Method and system for associating positioning information with train based on multi-source data

By integrating multiple data sources and adopting multi-step processing methods, the problem of inefficient traditional train positioning and official document tracking is solved, and higher positioning accuracy and safety are achieved.

CN119646403AActive Publication Date: 2025-03-18CHINA ACADEMY OF RAILWAY SCI CORP LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411795476.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-09
Publication Date
2025-03-18
Estimated Expiration
2044-12-09

AI Technical Summary

Technical Problem

The traditional train document tracking method is inefficient and difficult to meet the needs of modern transportation management, especially when the GPS signal is disturbed, the positioning accuracy decreases, and even completely loses the signal in some areas.

Method used

Combining GPS positioning information, WTDS data, train timetables and operation line data, an efficient and coordinated positioning solution is built through preprocessing, train clustering, train line, positioning integrity monitoring, data correction, model construction and model optimization steps.

Benefits of technology

It improves the real-time and accuracy of train positioning and official document tracking, enhances the safety and defense of official document, and realizes comprehensive traceability from the source to the terminal.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119646403A_ABST
    Figure CN119646403A_ABST
Patent Text Reader

Abstract

The invention discloses a method and system for associating positioning information with a train based on multi-source data, and the method comprises the steps: collecting train operation data of multiple data sources, and carrying out the preprocessing of the train operation data; carrying out train number clustering on the train operation data to obtain train walking data, and carrying out train number crossing on the train walking data to obtain a train walking path; carrying out positioning integrity monitoring on the running path of the train to obtain integrity data, and correcting the integrity data according to the real-time data to obtain monitoring correction data; calculating train positioning according to the monitoring correction data, and constructing a positioning information and train association model according to the train positioning; and optimizing the positioning information and train association model according to the positioning error, inputting to-be-associated data into the positioning information and train association model, and outputting an association result. The method can improve the correlation precision of the positioning information and the train, has good interpretability, and can be directly applied to a train information positioning system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of multi-source positioning, and in particular to a method and system for associating positioning information with a train based on multi-source data. Background Art

[0002] With the rapid development of the railway transportation industry, the requirements for the safety and real-time performance of the document transportation process are increasing. Traditional document tracking methods often rely on manual records and regular inspections, which are not only inefficient but also difficult to meet the needs of modern transportation management. Although GPS positioning technology has made significant progress in the field of logistics tracking in recent years, in train transportation scenarios, when trains are running in tunnels or in the shade of high-rise buildings in cities, GPS signals are easily interfered with, resulting in reduced positioning accuracy, and even complete loss of signals in some areas.

[0003] In order to make up for the shortcomings of GPS positioning, some position correction methods based on other auxiliary technologies have appeared on the market, such as using data from the train operation control system, track circuit information or data from the train wireless communication system to assist in positioning. However, these methods still have room for improvement in terms of real-time performance, accuracy and system integration. The present invention integrates multiple data sources such as GPS positioning information, WTDS data, train timetables and running line data to build a set of efficient and collaborative solutions to improve the real-time and accuracy of train positioning and document tracking. This integrated strategy not only strengthens the security line of official documents, but also realizes comprehensive traceability from source to terminal, setting a new benchmark for the seamless flow and security of information. Summary of the invention

[0004] The object of the present invention is to provide a method for associating positioning information with a train based on multi-source data.

[0005] To achieve the above object, the present invention is implemented according to the following technical solutions:

[0006] The present invention comprises the following steps:

[0007] Collecting train operation data from multiple data sources and preprocessing the train operation data; the train operation data includes historical data and real-time data; the historical data includes train crossing information, train timetable and operation line data; the real-time data is WTDS data;

[0008] Clustering the train operation data by train number to obtain train running data, and performing train number stringing on the train running data to obtain a train running path;

[0009] Performing positioning integrity monitoring on the train running path to obtain integrity data, and correcting the integrity data according to the real-time data to obtain monitoring correction data;

[0010] Calculate the train positioning according to the monitoring correction data, and construct a positioning information and train association model according to the train positioning; the train positioning is obtained by using the global navigation satellite system through signal propagation time;

[0011] The positioning information and train association model is optimized according to the positioning error, the data to be associated is input into the positioning information and train association model, and the association result is output.

