Dry bulk cargo port and wharf pollution prevention and control level quantitative evaluation method
By building a standardized evaluation system of 12 indicators, the quantitative evaluation method for pollution prevention and control at dry bulk ports and terminals solves the problem that the existing evaluation methods lack unified standards and quantitative evaluation, and realizes scientific and systematic pollution prevention and control evaluation, providing decision-making support for port management.
Patent Information
- Application Number
- CN202411761784.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-03
- Publication Date
- 2025-03-14
AI Technical Summary
The existing dry bulk port and terminal pollution prevention and control evaluation methods lack a unified standard and quantitative evaluation system, which makes it difficult to compare and optimize the pollution prevention and control effects, and lacks scientific and systematic evaluation methods.
A quantitative evaluation method for pollution prevention and control level of dry bulk ports and terminals is proposed. By building a standardized evaluation system of 12 indicators, including air pollution, water pollution, dust prevention and control, noise management, etc., a quantitative evaluation method is adopted, combined with on-site monitoring and third-party testing data, the pollution prevention and control effect is comprehensively evaluated.
A scientific, systematic and quantitative assessment of the pollution prevention and control level of dry bulk ports and terminals has been achieved, providing scientific decision-making basis for port management departments, optimizing pollution prevention and control measures, and promoting the green and sustainable development of ports.
Smart Images

Figure CN119624245A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of port environmental protection, and in particular to a quantitative evaluation method for the pollution prevention and control level of a dry bulk cargo port terminal. Background Art
[0002] Dry bulk cargo ports are important cargo transportation hubs, but the loading and unloading of dusty dry bulk cargoes such as coal, ore, and grain can easily cause air pollution (including but not limited to water pollution, noise pollution, and solid waste pollution), which seriously affects the ecological environment and health of residents around the ports. These pollution problems have increased the environmental pressure on dry bulk cargo ports, and the need for environmental protection has become more urgent.
[0003] Looking at existing research at home and abroad, the evaluation of the pollution prevention and control level of dry bulk port terminals has attracted widespread attention, but there are still the following problems that need to be solved: 1) Pollution prevention and control measures are scattered and the effects vary greatly. Although ports in various places have adopted prevention and control measures such as sprinkling water to reduce dust and wastewater treatment, the lack of unified evaluation standards and methods makes it difficult to compare and optimize the pollution prevention and control effects of different ports; 2) There is a lack of scientific and standardized evaluation methods. Most of the existing evaluations are qualitative analyses and lack a quantitative evaluation system; 3) Existing pollution prevention and control evaluation methods usually lack systematicity and comprehensiveness, and the monitoring methods and data collection are imperfect. It is impossible to scientifically quantify the actual effect of pollution prevention and control, and it is difficult to provide strong support for policy formulation and environmental management.
[0004] The technical comparison is as follows:
[0005] Technical comparison with patent CN103927461A "A method for calculating the dynamic composition of port and ship air pollutant emission inventories"
[0006] 1. Patent CN103927461A proposes a method for dynamically building an inventory of air pollutants from ports and ships, and calculates single and superimposed emission inventories of air pollutants through port and ship emission modules, providing data support for energy conservation and emission reduction programs. The quantitative evaluation method for the pollution prevention and control level of dry bulk port terminals proposed by us focuses on the comprehensive evaluation of multiple environmental factors such as port dust and exhaust gas prevention and control, port water pollution, solid waste prevention and control, and noise prevention and control. It uses 12 indicators for comprehensive quantitative evaluation, focusing on the quantitative evaluation of port pollution prevention and control levels and comparative analysis between different ports.
[0007] Second, patent CN103927461A focuses on the generation of emission inventories of air pollutants and energy conservation and emission reduction, while our method focuses more on the evaluation of the implementation effect of pollution prevention and control measures, covering a wide range of environmental factors, and proposes a highly operational quantitative evaluation scheme to support port environmental protection decision-making and comparative analysis.
[0008] Technical comparison with patent CN117388139A "A method for monitoring and early warning of dust pollution in dry bulk ports based on patrol robots"
[0009] 1. Patent CN117388139A proposed a dry bulk port dust pollution monitoring and risk warning method based on patrol robots, focusing on real-time monitoring of dust concentration and early warning through patrol robots, focusing on immediate monitoring and risk warning. Our method focuses on evaluating the overall pollution prevention and control level of dry bulk port terminals through a quantitative evaluation index system, focusing on the comprehensiveness of pollution prevention and control measures and long-term effect evaluation.
[0010] Second, patent CN117388139A emphasizes the construction of real-time monitoring and early warning systems, while our method systematically evaluates the pollution prevention and control effects by constructing a scientific evaluation index system to provide a basis for port environmental protection decision-making. The two differ in technical direction and application objectives.
[0011] Technical comparison with patent CN118378795A "A method for evaluating the pollution reduction and carbon reduction effect for ports and terminals"
[0012] 1. Patent CN118378795A focuses on the pollution reduction and carbon reduction effect evaluation of air purification equipment, and uses pollutant gas concentration data analysis technology to evaluate the purification effect in real time. The quantitative evaluation method for the pollution prevention and control level of dry bulk port terminals proposed by us covers the prevention and control effects of multiple pollution sources such as dust, water pollution, solid waste, and noise, providing a more comprehensive pollution prevention and control effect evaluation framework.
[0013] Second, patent CN118378795A mainly focuses on the single effect evaluation of purification equipment, while our method integrates the evaluation of various pollution prevention and control measures of the port to form a complete quantitative evaluation system, which can provide support for port environmental protection decision-making in many aspects.
[0014] Based on the above background, this paper proposes a quantitative evaluation method for the pollution prevention and control level of dry bulk cargo port terminals. By establishing a set of standardized evaluation index systems and a scientific quantitative analysis framework, combined with pollution source monitoring data, the pollution prevention and control level is objectively and comprehensively evaluated. This method will provide a basis for the optimization of environmental protection policies for dry bulk cargo port terminals and promote the realization of ports' goals in sustainable development and green development. Summary of the invention
[0015] In order to solve the above technical problems, the present invention proposes a quantitative evaluation method for the pollution prevention and control level of dry bulk cargo port terminals, which is used to accurately evaluate the pollution prevention and control level of dry bulk cargo port terminals. By constructing a comprehensive pollution prevention and control evaluation index system, covering air pollution, water pollution, dust prevention and control, noise management and other aspects, a quantitative scoring method is adopted, combined with on-site monitoring and third-party detection data, to comprehensively evaluate the pollution prevention and control effect of dry bulk cargo port terminals. This method can obtain the comprehensive pollution prevention and control level of the port terminal by weighted comprehensive calculation of various indicators, provide scientific decision-making basis for port management departments, optimize pollution prevention and control measures, and promote the green and sustainable development of ports.
