Ultra-long attached hoop support of tower crane

By designing the tower crane’s extra-long attachment hoop support, the combination of adjustment rods, limiting columns and fine-tuning clamps is used to solve the structural safety problems caused by the complex operation, long construction period and special-shaped buildings of the traditional attachment support, and the adjustable size, reuse and efficient construction of the support.

CN119706638APending Publication Date: 2025-03-28SICHUAN TAILONG CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411962797.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-30
Publication Date
2025-03-28

AI Technical Summary

Technical Problem

The embedded attachment support of traditional attached tower cranes is complex in operation, has a long construction period, and cannot be recycled, resulting in waste of materials and increased production costs. In addition, the special-shaped structure construction will cause the tower crane to have a wall attachment exceeding the maximum wall attachment distance and bearing capacity, affecting structural safety.

Method used

A tower crane is designed with an extra-long attachment clamp support, which adopts a combination of adjustment rods, limiting columns, connectors and fine-tuning clamps to achieve adjustable size, removable and reusable clamps, and improve the stability of the support through fine-tuning clamps.

Benefits of technology

The size of the clamp support is adjustable and reusable, the installation and disassembly steps are simplified, the construction period is shortened, the structure safety and construction efficiency are improved, and resource waste and production costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119706638A_ABST
    Figure CN119706638A_ABST
Patent Text Reader

Abstract

The invention provides a tower crane super-long attachment hoop support, and relates to the technical field of special structure tower crane attachment installation construction.The tower crane super-long attachment hoop support comprises four adjusting rods, a square is defined by the four adjusting rods, strip-shaped grooves are formed in the tops of the adjusting rods, and the two ends of each strip-shaped groove penetrate through the outer wall of the corresponding adjusting rod; the upper portions of the two sides of the adjusting rod are each provided with a row of installation holes communicating with the strip-shaped groove. The number of the limiting columns is four, and each limiting column is installed at the joint of every two adjusting rods; the method has the beneficial effects that the problems that an embedded attachment support is complex in operation and long in construction period, and embedded parts cannot be recycled, so that materials are wasted, energy conservation and environmental protection are not enough, the production cost is increased, and the construction period is shortened are solved; and the problems that the wall-attached distance of the tower crane exceeds the maximum wall-attached distance of the tower crane and the wall-attached bearing capacity of a large tower crane is insufficient due to a building with a special-shaped structure, so that the structural safety is influenced are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of attachment and installation construction of a tower crane with a special structure, and in particular to an extra-long attachment hoop support for a tower crane. Background Art

[0002] With the rapid development of cities, there are more and more high-rise buildings with special structures and irregular shapes, and attached tower cranes are widely used. As the tower crane rises to a certain height, an attachment device is needed to connect the tower to the building to increase the constraints of the tower steel structure in order to control the calculated height of the tower, thereby enhancing its rigidity and keeping the stability of the tower unchanged. Traditional attached tower cranes mainly use pre-embedded attachment supports, which require the installation of embedded parts during the civil construction process. Not only is the operation complicated and the construction period long, but the embedded parts cannot be recycled, resulting in material waste, insufficient energy conservation and environmental protection, and increased production costs for enterprises; secondly, buildings with irregular shapes will cause the tower crane to be attached to the wall to exceed the maximum attachment distance of the tower crane and the insufficient bearing capacity of the large tower crane to the wall, affecting the structural safety. Therefore, an ultra-long attachment clamp support for the tower crane is urgently needed to solve the above problems. Summary of the invention

[0003] In view of the above-mentioned technical problems existing in the prior art, an extra-long attachment hoop support for a tower crane is provided, which solves the problems that the operation of the embedded attachment support is complicated, the construction period is long, and the embedded parts cannot be recycled, thereby causing material waste, being not energy-saving and environmentally friendly, and increasing production costs, as well as the problem that special-shaped structural buildings will cause the tower crane to be attached to the wall exceeding the maximum attachment distance of the tower crane and the insufficient bearing capacity of the wall attachment of large tower cranes, affecting structural safety.

