Single-phase earth fault detection processing device using voltage and current time sequence information

By setting multiple measurement points and switches on the distribution line, using voltage and current time series information to detect faults and control switch actions, the problem of inaccurate single-phase grounding fault handling in the distribution line is solved, and the effect of quickly isolating the fault section is achieved.

CN119651508AActive Publication Date: 2025-03-18STATE GRID ANHUI ELECTRIC POWER CO LTD ELECTRIC POWER SCI RES INST +3
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411790152.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-06
Publication Date
2025-03-18
Estimated Expiration
2044-12-06

AI Technical Summary

Technical Problem

The prior art is difficult to accurately deal with single-phase grounding faults in distribution lines, resulting in incomplete or timely troubleshooting.

Method used

By setting multiple measurement points and switches on the distribution line, using voltage and current time series information, the fault is detected and the switch is controlled to be disconnected or overlapped to isolate the fault segment.

Benefits of technology

It improves the precise handling capability of single-phase grounding faults, can quickly clear temporary faults and isolate permanent fault segments, improving the reliability and economicality of fault handling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119651508A_ABST
    Figure CN119651508A_ABST
Patent Text Reader

Abstract

The invention provides a single-phase earth fault detection processing device using voltage and current time sequence information. The single-phase earth fault detection processing device using the voltage and current time sequence information comprises a fault detection module used for detecting whether a distribution line has a single-phase earth fault; the control module is used for controlling the first switch in the plurality of switches to be switched off under the condition that the distribution line has a single-phase earth fault, and controlling the first switch to be switched on after delaying for a first time length; the fault detection module is used for judging that a single-phase earth fault is an instantaneous fault after the first switch is switched on and the distribution line does not have the single-phase earth fault; the fault detection module is used for judging that a single-phase earth fault is a permanent fault after the first switch is switched on and under the condition that the distribution line has the single-phase earth fault; the fault detection module is used for determining a fault section in the plurality of sections to be detected; the control module is used for controlling the second switch and the third switch to be switched off.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power systems, and in particular to a single-phase ground fault detection and processing device using voltage and current time series information. Background Art

[0002] The power system includes power generation, transmission, distribution and consumption. Electricity is received from the transmission network and supplied and distributed to various users step by step through distribution lines.

[0003] During the operation of the distribution line, a single-phase grounding fault may occur. When a single-phase grounding fault occurs, it is difficult for the distribution line in the related technology to accurately handle the single-phase grounding fault. Summary of the invention

[0004] The present application aims to solve one of the technical problems existing in the prior art or related technology.

[0005] To this end, the present application proposes a single-phase grounding fault detection and processing device using voltage and current time series information.

[0006] In view of this, the present application proposes a single-phase grounding fault detection and processing device using voltage and current time series information, which is applied to a distribution line. A plurality of measuring points and a plurality of switches are arranged on the distribution line. The plurality of measuring points divide the distribution line into a plurality of sections to be measured. Each measuring point is provided with a switch. The single-phase grounding fault detection and processing device using voltage and current time series information comprises: a fault detection module, which is used to detect whether there is a single-phase grounding fault in the distribution line; a control module, which is used to control the first switch among the plurality of switches to be disconnected when a single-phase grounding fault exists in the distribution line, and control the first switch to be reclosed after a delay of a first time length, wherein the first The switch is the switch closest to the power supply side in the distribution line; the fault detection module is used to determine that the single-phase grounding fault is a transient fault after the first switch is reclosed and there is no single-phase grounding fault in the distribution line; the fault detection module is used to determine that the single-phase grounding fault is a permanent fault after the first switch is reclosed and there is a single-phase grounding fault in the distribution line; the fault detection module is used to determine the faulty section among multiple sections to be tested; the control module is used to control the second switch to be disconnected and the third switch to be disconnected to isolate the faulty section, wherein the second switch is the switch on the power supply side of the faulty section, and the third switch is the switch on the load side of the faulty section.

[0007] In this technical solution, the fault detection module is used to detect whether there is a single-phase grounding fault in the power distribution line. The control module is used to control multiple switches based on whether there is a single-phase grounding fault in the power distribution line.

[0008] When a single-phase grounding fault is detected on the distribution line, the first switch on the distribution line is controlled to be disconnected, and the first switch is controlled to be reclosed after a first delay. The first switch is the switch closest to the power supply side in the distribution line, that is, the first switch at the outlet of the distribution line.

[0009] By disconnecting the first switch closest to the power supply side in the distribution line, the power supply can be isolated from the distribution line with a single-phase grounding fault, so that part of the distribution line on the load side of the first switch is in a power-off state. After the first switch is controlled to be disconnected, timing starts, and after the timing reaches a first time length, the first switch is controlled to be reclosed, so that part of the distribution line on the load side of the first switch is re-energized.

[0010] It should be noted that after the first switch is reclosed, the distribution line is continuously monitored for single-phase grounding faults, and the fault type of the single-phase grounding fault on the distribution line is determined accordingly.

[0011] After the first switch is reclosed, it is determined again whether there is still a single-phase grounding fault in the distribution line. When it is detected that the single-phase grounding fault no longer exists in the distribution line, it is determined that the single-phase grounding fault in the distribution line has disappeared during the process of the first switch being disconnected and delayed for the first time to reclose, that is, the single-phase grounding fault is eliminated by the action of disconnecting and reclosing the first switch. At this time, the distribution line resumes normal operation, and it is determined that the single-phase grounding fault occurring in the distribution line is a transient fault.

[0012] After the first switch is reclosed, it is determined again whether a single-phase grounding fault still exists in the distribution line. When it is detected that a single-phase grounding fault still exists in the distribution line, it is determined that the single-phase grounding fault in the distribution line still exists after the first switch is disconnected and reclosed with a delay of the first time length. The single-phase grounding fault in the distribution line is determined to be a permanent fault, and the faulty section in the distribution line needs to be located and isolated.

[0013] The multiple measuring points divide the distribution line into multiple sections to be tested. When it is determined that there is a permanent single-phase grounding fault on the distribution line, the faulty section among the multiple sections to be tested is located. After the faulty section is located, the second switch on the power supply side of the faulty section is controlled to be disconnected, and the third switch on the load side of the faulty section coordinated with it is controlled to be disconnected successively and quickly, so as to quickly isolate the faulty section.