[0012] Furthermore, the pretreatment method comprises:

[0013] The train operation data is processed and grouped according to each dispatching desk section; the train operation data of the dispatching section is compared with the section dictionary, and the section data is corrected; the description information of the corresponding section is generated according to the section data, and the description information includes: train number ID, dispatching desk ID, running train number, starting station, starting time, ending station, and ending time.

[0014] Furthermore, the method of clustering the train operation data to obtain train running data includes:

[0015] The pre-processed train operation data is subjected to conditional judgment corresponding to the train number type, and the judgment conditions include checking whether the running train number is included, whether the running stations are close, and whether the time span exceeds the preset threshold;

[0016] If the condition judgment of the corresponding train number class is met, the entire segment data of the train operation data is classified and the cluster information is updated;

[0017] If the condition judgment of the corresponding train class is not met, a new class cluster and class description information are generated, and the class description information includes: class ID, running train set; the running train set includes the starting station, starting time, ending station, ending time, dispatching station, and train ID;

[0018] Traverse all train operation data and output new class clusters and class description information as train running data.

[0019] Furthermore, the method of performing train number stringing on the train running data to obtain the train running path includes:

[0020] Through the coherence of time and space, the train running data in the same cluster are strung together;

[0021] The splitting rules are customized according to the properties of different types of trains, and the stringing results are split according to the splitting rules to obtain the train running path of a single operation.

[0022] Furthermore, the method for performing positioning integrity monitoring on the train running path to obtain integrity data includes:

[0023] The train positioning of the train route is obtained by combining GPS global satellite positioning with track potential positioning method;

[0024] A filter parameter selection method based on fuzzy inference system is adopted to dynamically adjust the filter parameters according to the characteristics of train positioning data using fuzzy inference system to realize the integrity monitoring of the train running path.

[0025] Furthermore, the method of correcting the integrity data according to the real-time data to obtain the monitoring correction data includes:

[0026] Calculate the similarity between real-time data and integrity data:

[0027]

[0028] The i-th real-time data is a i , the i-th integrity data is f i , the similarity between real-time data a and integrity data f is The impact factor is ζ, the control constant is x, and the amount of real-time data is The amount of integrity data is

[0029] Pair the integrity data with the real-time data whose similarity is greater than 0.713, and construct the recursive relationship about the time series based on the real-time data. The expression is:

[0030] a i (s+1)=log2(e -ζ +0.12)·a i T (s)+σ 2 (s+1)

[0031] The i-th real-time data at the s+1th time is The error between the integrity data and the real-time data at the s+1th moment is σ(s+1), and the i-th real-time data at the sth moment is a i (s), transposed to T;

[0032] Using the least squares algorithm for recursion, the expression is:

[0033]

[0034] The gain matrix at the sth moment is The covariance matrix at the sth moment is The suppression factor is ρ, and the covariance matrix at the s+1th moment is

[0035] Update real-time data, the expression is:

[0036]

[0037] The i-th real-time data updated at time s+1 is a i (s+1), the penalty weight at the sth moment is

[0038] Calculate the error ratio parameters of real-time data and integrity data:

[0039]

[0040] The error ratio parameter between the i-th real-time data and the integrity data at the s+1th time is K(s+1);

[0041] Correct the integrity data according to the error ratio parameter:

[0042]

[0043] The error correction factor is ξ, the optimal control coefficient is ξ, and the actual integrity data value of the i-th is f i , the corrected i-th integrity data is

[0044] Furthermore, the method for constructing a positioning information and train association model according to the train positioning includes:

[0045] Calculate the loss function of the actual train positioning and the predicted train positioning, and use the minimum value of the loss function as the objective function of the positioning information and train association model;

[0046] The positioning information and train association model includes clustering anomaly recognition algorithm, causal inference method, and deep belief network algorithm;

[0047] The clustering anomaly identification algorithm groups the input multi-source train operation data into different clusters, identifies the data points where the multi-source train operation data is significantly different from the main cluster, and marks the significantly different data as abnormal data;

[0048] The causal inference method determines the cause and consequences of the anomaly by analyzing the causal relationship between the abnormal data and the train positioning variables, quantifies the impact of the anomaly on the system or data set based on the cause and consequence, and obtains the impact coefficient;

[0049] The deep belief network algorithm pre-trains and fine-tunes the deep neural network layer by layer through multi-source train operation data and influence coefficients, learns complex nonlinear relationships, and predicts train positioning information.

