Semi-fabricated top surface aluminum plate curtain wall structure and construction method thereof
By adopting a semi-prefabricated design in the aluminum panel curtain wall structure of special-shaped buildings, including sleeve adapters and curtain wall support frame with movable connection angle codes, the problems of large construction variables and insufficient displacement capabilities are solved, and efficient and flat curtain wall construction and good wind and earthquake resistance are achieved.
Patent Information
- Application Number
- CN202411680886.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-03-14
AI Technical Summary
The construction of aluminum panel curtain walls in special-shaped buildings is limited by the complexity of the roof steel structure and the deviation of the main structure, resulting in large construction variables and slow progress. The curtain wall lacks displacement ability relative to the main structure under the action of earthquakes and wind loads, which poses safety hazards.
It adopts a semi-prefabricated top aluminum panel curtain wall structure, including top steel structure, sleeve adapters, curtain wall support frame and aluminum alloy decorative panels. The sleeve adapter achieves height adjustment through the bottom supporting outer sleeve and the top telescopic inner sleeve. The curtain wall support frame enhances deformation ability through transverse galvanized square steel and longitudinal galvanized angle steel, combined with movable connection angle codes.
The height control of the curtain wall aluminum alloy decorative panel is realized, structural deviation is digested, the flatness of the aluminum plate finish surface is ensured, the construction efficiency is improved, the wind and earthquake resistance of the curtain wall is enhanced, and the construction cost is reduced.
Smart Images

Figure CN119616114A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of aluminum plate curtain wall construction, and in particular to a semi-assembled top aluminum plate curtain wall structure and a construction method thereof. Background Art
[0002] With the emergence of large-scale exhibition centers, art centers, theaters, etc. in domestic buildings, special-shaped buildings have a trend of vigorous development. Such buildings adopt steel structure plus curtain wall from roof to overall building. Metal aluminum plates are widely used in building exterior protection system due to their light weight, low load, low maintenance cost, strong plasticity, diverse appearance and high integration with other curtain wall materials. They are restricted by special-shaped buildings, complex roof steel structure, and curtain wall surface construction is restricted by the construction accuracy of other professions, main structure deviation, and the actual shape of the main structure after final tensioning. The final shape size needs to be determined according to the actual completion of other professions on site. The construction variables are large, which seriously restricts Construction progress; and under the action of earthquake and wind load horizontal forces, relative displacement will occur between the main structures of the building. The curtain wall, as a protective structure suspended on the main structure, not only moves with the main structure, but also has its own movement. Once the curtain wall design does not take into account the displacement capacity relative to the main structure, and does not adopt measures such as elastic movable connections, it will cause deformation of the curtain wall and even the structure, posing a great safety hazard. The current approach to dealing with the deformation capacity of the curtain wall can only satisfy the front and rear deformation in the direction perpendicular to the plane of the curtain wall through the strip holes of the steel angle code, while ignoring the left and right deformation capacity of the curtain wall skeleton, resulting in the curtain wall only being able to deform with the main structure, and having no deformation capacity relative to the main structure. Summary of the invention
[0003] The purpose of the present invention is to provide a semi-assembled top aluminum plate curtain wall structure and a construction method thereof, in order to solve the technical problems mentioned in the above background technology.