[0014] In the technical solution of the present application, by setting multiple measuring points on the distribution line, and setting switches that can independently control the on and off states at each measuring point, when a fault occurs in the distribution line, by controlling the first switch closest to the power supply side to disconnect and delay reclosing, the instantaneous single-phase grounding fault can be quickly cleared, and the power supply of the distribution line can be quickly restored. When the single-phase grounding fault still exists after the first switch delays reclosing, it can be determined that the single-phase grounding fault is a permanent fault, and the faulty section in the distribution line can be quickly isolated by disconnecting the second switch on the power supply side and the third switch on the load side of the faulty section. The present application improves the accuracy of single-phase grounding fault processing, and the process of processing single-phase grounding faults does not rely on external communication, but is only implemented by using the time series of electrical quantities sensed by different measuring points after the single-phase grounding fault occurs, thereby improving reliability and economy.

[0015] In some technical solutions, optionally, the control module includes a first sub-control module and a second sub-control module, the first sub-control module corresponds to the second switch, and the second sub-control module corresponds to the third switch; The process of disconnecting the second switch and the third switch of the control module includes: A first sub-control module, used for controlling the second switch to be disconnected; The second sub-control module is used to control the third switch to be disconnected when the first measurement point is in a three-phase voltage loss and three-phase current loss state, and the first measurement point is the measurement point corresponding to the third switch.

[0016] In this technical solution, the control module includes a first sub-control module and a second sub-control module for controlling different switch actions. The first sub-control module is used to control the on and off of the second switch, and the second sub-control module is used to control the on and off of the third switch.

[0017] It should be noted that the control module includes a plurality of sub-control modules, and the plurality of sub-control modules correspond to the plurality of switches one by one, and the plurality of sub-control modules are used to control the on-off states of the plurality of switches respectively.

[0018] In this technical solution, when the single-phase grounding fault is determined to be a permanent fault, the second switch is first controlled to be disconnected. After the second switch is disconnected, when it is monitored that the first measurement point is in a three-phase voltage loss and three-phase current loss state, the third switch is controlled to be disconnected.

[0019] It should be noted that the first measurement point is a measurement point on the load side of the fault section, and the third switch is a switch arranged on the load side of the fault section.

[0020] In the technical solution of the present application, after determining that the single-phase grounding fault is a permanent fault, the third switch on the power supply side of the fault section is controlled to be disconnected, and by monitoring that the first measurement point on the power supply side of the fault section is in a three-phase voltage loss and three-phase current loss state, it can be determined that the fault section needs to be isolated at this time, so the third switch on the load side of the fault section is controlled to be disconnected. The present application only uses the change in electrical quantity sensed by the first measurement point after the permanent single-phase grounding fault occurs, controls the third switch to be disconnected to isolate the fault section, and further improves the reliability and economy.

[0021] In some technical solutions, optionally, a plurality of measuring devices are arranged on the power distribution line, and the plurality of measuring devices are arranged at a plurality of measuring points respectively; The single-phase ground fault detection and processing device using voltage and current time series information also includes: A first sampling module, used to obtain the zero-sequence voltage value collected by the measuring device; A fault detection module is used to determine whether a ground fault exists in the distribution line when the zero-sequence voltage value is greater than the voltage setting value; A first sampling module, used to obtain the three-phase current values ​​collected by the measuring device; The fault detection module is used to determine whether there is a single-phase grounding fault in the distribution line according to the three-phase current value.

[0022] In this technical solution, the first sampling module is communicatively connected to the measuring device, and the measuring device transmits the sampled voltage and current information to the fault detection module or the control module through the first sampling module, so that the fault detection module and the control module perform corresponding actions based on the voltage and current information.

[0023] In this technical solution, corresponding measuring devices are set at multiple measuring points of the distribution line. The measuring devices can collect the zero-sequence voltage value at the measuring point and transmit the collected zero-sequence voltage value to the corresponding controller. The controller can compare the zero-sequence voltage with the voltage setting value. When the zero-sequence voltage value is greater than the voltage setting value, it is determined that there is a ground fault in the distribution line. When the ground fault in the distribution line is detected, it is further determined whether there is a single-phase ground fault in the distribution line.

[0024] The measuring device can also collect the three-phase current value at the measuring point and transmit the collected three-phase current value to the controller. The controller can analyze the collected three-phase current value and determine whether the ground fault is a single-phase ground fault.

[0025] In the technical solution of the present application, by setting a corresponding measuring device at a measuring point on the distribution line, the zero-sequence voltage value and the three-phase current value at the measuring point can be collected by the measuring device, and the collected zero-sequence voltage value can be used to determine whether there is a ground fault on the distribution line. In the case of a ground fault, the three-phase current value can be used to further determine whether the ground fault on the distribution line is a single-phase ground fault, thereby improving the accuracy of fault judgment and reducing hardware costs.

[0026] In some technical solutions, optionally, the fault detection module is used to determine that a single-phase grounding fault exists in the distribution line when each phase current value among the three-phase current values ​​is less than or equal to the current setting value; The fault detection module is used to determine whether there is a single-phase grounding fault in the distribution line when any phase current value among the three-phase current values ​​is greater than the current setting value.

[0027] In the technical solution of the present application, after the three-phase current values ​​are collected, the numerical relationship between each current value in the three-phase current value and the current setting value is compared, and based on the comparison result, it can be determined whether there is a single-phase grounding fault in the distribution line, thereby improving the accuracy of the single-phase grounding fault judgment.

[0028] In some technical solutions, optionally, the measuring device includes a voltage transformer; A first sampling module, used to obtain a voltage measurement value collected by a voltage transformer; Fault detection module, including: The first processing module is used to determine the zero-sequence voltage value according to the voltage measurement value.

[0029] In this technical solution, the fault detection module includes a first processing module, which can receive the voltage measurement value from the first sampling module and calculate the zero-sequence voltage value based on the voltage measurement value.