[0050] Furthermore, the method for optimizing the positioning information and train association model according to the positioning error includes:

[0051] Introduce particle population, take positioning error as fitness function, calculate the fitness of particle population, and take the particle with minimum fitness as the optimal solution;

[0052] Taking the minimum positioning error as the search strategy, the particle population is initialized, and the expression is:

[0053]

[0054] The position of the zth particle in the dth dimension is The random number from 0 to 1 is τ1, and the lower limit of the dth dimension is The upper limit of the dth dimension is

[0055] Update the particle position, the expression is:

[0056]

[0057] The position of the zth particle in the dth dimension at the t+1th iteration is The optimal solution is A random integer from 1 to 2 is γ, and the fitness function value of the optimal solution is The fitness function value of the zth particle is The current number of iterations is t, and the maximum number of iterations is t max , the random numbers from 0 to 1 are τ2 and τ3 respectively;

[0058] Update the particle position to obtain the search position. The expression is:

[0059]

[0060] The search position of the zth particle in the dth dimension at the t+1th iteration is The position of the zth particle in the dth dimension at the tth iteration is The random number between 0 and 1 is τ4;

[0061] The attenuation factor is used to update the search position to obtain the adaptation position. The expression is:

[0062]

[0063] The search position of the zth particle in the dth dimension at the tth iteration is The random number from 0 to 1 is τ5, the decay factor is ε, and the adaptation position of the zth particle in the dth dimension at the t+1th iteration is

[0064] The attenuation factor is adjusted by nonlinear adaptive adjustment, and the expression is:

[0065]

[0066] The maximum value of the attenuation factor is ε max , the minimum value of the attenuation factor is ε min , the attenuation factor of the tth iteration is ε(t+1);

[0067] The updated attenuation factor is used to update the adaptive position and iterate continuously until the positioning error is minimized, otherwise the particle is updated to readjust the attenuation factor.

[0068] In a second aspect, a system for associating positioning information with a train based on multi-source data includes:

[0069] Data acquisition module: used to collect train operation data from multiple data sources and pre-process the train operation data; the train operation data includes historical data and real-time data; the historical data includes train crossing information, train timetable and operation line data; the real-time data is WTDS data;

[0070] Clustering and stringing module: used for clustering the train operation data by train number to obtain train running data, and stringing the train running data by train number to obtain the train running path;

[0071] Monitoring and correction module: used for performing positioning integrity monitoring on the train running path to obtain integrity data, and correcting the integrity data according to the real-time data to obtain monitoring correction data;

[0072] A calculation and construction module: used to calculate the train location according to the monitoring correction data, and to construct a model of the association between the location information and the train according to the train location;

[0073] Optimization output module: used to optimize the positioning information and train association model according to the positioning error, input the data to be associated into the positioning information and train association model, and output the association result.

[0074] The beneficial effects of the present invention are:

[0075] The present invention is a method and system for associating positioning information with trains based on multi-source data. Compared with the prior art, the present invention has the following technical effects:

[0076] The present invention can improve the accuracy of associating positioning information based on multi-source data with trains through preprocessing, train number clustering, train number cross-connection, positioning integrity monitoring, data correction, model construction and model optimization steps, thereby improving the accuracy of associating positioning information based on multi-source data with trains. Optimizing the association between positioning information based on multi-source data and trains can greatly save resources and improve work efficiency. It can realize the intelligent association between positioning information of multi-source data and trains, perform train number clustering and cross-connection and data correction on the association between positioning information of multi-source data and trains in real time, which is of great significance to the association between positioning information of multi-source data and trains, can adapt to the requirements of associating positioning information of multi-source data with trains of different standards and associating positioning information of different multi-source data with trains, and has a certain universality. BRIEF DESCRIPTION OF THE DRAWINGS

[0077] Figure 1 A flowchart of the steps of a method for associating positioning information with a train based on multi-source data according to the present invention;

[0078] Figure 2 This is a flow chart of train line data processing according to the present invention. DETAILED DESCRIPTION

[0079] The present invention is further described below by means of specific embodiments. The illustrative embodiments and descriptions of the present invention are used to explain the present invention but are not intended to limit the present invention.

