Mounting structure and filling method of assembly type foam concrete pipe
By using arch brackets and partition ribs in the installation structure of prefabricated foam concrete pipes to form a filling frame, the problems of complex installation, time-consuming and poor connection reliability in the prior art are solved, and the installation effect is achieved, which is fast, stable and flexible, adapted to the error-proof requirements under complex geological conditions, and improved the durability of the buffer layer.
Patent Information
- Application Number
- CN202411905592.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2044-12-23
AI Technical Summary
The installation process of existing prefabricated foam concrete pipes is complicated and time-consuming, which can easily lead to structural misalignment and uneven stress. The bolt material is easily corroded in high humidity environments, and the connection reliability is poor, resulting in unstable pipeline arrangement.
The installation structure of the arch bracket and partition rib is adopted. By setting the first arch bracket, partition rib and second arch bracket, a filling frame is formed and the prefabricated foam concrete pipe is placed to achieve quick installation and flexible adjustment.
It reduces construction difficulty and time-consuming, improves construction efficiency, ensures the stable arrangement of prefabricated foam concrete pipes, adapts to the error-resistant requirements under complex geological conditions, and improves the durability and service life of the buffer layer.
Smart Images

Figure CN119686772A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel construction, and in particular relates to an installation structure and a filling method of an assembled foam concrete pipe. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] As a basic transportation facility, tunnel engineering faces increasingly prominent geological challenges in modern urban transportation and cross-regional connections, and inevitably crosses active fault areas. Existing technologies use a buffer layer between the initial support and secondary lining of the tunnel within the fault zone, and the buffer layer material is generally made of flexible materials. Considering the on-site construction and maintenance conditions, some tunnel buffer layers are currently filled with prefabricated components, such as porous prefabricated concrete components or assembled foam concrete pipes.
[0004] Existing prefabricated foam concrete pipes are installed with bolts, which have high requirements for installation accuracy. It is easy for the structure to be misaligned and uneven force to cause cracks or damage on the pipe surface. The installation process is cumbersome and time-consuming, and it is difficult to adjust flexibly, which makes the assembly of foam concrete pipes more difficult. The bolt material in areas with high humidity and abundant groundwater is more prone to rust, and the reliability of the bolt structure is difficult to ensure. At the same time, the bolt and the prefabricated foam concrete pipe are point-connected, which makes it easy for the unsupported parts between the pipes to move freely or offset, making it difficult to keep the overall arrangement neat and stable. Summary of the invention
[0005] In view of the above problems, the present invention provides an installation structure and filling method for an assembled foam concrete pipe. By setting arch supports and partition bars, the construction difficulty is reduced, the construction efficiency is improved, and the requirements for the construction quality of the buffer layer in the tunnel anti-slip design can be flexibly met.
[0006] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0007] In the first aspect, the present invention provides an installation structure for an assembled foam concrete pipe, comprising two installation units; the installation unit comprises a first arch frame, a partition rib and a second arch frame; the installation structure is located in a buffer layer between an initial support and a secondary lining; the first arch frame is arranged on a side close to the initial support, and the second arch frame is arranged on a side close to the secondary lining; the partition rib is arranged between the first arch frame and the second arch frame; the radius of the first arch frame is greater than the radius of the second arch frame; the partition rib and the first arch frame can move relative to each other, and the partition rib and the second arch frame can also move relative to each other; the partition rib and the first arch frame and the second arch frame together form a filling frame; the filling frame is used to place assembled foam concrete pipes.
[0008] Furthermore, the installation structure is continuously arranged along the longitudinal direction of the buffer layer, and is composed of two installation units spaced a set distance apart along the longitudinal direction of the tunnel, and a plurality of installation structures are provided.
[0009] Furthermore, the length of the intervals between the installation units is smaller than the length of the assembled foam concrete pipe.
