Cutting and welding production line and cutting and welding production method thereof

By designing a fully automatic cutting and welding production line, including multiple collaborative components, the problems of large space occupied, low production capacity and high human resources in the existing technology are solved, and efficient and automated welding production is achieved.

CN119703813AActive Publication Date: 2025-03-28扬州京柏自动化科技有限公司
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202510175031.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-18
Publication Date
2025-03-28
Estimated Expiration
2045-02-18

AI Technical Summary

Technical Problem

The existing cutting and welding production lines have problems such as large plant space, low production capacity and large human resources consumption.

Method used

A cutting and welding production line is designed, including a main tape loading assembly, a first and a second main tape welding assembly, a roll-to-roll waste cutting assembly, a thrust test assembly, an L-shaped piece welding assembly, an L-shaped piece breaking assembly and an L-shaped piece loading mechanism, and fully automatic welding is achieved through the coordinated work of these components.

Benefits of technology

Fully automatic welding is realized, welding efficiency is improved, human resource consumption is reduced, and production automation is improved through automatic material discharge and waste collection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119703813A_ABST
    Figure CN119703813A_ABST
Patent Text Reader

Abstract

The invention discloses a cutting and welding production line and a cutting and welding production method thereof. Comprising a main material belt feeding assembly, a first main material belt welding assembly, a second main material belt welding assembly and a roll-to-roll waste cutting assembly which are sequentially arranged in the moving direction of a material belt, wherein the first main material belt welding assembly is used for welding parts to a front-section product of the main material belt; the second main material belt welding assembly is used for welding the parts to a rear-section product of the main material belt; the roll-to-roll waste cutting assembly is used for removing waste on the material belt; the first thrust testing assembly is used for carrying out thrust testing on the welded assembly; the first L-shaped welding assembly and the second L-shaped welding assembly are used for welding an L-shaped part on a main material; the L-shaped part breaking assembly is used for breaking off a waste connecting end of the L-shaped part; the second thrust testing assembly is used for detecting the welding firmness of the L-shaped part; and the L-shaped piece feeding mechanism is arranged on one side of the first L-shaped welding assembly and one side of the second L-shaped welding assembly, full-automatic welding of products can be achieved through the structure, and then the whole welding efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of cutting and welding, and in particular to a cutting and welding production line and a cutting and welding production method thereof. Background Art

[0002] The button clip is made by stacking and welding multiple layers of products. Each layer of structure to be welded is very small, so cutting, welding and other operations are required in the whole process. After welding, in order to ensure the firmness of the welding, the welding force test is required. At present, the above operations are completed by multiple semi-automatic equipment, and each device requires manual operation and control. Therefore, it has the disadvantages of occupying large factory space, low production capacity, and high consumption of human resources. Summary of the invention

[0003] The technical problem solved by the invention is to provide a cutting and welding production line and a cutting and welding production method thereof for improving productivity.

[0004] The technical solution adopted by the present invention to solve its technical problem is: a cutting and welding production line, including a main material belt feeding assembly arranged in sequence along the moving direction of the material belt, a first main material belt welding assembly for welding parts to the front end products of the main material belt, a second main material belt welding assembly for welding parts to the rear end products of the main material belt, a roll-to-roll waste material cutting assembly for removing waste materials on the material belt, a first thrust testing assembly for performing thrust testing on the welded assembly, a first L-shaped welding assembly and a second L-shaped welding assembly for welding L-shaped parts to the main material, an L-shaped part breaking assembly for breaking off the waste material connection end of the L-shaped part, and a second thrust testing assembly for detecting the welding firmness of the L-shaped part;

[0005] It also includes an L-shaped member feeding mechanism disposed on one side of the first L-shaped welding assembly and the second L-shaped welding assembly;

[0006] The L-shaped piece feeding mechanism comprises an L-shaped piece feeding assembly, an L-shaped piece cutting assembly and a dividing mechanism which divides the L-shaped piece cut by the L-shaped piece into a first L-shaped welding assembly and a second L-shaped welding assembly respectively.

[0007] Furthermore, the main material belt loading assembly and the L-shaped piece loading assembly both include a material tray and a material tray driving motor for driving the material tray to rotate, a material channel is provided on one side of the material tray, a grounding wire sensing rod is provided on the material channel, when there is no electrical signal from the grounding wire sensing rod, the material tray rotates to discharge the material, a waste roll rod collecting rack is provided on one side of the material tray, a winding rod is provided on the waste roll rod collecting rack, a spring is provided between the winding rod and the waste roll rod collecting rack, so that the waste paper on the winding rod can abut against the upper material tray or the lower material tray.

[0008] Furthermore, the first main material strip welding assembly and the second main material strip welding assembly both include a first welding frame, a first main flow channel plate for the main material channel to pass through is provided in the first welding frame, a first lower pressure block mounting plate and a first lifting drive cylinder for driving the first lower pressure block mounting plate to perform lifting movement are provided below the first main flow channel plate, a first upper pressure block mounting plate is provided above the first main flow channel plate, a second lifting drive cylinder for driving the first upper pressure block mounting plate to perform lifting movement is provided below the first lifting drive cylinder, a first lower pressure block is provided at the bottom of the first upper pressure block mounting plate, a first upper pressure block cooperating with the first lower pressure block is provided on the upper surface of the first lower pressure block mounting plate, a retractable first part positioning pin is provided on the upper surface of the first lower pressure block mounting plate, a third lifting drive cylinder for driving the first part positioning pin to extend out of the upper surface of the first lower pressure block mounting plate is provided at the bottom of the first lower pressure block mounting plate, a first material strip positioning pin for positioning the material strip is also provided on the first lower pressure block mounting plate, a notch is provided on the first upper pressure block mounting plate to expose the product welding point, and a first laser welding assembly for welding is provided above the first upper pressure block mounting plate.

[0009] Furthermore, it also includes a precision positioning pin arranged below the first upper pressure block mounting plate, and a pin hole matching with the precision positioning pin is arranged on the first lower pressure block mounting plate. When the first upper pressure block mounting plate moves downward and the first lower pressure block mounting plate moves upward, the precision positioning pin passes through the main channel plate and extends into the pin hole. A detection block is arranged on one side of the first upper pressure plate mounting plate, and a sensor mounting block is arranged on one side of the lower pressure plate mounting plate, and a displacement detection sensor is arranged on the sensor mounting block.

[0010] Furthermore, the roll-to-roll waste cutting assembly and the L-shaped piece cutting assembly both include a cutting frame, the cutting frame is provided with a lower mold and an upper mold located above the lower mold, a first electric cylinder for driving the upper mold to move downward is provided above the upper mold, and a cutter for cutting off the connection end between the product and the waste is provided at the lower end of the upper mold;

[0011] The bottom end of the cutting machine frame is also provided with a waste discharge mechanism for collecting waste.

