Steel structure high-altitude installation operation platform

By designing the expansion unit and docking unit of the steel structure high-altitude installation operation platform, the problem of difficulty in splicing the operating platform in the existing technology is solved, the stable docking of the operating platform in the aerial operation and the expansion of the activity space is achieved, and the efficiency and quality of the aerial operation are improved.

CN119616187APending Publication Date: 2025-03-14THE 2ND ENG CO LTD OF CHINA RAILWAY URBAN CONSTR GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510117656.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-24
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

The existing high-altitude installation operating platform is difficult to splice with adjacent operating platforms during construction, which limits the stability of the staff's activity space and working environment, and thus reduces the efficiency and quality of high-altitude construction operations.

Method used

A steel structure high-altitude installation operation platform is designed, and the expansion unit and docking unit cooperate with each other to realize high-altitude docking operation of two adjacent frames. The expansion unit drives the bevel gear and flat gear to drive each other through a servo motor, driving the shaft body and the secondary plate to rotate, expanding the range of movement of the operating platform; the docking unit realizes stable docking of the two operating platforms through the cooperation of the limit rod and the spring.

Benefits of technology

It realizes stable docking of the two operating platforms in a high altitude environment, expands the activity space of the operating platform, is suitable for high altitude operations with wider walls, and improves the efficiency and quality of high altitude operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119616187A_ABST
    Figure CN119616187A_ABST
Patent Text Reader

Abstract

The invention discloses a steel structure high-altitude installation operation platform, and relates to the technical field of building operation platforms, the steel structure high-altitude installation operation platform comprises a frame body, a base plate is arranged on the inner wall of the frame body, a lifting appliance is arranged above the frame body, a side frame is arranged on one side of the frame body, and a first insertion rod and a second insertion rod are arranged on one side of the side frame; the first inserting rod and the second inserting rod are both located in the frame body and slidably connected with the frame body, a first shaft body is arranged in the base plate, an auxiliary plate is arranged on the outer wall of the first shaft body and located below the base plate, a fixing plate is arranged on the side face of the bottom end of the side frame, and an expansion unit for driving the auxiliary plate to rotate to coincide with the base plate is arranged in the frame body. And the expansion unit is used for expanding the overall movement range of the frame body, in the equipment, the movement range of workers is expanded, and the efficiency and quality of high-altitude operation can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building operating platforms, in particular to a steel structure high-altitude installation operating platform. Background Art

[0002] The high-altitude installation operation platform is usually made of metal materials, such as steel pipes, aluminum alloy pipes, steel plates, etc. The platform structure includes columns, beams, diagonal braces, platform surfaces, etc. On the upper part of the platform, there is usually an operation station for people to sit and work. There is a track at the bottom to facilitate the movement of the platform.

[0003] During construction, steel columns are usually used to build the main frame of the building. When building steel columns, facing wider buildings, it is often necessary to splice two sections of steel operating platforms at high altitude to give the operating platform a larger activity space and stronger stability. However, most common operating platforms are constructed individually and it is difficult to splice them with adjacent operating platforms during the construction process. This phenomenon will limit the activity space of the workers on the operating platform, and the working environment is not stable enough, which reduces the efficiency and quality of high-altitude construction work.

[0004] To this end, the present invention proposes a steel structure high-altitude installation operation platform. Summary of the invention

[0005] The object of the present invention is to provide a steel structure high-altitude installation operating platform to solve the problems raised in the above-mentioned background technology. In order to achieve the above-mentioned object, the present invention provides the following technical solutions: a steel structure high-altitude installation operating platform, comprising a frame, the inner wall of the frame is provided with a base plate, the upper part of the frame is provided with a hanger, one side of the frame is provided with a side frame, one side of the side frame is provided with an insertion rod 1 and an insertion rod 2, the insertion rod 1 and the insertion rod 2 are both located inside the frame and slidably connected thereto, the inside of the base plate is provided with an axis body 1, the outer wall of the axis body 1 is provided with a sub-plate, the sub-plate is located below the base plate, the bottom end side of the side frame is provided with a fixing plate, the inside of the frame is provided with an expansion unit for driving the sub-plate to rotate to overlap with the base plate, the expansion unit is used to expand the overall range of motion of the frame; Two limiting rods are also arranged inside the frame, and a docking unit is arranged inside the frame for driving the limiting rods to extend outwards. The expansion unit and the docking unit cooperate with each other to enable two adjacent frames to perform high-altitude docking operations.

