Automatic sampling ship for surface water

By designing an automatic sampling ship with multiple inlet pipes and high-pressure flushing structures, the problems of small sampling numbers of existing sampling ships and easy entanglements of water pumps are solved, and efficient and independent sampling of multiple places and sampling of sediments at the bottom of the water body are achieved.

CN119705740AActive Publication Date: 2025-03-28SICHUAN LIANGTEST TESTING TECH CO LTD

Patent Information

Application Number
CN202411760645.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-03
Publication Date
2025-03-28
Estimated Expiration
2044-12-03

AI Technical Summary

Technical Problem

The existing surface water sampling vessels use two water inlet pipes, which has a small number of samples, which leads to returning to the land to replace the sample bottle when sampling multiple places. It is inconvenient to operate, and the water pump is prone to wrap around impurities such as aquatic plants, making it impossible to sample sediments at the bottom of the water body.

Method used

An automatic surface water sampling boat was designed, equipped with multiple water inlet pipes, solenoid valves, flushing structures and telescopic sampling structures. It can sample at different locations, and flush the pump pipes through high-pressure water flow to clean impurities such as aquatic plants.

Benefits of technology

It improves sampling efficiency and can independently complete four sampling, ensuring the independence of each sampling, and keeping the outside of the pump pipe clean, suitable for multiple sampling and sampling of sediment at the bottom of the water body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119705740A_ABST
    Figure CN119705740A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic surface water sampling ship, and relates to the field of water sampling, the automatic surface water sampling ship comprises a ship body, the inner side of the ship body is provided with an equipment bin, the bottom end of the ship body is provided with a storage groove, the inner side of the storage groove is provided with a water pumping pipe, the front end of the water pumping pipe is provided with a driving rod, and one side of the water pumping pipe is connected with a corrugated pipe. According to the device, first water inlet pipes, electromagnetic valves, flushing pipes and sample bottles are arranged, a first motor controls a water pumping pipe to be opened to sample and extract a water body, and the electromagnetic valves on different first water inlet pipes are opened, so that extracted samples enter different sample bottles through the first water inlet pipes, hoses, first connecting pipes and second connecting pipes respectively; sampling can be carried out on four different positions, the sampling efficiency is improved, and before sampling is started, water in the water purification tank carries out back washing on the conveying pipe, the corrugated pipe and the water pumping pipe, so that residues of last sampling disappear, and the original condition of a water body sampled next time cannot be influenced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of water body sampling, in particular to an automatic surface water sampling vessel. Background Art

[0002] Surface water refers to the general term for dynamic water and static water on the surface of land, also known as "land water", including various liquid and solid water bodies, mainly rivers, lakes, swamps, glaciers, ice sheets, etc. It is one of the important sources of water for human life. In order to ensure the safety of surface water quality, it is often necessary to sample and test the water quality of relevant waters. Since traditional manual sampling is time-consuming and labor-intensive and has certain operational risks, water quality sampling now mostly uses unmanned sampling ships instead of manual sampling.

[0003] At present, most sampling vessels use two water inlet pipes to take samples from two water areas. The number of samples taken is relatively small, which means that when taking samples from multiple locations, the sampling vessel needs to return to land to replace the sample bottle and then set out again to take samples. This is inconvenient to operate, and therefore an automatic surface water sampling vessel is urgently needed. Summary of the invention

[0004] The purpose of the present invention is to provide an automatic surface water sampling vessel to solve the problems that most existing sampling vessels use two water inlet pipes to sample two water areas, but the number of samples is small, resulting in the sampling vessel needing to return to land to replace the sample bottle when sampling in multiple areas, and then setting out again to sample, which is inconvenient to operate, the pumping pipe is easily entangled with aquatic plants, garbage, etc. when it goes deep into the water body, and needs to be cleaned in time, and the current sampling vessels are unable to sample the sediments at the bottom of the water body.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an automatic surface water sampling ship, comprising a hull, an equipment compartment is provided on the inner side of the hull, and a storage groove is provided on the bottom end of the hull, a water pumping pipe is provided on the inner side of the storage groove, a driving rod is provided at the front end of the water pumping pipe, and a bellows is connected to one side of the water pumping pipe, a flushing structure is provided on the water pumping pipe, a sampling structure is provided at the end of the bellows, a sample bottle is provided on the inner side of the equipment compartment, and a sampling structure is provided at the rear end of the sample bottle.