[0030] In this technical solution, the measuring device includes a voltage transformer, through which the voltage measurement value at the measuring point can be collected and transmitted to the controller. The controller can calculate the zero-sequence voltage value at the corresponding measuring point according to the voltage measurement value.

[0031] In the technical solution of the present application, a voltage transformer is provided in the measuring device, and the voltage measurement value at the measuring point can be collected through the voltage transformer, and the zero-sequence voltage value can be determined based on the voltage measurement value, and the ground fault can be judged by the zero-sequence voltage value, thereby improving the accuracy of judging the fault type and further reducing the hardware cost.

[0032] In some technical solutions, the measuring device includes a current transformer; A first sampling module, used to obtain the current measurement value collected by the current transformer; Fault detection module, including: The second processing module is used to determine the three-phase current values ​​according to the current measurement values.

[0033] In this technical solution, the fault detection module includes a second processing module, which can receive the current measurement value from the second sampling module and calculate the three-phase current value based on the current measurement value.

[0034] In this technical solution, the measuring device includes a current transformer, through which the current measurement value at the measuring point can be collected and transmitted to the controller. The controller can calculate the three-phase current value at the corresponding measuring point according to the current measurement value.

[0035] In the technical solution of the present application, a current transformer is arranged in the measuring device, and the current measurement value at the measuring point can be collected through the current transformer, and the three-phase current value can be determined based on the current measurement value, and whether the grounding fault is a single-phase grounding fault can be judged by the three-phase current value, thereby improving the accuracy of judging the fault type and further reducing the hardware cost.

[0036] In some technical solutions, optionally, the single-phase ground fault detection and processing device using voltage and current time series information further includes: The second sampling module is used to obtain the three-phase current change of each measuring point before and after the first switch is disconnected; The fault detection module also includes: The third processing module is used to determine the relative position relationship between each measuring point and the fault point according to the change amount of the three-phase current; The third processing module is used to determine the fault section according to a plurality of relative position relationships corresponding to a plurality of measurement points.

[0037] In this technical solution, the second sampling module is connected to the measuring device for communication, and the second sampling module can obtain the three-phase current variation of each measuring point before and after the first switch is disconnected through the measuring device. The third processing module is used to determine the relative position relationship between each measuring point and the fault point based on the three-phase current variation collected by the second sampling module, and then locate the fault section in the multiple sections to be measured based on the determined relative position relationship.

[0038] In this technical solution, before isolating the faulty section by controlling the second switch and the third switch to disconnect, it is necessary to locate the faulty section among the multiple sections to be tested. The criterion for locating the faulty section is the change in three-phase current. When there is a grounding fault in the distribution line, the three-phase current value is collected by the measuring device of each measuring point, and the three-phase current value is transmitted to the corresponding controller, and the controller can determine the change in the three-phase current according to the three-phase current value. After the controller determines the change in the three-phase current, the relative position relationship between the measuring point where the controller is located and the fault point can be determined according to the change in the three-phase current. After determining the relative position relationship between each measuring point and the fault point, the faulty sections among the multiple sections to be tested can be located according to multiple relative position relationships.

[0039] Specifically, the criterion for determining the fault section among multiple sections to be tested is the positional relationship between each measuring point and the fault point, and the criterion for the positional relationship between each measuring point and the fault point is the three-phase current change. Therefore, the three-phase current value at each measuring point is collected by a measuring device, the three-phase current change is determined by a corresponding controller, and then the positional relationship between each measuring point and the fault point is determined based on the three-phase current change.

[0040] In the technical solution of the present application, by determining the change in three-phase current at each measuring point, the relative position relationship between the corresponding measuring point and the fault point can be determined according to the change in three-phase current, and based on the relative position relationship between each measuring point and the fault point, the fault section can be located among multiple sections to be measured, thereby improving the accuracy of locating the fault section.

[0041] In some technical solutions, optionally, the third processing module is further used to obtain the maximum change amount and the second largest change amount among the three-phase current change amounts; The third processing module is further used to determine that the measurement point is located at the power supply side of the fault point when the maximum change amount is greater than or equal to twice the second largest change amount; The third processing module is further used to determine that the measuring point is located at the load side of the fault point when the maximum change is less than twice the second largest change.

[0042] In this technical solution, after the controller obtains the three-phase current change, it obtains the maximum change and the second largest change in the three-phase current change, and performs a numerical comparison on the maximum change and the second largest change, and determines the relative position relationship between the measurement point and the fault point based on the numerical comparison result.

[0043] Specifically, when the comparison shows that the maximum change is greater than or equal to twice the second largest change, it is determined that the measurement point is located on the power supply side of the fault point. When the comparison shows that the maximum change is less than twice the second largest change, it is determined that the measurement point is located on the load side of the fault point.

[0044] It should be noted that each measuring point of the distribution line is provided with a measuring device and a controller. After the measuring device collects the three-phase current value, it transmits the three-phase current value to the corresponding controller. The controller determines the three-phase current variation based on the three-phase current value, and extracts the largest phase current variation among the three-phase current variations, i.e., the maximum variation, and extracts the second largest phase current variation among the three-phase current variations, i.e., the second largest variation. When the maximum variation is greater than or equal to twice the second largest variation, the measuring point is located on the power supply side of the single-phase grounding fault point, and when the maximum variation is less than twice the second largest variation, the measuring point is located on the load side of the single-phase grounding fault point.

[0045] In the technical solution of the present application, the maximum change and the second largest change in the three-phase current changes at the measuring point are extracted, and by numerically comparing the maximum change with the second largest change, the relative position relationship between the measuring point and the fault point can be determined, thereby improving the accuracy of determining the relative position relationship, thereby improving the accuracy of locating the fault section among multiple sections to be measured.

[0046] In some technical schemes, optionally, the third processing module is also used to determine that the section to be measured between two adjacent measurement points is a fault section when one of the two adjacent measurement points is located on the power supply side of the fault point and the other measurement point is located on the load side of the fault point.

[0047] In this technical solution, after determining the relative positional relationship between each measuring point and the fault point, the relative positional relationship between each two adjacent measuring points and the fault point is detected. When it is determined that one of the two adjacent measuring points is located on the power supply side of the fault point and the other measuring point is located on the load side of the fault point, it is determined that the fault section is located between the two adjacent measuring points.