[0012] Furthermore, the first thrust test assembly and the second thrust test assembly both include a thrust detection frame, an elastic upper pressure block is arranged on the thrust detection frame, a support plate is arranged below the elastic upper pressure block, the support plate is provided with avoidance grooves corresponding one to one with the products, a plurality of detection rods corresponding one to one with the avoidance grooves are arranged on one side of the support plate, a driving rod is arranged on the side of the detection rod away from the support plate, and also includes a second electric cylinder for driving the driving rod to make horizontal movement, a force detection sensor is arranged between the driving rod and the detection rod, and also includes a fourth lifting drive cylinder for driving the elastic upper pressure block to press downward and a fifth lifting drive cylinder for driving the support plate to make lifting movement.

[0013] Furthermore, the first L-shaped welding assembly and the second L-shaped welding assembly both include a second welding frame, a second main flow channel plate for the main material channel to pass through is provided in the second welding frame, a second lower pressure block mounting plate and a sixth lifting drive cylinder for driving the second lower pressure block mounting plate to perform lifting movement are provided below the second main flow channel plate, a second upper pressure block mounting plate is provided above the second main flow channel plate, a seventh lifting drive cylinder for driving the second upper pressure block mounting plate to perform lifting movement is provided above the second lifting drive cylinder, a second lower pressure block is provided at the bottom of the second upper pressure block mounting plate, a second upper pressure block cooperating with the second lower pressure block is provided on the upper surface of the second lower pressure block mounting plate, a second part positioning pin for positioning the L-shaped part is provided on the upper surface of the second lower pressure block mounting plate, a second material strip positioning pin for positioning the material strip is also provided on the second lower pressure block mounting plate, and a second laser welding assembly for welding and a smoke extraction assembly for extracting smoke are provided below the second lower pressure block mounting plate;

[0014] The second lower pressing block mounting plate is provided with a welding notch at the L-shaped piece welding position, and the bottom surface of the second lower pressing block mounting plate is provided with a trumpet-shaped groove converging toward the welding notch at the welding notch.

[0015] Furthermore, the L-shaped piece breaking assembly includes a breaking frame, a third main flow channel plate is arranged in the breaking frame, a third upper pressure block mounting plate and an eighth lifting drive cylinder driving the third upper pressure block mounting plate to perform lifting movement are arranged above the third main flow channel plate, a third lower pressure block mounting plate and a thirteenth lifting drive cylinder driving the third lower pressure block mounting plate to perform lifting movement are arranged below the third main flow channel plate, a third upper pressure block is arranged at the lower part of the third upper pressure block mounting plate, a third lower pressure block cooperating with the third upper pressure block is arranged on the upper surface of the third lower pressure block mounting plate, and the breaking drive plate also includes a breaking drive plate and a ninth lifting drive cylinder driving the breaking drive plate to perform lifting movement, an upper ejector pin for abutting the upper surface of the breaking part and a lower ejector pin for abutting the lower surface of the breaking part are respectively arranged on the breaking drive plate, and a tenth lifting drive cylinder for driving the upper ejector pin to perform lifting movement and an eleventh lifting drive cylinder for driving the lower ejector pin to perform lifting movement are also arranged on the breaking drive plate.

[0016] Furthermore, the material dividing mechanism includes a material receiving assembly, both sides of which are provided with a rotating assembly and a distance conveying assembly for conveying the L-shaped piece on the material receiving assembly to the rotating assembly, and one side of the first L-shaped welding assembly and the second L-shaped welding assembly are respectively provided with a suction cup conveying assembly for conveying the L-shaped piece on the rotating assembly to the first L-shaped welding assembly and the second L-shaped welding assembly;

[0017] The material receiving assembly includes a material receiving bottom plate, a twelfth lifting drive cylinder driving the material receiving bottom plate to perform lifting movement, and a first horizontal drive module driving the material receiving bottom plate to move to the distance conveying assembly, a first material placing rod and a second material placing rod are arranged on the material receiving bottom plate, a guide rod is arranged between the second material placing rod and the first material placing rod, a first horizontal drive cylinder driving the second material placing rod to move relative to the first material placing rod is arranged on the side of the second material placing rod away from the first material placing rod, a plurality of material receiving rods are arranged at intervals on the first material placing rod and the second material placing rod, and a second positioning pin is arranged on the surface of the material receiving rod;

[0018] The rotating assembly includes a second horizontal driving module, and a rotating module is provided at the driving end of the second horizontal driving module; the rotating module includes a rotating mounting plate, a suction cup fixing plate is provided in the middle of the bottom of the rotating mounting plate, and side plates horizontally slidingly connected to the rotating mounting plate are respectively provided on both sides of the suction cup fixing plate, and also includes a plurality of connecting rods, one end of the connecting rod is rotatably connected to the side plate, and the other end of the connecting rod is rotatably connected to the suction cup fixing plate, one end of the connecting rod is located below the suction cup fixing plate and is provided with a suction cup for sucking products, and one side of the end of the side plate is provided with a side plate driving cylinder for driving the side plate to make horizontal movement.

[0019] The present invention also discloses a cutting and welding production method, which adopts the cutting and welding production line described above, and the steps are as follows:

[0020] S100: the main material belt loading assembly discharges the material, so that the main material belt moves into the first main material belt welding assembly and the second main material belt welding assembly in sequence;

[0021] S200: The external transport component transports the parts to be welded to the first main material strip welding component and the second main material strip welding component for welding operations, and then the products continue to be transported to the roll-to-roll scrap cutting component;

[0022] S300: The roll-to-roll waste cutting assembly removes waste from the material belt, and then the product continues to be transported to the first thrust testing assembly;

[0023] S400: The elastic upper pressing block in the first thrust test assembly presses the main material product, and the detection rod pushes the part product. The thrust data of the force detection sensor is used to detect whether the upper layer product and the lower layer product are welded firmly. After the detection is completed, the product is conveyed to the first L-shaped welding assembly and the second L-shaped welding assembly;

[0024] S500: The L-shaped piece feeding mechanism divides the L-shaped piece into the first L-shaped welding assembly and the second L-shaped welding assembly respectively, and the main material and the L-shaped piece are welded together by the first L-shaped welding assembly and the second L-shaped welding assembly. After the welding is completed, the product is conveyed to the L-shaped piece breaking assembly;

[0025] S600: The L-shaped piece breaking component breaks off the end waste of the L-shaped piece. After the breaking is completed, the product continues to be conveyed to the second thrust testing component;

[0026] S700: The elastic upper pressure block in the second thrust test assembly presses the main material product, and the detection rod pushes the L-shaped part. The thrust data of the force detection sensor is used to detect whether the upper and lower products are welded firmly, completing the production of the entire product.

