Aluminum alloy cable heat treatment stranding continuous production line and production process thereof
By designing a continuous production line for heat treatment of aluminum alloy cables, connecting the three processes of cleaning, annealing and twisting to make bundles, the problem of mismatch in process speeds in the existing production lines is solved, and production efficiency and product quality are improved.
Patent Information
- Application Number
- CN202411894392.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-20
- Publication Date
- 2025-03-28
AI Technical Summary
In the existing aluminum alloy wire production lines, the speed difference between the three processes of cleaning, heat treatment and stranding are large, resulting in low production efficiency, especially in large-scale production, it is difficult to meet the requirements of high efficiency, energy saving, and green environmental protection.
A continuous production line for heat treatment of aluminum alloy cables is designed, and a continuous production process of three processes such as cleaning, annealing and twisting are formed by successively setting up a wire laying frame, a wire laying guide wheel frame, a cleaning machine, a continuous annealing furnace and a wire bundle.
By connecting the three processes of cleaning, annealing and stranding into a bundle, a continuous production line is formed, which improves production efficiency, shortens production processes, reduces costs, and improves product quality.
Smart Images

Figure CN119710210A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of aluminum alloy conductor material processing, and in particular to an aluminum alloy cable heat treatment and twisting continuous production line and a production process thereof. Background Art
[0002] In recent years, aluminum alloy wires with strong torsion resistance and bending performance have been developed for new energy wind power, photovoltaics, etc. The production of aluminum alloy wires is more complicated than copper wires. The wire drawing lubricants used in the production process of aluminum alloy wires are mainly oil-based. Aluminum alloy wires with a diameter of less than 0.5 mm may use emulsions in the drawing process, and the emulsion must increase the oil content to meet the drawing process requirements of aluminum alloy wires. In order to remove the residual oily lubricant on the surface of the aluminum alloy wire, a cleaning process must be added before the annealing heat treatment process can be entered. It is not convenient to clean during high-speed wire drawing, and cleaning requires a single process. The subsequent annealing heat treatment is annealed in a coiled wire box furnace, and then bundled into strands after annealing. The wire bundling machine is currently the fastest equipment for stranding aluminum alloy wires with thinner diameters into stranded wires, but compared with the manufacturing process of aluminum alloy wires with thicker diameters, the efficiency of the wire bundling machine is still relatively low. The cleaning, annealing and bundle twisting processes of aluminum alloy wires with smaller diameters are independent, which leads to low efficiency. This is acceptable in small-batch production, but when the product usage increases, high efficiency, energy saving and green environmental protection become the main goals.
[0003] How to design a production line that can connect three processes of cleaning, heat treatment and stranding at similar speeds to improve production efficiency is a problem that technicians in this field need to solve. Summary of the invention
[0004] In view of the shortcomings of the prior art mentioned above, the technical problem solved by the present invention is to provide an aluminum alloy cable heat treatment and stranding continuous production line and production process that can connect three processes of similar speeds, namely cleaning, heat treatment and stranding, to improve production efficiency.
[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides an aluminum alloy cable heat treatment and stranding continuous production line, comprising: a pay-off frame, a pay-off and wire guide wheel frame, a cleaning machine, a continuous annealing furnace and a wire bundling machine arranged in sequence;
[0006] The pay-off frame is provided with a pay-off drum for winding the aluminum alloy single wire; the pay-off wire guide wheel frame is used to support the aluminum alloy single wire; a cleaning section outlet wire storage device is provided between the cleaning machine and the continuous annealing furnace; an annealing section outlet wire storage device is provided between the continuous annealing furnace and the wire bundling machine; a plurality of wire splitting guide wheel frames are provided between the annealing section outlet wire storage device and the wire bundling machine; a spare wire pay-off and take-up machine is provided between the annealing section outlet wire storage device and all the wire splitting guide wheel frames; all the wire splitting guide wheel frames are arranged in parallel, and a furnace-out wire breakage protection device is provided between the continuous annealing furnace and the annealing section outlet wire storage device; a cleaning wire breakage protection device is provided between the cleaning machine and the cleaning section outlet wire storage device;
[0007] The cleaning machine comprises a housing, wherein a flushing module, a drying module and a traction component are arranged inside the housing; the flushing module is used to flush the aluminum alloy single wire, and the drying module is used to dry the aluminum alloy single wire; the traction component is used to pull the aluminum alloy single wire;
[0008] The wire bundling machine is provided with a wire take-up drum, on which the stranded wires bundled into bundles are wound.