[0048] In the technical solution of the present application, after obtaining the relative position relationship between each measurement point and the fault point, if there is a measurement point located on the power supply side of the fault point and a joint measurement point located on the load side of the fault point among two adjacent measurement points, it is determined that the fault section is located between the two adjacent measurement points.

[0049] In some technical solutions, optionally, the first duration ranges from 3 seconds to 8 seconds.

[0050] In the technical solution of the present application, the first time duration is the delay duration for reclosing after the first switch is disconnected. By setting the value range of the first time duration to be greater than or equal to 3 seconds, it can be ensured that the instantaneous single-phase grounding fault can be cleared within the first time duration, and by setting the value range of the first time duration to be less than or equal to 8 seconds, it can be ensured that after the instantaneous single-phase grounding fault is cleared, the power supply of the distribution line can be quickly restored.

[0051] Additional aspects and advantages of the present application will become apparent in the following description or will be learned through practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which: Figure 1 A structural block diagram of a single-phase ground fault detection and processing device using voltage and current time series information provided in some embodiments of the present application is shown; Figure 2 One of the power distribution line schematic diagrams provided in some embodiments of the present application is shown; Figure 3a A second schematic diagram of a power distribution line provided in some embodiments of the present application is shown; Figure 3b A third schematic diagram of a power distribution line provided in some embodiments of the present application is shown; Figure 3c A fourth schematic diagram of a power distribution line provided in some embodiments of the present application is shown; Figure 3d A fifth schematic diagram of a power distribution line provided in some embodiments of the present application is shown; Figure 4 FIG. 6 shows a sixth schematic diagram of a power distribution line provided in some embodiments of the present application.

[0053] Figure 2 The reference numerals in the figures are as follows: 200 distribution line, 201 switch, 202 section to be tested, 203 measuring device. DETAILED DESCRIPTION

[0054] In order to more clearly understand the above-mentioned objectives, features and advantages of the present application, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, in the absence of conflict, the present embodiment and the features in the embodiment can be combined with each other.

[0055] In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application may also be implemented in other ways different from those described herein. Therefore, the scope of protection of the present application is not limited to the specific embodiments disclosed below.

[0056] Refer to the following Figures 1 to 4 A single-phase grounding fault detection and processing device using voltage and current time series information according to some embodiments of the present application is described.

[0057] According to one embodiment of the present application, Figure 1A structural block diagram of a single-phase ground fault detection and processing device using voltage and current time series information provided in some embodiments of the present application is shown. Figure 2 One of the power distribution line schematic diagrams provided in some embodiments of the present application is shown, such as Figure 1 and Figure 2 As shown, a single-phase grounding fault detection and processing device using voltage and current time series information is proposed, which is applied to a distribution line. A plurality of measuring points and a plurality of switches are arranged on the distribution line. The plurality of measuring points divide the distribution line into a plurality of sections to be measured, and each measuring point is provided with a switch.

[0058] In this embodiment, a single-phase grounding fault processing method is applied to a distribution line. A plurality of measuring points are arranged on the distribution line. A switch is arranged at each measuring point. By controlling the switch action at each measuring point, the distribution line can be cut off at the measuring point.

[0059] Exemplarily, a controller is provided at each measuring point, and the controller can control the switch at each measuring point.

[0060] For example, the distribution line can be selected as a 10kV medium voltage distribution line, the power supply comes from the 10kV voltage side bus of the substation, and the switch cabinet is configured at the outlet of the distribution line connected to the bus in the station. The line outside the station is connected to a distribution transformer with a rating of 10kV / 380V for load power supply. In order to meet the requirements of line operation and fault isolation. Figure 2 As shown, a plurality of switches 201 are arranged on the distribution line 200, and the plurality of switches 201 are arranged at the measuring point of the distribution line 200, and the plurality of switches 201 divide the distribution line into a plurality of sections 202 to be measured, and a controller for controlling the action of the switch 201 is arranged at each switch 201. A distribution line 200 is divided into a trunk line and a branch line according to the size of the power that can be distributed. Switches 201 and controllers can be arranged on both the trunk line and the branch line. In a typical configuration, a distribution line 200 trunk line is equipped with 5 sets of switches 201 and controllers, and a set of switches 201 and controllers are arranged at the outlet of the branch line. The core components of the switch 201 are the breaking element and the operating structure. The key to the breaking element is the arc extinguishing medium. The arc extinguishing medium of the switch 201 in the distribution line 200 can be selected as vacuum, SF6 gas and environmental protection gas. The switch operating mechanism can be selected as a spring operating mechanism and a magnetic control operating mechanism.

[0061] like Figure 1 As shown, the single-phase ground fault detection and processing device 100 using voltage and current time series information includes: A fault detection module 102 is used to detect whether there is a single-phase grounding fault in the power distribution line; The control module 104 is used to control the first switch among the multiple switches to be disconnected when a single-phase grounding fault occurs in the distribution line, and control the first switch to be reclosed after a first delay, wherein the first switch is the switch closest to the power supply side in the distribution line; The fault detection module 102 is used to determine that the single-phase grounding fault is a transient fault after the first switch is reclosed and there is no single-phase grounding fault in the distribution line; The fault detection module 102 is used to determine that the single-phase grounding fault is a permanent fault after the first switch is reclosed and there is a single-phase grounding fault in the distribution line; A fault detection module 102, used to determine a faulty section among a plurality of sections to be tested; The control module 104 is used to control the second switch and the third switch to be disconnected to isolate the fault section, wherein the second switch is a switch on the power supply side of the fault section, and the third switch is a switch on the load side of the fault section.

[0062] In this embodiment, the fault detection module 102 is used to detect whether there is a single-phase grounding fault in the power distribution line. The control module 104 is used to control multiple switches based on whether there is a single-phase grounding fault in the power distribution line.

[0063] When a single-phase grounding fault is detected on the distribution line, the first switch on the distribution line is controlled to be disconnected, and the first switch is controlled to be reclosed after a first delay. The first switch is the switch closest to the power supply side in the distribution line, that is, the first switch at the outlet of the distribution line.

