Through the BIM-based prefabricated station building design optimization method, the problems of modular design and energy efficiency control in prefabricated station building are solved, efficient component production and energy management are achieved, and the sustainability of the station building is improved.

CN119761086AInactive Publication Date: 2025-04-04CHINA RAILWAY DESIGN GRP CO LTD

Patent Information

Application Number
CN202510271932.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-10
Publication Date
2025-04-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, assembly components cannot be modularly designed in prefabricated station buildings, and the production quality of components is not strictly supervised, making it difficult to effectively control the energy utilization efficiency of assembly station buildings.

Method used

The prefabricated station building design optimization method based on BIM (building information model) is adopted, and three-dimensional modeling is obtained by obtaining station building design data, and standardized component library data are obtained for modular design, ensuring the quality control of component production and supply chain, and energy efficiency analysis and renewable energy design are carried out according to energy needs.

Benefits of technology

The modular design and production quality supervision of prefabricated station building components has been realized, energy utilization efficiency has been improved, energy consumption has been reduced, and the sustainability of station building has been enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119761086A_ABST
    Figure CN119761086A_ABST
Patent Text Reader

Abstract

The invention is suitable for the technical field of station building data optimization processing, and provides a BIM-based fabricated station building design optimization method and system, and the method comprises the steps: obtaining station building design data, and carrying out the three-dimensional modeling according to the station building design data; standardized components are obtained through station building component library data, modular design is composed of the standardized components, the component size, the component position and the component connecting mode of the standardized components are determined through the modular design, and visual processing is conducted on the modular design; component production is carried out according to the standardized component, a production result is compared with an error threshold value, and a supply chain threshold value is compared with monitoring data; the energy demand is obtained according to three-dimensional modeling, the current station building energy efficiency analysis result is obtained, the current station building energy efficiency analysis result is compared according to the energy demand, and the problems that in an assembly type station building in the prior art, modular design cannot be conducted on assembly components, the production quality of the components cannot be supervised, and the production efficiency is poor are solved. And energy of the assembly station building cannot be effectively controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of station building data optimization processing, and in particular relates to a BIM-based prefabricated station building design optimization method and system. Background Art

[0002] As the world's attention to energy efficiency and sustainable power stations continues to increase, the power station industry has an increasingly urgent need for energy demand optimization, energy efficiency analysis, and green power station design during design and construction. Especially in the power station operation stage, how to reduce energy consumption through accurate energy consumption prediction and effective energy-saving design has become an important consideration in power station design.

[0003] Traditional station building design and construction methods often rely on manual calculations, paper drawings, and scattered engineering data, which not only makes energy efficiency optimization more difficult, but also makes it difficult to accurately estimate the energy demand and consumption of the station building in the early stages of design. Energy efficiency analysis in station building design mainly relies on empirical data and manual calculations, and lacks real-time digital analysis tools, which makes it difficult to fully optimize the energy utilization efficiency in station building design.

[0004] In the prior art, there are problems that the assembled components in the prefabricated station building cannot be modularly designed, the production quality of the components cannot be supervised, and the energy of the assembly station building cannot be effectively controlled. Summary of the invention

[0005] The purpose of the embodiment of the present invention is to provide a BIM-based prefabricated station building design optimization method, aiming to solve the problems raised in the third part of the background technology.

[0006] The embodiment of the present invention is implemented as follows: a BIM-based prefabricated station building design optimization method, the method comprising: Acquire station building design data, wherein the station building design data includes components, and perform three-dimensional modeling according to the station building design data; Acquire the station building component library data, obtain standardized components through the station building component library data, modular design is composed of standardized components, and the component size, component position and component connection method of the standardized components are determined through modular design, and the modular design is visualized; Acquisition and processing stage: produce components according to standardized components, compare production results with error thresholds, and re-produce components if it is determined to exceed the threshold; compare supply chain thresholds with monitoring data, and re-plan the supply chain if it is determined to exceed the threshold; Obtain energy demand based on three-dimensional modeling, obtain the energy efficiency analysis results of the current station building, compare the energy efficiency analysis results of the current station building with the energy demand, and if the analysis result is less than the energy demand, increase the renewable energy design.