[0027] The beneficial effects of the present invention are:

[0028] 1. In this structure, by using the main material belt feeding assembly, the first main material belt welding assembly, the second main material belt welding assembly, the roll-to-roll waste cutting assembly, the first thrust test assembly, the first L-shaped welding assembly, the second L-shaped welding assembly, the L-shaped piece breaking assembly, the second thrust test assembly and the L-shaped piece feeding mechanism, the fully automatic welding of the product can be realized, thereby improving the overall welding efficiency.

[0029] 2. In this structure, the setting of the grounding wire induction rod can realize automatic material discharge operation, reducing the situation of too much or too little material tape. At the same time, the automatic collection of waste materials can be realized through the setting of the winding rod.

[0030] 3. In this structure, by setting up the thrust detection component, it is possible to push the lower layer product while pressing the upper layer product, and then detect the welding firmness through thrust detection.

[0031] 4. In this structure, when welding the L-shaped parts, the welding is performed from bottom to top by inverted welding, thereby reducing the steps of product flipping and ensuring the accuracy of welding. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a structural schematic diagram of a cutting and welding production line according to an embodiment of the present application.

[0033] Figure 2 It is a schematic structural diagram of the main material strip feeding assembly and the L-shaped piece feeding assembly of the cutting and welding production line according to an embodiment of the present application.

[0034] Figure 3 This is a schematic structural diagram of a first main material strip welding assembly and a second main material strip welding assembly for a cutting and welding production line according to an embodiment of the present application.

[0035] Figure 4 for Figure 3 A in the figure is an enlarged structural diagram.

[0036] Figure 5 It is a schematic structural diagram of a roll-to-roll waste cutting assembly of a cutting and welding production line according to an embodiment of the present application.

[0037] Figure 6 It is a structural schematic diagram of the first thrust test assembly and the second thrust test assembly of the cutting and welding production line of an embodiment of the present application.

[0038] Figure 7 This is a structural schematic diagram from another perspective of the first thrust test assembly and the second thrust test assembly of the cutting and welding production line of an embodiment of the present application.

[0039] Figure 8 It is a schematic structural diagram of a first L-shaped welding assembly and a second L-shaped welding assembly of a cutting and welding production line according to an embodiment of the present application.

[0040] Fig. 9 This is a schematic structural diagram of the second lower pressing block mounting plate in the first L-shaped welding assembly and the second L-shaped welding assembly of the cutting and welding production line according to an embodiment of the present application.

[0041] Fig.10 This is a schematic structural diagram of an L-shaped piece breaking assembly of a cutting and welding production line according to an embodiment of the present application.

[0042] Fig.11 It is a schematic structural diagram of the material receiving assembly of the cutting and welding production line according to an embodiment of the present application.

[0043] Fig.12 It is a schematic structural diagram of a rotating assembly of a cutting and welding production line according to an embodiment of the present application.

[0044] The markings in the figure are:

[0045] Main material belt feeding assembly 1, material tray 101, material channel 102, grounding wire induction rod 103, winding rod 104;

[0046] First main material strip welding assembly 2, first main runner plate 201, first lower pressing block mounting plate 202, first lifting drive cylinder 203, first upper pressing block mounting plate 204, second lifting drive cylinder 205, first part positioning pin 206, third lifting drive cylinder 207, first material strip positioning pin 208, first laser welding assembly 209, precision positioning pin 210, displacement detection sensor 211, second main material strip welding assembly 3;

[0047] Roll-to-roll waste cutting assembly 4, lower mold 401, upper mold 402, first electric cylinder 403, waste discharge mechanism 404,

[0048] The first thrust test assembly 5, the elastic upper pressing block 501, the support plate 502, the avoidance slot 503, the detection rod 504, the second electric cylinder 505, the force detection sensor 506, the fourth lifting drive cylinder 507, and the fifth lifting drive cylinder 508;

[0049] The first L-shaped welding assembly 6, the second main flow channel plate 601, the second lower pressing block mounting plate 602, the sixth lifting drive cylinder 603, the second upper pressing block mounting plate 604, the seventh lifting drive cylinder 605, the second part positioning needle 606, the second material belt positioning needle 607, the second laser welding assembly 608, the smoke extraction assembly 609, the trumpet-shaped groove 610, and the second L-shaped welding assembly 7;

[0050] L-shaped piece breaking assembly 8, third main flow channel plate 801, third upper pressing block 802, eighth lifting drive cylinder 803, third lower pressing block 804, thirteenth lifting drive cylinder 805, ninth lifting drive cylinder 806, upper ejector pin 807, lower ejector pin 808, tenth lifting drive cylinder 809, eleventh lifting drive cylinder 810;

[0051] A second thrust test assembly 9;

[0052] L-shaped part feeding mechanism 10, L-shaped part feeding assembly 110, L-shaped part cutting assembly 120, material dividing mechanism 130, material receiving bottom plate 1301, twelfth lifting drive cylinder 1302, first horizontal drive module 1303, first material placing rod 1304, second material placing rod 1305, first horizontal drive cylinder 1307, material receiving rod 1308, second positioning pin 1309, second horizontal drive module 1310, rotating mounting plate 1311, suction cup fixing plate 1312, side plate 1313, connecting rod 1314, suction cup 1315, side plate driving cylinder 1316. DETAILED DESCRIPTION

[0053] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0054] like Figure 1 As shown, the embodiment of the present application discloses a cutting and welding production line, comprising a main material belt feeding assembly 1 arranged in sequence along the moving direction of the material belt, a first main material belt welding assembly 2 for welding parts to the front end product of the main material belt, a second main material belt welding assembly 3 for welding parts to the rear end product of the main material belt, a roll-to-roll waste material cutting assembly 4 for removing waste materials on the material belt, a first thrust testing assembly 5 for performing thrust testing on the welded assembly, a first L-shaped welding assembly 6 and a second L-shaped welding assembly 7 for welding an L-shaped piece to the main material, an L-shaped piece breaking assembly 8 for breaking off the waste material connection end of the L-shaped piece, and a second thrust testing assembly 9 for detecting the welding firmness of the L-shaped piece;

[0055] It also includes an L-shaped member feeding mechanism 10 disposed on one side of the first L-shaped welding assembly 6 and the second L-shaped welding assembly 7;

[0056] The L-shaped piece feeding mechanism 10 includes an L-shaped piece feeding assembly 110, an L-shaped piece cutting assembly 120, and a dividing mechanism 130 which divides the L-shaped pieces cut by the L-shaped pieces into the first L-shaped welding assembly 6 and the second L-shaped welding assembly 7 respectively.