[0080] A method and system for associating positioning information with a train based on multi-source data of the present invention comprises the following steps:

[0081] like Figure 1 As shown, in this embodiment, the following steps are included:

[0082] Collecting train operation data from multiple data sources and preprocessing the train operation data; the train operation data includes historical data and real-time data; the historical data includes train crossing information, train timetable and operation line data; the real-time data is WTDS data;

[0083] In the actual evaluation, train A and train B at XXX railway station are taken as research objects; multiple data sources include GPS, WTDS, train schedule and running line data;

[0084] Historical data includes train route information, train timetable, train route, train ID, dispatching station ID, train number, starting station, starting time, ending station, ending time, train speed, and train position;

[0085] Real-time data includes train ID, dispatch station ID, running train number, starting station, starting time, ending station, ending time, current train speed, and current train position;

[0086] Clustering the train operation data by train number to obtain train running data, and performing train number stringing on the train running data to obtain a train running path;

[0087] In the actual evaluation, the trains follow the following path: Train A: Station 20> Station 21> ...> Station 29> Station 30> ...> Station 20;

[0088] Train B: Station 25> Station 26> ...> Station 34> Station 35> ...> Station 25;

[0089] Performing positioning integrity monitoring on the train running path to obtain integrity data, and correcting the integrity data according to the real-time data to obtain monitoring correction data;

[0090] In the actual evaluation, the positioning integrity of train A was 0.982, and the positioning integrity of train B was 0.973;

[0091] Calculate the train positioning according to the monitoring correction data, and construct a positioning information and train association model according to the train positioning; the train positioning is obtained by using the global navigation satellite system through signal propagation time;

[0092] In the actual evaluation, the actual acceleration of train A was reduced to 0.3m / s due to the construction ahead. 2 , the correction integrity is 95%; the position data of train B is normal and does not need to be corrected;

[0093] The positioning information and train association model is optimized according to the positioning error, the data to be associated is input into the positioning information and train association model, and the association result is output.

[0094] In this embodiment, the preprocessing method includes:

[0095] The train operation data is processed and grouped according to each dispatching desk section; the train operation data of the dispatching section is compared with the section dictionary, and the section data is corrected; the description information of the corresponding section is generated according to the section data, and the description information includes: train number ID, dispatching desk ID, running train number, starting station, starting time, ending station, and ending time.

[0096] In this embodiment, the method for obtaining train running data by clustering the train operation data includes:

[0097] The pre-processed train operation data is subjected to conditional judgment corresponding to the train number type, and the judgment conditions include checking whether the running train number is included, whether the running stations are close, and whether the time span exceeds the preset threshold;

[0098] If the condition judgment of the corresponding train number class is met, the entire segment data of the train operation data is classified and the cluster information is updated;

[0099] If the condition judgment of the corresponding train class is not met, a new class cluster and class description information are generated, and the class description information includes: class ID, running train set; the running train set includes the starting station, starting time, ending station, ending time, dispatching station, and train ID;

[0100] Traverse all train operation data and output new class clusters and class description information as train running data.

[0101] In this embodiment, the method for obtaining the train running path by performing train number stringing on the train running data includes:

[0102] Through the coherence of time and space, the train running data in the same cluster are strung together;

[0103] The splitting rules are customized according to the properties of different types of trains, and the stringing results are split according to the splitting rules to obtain the train running path of a single operation.

[0104] In this embodiment, the method for performing positioning integrity monitoring on the train running path to obtain integrity data includes:

[0105] The train positioning of the train route is obtained by combining GPS global satellite positioning with track potential positioning method;

[0106] A filter parameter selection method based on fuzzy inference system is adopted to dynamically adjust the filter parameters according to the characteristics of train positioning data using fuzzy inference system to realize the integrity monitoring of the train running path.