[0007] Preferably, the steps of acquiring station building component library data, obtaining standardized components through the station building component library data, modular designing through standardized components, determining component sizes, component positions and component connection methods of standardized components through modular design, and visualizing the modular design specifically include: Acquire station building component library data, where the station building component library data is created through BIM technology, and obtain standardized components through the station building component library data; Obtaining a modular design, wherein the modular design is a prefabricated, reusable large-scale assembly, the modular design is composed of standardized components, and the component size, component location and component connection method of the standardized components are determined by the modular design; The modular design is visualized as a component three-dimensional model, and the visualization result is sent to the terminal.

[0008] Preferably, the acquisition and processing link comprises the steps of producing components according to standardized components, comparing the production results with the error threshold, reproducing the components if it is determined to exceed the threshold, and comparing the supply chain threshold with the monitoring data, and replanning the supply chain if it is determined to exceed the threshold, specifically including: Obtaining a processing link, wherein the processing link includes component production and supply chain, producing components according to standardized components, obtaining production results, and obtaining an error threshold, wherein the error threshold is the maximum error allowed in the production process; Compare the production results with the error threshold, and if it is determined that the threshold is exceeded, re-produce the component and obtain monitoring data, which is used to monitor the supply chain, including material procurement, transportation and storage; Obtain a supply chain threshold, which is the minimum requirement for the production plan, and compare the supply chain threshold with the monitoring data. If it is determined to exceed the threshold, re-plan the supply chain.

[0009] Preferably, the step of obtaining energy demand according to three-dimensional modeling, obtaining the energy efficiency analysis result of the current station building, comparing the energy efficiency analysis result of the current station building according to the energy demand, and adding a step of renewable energy design if the analysis result is less than the energy demand, specifically includes: Obtaining energy demand based on three-dimensional modeling, where the energy demand is the energy consumption limit of the station building; Obtain the energy efficiency analysis results of the current station building. The energy efficiency analysis is to simulate the energy performance of the station building through BIM. The energy performance simulation includes thermal performance, air conditioning load, lighting effect and energy consumption; Compare the current station building energy efficiency analysis results with the energy demand. If the analysis result is less than the energy demand, increase the renewable energy design.

[0010] Preferably, the renewable energy design includes solar panels and wind power generation.

[0011] Another object of an embodiment of the present invention is to provide a BIM-based prefabricated station building design optimization system, the system comprising: A data acquisition module, which acquires station building design data, wherein the station building design data includes components, and performs three-dimensional modeling according to the station building design data; Standardization module, obtains station building component library data, obtains standardized components through station building component library data, modular design is composed of standardized components, component size, component position and component connection method of standardized components are determined through modular design, and modular design is visualized; Processing module, obtains processing links, produces components according to standardized components, compares production results with error thresholds, and re-produces components if it is determined to exceed the threshold, compares supply chain thresholds with monitoring data, and re-plans the supply chain if it is determined to exceed the threshold; The energy module obtains energy demand based on three-dimensional modeling, obtains the energy efficiency analysis results of the current station building, and compares the energy efficiency analysis results of the current station building with the energy demand. If the analysis result is less than the energy demand, renewable energy design is added.

[0012] Preferably, the standardization module includes: The standardization unit obtains station building component library data, wherein the station building component library data is created by BIM technology, and obtains standardized components through the station building component library data; Modular units, obtaining modular designs, wherein the modular designs are prefabricated, reusable large-scale components, the modular designs are composed of standardized components, and the component sizes, component positions, and component connection methods of the standardized components are determined by the modular designs; The visualization unit performs visualization processing on the modular design, wherein the visualization processing is a three-dimensional model of the component, and sends the visualization processing result to the terminal.

[0013] Preferably, the processing module comprises: A processing unit obtains a processing link, wherein the processing link includes component production and supply chain, performs component production according to standardized components, obtains production results, and obtains an error threshold, wherein the error threshold is a maximum error allowed in the production process; The supply chain unit compares the production results with the error threshold, and if it is determined that the error exceeds the threshold, the component production is restarted, and monitoring data is obtained. The monitoring data is used to monitor the supply chain, which includes material procurement, transportation and storage; The re-planning unit obtains a supply chain threshold, which is the minimum requirement for the production plan, and compares the supply chain threshold with the monitoring data. If it is determined that the threshold is exceeded, the supply chain is re-planned.

