliced ​​into a whole transverse scaffolding board in a staggered manner.