[0057] During the specific operation, the main material belt loading component 1 discharges the material, so that the main material belt moves to the first main material belt welding component 2 and the second main material belt welding component 3 in sequence. Then, the external transport component transports the parts to be welded to the first main material belt welding component 2 and the second main material belt welding component 3 for welding operations. Then the product continues to be transported to the roll-to-roll waste cutting component 4, and the roll-to-roll waste cutting component 4 removes the waste on the material belt. Then the product continues to be transported to the first thrust testing component 5, and the first thrust testing component 5 detects whether the upper layer product and the lower layer product are welded firmly. After the detection is completed, the product is transported to The first L-shaped welding component 6 and the second L-shaped welding component 7, the L-shaped part feeding mechanism 10 divides the L-shaped parts into the first L-shaped welding component 6 and the second L-shaped welding component 7 respectively, the main material and the L-shaped parts are welded together by the first L-shaped welding component 6 and the second L-shaped welding component 7, after the welding is completed, the product is conveyed to the L-shaped part breaking component 8, the L-shaped part breaking component 8 breaks the end waste of the L-shaped part, after the breaking is completed, the product continues to be conveyed to the second thrust testing component 9, the second thrust testing component 9 detects whether the upper layer product and the lower layer product are firmly welded, and completes the production of the entire product.

[0058] In this structure, through the coordinated use of the main material strip feeding assembly 1, the first main material strip welding assembly 2, the second main material strip welding assembly 3, the roll-to-roll waste cutting assembly 4, the first thrust testing assembly 5, the first L-shaped welding assembly 6, the second L-shaped welding assembly 7, the L-shaped piece breaking assembly 8, the second thrust testing assembly 9 and the L-shaped piece feeding mechanism 10, full-automatic welding of the product can be achieved, thereby improving the overall welding efficiency.

[0059] In this embodiment, the main material belt loading assembly 1 and the L-shaped piece loading assembly 110 both include a material tray 101 and a material tray driving motor for driving the material tray 101 to rotate, a material channel 102 is provided on one side of the material tray 101, a grounding wire sensing rod 103 is provided on the material channel 102, when there is no electrical signal from the grounding wire sensing rod 103, the material tray 101 rotates to discharge the material, a waste roll rod collecting rack is provided on one side of the material tray 101, a winding rod 104 is provided on the waste roll rod collecting rack, a spring is provided between the winding rod 104 and the waste roll rod collecting rack, so that the waste paper on the winding rod 104 can abut against the material tray.

[0060] It should be explained that current will be given to the material channel 102 and the grounding sensor rod 103. When the material strip in the material channel 102 contacts the grounding sensor rod 103, the material channel 102, the grounding sensor rod 103 and the material strip will form a loop to generate current.

[0061] Specifically, during operation, the material belt is installed in the material tray 101, and the material tray driving motor drives the material tray 101 to rotate and discharge the material. During normal material discharge, the material belt will not contact the grounding wire sensing rod 103, and the grounding wire sensing rod 103 has no electrical signal, and the material tray driving motor continues to work. When the material discharge is too long, the material belt will jump up and contact the grounding wire sensing rod 103, and the grounding wire sensing rod 103 will generate current. At this time, the material tray driving motor stops working and waits for the grounding wire sensing rod 103 to have no current before continuing to work. At the same time, during the material discharge process, there is a layer of waste paper on one side of the material belt, and the waste paper will be wound around the winding rod 104. Under the action of the spring, the waste paper on the winding rod 104 will always be in contact with the material tray 101. Under the action of friction, the rotation of the material tray 101 will drive the winding rod 104 to rotate together, so that the winding rod 104 can realize the winding of the waste paper.

[0062] In this structure, the grounding wire induction rod 103 is provided to realize automatic material discharge operation, thereby reducing the situation where the material strip is discharged too much or too little. At the same time, the winding rod 104 is provided to realize automatic collection of waste materials.

[0063] In this embodiment, the first main material strip welding assembly 2 and the second main material strip welding assembly 3 both include a first welding frame, in which a first main flow channel plate 201 for the main material channel 102 to pass through is provided, a first lower pressure block mounting plate 202 and a first lifting drive cylinder 203 for driving the first lower pressure block mounting plate 202 to perform lifting movement are provided below the first main flow channel plate 201, a first upper pressure block mounting plate 204 is provided above the first main flow channel plate 201, a second lifting drive cylinder 205 for driving the first upper pressure block mounting plate 204 to perform lifting movement is provided below the first lifting drive cylinder 203, and a first lower pressure block is provided at the bottom of the first upper pressure block mounting plate 204. The upper surface of the first lower pressure block mounting plate 202 is provided with a first upper pressure block that cooperates with the first lower pressure block, and the upper surface of the first lower pressure block mounting plate 202 is provided with a retractable first part positioning needle 206. The bottom end of the first part positioning needle 206 is provided with a third lifting drive cylinder 207 for driving the first part positioning needle 206 to extend out of the upper surface of the first lower pressure block mounting plate 202. The first lower pressure block mounting plate 202 is also provided with a first material strip positioning needle 208 for positioning the material strip. A notch is opened on the first upper pressure block mounting plate 204 to expose the product welding point, and a first laser welding component 209 for welding is arranged above the first upper pressure block mounting plate 204.

[0064] Specifically, during operation, the main material belt moves to the first main flow channel plate 201, the first part positioning pin 206 is in an extended state, the part is transported to the first lower pressure block mounting plate 202 by an external mechanism, and is positioned by the first part positioning pin 206, then the first lifting drive cylinder 203 drives the first lower pressure block mounting plate 202 to rise, and the second lifting drive cylinder 205 drives the first upper pressure block mounting plate 204 to descend, so that the part and the main material belt are pressed together, and the main material belt is positioned by the first material belt positioning pin 208. At this time, the main material belt and the part are pressed by the first upper pressure block and the first lower pressure block, and the first laser welding assembly 209 welds the main material belt and the part. After welding is completed, the third lifting drive cylinder 207 first drives the first part positioning pin 206 to descend, so that the first part positioning pin 206 exits the product, and then the first lifting drive cylinder 203 drives the first lower pressure block mounting plate 202 to descend, and the second lifting drive cylinder 205 drives the first upper pressure block mounting plate 204 to rise, and the product continues to flow to the next workstation.

[0065] The arrangement of the above structure can realize precise positioning of the main material strip and parts during welding. At the same time, after welding is completed, the third lifting drive cylinder 207 first drives the first part positioning needle 206 to descend, thereby preventing the first part positioning needle 206 from pulling the product skewed when the first lower pressure block mounting plate 202 descends, thereby ensuring the product yield.

[0066] In this embodiment, it also includes a precision positioning pin 210 arranged below the first upper pressure block mounting plate 204, and the first lower pressure block mounting plate 202 is provided with a pin hole that cooperates with the precision positioning pin 210. When the first upper pressure block mounting plate 204 moves downward and the first lower pressure block mounting plate 202 moves upward, the precision positioning pin 210 passes through the main channel plate and extends into the pin hole. A detection block is provided on one side of the first upper pressure plate mounting plate, and a sensor mounting block is provided on one side of the lower pressure plate mounting plate, and a displacement detection sensor 211 is provided on the sensor mounting block.