[0014] Preferably, the energy module comprises: An energy demand unit, which obtains energy demand based on three-dimensional modeling, wherein the energy demand is the energy consumption limit of the station building; Energy efficiency analysis unit, which obtains the energy efficiency analysis result of the current station building. The energy efficiency analysis is to simulate the energy performance of the station building through BIM. The energy performance simulation includes thermal performance, air conditioning load, lighting effect and energy consumption; Renewable energy unit, compare the current station energy efficiency analysis results according to the energy demand. If the analysis result is less than the energy demand, increase the renewable energy design.

[0015] Preferably, the renewable energy design includes solar panels and wind power generation.

[0016] An embodiment of the present invention provides a method for optimizing the design of an assembled station building based on BIM, which includes obtaining station building design data, the station building design data including components, performing three-dimensional modeling according to the station building design data, obtaining station building component library data, obtaining standardized components through the station building component library data, obtaining modular design, the modular design is composed of standardized components, determining the component size, component position and component connection method of the standardized components through the modular design, visualizing the modular design, sending the visualization processing result to a terminal, obtaining a processing link, producing components according to the standardized components, obtaining a production result, obtaining an error threshold, comparing the production result with the error threshold, and reproducing the components if it is determined that the threshold is exceeded. Production, obtain monitoring data, obtain supply chain thresholds, compare supply chain thresholds with monitoring data, and re-plan the supply chain if it is determined to exceed the threshold. Obtain energy demand based on three-dimensional modeling and obtain the current station building energy efficiency analysis results. Energy efficiency analysis is to simulate the energy performance of station buildings through BIM. Energy performance simulation includes thermal performance, air conditioning load, lighting effects and energy consumption. Compare the current station building energy efficiency analysis results according to energy demand. If the analysis result is less than the energy demand, increase renewable energy design. This solves the problems in the prior art that assembled components cannot be modularly designed, the production quality of components cannot be supervised, and the energy of assembled stations cannot be effectively controlled. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A flowchart of a BIM-based prefabricated station building design optimization method provided in an embodiment of the present invention; Figure 2 A flowchart of the steps of obtaining the station building component library data, modular design through standardized component composition, and visualizing the modular design provided by the embodiment of the present invention; Figure 3A flowchart of the steps of producing components according to standardized components, comparing production results with error thresholds, and comparing supply chain thresholds with monitoring data provided by an embodiment of the present invention; Figure 4 A flowchart of the steps of obtaining energy demand according to three-dimensional modeling and comparing the current station building energy efficiency analysis results according to the energy demand provided in an embodiment of the present invention; Figure 5 An architectural diagram of a BIM-based prefabricated station building design optimization system provided in an embodiment of the present invention; Figure 6 An architectural diagram of a standardized module provided by an embodiment of the present invention; Figure 7 An architectural diagram of a processing module provided in an embodiment of the present invention; Figure 8 An architectural diagram of an energy module provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0018] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0019] It is understood that the terms "first", "second", etc. used in this application may be used herein to describe various elements, but unless otherwise specified, these elements are not limited by these terms. These terms are only used to distinguish a first element from another element. For example, without departing from the scope of this application, a first xx script may be referred to as a second xx script, and similarly, a second xx script may be referred to as a first xx script.

[0020] like Figure 1 As shown, a BIM-based prefabricated station building design optimization method provided by an embodiment of the present invention includes: S100, acquiring station building design data, wherein the station building design data includes components, and performing three-dimensional modeling according to the station building design data.

[0021] In this step, the station building design data is obtained. The station building design data includes components. The component data includes detailed information of various station building elements such as walls, beams, columns, floor slabs, doors, windows, stairs, etc., such as the size, material and bearing capacity of columns, the thickness, material and insulation performance of walls, and may also include relevant construction standards, station building regulations, structural specifications and fire safety requirements; Three-dimensional modeling is performed based on the station building design data. Preliminary modeling is performed based on the floor plan, elevation, and section drawings in the station building design data to establish the basic framework of the station building. The basic structure of the station building is formed by positioning and combining components in three-dimensional space. For example, the size and position of columns, beams, and floor slabs are input to create the frame structure of the station building. Three-dimensional modeling provides full life cycle support for station building design, construction, and later operations. The three-dimensional model provides more intuitive and accurate station building information, which can effectively reduce errors, improve collaborative efficiency, optimize design quality, and ultimately improve the feasibility and sustainability of the station building project.

[0022] S200, obtaining station building component library data, obtaining standardized components through the station building component library data, modular design is composed of standardized components, component size, component position and component connection method of the standardized components are determined through modular design, and the modular design is visualized.

