A fluidized bed welding process for railway cement tank cars
By using a segmented assembly method for the overall fluidized bed structure, the problems of splicing mismatch and welding deformation in railway cement tank cars fluidized beds were solved, improving assembly accuracy and production efficiency, improving the operating environment, and enhancing product quality.
Patent Information
- Application Number
- CN202411955785.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-28
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2044-12-28
AI Technical Summary
Existing technologies for segmented splicing and welding of fluidized beds in railway cement tank cars suffer from problems such as component mismatch, welding deformation, high labor intensity for operators, and environmental degradation.
The integral fluidized bed structure is assembled in sections. First, the end fluidized bed is assembled in the half of the tank before the tank is closed. Then, the middle fluidized bed is assembled in the tank after it is closed. Support rods and reference lines are used to ensure assembly accuracy. Each component is assembled step by step. Finally, the breathable cloth is installed and a sealing test is conducted.
It improves the precision of component assembly, reduces the labor intensity of operators, improves the working environment, and enhances product quality and production efficiency.
Smart Images

Figure CN119703650B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of mechanical manufacturing, and particularly to the field of welding. Background Technology
[0002] Cement tanker trucks exported to South Korea operate on 1435mm gauge tracks and are primarily used for transporting dry cement powder with a particle diameter of no more than 0.1mm. Loading is done from the top, and unloading is done via air unloading. The fluidized bed structure is the main functional structure for loading and unloading cement tanker trucks, used for bearing cement cargo and transmitting pressurized air during unloading.
[0003] The fluidized bed structure of the South Korean cement tanker truck is a double V-shaped bathtub structure, covering the entire lower length of the tank. During small-batch trial production, the fluidized bed is assembled after the entire tank is assembled. Therefore, the only option is to cut each structural component into multiple sections to ensure that the size of each section is smaller than the diameter of the tank's manhole and can be fed into the tank through the manhole. Then, the components are spliced and welded together inside the tank, and finally, the entire assembly is performed.
[0004] The general procedure is as follows: 1. Determine the center of the tank and fluidized bed structure by referring to the air inlet pipes on both sides of the tank and the unloading port, and mark the lines. Assemble and weld the air duct support plate, baffle, air duct bottom plate, spine plate and other components in sequence according to the marked lines; 2. Assemble the baffle, support plate, bottom plate, end plate and other components in sequence according to the operation sequence; 3. Mark the dimensions and positions of the side plates after assembly according to the design drawings, and assemble each side plate component in the order of material cutting; 4. Assemble and weld the permeable cloth support structure and permeable cloth mounting base plate from both sides of the tank towards the center; 5. Install the permeable cloth.
[0005] The shortcomings of the existing technical solution are as follows: 1. Due to the multi-segment cutting and blanking of each component, the blanking accuracy tolerance is basically ±2mm, resulting in large length deviations and mismatches after component splicing and welding, which has a significant impact on the overall size and shape of the fluidized bed; 2. Due to the certain welding deformation at the splicing position of the spine support structure components, the subsequent assembly of the air duct and side plate structure based on the side of the spine support plate is very likely to cause problems such as large deviations in the overall symmetry of the fluidized bed and the angle of the side plates; 3. Due to the large amount of welding work such as segmented splicing and welding in the limited space of the tank, the labor intensity of the operators is high and the working environment is deteriorated. Summary of the Invention
[0006] The purpose of this invention is to provide a fluidized bed welding process for railway cement tank cars, which can solve the quality problems caused by a large number of welding operations such as segmented splicing and welding within the limited space of the tank body. The labor intensity of operators is relatively low, the assembly accuracy of parts is high, the product quality can be significantly improved, the working environment is improved, and the production efficiency is increased.
[0007] The fluidized bed welding process for railway cement tank cars includes the following steps:
[0008] Step (1): The overall fluidized bed structure is cut into three parts: two end fluidized bed components and one middle fluidized bed component. The end fluidized bed components are assembled in the half tank before the tank body is closed, and the middle fluidized bed component is assembled in the tank body after the tank body is closed.
[0009] Step (2): Before assembling the fluidized bed at the end of the half tank, place the half tank on the support fixture and use a support rod to connect and support it at the center of the opening diameter of the half tank to control the roundness and shape of the half tank.