[0067] Specifically, when the first upper pressure block mounting plate 204 and the first lower pressure block mounting plate 202 move toward each other, the precision positioning pin 210 can be inserted into the pin hole, thereby ensuring the position of the first upper pressure block mounting plate 204 and the first lower pressure block mounting plate 202. At the same time, during the movement, the displacement detection sensor 211 can detect the distance between the first upper pressure block mounting plate 204 and the first lower pressure block mounting plate 202. When the detected distance position is inaccurate, it means that the material tape may be stuck at this time, and the material tape needs to be inspected to ensure the yield rate of subsequent product production.

[0068] In this embodiment, the roll-to-roll waste cutting assembly 4 and the L-shaped piece cutting assembly 120 both include a cutting frame, on which a lower mold 401 and an upper mold 402 located above the lower mold 401 are disposed, a first electric cylinder 403 for driving the upper mold 402 to move downward is disposed above the upper mold 402, and a cutter for cutting off the connection end between the product and the waste is disposed at the lower end of the upper mold 402;

[0069] A waste discharge mechanism 404 for collecting waste is also provided at the bottom end of the cutting frame.

[0070] Specifically, when the cutting operation is performed, when the main material channel 102 moves to between the lower mold 401 and the upper mold 402, the first electric cylinder 403 drives the upper mold 402 to move downward, and the cutter under the upper mold 402 cuts off the connection between the product and the waste, and the cut waste is discharged through the waste discharge mechanism 404.

[0071] It should be explained that the waste discharge mechanism 404 described above can be a reel, the waste belt is rolled onto the reel in advance, and the waste is reeled by the reel. The above structure can also be designed as a waste discharge pipe, and the waste is sucked away by the waste discharge pipe.

[0072] In this embodiment, the first thrust test assembly 5 and the second thrust test assembly 9 both include a thrust detection frame, an elastic upper pressure block 501 is provided on the thrust detection frame, a support plate 502 is provided below the elastic upper pressure block 501, and the support plate 502 is provided with avoidance grooves 503 corresponding to the products one by one, a plurality of detection rods 504 corresponding to the avoidance grooves 503 are provided on one side of the support plate 502, a driving rod is provided on the side of the detection rod 504 away from the support plate 502, and also includes a second electric cylinder 505 for driving the driving rod to make horizontal movement, a force detection sensor 506 is provided between the driving rod and the detection rod 504, and also includes a fourth lifting drive cylinder 507 for driving the elastic upper pressure block 501 to press downward and a fifth lifting drive cylinder 508 for driving the support plate 502 to make lifting movement.

[0073] During the specific inspection, the product is supported by the support plate 502 from below, and the elastic upper pressure block 501 descends. Under the action of the fourth lifting drive cylinder 507 and the fifth lifting drive cylinder 508, the upper product is pressed between the elastic lower pressure block and the support plate 502. Then the second electric cylinder 505 drives the detection rod 504 to extend into the avoidance groove 503 and contact with the lower parts, and exert pressure on the lower parts. At this time, the detection sensor can detect the thrust at this time, and judge whether the main product and the parts product are firmly welded by the size of the thrust.

[0074] In this structure, by setting up the thrust test assembly, it is possible to push the lower layer parts product while pressing the main product, and then to detect the welding firmness through thrust detection.

[0075] In this embodiment, the first L-shaped welding assembly 6 and the second L-shaped welding assembly 7 both include a second welding frame, in which a second main flow channel plate 601 for the main material channel 102 to pass through is provided, a second lower pressing block mounting plate 602 and a sixth lifting drive cylinder 603 for driving the second lower pressing block mounting plate 602 to perform lifting movement are provided below the second main flow channel plate 601, a second upper pressing block mounting plate 604 is provided above the second main flow channel plate 601, and a sixth lifting drive cylinder 605 for driving the second upper pressing block mounting plate 604 to perform lifting movement is provided above the second lifting drive cylinder 205. The seventh lifting drive cylinder 605, the second upper pressing block mounting plate 604 is provided with a second lower pressing block at the bottom, the second lower pressing block mounting plate 602 is provided with a second upper pressing block matched with the second lower pressing block on the upper surface, the second lower pressing block mounting plate 602 is provided with a second part positioning pin 606 for positioning the L-shaped part on the upper surface, the second lower pressing block mounting plate 602 is also provided with a second material belt positioning pin 607 for positioning the material belt, and the second laser welding assembly 608 for welding and the smoke extraction assembly 609 for extracting smoke are provided below the second lower pressing block mounting plate 602;

[0076] The second lower pressing block mounting plate 602 is provided with a welding notch at the L-shaped welding position, and the bottom surface of the second lower pressing block mounting plate 602 is provided with a trumpet-shaped groove 610 that gathers toward the welding notch at the welding notch.

[0077] During specific operation, the main material belt flows to the second main channel plate 601, the second part positioning needle 606 is in an extended state, the L-shaped part is moved to the second lower pressure block mounting plate 602 by an external mechanism, and is positioned by the second part positioning needle 606, then the sixth lifting drive cylinder 603 drives the second lower pressure block mounting plate 602 to rise, and the seventh lifting drive cylinder 605 drives the first upper pressure block mounting plate 204 to descend, so that the L-shaped part and the main material belt are pressed together, and the main material belt is positioned by the first material belt positioning needle 208. At this time, the main material belt and the L-shaped part are pressed together by the second upper pressure block and the second lower pressure block, and the second laser welding assembly 608 welds the main material belt and the L-shaped part. After welding is completed, the second part positioning needle 606 descends, so that the second part positioning needle 606 exits the product, and then the sixth lifting drive cylinder 603 drives the second lower pressure block mounting plate 602 to descend, and the seventh lifting drive cylinder 605 drives the second upper pressure block mounting plate 604 to rise, and the product continues to flow to the next workstation.

[0078] The arrangement of the above-mentioned structure can realize precise positioning of the main material strip and the L-shaped part during welding. At the same time, since the bottom surface of the second lower pressure block mounting plate 602 is provided with a trumpet-shaped groove 610 that converges toward the welding notch at the welding notch, the laser line during welding can be avoided to prevent the laser line from damaging the second lower pressure block mounting plate 602, and it also facilitates the exhaust of smoke during welding.