[0004] The purpose and effect of the present invention are achieved by the following specific technical means:

[0005] An extra-long attached hoop support for a tower crane, comprising:

[0006] The adjusting rods are provided with four adjusting rods and are arranged in a square shape. The tops of the adjusting rods are provided with strip grooves. Both ends of the strip grooves penetrate the outer wall of the adjusting rods. A row of mounting holes communicating with the strip grooves are provided on the upper sides of the adjusting rods.

[0007] Limiting columns, four of which are respectively installed at the intersection of every two adjusting rods, both sides of the limiting columns are penetrated with mounting openings distributed up and down, and mounting blocks are fixed on the upper part of the mounting openings, at least one end of the mounting block protrudes from the limiting column, and at least one plug hole is penetrated on the side of the mounting block and is located outside the limiting column, the plug hole is consistent with the size of the mounting hole, and the adjusting rod is inserted into the corresponding mounting opening;

[0008] Connectors, the number of which is equal to the number of the jacks, and the connectors are installed between the mounting openings and the jacks;

[0009] The fine-adjustment clamping piece is provided with four and is detachably connected to the bottom of the four adjustment rods respectively, and the clamping end of the fine-adjustment clamping piece is located on the inner side of the adjustment rod.

[0010] A further preferred solution: the connecting member includes a first screw and a first nut, the first screw is inserted between the mounting port and the socket, and adjustment rods extend from both ends of the first screw, and the first nut is provided with two and is threadedly connected to both ends of the first screw.

[0011] A further preferred solution is that the mounting block matches the strip groove, and both outer sides and the bottom of the mounting block are in contact with the inner wall of the strip groove.

[0012] A further preferred solution: the installation opening is a slide groove, and the adjustment rod is slidably connected to the slide groove.

[0013] A further preferred solution is that a mounting plate is fixed at the middle of the bottom of the adjusting rod, and a hole is opened on the mounting plate;

[0014] The fine-tuning clamping member includes a second screw, a clamping plate and a second nut, the second screw is inserted into the hole, the clamping plate is located on the inner side of the adjusting rod and is fixedly connected to the second screw, and the second nut is threadedly connected to the second screw.

[0015] A further preferred solution is that rubber pads are fixed on the inner sides of the clamping plates.

[0016] A further preferred solution is that the adjusting rod, the limiting column, the connecting piece and the fine-adjusting clamping piece are all made of steel.

[0017] A further preferred solution: a fixing ring is welded on the outer wall of each of the limiting columns.

[0018] A further preferred solution is that a connecting seat is welded in the middle of the outer side of one of the adjusting rods, and a plurality of threaded holes are opened on the connecting seat.

[0019] A further preferred solution: the limiting column and the mounting block are integrally formed.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] 1. This type of tower crane super-long attachment hoop support, with the use of adjusting rods, limit columns and connectors, not only realizes the adjustable size of the hoop support and can be fixed on buildings of different sizes, but also can be disassembled and reused, reducing resource waste and construction costs;

[0022] 2. The installation and disassembly steps of the hoop support are simple, which is convenient for construction workers to operate. Compared with the traditional embedded attachment support, the construction period is greatly shortened;

[0023] 3. By further arranging a fine-adjusting clamp on the hoop support, it is beneficial to firmly fix the hoop support on the building, thereby improving the safety of construction and effectively solving the problem that the special-shaped building will cause the tower crane to be attached to the wall to exceed the maximum attachment distance of the tower crane and the insufficient bearing capacity of the large tower crane to the wall to affect the structural safety;

[0024] 4. According to whether the building surface is flat or curved, you can choose a curved clamping plate or a flat clamping plate to meet the needs of fixing it on special-shaped buildings;

[0025] 5. By arranging a mounting block on the limit column to fill the gap in the strip groove where the adjusting rod is installed, the connection strength between the limit column and the adjusting rod can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the present invention;

[0027] Figure 2 For the present invention Figure 1 Schematic diagram of the local structure at A;

[0028] Figure 3 It is a schematic diagram of the three-dimensional structure of the limiting column of the present invention;

[0029] Figure 4 It is a bottom view structural schematic diagram of the adjusting rod and the fine-adjusting clamping member of the present invention.

