Auxiliary rope arrangement side wall baffle structure of multi-layer winding drum

By designing a combined structure of sidewall baffle and double-fold rope groove in a multi-layer winding roll, the problem of untidy arrangement of the wire ropes at the layer change is solved, and the neat arrangement of the wire ropes on each layer is achieved, avoiding the phenomenon of messy ropes.

CN119683506AInactive Publication Date: 2025-03-25THE 704TH RES INST OF CHINA STATE SHIPBUILDING CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411700989.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-26
Publication Date
2025-03-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the multi-layer winding drum, the wire rope is prone to fall into the gap between the side baffle of the drum at the middle and outer layers at the replacement layer, resulting in the uneven arrangement of the wire ropes and causing the rope disorder.

Method used

A multi-layer winding reel auxiliary rope-row sidewall baffle structure is designed, including the reel side plate, a double-fold rope groove and a sidewall baffle. The sidewall baffle is installed at the secondary climbing section of the wire rope on both sides of the reel side plate, and is used in conjunction with the double-fold rope groove to ensure that the wire rope is arranged neatly on each layer.

Benefits of technology

Through the design of the side wall baffle, the triangular area of ​​the climbing of the two-layer wire rope of the double-fold linear reel is effectively filled, reducing the gap in the layout of the wire rope, preventing the wire rope from falling into the gap, ensuring that the wire rope is arranged neatly at the change of the layer, and avoiding the phenomenon of messing up the rope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119683506A_ABST
    Figure CN119683506A_ABST
Patent Text Reader

Abstract

The invention relates to a multi-layer winding drum auxiliary rope arrangement side wall baffle structure which comprises a drum side plate, a drum double-fold line rope groove and side wall baffles, and the side wall baffles are installed at steel wire rope secondary climbing sections on the two sides of the drum side plate and used in cooperation with the drum double-fold line rope groove. The triangular area of the climbing position of the two layers of steel wire ropes of the double-broken-line type winding drum is effectively filled, so that the arrangement gaps of the steel wire ropes in each layer are reduced, and the steel wire ropes are effectively prevented from being embedded due to no supporting layers; when the steel wire ropes are not tightly arranged on the middle layer and the outer layer of the winding drum, rope arrangement can be assisted at the layer changing position, and the steel wire ropes are helped to be wound to correct positions; the side wall baffles can prevent the steel wire ropes from changing layers in advance during layer changing, the steel wire ropes are regularly arranged from the bottom layer, and therefore the steel wire ropes of the whole reel are arranged in order.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a multi-layer winding drum, in particular to a multi-layer winding drum auxiliary rope arrangement side wall baffle structure. Background Art

[0002] The drum is one of the important parts of the winch. The neat arrangement of wire ropes on the drum is the basis for ensuring the normal operation of the winch. For multi-layer wound drums, rope arrangement is one of the key issues that need to be addressed. Commonly used auxiliary rope arrangement measures include using double-fold rope grooves, adding rope arrangement devices to the winch to assist in rope arrangement, etc. During the process of changing the middle and outer layers of the drum using double-fold rope grooves, due to the gap between the wire rope and the drum side baffle, in some cases the wire rope will fall into the gap, resulting in uneven arrangement of the wire rope at the layer change location, which will cause the middle and outer layers of the wire rope to be tangled. In response to the above problems, it is necessary to develop a drum side plate baffle to assist in arranging the wire rope at the drum layer change location to achieve neat arrangement of the wire rope. Summary of the invention

[0003] The present invention provides a multi-layer winding drum auxiliary rope arrangement side wall baffle structure, which is mainly used for multi-layer winding winch drums, and cooperates with double-fold drum rope grooves to assist the arrangement of wire ropes to the correct position at the middle layer or outer wire rope layer change point.

[0004] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a multi-layer winding drum auxiliary rope arrangement side wall baffle structure, including a drum side plate, a drum double-fold rope groove, a side wall baffle, and a side wall baffle installed at the secondary climbing section of the wire rope on both sides of the drum side plate, and the side wall baffle is used in conjunction with the drum double-fold rope groove.

[0005] Furthermore, the height of the side wall baffle covers the steel wire ropes from the third layer to the outermost layer of the drum to ensure that each layer of the steel wire ropes is arranged neatly.

[0006] Furthermore, the side wall baffles are symmetrically arranged on the side plates of the drum and are welded to the side plates of the drum in a circle by using fillet welds.

[0007] Furthermore, the maximum thickness H of the side wall baffle is determined by the maximum value of the gap at the intersection when the two layers of wire ropes are replaced, and is adjusted according to the actual gap between the wire rope and the side wall.

[0008] Furthermore, the edge radius r of the side wall baffle is made into an excessive radius according to the size of the side wall baffle.

[0009] Furthermore, the outer diameter Ra of the side wall baffle is 1 to 1.5 times the rope diameter larger than the outermost circle wire rope winding diameter; the inner diameter Rb of the side wall baffle is 0.5 times the rope diameter larger than the third layer winding diameter; the width B of the side wall baffle is the straight length of the single-sided climbing section angle of the double-fold rope groove at the innermost layer of wire rope.