[0009] Preferably, the continuous annealing furnace comprises a heating annealing section and a cooling section which are connected in sequence.
[0010] Furthermore, the heating annealing section includes a heating temperature rising section and a soaking section which are arranged in sequence.
[0011] Furthermore, an annealing furnace wheel traction machine is provided at the outlet of the continuous annealing furnace.
[0012] Furthermore, an air blowing nozzle is provided at the entrance of the continuous annealing furnace.
[0013] The present invention also relates to a production process of the aluminum alloy cable heat treatment and stranding continuous production line, comprising the following steps:
[0014] 1) When the aluminum alloy cable heat treatment and twisting continuous production line is started, all aluminum alloy single wires are transported in the aluminum alloy cable heat treatment and twisting continuous production line, the flushing module rinses all aluminum alloy single wires entering the cleaning machine, and the drying module dries all aluminum alloy single wires entering the cleaning machine; the blowing nozzle at the entrance of the continuous annealing furnace blows cold air to all aluminum alloy single wires passing through, and the continuous annealing furnace anneals the aluminum alloy single wires; after the wheeled traction machine of the annealing furnace pulls all the aluminum alloy single wires out of the continuous annealing furnace, all the aluminum alloy single wires enter the corresponding branching guide wheel frame, and then enter the wire bundling machine to form stranded wires;
[0015] 2) When the aluminum alloy cable heat treatment and twisting continuous production line is started, all aluminum alloy single wires are transported in the aluminum alloy cable heat treatment and twisting continuous production line, the flushing module flushes all aluminum alloy single wires entering the cleaning machine, and the drying module blows dry all aluminum alloy single wires entering the cleaning machine; the blowing nozzle at the entrance of the continuous annealing furnace blows cold air to all aluminum alloy single wires passing through, the continuous annealing furnace heats all aluminum alloy single wires entering the continuous annealing furnace, and the drying module blows dry all aluminum alloy single wires entering the continuous annealing furnace; after the annealing furnace wheel traction machine pulls all aluminum alloy single wires out of the continuous annealing furnace, all aluminum alloy single wires enter all the branching guide wheel frames, and then enter the wire bundling machine to form stranded wires;
[0016] When the wire take-up reel on the wire bundling machine needs to be replaced, the wire bundling machine is stopped, and the aluminum alloy single wire is stored in the annealing part outlet wire storage device at the front end of the wire bundling machine;
[0017] When the aluminum alloy single wire in the cleaning machine breaks and forms a broken wire, the cleaning broken wire protection device is activated, the wire bundling machine stops, and the wire bundling machine outputs an alarm signal; the spare wire on the spare wire take-up and pay-off machine is used to connect the broken wire head entering the wire bundling machine, and then the wire bundling machine is started to continue running;
[0018] When the aluminum alloy single wire in the continuous annealing furnace breaks and forms a broken wire, the furnace-out broken wire protection device is activated, the wire bundling machine stops, and the wire bundling machine outputs an alarm signal; the spare wire on the spare wire take-up and pay-off machine is used to connect with the broken end of the broken wire entering the wire bundling machine, and then the wire bundling machine is started to continue running.
[0019] As described above, the aluminum alloy cable heat treatment and stranding continuous production line and production process of the present invention have the following beneficial effects:
[0020] The aluminum alloy cable heat treatment and twisting continuous production line and its production process connect the three processes of cleaning, annealing and twisting into bundles with similar speeds to form a continuous production process, shortening the production process, reducing investment, lowering costs, and improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 Shown is a side structural schematic diagram of the aluminum alloy cable heat treatment and stranding continuous production line of this embodiment.
[0022] Figure 2 Shown is a schematic diagram of the top view of the aluminum alloy cable heat treatment and stranding continuous production line of this embodiment.