[0006] The sampling structure includes a delivery pipe, both sides of the delivery pipe are connected to water inlet pipes, and the end of the delivery pipe is connected to a flushing pipe, a solenoid valve is installed on the water inlet pipe, and the end of the water inlet pipe is connected to a hose, the end of the hose is connected to a first connecting pipe, the outer wall of the first connecting pipe is sleeved with a threaded sleeve, and a second connecting pipe is arranged below the first connecting pipe, a first water pump is installed on the flushing pipe, and a clean water tank is arranged at one end of the flushing pipe, one side of the clean water tank is connected to a sewage pipe, and a filter assembly is arranged inside the clean water tank.

[0007] The flushing structure includes a first water spray ring, the bottom end of the first water spray ring is connected to the second water spray ring, and the outer wall of the first water spray ring is provided with a mounting frame, the inner side of the second water spray ring is connected to a high-pressure water pipe, and the interior of the second water spray ring is provided with a high-pressure nozzle, a second water pump is installed on the high-pressure water pipe, and a booster pump is installed on one side of the second water pump.

[0008] The sampling structure includes a waterproof cover, a second motor is installed on the inner side of the waterproof cover, a gear is provided at the output end of the second motor, a support sleeve is provided on one side of the gear, a sampling tube is movably provided on the inner side of the support sleeve, a threaded seat is fixed on the top end of the sampling tube, and a tooth groove is provided on the outer wall of the sampling tube, a sampling head is connected to the bottom end of the sampling tube, a third motor is installed inside the sampling head, a winding roller is provided at the output end of the third motor, and a sampling groove is provided below the third motor, a rope is connected to the winding roller, a baffle is provided at the end of the rope, and a counterweight is provided on the outer wall of the baffle.

[0009] Preferably, a first motor is installed at the front end of the driving rod, a handle is provided at the top of the sample bottle, an antenna is installed at the top of the hull, and a power device is installed inside the hull. The first motor is fixed to the hull through a base, and the water pumping pipe and the storage tank are movably connected through the driving rod and the first motor, and the water pumping pipe and the delivery pipe are movably connected through a bellows.

[0010] Preferably, the delivery pipe is fixedly installed on the hull through a mounting block, the water inlet pipe, solenoid valve, hose, first connecting pipe and second connecting pipe are four in number, and the second connecting pipe penetrates to the inner side of the sample bottle, and the second connecting pipe is movably connected to the first connecting pipe through a threaded sleeve.

[0011] Preferably, the flushing pipe is fixedly connected to the delivery pipe and the clean water tank, and the delivery pipe, the flushing pipe and the sewage pipe are all equipped with a first water pump. A water inlet is provided at the top of the clean water tank, and the sample bottle, the clean water tank and the equipment compartment are fixed by a socket.

[0012] Preferably, the first water spray ring and the second water spray ring are fixedly connected via a mounting frame and bolts, and sealing gaskets are provided at the ends of the first water spray ring and the second water spray ring.

[0013] Preferably, water inlet grooves are provided inside the first water spray ring and the second water spray ring, and high-pressure nozzles are installed in the water inlet grooves inside the first water spray ring and the second water spray ring, and the high-pressure water pipes penetrate to the bottom of the hull.

[0014] Preferably, the second motor is fixedly installed on the equipment compartment through a waterproof cover, the support sleeve is fixed to the bottom of the inner wall of the equipment compartment, an extension rod is arranged above the sampling tube, and the sampling tube and the extension rod are fixedly connected through a threaded seat, and the outer walls of the sampling tube and the extension rod are provided with grooves.

[0015] Preferably, the gear is meshingly connected with the tooth groove, a movable groove matching the sampling head is opened on the inner side of the hull, an adjustment groove matching the third motor is opened inside the sampling head, and a roller is installed inside the adjustment groove, and the sampling head and the sampling tube are movably connected through a threaded seat.

[0016] Preferably, the baffle is movably connected to the winding roller via a rope, a limiting frame is provided on the outer wall of the sampling tube, and the limiting frame is movably engaged with the baffle.