[0006] Preferably, the expansion unit includes a bevel gear 1 located on the outer wall of shaft body 1, the shaft body 1 passes through the frame and is rotatably connected thereto, one side of the bevel gear 1 is provided with a bevel gear 2 meshing therewith, the inner wall of the bevel gear 2 is provided with shaft body 2, the end of the shaft body 2 is provided with a servo motor, the outer wall of the shaft body 2 is provided with a fixing block, the bottom of the fixing block is fixedly connected to the inner wall of the frame, the outer wall of the shaft body 1 is also provided with a spur gear, a rack meshing therewith is provided below the spur gear, the rack passes through the frame and the end of the rack is fixedly connected to the side frame.

[0007] Preferably, a bending rod is provided above the side frame, an insertion rod three is provided inside the bending rod, the end of the insertion rod three is fixedly connected to the frame body, and the outer wall of the bending rod is provided with a groove for clamping by a clamp, and the center point of the groove is located on the central vertical plane of the operating platform.

[0008] Preferably, the docking unit includes an inclined block located on one side of the second insertion rod, a protrusion is provided at the end of the limit rod, a connecting plate is provided on the outer walls of the two limit rods, a spring 1 is provided on the outside of the two limit rods, a fixing plate is also provided on the outer wall of the limit rod and is slidably connected to the fixing plate, both ends of the spring 1 are fixedly connected to the fixing plate and the connecting plate respectively, and the wall of the frame body is provided with a socket for the limit rod to slide.

[0009] Preferably, when the inclined block slides with the second insertion rod, the inclined area of ​​the inclined block abuts against the outer edge of the protrusion, and the elastic force of the first spring pushes the end of the limit rod to coincide with the inner wall surface of the frame under normal conditions.

[0010] Preferably, a fixed groove is provided on the outer wall of the fixing plate, and the fixing plate slides freely inside the fixed groove; a connecting block is provided above the protrusion, and a rotating bar is rotatably connected to the inside of the connecting block via a rotating shaft; a U-shaped frame 1 is provided above the frame body for the rotating bar to be inserted into, and a U-shaped frame 2 with a groove width equal to that of the U-shaped frame 1 is also provided above the frame body.

[0011] Preferably, the rotating bar is L-shaped, a U-shaped frame three is provided above the U-shaped frame one, a stop block is provided inside the U-shaped frame three, a spring two is provided above the stop block, a fixing box is provided outside the spring two, the fixing box is located above the U-shaped frame three and fixedly connected thereto, and during the sliding process of the rotating bar inside the U-shaped frame one, the end of the rotating bar contacts the inclined portion of the stop block.

[0012] Preferably, a pull rod is provided above the stop block, and the pull rod passes through the fixing box and is slidably connected thereto.

[0013] Preferably, an L-shaped rod is provided inside the fixing plate, the L-shaped rod is located inside the fixing plate and the base plate, a limiting hole is provided inside the sub-plate for inserting the L-shaped rod, and two square grooves are provided inside the fixing plate for inserting the L-shaped rod.

[0014] The present invention has at least the following beneficial effects: 1. In the present invention, the servo motor drives bevel gear 2 and bevel gear 1 to transmit to each other, and drives shaft body 1 and auxiliary plate to rotate downward; at the same time, the flat gear drives the rack to transmit to each other, and the rack will push the side frame to gradually move away from the frame body until the auxiliary plate rotates to coincide with the base plate. The staff can insert the L-shaped rod into the interior of the fixed plate and the auxiliary plate, and rotate the bent part of the L-shaped rod into the square groove, so that the fixed plate, the auxiliary plate and the base plate form a new stable operating platform. In this process, multiple cross bars of the side frame will also be pulled out from the interior of the frame body, providing safety protection for the new operating platform, while expanding the range of activities of the staff, which is conducive to improving the efficiency and quality of aerial operations.