[0023] Description of Figure Numbers
[0024] 10 Aluminum alloy single wire
[0025] 100 Pay-off rack
[0026] 110 Pay-off reel
[0027] 200 Pay-off and wire guide wheel frame
[0028] 300 Cleaning Machine
[0029] 310 Case
[0030] 320 Flushing Module
[0031] 330 Blow Dry Module
[0032] 340 Traction components
[0033] 400 Continuous Annealing Furnace
[0034] 410 Heating annealing section
[0035] 420 Cooling Section
[0036] 430 Annealing Furnace Wheel Hauler
[0037] 440 Blowing nozzle
[0038] 500 Cable Wire Machine
[0039] 510 Take-up Reel
[0040] 610 Cleaning outlet wire storage device
[0041] 620 Annealing Department Exit Wire Storage Device
[0042] 700 Line guide wheel frame
[0043] 800 Spare wire pay-off and take-up machine
[0044] 910 Furnace disconnection protection device
[0045] 920 Cleaning disconnection protection device DETAILED DESCRIPTION
[0046] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0047] Please refer to the attached drawings. It should be noted that the structures, proportions, sizes, etc. illustrated in the attached drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change in the proportional relationship, or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.
[0048] like Figure 1 and Figure 2 As shown, the aluminum alloy cable heat treatment and stranding continuous production line of this embodiment comprises: a pay-off frame 100, a pay-off and wire guide wheel frame 200, a cleaning machine 300, a continuous annealing furnace 400 and a wire bundling machine 500 which are arranged in sequence;
[0049] The pay-off frame 100 is provided with a pay-off drum 110 for winding the aluminum alloy single wire 10; the pay-off wire guide wheel frame 200 is used to support the aluminum alloy single wire 10; a cleaning section outlet wire storage device 610 is provided between the cleaning machine 300 and the continuous annealing furnace 400; an annealing section outlet wire storage device 620 is provided between the continuous annealing furnace 400 and the wire bundling machine 500; a plurality of branch wire guide wheel frames 700 are provided between the annealing section outlet wire storage device 620 and the wire bundling machine 500; a spare wire pay-off and take-up machine 800 is provided between the annealing section outlet wire storage device 620 and all the branch wire guide wheel frames 700; all the branch wire guide wheel frames 700 are arranged in parallel, and a furnace-out wire breakage protection device 910 is provided between the continuous annealing furnace 400 and the annealing section outlet wire storage device 620; a cleaning wire breakage protection device 920 is provided between the cleaning machine 300 and the cleaning section outlet wire storage device 610;
[0050] The cleaning machine 300 includes a housing 310, and a flushing module 320, a drying module 330 and a traction component 340 are arranged inside the housing 310; the flushing module 320 is used to flush the aluminum alloy single wire 10, and the drying module 330 is used to dry the aluminum alloy single wire 10; the traction component 340 is used to pull the aluminum alloy single wire 10;
[0051] The wire bundling machine 500 is provided with a wire take-up drum 510 , on which the stranded wires bundled into bundles are wound.
[0052] The aluminum alloy cable heat treatment and twisting continuous production line and its production process connect the three processes of cleaning, annealing and twisting into bundles with similar speeds to form a continuous production process, shortening the production process, reducing investment, lowering costs, and improving production efficiency.
[0053] Compared with the existing technology, the aluminum alloy cable heat treatment and twisting continuous production line and its production process have increased production efficiency to more than 48%, reduced process waste at the head and tail by 1% to 3%, reduced energy consumption by 35%, reduced the number of operators by 2 to 3, reduced production costs, and improved product quality.
[0054] The aluminum alloy cable heat treatment and twisting continuous production line and its production process form a continuous production process and carry out intelligent control; among the three processes of cleaning, annealing and twisting into bundles, the annealing process has the highest energy consumption. The annealing process consumes the most energy during the heating and temperature rising stage and when the aluminum alloy cable heat treatment and twisting continuous production line is in high-speed operation, and can utilize valley power. The peak power stage can be used when the aluminum alloy cable heat treatment and twisting continuous production line is in low-speed operation or shutdown for line change.
[0055] In view of the shortcomings of discontinuity and low efficiency of the production process of the prior art, in the present invention, by adjusting the transmission speed of the aluminum alloy cable heat treatment and twisting continuous production line, the aluminum alloy cable heat treatment and twisting continuous production line can be operated in high-speed operation, low-speed operation, shutdown and line change operations, so as to make full use of valley electricity, use less or no peak electricity, and achieve low-cost and efficient production.