[0107] In this embodiment, the method of correcting the integrity data according to the real-time data to obtain the monitoring correction data includes:

[0108] Calculate the similarity between real-time data and integrity data:

[0109]

[0110] The i-th real-time data is a i , the i-th integrity data is f i , the similarity between real-time data a and integrity data f is The impact factor is ζ, the control constant is x, and the amount of real-time data is The amount of integrity data is

[0111] Pair the integrity data with the real-time data whose similarity is greater than 0.713, and construct the recursive relationship about the time series based on the real-time data. The expression is:

[0112]

[0113] The i-th real-time data at the s+1th time is The error between the integrity data and the real-time data at the s+1th moment is σ(s+1), and the i-th real-time data at the sth moment is a i (s), transposed to T;

[0114] Using the least squares algorithm for recursion, the expression is:

[0115]

[0116] The gain matrix at the sth moment is The covariance matrix at the sth moment is The suppression factor is ρ, and the covariance matrix at the s+1th moment is

[0117] Update real-time data, the expression is:

[0118]

[0119] The i-th real-time data updated at the s+1th time is á i (s+1), the penalty weight at the sth moment is

[0120] Calculate the error ratio parameters of real-time data and integrity data:

[0121]

[0122] The error ratio parameter between the i-th real-time data and the integrity data at the s+1th time is K(s+1);

[0123] Correct the integrity data according to the error ratio parameter:

[0124]

[0125] The error correction factor is ξ, the optimal control coefficient is ξ, and the actual integrity data value of the i-th is The corrected integrity data of the i-th data is

[0126] In this embodiment, the method for constructing a positioning information and train association model according to the train positioning includes:

[0127] Calculate the loss function of the actual train positioning and the predicted train positioning, and use the minimum value of the loss function as the objective function of the positioning information and train association model;

[0128] The positioning information and train association model includes clustering anomaly recognition algorithm, causal inference method, and deep belief network algorithm;

[0129] The clustering anomaly identification algorithm groups the input multi-source train operation data into different clusters, identifies the data points where the multi-source train operation data is significantly different from the main cluster, and marks the significantly different data as abnormal data;

[0130] The causal inference method determines the cause and consequences of the anomaly by analyzing the causal relationship between the abnormal data and the train positioning variables, quantifies the impact of the anomaly on the system or data set based on the cause and consequence, and obtains the impact coefficient;

[0131] The deep belief network algorithm pre-trains and fine-tunes the deep neural network layer by layer through multi-source train operation data and influence coefficients, learns complex nonlinear relationships, and predicts train positioning information.

[0132] In this embodiment, the method for optimizing the positioning information and train association model according to the positioning error includes:

[0133] Introduce particle population, take positioning error as fitness function, calculate the fitness of particle population, and take the particle with minimum fitness as the optimal solution;

[0134] Taking the minimum positioning error as the search strategy, the particle population is initialized, and the expression is:

[0135]

[0136] The position of the zth particle in the dth dimension is The random number from 0 to 1 is τ1, and the lower limit of the dth dimension is The upper limit of the dth dimension is

[0137] Update the particle position, the expression is:

[0138]

[0139] The position of the zth particle in the dth dimension at the t+1th iteration is The optimal solution is A random integer from 1 to 2 is γ, and the fitness function value of the optimal solution is The fitness function value of the zth particle is The current number of iterations is t, and the maximum number of iterations is t max , the random numbers from 0 to 1 are τ2 and τ3 respectively;

[0140] Update the particle position to obtain the search position. The expression is:

[0141]

[0142] The search position of the zth particle in the dth dimension at the t+1th iteration is The position of the zth particle in the dth dimension at the tth iteration is The random number between 0 and 1 is τ4;

[0143] The attenuation factor is used to update the search position to obtain the adaptation position. The expression is:

[0144]

[0145] The search position of the zth particle in the dth dimension at the tth iteration is The random number from 0 to 1 is τ5, the decay factor is ε, and the adaptation position of the zth particle in the dth dimension at the t+1th iteration is

[0146] The attenuation factor is adjusted by nonlinear adaptive adjustment, and the expression is:

[0147]

[0148] The maximum value of the attenuation factor is ε max , the minimum value of the attenuation factor is ε min , the attenuation factor of the tth iteration is ε(t+1);

[0149] The updated attenuation factor is used to update the adaptive position and iterate continuously until the positioning error is minimized, otherwise the particle is updated to readjust the attenuation factor.

[0150] In a second aspect, a system for associating positioning information with a train based on multi-source data includes:

[0151] Data acquisition module: used to collect train operation data from multiple data sources and pre-process the train operation data; the train operation data includes historical data and real-time data; the historical data includes train crossing information, train timetable and operation line data; the real-time data is WTDS data;

[0152] Clustering and stringing module: used for clustering the train operation data by train number to obtain train running data, and stringing the train running data by train number to obtain the train running path;

[0153] Monitoring and correction module: used for performing positioning integrity monitoring on the train running path to obtain integrity data, and correcting the integrity data according to the real-time data to obtain monitoring correction data;

[0154] A calculation and construction module: used to calculate the train location according to the monitoring correction data, and to construct a model of the association between the location information and the train according to the train location;

[0155] Optimization output module: used to optimize the positioning information and train association model according to the positioning error, input the data to be associated into the positioning information and train association model, and output the association result.