[0016] To achieve the above object, the technical solution adopted by the present invention is:
[0017] A method for quantitatively evaluating the pollution prevention and control level of a dry bulk cargo port terminal, characterized in that the method comprises the following steps:
[0018] Step 1: Through literature review and field research of port enterprises, the factors affecting the pollution prevention and control level of dry bulk port terminals are screened out, and the impact weights are assigned;
[0019] Step 2: For the influencing factor “application of port dust and exhaust gas prevention and control measures”, select evaluation indicators and construct a quantitative calculation method for this influencing factor;
[0020] Step 3: For the influencing factors of “port water pollution and solid waste prevention and control”, select evaluation indicators and construct a quantitative calculation method for this influencing factor;
[0021] Step 4: For the influencing factors of “receiving, transferring and disposing of pollutants from ships”, select evaluation indicators and construct a quantitative calculation method for this influencing factor;
[0022] Step 5: For the “port operation noise prevention and control” among the influencing factors, select evaluation indicators and construct a quantitative calculation method for this influencing factor;
[0023] Step 6, assign impact weights to the evaluation indicators in steps 2 to 5, and calculate the pollution prevention and control level score of the dry bulk port terminal.
[0024] As a further improvement of the present invention, the specific process of step 1 is as follows:
[0025] Step 11, through literature review and field research, select four key factors that affect the pollution prevention and control level of dry bulk port terminals: "application of port dust and exhaust gas prevention and control measures", "port water pollution and solid waste prevention and control", "ship pollutant reception, transportation and disposal" and "port operation noise prevention and control";
[0026] Step 12, assign the influence weights of the four key factors in step 11. Combined with the influence of the above four factors on the pollution prevention and control level of dry bulk port terminals, the influence weight assigned to "application of port dust and exhaust gas prevention and control measures" is η1, the influence weight assigned to "port water pollution and solid waste prevention and control" is η2, the influence weight assigned to "ship pollutant reception, transportation and disposal" is η3, and the influence weight assigned to "port operation noise prevention and control" is η4.
[0027] As a further improvement of the present invention, the specific process of step 2 is as follows:
[0028] Step 21, for the influencing factors of "application of port dust and exhaust gas prevention and control measures", five evaluation indicators are selected, namely "enclosed proportion of yard area", "equipment of dust suppression and removal facilities", "number of sweeping vehicles", "dust concentration monitoring value" and "greening rate of port area greenable area";
[0029] Step 22, calculate the proportion of the yard area that realizes closed or semi-closed storage. For open-air yards, dust barriers such as wind and dust suppression nets are constructed as required and sprinklers are installed. The construction requirements of wind and dust suppression nets are: the height should be 1.1-1.5 times the stacking height, and not less than 1 meter higher than the stacking part, and the opening rate is 30%-40%.
[0030] The ratio of the yard area for closed or semi-closed storage to the total yard area It is expressed as:
[0031]
[0032] In the formula, E q The yard area for closed or semi-closed storage, m 2 ; E z is the total yard area, m 2 , when the calculated ratio If the ratio is greater than or equal to 50%, and the wind and dust suppression nets built in the open-air storage yard meet the requirements and are equipped with sprinkler devices, this item will score 100 points; If the wind and dust suppression nets of the open-air storage yard do not meet the requirements or are not equipped with sprinklers, this item will be scored 75 points. If a closed or semi-closed storage yard is built, If the wind and dust suppression nets of the open-air storage yard meet the requirements and are equipped with sprinklers, this item can score 75 points. If the open-air storage yard has a closed or semi-closed storage yard, If the wind and dust suppression nets of the open-air storage yard do not meet the requirements or are not equipped with sprinklers, the score for this item is 50 points; if the closed or semi-closed storage yard is not built, but the wind and dust suppression nets of the open-air storage yard meet the requirements and are equipped with sprinklers, the score for this item is 50 points; if the closed or semi-closed storage yard is not built, and the wind and dust suppression nets of the open-air storage yard do not meet the requirements or are not equipped with sprinklers, the score for this item is not scored. The final score of this item is represented by A1;
[0033] Step 23, consider the configuration of dust suppression and dust removal facilities;
[0034] 1) Horizontal transportation adopts closed measures and material spill prevention facilities;
[0035] 2) Ship loading and unloading machines, stacking and reclaiming equipment, car tippers and car loaders have spray systems or mist systems;
[0036] 3) A material guide chute, a closed cover and a dust curtain are provided at the material transfer point;
[0037] If all three of the above items are equipped, the score for this item is 100 points; if two of them are equipped, the score for this item is 75 points; if one of them is equipped, the score for this item is 50 points. The final score of this item is represented by A2;
[0038] Step 24, calculate the ratio γ of the number of sweeping vehicles to the port area:
[0039]
[0040] Where N a Number of sweeping vehicles, N b is the total area of the port, m 2 , when the calculated γ is every 50,000-80,000 m 2 If one sweeping vehicle is equipped and sweeps at least 1-2 times a day, this item will score 100 points; when γ is 80,000-100,000 m 2 If one sweeping vehicle is equipped and sweeps at least 1-2 times a day, this item will be scored 75 points; if the average sweeping area is greater than 100,000 m 2 If there is only one sweeping vehicle and the sweeping is done at least 1-2 times a day, this item will be scored 50 points; if the requirement of sweeping once a day cannot be met, no points will be awarded for this item regardless of the number of sweeping vehicles. The final score for this item is represented by A3;
[0041] Step 25: Consider the dust concentration monitoring value. When the dust concentration monitoring value at the port area is less than or equal to 85% of the limit value specified in the comprehensive emission standard of air pollutants GB16297-1996, that is, 0.85 mg / m 3 When the dust concentration monitoring value is greater than 0.85mg / m3 , but less than or equal to the prescribed limit of 1.0 mg / m 3 The score for this item is 50 points. The port perimeter refers to the boundary between the port area and the external environment. The boundary is determined according to legal procedures. The final score of this item is represented by A4.
[0042] Step 26, calculate the greening rate of the port area that can be greened. The area of the port area that can be greened is expressed as:
[0043] D s =DD a -D b -D c
[0044] Where D s is the greening area of the port area, m 2 ; D is the land area of the port, m 2 ;D a is the storage yard area, m 2 ;D b is the road area, m 2 ;D c is the building area, m 2 The greening rate ε of the greenable area in the port area is expressed as:
[0045]
[0046] Where D g is the actual green area of the port area, m 2 When ε is 100%, this item is scored 100 points; when ε is greater than or equal to 85% and less than 100%, this item is scored 75 points; when ε is greater than or equal to 70% and less than 85%, this item is scored 50 points; when ε is less than 70%, this item is not scored. The final score of this item is represented by A5.