[0056] The continuous annealing furnace 400 includes a sequentially connected heating annealing section 410 and a cooling section 420. The continuous annealing furnace 400 can stably perform an annealing operation.
[0057] The heating annealing section 410 includes a heating temperature rising section and a soaking section arranged in sequence. The temperature of the heating temperature rising section in the continuous annealing furnace 400 is 180° C. to 490° C. The annealing speed of the continuous annealing furnace 400 is 10 to 120 m / min, and the annealing speed of the continuous annealing furnace 400 is adjustable.
[0058] An annealing furnace wheel traction machine 430 is provided at the exit of the continuous annealing furnace 400. The arrangement of the heating temperature rising section and the soaking section can stably realize the heating operation.
[0059] The inlet of the continuous annealing furnace 400 is provided with a blowing nozzle 440 . The blowing nozzle 440 is a high-pressure rapid cooling blowing nozzle 440 . The blowing nozzle 440 blows high-pressure rapid cooling gas to the aluminum alloy single wire 10 .
[0060] The production process of the aluminum alloy cable heat treatment and stranding continuous production line of this embodiment includes the following steps:
[0061] 1) When all the aluminum alloy single wires 10 are installed on the aluminum alloy cable heat treatment stranding continuous production line, multiple aluminum alloy single wires 10 are released from the pay-off frame 100, and all the aluminum alloy single wires 10 enter the cleaning machine 300 through the pay-off wire guide wheel frame 200; after all the aluminum alloy single wires 10 pass through the cleaning wire break protection device 920, they enter the cleaning part outlet wire storage device 610; after that, all the aluminum alloy single wires 10 pass through the continuous annealing furnace 400, and then pass through the annealing furnace wheel traction machine 430, and then pass through the furnace break protection device 910, and enter the annealing part outlet wire storage device 620; then, all the aluminum alloy single wires 10 first pass through the spare wire pay-off machine 800, and all the aluminum alloy single wires 10 respectively pass through the corresponding branch wire guide wheel frames 700, and then enter the wire bundling machine 500;
[0062] 2) When the aluminum alloy cable heat treatment and twisting continuous production line is started, all the aluminum alloy single wires 10 are transported in the aluminum alloy cable heat treatment and twisting continuous production line, the flushing module 320 rinses all the aluminum alloy single wires 10 entering the cleaning machine 300, and the drying module 330 dries all the aluminum alloy single wires 10 entering the cleaning machine 300; the blowing nozzle 440 at the entrance of the continuous annealing furnace 400 blows cold air to all the aluminum alloy single wires 10 passing through, and the continuous annealing furnace 400 anneals the aluminum alloy single wires 10; after the annealing furnace wheel traction machine 430 pulls all the aluminum alloy single wires 10 out of the continuous annealing furnace 400, all the aluminum alloy single wires 10 enter the corresponding branching guide wheel frame 700, and then enter the wire bundling machine 500 to form a stranded wire bundle;
[0063] When the wire take-up reel 510 on the wire bundling machine 500 needs to be replaced, the wire bundling machine 500 is stopped, and the aluminum alloy single wire 10 is stored through the annealing section outlet wire storage device 620 at the front end of the wire bundling machine 500;
[0064] When the aluminum alloy single wire 10 in the cleaning machine 300 breaks and forms a broken wire, the cleaning broken wire protection device 920 is started, the wire bundling machine 500 stops, and the wire bundling machine 500 outputs an alarm signal; the spare wire on the spare wire take-up and pay-off machine 800 is connected to the broken joint of the broken wire entering the wire bundling machine 500, and then the wire bundling machine 500 is started to continue running;
[0065] When the aluminum alloy single wire 10 in the continuous annealing furnace 400 breaks and forms a broken wire, the furnace-out broken wire protection device 910 is started, the wire bundling machine 500 stops, and the wire bundling machine 500 outputs an alarm signal; the spare wire on the spare wire take-up and pay-off machine 800 is connected to the broken joint of the broken wire entering the wire bundling machine 500, and then the wire bundling machine 500 is started to continue running.
[0066] In this embodiment, the outer diameter of the pay-off drum 110 is 280-400 mm, the wire loading length of the pay-off drum 110 is 20000-60000 m, and the aluminum alloy single wire 10 is paid out from the pay-off frame 100 .