[0079] In this embodiment, the L-shaped piece breaking component 8 includes a breaking frame, in which a third main flow channel plate 801 is arranged, a third upper pressure block 802 mounting plate and an eighth lifting drive cylinder 803 for driving the third upper pressure block 802 mounting plate to do lifting movement are arranged above the third main flow channel plate 801, a third lower pressure block 804 mounting plate and a thirteenth lifting drive cylinder 805 for driving the third lower pressure block 804 mounting plate to do lifting movement are arranged below the third main flow channel plate 801, a third upper pressure block 802 is arranged at the lower part of the third upper pressure block 802 mounting plate, and the third The upper surface of the lower pressing block 804 mounting plate is provided with a third lower pressing block 804 cooperating with the third upper pressing block 802, and the plate also includes a breaking drive plate and a ninth lifting drive cylinder 806 for driving the breaking drive plate to perform lifting motion, and the breaking drive plate is respectively provided with an upper ejector pin 807 for abutting the upper surface of the breaking part and a lower ejector pin 808 for abutting the lower surface of the breaking part, and the breaking drive plate is also provided with a tenth lifting drive cylinder 809 for driving the upper ejector pin 807 to perform lifting motion and an eleventh lifting drive cylinder 810 for driving the lower ejector pin 808 to perform lifting motion.

[0080] Specifically, when the main material belt moves to the third main flow channel plate 801, the eighth lifting drive cylinder 803 drives the third upper pressure block 802 mounting plate to descend, and the thirteenth lifting drive cylinder 805 drives the third lower pressure block 804 mounting plate to rise, so that the third upper pressure block 802 and the third lower pressure block 804 can press the main material belt, then the tenth lifting drive cylinder 809 drives the upper ejector pin 807 to descend, and the eleventh lifting drive cylinder 810 drives the lower ejector pin 808 to rise, so that the upper ejector pin 807 and the lower ejector pin 808 clamp the waste end of the L-shaped part, and then the ninth lifting drive cylinder 806 drives the breaking drive plate to perform reciprocating lifting and lowering motion, so that the upper ejector pin 807 and the lower ejector pin 808 break the waste.

[0081] In this embodiment, the material dividing mechanism 130 includes a material receiving assembly, both sides of which are provided with a rotating assembly and a distance conveying assembly for conveying the L-shaped piece on the material receiving assembly to the rotating assembly, and one side of the first L-shaped welding assembly 6 and the second L-shaped welding assembly 7 are respectively provided with a suction cup 1315 conveying assembly for conveying the L-shaped piece on the rotating assembly to the first L-shaped welding assembly 6 and the second L-shaped welding assembly 7;

[0082] The material receiving assembly includes a material receiving bottom plate 1301, a twelfth lifting drive cylinder 1302 for driving the material receiving bottom plate 1301 to perform lifting motion, and a first horizontal drive module 1303 for driving the material receiving bottom plate 1301 to move to the distance conveying assembly, a first material placing rod 1304 and a second material placing rod 1305 are arranged on the material receiving bottom plate 1301, a guide rod is arranged between the second material placing rod 1305 and the first material placing rod 1304, a first horizontal drive cylinder 1307 for driving the second material placing rod 1305 to move relative to the first material placing rod 1304 is arranged on the side of the second material placing rod 1305 away from the first material placing rod 1304, a plurality of material receiving rods 1308 are arranged at intervals on the first material placing rod 1304 and the second material placing rod 1305, and a second positioning pin 1309 is arranged on the surface of the material placing rod 1308;

[0083] The rotating assembly includes a second horizontal driving module 1310, and a rotating module is provided at the driving end of the second horizontal driving module 1310; the rotating module includes a rotating mounting plate 1311, and a suction cup fixing plate 1312 is provided in the middle of the bottom of the rotating mounting plate 1311, and side plates 1313 horizontally slidingly connected to the rotating mounting plate 1311 are respectively provided on both sides of the suction cup fixing plate 1312, and also includes a plurality of connecting rods 1314, one end of the connecting rod 1314 is rotatably connected to the side plate 1313, and the other end of the connecting rod 1314 is rotatably connected to the suction cup fixing plate 1312, and one end of the connecting rod 1314 is located below the suction cup fixing plate 1312 and is provided with a suction cup 1315 for sucking products, and one side of the end of the side plate 1313 is provided with a side plate driving cylinder 1316 for driving the side plate 1313 to make horizontal movement.

[0084] Specifically, when the L-shaped piece cutting assembly 120 completes cutting of the L-shaped piece, the L-shaped piece will fall onto the receiving base plate 1301, and through the positioning of the second positioning pin 1309, the positioning hole of the product can fall on the second positioning pin 1309, and then the first horizontal driving cylinder 1307 drives the second placing rod 1305 to move, so as to achieve the lateral distance change of the product, and then the first horizontal driving module 1303 drives the receiving base plate 1301 to move to the distance conveying assembly, and the distance conveying assembly absorbs the receiving piece. The product on the material bottom plate 1301 is transported to the rotating component. When the product is on the rotating component, the product is fixed by the suction cup 1315. The side plate driving cylinder 1316 drives the side plate 1313 to move horizontally, so that the connecting rod 1314 moves, and then the connecting rod 1314 drives the suction cup 1315 to rotate, realizing the rotation of the L-shaped part. After the rotation of the L-shaped part is completed, the suction cup 1315 transporting assembly respectively transports the L-shaped part on the rotating component to the first L-shaped welding component 6 and the second L-shaped welding component 7.

[0085] It should be explained that the suction cup 1315 transport assembly can use the existing suction cup 1315 transport mechanism, which will not be described in detail here.

[0086] This structure can realize the transportation and distance change of products, thereby ensuring that the products after distance change fall into the subsequent workstations one by one. At the same time, in this structure, the simultaneous rotation of multiple products can be realized by driving the connecting rod 1314 to move.

[0087] The present invention also discloses a cutting and welding production method, which adopts the cutting and welding production line described above, and the method is as follows:

[0088] S100: the main material belt loading assembly 1 discharges the material, so that the main material belt moves into the first main material belt welding assembly 2 and the second main material belt welding assembly 3 in sequence;

[0089] S200: The external transport component transports the parts to be welded to the first main material strip welding component 2 and the second main material strip welding component 3 for welding operations, and then the products continue to be transported to the roll-to-roll scrap cutting component 4;

[0090] S300: the roll-to-roll waste cutting assembly 4 removes waste from the material belt, and then the product continues to be transported to the first thrust testing assembly 5;

[0091] S400: The elastic upper pressing block 501 in the first thrust testing assembly 5 presses the main material product, and the detection rod 504 pushes the part product. The thrust data of the force detection sensor 506 is used to detect whether the upper layer product and the lower layer product are welded firmly. After the detection is completed, the product is conveyed to the first L-shaped welding assembly 6 and the second L-shaped welding assembly 7;

[0092] S500: The L-shaped piece feeding mechanism 10 divides the L-shaped piece into the first L-shaped welding assembly 6 and the second L-shaped welding assembly 7 respectively, and the main material and the L-shaped piece are welded together by the first L-shaped welding assembly 6 and the second L-shaped welding assembly 7. After the welding is completed, the product is conveyed to the L-shaped piece breaking assembly 8;

[0093] S600: The L-shaped piece breaking component 8 breaks off the end waste of the L-shaped piece. After the breaking is completed, the product continues to be conveyed to the second thrust testing component 9;

[0094] S700: The elastic upper pressing block 501 in the second thrust testing assembly 9 presses the main material product, and the detection rod 504 pushes the L-shaped part. The thrust data of the force detection sensor 506 is used to detect whether the upper layer product and the lower layer product are firmly welded, thereby completing the production of the entire product.