[0015] 2. In the present invention, the second plug rod will drive the inclined block to move until the inclined surface of the inclined block contacts the protrusion, and the two limit rods will gradually extend from the inside of the frame and insert into the two plug holes inside the other frame, so that the two adjacent frames can be docked. The two operating platforms can be stably docked in a high-altitude environment, and the expansion unit can also expand the activity space of the operating platform, which is suitable for high-altitude operations with wide walls, and further improves the work efficiency and quality of high-altitude operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 For the present invention Figure 1 A magnified view of the structure of the middle A area; Figure 3 It is a schematic diagram of the frame and side frame structure of the present invention; Figure 4 This is a cross-sectional view of the frame structure at a first angle of the present invention; Figure 5 For the present invention Figure 4 A magnified view of the structure of the middle B region; Figure 6 It is a cross-sectional view of the docking unit structure of the present invention; Figure 7 For the present invention Figure 6 A magnified view of the structure of the middle C region; Figure 8 A cross-sectional view of the frame structure at a second angle of the present invention; Fig. 9 For the present invention Figure 8 A magnified view of the structure of the middle D region; Fig.10 A cross-sectional view of the frame structure at a third angle of the present invention; Fig.11 A cross-sectional view of the frame structure at a fourth angle of the present invention; Fig.12 For the present invention Fig.11 A magnified view of the structure of the middle E region; Fig.13 It is a structural schematic diagram of the auxiliary plate and the shaft body of the present invention.

[0017] In the figure: 1-frame; 2-base plate; 3-hanger; 4-side frame; 5-insertion rod 1; 6-insertion rod 2; 7-axis body 1; 8-sub-plate; 9-fixed plate; 10-expansion unit; 11-limiting rod; 12-docking unit; 13-bevel gear 1; 14-bevel gear 2; 15-axis body 2; 16-servo motor; 17-fixed block; 18-flat gear; 19-rack; 20-bending rod; 21-insertion rod 3 ; 22-groove; 23-oblique block; 24-protrusion; 25-connecting plate; 26-spring one; 27-fixing plate; 28-jack; 29-fixing slot; 30-connecting block; 31-rotating bar; 32-U-shaped frame one; 33-U-shaped frame two; 34-U-shaped frame three; 35-stop block; 36-spring two; 37-fixing box; 38-pull rod; 39-L-shaped rod; 40-limiting hole; 41-square groove. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] See also Figure 1-13 The present invention provides a technical solution: a steel structure high-altitude installation operation platform, comprising: Embodiment 1, A frame 1 is provided with a base plate 2 on the inner wall of the frame 1, one side of the base plate 2 is fixedly connected to the inner wall of the frame 1, a sling 3 is provided above the frame 1, and an operating platform is suspended at both ends by two slings 3 for high-altitude operations or movement. The above is the existing technology and will not be described in detail.

[0020] In this scheme, a side frame 4 is provided on one side of the frame body 1, and the side frame 4 itself includes multiple cross bars, and the multiple cross bars are slidably connected to the frame body 1, and an insertion rod 1 5 and an insertion rod 2 6 are provided on one side of the side frame 4, and the insertion rod 1 5 and the insertion rod 2 6 each have two rods, and the ends of the insertion rod 1 5 and the insertion rod 2 6 are fixedly connected to the side frame 4, and the insertion rod 1 5 and the insertion rod 2 6 are both located inside the frame body 1 and slidably connected thereto, and an axis body 1 7 is provided inside the base plate 2 and is rotatably connected thereto, and a sub-plate 8 is provided on the outer wall of the axis body 1 7 and is fixedly connected thereto, and the sub-plate 8 is located below the base plate 2, and a fixing plate 9 is provided on the side surface of the bottom end of the side frame 4 and is fixedly connected thereto, and an expansion unit 10 is provided inside the frame body 1 for driving the sub-plate 8 to rotate to overlap with the base plate 2, and the expansion unit 10 is used to expand the overall range of motion of the frame body 1, so that workers working at high altitudes have a more relaxed space for activities, which is conducive to improving the quality and efficiency of operations.

[0021] Furthermore, an L-shaped rod 39 is provided inside the fixed plate 9 and is slidably connected thereto. The L-shaped rod 39 is located inside the fixed plate 9 and the base plate 2 and can slide freely inside the two. A limiting hole 40 is provided inside the sub-plate 8 for the L-shaped rod 39 to be inserted into. Two square grooves 41 are provided inside the fixed plate 9 for the L-shaped rod 39 to be inserted into. The staff can rotate the L-shaped rod 39 to the inside of the square groove 41 to limit the sliding of the L-shaped rod 39, thereby putting the base plate 2 and the fixed plate 9 in a locked state, thereby ensuring the stability of the operating platform when used in normal state. At the same time, when the sub-plate 8 is rotated to overlap with the base plate 2, the L-shaped rod 39 can be rotated out of the square groove 41 again and inserted into the limiting hole 40 of the sub-plate 8 to form a new movable platform with a larger area, so that the fixed plate 9, the sub-plate 8 and the base plate 2 are in a stable state, and while obtaining a larger activity space, it also has good stability.