[0017] Compared with the prior art, the present invention has the following beneficial effects: First, the present invention arranges a first water inlet pipe, a solenoid valve, a flushing pipe and a sample bottle, and a first motor controls the pumping pipe to open to sample the water body. By opening the solenoid valves on different first water inlet pipes, the extracted samples enter different sample bottles through the first water inlet pipe, the hose, the first connecting pipe and the second connecting pipe respectively, so that sampling can be performed at four different positions to improve the sampling efficiency. Before starting the sampling, the water in the clean water tank backwashes the delivery pipe, the bellows and the pumping pipe, so that the residue of the previous sampling disappears, thereby not affecting the original condition of the water body for the next sampling.

[0018] Second, the present invention sets a first water spray ring, a second water spray ring, a high-pressure nozzle and a high-pressure water pipe. After sampling is completed, the first motor drives the water pumping pipe to be retracted into the storage groove through the driving rod. At this time, the second water pump and the booster pump on the high-pressure water pipe are controlled to operate. Then, after the high-pressure water pipe draws water from the water body, it is pressurized, and the high-pressure water flow enters the first water spray ring and the second water spray ring, and is sprayed out through a plurality of high-pressure nozzles to flush the outer wall of the water pumping pipe, so that aquatic plants, impurities and other items are washed down by the high-pressure water flow under the influence of the buoyancy of the water body, and then fall into the water body, thereby ensuring that the outside of the water pumping pipe is clean.

[0019] Third, the present invention provides an extension rod, a sampling tube, a sampling head, a sampling slot and a baffle. When it is necessary to sample the sediment at the bottom of the water body, the extension rod is fixedly connected to the sampling tube through a threaded seat in advance, and the tooth grooves of the outer wall are aligned. At this time, the second motor is controlled to operate to drive the gear at the output end to rotate. When the gear rotates, it engages with the tooth groove to drive the sampling tube and the extension rod to move vertically downward on the inner side of the support sleeve until the sampling tube is inserted into the sediment. At this time, the third motor is controlled to operate to drive the winding roller at the output end and The rope is reeled in, and then the baffle is driven by the tension of the rope to move up on the inner side of the limit frame, thereby exposing the sampling slot, and the sediment can enter the sampling slot. At this time, the third motor drives the winding roller and the rope to unwind, and the baffle falls down by the deadweight of the counterweight block, and finally seals the sampling slot. At this time, the second motor drives the gear to reverse, thereby driving the extension rod and the sampling tube to move up, so that the sampling tube returns to the inner side of the movable slot. When the hull returns to land, the sampling head can be screwed to separate it from the sampling tube, so as to facilitate the removal of the sample. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the top-sectional structure of the present invention; Figure 3 It is a schematic diagram of the sampling structure of the present invention; Figure 4 It is a schematic diagram of a sample bottle of the present invention; Figure 5 It is a schematic diagram of a threaded sleeve of the present invention; Figure 6 It is a schematic diagram of the structure of the water purification tank of the present invention; Figure 7 It is a schematic diagram of the side section structure of the hull of the present invention; Figure 8 It is a schematic diagram of a high-pressure water pipe of the present invention; Fig. 9 is a schematic diagram of a first motor of the present invention; Fig.10 It is a schematic diagram of the flushing structure of the present invention; Fig.11 It is a schematic diagram of a booster pump of the present invention; Fig.12 For the present invention Figure 2 A is an enlarged schematic diagram; Fig.13 It is a schematic diagram of the gear of the present invention; Fig.14 For the present invention Fig.13 A magnified schematic diagram of B; Fig.15 It is a schematic diagram of the sampling structure of the present invention; Fig.16 It is a schematic diagram of the sampling tank of the present invention.