[0095] The specific embodiments described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. Cutting and welding production line, characterized by: The invention comprises a main material belt feeding assembly (1) arranged in sequence along the moving direction of the material belt, a first main material belt welding assembly (2) for welding parts to the front end products of the main material belt, a second main material belt welding assembly (3) for welding parts to the rear end products of the main material belt, a roll-to-roll waste material cutting assembly (4) for removing waste materials on the material belt, a first thrust testing assembly (5) for performing thrust testing on the welded assembly, a first L-shaped welding assembly (6) and a second L-shaped welding assembly (7) for welding an L-shaped piece to the main material, an L-shaped piece breaking assembly (8) for breaking off the waste material connection end of the L-shaped piece, and a second thrust testing assembly (9) for detecting the welding firmness of the L-shaped piece; It also includes an L-shaped piece feeding mechanism (10) arranged on one side of the first L-shaped welding assembly (6) and the second L-shaped welding assembly (7); The L-shaped piece feeding mechanism (10) comprises an L-shaped piece feeding assembly (110), an L-shaped piece cutting assembly (120) which are arranged in sequence, and a material distribution mechanism (130) which distributes the L-shaped pieces after the L-shaped piece cutting into a first L-shaped welding assembly (6) and a second L-shaped welding assembly (7).

2. The cutting and welding production line according to claim 1, characterized in that: The main material belt loading assembly (1) and the L-shaped piece loading assembly (110) both comprise a material tray (101) and a material tray driving motor for driving the material tray (101) to rotate; a material channel (102) is provided on one side of the material tray (101); a grounding wire sensing rod (103) is provided on the material channel (102); when there is no electrical signal from the grounding wire sensing rod (103), the material tray (101) rotates to discharge the material; a waste roll rod collection rack is provided on one side of the material tray (101); a winding rod (104) is provided on the waste roll rod collection rack; a spring is provided between the winding rod (104) and the waste roll rod collection rack so that the waste paper on the winding rod (104) can abut against the material tray.

3. The cutting and welding production line according to claim 1, characterized in that: The first main material strip welding assembly (2) and the second main material strip welding assembly (3) both comprise a first welding frame, wherein the first welding frame is provided with a first main flow channel plate (201) for the main material channel (102) to pass through, a first lower pressing block mounting plate (202) and a first lifting drive cylinder (203) for driving the first lower pressing block mounting plate (202) to perform lifting movement are provided below the first main flow channel plate (201), a first upper pressing block mounting plate (204) is provided above the first main flow channel plate (201), a second lifting drive cylinder (205) for driving the first upper pressing block mounting plate (204) to perform lifting movement is provided below the first lifting drive cylinder (203), and a first lower pressing block is provided at the bottom of the first upper pressing block mounting plate (204), The upper surface of the first lower pressure block mounting plate (202) is provided with a first upper pressure block that cooperates with the first lower pressure block, the upper surface of the first lower pressure block mounting plate (202) is provided with a retractable first part positioning needle (206), the bottom end of the first part positioning needle (206) is provided with a third lifting drive cylinder (207) for driving the first part positioning needle (206) to extend out of the upper surface of the first lower pressure block mounting plate (202), the first lower pressure block mounting plate (202) is also provided with a first material strip positioning needle (208) for positioning the material strip, the first upper pressure block mounting plate (204) is provided with a notch to expose the product welding point, and a first laser welding assembly (209) for welding is provided above the first upper pressure block mounting plate (204).

4. The cutting and welding production line according to claim 3, characterized in that: It also includes a precision positioning pin (210) arranged below the first upper pressure block mounting plate (204); the first lower pressure block mounting plate (202) is provided with a pin hole that cooperates with the precision positioning pin (210); when the first upper pressure block mounting plate (204) moves downward and the first lower pressure block mounting plate (202) moves upward, the precision positioning pin (210) passes through the main channel plate and extends into the pin hole; a detection block is provided on one side of the first upper pressure plate mounting plate; a sensor mounting block is provided on one side of the lower pressure plate mounting plate; and a displacement detection sensor (211) is provided on the sensor mounting block.

5. The cutting and welding production line according to claim 1, characterized in that: The roll-to-roll waste cutting assembly (4) and the L-shaped piece cutting assembly (120) both comprise a cutting frame, on which a lower mold (401) and an upper mold (402) located above the lower mold (401) are arranged, a first electric cylinder (403) for driving the upper mold (402) to move downward is arranged above the upper mold (402), and a cutter for cutting off the connection end between the product and the waste is arranged at the lower end of the upper mold (402); The bottom end of the cutting machine frame is also provided with a waste discharge mechanism (404) for collecting waste.

6. The cutting and welding production line according to claim 1, characterized in that: The first thrust test assembly (5) and the second thrust test assembly (9) both comprise a thrust detection frame, on which an elastic upper pressure block (501) is arranged, below which a support plate (502) is arranged, on which avoidance grooves (503) corresponding one to one with the products are arranged, on one side of the support plate (502) a plurality of detection rods (504) corresponding one to one with the avoidance grooves (503) are arranged, a driving rod is arranged on the side of the detection rod (504) away from the support plate (502), and further comprise a second electric cylinder (505) for driving the driving rod to perform horizontal movement, a force detection sensor (506) is arranged between the driving rod and the detection rod (504), and further comprise a fourth lifting driving cylinder (507) for driving the elastic upper pressure block (501) to press downward, and a fifth lifting driving cylinder (508) for driving the support plate (502) to perform lifting movement.