[0030] Markings in the figure: adjusting rod 1, strip groove 11, mounting hole 12, first screw 13, first nut 14, limiting column 2, mounting port 21, mounting block 22, jack 221, fixing ring 23, fine-tuning clamp 3, mounting plate 31, second screw 32, clamping plate 33, arc-shaped clamping plate 331, plane clamping plate 332, rubber pad 34, second nut 35, connecting seat 4. DETAILED DESCRIPTION

[0031] See also Figure 1-4 , further illustrate the embodiments of the present invention;

[0032] like Figure 1-2As shown, an extra-long attachment hoop support for a tower crane comprises: an adjusting rod 1, a limiting column 2, a connecting piece and a fine-adjusting clamp 3. The adjusting rods 1 are provided with four and are surrounded in a square shape, and the tops of the adjusting rods 1 are provided with strip grooves 11, both ends of the strip grooves 11 penetrate the outer wall of the adjusting rod 1, and the upper sides of the adjusting rods 1 are provided with a row of mounting holes 12 which are communicated with the strip grooves 11, and the two rows of mounting holes 12 on each adjusting rod 1 correspond to each other, and a connecting seat 4 is welded in the middle of the outer side of one of the adjusting rods 1, and a plurality of threaded holes are provided on the connecting seat 4, and the connecting seat 4 is bolted to the attachment frame on the tower crane Connection; There are four limit columns 2 and they are respectively installed at the intersection of every two adjusting rods 1, which can be used to fix on the building. Both sides of the limit column 2 are penetrated with installation openings 21 distributed up and down. The installation openings 21 are preferably slide grooves. The adjusting rod 1 is slidably connected with the slide groove, which enhances the stability of the connection between the adjusting rod 1 and the installation opening 21 and the smoothness of the movement of the adjusting rod 1; The upper part of the installation opening 21 is fixed with a mounting block 22. The limit column 2 and the mounting block 22 are preferably connected in an integrated manner, and the connection strength is greater; The mounting block 22 matches the strip groove 11, and the mounting block 22 The two outer sides and the bottom are in contact with the inner wall of the strip groove 11, at least one end of the mounting block 22 protrudes from the limiting column 2, and at least one plug hole 221 is passed through the side of the mounting block 22 and is located outside the limiting column 2. Under the condition of ensuring the connection strength, in order to facilitate installation and disassembly, each mounting block 22 is provided with a plug hole 221, and the plug hole 221 is consistent in size with the mounting hole 12. The adjusting rod 1 is inserted into the corresponding mounting port 21. The outer wall of the limiting column 2 is welded with a fixing ring 23, which is fixedly connected to the pull rod of the tower crane body through the fixing ring 23; the number of connecting parts The amount is equal to the number of sockets 221, and the connecting piece is installed between the mounting port 21 and the socket 221; four fine-adjustment clamps 3 are provided and are detachably connected to the bottom of the four adjusting rods 1, and the clamping end of the fine-adjustment clamp 3 is located on the inner side of the adjusting rod 1. The fine-adjustment clamp 3 can be fine-tuned, which is beneficial for the clamp support to be stably fixed on the building. The clamping end of the fine-adjustment clamp 3 can be designed into two types, one is a flat surface and the other is an arc surface, so as to be fixed on a square or arc-shaped building. The adjusting rod 1, the limit column 2, the connecting piece and the fine-adjustment clamp are all made of steel.

[0033] like Figure 2 As shown, the connecting member includes a first screw 13 and a first nut 14. The first screw 13 is inserted between the installation port 21 and the insertion hole 221, and the adjusting rod 1 extends from both ends of the first screw 13. Two first nuts 14 are provided and are respectively threadedly connected to the two ends of the first screw 13.