[0010] Furthermore, the installation unit is provided with a plurality of partition ribs between the first arch frame and the second arch frame, so that the partition ribs, the first arch frame and the second arch frame together form a plurality of filling frames.
[0011] Furthermore, the curvature of the first arch frame fits the initial support surface; the material of the first arch frame is an aluminum alloy tube; the wall thickness and outer diameter of the aluminum alloy tube are both selected to be set sizes.
[0012] Furthermore, the curvature of the second arch frame fits the surface of the secondary lining; the material of the second arch frame is an aluminum alloy tube; the wall thickness and outer diameter of the aluminum alloy tube are also selected according to set dimensions.
[0013] Furthermore, the partition bar is made of glass fiber reinforced plastic; the diameter of the partition bar is selected to be a set size; the length of the partition bar is equal to the spacing between the first arch frame and the second arch frame; and C-shaped fixing structures are respectively installed at both ends of the partition bar.
[0014] Furthermore, the C-shaped fixing structure is composed of a C-shaped hoop and a fastener; the material of the C-shaped hoop is consistent with the material of the partition reinforcement.
[0015] Furthermore, the fastener is arranged at the opening of the C-shaped hoop, and the fastener is selected from half-thread bolts and nuts.
[0016] In a second aspect, the present invention further provides a filling method for an installation structure of an assembled foam concrete pipe, comprising:
[0017] Arrange the foam concrete pipes along the edge of the arc-shaped quadrilateral frame in the order of rows and columns so that the pipes are distributed in a matrix;
[0018] Alternatively, the foam concrete tubes are closely arranged in a honeycomb pattern, which is suitable for use in curved quadrilateral frames that require high packing density.
[0019] Compared with the prior art, the present invention has the following advantages and positive effects:
[0020] The arched bracket and the partition reinforcement of the present invention can be installed in the prefabrication site or on-site, so as to realize the quick installation of the assembled foam concrete pipe and avoid the complicated operation process of the traditional bolt rod fixing method, thereby greatly improving the construction efficiency and reducing the construction difficulty; the partition reinforcement structure has the functions of detachability and adjustment, and by adjusting the filling frame size and filling method, local reinforcement design can be implemented for key parts, which can more flexibly adapt to the anti-misalignment requirements under complex geological conditions; compared with the traditional installation method, the design of the partition reinforcement makes the arrangement of the assembled foam concrete pipe more stable.
[0021] The arch support and the partition reinforcement materials of the present invention are both corrosion-resistant materials, which can effectively enhance the durability and service life of the tunnel buffer layer in extreme environments and meet the medium- and long-term protection needs of tunnel projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0023] Figure 1 It is a schematic diagram of the installation structure of the present invention;
[0024] Figure 2 A cross-sectional view of a tunnel provided with the mounting structure of the present invention;
[0025] Figure 3 This is a structural diagram of the partition bar of the present invention;
[0026] Figure 4 This is a schematic diagram of the foam concrete pipes of the present invention arranged in a matrix form;
[0027] Figure 5 It is a schematic diagram of the honeycomb arrangement of the foam concrete pipes of the present invention.
[0028] In the figure: 1. first arch frame; 2. partition reinforcement; 3. second arch frame; 4. foam concrete pipe; 5. initial support; 6. secondary lining; 7. crushing zone; 8. C-shaped hoop; 9. fastener. DETAILED DESCRIPTION
[0029] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0030] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof;
[0031] This embodiment discloses an installation structure of an assembled foam concrete pipe, such as Figure 1-Figure 3 As shown, the installation structure is located in the buffer layer between the initial support 5 and the secondary lining 6; the installation structure is composed of two installation units; the installation unit includes a first arch frame 1, a partition rib 2 and a second arch frame 3; the first arch frame 1 is arranged on the side close to the initial support 5, and the second arch frame 3 is arranged on the side close to the secondary lining 6; the partition rib 2 is arranged between the first arch frame 1 and the second arch frame 3; the radius of the first arch frame 1 is larger than the radius of the second arch frame 3; the partition rib 2 and the first arch frame 1 can move relative to each other, and the partition rib 2 and the second arch frame 3 can also move relative to each other; the partition rib and the first arch frame and the second arch frame together form a filling frame; the filling frame is used to place assembled foam concrete pipes.