[0064] By disconnecting the first switch closest to the power supply side in the distribution line, the power supply can be isolated from the distribution line with a single-phase grounding fault, so that part of the distribution line on the load side of the first switch is in a power-off state. After the first switch is controlled to be disconnected, timing starts, and after the timing reaches a first time length, the first switch is controlled to be reclosed, so that part of the distribution line on the load side of the first switch is re-energized.

[0065] Figure 3a The second schematic diagram of the power distribution line provided in some embodiments of the present application is shown. Figure 3b FIG. 3 shows a third schematic diagram of a power distribution circuit provided in some embodiments of the present application, such as Figure 3a As shown in FIG, five switches are set on the distribution line, namely PU1, PU2, PU3, PU4 and PU5. After a single-phase grounding fault is detected on the distribution line, PU1 is controlled to be disconnected. Figure 3b As shown, after PU1 is disconnected, PU1 is delayed for a first time and then closed. PU1 is the first switch.

[0066] It should be noted that after the first switch is reclosed, the distribution line is continuously monitored for single-phase grounding faults, and the fault type of the single-phase grounding fault on the distribution line is determined accordingly.

[0067] After the first switch is reclosed, it is determined again whether there is still a single-phase grounding fault in the distribution line. When it is detected that the single-phase grounding fault no longer exists in the distribution line, it is determined that the single-phase grounding fault in the distribution line has disappeared during the process of the first switch being disconnected and delayed for the first time to reclose, that is, the single-phase grounding fault is eliminated by the action of disconnecting and reclosing the first switch. At this time, the distribution line resumes normal operation, and it is determined that the single-phase grounding fault occurring in the distribution line is a transient fault.

[0068] After the first switch is reclosed, it is determined again whether a single-phase grounding fault still exists in the distribution line. When it is detected that a single-phase grounding fault still exists in the distribution line, it is determined that the single-phase grounding fault in the distribution line still exists after the first switch is disconnected and reclosed with a delay of the first time length. The single-phase grounding fault in the distribution line is determined to be a permanent fault, and the faulty section in the distribution line needs to be located and isolated.

[0069] The multiple measuring points divide the distribution line into multiple sections to be tested. When it is determined that there is a permanent single-phase grounding fault on the distribution line, the faulty section among the multiple sections to be tested is located. After the faulty section is located, the second switch on the power supply side of the faulty section is controlled to be disconnected, and the third switch on the load side of the faulty section coordinated with it is controlled to be disconnected successively and quickly, so as to quickly isolate the faulty section.

[0070] Figure 3c FIG4 shows a fourth schematic diagram of a power distribution line provided in some embodiments of the present application. Figure 3d FIG. 5 shows a fifth schematic diagram of a power distribution line provided in some embodiments of the present application, such as Figure 3c and Figure 3d As shown, when it is determined that there is a permanent fault in the distribution line and the fault section is located, the switch PU3 on the power supply side of the fault section is disconnected, and then the switch PU4 on the load side of the grounding point coordinated with it is controlled to be disconnected quickly in succession to isolate the fault section. Among them, PU3 is the second switch and PU4 is the third switch.

[0071] In the embodiment of the present application, by setting a plurality of measuring points on the distribution line, and setting a switch that can independently control the on / off state at each measuring point, when a fault occurs in the distribution line, by controlling the first switch closest to the power supply side to disconnect and delay reclosing, the instantaneous single-phase grounding fault can be quickly cleared, and the power supply of the distribution line can be quickly restored. When the single-phase grounding fault still exists after the first switch delays reclosing, it can be determined that the single-phase grounding fault is a permanent fault, and the faulty section in the distribution line can be quickly isolated by disconnecting the second switch on the power supply side and the third switch on the load side of the faulty section. The present application improves the accuracy of single-phase grounding fault processing, and the process of processing single-phase grounding fault does not rely on external communication, but is realized only by using the time series of electrical quantities sensed by different measuring points after the single-phase grounding fault occurs, thereby improving reliability and economy.

[0072] In some embodiments, optionally, the control module 104 includes a first sub-control module 104 and a second sub-control module 104, the first sub-control module 104 corresponds to the second switch, and the second sub-control module 104 corresponds to the third switch; The process of the control module 104 disconnecting the second switch and the third switch includes: A first sub-control module 104, used to control the second switch to be disconnected; The second sub-control module 104 is used to control the third switch to be disconnected when the first measurement point is in a three-phase voltage loss and three-phase current loss state, and the first measurement point is the measurement point corresponding to the third switch.

[0073] In this embodiment, the control module 104 includes a first sub-control module 104 and a second sub-control module 104 for controlling different switch actions. The first sub-control module 104 is used to control the on and off of the second switch, and the second sub-control module 104 is used to control the on and off of the third switch.

[0074] It should be noted that the control module 104 includes a plurality of sub-control modules 104 , and the plurality of sub-control modules 104 correspond to the plurality of switches one by one, and the plurality of sub-control modules 104 are used to control the on and off states of the plurality of switches respectively.

[0075] In this embodiment, when the single-phase grounding fault is determined to be a permanent fault, the second switch is first controlled to be disconnected. After the second switch is disconnected, when it is monitored that the first measurement point is in a three-phase voltage loss and three-phase current loss state, the third switch is controlled to be disconnected.

[0076] It should be noted that the first measurement point is a measurement point on the load side of the fault section, and the third switch is a switch arranged on the load side of the fault section.

[0077] Exemplarily, a controller is provided corresponding to each switch, that is, the controller is provided in a one-to-one correspondence with the switch, and the controller is only used to control the on / off state of the corresponding switch. The controller at the second switch determines that there is a permanent single-phase grounding fault in the fault section, and controls the second switch to disconnect. The controller at the third switch detects the three-phase loss of voltage and the three-phase loss of current through the measuring device of the measuring point, and determines that the single-phase grounding fault is a permanent fault, so the third switch is controlled to disconnect and isolate the fault section. Specifically, after the first switch is disconnected and reclosed, the controller at the third switch can obtain the corresponding voltage value and current value. After the second switch is disconnected, the three-phase loss of voltage and the three-phase loss of current are detected again at the third switch in a short time, and it is determined that there is a permanent single-phase grounding fault in the fault section, so the third switch is controlled to disconnect.