7. The cutting and welding production line according to claim 1, characterized in that: The first L-shaped welding assembly (6) and the second L-shaped welding assembly (7) both comprise a second welding frame, wherein the second welding frame is provided with a second main flow channel plate (601) for the main material channel (102) to pass through, a second lower pressure block mounting plate (602) and a sixth lifting drive cylinder (603) for driving the second lower pressure block mounting plate (602) to perform lifting movement are provided below the second main flow channel plate (601), a second upper pressure block mounting plate (604) is provided above the second main flow channel plate (601), and a sixth lifting drive cylinder (605) for driving the second upper pressure block mounting plate (604) to perform lifting movement is provided above the second lifting drive cylinder (205). A seventh lifting drive cylinder (605), a second lower pressing block is arranged at the bottom of the second upper pressing block mounting plate (604), a second upper pressing block cooperating with the second lower pressing block is arranged on the upper surface of the second lower pressing block mounting plate (602), a second part positioning pin (606) for positioning the L-shaped part is arranged on the upper surface of the second lower pressing block mounting plate (602), a second material strip positioning pin (607) for positioning the material strip is also arranged on the second lower pressing block mounting plate (602), and a second laser welding assembly (608) for welding and a smoke extraction assembly (609) for extracting smoke are arranged below the second lower pressing block mounting plate (602); The second lower pressing block mounting plate (602) is provided with a welding notch at the L-shaped piece welding position, and the bottom surface of the second lower pressing block mounting plate (602) is provided with a trumpet-shaped groove (610) converging in the direction of the welding notch at the welding notch.

8. The cutting and welding production line according to claim 1, characterized in that: The L-shaped piece breaking component (8) includes a breaking frame, in which a third main flow channel plate (801) is arranged, a third upper pressure block (802) mounting plate and an eighth lifting drive cylinder (803) for driving the third upper pressure block (802) mounting plate to perform lifting movement are arranged above the third main flow channel plate (801), a third lower pressure block (804) mounting plate and a thirteenth lifting drive cylinder (805) for driving the third lower pressure block (804) mounting plate to perform lifting movement are arranged below the third main flow channel plate (801), a third upper pressure block (802) is arranged at the lower part of the third upper pressure block (802) mounting plate, and the third lower pressure block (804) is arranged at the lower part of the third upper pressure block (802). A third lower pressing block (804) cooperating with the third upper pressing block (802) is arranged on the upper surface of the pressing block (804) mounting plate, and the pressing block (804) also includes a breaking driving plate and a ninth lifting driving cylinder (806) driving the breaking driving plate to perform lifting motion, and the breaking driving plate is respectively provided with an upper ejector pin (807) for abutting against the upper surface of the breaking part and a lower ejector pin (808) for abutting against the lower surface of the breaking part, and the breaking driving plate is also provided with a tenth lifting driving cylinder (809) for driving the upper ejector pin (807) to perform lifting motion and an eleventh lifting driving cylinder (810) for driving the lower ejector pin (808) to perform lifting motion.

9. The cutting and welding production line according to claim 1, characterized in that: The material dividing mechanism (130) comprises a material receiving assembly, both sides of which are provided with a rotating assembly and a distance conveying assembly for conveying the L-shaped piece on the material receiving assembly to the rotating assembly, and one side of the first L-shaped welding assembly (6) and the second L-shaped welding assembly (7) are respectively provided with a suction cup (1315) conveying assembly for conveying the L-shaped piece on the rotating assembly to the first L-shaped welding assembly (6) and the second L-shaped welding assembly (7); The material receiving assembly comprises a material receiving bottom plate (1301), a twelfth lifting driving cylinder (1302) for driving the material receiving bottom plate (1301) to move up and down, and a first horizontal driving module (1303) for driving the material receiving bottom plate (1301) to move to the distance transporting assembly, and a first material placing rod (1304) and a second material placing rod (1305) are arranged on the material receiving bottom plate (1301), and the second material placing rod (1305) and the first material placing rod (1304) are connected to each other. A guide rod is arranged between the two rods; a first horizontal driving cylinder (1307) is arranged on the side of the second material placing rod (1305) away from the first material placing rod (1304) to drive the second material placing rod (1305) to move relative to the first material placing rod (1304); a plurality of material receiving rods (1308) are arranged at intervals on the first material placing rod (1304) and the second material placing rod (1305); a second positioning needle (1309) is arranged on the surface of the material receiving rod (1308); The rotating assembly comprises a second horizontal driving module (1310), the driving end of the second horizontal driving module (1310) is provided with a rotating module; the rotating module comprises a rotating mounting plate (1311), a suction cup fixing plate (1312) is provided in the middle of the bottom of the rotating mounting plate (1311), side plates (1313) horizontally slidably connected to the rotating mounting plate (1311) are respectively provided on both sides of the suction cup fixing plate (1312), and a plurality of connecting A rod (1314), one end of the connecting rod (1314) is rotatably connected to the side plate (1313), and the other end of the connecting rod (1314) is rotatably connected to the suction cup fixing plate (1312); one end of the connecting rod (1314) located below the suction cup fixing plate (1312) is provided with a suction cup (1315) for sucking the product, and one side of the end of the side plate (1313) is provided with a side plate driving cylinder (1316) for driving the side plate (1313) to move horizontally.

10. A cutting and welding production method, using the cutting and welding production line according to any one of claims 1 to 9, characterized in that: S100: the main material belt loading assembly (1) discharges the material, so that the main material belt moves into the first main material belt welding assembly (2) and the second main material belt welding assembly (3) in sequence; S200: The external transport component transports the parts to be welded to the first main material strip welding component (2) and the second main material strip welding component (3) for welding operations, and then the products are continuously transported to the roll-to-roll waste cutting component (4); S300: The roll-to-roll waste cutting assembly (4) removes waste from the material strip, and then the product continues to be transported to the first thrust testing assembly (5); S400: The elastic upper pressing block (501) in the first thrust testing assembly (5) presses the main material product, and the detection rod (504) pushes the component product. The thrust data of the force detection sensor (506) is used to detect whether the upper layer product and the lower layer product are firmly welded. After the detection is completed, the product is conveyed to the first L-shaped welding assembly (6) and the second L-shaped welding assembly (7); S500: The L-shaped piece feeding mechanism (10) divides the L-shaped piece into the first L-shaped welding assembly (6) and the second L-shaped welding assembly (7), respectively, and the main material and the L-shaped piece are welded together by the first L-shaped welding assembly (6) and the second L-shaped welding assembly (7). After the welding is completed, the product is conveyed to the L-shaped piece breaking assembly (8); S600: The L-shaped piece breaking component (8) breaks off the end waste of the L-shaped piece. After the breaking is completed, the product continues to be conveyed to the second thrust testing component (9); S700: The elastic upper pressing block (501) in the second thrust testing assembly (9) presses the main material product, and the detection rod (504) pushes the L-shaped part. The thrust data of the force detection sensor (506) is used to detect whether the upper layer product and the lower layer product are firmly welded, thereby completing the production of the entire product.

Citation Information

Patent Citations

  • Steel grating plate welding main assembly line and welding method

    CN108637703A

  • Welding equipment for welding two material pieces and control method thereof

    CN108788767A

  • Hot stamping forming process

    CN109807552A

  • LED module combination system of LED display screen

    CN113319598A

  • Feeding device provided with cleaning assembly and used for PCB milling cutter machining and welding

    CN216326019U