[0004] To achieve the above object, the present invention adopts the following technical solution: A semi-assembled top aluminum plate curtain wall structure comprises a top steel structure, a sleeve adapter arranged above the top steel structure, a curtain wall support frame arranged above the sleeve adapter, and an aluminum alloy decorative panel arranged on the curtain wall support frame, wherein the sleeve adapter comprises a bottom support outer sleeve and a top telescopic inner sleeve arranged above the top steel structure, the bottom support outer sleeve is vertically fixed to the top of the top steel structure, the bottom support outer sleeve is partially sleeved on the top telescopic inner sleeve and telescopically sleeved with the top telescopic inner sleeve, the curtain wall support frame comprises transverse galvanized square steels, and longitudinal galvanized angle steels vertically connected between the transverse galvanized square steels, the bottom surface of the transverse galvanized square steels is welded and fixed to the top of the top telescopic inner sleeve, The transverse galvanized square steel includes a plurality of relatively connected square steel short sections, and a sleeve-type galvanized square steel plug-in is provided between the ends of the relatively connected square steel short sections, and the two relatively connected square steel short section ends are respectively sleeved on the two ends of the sleeve-type galvanized square steel plug-in and sleeved with the sleeve-type galvanized square steel plug-in. A movable connection angle code is provided at the connection between the longitudinal galvanized angle steel and the transverse galvanized square steel, and two parallel strip holes are provided on the side of the movable connection angle code. One end of the movable connection angle code is vertically welded and fixed to the belly of the transverse galvanized square steel, and the inner side of the folded angle of the longitudinal galvanized angle steel is attached to the outer side of the folded angle of the movable connection angle code and is connected and fixed to the movable connection angle code by stainless steel bolts. A hanger is provided on the aluminum alloy decorative panel, and the hanger is connected and fixed to the longitudinal galvanized angle steel by self-tapping screws.
[0005] Furthermore, the longitudinal galvanized angle steel and the movable connecting angle code are both arranged with the inner side of the folded corner facing downward and one side edge being arranged horizontally, and the horizontal side edge of the longitudinal galvanized angle steel is flush with the top horizontal surface of the transverse galvanized square steel.
[0006] Furthermore, the cross-sectional shapes of the bottom supporting outer sleeve and the top telescopic inner sleeve are both rectangular or circular.
[0007] Furthermore, the socket depth between the square steel short section and the sleeve-type galvanized square steel plug-in is greater than 250 mm.
[0008] Furthermore, the movable connection angle code has the same specification as the longitudinal galvanized angle steel, and the length of the movable connection angle code is 60 mm.
[0009] Furthermore, a gasket is provided between the longitudinal galvanized angle steel and the movable connection angle code.
[0010] Furthermore, the top surface steel structure is an I-beam.
[0011] A construction method of a semi-assembled top aluminum plate curtain wall structure comprises the following steps: Step 1: Draw detailed drawings, complete the unit aluminum alloy decorative panel distribution diagram and the sleeve adapter installation point diagram; determine the location on site according to the sleeve adapter installation point diagram to set up the platform steel plate and drill holes on the platform steel plate; accurately mark the installation points of the sleeve adapter on the top surface steel structure according to the detailed drawings and the sleeve adapter installation point diagram, and master the construction deviation of the top surface steel structure; Step 2: According to the installation point diagram of the sleeve adapter, weld and fix the bottom support outer sleeve of the sleeve adapter to the top of the top steel structure, and the bottom support outer sleeve is vertically perpendicular to the top steel structure; insert the top telescopic inner sleeve into the bottom support outer sleeve and temporarily fix it; according to the three-dimensional model of the building, the deepening drawings, the spatial position of each point, and the on-site measurement and layout, adjust the insertion depth of the top telescopic inner sleeve in the bottom support outer sleeve, and after checking the position, weld and fix the top telescopic inner sleeve to the bottom support outer sleeve; Step 3, the transverse galvanized square steel is welded and fixed to the top of the fixed top telescopic inner sleeve, the square steel short section of the transverse galvanized square steel is overlapped and fixed with a sleeve-type galvanized square steel plug-in, and both ends of the sleeve-type galvanized square steel plug-in are simultaneously inserted into the ends of the two oppositely connected square steel short sections for welding and fixing; Step 4, check the size, angle and flatness of the transverse galvanized square steel, connect and fix the movable connection angle code to the transverse galvanized square steel, and then vertically fix the longitudinal galvanized angle steel to the transverse galvanized square steel through the movable connection angle code; Step 5. Mark the positioning line for the installation of the aluminum alloy decorative panel on the longitudinal galvanized angle steel. According to the assigned number of the unit aluminum alloy decorative panel, vertically transport the unit aluminum alloy decorative panel to the corresponding installation position, and use self-tapping screws to fix the matching hangers of the unit aluminum plate at the marked position to complete the installation of the aluminum alloy decorative panel; clean the glue seam, inject glue according to the design requirements, and gradually remove the platform steel plate.