[0021] In the figure: 1, hull; 2, equipment compartment; 3, storage tank; 4, water pumping pipe; 5, driving rod; 6, first motor; 7, bellows; 8, sampling structure; 801, delivery pipe; 802, water inlet pipe; 803, solenoid valve; 804, hose; 805, first connecting pipe; 806, threaded sleeve; 807, second connecting pipe; 808, flushing pipe; 809, clean water tank; 810, first water pump; 811, sewage pipe; 812, filter assembly; 9, sample bottle; 10, handle; 11, flushing structure; 1101, first water spray ring; 1102, second water spray ring; 1103, installation Frame; 1104, high-pressure water pipe; 1105, high-pressure nozzle; 1106, second water pump; 1107, booster pump; 12, sampling structure; 1201, waterproof cover; 1202, second motor; 1203, gear; 1204, support sleeve; 1205, sampling tube; 1206, threaded seat; 1207, tooth groove; 1208, third motor; 1209, winding roller; 1210, rope; 1211, baffle; 1212, counterweight; 1213, limit frame; 1214, roller; 1215, sampling slot; 1216, sampling head; 13, extension rod; 14, antenna. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] See also Figure 1-Figure 6A surface water automatic sampling ship comprises a hull 1, an equipment compartment 2 is provided on the inner side of the hull 1, and a storage tank 3 is provided on the bottom end of the hull 1, a water pumping pipe 4 is provided on the inner side of the storage tank 3, a driving rod 5 is provided at the front end of the water pumping pipe 4, and a bellows 7 is connected to one side of the water pumping pipe 4, a flushing structure 11 is provided on the water pumping pipe 4, and a sampling structure 8 is provided at the end of the bellows 7, a sample bottle 9 is provided on the inner side of the equipment compartment 2, and a sampling structure 12 is provided at the rear end of the sample bottle 9, the sampling structure 8 comprises a delivery pipe 801, water inlet pipes 802 are connected to both sides of the delivery pipe 801, and a flushing pipe 808 is connected to the end of the delivery pipe 801, an electromagnetic valve 803 is installed on the water inlet pipe 802, and a hose 804 is connected to the end of the water inlet pipe 802, and the hose 8 04 is connected to the end of a first connecting pipe 805, the outer wall of the first connecting pipe 805 is sleeved with a threaded sleeve 806, and a second connecting pipe 807 is arranged below the first connecting pipe 805, a first water pump 810 is installed on the flushing pipe 808, and a clean water tank 809 is arranged at one end of the flushing pipe 808, a sewage pipe 811 is connected to one side of the clean water tank 809, and a filter assembly 812 is arranged inside the clean water tank 809, a first motor 6 is installed at the front end of the driving rod 5, a handle 10 is arranged at the top of the sample bottle 9, an antenna 14 is installed at the top of the hull 1, and a power device is installed inside the hull 1, the first motor 6 is fixedly installed with the hull 1 through a base, and the pumping pipe 4 is movably connected with the storage tank 3 through the driving rod 5 and the first motor 6, and the pumping pipe 4 is movably connected to the delivery pipe 801 through the bellows 7, the delivery pipe 801 is fixedly installed with the hull 1 through the mounting block, the number of the water inlet pipe 802, the solenoid valve 803, the hose 804, the first connecting pipe 805 and the second connecting pipe 807 is four, and the second connecting pipe 807 penetrates the inner side of the sample bottle 9, the second connecting pipe 807 is movably connected with the first connecting pipe 805 through the threaded sleeve 806, the flushing pipe 808 is fixedly connected with the delivery pipe 801 and the clean water tank 809, and the delivery pipe 801, the flushing pipe 808 and the sewage pipe 811 are all installed with the first water pump 810, the top of the clean water tank 809 is provided with a water inlet, the sample bottle 9, the clean water tank 809 and the equipment compartment 2 are fixed by the card holder, and the power device inside the hull 1 drives The hull 1 moves on the surface water body. When it moves to the specified position, the first motor 6 is controlled to run. The internal technology of the first motor 6 is the existing technology. After the first motor 6 runs, it drives the driving rod 5 at the output end and the pumping pipe 4 to open downward, so that the pumping pipe 4 goes deep into the water body. At this time, the first water pump 810 on the delivery pipe 801 is controlled to run, so that the water body is sampled and extracted through the bellows 7 and the pumping pipe 4. At this time, the solenoid valve 803 on the first water inlet pipe 802 is opened, so that the extracted water enters the first sample bottle 9 through the first water inlet pipe 802, the hose 804, the first connecting pipe 805 and the second connecting pipe 807. After the sample bottle 9 is full, the sampling at this position is completed, and the hull 1 can move to the next position. Before starting sampling,The clean water tank 809 extracts water from the water body through the sewage pipe 811, and after filtering through the filter assembly 812, it is stored, so that the purified water can flow back into the delivery pipe 801 through the flushing pipe 808, thereby backwashing the delivery pipe 801, the bellows 7 and the pumping pipe 4, so that the residue of the initial sampling disappears, so as not to affect the original situation of the secondary sampling water body, and then the second sampling can be started, and the solenoid valve 803 on the second water inlet pipe 802 is opened, so that the extracted water is delivered to the second sample bottle 9, and the second sampling is completed. According to this method, sampling can be carried out at four locations in turn, with high sampling efficiency, and the residue of the previous sampling will not affect the next sampling, ensuring the independence of each sampling.

