Preparation method of full-replacement variable-cross-section cement-soil pile
Through the preparation method of fully replaced and variable cross-section cement soil piles, a long auger and a high-speed mixer are used to solve the problem of uneven mixing of cement soil mixing piles in the clay layer, the construction quality and bearing capacity are improved, and the energy saving and emission reduction and engineering cost are achieved.
Patent Information
- Application Number
- CN202411865586.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-18
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2044-12-18
AI Technical Summary
The existing cement soil mixing piles are unevenly mixed in the clay layer, which makes it difficult to ensure the construction quality, and the pile body strength is low, making it easy to cause engineering accidents in which deformation control fails.
The preparation method of fully replaced variable-section cement soil piles is adopted, and holes are formed through a long auger drilling rig, and cement soil slurry is prepared using a high-speed mixing mechanism, and pumped to the bottom of the hole through a concrete pump to form a variable-section structure, which solves the problem of uneven mixing.
It improves the construction quality and bearing capacity of cement piles, reduces cement consumption, complies with energy conservation and emission reduction policies, reduces energy consumption, and reduces engineering costs, and has great economic and social benefits.