[0012] Compared with the prior art, the present invention has the following characteristics and beneficial effects: The present invention provides a sleeve adapter, which includes a bottom supporting outer sleeve and a top telescopic inner sleeve. The bottom supporting outer sleeve is partially sleeved on the top telescopic inner sleeve and telescopically sleeved with the top telescopic inner sleeve, so that the height change adjustment of the entire supporting system can be realized, and the installation height of the curtain wall aluminum alloy decorative panel can be controlled, the structural deviation is absorbed, the flatness of the finished surface of the aluminum plate is guaranteed, and the construction efficiency is ensured; the curtain wall supporting frame includes transverse galvanized square steels, and longitudinal galvanized angle steels vertically connected between the transverse galvanized square steels. The square steel short sections of the transverse galvanized square steels are sleeved by sleeve-type galvanized square steel plug-ins, and the longitudinal galvanized angle steels are connected to the transverse The galvanized square steels are connected through movable angle brackets to realize a curtain wall support frame with movable connection function, which greatly enhances the overall strength and deformation capacity of the aluminum alloy decorative panel curtain wall, ensures the flatness and wind and earthquake resistance for long-term use, and has a fast overall construction progress and low construction cost. The normal construction of vertical space intersections does not affect each other. The construction materials are all conventional materials, which are processed and formed in the factory and then transported to the construction site for installation, ensuring the precision of the curtain wall curved surface installation and accelerating the construction progress. It is safe and applicable, has good promotion and practical value, and will produce good economic benefits after widespread promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the transverse cross-sectional structure of the present invention; Figure 2 It is a schematic diagram of the longitudinal cross-sectional structure of the present invention.
[0014] Figure numerals: 1. Top steel structure; 2. Aluminum alloy decorative panel; 3. Bottom support outer sleeve; 4. Top telescopic inner sleeve; 5. Horizontal galvanized square steel; 6. Longitudinal galvanized angle steel; 7. Sleeve-type galvanized square steel plug-in; 8. Active connection angle code; 9. Stainless steel bolt; 10. Hanging piece; 11. Self-tapping screw; 12. Gasket. DETAILED DESCRIPTION
[0015] In order to make the technical means, innovative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below.
[0016] The embodiments described herein are specific embodiments of the present invention, which are used to illustrate the concept of the present invention, are illustrative and exemplary, and should not be construed as limiting the embodiments of the present invention and the scope of the present invention. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the claims and the contents disclosed in the specification of this application, including technical solutions that adopt any obvious replacement and modification of the embodiments described herein.
[0017] The present invention discloses a semi-assembled top aluminum plate curtain wall structure, such as Figure 1 and Figure 2 As shown, it includes a top steel structure 1, a sleeve adapter arranged above the top steel structure 1, a curtain wall support frame arranged above the sleeve adapter, and an aluminum alloy decorative panel 2 arranged on the curtain wall support frame. The top steel structure 1 is a horizontally arranged I-beam. The sleeve adapter includes a bottom support outer sleeve 3 and a top telescopic inner sleeve 4 arranged above the top steel structure 1. The bottom support outer sleeve 3 is vertically fixed to the top surface of the top steel structure 1. The cross-sectional shape of the bottom support outer sleeve 3 is consistent with the cross-sectional shape of the top telescopic inner sleeve 4 and both are rectangular or circular. The bottom support outer sleeve 3 is partially sleeved on the top telescopic inner sleeve 4 and telescopically sleeved with the top telescopic inner sleeve 4. The top telescopic inner sleeve 4 is welded and fixed to the bottom supporting outer sleeve 3. The curtain wall supporting frame includes a transverse galvanized square steel 5 and a longitudinal galvanized angle steel 6 vertically connected between the transverse galvanized square steel 5. The transverse galvanized square steel 5 is a transverse force-bearing member of the curtain wall supporting frame. The bottom surface of the transverse galvanized square steel 5 is welded and fixed to the top of the sleeve adapter. The transverse galvanized square steel 5 includes a plurality of oppositely connected square steel short sections. A sleeve-type galvanized square steel plug-in 7 is provided between the ends of the oppositely connected square steel short sections. The outer wall specifications of the sleeve-type galvanized square steel plug-in 7 are adapted to the inner wall specifications of the square steel short section. The two oppositely connected