[0023] In this step, the station building component library data is obtained. The component library data contains various specifications, materials, performance and other information of the station building components. By obtaining and integrating the station building component library data, the design team can perform modular design based on standardized components. Modular design is to decompose the station building into several prefabricated modules, each module contains multiple standardized components, and is assembled, transported and constructed in a predetermined manner; The size, location and connection method of standardized components are determined through modular design. The size of each component is determined according to the design requirements, functional requirements and construction standards of the project. The layout of standardized components must be determined according to the spatial planning of the station building design. Each component in the modular design needs to be accurately connected according to the construction process. Visualizing modular design can help designers, construction workers and customers understand the design effects, construction steps and expected results more intuitively.

[0024] S300, acquisition processing link, component production is carried out according to standardized components, production results are compared with error thresholds, if it is determined that the threshold is exceeded, component production is carried out again, supply chain thresholds are compared with monitoring data, if it is determined that the threshold is exceeded, supply chain is re-planned.

[0025] In this step, the acquisition process, through BIM technology, the station building design stage will first standardize the modeling of all components to determine the size, shape, material, connection method and other parameters of the components. These components will be mass-produced in the factory and accurately manufactured according to the design drawings; In the component production process, error control is the key. The production accuracy of each component has a preset error range, which is the error threshold. The production results are compared with the error threshold. If the error of the produced component exceeds the set threshold, an alarm will be triggered to prompt the production department to re-produce the component; Compare the supply chain thresholds with the monitoring data, and track the production, transportation, inventory and delivery status of all components through the monitoring data. If the supply chain monitoring system detects that a certain link exceeds the threshold, it will be determined that the threshold is exceeded and the supply chain is re-planned. This will trigger an automated early warning, and the system will automatically re-plan the supply chain based on the current situation.

[0026] S400, obtaining energy demand based on three-dimensional modeling, obtaining energy efficiency analysis results of the current station building, comparing the energy efficiency analysis results of the current station building with the energy demand, and if the analysis result is less than the energy demand, adding renewable energy design.

[0027] In this step, energy demand is obtained based on 3D modeling. Based on the 3D model of the station building, energy analysis tools are used for simulation to obtain the energy efficiency analysis results of the current station building. Energy efficiency analysis is to simulate the energy performance of the station building through BIM. Energy efficiency analysis is a key step to ensure that the station building has lower energy consumption and higher comfort during operation. Compare the current station building energy efficiency analysis results with the energy demand. If the analysis result is less than the energy demand, then increase the renewable energy design. If the energy efficiency analysis result of the station building is lower than the energy demand of the station building, then increasing the renewable energy design becomes an effective means to improve the energy performance of the station building.

[0028] like Figure 2 As shown, as a preferred embodiment of the present invention, the steps of obtaining station building component library data, obtaining standardized components through the station building component library data, modular design is composed of standardized components, determining the component size, component position and component connection method of the standardized components through modular design, and visualizing the modular design specifically include: S201, obtaining station building component library data, wherein the station building component library data is created by BIM technology, and standardized components are obtained through the station building component library data.

[0029] In this step, the station building component library data is obtained. The station building component library data is created through BIM technology. Each component in the BIM model is not only a three-dimensional geometric figure, but also contains multiple attributes, including component type, component size and specification, material, physical properties and construction details. Component types include walls, columns, beams, floors and doors and windows, component sizes and specifications such as wall thickness, column height and diameter, beam span, materials such as reinforced concrete, steel, glass and wood, physical properties such as strength, fire resistance and thermal conductivity, construction details such as component connection method and construction process requirements; Standardized components are obtained through the station building component library data. The use of standardized components greatly reduces duplication of work and material waste in the design and construction process, and can be reused in multiple projects, ensuring uniformity of quality and controllability of construction.

[0030] S202, obtaining a modular design, wherein the modular design is to prefabricate and reuse large-scale components, and the modular design is composed of standardized components, and the component size, component position and component connection method of the standardized components are determined by the modular design.