[0022] The expansion unit 10 includes a bevel gear 13 located on the outer wall of the shaft body 17, the inner wall of the bevel gear 13 is fixedly connected to the shaft body 17, both ends of the shaft body 17 pass through the frame body 1 and are rotatably connected thereto, one side of the bevel gear 13 is provided with a bevel gear 2 14 meshing therewith, the inner wall of the bevel gear 2 14 is provided with a shaft body 2 15 and is fixedly connected thereto, the end of the shaft body 2 15 is provided with a servo motor 16, the shaft body 2 15 is connected to the rotating shaft of the servo motor 16 through a coupling, the bottom of the servo motor 16 is fixedly connected to the inner wall of the frame body 1, the outer wall of the shaft body 2 15 is provided with a fixing block 17 and is rotatably connected thereto, the bottom of the fixing block 17 is fixedly connected to the inner wall of the frame body 1, the outer wall of the shaft body 7 is also provided with a flat gear 18 and is fixedly connected thereto, a rack 19 meshing therewith is provided below the flat gear 18, the rack 19 passes through the frame body 1 and can slide freely inside the frame body 1, and the end of the rack 19 is fixedly connected to the side frame 4; When in use, the staff can remotely start the servo motor 16 to make it rotate a certain number of circles at a low speed. The servo motor 16 will drive the shaft body 2 15 and the bevel gear 2 14 to rotate at the same time, thereby driving the bevel gear 2 14 and the bevel gear 1 13 to transmit to each other, and drive the shaft body 1 7 and the auxiliary plate 8 to rotate downward; at the same time, the shaft body 1 7 will also drive the flat gear 18 to rotate, thereby driving the rack 19 to transmit to each other, and the rack 19 will push the side frame 4 to gradually move away from the frame body 1 until the auxiliary plate 8 rotates to coincide with the base plate 2, and the servo motor 16 stops rotating. The staff can insert the L-shaped rod 39 into the interior of the fixed plate 9 and the auxiliary plate 8, and rotate the bent part of the L-shaped rod 39 into the square groove 41, so that the fixed plate 9, the auxiliary plate 8 and the base plate 2 form a new stable operating platform. In this process, multiple cross bars of the side frame 4 will also be drawn out from the interior of the frame body 1, providing safety protection for the new operating platform, while expanding the range of activities of the staff, which is conducive to improving the efficiency and quality of aerial operations.

[0023] In addition, a bending rod 20 is provided on the top of the side frame 4 and fixedly connected thereto, an insertion rod three 21 is provided inside the bending rod 20 and slidably connected thereto, the end of the insertion rod three 21 is fixedly connected to the frame body 1, and the outer wall of the bending rod 20 is provided with a groove 22 for clamping by a clamp, and the center point of the groove 22 is located on the central vertical plane of the operating platform; when the side frame 4 moves away from the frame body 1, the bending rod 20 will also drive the clamp to move with the side frame 4, so that during the expansion of the operating platform, the two hangers 3 are always on the central vertical plane of the operating platform, ensuring the stability and safety of the expansion process.

[0024] According to the above embodiment, embodiment 2, Two limit rods 11 are further provided inside the frame 1. A docking unit 12 is provided inside the frame 1 to drive the limit rods 11 to extend outward. The expansion unit 10 and the docking unit 12 cooperate with each other to enable two adjacent frames 1 to perform high-altitude docking operations. The docking unit 12 includes an inclined block 23 located on one side of the insertion rod 6, the side surface of the inclined block 23 is fixedly connected to the insertion rod 6, the end of the limit rod 11 is provided with a protrusion 24 and fixedly connected thereto, the outer walls of the two limit rods 11 are provided with a connecting plate 25 and are fixedly connected thereto, the outside of the two limit rods 11 are provided with a spring 26, the outer wall of the limit rod 11 is also provided with a fixing plate 27 and is slidably connected thereto, the two ends of the spring 26 are respectively fixedly connected to the fixing plate 27 and the connecting plate 25, and the wall of the frame 1 is provided with a socket 28 for the limit rod 11 to slide. When the inclined block 23 slides with the insertion rod 6, the inclined area of ​​the inclined block 23 resists the outer edge of the protrusion 24, thereby driving the two limit rods 11 to gradually extend from the inside of the frame 1 for subsequent docking work, and the elastic force of the spring 26 under normal conditions pushes the end of the limit rod 11 to coincide with the inner wall surface of the frame 1, so as to facilitate the position adjustment of the two limit rods 11.