[0047] As a further improvement of the present invention, the specific process of step 3 is as follows:
[0048] Step 31, for the influencing factors of "port water pollution and solid waste prevention and control", select four evaluation indicators: "industrial wastewater and domestic sewage treatment", "general industrial solid waste storage", "temporary storage of hazardous wastes" and "water pollution accident emergency response level";
[0049] Step 32, considering the treatment of production wastewater and domestic sewage, requires a sewage discharge permit, and the terminal's production wastewater, domestic sewage and clean rainwater adopt a diversion drainage system. If the above requirements are not met, this item will not be scored. On the basis of meeting the above requirements, check the terminal sewage collection or self-treatment rate and the sewage collection water quality or self-treatment effluent water quality standards. Among them, the sewage collection water quality or self-treatment effluent water quality standard refers to the sewage that will be used after treatment, which should meet the requirements of recycled water quality standards. After treatment, if it is discharged into natural water bodies or sewage collection, it should also meet relevant standards, including providing a third-party test report with testing qualifications. The terminal sewage collection or self-treatment rate α is expressed as:
[0050]
[0051] Where M a It is the sum of the water volume that meets the standards for discharge or reuse at the terminal and the water volume that is included in the municipal sewage treatment network; M b It is the total amount of various types of sewage generated by the port enterprises themselves and the various types of ship sewage received. When α is 100%, and the quality of the water received or the quality of the self-treated effluent meets the standard, this sub-item is scored 100 points; if one of the above two requirements is met, this sub-item is scored 75 points; if neither of the two requirements is met, this sub-item is scored 50 points. The final score of this sub-item is represented by A6;
[0052] Step 33, considering general industrial solid waste storage site conditions;
[0053] 1) The storage site is set up independently;
[0054] 2) The storage area is not set up in the open air and is covered;
[0055] 3) Equipped with anti-leakage system and rainwater and sewage diversion system;
[0056] If all three of the above items are equipped, the score for this item is 100 points; if two of them are equipped, the score for this item is 75 points; if one of them is equipped, the score for this item is 50 points. The final score of this item is represented by A7.
[0057] Step 34, considering the temporary storage site conditions of hazardous wastes;
[0058] 1) The storage site is independent and closed;
[0059] 2) Equipped with anti-leakage system and rainwater and sewage diversion system, and equipped with explosion-proof cameras in the venue;
[0060] 3) Hazardous waste labels and hazardous waste storage management systems are clearly posted, with clear records and weighing devices;
[0061] If all three of the above items are equipped, the score for this item is 100 points; if two of them are equipped, the score for this item is 75 points; if one of them is equipped, the score for this item is 50 points. The final score of this item is represented by A8;
[0062] Step 35, considering the emergency response level of water pollution accidents;
[0063] 1) Formulate emergency plans for water pollution accidents;
[0064] 2) Set up a water pollution accident emergency equipment warehouse;
[0065] 3) Equip emergency personnel and conduct emergency training and drills regularly;
[0066] If all three of the above items are met, the score for this item is 100 points; if two of them are met, the score for this item is 75 points; if one of them is met, the score for this item is 50 points. The final score for this item is represented by A9.
[0067] As a further improvement of the present invention, the specific process of step 4 is as follows:
[0068] Step 41, for the influencing factor of "receiving, transferring and disposing of pollutants from ships", two evaluation indicators are selected: "transfer and disposal ratio of domestic sewage and oily sewage from ships" and "transfer and disposal ratio of garbage from ships".
[0069] Step 42, calculate the transfer and disposal ratio v of ship domestic sewage and oily sewage:
[0070]
[0071] In the formula, Q a It indicates the amount of domestic sewage and oily sewage from ships that are received by the terminal through self-built facilities or purchased services and included in the port service scope, and that is treated by the port itself or transferred ashore; Q b The total amount of domestic sewage and oily sewage from ships;
[0072] When υ is 100%, this item is scored 100 points; when υ is greater than or equal to 90% but less than 100%, this item is scored 75 points; when υ is greater than or equal to 80% but less than 90%, this item is scored 50 points; when υ is less than 80%, this item is not scored. The final score of this item is A 10 express;
[0073] Step 43, calculate the ship garbage transfer and disposal ratio χ:
[0074]
[0075] In the formula, B aIt means that the terminal adopts self-built facilities or purchased services to include the reception of ship garbage into the scope of port services, and does a good job in the classification, collection, storage and transfer of garbage; B b Indicates the total amount of ship garbage. When χ is 100%, this item is scored 100 points; when χ is greater than or equal to 90% but less than 100%, this item is scored 75 points; when χ is greater than or equal to 80% but less than 90%, this item is scored 50 points; when χ is less than 80%, this item is not scored, and the final score of this item is A. 11 express.
[0076] As a further improvement of the present invention, the specific process of step 5 is as follows:
[0077] Step 51, for the influencing factor of "port operation noise prevention and control", select "factory boundary noise compliance rate" as an evaluation indicator;
[0078] Step 52, calculate the factory boundary noise compliance rate μ:
[0079]
[0080] In the formula, S a It indicates the number of days when the noise monitoring value at the factory boundary meets the emission limit value specified in the environmental noise emission standard for industrial enterprises, where the daytime is 65dB and the nighttime is 55dB; S b is the total number of monitoring days;
[0081] When μ is 100%, this item is scored 100 points; when μ is greater than or equal to 90% but less than 100%, this item is scored 75 points; when μ is greater than or equal to 80% but less than 90%, this item is scored 50 points; when μ is less than 80%, this item is not scored, and the final score of this item is A. 12 express.
[0082] As a further improvement of the present invention, the specific process of step 6 is as follows:
[0083] Step 61, assigning influence weights to the evaluation indicators in steps 2 to 5. For the five evaluation indicators in step 21, namely, "enclosed proportion of yard area", "equipment of dust suppression and removal facilities", "number of sweeping vehicles", "dust concentration monitoring value" and "greening rate of greenable areas in the port area", weights λ1, λ2, λ3, λ4 and λ5 are assigned respectively and meet the following requirements:
[0084] λ1+λ2+λ3+λ4+λ5=1
[0085] For the four evaluation indicators of "industrial wastewater and domestic sewage treatment", "general industrial solid waste storage", "temporary storage of hazardous wastes" and "emergency level of water pollution accidents" in step 31, weights λ6, λ7, λ8 and λ9 are assigned respectively, and they meet the following requirements:
[0086] λ6+λ7+λ8+λ9=1
[0087] For the two evaluation indicators of “transfer and disposal ratio of domestic sewage and oily sewage from ships” and “transfer and disposal ratio of garbage from ships” in step 41, weights λ are assigned respectively. 10 and λ 11 , and satisfy:
[0088] λ 10 +λ 11 =1
[0089] For the evaluation index of “factory boundary noise compliance rate” in step 51, the weight λ is assigned 12 , and satisfy:
[0090] λ 12 =1
[0091] Step 62, calculate the final dry bulk port terminal pollution prevention and control level score G:
[0092] G=η1(λ1A1+λ2A2+λ3A3+λ4A4+λ5A5)+η2(λ6A6+λ7A7+λ8A8+λ9A9)+η3(λ 10 A 10 +λ 11 A 11 )+η4(λ 12 A 12 )
[0093] The calculated pollution prevention level G score ranges from 0 to 100, and the higher the score, the higher the pollution prevention level of the dry bulk port terminal.