[0031] In this step, modular design is obtained. Modular design is to design, produce and construct prefabricated, reusable large components by splitting the station building into multiple prefabricated, standardized modules or components. These modules are usually prefabricated in the factory and quickly assembled after being transported to the construction site, which can significantly improve construction efficiency and reduce the complexity and cost of on-site construction; Modular design is composed of standardized components. Modular design includes a series of optimization measures such as the selection of standardized components, the determination of component sizes, the arrangement of component locations, and the connection methods of components. BIM technology plays an important role in this process. It can help designers accurately model and visualize modular components, and optimize functionality and construction. The size, position and connection method of standardized components are determined through modular design to ensure that the modules can be assembled efficiently and safely on the construction site. According to the functional requirements and the structural requirements of the station building, the standardized size of each component is first determined, and the relative position of each component needs to be reasonably arranged. The connection method in the modular design needs to ensure the stability and safety between modules; For example, when designing a prefabricated residential project, a modular design is adopted with the goal of dividing the station building into multiple standardized modules. Each residential unit is a module, such as a bedroom or a living room, and is composed of standardized components. Standardized wall components (such as 3m×4m prefabricated reinforced concrete wall panels), standardized floor components (such as 5m×5m prefabricated reinforced concrete floor panels) and standardized door and window components (such as standardized double-glazed windows) are selected. The size of each wall panel module has been standardized, the wall panel thickness is 200mm, and the window position has been fixed. The positions of the wall modules, door and window modules and floor modules are arranged according to the predetermined functional divisions (such as bedrooms, living rooms, kitchens, etc.), and the modules are connected together with bolts using embedded steel connectors.

[0032] S203, performing visualization processing on the modular design, wherein the visualization processing is a three-dimensional model of the component, and sending the visualization processing result to the terminal.

[0033] In this step, the modular design is visualized into a three-dimensional component model. The modular station building design generated by BIM technology is converted into a visualized three-dimensional model, which is convenient for the design team, construction personnel and customers to intuitively understand, modify and optimize. Each prefabricated module is assembled and positioned according to the design requirements. The connection relationship, construction sequence, and assembly and disassembly methods between each module will be accurately displayed in three-dimensional space to simulate the real construction process.

[0034] like Figure 3 As shown, as a preferred embodiment of the present invention, the acquisition and processing link, producing components according to standardized components, comparing the production results with the error threshold, reproducing the components if it is determined to exceed the threshold, comparing the supply chain threshold with the monitoring data, and replanning the supply chain if it is determined to exceed the threshold, specifically includes: S301, obtaining processing links, the processing links include component production and supply chain, producing components according to standardized components, obtaining production results, and obtaining an error threshold, the error threshold being the maximum error allowed in the production process.

[0035] In this step, the processing links are obtained, which include component production and supply chain. Component production is a very critical step in prefabricated station buildings. The production of standardized components can be carried out by directly connecting intelligent production equipment and BIM models. The component data in the BIM model is automatically transmitted to the production system, so that the production equipment can accurately manufacture components according to these parameters and produce components according to standardized components. Get the production results and the error threshold. The error threshold refers to the maximum error range allowed during the component production process. It is formulated based on multiple factors such as design specifications, material properties, and construction requirements, and is the acceptable deviation range during the production process.

[0036] S302, comparing the production result with the error threshold, if it is determined that the threshold is exceeded, re-producing the component, and obtaining monitoring data, the monitoring data is used to monitor the supply chain, the supply chain includes material procurement, transportation and storage.

[0037] In this step, the production result is compared with the error threshold. If it is determined to exceed the threshold, the component production is repeated. For example, for a wall component, the design thickness is 200mm, and the error threshold may be set to ±1mm, that is, the actual thickness of the wall should be between 199mm and 201mm. Components exceeding this range will be judged as unqualified. Obtain monitoring data. Monitoring data is used to monitor the supply chain. Supply chain management has a huge impact on component production. Ensuring the smooth flow of raw materials, transportation, and storage can avoid production stagnation due to material shortages, delays, or damage. The supply chain includes material procurement, transportation, and storage. For example, the threshold set in the procurement link is that the material inventory is lower than the safety inventory. When a link exceeds the threshold, the supply chain management system will automatically adjust it.

[0038] For example, the material procurement department receives a warning from the supply chain monitoring system and finds that the steel bar inventory is about to fall below the safety inventory. It automatically generates a procurement instruction, notifies the purchaser to place orders in advance and adjust the supplier. At the same time, the transportation department also monitors that the transportation time of prefabricated components may be delayed due to traffic problems. By rearranging the transportation route and adding transportation vehicles, it ensures that the components arrive on time to avoid affecting the construction progress due to insufficient materials or transportation delays.