[0156] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for associating positioning information with trains based on multi-source data, characterized in that: The following steps are involved: Collecting train operation data from multiple data sources and preprocessing the train operation data; the train operation data includes historical data and real-time data; the historical data includes train crossing information, train timetable and operation line data; the real-time data is WTDS data; Clustering the train operation data by train number to obtain train running data, and performing train number stringing on the train running data to obtain a train running path; Performing positioning integrity monitoring on the train running path to obtain integrity data, and correcting the integrity data according to the real-time data to obtain monitoring correction data; Calculate the train positioning according to the monitoring correction data, and construct a positioning information and train association model according to the train positioning; the train positioning is obtained by using the global navigation satellite system through signal propagation time; The positioning information and train association model is optimized according to the positioning error, the data to be associated is input into the positioning information and train association model, and the association result is output.

2. According to claim 1, a method for associating positioning information with trains based on multi-source data is characterized in that: The pretreatment method comprises: The train operation data is processed and grouped according to each dispatching desk section; the train operation data of the dispatching section is compared with the section dictionary, and the section data is corrected; the description information of the corresponding section is generated according to the section data, and the description information includes: train number ID, dispatching desk ID, running train number, starting station, starting time, ending station, and ending time.

3. The method for associating positioning information with trains based on multi-source data according to claim 1, characterized in that: The method for obtaining train running data by clustering the train running data comprises: The pre-processed train operation data is subjected to conditional judgment corresponding to the train number type, and the judgment conditions include checking whether the running train number is included, whether the running stations are close, and whether the time span exceeds the preset threshold; If the condition judgment of the corresponding train number class is met, the entire segment data of the train operation data is classified and the cluster information is updated; If the condition judgment of the corresponding train class is not met, a new class cluster and class description information are generated, and the class description information includes: class ID, running train set; the running train set includes the starting station, starting time, ending station, ending time, dispatching station, and train ID; Traverse all train operation data and output new class clusters and class description information as train running data.

4. The method for associating positioning information with trains based on multi-source data according to claim 1, characterized in that: The method for obtaining the train running path by performing train number connection on the train running data comprises: Through the coherence of time and space, the train running data in the same cluster are strung together; The splitting rules are customized according to the properties of different types of trains, and the stringing results are split according to the splitting rules to obtain the train running path of a single operation.

5. The method for associating positioning information with trains based on multi-source data according to claim 1, characterized in that: The method for performing positioning integrity monitoring on the train running path to obtain integrity data comprises: The train positioning of the train route is obtained by combining GPS global satellite positioning with track potential positioning method; A filter parameter selection method based on fuzzy inference system is adopted to dynamically adjust the filter parameters according to the characteristics of train positioning data using fuzzy inference system to realize the integrity monitoring of the train running path.