[0024] See also Figure 7-Figure 11 , a surface water automatic sampling ship, the flushing structure 11 includes a first water spray ring 1101, the bottom end of the first water spray ring 1101 is connected to the second water spray ring 1102, and the outer wall of the first water spray ring 1101 is provided with a mounting frame 1103, the inner side of the second water spray ring 1102 is connected to a high-pressure water pipe 1104, and the interior of the second water spray ring 1102 is provided with a high-pressure nozzle 1105, a second water pump 1106 is installed on the high-pressure water pipe 1104, and a booster pump 1107 is installed on one side of the second water pump 1106, the first water spray ring 1101 and the second water spray ring 1102 are fixedly connected by the mounting frame 1103 and bolts, and the ends of the first water spray ring 1101 and the second water spray ring 1102 are provided with sealing gaskets, and the inner sides of the first water spray ring 1101 and the second water spray ring 1102 are opened A water inlet trough is provided, and the water inlet troughs inside the first water spray ring 1101 and the second water spray ring 1102 are both installed with high-pressure nozzles 1105. The high-pressure water pipe 1104 penetrates to the bottom of the hull 1. After sampling is completed, the first motor 6 drives the water pumping pipe 4 to be retracted into the storage groove 3 through the driving rod 5. At this time, the second water pump 1106 and the booster pump 1107 on the high-pressure water pipe 1104 are controlled to operate. After the high-pressure water pipe 1104 draws water from the water body, it is pressurized and the high-pressure water flow enters the first water spray ring 1101 and the second water spray ring 1102, and is sprayed out through multiple high-pressure nozzles 1105 to flush the outer wall of the water pumping pipe 4, so that aquatic plants, impurities and other items are washed down by the high-pressure water flow under the influence of the buoyancy of the water body, and then fall into the water body, ensuring that the outside of the water pumping pipe 4 is clean.