[0094] Beneficial effects: Compared with the prior art, the technical solution of the present invention has the following beneficial technical effects:
[0095] The present invention provides a scientific, systematic and practical quantitative evaluation method for the pollution prevention and control level of dry bulk cargo port terminals. By constructing a comprehensive and standardized pollution prevention and control evaluation index system, it covers multiple aspects such as air pollution, water pollution, dust prevention and control, and noise management, thereby ensuring the scientificity and systematicness of the evaluation and overcoming the limitations of traditional qualitative evaluation. A quantitative scoring method is adopted, combined with on-site monitoring and third-party detection data, to provide objective and clear evaluation results, providing a strong basis for decision-making for port management departments. By comprehensively calculating various pollution prevention and control indicators, this method can provide reliable data support for the formulation and optimization of environmental protection policies for dry bulk cargo port terminals. Through quantitative pollution prevention and control evaluation, ports can better achieve green development goals, improve the overall environmental management level, and obtain higher recognition from society and the public for port environmental protection work. BRIEF DESCRIPTION OF THE DRAWINGS
[0096] Figure 1 The present invention is a calculation flow chart of a method for quantitatively evaluating the pollution prevention and control level of a dry bulk cargo port terminal. DETAILED DESCRIPTION
[0097] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be interpreted as limiting the present invention.
[0098] like Figure 1 As shown, it is a calculation flow chart of a quantitative evaluation method for the pollution prevention and control level of a dry bulk cargo port terminal of the present invention, and the specific steps are as follows:
[0099] Step 1: Through literature review and on-site investigation of port enterprises, the factors affecting the pollution prevention and control level of dry bulk port terminals are screened out, and the influence weights are assigned. The specific process of step 1 is as follows:
[0100] Step 11, through literature review and field research, select four key factors that affect the pollution prevention and control level of dry bulk port terminals: "application of port dust and exhaust gas prevention and control measures", "port water pollution and solid waste prevention and control", "ship pollutant reception, transportation and disposal" and "port operation noise prevention and control";
[0101] Step 12, assign the impact weights of the four key factors in step 11. Combined with the impact of the above four factors on the level of pollution prevention and control at dry bulk port terminals, the impact weight assigned to "application of port dust and exhaust gas prevention and control measures" is η1, the impact weight assigned to "port water pollution and solid waste prevention and control" is η2, the impact weight assigned to "ship pollutant reception, transportation and disposal" is η3, and the impact weight assigned to "port operation noise prevention and control" is η4.
[0102] Step 2: For the influencing factor "application of port dust and exhaust gas prevention and control measures", select evaluation indicators and construct a quantitative calculation method for this influencing factor. The specific method is as follows:
[0103] Step 21, for the influencing factors of "application of port dust and exhaust gas prevention and control measures", five evaluation indicators are selected, namely "enclosed proportion of yard area", "equipment of dust suppression and removal facilities", "number of sweeping vehicles", "dust concentration monitoring value" and "greening rate of port area greenable area";
[0104] Step 22, calculate the proportion of the yard area that achieves closed or semi-closed storage. For open-air yards, dust barriers such as wind and dust suppression nets can be built as required and sprinklers can be installed. The construction requirements of wind and dust suppression nets are: the height should be 1.1-1.5 times the height of the stacking, and the height should be no less than 1 meter above the stacking part, and the opening rate should be 30%-40%.
[0105] The ratio of the yard area for closed or semi-closed storage to the total yard area It can be expressed as:
[0106]
[0107] In the formula, E q The yard area for closed or semi-closed storage, m 2 ; E z is the total yard area, m 2 When the calculated ratio If the ratio is greater than or equal to 50%, and the wind and dust suppression nets built in the open-air storage yard meet the requirements and are equipped with sprinkler devices, this item will score 100 points; If the wind and dust suppression nets of the open-air storage yard do not meet the requirements or are not equipped with sprinklers, this item will be scored 75 points. If a closed or semi-closed storage yard is built, If the wind and dust suppression nets of the open-air storage yard meet the requirements and are equipped with sprinklers, this item can score 75 points. If the open-air storage yard has a closed or semi-closed storage yard, If the wind and dust suppression nets of the open-air storage yard do not meet the requirements or are not equipped with sprinklers, the score for this item is 50 points; if the closed or semi-closed storage yard is not built, but the wind and dust suppression nets of the open-air storage yard meet the requirements and are equipped with sprinklers, the score for this item is 50 points; if the closed or semi-closed storage yard is not built, and the wind and dust suppression nets of the open-air storage yard do not meet the requirements or are not equipped with sprinklers, the score for this item is not scored. The final score of this item is represented by A1;
[0108] Step 23, consider the configuration of dust suppression and dust removal facilities. 1) Horizontal transportation adopts closed measures and material spill prevention facilities; 2) Ship loading and unloading machines, stacking and reclaiming equipment, tippers, loaders and other loading and unloading equipment have spray (spray) systems; 3) Material guide troughs, closed covers and dust curtains are installed at material transfer points. If all three of the above items are equipped, this item will score 100 points; if two of them are equipped, this item will score 75 points; if one of them is equipped, this item will score 50 points. The final score of this item is represented by A2;
[0109] Step 24, calculate the ratio γ of the number of sweeping vehicles to the port area:
[0110]
[0111] Where N a Number of sweeping vehicles, N b is the total area of the port, m 2 When the calculated γ is 50,000-80,000 m 2 If one sweeping vehicle is equipped and sweeps at least 1-2 times a day, this item will score 100 points; when γ is 80,000-100,000 m 2 If one sweeping vehicle is equipped and sweeps at least 1-2 times a day, this item will be scored 75 points; if the average sweeping area is greater than 100,000 m 2 If there is only one sweeping vehicle and the sweeping is done at least 1-2 times a day, this item will be scored 50 points; if the requirement of sweeping once a day cannot be met, no points will be awarded for this item regardless of the number of sweeping vehicles. The final score for this item is represented by A3;
[0112] Step 25: Consider the dust concentration monitoring value. When the dust concentration monitoring value at the port area is less than or equal to 85% of the limit value specified in the "Integrated Emission Standard of Air Pollutants" (GB16297-1996), that is, 0.85 mg / m 3 When the dust concentration monitoring value is greater than 0.85mg / m 3 , but less than or equal to the prescribed limit of 1.0 mg / m 3 The port perimeter refers to the boundary between the port area and the external environment, which is usually determined according to legal procedures. The final score of this item is represented by A4;
[0113] Step 26, calculate the greening rate of the port area that can be greened. The area of the port area that can be greened can be expressed as:
[0114] D s =DD a -D b -D c
[0115] Where D sis the greening area of the port area, m 2 ; D is the land area of the port, m 2 ;D a is the storage yard area, m 2 ;D b is the road area, m 2 ;D c is the building area, m 2 The greening rate ε of the greenable area in the port area is expressed as:
[0116]
[0117] Where Dg is the actual green area of the port area, m 2 When ε is 100%, this item is scored 100 points; when ε is greater than or equal to 85% and less than 100%, this item is scored 75 points; when ε is greater than or equal to 70% and less than 85%, this item is scored 50 points; when ε is less than 70%, this item is not scored. The final score of this item is represented by A5.
