Arch ring formwork for supporting ultrahigh arch bridge

By designing an arch ring form frame including support base, support column, Bere beam, full-door bracket and bottom form, the stability and sealing problems of the mid-bottom form of the high-arch bridge construction are solved, and efficient concrete pouring and safe construction process are achieved.

CN119686233AInactive Publication Date: 2025-03-25SHANXI CONSTR ENG CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202510200404.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-24
Publication Date
2025-03-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the construction process, high-arch bridges are prone to problems such as abutment displacement, arch top drop and cracking. The existing prefabricated assembly methods have safety hazards and poor integrity. At the same time, the gaps of the base mold are prone to deform and lead to slurry leakage.

Method used

An arch ring form frame including a support base, support column, Bere beam, Fully-tang bracket and bottom mold is designed. The support combination of Bere beam and Fully-tang bracket is used to achieve stable support of the bottom mold, and the connection between the adjustment components and splicing blocks and the steel beam is fixed to ensure the stability and sealing of the bottom mold.

Benefits of technology

It improves the stability of the full-house bracket, realizes stable support and anti-collapse of the bottom mold, solves the problem of slurry leakage, and ensures the quality and safety of concrete pouring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119686233A_ABST
    Figure CN119686233A_ABST
Patent Text Reader

Abstract

The invention discloses an arch ring formwork for supporting an ultrahigh arch bridge, and belongs to the technical field of concrete arch bridge pouring. Comprising a supporting base, supporting columns, bailey beams, a full framing and a bottom die. Wherein the bottom die consists of a plurality of splicing blocks and a plurality of splicing templates; each splicing block is composed of a connecting plate and a shrinkage convex block, a plurality of anti-collapse grooves are formed in each shrinkage convex block at equal intervals, sealing gaskets are arranged on the two sides of each shrinkage convex block, and the sealing gaskets are horizontally attached to the top faces of the connecting plates; a plurality of supporting springs are arranged in the shrinkage protruding block at equal intervals and installed in the anti-collapse groove in a penetrating mode. The stability of full framing support installation and the stability of bottom die installation are improved, the stable combined supporting function can be achieved, and finally the problem that when the bottom die is poured, a connecting part is prone to deformation, and consequently slurry leakage is caused is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of concrete arch bridge casting, and in particular relates to an arch ring formwork used for supporting a super-high arch bridge. Background Art

[0002] Arch bridges are mostly used in urban and landscape design, and are also used to cross canyons and for mountain rafting. Top-supported arch bridges use a main arch ring, upper columns and a belly arch structure. The main belly arch structure is used to divert water flow under the bridge and to evenly distribute the force on the bridge. At the same time, arch bridges are mostly constructed with inclined piles and vertical piles to decompose the lateral pressure of the arch ring.

[0003] In recent years, high arch bridges built above river valleys have developed rapidly in my country; however, high arch bridges are prone to problems such as abutment displacement, arch crown drop, and arch column cracking; although the prefabricated assembly method can speed up the construction, the integrity is not as good as cast-in-place, and there are high requirements for lifting equipment, and there are also major safety hazards; moreover, the existing bottom formwork is mostly composed of several pieces of formwork, and the gaps left after assembly are easily deformed under pressure during pouring, causing the concrete in the pouring area to leak slurry through the gaps, resulting in leakage. Summary of the invention