[0025] See also Figure 12-16, a surface water automatic sampling ship, the sampling structure 12 includes a waterproof cover 1201, a second motor 1202 is installed inside the waterproof cover 1201, a gear 1203 is provided at the output end of the second motor 1202, a support sleeve 1204 is provided on one side of the gear 1203, a sampling tube 1205 is movably provided inside the support sleeve 1204, a threaded seat 1206 is fixed to the top of the sampling tube 1205, and a tooth groove 1207 is provided on the outer wall of the sampling tube 1205, a sampling head 1216 is connected to the bottom end of the sampling tube 1205, a third motor 1208 is installed inside the sampling head 1216, a winding roller 1209 is provided at the output end of the third motor 1208, and a sampling slot 121 is provided below the third motor 1208 5. A rope 1210 is connected to the winding roller 1209, a baffle 1211 is provided at the end of the rope 1210, a counterweight 1212 is provided on the outer wall of the baffle 1211, the second motor 1202 is fixedly installed with the equipment compartment 2 through the waterproof cover 1201, the support sleeve 1204 is fixed to the bottom of the inner wall of the equipment compartment 2, an extension rod 13 is provided above the sampling tube 1205, and the sampling tube 1205 and the extension rod 13 are fixedly connected through a threaded seat 1206, and the outer walls of the sampling tube 1205 and the extension rod 13 are provided with tooth grooves 1207, and the gear 1203 is meshed with the tooth grooves 1207. A movable groove matching the sampling head 1216 is provided on the inner side of the hull 1, and a third motor 1208 matching the sampling head 1216 is provided inside the sampling head 1216. The adjusting groove is provided with a roller 1214 inside the adjusting groove, the sampling head 1216 is movably connected to the sampling tube 1205 through the threaded seat 1206, the baffle 1211 is movably connected to the winding roller 1209 through the rope 1210, the outer wall of the sampling tube 1205 is provided with a limit frame 1213, and the limit frame 1213 is movably engaged with the baffle 1211. When it is necessary to sample the sediment at the bottom of the water body, the extension rod 13 is fixedly connected to the sampling tube 1205 through the threaded seat 1206 in advance, and the tooth groove 1207 of the outer wall is aligned, and the second motor 1202 is controlled to run at this time. The internal technology of the second motor 1202 is the existing technology. After the second motor 1202 runs, it drives the gear 1203 at the output end to rotate. When the gear 1203 rotates, By meshing with the tooth groove 1207, the sampling tube 1205 and the extension rod 13 are driven to move vertically downward on the inner side of the support sleeve 1204 until the sampling tube 1205 is inserted into the sediment. At this time, the third motor 1208 is controlled to operate. The internal technology of the third motor 1208 is the existing technology. After the third motor 1208 operates, it drives the winding roller 1209 and the rope 1210 at the output end to reel up, so that the baffle 1211 is driven by the pulling force of the rope 1210 to move up on the inner side of the limit frame 1213, so that the sampling slot 1215 is exposed, and the sediment can enter the sampling slot 1215. At this time, the third motor 1208 drives the winding roller 1209 and the rope 1210 to unwind, and the baffle 1211 falls by the deadweight of the counterweight block 1212.Finally, the sampling slot 1215 is sealed, and the second motor 1202 drives the gear 1203 to reverse, thereby driving the extension rod 13 and the sampling tube 1205 to move upward, so that the sampling tube 1205 returns to the inner side of the movable slot. When the hull 1 returns to land, the sampling head 1216 can be screwed to separate it from the sampling tube 1205, so as to facilitate the removal of the sample.

[0026] Working principle: When the present invention is used, the power device inside the hull 1 drives the hull 1 to move on the surface water body. When it moves to the specified position, the first motor 6 is controlled to run. The internal technology of the first motor 6 is the existing technology. After the first motor 6 runs, it drives the driving rod 5 at the output end and the water pumping pipe 4 to open downward, so that the water pumping pipe 4 penetrates into the water body. At this time, the first water pump 810 on the delivery pipe 801 is controlled to run, so that the water body is sampled and extracted through the bellows 7 and the water pumping pipe 4. At this time, the solenoid valve 803 on the first water inlet pipe 802 is opened, so that the extracted water enters the first sample bottle 9 through the first water inlet pipe 802, the hose 804, the first connecting pipe 805 and the second connecting pipe 807. After the sample bottle 9 is filled, the position here After the sampling is completed, the hull 1 can be moved to the next position. Before starting the sampling, the clean water tank 809 extracts water from the water body through the sewage pipe 811, and stores it after filtering through the filter component 812, so that the purified water can flow back to the delivery pipe 801 through the flushing pipe 808, thereby backwashing the delivery pipe 801, the bellows 7 and the pumping pipe 4, so that the residue of the initial sampling disappears, thereby not affecting the original condition of the secondary sampling water body, and then the second sampling can be started, and the solenoid valve 803 on the second water inlet pipe 802 is opened to transport the extracted water to the second sample bottle 9, and the second sampling is completed. According to this method, sampling can be carried out at four positions in turn, the sampling efficiency is high, and the residue of the previous sampling will not affect the next sampling. The first motor 6 drives the water extraction pipe 4 to be retracted into the storage tank 3 through the driving rod 5. At this time, the second water pump 1106 and the booster pump 1107 on the high-pressure water pipe 1104 are controlled to operate. After the high-pressure water pipe 1104 extracts water from the water body, it is pressurized and the high-pressure water flows into the first water spray ring 1101 and the second water spray ring 1102, and is sprayed out through a plurality of high-pressure nozzles 1105 to wash the outer wall of the water extraction pipe 4, so that aquatic plants, impurities and other objects are washed down by the high-pressure water flow under the influence of the buoyancy of the water body, and then fall into the water body, ensuring that the outside of the water extraction pipe 4 is clean. When it is necessary to sample the sediment at the bottom of the water body, the extension rod 13 is connected with the threaded seat 1206 in advance. The sampling tube 1205 is fixedly connected, and the tooth groove 1207 of the outer wall is aligned. At this time, the second motor 1202 is controlled to run. The internal technology of the second motor 1202 is the existing technology. After the second motor 1202 runs, it drives the gear 1203 at the output end to rotate. When the gear 1203 rotates, it engages with the tooth groove 1207, thereby driving the sampling tube 1205 and the extension rod 13 to move vertically downward on the inner side of the support sleeve 1204 until the sampling tube 1205 is inserted into the sediment. At this time, the third motor 1208 is controlled to run. The internal technology of the third motor 1208 is the existing technology. After the third motor 1208 runs, it drives the winding roller 1209 at the output end and the rope 1210 to reel, so that the baffle 1211 is driven by the pulling force of the rope 1210.The inner side of the limit frame 1213 is moved upward, so that the sampling slot 1215 is exposed, and the sediment can enter the sampling slot 1215. At this time, the third motor 1208 drives the winding roller 1209 and the rope 1210 to unwind, and the baffle 1211 falls by the deadweight of the counterweight block 1212, and finally seals the sampling slot 1215. At this time, the second motor 1202 drives the gear 1203 to reverse, thereby driving the extension rod 13 and the sampling tube 1205 to move upward, so that the sampling tube 1205 returns to the inner side of the movable slot. When the hull 1 returns to land, the sampling head 1216 can be screwed to separate it from the sampling tube 1205, so as to facilitate the removal of the sample.