[0039] S303, obtaining a supply chain threshold, which is the minimum requirement of the production plan, and comparing the supply chain threshold with the monitoring data. If it is determined that the threshold is exceeded, the supply chain is replanned.

[0040] In this step, the supply chain threshold is obtained. The supply chain threshold is the minimum requirement of the production plan and is used to determine whether the execution of a certain link in the supply chain meets the basic requirements of the production plan. The supply chain threshold is set based on historical data, production experience, and demand forecasts. For example, the material procurement threshold refers to the minimum purchase quantity of the required raw materials, the transportation threshold is the threshold of the transportation link, which usually involves transportation time, transportation distance and transportation capacity, and the storage threshold is the minimum quantity requirement for inventory; Compare the supply chain thresholds with the monitoring data. When the monitoring data shows that a certain link in the supply chain exceeds the preset threshold, immediate measures need to be taken to replan the supply chain to avoid affecting the overall production progress.

[0041] like Figure 4 As shown, as a preferred embodiment of the present invention, the energy demand is obtained according to the three-dimensional modeling, the energy efficiency analysis result of the current station is obtained, and the energy efficiency analysis result of the current station is compared with the energy demand. If the analysis result is less than the energy demand, the step of adding renewable energy design is specifically included: S401, obtaining energy demand based on three-dimensional modeling, wherein the energy demand is the energy consumption limit of the station building.

[0042] In this step, energy demand is obtained according to 3D modeling. Based on the 3D model of the station building, energy analysis tools are used for simulation, such as EnergyPlus, to calculate the energy consumption limit of the station building under different seasons and usage conditions. The energy consumption limit is affected by four factors: heat load, lighting load, ventilation load, and equipment load. Heat load refers to the heat inflow and outflow of the station building, including heat conduction and radiation through walls, roofs, and windows, analyzing heating and cooling needs; lighting load refers to the energy demand for lighting inside the station building. It includes a combination of natural light and artificial lighting, as well as the energy efficiency of the lighting system; ventilation load refers to the energy consumed by the ventilation system of the station building; equipment load: the energy demand of the power equipment inside the station building, such as air conditioners, elevators, and computers.

[0043] S402, obtaining the energy efficiency analysis result of the current station building, wherein the energy efficiency analysis is to simulate the energy performance of the station building through BIM, and the energy performance simulation includes thermal performance, air conditioning load, lighting effect and energy consumption.

[0044] In this step, the energy efficiency analysis results of the current station building are obtained. Energy efficiency analysis is to simulate the energy performance of the station building through BIM. Energy efficiency analysis is a key step to ensure that the station building has lower energy consumption and higher comfort during operation. Energy performance simulation includes thermal performance, air conditioning load, lighting effect and energy consumption; thermal performance analysis focuses on factors such as heat conduction, heat radiation and heat convection of station buildings, and evaluates the heat load requirements of station buildings in different seasons; air conditioning load analysis focuses on calculating the air conditioning requirements of station buildings under different climatic conditions; lighting effect analysis evaluates the natural light conditions of station buildings in different seasons and times to ensure that there is enough daylight indoors, while avoiding excessive sunlight exposure that leads to reduced energy efficiency; energy consumption analysis is to calculate the total energy consumption of station buildings by comprehensively considering all energy use requirements of station buildings; Energy performance simulation of station buildings through BIM and energy efficiency analysis can help designers conduct a comprehensive station performance evaluation during the design phase, identify potential energy consumption problems in advance, and reduce energy waste through optimized design. For example, changing the facade material of the station building, optimizing the window design, adjusting the station building layout, and adopting an efficient air conditioning system can significantly improve the energy efficiency of the station building.

[0045] S403, comparing the current station building energy efficiency analysis result with the energy demand, if the analysis result is less than the energy demand, then increasing the renewable energy design.

[0046] In this step, the energy efficiency analysis results of the current station building are compared with the energy demand to evaluate whether the energy efficiency of the existing station building design can meet the predetermined energy consumption limit. If the energy efficiency analysis results of the station building are lower than the energy demand of the station building, then adding renewable energy design becomes an effective means to improve the energy performance of the station building; When the energy efficiency result of the station building obtained through energy efficiency analysis is less than the energy demand of the station building, it means that the existing design of the station building may not be able to meet the prescribed standards or targets in terms of energy consumption. The shortfall can be compensated by adding renewable energy design to enhance the energy self-sufficiency of the station building while reducing dependence on traditional energy. For example, solar photovoltaic panels can be installed on the roof to convert solar energy into electricity.