[0067] When the aluminum alloy single wire 10 enters the cleaning machine 300, the aluminum alloy single wire 10 passes through the flushing module 320 and the blow-drying module 330 in the cleaning machine 300, and then the aluminum alloy single wire 10 passes through the traction component 340, and then the aluminum alloy single wire 10 passes through the cleaning wire break protection device 920 and enters the annealing section outlet wire storage device 620; at this time, the cleaning machine 300 starts the low-speed cleaning mode, and the flushing module 320 of the cleaning machine 300 includes a cleaning module and a rinsing module, one of the blow-drying modules 330 is arranged between the cleaning module and the rinsing module, and the other blow-drying module 330 is arranged behind the rinsing module.
[0068] The aluminum alloy single wire 10 in the cleaning machine 300 is cleaned by the three-stage cleaning module, blown dry by the same pressure gas of one of the blowing modules 330, and then enters the second-stage rinsing module to rinse the aluminum alloy single wire 10, and blown dry by the high-pressure gas of another blowing module 330, and then the aluminum alloy single wire 10 is pulled out of the cleaning machine 300 by the traction component 340 and enters the continuous annealing furnace 400. The length of the wire storage device 620 at the outlet of the annealing section that can store wire is 200m. The length of the wire storage device 620 at the outlet of the annealing section that can store wire is 500m. The diameter of the wire take-up reel 510 is 500-630mm; the reel change time of the wire take-up reel 510 is 18-35 minutes each. Environmentally friendly cleaning agents are used in the cleaning module.
[0069] The continuous annealing speed in the continuous annealing furnace 400 is used as the control base point of the aluminum alloy cable heat treatment and stranding continuous production line. The speeds of the cleaning machine 300 and the wire bundling machine 500 are increased and decreased according to the speed of the continuous annealing furnace 400. The continuous annealing speed in the continuous annealing furnace 400 is determined according to the heating temperature in the continuous annealing furnace 400.
[0070] The pay-off drum 110 is replaced once a day. During the peak electricity consumption period, the aluminum alloy cable heat treatment into stranded continuous production line is shut down and the pay-off drum 110 is replaced or operated at a low speed. During the off-peak period, the temperature is increased and the aluminum alloy cable heat treatment into stranded continuous production line is operated at a high speed.
[0071] The stranded wire produced by the aluminum alloy cable heat treatment and twisting continuous production line of the present invention mainly replaces the corresponding copper conductor. The performance of the stranded wire has reached or exceeded the level of the copper conductor, but the manufacturing cost of the stranded wire is reduced by about 50% compared with the copper conductor, which saves copper resources and has economic and social benefits.
[0072] Compared with the prior art, the present invention can connect the three processes of cleaning, annealing and twisting into bundles to form a continuous, automatic and intelligent production line, which greatly improves the production efficiency of fine wire strands, and the production efficiency is increased by at least 48%. At the same time, it also reduces production processes and intermediate flows, reduces energy consumption, and reduces the number of operators, ultimately reducing the production cost of fine wire strands and improving product quality.
[0073] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A continuous production line for heat treatment of aluminum alloy cables, characterized in that: include: A wire pay-off frame (100), a wire pay-off guide wheel frame (200), a cleaning machine (300), a continuous annealing furnace (400) and a wire bundling machine (500) are arranged in sequence; The pay-off frame (100) is provided with a pay-off drum (110) for winding the aluminum alloy single wire (10); the pay-off wire guide wheel frame (200) is used to support the aluminum alloy single wire (10); a cleaning section outlet wire storage device (610) is provided between the cleaning machine (300) and the continuous annealing furnace (400); an annealing section outlet wire storage device (620) is provided between the continuous annealing furnace (400) and the wire bundling machine (500); the annealing section A plurality of wire-dividing guide wheel frames (700) are provided between the outlet wire storage device (620) and the wire-bundling machine (500); a spare wire-reeling and -reeling machine (800) is provided between the outlet wire storage device (620) of the annealing section and all the wire-dividing guide wheel frames (700); all the wire-dividing guide wheel frames (700) are arranged in parallel, and a furnace-out wire-breakage protection device (910) is provided between the continuous annealing furnace (400) and the outlet wire storage device (620) of the annealing section; A cleaning wire break protection device (920) is provided between the cleaning machine (300) and the cleaning section outlet wire storage device (610); the cleaning machine (300) comprises a housing (310), and a flushing module (320), a blow-drying module (330) and a traction component (340) are provided inside the housing (310); the flushing module (320) is used to flush the aluminum alloy single wire (10), and the blow-drying module (330) is used to blow dry the aluminum alloy single wire (10); the traction component (340) is used to traction the aluminum alloy single wire (10); The wire bundling machine (500) is provided with a wire take-up drum (510), and the stranded wires that are bundled are wound around the wire take-up drum (510).