square steel short section ends are respectively sleeved on both ends of the sleeve-type galvanized square steel plug-in 7 and the sleeve-type galvanized The zinc square steel plug-in 7 is socketed, the square steel short section is welded and fixed to the sleeve type galvanized square steel plug-in 7, the socket depth of the square steel short section and the sleeve type galvanized square steel plug-in 7 is greater than 250mm, the longitudinal galvanized angle steel 6 is bent downward, and one side is horizontally set, the horizontal side of the longitudinal galvanized angle steel 6 is flush with the top horizontal surface of the transverse galvanized square steel 5, the longitudinal galvanized angle steel 6 is the longitudinal force-bearing member of the entire curtain wall support frame, and the connection between the longitudinal galvanized angle steel 6 and the transverse galvanized square steel 5 is provided with a movable connection angle code 8, the specification of the movable connection angle code 8 is the same as that of the longitudinal galvanized angle steel 6, the length of the movable connection angle code 8 is 60mm, and two parallel strips are provided on the side of the movable connection angle code 8 Hole, the movable connecting angle code 8 is a movable connecting piece between the longitudinal galvanized angle steel 6 and the transverse galvanized square steel 5, the movable connecting angle code 8 is folded downward and one side is horizontally arranged, one end of the movable connecting angle code 8 is vertically welded and fixed to the belly of the transverse galvanized square steel 5, the longitudinal galvanized angle steel 6 is sleeved on the movable connecting angle code 8 and is connected and fixed to the movable connecting angle code 8 by stainless steel bolts 9, a gasket 12 is provided between the longitudinal galvanized angle steel 6 and the movable connecting angle code 8, which plays an anti-slip and anti-rust role, a hanger 10 is provided on the aluminum alloy decorative panel 2, the hanger 10 is used in conjunction with the aluminum alloy decorative panel 2, and the hanger 10 is connected and fixed to the longitudinal galvanized angle steel 6 by self-tapping screws 11.
[0018] A construction method of a semi-assembled top aluminum plate curtain wall structure comprises the following steps: Step 1: Draw the detailed drawings, complete the unit aluminum alloy decorative panel 2 distribution drawing and the sleeve adapter installation point diagram; determine the location on site according to the sleeve adapter installation point diagram to set up the platform steel plate and drill holes on the platform steel plate, accurately mark the installation points of the sleeve adapter on the top surface steel structure 1 according to the detailed drawings and the sleeve adapter installation point diagram, and master the construction deviation of the top surface steel structure 1; Step 2, according to the installation point diagram of the sleeve adapter, weld and fix the bottom support outer sleeve 3 of the sleeve adapter to the top of the top steel structure 1, and the bottom support outer sleeve 3 is vertically perpendicular to the top steel structure 1; insert the top telescopic inner sleeve 4 into the bottom support outer sleeve 3 and temporarily fix it; according to the three-dimensional model of the building, the deepening drawings, the spatial position of each point, combined with the on-site measurement and layout, adjust the insertion depth of the top telescopic inner sleeve 4 in the bottom support outer sleeve 3, and after checking the position, weld and fix the top telescopic inner sleeve 4 to the bottom support outer sleeve 3; Step 3, the transverse galvanized square steel 5 is welded and fixed to the top of the fixed top telescopic inner sleeve 4, the square steel short section of the transverse galvanized square steel 5 is overlapped and fixed by a sleeve-type galvanized square steel plug-in 7, and both ends of the sleeve-type galvanized square steel plug-in 7 are simultaneously inserted into the ends of the two oppositely connected square steel short sections for welding and fixing, and the socket depth of the square steel short section and the sleeve-type galvanized square steel plug-in 7 is greater than 250mm; Step 4, check the size, angle and flatness of the transverse galvanized square steel 5, connect and fix the movable connection angle code 8 to the transverse galvanized square steel 5, and then vertically fix the longitudinal galvanized angle steel 6 to the transverse galvanized square steel 5 through the movable connection angle code 8; Step 5, mark the installation positioning line of the aluminum alloy decorative panel 2 on the longitudinal galvanized angle steel 6, assign numbers to the unit aluminum alloy decorative panel 2, vertically transport the unit aluminum alloy decorative panel 2 to the corresponding installation position, and use self-tapping screws to fix the matching hangers 10 of the unit aluminum plate at the marked position to complete the installation of the aluminum alloy decorative panel 2; clean the glue seam and inject glue according to the design requirements. During the gluing process, the injected glue should be continuous and full, and the platform steel plate should be gradually removed.