[0004] The present invention overcomes the shortcomings of the prior art and proposes an arch ring formwork for supporting a super-high arch bridge; the present invention is achieved through the following technical solutions: An arch ring formwork for supporting a super-high arch bridge, comprising a supporting base, a supporting column, a Bailey beam, a full-bridge support and a bottom formwork; A plurality of spaced and parallel support bases are arranged on the ground; a plurality of support columns are equidistantly installed on the support bases; a support plate is commonly arranged on the tops of the support columns on the same support base; a plurality of Bailey beams are equidistantly arranged horizontally on the plurality of support plates; a plurality of I-beams are equidistantly arranged longitudinally on the plurality of Bailey beams; a full-height bracket is installed on the plurality of I-beams; an adjusting component for adjusting the height is arranged on the top of the full-height bracket, and the adjusting component is connected to the bottom mold by abutting the support plate; The bottom mold is composed of several splicing blocks and several splicing templates; a plurality of connecting protrusions are convexly provided on the bottom surface of each splicing template; a lap fixing groove is provided at the side end of the abutting support plate, and the connecting protrusion is abutted and fixedly connected with the corresponding lap fixing groove of the abutting support plate; a through hole is provided on the abutting support plate, and a steel beam is passed through between the through holes of the abutting support plates at the bottom of the plurality of splicing templates; The splicing block is composed of a connecting plate and a shrinkage protrusion, which is fixedly installed in the middle of the top surface of the connecting plate, and is placed between the installation gaps of the two splicing templates. A third connecting bolt is passed through the connecting plate, and the front end of the bolt column of the third connecting bolt is connected to the splicing template; a number of anti-collapse grooves are equidistantly provided on the shrinkage protrusion, and sealing gaskets are provided on both sides of the shrinkage protrusion, which are horizontally attached to the top surface of the connecting plate; a number of support springs are equidistantly built into the shrinkage protrusion, and the support springs are passed through and installed in the anti-collapse grooves.

[0005] Furthermore, a plurality of connecting support protrusions are symmetrically arranged on both sides of the support base, a plurality of nail columns are equidistantly penetrated through the connecting support protrusions, and the lower ends of the nail columns are immersed in the soil layer.

[0006] Furthermore, the support column is formed by assembling and connecting multiple assembly columns in the height direction, and both ends of each assembly column are provided with connecting flanges for bolt connection; a level detector is installed at the lower end of the side of one of the assembly columns.

[0007] Furthermore, a butt mounting block is provided at the bottom end of the full-hall bracket, and the butt mounting block is installed and fixed on the I-beam.

[0008] Furthermore, blocking side plates are vertically symmetrically provided on both sides of the bottom mold, and the blocking side plate bolts are installed on the side ends of the bottom mold. Partition plug plates are provided between the blocking side plates, and slots for inserting the blocking side plates are provided at both ends of the partition plug plates; the partition plug plates are vertically abutted against the bottom mold, and several reinforcing ribs are installed with horizontal bolts on the upper surface of the bottom mold, and a matching groove that fits the reinforcing ribs is provided at the lower end of the partition plug plates.

[0009] Furthermore, the adjustment component is composed of a lifting threaded support rod and a rotating threaded sleeve. A connecting block is fixedly installed on the top flange of the full-hall bracket. The rotating threaded sleeve is rotatably clamped in the connecting block. The rotating threaded sleeve is threadably sleeved on the lifting threaded support rod. Two rotating blocks are symmetrically protruded on the rotating threaded sleeve. An abutment support plate is provided on the top of the lifting threaded support rod, and the abutment support plate is rotatably clamped on the lifting threaded support rod.

[0010] Furthermore, a first connecting bolt for fixing the abutment support plate is threadedly connected to the connecting protrusion, and the abutment support plate is connected to the bottom surface of the splicing template through the first connecting bolt.

[0011] Furthermore, a fixed seat is convexly provided on the bottom surface of the splicing template, and the fixed seat is located between two adjacent abutting support plates; a movable seat is provided at the lower end of the fixed seat, and a second connecting bolt for connecting the fixed seat is provided on the movable seat; the steel beam is fixedly inserted between the fixed seat and the movable seat.

[0012] Furthermore, the shrinkage protrusion is provided with a plurality of installation grooves at equal intervals, the installation grooves are provided between a plurality of anti-collapse grooves, and the support spring is arranged in the installation grooves.