[0032] Each installation unit is provided with a plurality of partition bars 2; the partition bars 2 and the first arch frame 1 and the second arch frame 3 together form a plurality of filling frames, the size of the filling frames is set according to actual conditions; the filling frames can carry the assembled foam concrete pipes 4 in an orderly manner.
[0033] In this embodiment, the shape of the installation structure is similar to the steel arch frame of the initial support 5, but its main function is not to bear the surrounding rock pressure, but to support the deadweight of the assembled foam concrete pipe 4. In order to ensure that the assembled foam concrete pipe 4 can effectively activate the seismic buffering effect when the crushing zone 7 is displaced, the design of the partition rib 2 focuses on flexibility and corrosion resistance to avoid stress concentration caused by excessive strength.
[0034] Specifically, the installation structures are continuously arranged along the longitudinal direction of the buffer layer, and are composed of two installation units spaced apart by a set distance along the longitudinal direction of the tunnel, and a plurality of installation structures are provided.
[0035] Specifically, the length of the intervals of the installation units is less than the length of each section of the assembled foam concrete pipe. Generally, the length of the intervals of the installation units is 0.8 times the length of the assembled foam concrete pipe 4 .
[0036] Specifically, the curvature of the first arch frame 1 is in contact with the surface of the initial support 5; the material of the first arch frame 1 is an aluminum alloy tube; the wall thickness and outer diameter of the aluminum alloy tube are both selected as set sizes.
[0037] The curvature of the second arch frame 3 fits the surface of the secondary lining 6; the material of the second arch frame 3 is an aluminum alloy tube; the wall thickness and outer diameter of the aluminum alloy tube are also selected to be set sizes. The first arch frame 1 and the second arch frame 3 in the present invention are both made of lightweight, high-strength and corrosion-resistant aluminum alloy tubes to ensure the long-term durability and service life of the buffer layer in extreme environments.
[0038] The material of the partition rib 2 is glass fiber reinforced plastic; the diameter of the partition rib 2 is selected to be a set size; the length of the partition rib 2 is equal to the distance between the first arch frame 1 and the second arch frame 3; and C-shaped fixing structures are respectively installed at both ends of the partition rib 2.
[0039] Specifically, the C-shaped fixing structures at both ends of the partition rib 2 can realize the detachable installation of the partition rib 2 on the arch bracket. The C-shaped fixing structure is composed of a C-shaped hoop 8 and a fastener 9. In order to facilitate manufacturing and ensure material compatibility, the material of the C-shaped hoop 8 is consistent with that of the partition rib 2; the fastener 9 is set at the bottom of the hoop, and the fastener 9 uses a half-thread bolt and a nut; the clamping force of the C-shaped hoop 8 is adjusted by tightening the bolt, so as to realize the sliding or locking of the partition rib 2 on the arch bracket, ensuring flexibility and operational stability during installation.
[0040] In order to meet the requirements of anti-fault under complex geological conditions, the filling method can be flexibly selected and the key parts can be locally strengthened. Therefore, there are two filling methods for the above-mentioned assembled foam concrete pipe 4:
[0041] like Figure 4 As shown, the foam concrete pipes 4 are arranged in rows and columns along the edge of the arc-shaped quadrilateral frame, so that the pipes are distributed in a matrix, and the space utilization rate is 78.5%, which is suitable for areas with medium filling density requirements and facilitates the unified layout and maintenance of the pipes.