6. The method for associating positioning information with trains based on multi-source data according to claim 1, characterized in that: The method for correcting the integrity data according to the real-time data to obtain monitoring correction data comprises: Calculate the similarity between real-time data and integrity data: The i-th real-time data is a i , the i-th integrity data is f i , the similarity between real-time data a and integrity data f is The impact factor is ζ, the control constant is x, and the amount of real-time data is The amount of integrity data is Pair the integrity data with the real-time data whose similarity is greater than 0.713, and construct the recursive relationship about the time series based on the real-time data. The expression is: The i-th real-time data at the s+1th time is θ(s+1), the error between the integrity data and the real-time data at the s+1th time is σ(s+1), and the i-th real-time data at the sth time is a i (s), transposed to T; Using the least squares algorithm for recursion, the expression is: The gain matrix at the sth moment is The covariance matrix at the sth moment is The suppression factor is ρ, and the covariance matrix at the s+1th moment is Update real-time data, the expression is: The i-th real-time data updated at time s+1 is The penalty weight at the sth moment is Calculate the error ratio parameters of real-time data and integrity data: The error ratio parameter between the i-th real-time data and the integrity data at the s+1th time is K(s+1); Correct the integrity data according to the error ratio parameter: The error correction factor is ξ, the optimal control coefficient is ξ, and the actual integrity data value of the i-th is The corrected integrity data of the i-th is 7. The method for associating positioning information with trains based on multi-source data according to claim 1, characterized in that: The method for constructing a positioning information and train association model according to the train positioning includes: Calculate the loss function of the actual train positioning and the predicted train positioning, and use the minimum value of the loss function as the objective function of the positioning information and train association model; The positioning information and train association model includes clustering anomaly recognition algorithm, causal inference method, and deep belief network algorithm; The clustering anomaly identification algorithm groups the input multi-source train operation data into different clusters, identifies the data points where the multi-source train operation data is significantly different from the main cluster, and marks the significantly different data as abnormal data; The causal inference method determines the cause and consequences of the anomaly by analyzing the causal relationship between the abnormal data and the train positioning variables, quantifies the impact of the anomaly on the system or data set based on the cause and consequence, and obtains the impact coefficient; The deep belief network algorithm pre-trains and fine-tunes the deep neural network layer by layer through multi-source train operation data and influence coefficients, learns complex nonlinear relationships, and predicts train positioning information.

8. The method for associating positioning information with trains based on multi-source data according to claim 1, characterized in that: The method for optimizing the positioning information and train association model according to the positioning error includes: Introduce particle population, take positioning error as fitness function, calculate the fitness of particle population, and take the particle with minimum fitness as the optimal solution; Taking the minimum positioning error as the search strategy, the particle population is initialized, and the expression is: The position of the zth particle in the dth dimension is The random number from 0 to 1 is τ1, and the lower limit of the dth dimension is The upper limit of the dth dimension is Update the particle position, the expression is: The position of the zth particle in the dth dimension at the t+1th iteration is The optimal solution is A random integer from 1 to 2 is γ, and the fitness function value of the optimal solution is The fitness function value of the zth particle is The current number of iterations is t, and the maximum number of iterations is t max , the random numbers from 0 to 1 are τ2 and τ3 respectively; Update the particle position to obtain the search position. The expression is: The search position of the zth particle in the dth dimension at the t+1th iteration is The position of the zth particle in the dth dimension at the tth iteration is The random number between 0 and 1 is τ4; The attenuation factor is used to update the search position to obtain the adaptation position. The expression is: The search position of the zth particle in the dth dimension at the tth iteration is The random number from 0 to 1 is τ5, the decay factor is ε, and the adaptation position of the zth particle in the dth dimension at the t+1th iteration is The attenuation factor is adjusted by nonlinear adaptive adjustment, and the expression is: The maximum value of the attenuation factor is ε max , the minimum value of the attenuation factor is ε min , the attenuation factor of the tth iteration is ε(t+1); The updated attenuation factor is used to update the adaptive position and iterate continuously until the positioning error is minimized, otherwise the particle is updated to readjust the attenuation factor.

9. A system for associating positioning information with trains based on multi-source data, used to execute the method according to any one of claims 1 to 8, characterized in that: include: Data collection module: used to collect train operation data from multiple data sources and pre-process the train operation data; The train operation data includes historical data and real-time data; the historical data includes train route information, train timetable and operation line data; the real-time data is WTDS data; Clustering and stringing module: used for clustering the train operation data by train number to obtain train running data, and stringing the train running data by train number to obtain the train running path; Monitoring and correction module: used for performing positioning integrity monitoring on the train running path to obtain integrity data, and correcting the integrity data according to the real-time data to obtain monitoring correction data; A calculation and construction module: used to calculate the train location according to the monitoring correction data, and to construct a model of the association between the positioning information and the train according to the train location; Optimization output module: used to optimize the positioning information and train association model according to the positioning error, input the data to be associated into the positioning information and train association model, and output the association result.

Citation Information

Patent Citations

  • Train combined positioning method under condition of limited satellite signal

    CN108196289A

  • Method and system for monitoring local integrity of train satellite positioning

    CN108761497A

  • Permanent magnet maglev train traffic positioning system and method based on information fusion

    CN114609657A

  • Train potential tracking early warning method based on train-to-train communication system

    CN115042838A

  • Safe and reliable method, device, and system for real-time speed measurement and continuous positioning

    US20210129880A1