[0013] The beneficial effects of the present invention compared with the prior art are as follows: The present invention facilitates the establishment of a supporting operating platform above through the support cooperation between the supporting base and the Bailey beam, thereby improving the stability of the support installation of the full-height bracket, and further realizing the function of stable support of the bottom mold; through the support and adjustment cooperation between the full-height bracket and the adjustment component, it is convenient to support the bottom molds at different heights, thereby improving the stability of the bottom mold installation, and further realizing the function of preventing the bottom mold from collapsing; and through the support connection cooperation between the splicing block and the steel beam, it is convenient to connect and fix the splicing template, thereby realizing the function of stable joint support, and finally solving the problem of leakage caused by easy deformation of the connection part during the casting of the bottom mold. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a structural schematic diagram of the connection between the I-beam and the full-chair support of the present invention; Figure 3 It is a schematic diagram of the three-dimensional structure of the bottom mold of the present invention; Figure 4 It is a schematic diagram of the three-dimensional structure of the support base and the support column of the present invention; Figure 5 It is a three-dimensional structural schematic diagram of the splicing block and the splicing template of the present invention; Figure 6 The bottom structure of the splicing template of the present invention is shown in FIG. Figure 1 ; Figure 7 The bottom structure of the splicing template of the present invention is shown in FIG. Figure 2 ; Figure 8 It is a schematic diagram of the three-dimensional structure of the splicing block of the present invention; Fig. 9 It is a schematic diagram of the three-dimensional structure of the connecting card block of the present invention.

[0015] Serial numbers in the figure: 1. Support base; 2. Support column; 3. Bailey beam; 4. Full-height bracket; 5. I-beam; 6. Abutment mounting block; 7. Bottom mold; 8. Lifting threaded support rod; 9. Rotating threaded sleeve; 10. Blocking side plate; 11. Partition plug plate; 12. Strengthening rib; 13. Assembly column; 14. Connecting support protrusion; 15. Level detector; 16. Nail column; 17. Splicing block; 18. Splicing template; 19. Abutment support plate; 20. Fixed seat; 21. Steel beam; 22. Movable seat; 23. Connecting protrusion; 24. First connecting bolt; 25. Second connecting bolt; 26. Through hole; 27. Shrinkage protrusion; 28. Sealing pad; 29. ​​Support spring; 30. Third connecting bolt; 31. Anti-collapse groove; 32. Connecting block; 33. Connecting plate. DETAILED DESCRIPTION

[0016] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention is further described in detail in conjunction with the embodiments and the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. The technical solutions of the present invention are described in detail below in conjunction with the embodiments and the accompanying drawings, but the scope of protection is not limited thereto.

[0017] See also Figures 1 to 9 This embodiment proposes an arch ring formwork for supporting a super-high arch bridge, including a support base 1, a support column 2, a Bailey beam 3, a full-chamber support 4 and a bottom form 7; According to the span of the high arch bridge, a plurality of spaced-apart and parallel support bases 1 are arranged on the ground; the support base 1 is the foundation for supporting the entire arch ring formwork; a plurality of connecting support protrusions 14 are symmetrically arranged on both sides of the support base 1, and a plurality of nail columns 16 are equidistantly penetrated on the connecting support protrusions 14, and the lower ends of the nail columns 16 are immersed in the soil layer; the support base 1 is firmly fixed by the plurality of connecting support protrusions 14 and the plurality of nail columns 16.

[0018] Several support columns 2 are installed at equal intervals on the support base 1. The support columns 2 are assembled and connected by multiple assembly columns 13 in the height direction. Both ends of each assembly column 13 are provided with connecting flanges for bolt connection; a level detector 15 is installed at the lower end of the side of one of the assembly columns 13, and the level detector 15 is used to detect the supporting state of the support base 1, so as to prevent tipping during the pouring process.

[0019] A support plate is commonly provided at the top of the support columns 2 on the same support base 1, and a plurality of Bailey beams 3 are horizontally and equidistantly arranged on the plurality of support plates, and the Bailey beams 3 are composed of double-layer Bailey sheets; a plurality of I-beams 5 are longitudinally and equidistantly arranged on the plurality of Bailey beams 3; a full-hall bracket 4 is installed on the plurality of I-beams 5, and a butt mounting block 6 is provided at the bottom end of the full-hall bracket 4, and the butt mounting block 6 is installed and fixed on the I-beam 5.