2. The aluminum alloy cable heat treatment and stranding continuous production line according to claim 1 is characterized by: The continuous annealing furnace (400) comprises a heating annealing section (410) and a cooling section (420) which are connected in sequence.
3. The aluminum alloy cable heat treatment and stranding continuous production line according to claim 2 is characterized by: The heating annealing section (410) comprises a heating temperature rising section and a soaking section which are arranged in sequence.
4. The aluminum alloy cable heat treatment and stranding continuous production line according to claim 3 is characterized by: An annealing furnace wheel traction machine (430) is provided at the outlet of the continuous annealing furnace (400).
5. The aluminum alloy cable heat treatment and stranding continuous production line according to claim 4 is characterized by: An air blowing nozzle (440) is provided at the entrance of the continuous annealing furnace (400).
6. A production process for the continuous stranding production line for heat treatment of aluminum alloy cables as claimed in claim 5, characterized in that: The following steps are involved: 1) When all aluminum alloy single wires (10) are installed on an aluminum alloy cable heat treatment stranding continuous production line, multiple aluminum alloy single wires (10) are released from a pay-off frame (100), and all aluminum alloy single wires (10) enter a cleaning machine (300) through a pay-off wire guide wheel frame (200); after all aluminum alloy single wires (10) pass through the cleaning machine (300), they pass through a cleaning wire break protection device (920) and enter a cleaning section outlet wire storage device (610); Afterwards, all the aluminum alloy single wires (10) pass through the continuous annealing furnace (400), and then pass through the annealing furnace wheel traction machine (430), and then pass through the furnace break protection device (910) to enter the annealing section outlet wire storage device (620); then, all the aluminum alloy single wires (10) first pass through the spare wire take-up and pay-off machine (800), and all the aluminum alloy single wires (10) respectively pass through the corresponding wire distribution guide wheel frame (700) and enter the wire bundling machine (500); 2) When the aluminum alloy cable heat treatment and twisting continuous production line is started, all aluminum alloy single wires (10) are transported in the aluminum alloy cable heat treatment and twisting continuous production line, the flushing module (320) flushes all aluminum alloy single wires (10) entering the cleaning machine (300), and the drying module (330) dries all aluminum alloy single wires (10) entering the cleaning machine (300); the blowing nozzle (440) at the entrance of the continuous annealing furnace (400) blows cold air to all aluminum alloy single wires (10) passing through, and the continuous annealing furnace (400) anneals the aluminum alloy single wires (10); after the annealing furnace wheel traction machine (430) pulls all aluminum alloy single wires (10) out of the continuous annealing furnace (400), all aluminum alloy single wires (10) enter the corresponding branching guide wheel frame (700), and then enter the wire bundling machine (500) to form stranded wires; When the wire take-up reel (510) on the wire bundling machine (500) needs to be replaced, the wire bundling machine (500) is stopped, and the aluminum alloy single wire (10) is stored through the wire storage device (620) at the annealing section outlet at the front end of the wire bundling machine (500); when the aluminum alloy single wire (10) in the cleaning machine (300) is broken and a broken wire is formed, the cleaning broken wire protection device (920) is started, the wire bundling machine (500) is stopped, and the wire bundling machine (500) outputs an alarm signal; the spare wire on the spare wire take-up and pay-off machine (800) is connected to the disconnecting joint of the broken wire entering the wire bundling machine (500), and then the wire bundling machine (500) is started to continue running; When the aluminum alloy single wire (10) in the continuous annealing furnace (400) breaks and forms a broken wire, the furnace-out broken wire protection device (910) is started, the wire bundling machine (500) stops, and the wire bundling machine (500) outputs an alarm signal; the spare wire on the spare wire take-up and pay-off machine (800) is connected to the disconnecting joint of the broken wire entering the wire bundling machine (500), and then the wire bundling machine (500) is started to continue to operate.