[0078] In the embodiment of the present application, after determining that the single-phase grounding fault is a permanent fault, the third switch on the power supply side of the fault section is controlled to be disconnected, and by monitoring that the first measurement point on the power supply side of the fault section is in a three-phase voltage loss and three-phase current loss state, it can be determined that the fault section needs to be isolated at this time, so the third switch on the load side of the fault section is controlled to be disconnected. The present application only uses the change in electrical quantity sensed by the first measurement point after the permanent single-phase grounding fault occurs to control the disconnection of the third switch to isolate the fault section, further improving the reliability and economy.

[0079] In some embodiments, optionally, a plurality of measuring devices are arranged on the power distribution line, and the plurality of measuring devices are arranged at a plurality of measuring points respectively; The single-phase ground fault detection and processing device 100 using voltage and current time series information also includes: A first sampling module, used to obtain the zero-sequence voltage value collected by the measuring device; The fault detection module 102 is used to determine that a ground fault exists in the distribution line when the zero-sequence voltage value is greater than the voltage setting value; A first sampling module, used to obtain the three-phase current values ​​collected by the measuring device; The fault detection module 102 is used to determine whether there is a single-phase grounding fault in the distribution line according to the three-phase current value.

[0080] In this embodiment, the first sampling module is in communication with the measuring device, and the measuring device transmits the sampled voltage and current information to the fault detection module 102 or the control module 104 through the first sampling module, so that the fault detection module 102 and the control module 104 perform corresponding actions based on the voltage and current information.

[0081] In this embodiment, corresponding measuring devices are provided at multiple measuring points of the distribution line, and the measuring devices can collect zero-sequence voltage values ​​at the measuring points and transmit the collected zero-sequence voltage values ​​to the corresponding controllers, and the controllers can compare the zero-sequence voltage with the voltage setting value, and determine that there is a ground fault in the distribution line when the zero-sequence voltage value is greater than the voltage setting value. When the ground fault in the distribution line is detected, it is further determined whether there is a single-phase ground fault in the distribution line.

[0082] The measuring device can also collect the three-phase current value at the measuring point and transmit the collected three-phase current value to the controller. The controller can analyze the collected three-phase current value and determine whether the ground fault is a single-phase ground fault.

[0083] like Figure 2 As shown, measuring devices 203 are respectively provided at multiple measuring points of the distribution line 200. The measuring devices 203 can collect current and voltage information and transmit the collected current and voltage information to the controller. The controller can determine whether there is a single-phase grounding fault in the distribution line 200 by analyzing the current and voltage information.

[0084] In the embodiment of the present application, by setting a corresponding measuring device at the measuring point on the distribution line, the zero-sequence voltage value and the three-phase current value at the measuring point can be collected by the measuring device, and the collected zero-sequence voltage value can be used to determine whether there is a ground fault on the distribution line. In the case of a ground fault, it is further determined whether the ground fault on the distribution line is a single-phase ground fault through the three-phase current value, thereby improving the accuracy of fault judgment and reducing hardware costs.

[0085] In some embodiments, optionally, the fault detection module 102 is used to determine that a single-phase grounding fault exists in the distribution line when each phase current value among the three-phase current values ​​is less than or equal to the current setting value; The fault detection module 102 is used to determine that there is no single-phase grounding fault in the distribution line when any phase current value among the three-phase current values ​​is greater than the current setting value.

[0086] In an embodiment of the present application, after the three-phase current values ​​are collected, the numerical relationship between each current value in the three-phase current value and the current setting value is compared, and based on the comparison result, it can be determined whether there is a single-phase grounding fault in the distribution line, thereby improving the accuracy of the single-phase grounding fault judgment.

[0087] In some embodiments, optionally, the measuring device comprises a voltage transformer; A first sampling module, used to obtain a voltage measurement value collected by a voltage transformer; The fault detection module 102 includes: The first processing module is used to determine the zero-sequence voltage value according to the voltage measurement value.

[0088] In this embodiment, the fault detection module 102 includes a first processing module, which can receive the voltage measurement value from the first sampling module and calculate the zero-sequence voltage value based on the voltage measurement value.

[0089] In this embodiment, the measuring device includes a voltage transformer, through which the voltage measurement value at the measuring point can be collected and transmitted to the controller. The controller can calculate the zero-sequence voltage value at the corresponding measuring point according to the voltage measurement value.

[0090] In an embodiment of the present application, a voltage transformer is provided in the measuring device, and the voltage measurement value at the measuring point can be collected through the voltage transformer, and the zero-sequence voltage value can be determined based on the voltage measurement value, and the ground fault can be judged by the zero-sequence voltage value, thereby improving the accuracy of judging the fault type and further reducing the hardware cost.

[0091] In some embodiments, the measuring device includes a current transformer; A first sampling module, used to obtain the current measurement value collected by the current transformer; The fault detection module 102 includes: The second processing module is used to determine the three-phase current values ​​according to the current measurement values.

[0092] In this embodiment, the fault detection module 102 includes a second processing module, which can receive the current measurement value from the second sampling module and calculate the three-phase current value based on the current measurement value.

[0093] In this embodiment, the measuring device includes a current transformer, through which the current measurement value at the measuring point can be collected and transmitted to the controller. The controller can calculate the three-phase current value at the corresponding measuring point according to the current measurement value.

[0094] In an embodiment of the present application, a current transformer is provided in the measuring device, and the current measurement value at the measuring point can be collected through the current transformer, and the three-phase current value can be determined based on the current measurement value, and whether the grounding fault is a single-phase grounding fault can be judged by the three-phase current value, thereby improving the accuracy of judging the fault type and further reducing the hardware cost.

[0095] In some embodiments, optionally, the single-phase ground fault detection and processing device 100 using voltage and current time series information further includes: The second sampling module is used to obtain the three-phase current change of each measuring point before and after the first switch is disconnected; The fault detection module 102 further includes: The third processing module is used to determine the relative position relationship between each measuring point and the fault point according to the change amount of the three-phase current; The third processing module is used to determine the fault section according to a plurality of relative position relationships corresponding to a plurality of measurement points.