[0020] An adjusting assembly is provided at the top of the full-chamber bracket 4, on which a bottom mold 7 is installed. The bottom mold 7 is composed of several splicing blocks 17 and several splicing templates 18. Through the arrangement of the Bailey beam 3 and the full-chamber bracket 4, the bottom mold 7 can be better supported, thereby bearing the weight of the concrete pouring material, and facilitating the assembly of the full-chamber bracket 4, so that the arc-shaped bottom mold 7 can be stably installed on the full-chamber bracket 4; both sides of the bottom mold 7 are vertically symmetrically provided with blocking side plates 10, and the blocking side plates 10 are bolted to the side ends of the bottom mold 7, and partition plugs 11 are provided between the blocking side plates 10, and the partition plugs 11 Slots for inserting the blocking side plates 10 are provided at both ends, and the blocking side plates 10 on both sides of the bottom mold 7 are reinforced by the slots on the partition plug plates 11; the partition plug plates 11 are vertically abutted against the bottom mold 7, and a number of reinforcing ribs 12 are installed with transverse bolts on the upper surface of the bottom mold 7, and a matching groove for fitting the reinforcing ribs 12 is provided at the lower end of the partition plug plates 11. Through the setting of the partition plug plates 11, the casting area can be divided, thereby realizing zoned casting, which is convenient for monitoring the quality of concrete casting and thus reducing construction risks; at the same time, it is also possible to realize simultaneous casting of concrete in multiple areas, thereby improving work efficiency.

[0021] The adjusting assembly is composed of a lifting threaded support rod 8 and a rotating threaded sleeve 9. A connecting block 32 is fixedly installed on the top flange of the full-hall bracket 4. The rotating threaded sleeve 9 is rotatably clamped in the connecting block 32. The rotating threaded sleeve 9 is threadedly sleeved on the lifting threaded support rod 8. Two rotating blocks are symmetrically protruded on the rotating threaded sleeve 9. A contact support plate 19 is provided on the top of the lifting threaded support rod 8. The contact support plate 19 is rotatably clamped on the lifting threaded support rod 8. Through the setting of the adjusting assembly, the height of the lifting threaded support rod 8 can be better adjusted, thereby better lifting and fitting the arc-shaped bottom mold 7, so that the bottom mold 7 can remain stable at different heights.

[0022] The side end of the abutment support plate 19 is provided with an overlapping fixing groove, and the bottom surface of each splicing formwork 18 is convexly provided with three connecting protrusions 23 for abutting and fitting the overlapping fixing grooves, and the connecting protrusions 23 are threadedly connected with a first connecting bolt 24 for fixing the abutment support plate 19, and the abutment support plate 19 is connected to the bottom surface of the splicing formwork 18 through the first connecting bolt 24; three through holes 26 are provided on the abutment support plate 19, and a steel beam 21 is penetrated between the through holes 26 of the abutment support plates 19 at the bottom of multiple splicing formworks 18; through the provision of the steel beam 21, the splicing formwork 18 can be assisted to stably bear the poured concrete, thereby reducing the deformation of the bolt connection and preventing the leakage of slurry during pouring. A fixed seat 20 is convexly provided on the bottom surface of the splicing template 18, and the fixed seat 20 is located between two adjacent abutting support plates 19; a movable seat 22 is provided at the lower end of the fixed seat 20, and a second connecting bolt 25 for connecting the fixed seat 20 is provided on the movable seat 22; the steel beam 21 is fixedly penetrated between the fixed seat 20 and the movable seat 22. Through the setting of the fixed seat 20 and the movable seat 22, the stability of the bottom mold 7 component unit can be further improved, and the steel beam 21 can be fixed after the steel beam 21 is penetrated to prevent the steel beam 21 from slipping.