[0027] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. A surface water automatic sampling vessel, comprising a hull (1), characterized in that: An equipment compartment (2) is provided on the inner side of the hull (1), and a storage groove (3) is provided on the bottom end of the hull (1); a water extraction pipe (4) is provided on the inner side of the storage groove (3); a driving rod (5) is provided at the front end of the water extraction pipe (4); a bellows (7) is connected to one side of the water extraction pipe (4); a flushing structure (11) is provided on the water extraction pipe (4); a sampling structure (8) is provided at the end of the bellows (7); a sample bottle (9) is provided on the inner side of the equipment compartment (2); and a sampling structure (12) is provided at the rear end of the sample bottle (9); The sampling structure (8) comprises a delivery pipe (801), both sides of the delivery pipe (801) are connected to a water inlet pipe (802), and the end of the delivery pipe (801) is connected to a flushing pipe (808), a solenoid valve (803) is installed on the water inlet pipe (802), and the end of the water inlet pipe (802) is connected to a hose (804), the end of the hose (804) is connected to a first connecting pipe (805), the outer wall of the first connecting pipe (805) is sleeved with a threaded sleeve (806), and a second connecting pipe (807) is arranged below the first connecting pipe (805), a first water pump (810) is installed on the flushing pipe (808), and a clean water tank (809) is arranged at one end of the flushing pipe (808), one side of the clean water tank (809) is connected to a sewage pipe (811), and a filter assembly (812) is arranged inside the clean water tank (809); The flushing structure (11) comprises a first water spray ring (1101), the bottom end of the first water spray ring (1101) is connected to a second water spray ring (1102), and a mounting frame (1103) is provided on the outer wall of the first water spray ring (1101), the inner side of the second water spray ring (1102) is connected to a high-pressure water pipe (1104), and a high-pressure nozzle (1105) is provided inside the second water spray ring (1102), a second water pump (1106) is installed on the high-pressure water pipe (1104), and a booster pump (1107) is installed on one side of the second water pump (1106); The sampling structure (12) comprises a waterproof cover (1201), a second motor (1202) is installed inside the waterproof cover (1201), a gear (1203) is arranged at the output end of the second motor (1202), a support sleeve (1204) is arranged on one side of the gear (1203), a sampling tube (1205) is movably arranged inside the support sleeve (1204), a threaded seat (1206) is fixed at the top end of the sampling tube (1205), and a tooth groove (1207) is provided on the outer wall of the sampling tube (1205), The bottom end of the sampling tube (1205) is connected to a sampling head (1216), a third motor (1208) is installed inside the sampling head (1216), a winding roller (1209) is provided at the output end of the third motor (1208), and a sampling slot (1215) is provided below the third motor (1208), a rope (1210) is connected to the winding roller (1209), a baffle (1211) is provided at the end of the rope (1210), and a counterweight (1212) is provided on the outer wall of the baffle (1211).