[0096] In this embodiment, the second sampling module is in communication connection with the measuring device, and the second sampling module can obtain the three-phase current variation of each measuring point before and after the first switch is disconnected through the measuring device. The third processing module is used to determine the relative position relationship between each measuring point and the fault point based on the three-phase current variation collected by the second sampling module, and then locate the fault section in the multiple sections to be measured based on the determined relative position relationship.

[0097] In this embodiment, before isolating the faulty section by controlling the second switch and the third switch to be disconnected, it is necessary to locate the faulty section among the multiple sections to be tested. The criterion for locating the faulty section is the change in three-phase current. When there is a grounding fault in the distribution line, the three-phase current value is collected by the measuring device of each measuring point, and the three-phase current value is transmitted to the corresponding controller, and the controller can determine the change in the three-phase current according to the three-phase current value. After the controller determines the change in the three-phase current, the relative position relationship between the measuring point where the controller is located and the fault point can be determined according to the change in the three-phase current. After determining the relative position relationship between each measuring point and the fault point, the faulty section among the multiple sections to be tested can be located according to multiple relative position relationships.

[0098] Specifically, the criterion for determining the fault section among multiple sections to be tested is the positional relationship between each measuring point and the fault point, and the criterion for the positional relationship between each measuring point and the fault point is the three-phase current change. Therefore, the three-phase current value at each measuring point is collected by a measuring device, the three-phase current change is determined by a corresponding controller, and then the positional relationship between each measuring point and the fault point is determined based on the three-phase current change.

[0099] In an embodiment of the present application, by determining the change in three-phase current at each measurement point, the relative position relationship between the corresponding measurement point and the fault point can be determined based on the change in three-phase current, and based on the relative position relationship between each measurement point and the fault point, the fault section can be located among multiple sections to be measured, thereby improving the accuracy of locating the fault section.

[0100] In some embodiments, optionally, the third processing module is further used to obtain the maximum change amount and the second largest change amount among the three-phase current change amounts; The third processing module is further used to determine that the measurement point is located at the power supply side of the fault point when the maximum change amount is greater than or equal to twice the second largest change amount; The third processing module is further used to determine that the measuring point is located at the load side of the fault point when the maximum change is less than twice the second largest change.

[0101] In this embodiment, after the controller obtains the three-phase current change, it obtains the maximum change and the second largest change among the three-phase current changes, and performs numerical comparison on the maximum change and the second largest change, and determines the relative position relationship between the measurement point and the fault point based on the numerical comparison result.

[0102] Specifically, when the comparison shows that the maximum change is greater than or equal to twice the second largest change, it is determined that the measurement point is located on the power supply side of the fault point. When the comparison shows that the maximum change is less than twice the second largest change, it is determined that the measurement point is located on the load side of the fault point.

[0103] It should be noted that each measuring point of the distribution line is provided with a measuring device and a controller. After the measuring device collects the three-phase current value, it transmits the three-phase current value to the corresponding controller. The controller determines the three-phase current variation based on the three-phase current value, and extracts the largest phase current variation among the three-phase current variations, i.e., the maximum variation, and extracts the second largest phase current variation among the three-phase current variations, i.e., the second largest variation. When the maximum variation is greater than or equal to twice the second largest variation, the measuring point is located on the power supply side of the single-phase grounding fault point, and when the maximum variation is less than twice the second largest variation, the measuring point is located on the load side of the single-phase grounding fault point.

[0104] In an embodiment of the present application, the maximum change and the second largest change in the three-phase current changes at the measuring point are extracted, and by numerically comparing the maximum change with the second largest change, the relative position relationship between the measuring point and the fault point can be determined, thereby improving the accuracy of determining the relative position relationship, thereby improving the accuracy of locating the fault section among multiple sections to be measured.

[0105] In some embodiments, optionally, the third processing module is also used to determine that the section to be measured between two adjacent measurement points is a fault section when one of the two adjacent measurement points is located on the power supply side of the fault point and the other measurement point is located on the load side of the fault point.

[0106] In this embodiment, after the relative positional relationship between each measuring point and the fault point is determined, the relative positional relationship between each two adjacent measuring points and the fault point is detected. When it is determined that one of the two adjacent measuring points is located on the power supply side of the fault point and the other measuring point is located on the load side of the fault point, it is determined that the fault section is located between the two adjacent measuring points.

[0107] In an embodiment of the present application, after obtaining the relative position relationship between each measurement point and the fault point, if there is a measurement point located on the power supply side of the fault point and a joint measurement point located on the load side of the fault point among two adjacent measurement points, it is determined that the fault section is located between the two adjacent measurement points.

[0108] In some embodiments, optionally, the first duration ranges from 3 seconds to 8 seconds.

[0109] In the embodiment of the present application, the first time duration is the delay duration for reclosing after the first switch is disconnected. By setting the value range of the first time duration to be greater than or equal to 3 seconds, it can be ensured that the instantaneous single-phase grounding fault can be cleared within the first time duration, and by setting the value range of the first time duration to be less than or equal to 8 seconds, it can be ensured that after the instantaneous single-phase grounding fault is cleared, the power supply of the distribution line can be quickly restored.

[0110] like Figure 4 As shown, there are 5 switches on the distribution line, namely PU1, PU2, PU3, PU4 and PU5. The first action delay of the outlet protection of the distribution line is 10 seconds, and the outlet protection reclosing delay is 5 seconds. The power supply side protection delay of PU1 is 60 seconds. The power supply side protection delay of PU2 is 50 seconds, and the window position of the load side protection camera action is 59 seconds to 61 seconds. The power supply side protection delay of PU3 is 40 seconds, and the window position of the load side protection camera action is 49 seconds to 51 seconds. The power supply side protection delay of PU4 is 30 seconds, and the window position of the load side protection camera action is 39 seconds to 41 seconds. The power supply side protection delay of PU5 is 20 seconds, and the window position of the load side protection camera action is 29 seconds to 31 seconds.