[0023] The splicing block 17 is composed of a connecting plate 33 and a shrinking protrusion 27. The shrinking protrusion 27 is fixedly installed in the middle of the top surface of the connecting plate 33. The shrinking protrusion 27 is placed between the installation gaps of the two splicing templates 18. The connecting plate 33 is penetrated with a third connecting bolt 30. The front end of the bolt column of the third connecting bolt 30 is connected to the splicing template 18. Through the setting of the third connecting bolt 30, the two splicing templates 18 can be assembled and fixed together, and the gap between the two splicing templates 18 can be filled by the shrinking protrusion 27. Several anti-collapse grooves 31 are opened at equal distances on the shrinking protrusion 27. Sealing pads 28 are provided on both sides of the shrinking protrusion 27. The sealing pads 28 are horizontally attached to the connecting plate 33. On the top surface, by setting the anti-collapse groove 31 and the sealing gasket 28, the connection gap of the splicing template 18 can be blocked, so that the splicing templates 18 can be spliced ​​with each other while ensuring the sealing of the connection; a number of installation grooves are evenly spaced in the shrinking protrusion 27, and the installation grooves are opened between the several anti-collapse grooves 31. A support spring 29 is provided in the installation groove, and the support spring 29 is passed between the several anti-collapse grooves 31. By setting the support spring 29 in the shrinking protrusion 27, the anti-collapse groove 31 in the shrinking protrusion 27 can be propped up, so that the shrinking protrusion 27 can better fit the splicing templates 18 on both sides, and prevent the top middle part of the shrinking protrusion 27 from being compressed and collapsed.

[0024] The present invention also proposes a method for using an arch ring formwork for supporting a super-high arch bridge, comprising the following steps: Step 1. First, design the bracket according to the construction drawings. According to the design plan and the support system plan, use a total station and a steel ruler to determine the position of the support base 1 made of concrete; chisel off the loose layer on the rock surface until the hard rock surface is reached, and the bottom is cleared and leveled before the temporary concrete pier construction can be carried out; the temporary pier is made of C25 reinforced concrete, with a length of 6.0m, a width of 1.0m, and a height of 0.3m. The site is leveled and the foundation is reinforced, and then the support base 1 is made by pouring concrete. After the concrete support base 1 is completely solidified, a nail column 16 is inserted into the connecting support protrusion 14 at the side end of the support base 1 to reinforce the support base 1, and then a support column 2 connected by a flange of multiple assembly columns 13 is installed on the upper end of the support base 1, and a support plate is installed on the top of the support column 2.

[0025] Step 2, then mark the position of the Bailey truss longitudinal beam on the support plate with paint, lift the installed Bailey beam 3, place it behind the installed Bailey beam 3, and make it in a straight line with it, two people use a wooden stick to pass through the node plate to lift the front section of Bailey beam 3, align the lower chord pin hole, insert the pin, and then lift the rear end of Bailey beam 3, insert the upper chord pin and set the safety pin, Bailey truss assembles single-layer double row on the ground, the assembled single-layer double row Bailey beam 3 is 24m long and weighs about 4.8t; single-layer three-row Bailey beam 3 and single-layer double row, single-layer three-row interval installation arrangement can be used in some reinforced areas, single-layer three-row Bailey beam 3 is 24m long and weighs about 7.2t; after the strength of the supporting base 1 reaches 100% and passes the inspection, the Bailey beam 3 is hoisted.

[0026] Step 3: Then, an I-beam 5 is fixedly installed on the upper end of the Bailey beam 3 as a distribution beam, and the spacing between the I-beams 5 is 60 cm. Then, a full-height bracket 4 is set up on the I-beam 5 to form an overall bracket system. The bottom mold 7 is installed on the full-height bracket 4. During the installation process, the height of the lifting threaded support rod 8 can be adjusted to better lift the bottom mold 7 that fits the arc, so that the bottom mold 7 can remain stable at different heights.