[0118] Step 3: For the influencing factors of “port water pollution and solid waste prevention and control”, select evaluation indicators and construct a quantitative calculation method for this influencing factor. The specific method is as follows:
[0119] Step 31, for the influencing factors of "port water pollution and solid waste prevention and control", select four evaluation indicators: "industrial wastewater and domestic sewage treatment", "general industrial solid waste storage", "temporary storage of hazardous wastes" and "water pollution accident emergency response level";
[0120] Step 32, consider the treatment of industrial wastewater and domestic sewage. A sewage discharge permit is required, and the terminal's industrial wastewater, domestic sewage and clean rainwater adopt a diversion drainage system. If the above requirements are not met, no points will be awarded for this item. On the basis of meeting the above requirements, check the sewage collection or self-treatment rate of the terminal and the water quality of the sewage collection or the water quality standard of the self-treated effluent. Among them, the water quality standard of the sewage collection or the self-treated effluent refers to the sewage that will be used after treatment, which should meet the requirements of the recycled water quality standard. After treatment, if it is discharged into natural water bodies or sewage collection, it should also meet the relevant standards (provide a third-party test report with testing qualifications). The sewage collection or self-treatment rate α of the terminal can be expressed as:
[0121]
[0122] Where M a It is the sum of the water volume that meets the standards for discharge or reuse at the terminal and the water volume that is included in the municipal sewage treatment network; M bIt is the total amount of various types of sewage generated by the port enterprises themselves and the total amount of sewage received by various types of ships. When α is 100%, and the quality of the water received or the quality of the self-treated effluent meets the standard, this sub-item scores 100 points; if one of the above two requirements is met, this sub-item scores 75 points; if neither of the two requirements is met, this sub-item scores 50 points. The final score of this sub-item is represented by A6.
[0123] Step 33, consider the conditions of general industrial solid waste storage sites. 1) The storage site is set up independently; 2) The storage site is not set up outdoors and is covered; 3) It has an anti-leakage system and a rainwater and sewage diversion system. If all three of the above are equipped, this item will score 100 points; if two of them are equipped, this item will score 75 points; if one of them is equipped, this item will score 50 points. The final score of this item is represented by A7;
[0124] Step 34, consider the conditions of temporary storage sites for hazardous waste. 1) The storage site is independent and closed; 2) It has a leak-proof system and a rainwater and sewage diversion system, and explosion-proof cameras are installed in the site; 3) Hazardous waste signs and hazardous waste storage management systems are clearly posted, the records are clear, and weighing devices are available. If all three of the above items are equipped, this item will score 100 points; if two of them are equipped, this item will score 75 points; if one of them is equipped, this item will score 50 points. The final score of this item is represented by A8;
[0125] Step 35, consider the emergency response level for water pollution accidents. 1) Develop an emergency plan for water pollution accidents; 2) Set up an emergency equipment warehouse for water pollution accidents; 3) Equip emergency personnel and conduct emergency training and drills regularly. If all three of the above are met, this item will score 100 points; if two of them are met, this item will score 75 points; if one of them is met, this item will score 50 points. The final score of this item is represented by A9;
[0126] Step 4: For the influencing factors of “receiving, transferring and disposing of pollutants from ships”, select evaluation indicators and construct a quantitative calculation method for this influencing factor. The specific process is as follows:
[0127] Step 41, for the influencing factor of "receiving, transferring and disposing of pollutants from ships", two evaluation indicators are selected: "transfer and disposal ratio of domestic sewage and oily sewage from ships" and "transfer and disposal ratio of garbage from ships".
[0128] Step 42, calculate the transfer and disposal ratio v of ship domestic sewage and oily sewage:
[0129]
[0130] In the formula, Q aIt indicates the amount of domestic sewage and oily sewage from ships that are received by the terminal through self-built facilities or purchased services and included in the port service scope, and that is treated by the port itself or transferred ashore; Q b It is the total amount of domestic sewage and oily sewage of the ship. When υ is 100%, this item is scored 100 points; when υ is greater than or equal to 90% but less than 100%, this item is scored 75 points; when υ is greater than or equal to 80% but less than 90%, this item is scored 50 points; when υ is less than 80%, this item is not scored. The final score of this item is A 10 express.
[0131] Step 43, calculate the ship garbage transfer and disposal ratio χ:
[0132]
[0133] In the formula, B a It means that the terminal adopts self-built facilities or purchased services to include the reception of ship garbage into the scope of port services, and does a good job in the classification, collection, storage and transfer of garbage; B b Indicates the total amount of ship garbage. When χ is 100%, this item is scored 100 points; when χ is greater than or equal to 90% but less than 100%, this item is scored 75 points; when χ is greater than or equal to 80% but less than 90%, this item is scored 50 points; when χ is less than 80%, this item is not scored. The final score of this item is A 11 express.
[0134] Step 5: For the “port operation noise prevention and control” among the influencing factors, select the evaluation index and construct the quantitative calculation method of this influencing factor. The specific process is as follows:
[0135] Step 51, for the influencing factor of "port operation noise prevention and control", select "factory boundary noise compliance rate" as an evaluation indicator;
[0136] Step 52, calculate the factory boundary noise compliance rate μ:
[0137]
[0138] In the formula, S a It indicates the number of days when the noise monitoring value at the factory boundary meets the emission limit value standard (65dB during the day and 55dB at night) specified in the "Environmental Noise Emission Standards for Industrial Enterprises at Factory Boundaries"; S b is the total number of monitoring days.
[0139] When μ is 100%, this item is scored 100 points; when μ is greater than or equal to 90% but less than 100%, this item is scored 75 points; when μ is greater than or equal to 80% but less than 90%, this item is scored 50 points; when μ is less than 80%, this item is not scored. The final score of this item is A 12 express.
[0140] Step 6: Assign impact weights to the evaluation indicators in steps 2 to 5 and calculate the pollution prevention and control level score of the dry bulk port terminal. The specific process is as follows:
[0141] Step 61, assigning influence weights to the evaluation indicators in steps 2 to 5. For the five evaluation indicators in step 21, namely, "enclosed proportion of yard area", "equipment of dust suppression and removal facilities", "number of sweeping vehicles", "dust concentration monitoring value" and "greening rate of greenable areas in the port area", weights λ1, λ2, λ3, λ4 and λ5 are assigned respectively and meet the following requirements:
[0142] λ1+λ2+λ3+λ4+λ5=1
[0143] For the four evaluation indicators of "industrial wastewater and domestic sewage treatment", "general industrial solid waste storage", "temporary storage of hazardous wastes" and "emergency level of water pollution accidents" in step 31, weights λ6, λ7, λ8 and λ9 are assigned respectively, and they meet the following requirements:
[0144] λ6+λ7+λ8+λ9=1
[0145] For the two evaluation indicators of “transfer and disposal ratio of domestic sewage and oily sewage from ships” and “transfer and disposal ratio of garbage from ships” in step 41, weights λ are assigned respectively. 10 and λ 11 , and satisfy:
[0146] λ 10 +λ 11 =1
[0147] For the evaluation index of “factory boundary noise compliance rate” in step 51, the weight λ is assigned 12 , and satisfy:
[0148] λ 12 =1
[0149] Step 62, calculate the final dry bulk port terminal pollution prevention and control level score G:
[0150] G=η1(λ1A1+λ2A2+λ3A3+λ4A4+λ5A5)+η2(λ6A6+λ7A7+λ8A8+λ9A9)+η3(λ 10 A 10 +λ 11 A11 )+η4(λ 12 A 12 )
[0151] The calculated pollution prevention level G score ranges from 0 to 100, and the higher the score, the higher the pollution prevention level of the dry bulk port terminal.