[0034] like Figure 4As shown, a mounting plate 31 is fixed at the middle of the bottom of the adjusting rod 1, and a hole is opened on the mounting plate 31; the fine-tuning clamping member 3 includes a second screw 32, a clamping plate 33 and a second nut 35, the second screw 32 is inserted into the hole, the clamping plate 33 is located on the inner side of the adjusting rod 1 and is fixedly connected to the second screw 32, the second nut 35 is threadedly connected to the second screw 32, the clamping plate 33 includes an arc-shaped clamping plate 331 and a plane clamping plate 332, the selection of the arc-shaped clamping plate 331 and the plane clamping plate 332 is determined according to the shape of the building, and a rubber pad 34 is fixed on the inner side of the clamping plate 33.

[0035] In this embodiment, during the construction process, if the clamp support needs to be fixed on the building, the components in the clamp support are moved to the required position, and then the four adjusting rods 1 are sequentially placed around the building, and at the same time, the end of the adjusting rod 1 is slid into the corresponding mounting opening 21 on the limiting column 2, and the mounting block 22 in the mounting opening 21 is embedded in the strip groove 11 of the adjusting rod 1, and the adjusting rod 1 is moved to make the clamping plate 33 in the fine-tuning clamp 3 fit the building surface, and align the insertion hole 221 with the adjacent mounting hole 12, and insert the first screw 13 between the insertion hole 221 and the mounting hole 12. After the connection is completed, the two ends of the first screw 13 are respectively located on both sides of the adjusting rod 1, and the two first nuts 14 are respectively screwed into the two ends of the first screw 13 until the first nut 14 is close to the outer wall of the adjusting rod 1. According to the above method, the remaining limiting columns 2 can lock the remaining three corners of the clamp support;

[0036] In order to stably fix the clamp support on the building, the second nut 35 is loosened, and the second screw 32 can be moved to make the clamping plate 33 close to the building, and then the second nut 35 is tightened to make the second nut 35 close to the mounting plate 31, thereby realizing the fine adjustment of the fine-adjustment clamp 3. The rubber pad 34 is provided to fill the gap between the clamping plate 33 and the building, and enhance the clamping stability of the fine-adjustment clamp 3;

[0037] Afterwards, the connecting seat 4 is bolted to the attachment frame on the tower crane, and fixedly connected to the tie rod of the tower crane body through the fixing ring 23. The multi-point connection at the wall structure can concentrate the force decomposition, and the structural safety is guaranteed, completing the operation of connecting the tower body to the building.

[0038] If the clamp support is not needed, the clamp support can be disassembled from the building in the reverse order of the installation steps of the clamp support so as to reuse the clamp support.

[0039] It should be noted that the arc-shaped clamping plate 331 or the plane clamping plate 332 (such as Figure 4As shown), the requirement of being fixed on special-shaped buildings can be met, and the adjusting rod 1 and the adjusting rod 1 can be adjusted in position through the limit column 2, that is, the size of the clamp support is changed, and the jack 221 is locked together with the adjacent mounting hole 12 through the mounting block 22, the first screw 13 and the first nut 14, so that the clamp support can be fixed on buildings of different sizes.

[0040] Compared with the prior art, the advantages of this application are:

[0041] 1. With the use of the adjusting rod 1, the limiting column 2 and the connecting piece, not only the size of the clamp support can be adjusted and can be fixed on buildings of different sizes, but the clamp support can also be disassembled and reused, which reduces resource waste and construction costs;

[0042] 2. The installation and disassembly steps of the hoop support are simple, which is convenient for construction workers to operate. Compared with the traditional embedded attachment support, the construction period is greatly shortened;

[0043] 3. By further providing a fine-adjustable clamping member 3 on the hoop support, the hoop support is facilitated to be firmly fixed on the building, thereby improving the safety of construction and effectively solving the problem that the tower crane attachment to the wall exceeds the maximum attachment distance of the tower crane due to special-shaped buildings and the insufficient bearing capacity of the large tower crane attachment to the wall affects the structural safety;

[0044] 4. Depending on whether the building surface is a flat surface or a curved surface, the arc-shaped clamping plate 331 or the flat clamping plate 332 can be specifically selected to meet the requirement of being fixed on a special-shaped building;

[0045] 5. By arranging a mounting block 22 on the limiting column 2 to fill the gap of the strip groove 11 where the adjusting rod 1 is installed, the connection strength between the limiting column 2 and the adjusting rod 1 can be improved.