[0027] Step 4: In order to avoid the adverse effects of arch frame deformation on arch ring construction, according to the design drawing requirements, before the main arch ring is constructed, the support must be pre-stressed with a weight not less than the arch ring and the building on the arch to ensure that it has sufficient strength, rigidity and stability, and the construction pre-arch degree is set according to the construction load. Through the setting of the support base 1 and the nail column 16, the upper support structure can be more stably supported, and the support status of the support base 1 can be detected by the level detector 15, thereby preventing tipping during the pouring process; pre-stressed ton bags filled with sand are used as load test materials. The bottom area of ​​each cylindrical pre-stressed ton bag is 1.2m 2, height 0.8m, weight controlled at 1500kg, weighed with a scale; the pre-compression loading of the bracket simulates the working conditions of the actual pouring of the arch ring concrete. Within the full width of the arch ring, sandbags are stacked layer by layer and step by step from the arch feet on both sides to the arch top simultaneously and symmetrically. The sandbags are stacked and loaded in a uniform distribution manner.

[0028] Step five, finally, fix the retaining side plates 10 on both sides of the bottom form 7, and then insert the partitioning plug plates 11 between the retaining side plates 10 to separate the casting area, and then tie the steel bars and cast the concrete in the partitioned formwork. Through the setting of the anti-collapse groove 31 and the sealing gasket 28, the connection gap of the splicing formwork 18 can be blocked, so that the splicing formwork 18 can ensure the sealing of the connection while being spliced ​​with each other. Through the setting of the supporting spring 29 in the shrinking protrusion 27, the anti-collapse groove 31 in the shrinking protrusion 27 can be propped up, so that the shrinking protrusion 27 can better fit the splicing formwork 18 on both sides and prevent the top middle part of the shrinking protrusion 27 from collapsing under pressure. After the concrete solidifies, the construction can continue on the concrete arch structure. After the construction is completed, the formwork is removed, and the use of the device ends.

[0029] The above content is a further detailed description of the present invention in combination with a specific preferred embodiment. It cannot be determined that the specific embodiments of the present invention are limited to this. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the present invention, which should be regarded as belonging to the present invention and the scope of patent protection determined by the submitted claims.

Claims

1. An arch ring formwork for supporting a super-high arch bridge, characterized in that: It comprises a supporting base (1), a supporting column (2), a Bailey beam (3), a full-chamber bracket (4) and a bottom mold (7); A plurality of spaced-apart and parallel support bases (1) are arranged on the ground; a plurality of support columns (2) are equidistantly installed on the support bases (1); a support plate is commonly provided at the tops of the support columns (2) on the same support base (1); a plurality of Bailey beams (3) are equidistantly installed horizontally on the plurality of support plates; a plurality of I-beams (5) are equidistantly installed longitudinally on the plurality of Bailey beams (3); a full-height bracket (4) is installed on the plurality of I-beams (5); an adjustment component for adjusting the height is provided at the top of the full-height bracket (4); the adjustment component is connected to the bottom mold (7) by abutting the support plate (19); The bottom mold (7) is composed of a plurality of splicing blocks (17) and a plurality of splicing templates (18); a plurality of connecting protrusions (23) are convexly provided on the bottom surface of each splicing template (18); a lap fixing groove is provided at the side end of the abutting support plate (19), and the connecting protrusion (23) abuts against and is fixedly connected to the corresponding lap fixing groove of the abutting support plate (19); a through hole (26) is provided on the abutting support plate (19), and a steel beam (21) is penetrated between the through holes (26) of the abutting support plates (19) at the bottom of the plurality of splicing templates (18); The splicing block (17) is composed of a connecting plate (33) and a shrinking protrusion (27). The shrinking protrusion (27) is fixedly mounted in the middle of the top surface of the connecting plate (33). The shrinking protrusion (27) is placed between the installation gaps of the two splicing templates (18). A third connecting bolt (30) is passed through the connecting plate (33). The front end of the bolt column of the third connecting bolt (30) is connected to the splicing template (18). The shrinking protrusion (27) is provided with a plurality of anti-collapse grooves (31) at equal intervals. Sealing pads (28) are provided on both sides of the shrinking protrusion (27). The sealing pads (28) are horizontally attached to the top surface of the connecting plate (33). The shrinking protrusion (27) is provided with a plurality of supporting springs (29) at equal intervals. The supporting springs (29) are passed through and installed in the anti-collapse grooves (31).