[0152] Example
[0153] (1) Materials and data were collected from the dry bulk cargo terminal of a port enterprise in Zhenjiang City in four aspects: "application of port dust and exhaust gas prevention and control measures", "port water pollution and solid waste prevention and control", "ship pollutant reception, transportation and disposal" and "port operation noise prevention and control".
[0154] (2) For the influencing factor of "application of port dust and exhaust gas prevention and control measures", a weight of 0.4 (i.e. η1 = 0.4) was assigned. Five evaluation indicators were selected: "enclosed area ratio of yard", "equipment of dust suppression and removal facilities", "number of sweeping vehicles", "dust concentration monitoring value" and "greening rate of port area greenable area".
[0155] The dry bulk cargo of the port enterprise is stored in three ways: open-air, closed and semi-closed. Among them, closed and semi-closed yards account for 30% of the total yard area, less than 50%. The open-air yard is equipped with dust-proof barriers such as wind and dust suppression nets, walls, and protective forests, and a spraying device is installed. In addition, in order to reduce the dust generated during the operation of the dock and yard, fast-growing tall trees with a high survival rate in the region are selected, and dust-proof green belts are set up around the yard. This sub-item A1 = 75, and the weight of this sub-item λ1 = 0.2.
[0156] The port enterprise uses closed dump trucks for horizontal transportation, and the vehicles are equipped with anti-spill nets; fog cannons are used for loading; negative pressure hoppers and spray hoppers are used for unloading, and dust curtains and dust nets are installed in the hoppers. If all three scoring items are met, this sub-item A2 = 100, and the weight of this sub-item λ2 = 0.2.
[0157] The total port area of the port enterprise is 420,000 m 2 , a total of 3 sweeping vehicles are equipped to carry out sweeping operations every day. The ratio of the number of sweeping vehicles to the port area is 140,000 m 2 Equipped with 1 sweeping vehicle. This sub-item A3=50, and this sub-item weight λ3=0.2.
[0158] The port enterprise commissioned a third-party environmental monitoring company with testing qualifications to regularly (once every three months) monitor the dust concentration around the port area. The results showed that the maximum dust concentration monitored was 0.303 mg / m 3 , less than 0.85mg / m 3 , this small item A4=100, and the weight of this small item λ4=0.2.
[0159] The port enterprise has a green area of 13,900 m 2 The actual green area is 13,900 m 2 , the greening rate of the port area is 100%. This sub-item A5 = 100, and the weight of this sub-item λ5 = 0.2.
[0160] (3) For the influencing factor of "port water pollution and solid waste prevention and control", a weight of 0.3 (i.e. η2 = 0.3) was assigned. Four evaluation indicators were selected: "industrial wastewater and domestic sewage treatment", "general industrial solid waste storage", "temporary storage of hazardous wastes" and "emergency level of water pollution accidents".
[0161] The port enterprise has a sewage discharge permit, and the terminal's production wastewater, domestic sewage and clean rainwater adopt a diversion drainage system. The initial rainwater and ground washing wastewater in the port area are collected in the collection pool through open channels and enter the self-built sewage station for treatment. After the domestic sewage is treated in the septic tank, it is entrusted to a qualified third-party service company for regular removal. The terminal's production and domestic sewage is piped or self-treated at a rate of 100%, but the self-treated effluent is not tested for water quality. This sub-item A6 = 75, and the weight of this sub-item λ6 = 0.3.
[0162] The port enterprise has built a general industrial solid waste storage site, which is independently set up; it is not set up in the open air and is covered; but it does not have a leakage prevention system and a rainwater and sewage diversion system. 2 of the 3 scoring items are met, this sub-item A7=75, and the weight of this sub-item λ7=0.2.
[0163] The port enterprise has built a temporary storage site for hazardous wastes, which is independent and closed; it has an anti-leakage system and a rainwater and sewage diversion system, and is equipped with explosion-proof cameras; it clearly posts hazardous waste signs and hazardous waste storage management systems, has clear records, and is equipped with weighing devices. All three scoring items are met, this sub-item A8 = 100, and this sub-item weight λ8 = 0.2.
[0164] The port enterprise has formulated an emergency plan for water pollution accidents; set up an emergency equipment warehouse for water pollution accidents; equipped emergency personnel, and regularly carried out emergency training and drills. All three scoring items are met, this sub-item A9 = 100, and this sub-item weight λ9 = 0.3.
[0165] (4) For the influencing factor of "receiving, transferring and disposing of pollutants from ships", a weight of 0.2 (i.e. η3 = 0.2) was assigned. Two evaluation indicators were selected: "transfer and disposal ratio of domestic sewage and oily sewage from ships" and "transfer and disposal ratio of garbage from ships".
[0166] The port enterprise has signed a commission agreement with a qualified third-party service company to handle all of the ship's domestic sewage and oily sewage for it, and the transfer and disposal ratio of ship domestic sewage and oily sewage is 100%. 10 =100, the weight of this item is λ 10 =0.5.
[0167] The port enterprise has signed a commission agreement with a qualified third-party service company to handle all ship waste for it, and the proportion of ship waste transfer and disposal is 100%. 11 =100, the weight of this item is λ 11 =0.5.
[0168] (5) For the influencing factor of “port operation noise prevention and control”, a weight of 0.1 (i.e. η4 = 0.1) was assigned, and one evaluation indicator, “factory boundary noise compliance rate”, was selected.
[0169] The main noise source of the port enterprise comes from the sound generated during the operation of machinery. Sound insulation measures such as door sound barriers and shelterbelts are adopted. The factory area has set up multiple noise online monitoring facilities. The monitoring results show that the maximum daytime noise monitoring value at the factory boundary for all monitoring days is 54.7-56.6dB, which is lower than 65dB; the maximum nighttime noise monitoring value is 46.8-48.1dB, which is lower than 55dB. The compliance rate of factory boundary noise is 100%. This sub-item A 12 =100, the weight of this item is λ 12 =1.0.
[0170] (6) Combining the scores and weights of the above indicators, the pollution prevention and control level score of the dry bulk cargo port terminal is calculated to be 90.25 points, which is a high score, indicating that the pollution prevention and control level of the dry bulk cargo port terminal is good.
[0171] The above description is only a preferred embodiment of the present invention and does not constitute any other form of limitation to the present invention. Any modification or equivalent change made based on the technical essence of the present invention still falls within the scope of protection required by the present invention.