[0046] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. An extra-long tower crane attachment hoop support, characterized in that: include: An adjusting rod (1), wherein the adjusting rod (1) is provided with four rods and arranged in a square shape, and each of the adjusting rods (1) is provided with a strip groove (11) at the top, and both ends of the strip groove (11) penetrate the outer wall of the adjusting rod (1), and each of the two sides of the adjusting rod (1) is provided with a row of mounting holes (12) which are in communication with the strip groove (11); A limiting column (2), wherein four limiting columns (2) are provided and are respectively installed at the intersection of every two adjusting rods (1), both sides of the limiting column (2) are penetrated with mounting openings (21) distributed in an upper and lower manner, and a mounting block (22) is fixed on the upper part of the mounting opening (21), at least one end of the mounting block (22) protrudes from the limiting column (2), and at least one plug hole (221) is penetrated on the side of the mounting block (22) and is located outside the limiting column (2), and the plug hole (221) is consistent in size with the mounting hole (12), and the adjusting rod (1) is inserted into the corresponding mounting opening (21); Connectors, the number of which is equal to the number of the jacks (221), and the connectors are installed between the installation opening (21) and the jacks (221); A fine-adjustment clamping piece (3), wherein four fine-adjustment clamping pieces (3) are provided and are respectively detachably connected to the bottom of the four adjustment rods (1), and the clamping ends of the fine-adjustment clamping pieces (3) are located on the inner sides of the adjustment rods (1).

2. The super-long tower crane attachment hoop support according to claim 1, characterized in that: The connecting member comprises a first screw (13) and a first nut (14); the first screw (13) is inserted between the mounting opening (21) and the insertion hole (221); and adjusting rods (1) extend from both ends of the first screw (13); and two first nuts (14) are provided and are respectively threadedly connected to both ends of the first screw (13).

3. The super-long tower crane attachment hoop support according to claim 1, characterized in that: The installation block (22) matches the strip groove (11), and both outer sides and the bottom of the installation block (22) are in contact with the inner wall of the strip groove (11).

4. The super-long tower crane attachment hoop support according to claim 1, characterized in that: The installation opening (21) is a sliding groove, and the adjustment rod (1) is slidably connected to the sliding groove.

5. The super-long tower crane attachment hoop support according to claim 1, characterized in that: A mounting plate (31) is fixed at the middle of the bottom of the adjusting rod (1), and a hole is opened on the mounting plate (31); The fine-adjustment clamping member (3) comprises a second screw (32), a clamping plate (33) and a second nut (35); the second screw (32) is inserted into the hole; the clamping plate (33) is located on the inner side of the adjusting rod (1) and is fixedly connected to the second screw (32); and the second nut (35) is threadedly connected to the second screw (32).

6. The super-long tower crane attachment hoop support according to claim 5, characterized in that: A rubber pad (34) is fixed on the inner side of the clamping plate (33).

7. The super-long tower crane attachment hoop support according to claim 1, characterized in that: The adjusting rod (1), the limiting column (2), the connecting piece and the fine-adjusting clamping piece are all made of steel.

8. The super-long tower crane attachment hoop support according to claim 1, characterized in that: A fixing ring (23) is welded on the outer wall of the limiting column (2).

9. The super-long tower crane attachment hoop support according to claim 1, characterized in that: A connecting seat (4) is welded in the middle of the outer side of one of the adjusting rods (1), and a plurality of threaded holes are formed on the connecting seat (4).

10. The super-long tower crane attachment hoop support according to claim 1, characterized in that: The limiting column (2) and the mounting block (22) are integrally formed.