[0025] Furthermore, the outer wall of the fixing plate 27 is provided with a fixing groove 29 and fixedly connected thereto, the fixing plate 27 slides freely inside the fixing groove 29, the fixing plate 27 is slidably connected to the fixing groove 29, a connecting block 30 is provided above the protrusion 24 and fixedly connected thereto, the interior of the connecting block 30 is rotatably connected with a rotating bar 31 through a rotating shaft, a U-shaped frame 1 32 is provided above the frame 1 for the rotating bar 31 to be inserted, a U-shaped frame 2 33 having a groove width equal to that of the U-shaped frame 1 32 is also provided above the frame 1, and the U-shaped frame 1 32 and the U-shaped frame 31 are connected to each other. The bottom of the second frame 33 is fixedly connected to the frame body 1, the rotating bar 31 is L-shaped, a U-shaped frame 34 is provided above the U-shaped frame 1 32, the bottom of the U-shaped frame 34 is fixedly connected to the frame body 1, a stopper 35 is provided inside the U-shaped frame 34 and is slidably connected thereto, a spring 2 36 is provided above the stopper 35, a fixing box 37 is provided outside the spring 2 36, both ends of the spring 2 36 are fixedly connected to the stopper 35 and the fixing box 37 respectively, and the fixing box 37 is located above the U-shaped frame 34 and is fixedly connected thereto; During the sliding process of the rotating bar 31 inside the U-shaped frame 32, the end of the rotating bar 31 contacts the inclined portion of the stop block 35, thereby driving the stop block 35 to rise upward. A pull rod 38 is provided above the stop block 35 and is fixedly connected thereto. The pull rod 38 passes through the fixed box 37 and is slidably connected thereto. The staff can drive the stop block 35 to rise upward by pulling the pull rod 38 to return the rotating bar 31 to its original position.

[0026] When it is necessary to dock different adjacent frames 1, the rotating bar 31 in the adjacent frame 1 can be rotated upward first to disengage it from the groove of the U-shaped frame 1 32. At this time, the rotating bar 31 drives the connecting block 30, the protrusion 24 and the two limiting rods 11 to move inside the frame 1 until the rotating bar 31 moves to align with the notch of the U-shaped frame 2 33. At this time, the rotating bar 31 is rotated again into the notch of the U-shaped frame 2 33 and is limited. In this state, there is no limiting rod 11 behind the two insertion holes 28, so that the limiting rod 11 inside the other frame 1 can be inserted. At this time, the servo motor 16 inside the frame 1 is started again, so that the insertion rod 26 drives the inclined block 23 to move until the inclined portion of the inclined block 23 is in contact with the protrusion 24, and the two limit rods 11 will gradually extend from the inside of the frame 1 and be inserted into the two sockets 28 inside the other frame 1. During this process, the protruding portion of the rotating bar 31 will be in contact with the inclined portion of the stop block 35, and drive the stop block 35 to rise inside the fixed box 37 until the end of the rotating bar 31 completely passes the stop block 35, and the elastic force of the spring 2 36 will drive the stop block 35 to drop to its original position. Under the elastic force of the spring 1 26, the end of the rotating bar 31 will be in contact with the flat area of ​​the stop block 35, thereby limiting the extended position of the rotating bar 31 and the limit rod 11, and finally completing the docking of the two adjacent frames 1. The two operating platforms can be stably docked in a high-altitude environment. At the same time, the expansion unit 10 also expands the activity space of the operating platform, which is suitable for high-altitude operations with wider walls, and further improves the work efficiency and quality of high-altitude operations.

[0027] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A steel structure high-altitude installation operation platform, comprising a frame (1), the inner wall of the frame (1) is provided with a base plate (2), and a sling (3) is provided above the frame (1). Features: A side frame (4) is provided on one side of the frame body (1), and an insertion rod (5) and an insertion rod (6) are provided on one side of the side frame (4), and the insertion rod (5) and the insertion rod (6) are both located inside the frame body (1) and slidably connected thereto, an axis body (7) is provided inside the base plate (2), and a sub-plate (8) is provided on the outer wall of the axis body (7), and the sub-plate (8) is located below the base plate (2), and a fixing plate (9) is provided on the side surface of the bottom end of the side frame (4), and an expansion unit (10) is provided inside the frame body (1) for driving the sub-plate (8) to rotate to overlap with the base plate (2), and the expansion unit (10) is used to expand the overall range of motion of the frame body (1); Two limit rods (11) are also provided inside the frame (1), and a docking unit (12) is provided inside the frame (1) for driving the limit rods (11) to extend outwards. The expansion unit (10) and the docking unit (12) cooperate with each other to enable two adjacent frames (1) to perform a high-altitude docking operation.