Claims
1. A quantitative evaluation method for the pollution prevention and control level of dry bulk cargo port terminals, characterized in that: The method comprises the following steps: Step 1: Through literature review and field research of port enterprises, the factors affecting the pollution prevention and control level of dry bulk port terminals are screened out, and the impact weights are assigned; Step 2: For the "application of port dust and exhaust gas prevention and control measures" among the influencing factors, select evaluation indicators and construct a quantitative calculation method for this influencing factor; Step 3: For the influencing factors "port water pollution and solid waste prevention and control", select evaluation indicators and construct a quantitative calculation method for this influencing factor; Step 4: For the influencing factors "receiving, transferring and disposing of pollutants from ships", select evaluation indicators and construct a quantitative calculation method for this influencing factor; Step 5: For the "port operation noise prevention and control" in the influencing factors, select the evaluation index and construct the quantitative calculation method of the influencing factor; Step 6, assign impact weights to the evaluation indicators in steps 2 to 5, and calculate the pollution prevention and control level score of the dry bulk port terminal.
2. A quantitative evaluation method for the pollution prevention and control level of a dry bulk cargo port terminal according to claim 1, characterized in that: The specific process of step 1 is as follows: Step 11, through literature review and field research, select four key factors that affect the pollution prevention and control level of dry bulk port terminals: "application of port dust and exhaust gas prevention and control measures", "port water pollution and solid waste prevention and control", "ship pollutant reception, transportation and disposal" and "port operation noise prevention and control"; Step 12, assign the impact weights of the four key factors in step 11. Combined with the impact of the above four factors on the pollution prevention and control level of dry bulk port terminals, the impact weight assigned to "application of port dust and exhaust gas prevention and control measures" is η1, the impact weight assigned to "port water pollution and solid waste prevention and control" is η2, the impact weight assigned to "ship pollutant reception, transportation and disposal" is η3, and the impact weight assigned to "port operation noise prevention and control" is η4.
3. A quantitative evaluation method for the pollution prevention and control level of a dry bulk cargo port terminal according to claim 1, characterized in that: The specific process of step 2 is as follows: Step 21, for the influencing factor of "application of port dust and exhaust gas prevention and control measures", select five evaluation indicators: "enclosed area ratio of yard", "equipment of dust suppression and removal facilities", "number of sweeping vehicles", "dust concentration monitoring value" and "greening rate of port area greenable area"; Step 22, calculate the proportion of the yard area that realizes closed or semi-closed storage. For open-air yards, dust barriers such as wind and dust suppression nets are constructed as required and sprinklers are installed. The construction requirements of wind and dust suppression nets are: the height should be 1.1-1.5 times the stacking height, and not less than 1 meter higher than the stacking part, and the opening rate is 30%-40%. The ratio of the yard area for closed or semi-closed storage to the total yard area It is expressed as: In the formula, E q The yard area for closed or semi-closed storage, m 2 ; E z is the total yard area, m 2 , when the calculated ratio If the ratio is greater than or equal to 50%, and the wind and dust suppression nets built in the open-air storage yard meet the requirements and are equipped with sprinkler devices, this item will score 100 points; If the wind and dust suppression nets of the open-air storage yard do not meet the requirements or are not equipped with sprinklers, this item will be scored 75 points. If a closed or semi-closed storage yard is built, If the wind and dust suppression nets of the open-air storage yard meet the requirements and are equipped with sprinklers, this item can score 75 points. If the open-air storage yard has a closed or semi-closed storage yard, If the wind and dust suppression nets of the open-air storage yard do not meet the requirements or are not equipped with sprinklers, the score for this item is 50 points; if the closed or semi-closed storage yard is not built, but the wind and dust suppression nets of the open-air storage yard meet the requirements and are equipped with sprinklers, the score for this item is 50 points; if the closed or semi-closed storage yard is not built, and the wind and dust suppression nets of the open-air storage yard do not meet the requirements or are not equipped with sprinklers, the score for this item is not scored. The final score of this item is represented by A1; Step 23, consider the configuration of dust suppression and dust removal facilities; 1) Horizontal transportation adopts closed measures and material spill prevention facilities; 2) Ship loading and unloading machines, stacking and reclaiming equipment, car tippers and car loaders have spray systems or mist systems; 3) A material guide chute, a closed cover and a dust curtain are provided at the material transfer point; If all three of the above items are equipped, the score for this item is 100 points; if two of them are equipped, the score for this item is 75 points; if one of them is equipped, the score for this item is 50 points. The final score of this item is represented by A2; Step 24, calculate the ratio γ of the number of sweeping vehicles to the port area: Where N a Number of sweeping vehicles, N b is the total area of the port, m 2 , when the calculated γ is every 50,000-80,000 m 2 If one sweeping vehicle is equipped and sweeps at least 1-2 times a day, this item will score 100 points; when γ is 80,000-100,000 m 2 If one sweeping vehicle is equipped and sweeps at least 1-2 times a day, this item will be scored 75 points; if the average sweeping area is greater than 100,000 m 2 Only when there is one sweeping vehicle and the sweeping is done at least 1-2 times a day, this item will be scored 50 points; If the requirement of sweeping once a day cannot be met, no score will be awarded for this item regardless of the number of sweeping vehicles. The final score for this item is represented by A3; Step 25: Consider the dust concentration monitoring value. When the dust concentration monitoring value at the port area is less than or equal to 85% of the limit value specified in the comprehensive emission standard of air pollutants GB16297-1996, that is, 0.85 mg / m 3 When the dust concentration monitoring value is greater than 0.85mg / m 3 , but less than or equal to the prescribed limit of 1.0 mg / m 3 The score for this item is 50 points. The port perimeter refers to the boundary between the port area and the external environment. The boundary is determined according to legal procedures. The final score of this item is represented by A4. Step 26, calculate the greening rate of the port area that can be greened. The area of the port area that can be greened is expressed as: D s =D-D a -D b -D c Where D s is the greening area of the port area, m 2 ; D is the land area of the port, m 2 ; D a is the storage yard area, m 2 ; D b is the road area, m 2 ; D c is the building area, m 2 The greening rate ε of the greenable area in the port area is expressed as: Where D g is the actual green area of the port area, m 2 When ε is 100%, this item is scored 100 points; when ε is greater than or equal to 85% and less than 100%, this item is scored 75 points; when ε is greater than or equal to 70% and less than 85%, this item is scored 50 points; When ε is less than 70%, this item is not scored. The final score of this item is represented by A5.