[0042] or, as Figure 5 As shown, the foam concrete tubes 4 are closely arranged in a honeycomb pattern, which is suitable for arc-shaped quadrilateral frames that require high filling density, and its space utilization rate is 90.7%. It can more effectively improve the overall anti-dislocation performance of the buffer layer and is particularly suitable for local strengthening treatment.
[0043] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. An installation structure for assembled foam concrete pipes, characterized in that: include: Two installation units; the installation unit comprises a first arch frame, a partition rib and a second arch frame; the installation structure is located in a buffer layer between the initial support and the secondary lining; the first arch frame is arranged on a side close to the initial support, and the second arch frame is arranged on a side close to the secondary lining; the partition rib is arranged between the first arch frame and the second arch frame; the radius of the first arch frame is larger than the radius of the second arch frame; the partition rib and the first arch frame can move relative to each other, and the partition rib and the second arch frame can also move relative to each other; the partition rib and the first arch frame and the second arch frame together form a filling frame; the filling frame is used to place assembled foam concrete pipes.
2. The installation structure of an assembled foam concrete pipe according to claim 1, characterized in that: The installation structure is continuously arranged along the longitudinal direction of the buffer layer, and is composed of two installation units spaced apart by a set distance along the longitudinal direction of the tunnel, and a plurality of installation structures are provided.
3. The installation structure of an assembled foam concrete pipe according to claim 1, characterized in that: The length of the intervals of the installation units is smaller than the length of the assembled foam concrete pipe.
4. The installation structure of an assembled foam concrete pipe as claimed in claim 3, characterized in that: The installation unit is provided with a plurality of partition ribs between the first arch frame and the second arch frame, so that the partition ribs, the first arch frame and the second arch frame together form a plurality of filling frames.
5. The installation structure of an assembled foam concrete pipe according to claim 4, characterized in that: The curvature of the first arch frame fits the initial support surface; the material of the first arch frame is an aluminum alloy tube; the wall thickness and outer diameter of the aluminum alloy tube are both selected from set sizes.
6. The installation structure of an assembled foam concrete pipe according to claim 4, characterized in that: The curvature of the second arch frame fits the surface of the secondary lining; the material of the second arch frame is an aluminum alloy tube; the wall thickness and outer diameter of the aluminum alloy tube are also selected to be set sizes.
7. The installation structure of an assembled foam concrete pipe according to claim 1, characterized in that: The material of the partition bar is glass fiber reinforced plastic; the diameter of the partition bar is selected to be a set size; the length of the partition bar is equal to the distance between the first arch frame and the second arch frame; and C-shaped fixing structures are respectively installed at both ends of the partition bar.
8. The installation structure of an assembled foam concrete pipe as claimed in claim 7, characterized in that: The C-shaped fixing structure is composed of a C-shaped hoop and a fastener; the material of the C-shaped hoop is consistent with the material of the partition bar.
9. The installation structure of an assembled foam concrete pipe as claimed in claim 8, characterized in that: The fastener is arranged at the opening of the C-shaped hoop, and the fastener is selected from half-thread bolts and nuts.
10. A filling method for an assembled foam concrete pipe installation structure as claimed in claims 1 to 9, characterized in that: include: Arrange the foam concrete pipes along the edge of the arc-shaped quadrilateral frame in the order of rows and columns so that the pipes are distributed in a matrix; Alternatively, the foam concrete tubes are closely arranged in a honeycomb pattern, which is suitable for use in curved quadrilateral frames that require high packing density.
Citation Information
Patent Citations
Foam concrete shock absorbing structure of tunnel and construction method of foam concrete shock absorbing structure
CN102562091A
Longitudinal anti-freezing damping seam structure of tunnel in high-altitude cold region in strong earthquake region and construction method
CN116220757A
Drilling and blasting method tunnel cast-in-place porous concrete anti-dislocation buffer layer structure and construction method
CN118933843A
Tunnel supporting structure
CN209604038U
Buffer layer structure and supporting structure for underground engineering surrounding rock deformation control
CN214303850U