[0010] Step (3): When assembling the spine, use the pre-reserved sample punch hole in the half-can as the longitudinal reference and the center of the tank body, i.e. the edge of the half-can plate, as the reference for the transverse positioning. Then assemble the support plate, bottom plate and spine in sequence.
[0011] Step (4): When assembling the air duct, mark the position with the center of the tank body, i.e. the edge of the half tank plate, as the reference, and assemble the air duct support plate, side plate support plate, air duct bottom plate and end plate in sequence.
[0012] Step (5): When assembling the side plate structure, first assemble the side plate support structure, and then assemble the side plate assembly. Draw the alignment reference line for each side plate support plate assembly with the tank center, i.e., the edge of the half tank plate as the reference. According to the reference, assemble each layer of side plate support plates and connecting angle steel in sequence from the tank center to the head direction. When assembling the side plate assembly, first assemble the first side plate closest to the tank center, and then assemble the other side plates in sequence with it as the reference.
[0013] Step (6): After the side plate structure is assembled, assemble the permeable cloth support plate and connecting angle steel in sequence from the head to the center of the tank, and assemble the permeable cloth installation base plate.
[0014] Step (7): After the fluidized bed assembly at the end of the half-tank is completed, the first and second half-tank assemblies are joined together to form the tank body assembly. The middle fluidized bed assembly is then performed inside the tank body. The middle fluidized bed assembly is positioned and assembled with the center of the tank body as the reference.
[0015] Step (8): After the fluidized bed steel structure is assembled, the breathable cloth is installed.
[0016] Preferably, after the breathable fabric is installed, a wind test is conducted using an anemometer, and any areas that are not properly sealed are sealed with silicone sealant.
[0017] Compared with the prior art, the present invention has the following advantages:
[0018] It can solve the quality problems caused by a large number of welding operations such as segmented splicing and welding in the limited space of the tank. The labor intensity of operators is relatively small, the splicing and assembly accuracy of parts is high, the product quality can be significantly improved, the working environment can be improved, and the production efficiency can be increased. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 This is a front view of the overall structure of the fluidized bed of the present invention;
[0021] Figure 2 This is a top view of the overall structure of the fluidized bed of the present invention;
[0022] Figure 3 This is a front view of the spine of the present invention;
[0023] Figure 4 This is a top view of the spine of the present invention;
[0024] In the diagram: 1-Back support plate, 2-Back base plate, 3-Spine, 4-Side support plate, 5-Side support plate A, 6-Side support plate B, 7-Side support plate C, 8-Side support plate D, 9-Side support component, 10-Breathable fabric support component, 11-Breathable fabric mounting base plate, 12-Breathable fabric. Detailed Implementation
[0025] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0026] Example 1
[0027] exist Figures 1 to 4 In the schematic diagram of the present invention shown, a segmented cutting method is adopted when cutting the parts, wherein the spine and spine support plate are cut in 2 segments, the side plate is cut in 6 segments, the side plate support plate is cut in 2 segments, and the breathable fabric support structure is cut in 3 segments.
[0028] The fluidized bed welding process for railway cement tank cars includes the following steps:
[0029] Step (1): The overall fluidized bed structure is cut into three parts: two end fluidized bed components and one middle fluidized bed component. The end fluidized bed components are assembled in the half tank before the tank body is closed, and the middle fluidized bed component is assembled in the tank body after the tank body is closed.
[0030] Step (2): Before assembling the fluidized bed at the end of the half tank, place the half tank body on the support fixture according to position 1 and 2, and use a support rod to connect and support at the center of the opening diameter of the half tank to control the roundness and shape of the half tank and ensure that the outer diameter of the tank body after support is 2985±2mm.
[0031] Step (3): When assembling the spine, mark the longitudinal center line of the tank body by punching holes according to the half-tank pre-reserved sample. Mark the spine support plate, i.e. the outer assembly reference line, based on the center line. Mark the spine bottom plate end assembly reference line and the spine end assembly reference line based on the tank body transverse center, i.e. the half-tank plate edge. The spine bottom plate end reference line is 1043mm from the center, and the spine end reference line is 825mm from the center. Assemble the two sides of the spine support plate 1 from the head towards the center of the tank body according to the marked lines. Assemble the spine bottom plate 2 and the spine 3 in sequence from the center of the tank body towards the head.