4. A method for quantitatively evaluating the level of pollution prevention and control at a dry bulk cargo port terminal according to claim 1, characterized in that: The specific process of step 3 is as follows: Step 31, for the influencing factors of "port water pollution and solid waste prevention and control", select four evaluation indicators: "industrial wastewater and domestic sewage treatment", "general industrial solid waste storage", "temporary storage of hazardous wastes" and "water pollution accident emergency response level"; Step 32, considering the treatment of production wastewater and domestic sewage, requires a sewage discharge permit, and the terminal's production wastewater, domestic sewage and clean rainwater adopt a diversion drainage system. If the above requirements are not met, this item will not be scored. On the basis of meeting the above requirements, check the terminal sewage collection or self-treatment rate and the sewage collection water quality or self-treatment effluent water quality standards. Among them, the sewage collection water quality or self-treatment effluent water quality standard refers to the sewage that will be used after treatment, which should meet the requirements of recycled water quality standards. After treatment, if it is discharged into natural water bodies or sewage collection, it should also meet relevant standards, including providing a third-party test report with testing qualifications. The terminal sewage collection or self-treatment rate α is expressed as: Where M a It is the sum of the water volume that meets the standards for discharge or reuse at the terminal and the water volume that is included in the municipal sewage treatment network; M b It is the total amount of various types of sewage generated by the port enterprises themselves and the various types of ship sewage received. When α is 100%, and the quality of the water received or the quality of the self-treated effluent meets the standard, this sub-item is scored 100 points; if one of the above two requirements is met, this sub-item is scored 75 points; if neither of the two requirements is met, this sub-item is scored 50 points. The final score of this sub-item is represented by A6; Step 33, considering general industrial solid waste storage site conditions; 1) The storage site is set up independently; 2) The storage area is not set up in the open air and is covered; 3) Equipped with anti-leakage system and rainwater and sewage diversion system; If all three of the above items are equipped, the score for this item is 100 points; if two of them are equipped, the score for this item is 75 points; if one of them is equipped, the score for this item is 50 points. The final score of this item is represented by A7. Step 34, considering the temporary storage site conditions of hazardous wastes; 1) The storage site is independent and closed; 2) Equipped with anti-leakage system and rainwater and sewage diversion system, and equipped with explosion-proof cameras in the venue; 3) Hazardous waste labels and hazardous waste storage management systems are clearly posted, with clear records and weighing devices; If all three of the above items are equipped, the score for this item is 100 points; if two of them are equipped, the score for this item is 75 points; if one of them is equipped, the score for this item is 50 points. The final score of this item is represented by A8; Step 35, considering the emergency response level of water pollution accidents; 1) Formulate emergency plans for water pollution accidents; 2) Set up a water pollution accident emergency equipment warehouse; 3) Equip emergency personnel and conduct emergency training and drills regularly; If all three of the above items are met, the score for this item is 100 points; if two of them are met, the score for this item is 75 points; if one of them is met, the score for this item is 50 points. The final score for this item is represented by A9.
5. A method for quantitatively evaluating the pollution prevention and control level of a dry bulk cargo port terminal according to claim 1, characterized in that: The specific process of step 4 is as follows: Step 41, for the influencing factor of "receiving, transferring and disposing of pollutants from ships", two evaluation indicators are selected: "transfer and disposal ratio of domestic sewage and oily sewage from ships" and "transfer and disposal ratio of garbage from ships"; Step 42, calculate the transfer and disposal ratio v of ship domestic sewage and oily sewage: In the formula, Q a It indicates the amount of domestic sewage and oily sewage from ships that are received by the terminal through self-built facilities or purchased services and included in the port service scope, and that is treated by the port itself or transferred ashore; Q b The total amount of domestic sewage and oily sewage from ships; When υ is 100%, this item is scored 100 points; when υ is greater than or equal to 90% but less than 100%, this item is scored 75 points; when υ is greater than or equal to 80% but less than 90%, this item is scored 50 points; when υ is less than 80%, this item is not scored; the final score of this item is A 10 express; Step 43, calculate the ship garbage transfer and disposal ratio χ: In the formula, B a It means that the terminal adopts self-built facilities or purchased services to include the reception of ship garbage into the scope of port services, and does a good job in the classification, collection, storage and transfer of garbage; B b Indicates the total amount of ship garbage. When χ is 100%, this item is scored 100 points; when χ is greater than or equal to 90% but less than 100%, this item is scored 75 points; when χ is greater than or equal to 80% but less than 90%, this item is scored 50 points; when χ is less than 80%, this item is not scored, and the final score of this item is A. 11 express.
6. A quantitative evaluation method for the pollution prevention and control level of a dry bulk cargo port terminal according to claim 1, characterized in that: The specific process of step 5 is as follows: Step 51, for the influencing factor of "port operation noise prevention and control", select "factory boundary noise compliance rate" as an evaluation indicator; Step 52, calculate the factory boundary noise compliance rate μ: In the formula, S a It indicates the number of days when the noise monitoring value at the factory boundary meets the emission limit value specified in the environmental noise emission standard for industrial enterprises, where the daytime value is 65dB and the nighttime value is 55dB; S b is the total number of monitoring days; When μ is 100%, this item is scored 100 points; when μ is greater than or equal to 90% but less than 100%, this item is scored 75 points; when μ is greater than or equal to 80% but less than 90%, this item is scored 50 points; when μ is less than 80%, this item is not scored, and the final score of this item is A. 12 express.
7. A method for quantitatively evaluating the pollution prevention and control level of a dry bulk cargo port terminal according to claim 1, characterized in that: The specific process of step 6 is as follows: Step 61, assigning influence weights to the evaluation indicators in steps 2 to 5. For the five evaluation indicators in step 21, namely, "enclosed proportion of yard area", "equipment of dust suppression and removal facilities", "number of sweeping vehicles", "dust concentration monitoring value" and "greening rate of greenable areas in port area", weights λ1, λ2, λ3, λ4 and λ5 are assigned respectively and meet the following conditions: λ1+λ2+λ3+λ4+λ5=1 For the four evaluation indicators of "industrial wastewater and domestic sewage treatment", "general industrial solid waste storage", "temporary storage of hazardous wastes" and "emergency level of water pollution accidents" in step 31, weights λ6, λ7, λ8 and λ9 are assigned respectively, and the following conditions are met: λ6+λ7+λ8+λ9=1 For the two evaluation indicators in step 41, "the proportion of ship domestic sewage and oily sewage transfer and disposal" and "the proportion of ship garbage transfer and disposal", the weights λ are assigned respectively. 10 and λ 11 , and satisfy: l 10 +λ 11 =1 For the evaluation index of "factory boundary noise compliance rate" in step 51, assign a weight λ 12 , and satisfy: l 12 =1 Step 62, calculate the final dry bulk port terminal pollution prevention and control level score G: G=η1(λ1A1+λ2A2+λ3A3+λ4A4+λ5A5)+η2(λ6A6+λ7A7+λ8A8+λ9A9)+η3(λ 10 A 10 +λ 11 A 11 )+η4(λ 12 A 12 ) The calculated pollution prevention level G score ranges from 0 to 100, and the higher the score, the higher the pollution prevention level of the dry bulk port terminal.
Citation Information
Patent Citations
Calculating method for dynamically establishing port and vessel air pollutant emission lists
CN103927461A
Dry bulk cargo port dust pollution monitoring and risk early warning method based on inspection robot
CN117388139A
Method for evaluating pollution reduction and carbon reduction effects of ports and piers
CN118378795A
Cited By
Bioretention purification method and device for port and wharf rainwater collection and treatment and readable storage medium
CN120208473A