[0019] The present invention provides a sleeve adapter, which includes a bottom supporting outer sleeve and a top telescopic inner sleeve. The bottom supporting outer sleeve is partially sleeved on the top telescopic inner sleeve and telescopically sleeved with the top telescopic inner sleeve, so that the height change adjustment of the entire supporting system can be realized, and the installation height of the curtain wall aluminum alloy decorative panel can be controlled, the structural deviation is absorbed, the flatness of the aluminum plate finished surface is guaranteed, and the construction efficiency is ensured; the curtain wall supporting frame includes transverse galvanized square steels, and longitudinal galvanized angle steels vertically connected between the transverse galvanized square steels, and the square steel short sections of the transverse galvanized square steels are connected The longitudinal galvanized square steel plug-in is connected with the transverse galvanized square steel through a movable connection angle code, realizing a curtain wall support frame with a movable connection function, greatly enhancing the overall strength and deformation capacity of the aluminum alloy decorative panel curtain wall, ensuring the flatness and wind and earthquake resistance for long-term use, with fast overall construction progress and low construction cost. The normal construction of vertical space intersection does not affect each other. The construction materials are all conventional materials, which are processed and formed in the factory and then transported to the construction site for installation, ensuring the precision of the curtain wall curved surface installation and accelerating the construction progress.
[0020] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A semi-assembled top aluminum plate curtain wall structure, characterized by: The invention comprises a top surface steel structure (1), a sleeve adapter arranged above the top surface steel structure (1), a curtain wall support frame arranged above the sleeve adapter, and an aluminum alloy decorative panel (2) arranged on the curtain wall support frame, wherein the sleeve adapter comprises a bottom support outer sleeve (3) and a top telescopic inner sleeve (4) arranged above the top surface steel structure (1), wherein the bottom support outer sleeve (3) is vertically fixed to the top of the top surface steel structure (1), and a portion of the bottom support outer sleeve (3) is sleeved on the top telescopic inner sleeve (4) and telescopically sleeved with the top telescopic inner sleeve (4), wherein the curtain wall support frame comprises transverse galvanized square steels (5), and longitudinal galvanized angle steels (6) vertically connected between the transverse galvanized square steels (5), wherein the bottom surface of the transverse galvanized square steels (5) is welded and fixed to the top of the top telescopic inner sleeve (4), and the transverse galvanized square steels (5) comprise a plurality of The two oppositely connected square steel short sections have a sleeve-type galvanized square steel plug-in (7) between their ends. The two oppositely connected square steel short section ends are respectively sleeved on the two ends of the sleeve-type galvanized square steel plug-in (7) and sleeved with the sleeve-type galvanized square steel plug-in (7). A movable connection angle code (8) is provided at the connection between the longitudinal galvanized angle steel (6) and the transverse galvanized square steel (5). Two parallel strip holes are provided on the side of the movable connection angle code (8). One end of the movable connection angle code (8) is vertically welded and fixed to the belly of the transverse galvanized square steel (5). The inner side of the folded angle of the longitudinal galvanized angle steel (6) is attached to the outer side of the folded angle of the movable connection angle code (8) and is connected and fixed to the movable connection angle code (8) by a stainless steel bolt (9). The aluminum alloy decorative panel (2) is provided with a hanger (10). The hanger (10) is connected and fixed to the longitudinal galvanized angle steel (6) by a self-tapping screw (11).