[0010] The beneficial effects brought by the technical solution of the present invention are as follows:

[0011] 1. Effective filling is done in the triangular area where the two layers of wire ropes on the double-fold drum climb, so that the gap between each layer of wire ropes is reduced, effectively preventing the wire ropes from being embedded in the layer due to lack of support;

[0012] 2. When the wire rope is not arranged tightly in the middle and outer layers on the drum, auxiliary rope arrangement can be used at the layer change point to help the wire rope be wound to the correct position;

[0013] 3. The side wall baffle can prevent the wire rope from changing layers prematurely, ensuring the regular arrangement of the wire rope starting from the bottom layer, so that the wire rope of the entire drum is arranged neatly. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the position of the auxiliary rope-arranging side wall baffle of the drum in the unfolded diagram of the drum;

[0015] Figure 2 This is a schematic diagram of the installation position of the side wall baffle of the drum auxiliary rope arrangement;

[0016] Figure 3 yes Figure 2 AA section view;

[0017] Figure 4 This is a schematic diagram of the side wall baffle of the drum auxiliary rope arrangement;

[0018] Figure 5 yes Figure 4 Left view of .

[0019] In the figure: 1- drum side plate, 2- drum double fold line rope groove, 3- side wall baffle, 4- nth layer of wire rope, 5- n-1th layer of wire rope, 6- innermost layer of wire rope, 7- outermost layer of wire rope, 8- rope entry point, G- secondary climbing section, H- maximum thickness, r- edge fillet, Ra- outer diameter, Rb- inner diameter, B- width. DETAILED DESCRIPTION

[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0021] like Figures 1 to 5 As shown, an embodiment of the present invention provides a multi-layer winding drum auxiliary rope arrangement side wall baffle structure, including a drum side plate 1, a drum double-fold rope groove 2, and a side wall baffle 3. The side wall baffle 3 is installed at the secondary climbing section G of the wire rope on both sides of the drum side plate 1, and the side wall baffle 3 is used in conjunction with the drum double-fold rope groove 2.

[0022] The height of the side wall baffle 3 covers the steel wire ropes from the third layer to the outermost layer of the drum to ensure that each layer of the steel wire ropes is arranged neatly.

[0023] The side wall baffles 3 are symmetrically arranged on the side wall of the drum and are welded to the side wall of the drum in a circle by fillet welds.

[0024] The external dimensions of the side wall baffle 3 are shown in the figure below: Figure 4 , as shown in 5, the maximum thickness H of the side wall baffle 3 is Figure 1 When the two layers of wire rope are replaced, the maximum value of the gap at the intersection in the top view is determined, and it can be adjusted according to the actual gap between the wire rope and the side wall; the edge fillet r is made into a transition fillet according to the size of the side wall baffle; the outer circle diameter Ra is 1 to 1.5 times the rope diameter larger than the outermost circle wire rope winding diameter; the inner circle diameter Rb is 0.5 times the rope diameter larger than the third layer winding diameter; the width B is the straight length of the angle of the single-side climbing section of the double-fold rope groove at the innermost layer of wire rope.

[0025] Key technical points of the present invention:

[0026] 1. The side wall baffle must be used in conjunction with the double-fold rope groove. To ensure that the side wall baffle plays the maximum role, the external dimensions should be determined according to the parameters of the double-fold rope groove of the drum;

[0027] 2. The side wall baffles are installed at the secondary climbing position of the wire rope on both sides of the drum;

[0028] 3. The height of the side wall baffle should cover the wire rope from the third layer to the outermost layer of the drum as much as possible to ensure that each layer of the wire rope is arranged neatly;

[0029] 4. The side wall baffle is welded to the side wall of the drum through fillet welds.

Claims

1. A multi-layer winding drum auxiliary rope side wall baffle structure, characterized in that: It includes a drum side plate, a drum double-folded rope groove, and a side wall baffle. The side wall baffle is installed at the secondary climbing section of the wire rope on both sides of the drum side plate, and the side wall baffle is used in conjunction with the drum double-folded rope groove.

2. The multi-layer winding drum auxiliary rope side wall baffle structure according to claim 1 is characterized in that: The height of the side wall baffle covers the third to the outermost layer of wire rope on the drum to ensure that each layer of wire rope is arranged neatly.

3. The multi-layer winding drum auxiliary rope side wall baffle structure according to claim 1 is characterized in that: The side wall baffles are symmetrically arranged on the side plates of the drum and are welded to the side plates of the drum in a circle by fillet welds.

4. The multi-layer winding drum auxiliary rope side wall baffle structure according to claim 1 is characterized in that: The maximum thickness H of the side wall baffle is determined by the maximum value of the gap at the intersection when the two layers of wire rope are changed, and is adjusted according to the actual gap between the wire rope and the side wall.

5. The multi-layer winding drum auxiliary rope side wall baffle structure according to claim 1 is characterized in that: The edge radius r of the side wall baffle is made into an excessive radius according to the size of the side wall baffle.

6. The multi-layer winding drum auxiliary rope side wall baffle structure according to claim 1, characterized in that: The outer diameter Ra of the side wall baffle is 1 to 1.5 times the rope diameter larger than the outermost circle wire rope winding diameter; the inner diameter Rb of the side wall baffle is 0.5 times the rope diameter larger than the third layer winding diameter; the width B of the side wall baffle is the straight length of the single-sided climbing section angle of the double-fold rope groove at the innermost layer of wire rope.

Citation Information

Patent Citations

  • Rear-mounted two-layer coiling and variable rope groove diameter type coiling block for winching of rotary drilling rig

    CN104555778A

  • Winding drum device capable of improving rope arrangement and preventing rope disorder

    CN116040515A