2. The surface water automatic sampling vessel according to claim 1, characterized in that: A first motor (6) is installed at the front end of the driving rod (5), a handle (10) is provided at the top end of the sample bottle (9), an antenna (14) is installed at the top end of the hull (1), and a power device is installed inside the hull (1), the first motor (6) and the hull (1) are fixedly installed via a base, and the water pumping pipe (4) and the storage tank (3) are movably connected via the driving rod (5) and the first motor (6), and the water pumping pipe (4) and the delivery pipe (801) are movably connected via a bellows (7).

3. The surface water automatic sampling vessel according to claim 1, characterized in that: The delivery pipe (801) is fixedly mounted on the hull (1) via a mounting block. The water inlet pipe (802), the solenoid valve (803), the hose (804), the first connecting pipe (805) and the second connecting pipe (807) are four in number, and the second connecting pipe (807) penetrates the inner side of the sample bottle (9). The second connecting pipe (807) is movably connected to the first connecting pipe (805) via a threaded sleeve (806).

4. The surface water automatic sampling vessel according to claim 1, characterized in that: The flushing pipe (808) is fixedly connected to the delivery pipe (801) and the clean water tank (809), and a first water pump (810) is installed on the delivery pipe (801), the flushing pipe (808) and the sewage pipe (811). A water inlet is provided at the top of the clean water tank (809), and the sample bottle (9), the clean water tank (809) and the equipment compartment (2) are fixed by means of a clamping seat.

5. The surface water automatic sampling vessel according to claim 1, characterized in that: The first water spray ring (1101) and the second water spray ring (1102) are fixedly connected via a mounting frame (1103) and bolts, and sealing gaskets are provided at the ends of the first water spray ring (1101) and the second water spray ring (1102).

6. The surface water automatic sampling vessel according to claim 1, characterized in that: Water inlet grooves are provided on the inner sides of the first water spray ring (1101) and the second water spray ring (1102), and high-pressure nozzles (1105) are installed in the water inlet grooves inside the first water spray ring (1101) and the second water spray ring (1102), and the high-pressure water pipe (1104) penetrates to the bottom of the hull (1).

7. The surface water automatic sampling vessel according to claim 1, characterized in that: The second motor (1202) is fixedly mounted to the equipment compartment (2) via a waterproof cover (1201); the support sleeve (1204) is fixed to the bottom of the inner wall of the equipment compartment (2); an extension rod (13) is provided above the sampling tube (1205); the sampling tube (1205) and the extension rod (13) are fixedly connected via a threaded seat (1206); and tooth grooves (1207) are provided on the outer walls of the sampling tube (1205) and the extension rod (13).

8. The surface water automatic sampling vessel according to claim 1, characterized in that: The gear (1203) is meshedly connected with the tooth groove (1207); a movable groove matching the sampling head (1216) is provided on the inner side of the hull (1); an adjustment groove matching the third motor (1208) is provided inside the sampling head (1216); a roller (1214) is installed inside the adjustment groove; the sampling head (1216) is movably connected with the sampling tube (1205) via a threaded seat (1206).

9. The surface water automatic sampling vessel according to claim 1, characterized in that: The baffle (1211) is movably connected to the winding roller (1209) via a rope (1210); a limiting frame (1213) is provided on the outer wall of the sampling tube (1205), and the limiting frame (1213) is movably engaged with the baffle (1211).

Citation Information

Patent Citations

  • Unmanned ship device and sampling method for automatic sampling of water quality

    CN107585266A

  • Automatic navigation water quality collection ship

    CN219391454U

  • A water quality monitoring device for unmanned boat

    CN221006908U

  • Autonomous and remote-controlled multi-parametric buoy for multi-depth water sampling, monitoring, data collection, transmission, and analysis

    EP2273251A2

  • Exhaust gas analyzing system and analyzing method available multi-point measurement

    KR101793551B1

Cited By

  • Device for monitoring outbreak area of green algae in offshore area

    CN120028091A