[0111] It should be clarified that in the claims, specification and drawings of the present application, the term "multiple" refers to two or more than two. Unless otherwise clearly defined, the orientation or position relationship indicated by the terms "upper" and "lower" is based on the orientation or position relationship shown in the drawings, which is only for the purpose of more conveniently describing the present application and making the description process easier, rather than indicating or implying that the device or element referred to must have the specific orientation described, be constructed and operated in a specific orientation, so these descriptions cannot be understood as limitations on the present application; the terms "connect", "install", "fix" and the like should be understood in a broad sense. For example, "connection" can be a fixed connection between multiple objects, or a detachable connection between multiple objects, or an integral connection; it can be a direct connection between multiple objects, or an indirect connection between multiple objects through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood based on the specific circumstances of the above data.

[0112] In the claims, specification and drawings of the present application, the description of the terms "one embodiment", "some embodiments", "specific embodiments" and the like means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In the claims, specification and drawings of the present application, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0113] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A single-phase ground fault detection and processing device using voltage and current time series information, characterized in that: Applied to a distribution line, the distribution line is provided with a plurality of measuring points and a plurality of switches, the plurality of measuring points divide the distribution line into a plurality of sections to be measured, each of the measuring points is provided with the switch, the single-phase grounding fault detection and processing device using voltage and current time series information comprises: A fault detection module, used to detect whether there is a single-phase grounding fault in the power distribution line; A control module, configured to control a first switch among the plurality of switches to be disconnected when a single-phase grounding fault occurs in the power distribution line, and control the first switch to be reclosed after a delay of a first time length, wherein the first switch is the switch closest to the power supply side in the power distribution line; The fault detection module is used to determine that the single-phase grounding fault is a transient fault after the first switch is reclosed and the distribution line does not have the single-phase grounding fault; The fault detection module is used to determine that the single-phase grounding fault is a permanent fault after the first switch is reclosed and the distribution line has the single-phase grounding fault; The fault detection module is used to determine the faulty section among the multiple sections to be tested; The control module is used to control the second switch and the third switch to be disconnected to isolate the fault section, wherein the second switch is the switch on the power supply side of the fault section, and the third switch is the switch on the load side of the fault section.

2. The single-phase ground fault detection and processing device using voltage and current time series information according to claim 1 is characterized in that: The control module includes a first sub-control module and a second sub-control module, the first sub-control module corresponds to the second switch, and the second sub-control module corresponds to the third switch; The process of the control module controlling the second switch to be disconnected and the third switch to be disconnected includes: The first sub-control module is used to control the second switch to be disconnected; The second sub-control module is used to control the third switch to be disconnected when the first measurement point is in a three-phase voltage loss and three-phase current loss state, and the first measurement point is the measurement point corresponding to the third switch.

3. The single-phase ground fault detection and processing device using voltage and current time series information according to claim 1, characterized in that: The power distribution line is provided with a plurality of measuring devices, and the plurality of measuring devices are respectively arranged at a plurality of measuring points; The single-phase ground fault detection and processing device using voltage and current time series information also includes: A first sampling module, used to obtain the zero-sequence voltage value collected by the measuring device; The fault detection module is used to determine that there is a ground fault in the distribution line when the zero-sequence voltage value is greater than the voltage setting value; The first sampling module is used to obtain the three-phase current values ​​collected by the measuring device; The fault detection module is used to determine whether the distribution line has the single-phase grounding fault according to the three-phase current value.

4. The single-phase ground fault detection and processing device using voltage and current time series information according to claim 3 is characterized in that: The fault detection module is used to determine that the distribution line has the single-phase grounding fault when each phase current value among the three-phase current values ​​is less than or equal to the current setting value; The fault detection module is used to determine that the distribution line does not have the single-phase grounding fault when any phase current value among the three-phase current values ​​is greater than the current setting value.

5. The single-phase ground fault detection and processing device using voltage and current time series information according to claim 3, characterized in that: The measuring device comprises a voltage transformer; The first sampling module is used to obtain the voltage measurement value collected by the voltage transformer; The fault detection module comprises: The first processing module is used to determine the zero-sequence voltage value according to the voltage measurement value.

6. The single-phase ground fault detection and processing device using voltage and current time series information according to claim 3, characterized in that: The measuring device comprises a current transformer; The first sampling module is used to obtain the current measurement value collected by the current transformer; The fault detection module comprises: The second processing module is used to determine the three-phase current values ​​according to the current measurement values.

7. The single-phase ground fault detection and processing device using voltage and current time series information according to any one of claims 1 to 6, characterized in that: The single-phase ground fault detection and processing device using voltage and current time series information also includes: A second sampling module, used for obtaining the three-phase current variation of each measuring point before and after the first switch is disconnected; The fault detection module further includes: A third processing module, used to determine the relative position relationship between each of the measurement points and the fault point according to the three-phase current variation; The third processing module is used to determine the fault section according to the plurality of relative position relationships corresponding to the plurality of measurement points.

8. The single-phase ground fault detection and processing device using voltage and current time series information according to claim 7, characterized in that: The third processing module is further used to obtain the maximum change amount and the second largest change amount among the three-phase current change amounts; The third processing module is further configured to determine that the measurement point is located at the power supply side of the fault point when the maximum variation is greater than or equal to twice the second largest variation; The third processing module is further configured to determine that the measurement point is located at a load side of the fault point when the maximum variation is less than twice the second largest variation.

9. The single-phase ground fault detection and processing device using voltage and current time series information according to claim 7, characterized in that: The third processing module is further used to determine that the section to be measured between two adjacent measurement points is the fault section when one of the measurement points is located at the power supply side of the fault point and the other measurement point is located at the load side of the fault point.

10. The single-phase ground fault detection and processing device using voltage and current time series information according to any one of claims 1 to 6, characterized in that: The first duration ranges from 3 seconds to 8 seconds.

Citation Information

Patent Citations

  • Single-phase earth fault isolation system and method for electrical distribution network

    CN102074938A

  • Single-phase earth fault direction judgment and processing method of small current grounding system

    CN103760465A

  • Ground fault self-healing system of small -current grounding system

    CN111130071A

  • Fault point positioning method in single-phase earth fault

    CN113484665A

  • Distribution line single-phase earth fault section identification device based on phase current variation

    CN114034964A