[0032] Step (4): When assembling the air duct, take the horizontal center of the tank body, i.e. the edge of the half tank plate, as the reference, draw the alignment reference line of the four ends of the side plate support plate. The reference line is 1008mm away from the center. Assemble the two side plate support plates from the center of the tank body towards the head according to the reference. Assemble the bottom plate and end plate of the air duct from the head towards the center of the tank body.
[0033] Step (5): When assembling the side plate support structure, take the transverse center of the tank body, i.e., the edge of the half-tank plate, as the reference, and draw the end alignment reference lines of the side plate support plate A5, side plate support plate B6, and side plate support plate C7 respectively. The end alignment reference line of side plate support plate A is 963mm from the center, the end alignment reference line of side plate support plate B is 913mm from the center, and the end alignment reference line of side plate support plate C is 849mm from the center. Use a template to connect the side plate support plate D8 to the tank plate. After ensuring that the plane and slope of each side plate support plate and each connecting angle steel support are on the same plane, assemble each layer of side plate support plates and connecting angle steel in sequence from the center of the tank body to the head direction according to the reference. When assembling the side plates, draw the connection line between the template used to assemble the side plate support 9 and the tank plate as the reference for the upper edge of the side plate. Draw the upper alignment reference line of the tank plate on the extension line of the connection line to the center of the tank body. Use this reference line as the reference to assemble each side plate in sequence from the center of the tank body to the head direction.
[0034] Step (6): When assembling the breathable cloth support 10, assemble the breathable cloth support plate and connecting angle steel in sequence from the end cap to the center of the tank, and assemble the breathable cloth mounting base plate 11 in sequence.
[0035] Step (7): After the fluidized bed assembly at the end of the half-tank is completed, the first and second half-tank assemblies are joined together to form the tank body assembly. The middle fluidized bed assembly is then performed inside the tank body. The middle fluidized bed assembly is positioned and assembled with the center of the tank body as the reference.
[0036] Step (8): When installing the breathable cloth, first pre-drill 8mm diameter round holes on the breathable cloth installation base plate, and then use self-drilling automatic screws to install the breathable cloth 12 onto the base plate through the breathable cloth pressure plate. After the breathable cloth is installed, use an anemometer to conduct a wind test. Apply silicone sealant to seal any areas that are not properly sealed.
[0037] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A fluidized bed welding process for railway cement tank cars, characterized in that: The steps are as follows: Step (1): The overall fluidized bed structure is cut into three parts: two end fluidized bed components and one middle fluidized bed component. The end fluidized bed components are assembled in the half tank before the tank body is closed, and the middle fluidized bed component is assembled in the tank body after the tank body is closed. Step (2): Before assembling the fluidized bed at the end of the half tank, place the half tank on the support fixture and use a support rod to connect and support it at the center of the opening diameter of the half tank to control the roundness and shape of the half tank. Step (3): When assembling the spine, use the pre-reserved sample punch hole in the half-can as the longitudinal reference and the center of the tank body, i.e. the edge of the half-can plate, as the reference for the transverse positioning. Then assemble the support plate, bottom plate and spine in sequence. Step (4): When assembling the air duct, mark the position with the center of the tank body, i.e. the edge of the half tank plate, as the reference, and assemble the air duct support plate, side plate support plate, air duct bottom plate and end plate in sequence. Step (5): When assembling the side plate structure, first assemble the side plate support structure, and then assemble the side plate assembly. Draw the alignment reference line for each side plate support plate assembly with the tank center, i.e., the edge of the half tank plate as the reference. According to the reference, assemble each layer of side plate support plates and connecting angle steel in sequence from the tank center to the head direction. When assembling the side plate assembly, first assemble the first side plate closest to the tank center, and then assemble the other side plates in sequence with it as the reference. Step (6): After the side plate structure is assembled, assemble the permeable cloth support plate and connecting angle steel in sequence from the head to the center of the tank, and assemble the permeable cloth installation base plate. Step (7): After the fluidized bed assembly at the end of the half-tank is completed, the first and second half-tank assemblies are joined together to form the tank body assembly. The middle fluidized bed assembly is then performed inside the tank body. The middle fluidized bed assembly is positioned and assembled with the center of the tank body as the reference. Step (8): After the fluidized bed steel structure is assembled, the breathable cloth is installed.
2. The fluidized bed welding process for railway cement tank cars according to claim 1, characterized in that: After the breathable fabric is installed, a wind test is conducted using an anemometer. Any areas that are not properly sealed are sealed with silicone sealant.