2. A semi-assembled top aluminum plate curtain wall structure according to claim 1, characterized in that: The longitudinal galvanized angle steel (6) and the movable connecting angle code (8) are both folded with the inner side facing downward and one side edge being arranged horizontally, and the horizontal side edge of the longitudinal galvanized angle steel (6) is flush with the top horizontal surface of the transverse galvanized square steel (5).
3. The semi-assembled top aluminum plate curtain wall structure according to claim 1, characterized in that: The cross-sectional shapes of the bottom supporting outer sleeve (3) and the top telescopic inner sleeve (4) are both rectangular or circular.
4. A semi-assembled top aluminum plate curtain wall structure according to claim 2, characterized in that: The socket connection depth between the square steel short section and the sleeve-type galvanized square steel plug-in unit (7) is greater than 250 mm.
5. The semi-assembled top aluminum plate curtain wall structure according to claim 2, characterized in that: The movable connection angle code (8) has the same specifications as the longitudinal galvanized angle steel (6), and the length of the movable connection angle code (8) is 60 mm.
6. The semi-assembled top aluminum plate curtain wall structure according to claim 1, characterized in that: A gasket (12) is provided between the longitudinal galvanized angle steel (6) and the movable connection angle bracket (8).
7. The semi-assembled top aluminum plate curtain wall structure according to claim 1, characterized in that: The top surface steel structure (1) is an I-beam.
8. The construction method of a semi-assembled top aluminum plate curtain wall structure according to claims 1 to 7, characterized in that: It includes the following steps: Step 1, draw a detailed drawing, complete the unit aluminum alloy decorative panel (2) distribution diagram, sleeve adapter installation point diagram; determine the location on site according to the sleeve adapter installation point diagram to set up the platform steel plate and drill holes on the platform steel plate, accurately mark the installation point of the sleeve adapter on the top surface steel structure (1) according to the detailed drawing and the sleeve adapter installation point diagram, and master the construction deviation of the top surface steel structure (1); Step 2, according to the installation point diagram of the sleeve adapter, weld and fix the bottom support outer sleeve (3) of the sleeve adapter to the top of the top steel structure (1), and the bottom support outer sleeve (3) is vertically perpendicular to the top steel structure (1); insert the top telescopic inner sleeve (4) into the bottom support outer sleeve (3) and temporarily fix it; According to the three-dimensional building model, the detailed drawings, the spatial position of each point, and the on-site measurement and layout, the insertion depth of the top telescopic inner sleeve (4) in the bottom supporting outer sleeve (3) is adjusted, and after the position is checked, the top telescopic inner sleeve (4) and the bottom supporting outer sleeve (3) are welded and fixed; Step 3, the transverse galvanized square steel (5) is welded and fixed to the top of the fixed top telescopic inner sleeve (4), the square steel short section of the transverse galvanized square steel (5) is overlapped and fixed by a sleeve-type galvanized square steel plug-in (7), and both ends of the sleeve-type galvanized square steel plug-in (7) are simultaneously inserted into the ends of the two oppositely connected square steel short sections for welding and fixing; Step 4, check the size, angle and flatness of the transverse galvanized square steel (5), connect and fix the movable connection angle code (8) to the transverse galvanized square steel (5), and then vertically fix the longitudinal galvanized angle steel (6) to the transverse galvanized square steel (5) through the movable connection angle code (8); Step 5, mark the positioning line for installing the aluminum alloy decorative panel (2) on the longitudinal galvanized angle steel (6), and according to the number assigned to the unit aluminum alloy decorative panel (2), vertically transport the unit aluminum alloy decorative panel (2) to the corresponding installation position, and use self-tapping screws to fix the matching hanger (10) of the unit aluminum plate at the marked position to complete the installation of the aluminum alloy decorative panel (2); then clean the glue joint, inject glue according to the design requirements, and gradually remove the platform steel plate.