[0047] like Figure 5 As shown, an embodiment of the present invention provides a BIM-based prefabricated station building design optimization system, the system comprising: The data acquisition module 100 is used to acquire station building design data, wherein the station building design data includes components, and perform three-dimensional modeling based on the station building design data.

[0048] In this system, the data acquisition module 100 acquires station building design data, which includes components. The component data includes detailed information of various station building elements such as walls, beams, columns, floor slabs, doors, windows, stairs, etc., such as the size, material and bearing capacity of columns, the thickness, material and insulation performance of walls, and may also include relevant construction standards, station building regulations, structural specifications and fire safety requirements; Three-dimensional modeling is performed based on the station building design data. Preliminary modeling is performed based on the floor plan, elevation, and section drawings in the station building design data to establish the basic framework of the station building. The basic structure of the station building is formed by positioning and combining components in three-dimensional space. For example, the size and position of columns, beams, and floor slabs are input to create the frame structure of the station building. Three-dimensional modeling provides full life cycle support for station building design, construction, and later operations. The three-dimensional model provides more intuitive and accurate station building information, which can effectively reduce errors, improve collaborative efficiency, optimize design quality, and ultimately improve the feasibility and sustainability of the station building project.

[0049] The standardization module 200 is used to obtain the station building component library data, obtain standardized components through the station building component library data, and the modular design is composed of standardized components. The component size, component position and component connection method of the standardized components are determined through the modular design, and the modular design is visualized.

[0050] In this system, the standardization module 200 obtains the data of the station building component library. The component library data contains various specifications, materials, performance and other information of the station building components. By obtaining and integrating the station building component library data, the design team can perform modular design based on standardized components. Modular design is to decompose the station building into several prefabricated modules, each module contains multiple standardized components, and is assembled, transported and constructed in a predetermined manner; The size, location and connection method of standardized components are determined through modular design. The size of each component is determined according to the design requirements, functional requirements and construction standards of the project. The layout of standardized components must be determined according to the spatial planning of the station building design. Each component in the modular design needs to be accurately connected according to the construction process. Visualizing modular design can help designers, construction workers and customers understand the design effects, construction steps and expected results more intuitively.

[0051] The processing module 300 is used to obtain the processing links, produce components according to standardized components, compare the production results with the error threshold, and re-produce the components if it is determined to exceed the threshold, compare the supply chain threshold with the monitoring data, and re-plan the supply chain if it is determined to exceed the threshold.

[0052] In this system, the processing module 300 obtains the processing links, produces components according to standardized components, compares the production results with the error threshold, and re-produces the components if it is determined to exceed the threshold, compares the supply chain threshold with the monitoring data, and re-plans the supply chain if it is determined to exceed the threshold.

[0053] In this step, the acquisition process, through BIM technology, the station building design stage will first standardize the modeling of all components to determine the size, shape, material, connection method and other parameters of the components. These components will be mass-produced in the factory and accurately manufactured according to the design drawings; In the component production process, error control is the key. The production accuracy of each component has a preset error range, which is the error threshold. The production results are compared with the error threshold. If the error of the produced component exceeds the set threshold, an alarm will be triggered to prompt the production department to re-produce the component; Compare the supply chain thresholds with the monitoring data, and track the production, transportation, inventory and delivery status of all components through the monitoring data. If the supply chain monitoring system detects that a certain link exceeds the threshold, it will be determined that the threshold is exceeded and the supply chain is re-planned. This will trigger an automated early warning, and the system will automatically re-plan the supply chain based on the current situation.

[0054] The energy module 400 is used to obtain energy demand based on three-dimensional modeling, obtain the current station energy efficiency analysis result, compare the current station energy efficiency analysis result with the energy demand, and increase the renewable energy design if the analysis result is less than the energy demand.