2. The steel structure high altitude installation operation platform according to claim 1 is characterized by: The expansion unit (10) comprises a bevel gear 1 (13) located on the outer wall of shaft body 1 (7); the shaft body 1 (7) passes through the frame body (1) and is rotatably connected thereto; a bevel gear 2 (14) meshing with the shaft body 1 (13) is provided on one side of the bevel gear 1 (13); a shaft body 2 (15) is provided on the inner wall of the bevel gear 2 (14); a servo motor (16) is provided at the end of the shaft body 2 (15); a fixing block (17) is provided on the outer wall of the shaft body 2 (15); the bottom of the fixing block (17) is fixedly connected to the inner wall of the frame body (1); a spur gear (18) is also provided on the outer wall of the shaft body 1 (7); a rack (19) meshing with the rack (18) is provided below the spur gear (18); the rack (19) passes through the frame body (1) and the end of the rack (19) is fixedly connected to the side frame (4).

3. The steel structure high altitude installation operation platform according to claim 2 is characterized by: A bending rod (20) is provided above the side frame (4), an insertion rod three (21) is provided inside the bending rod (20), an end of the insertion rod three (21) is fixedly connected to the frame body (1), and an outer wall of the bending rod (20) is provided with a groove (22) for clamping by a clamp, and the center point of the groove (22) is located on the central vertical plane of the operating platform.

4. The steel structure high altitude installation operation platform according to claim 2 is characterized by: The docking unit (12) comprises an inclined block (23) located on one side of the second insertion rod (6); a protrusion (24) is provided at the end of the limit rod (11); a connecting plate (25) is provided on the outer walls of the two limit rods (11); a spring (26) is provided on the outside of the two limit rods (11); a fixing plate (27) is also provided on the outer wall of the limit rod (11) and is slidably connected thereto; two ends of the spring (26) are respectively fixedly connected to the fixing plate (27) and the connecting plate (25); and a wall of the frame body (1) is provided with a socket (28) for the limit rod (11) to slide.

5. The steel structure high altitude installation operation platform according to claim 4 is characterized by: When the inclined block (23) slides along with the second insertion rod (6), the inclined area of ​​the inclined block (23) abuts against the outer edge of the protrusion (24), and the elastic force of the first spring (26) pushes the end of the limit rod (11) to coincide with the inner wall surface of the frame body (1) under normal conditions.

6. The steel structure high altitude installation operation platform according to claim 5 is characterized by: The outer wall of the fixing plate (27) is provided with a fixing groove (29), and the fixing plate (27) slides freely inside the fixing groove (29). A connecting block (30) is provided above the protrusion (24), and a rotating bar (31) is rotatably connected inside the connecting block (30) via a rotating shaft. A U-shaped frame (32) for the rotating bar (31) to be inserted is provided above the frame (1), and a U-shaped frame (33) having a groove width equal to that of the U-shaped frame (32) is also provided above the frame (1).

7. The steel structure high altitude installation operation platform according to claim 6 is characterized by: The rotating bar (31) is L-shaped. A U-shaped frame three (34) is provided above the U-shaped frame one (32). A stop block (35) is provided inside the U-shaped frame three (34). A spring two (36) is provided above the stop block (35). A fixing box (37) is provided outside the spring two (36). The fixing box (37) is located above the U-shaped frame three (34) and is fixedly connected thereto. When the rotating bar (31) slides inside the U-shaped frame one (32), the end of the rotating bar (31) contacts the inclined surface of the stop block (35).

8. The steel structure high altitude installation operation platform according to claim 7 is characterized by: A pull rod (38) is provided above the blocking block (35), and the pull rod (38) passes through the fixing box (37) and is slidably connected thereto.

9. The steel structure high altitude installation operation platform according to claim 1 is characterized by: An L-shaped rod (39) is provided inside the fixing plate (9), and the L-shaped rod (39) is located inside the fixing plate (9) and the base plate (2). A limiting hole (40) is provided inside the sub-plate (8) for the L-shaped rod (39) to be inserted into. Two square grooves (41) are provided inside the fixing plate (9) for the L-shaped rod (39) to be inserted into.