2. The arch ring formwork for supporting a super-high arch bridge according to claim 1, characterized in that: A plurality of connecting support protrusions (14) are symmetrically arranged on both sides of the supporting base (1), a plurality of nail columns (16) are equidistantly penetrated through the connecting support protrusions (14), and the lower ends of the nail columns (16) are immersed in the soil layer.

3. The arch ring formwork for supporting a super-high arch bridge according to claim 1, characterized in that: The support column (2) is formed by assembling and connecting a plurality of assembly columns (13) in the height direction, and each assembly column (13) is provided with connection flanges for bolt connection at both ends; a level detector (15) is installed at the lower end of the side surface of one of the assembly columns (13).

4. The arch ring formwork for supporting a super-high arch bridge according to claim 1, characterized in that: A butt mounting block (6) is provided at the bottom end of the full-chamber bracket (4), and the butt mounting block (6) is fitted on the I-beam (5) for installation and fixation.

5. The arch ring formwork for supporting a super-high arch bridge according to claim 1, characterized in that: The bottom mold (7) is provided with blocking side plates (10) vertically symmetrically on both sides. The blocking side plates (10) are bolted to the side ends of the bottom mold (7). A partition plug plate (11) is provided between the blocking side plates (10). Both ends of the partition plug plate (11) are provided with slots for inserting the blocking side plates (10). The partition plug plate (11) is vertically abutted against the bottom mold (7). A plurality of reinforcing ribs (12) are transversely bolted to the upper surface of the bottom mold (7). The lower end of the partition plug plate (11) is provided with a matching groove for fitting the reinforcing rib (12).

6. The arch ring formwork for supporting a super-high arch bridge according to claim 1, characterized in that: The adjustment assembly is composed of a lifting threaded support rod (8) and a rotating threaded sleeve (9). A connecting block (32) is fixedly mounted on the top flange of the full-chamber bracket (4). The rotating threaded sleeve (9) is rotatably clamped in the connecting block (32). The rotating threaded sleeve (9) is threadably sleeved on the lifting threaded support rod (8). Two rotating blocks are symmetrically protruded on the rotating threaded sleeve (9). A contact support plate (19) is provided at the top end of the lifting threaded support rod (8). The contact support plate (19) is rotatably clamped on the lifting threaded support rod (8).

7. The arch ring formwork for supporting a super-high arch bridge according to claim 1, characterized in that: A first connecting bolt (24) for fixing the abutment support plate (19) is threadedly connected to the connecting protrusion (23), and the abutment support plate (19) is connected to the bottom surface of the splicing template (18) via the first connecting bolt (24).

8. The arch ring formwork for supporting a super-high arch bridge according to claim 1, characterized in that: A fixed seat (20) is convexly provided on the bottom surface of the splicing template (18), and the fixed seat (20) is located between two adjacent abutting support plates (19); a movable seat (22) is provided at the lower end of the fixed seat (20), and a second connecting bolt (25) for connecting the fixed seat (20) is provided on the movable seat (22); and the steel beam (21) is fixedly arranged between the fixed seat (20) and the movable seat (22).

9. The arch ring formwork for supporting a super-high arch bridge according to claim 1, characterized in that: The shrinking protrusion (27) is provided with a plurality of installation grooves at equal intervals, the installation grooves are provided between a plurality of anti-collapse grooves (31), and the support spring (29) is arranged in the installation grooves.

Citation Information

Patent Citations

  • Cast-in-situ box girder bamboo plywood and splicing and reinforcement method thereof

    CN109826103A

  • High strength shear wall template structure

    CN207131071U

  • Composite adhesive tape for automobile glass sealing

    CN213261926U

  • Decorative treatment structure for bottom joint of composite floor slab

    CN214833596U

  • Plugging mechanism for abutted seam of shear wall pouring wood formwork

    CN215760476U