[0055] In this system, the energy module 400 obtains energy demand based on three-dimensional modeling, and uses energy analysis tools to simulate based on the three-dimensional model of the station building to obtain the energy efficiency analysis results of the current station building. Energy efficiency analysis is to simulate the energy performance of the station building through BIM. Energy efficiency analysis is a key step to ensure that the station building has lower energy consumption and higher comfort during operation. Compare the current station building energy efficiency analysis results with the energy demand. If the analysis result is less than the energy demand, then increase the renewable energy design. If the energy efficiency analysis result of the station building is lower than the energy demand of the station building, then increasing the renewable energy design becomes an effective means to improve the energy performance of the station building.

[0056] like Figure 6 As shown, as a preferred embodiment of the present invention, the standardization module 200 includes: The standardization unit 201 is used to obtain station building component library data, where the station building component library data is created using BIM technology, and standardized components are obtained using the station building component library data.

[0057] In this module, the standardization unit 201 obtains the station building component library data, which is created by BIM technology. Each component in the BIM model is not only a three-dimensional geometric figure, but also contains multiple attributes, including component type, component size and specification, material, physical properties and construction details. Component types include walls, columns, beams, floors and doors and windows, component sizes and specifications such as wall thickness, column height and diameter, beam span, materials such as reinforced concrete, steel, glass and wood, physical properties such as strength, fire resistance and thermal conductivity, and construction details such as component connection methods and construction process requirements; Standardized components are obtained through the station building component library data. The use of standardized components greatly reduces duplication of work and material waste in the design and construction process, and can be reused in multiple projects, ensuring uniformity of quality and controllability of construction.

[0058] The modular unit 202 is used to obtain a modular design, wherein the modular design is a prefabricated, reusable large-scale assembly, and the modular design is composed of standardized components, and the component size, component position and component connection method of the standardized components are determined by the modular design.

[0059] In this module, the modular unit 202 obtains modular design, which is to design, produce and construct prefabricated, reusable large components by splitting the station building into multiple prefabricated, standardized modules or components. These modules are usually prefabricated in the factory and quickly assembled after being transported to the construction site, which can significantly improve construction efficiency and reduce the complexity and cost of on-site construction; Modular design is composed of standardized components. Modular design includes a series of optimization measures such as the selection of standardized components, the determination of component sizes, the arrangement of component locations, and the connection methods of components. BIM technology plays an important role in this process. It can help designers accurately model and visualize modular components, and optimize functionality and construction. The size, position and connection method of standardized components are determined through modular design to ensure that the modules can be assembled efficiently and safely on the construction site. According to the functional requirements and the structural requirements of the station building, the standardized size of each component is first determined, and the relative position of each component needs to be reasonably arranged. The connection method in the modular design needs to ensure the stability and safety between modules; For example, when designing a prefabricated residential project, a modular design is adopted with the goal of dividing the station building into multiple standardized modules. Each residential unit is a module, such as a bedroom or a living room, and is composed of standardized components. Standardized wall components (such as 3m×4m prefabricated reinforced concrete wall panels), standardized floor components (such as 5m×5m prefabricated reinforced concrete floor panels) and standardized door and window components (such as standardized double-glazed windows) are selected. The size of each wall panel module has been standardized, the wall panel thickness is 200mm, and the window position has been fixed. The positions of the wall modules, door and window modules and floor modules are arranged according to the predetermined functional divisions (such as bedrooms, living rooms, kitchens, etc.), and the modules are connected together with bolts using embedded steel connectors.

[0060] The visualization unit 203 is used to perform visualization processing on the modular design, wherein the visualization processing is a three-dimensional model of the component, and sends the visualization processing result to the terminal.

[0061] In this module, the visualization unit 203 visualizes the modular design into a three-dimensional component model. The modular station building design generated by BIM technology is converted into a visualized three-dimensional model, which is convenient for the design team, construction personnel and customers to intuitively understand, modify and optimize; Each prefabricated module is assembled and positioned according to the design requirements. The connection relationship, construction sequence, and assembly and disassembly methods between each module will be accurately displayed in three-dimensional space to simulate the real construction process.

[0062] like Figure 7 As shown, as a preferred embodiment of the present invention, the processing module 300 includes: The processing unit 301 is used to obtain processing links, which include component production and supply chain, produce components according to standardized components, obtain production results, and obtain an error threshold, which is the maximum error allowed in the production process.

[0063] In this module, the processing unit 301 obtains the processing links, which include component production and supply chain. Component production is a very critical step in the prefabricated station building. The production of standardized components can be carried out by directly connecting intelligent production equipment and BIM models. The component data in the BIM model is automatically transmitted to the production system, so that the production equipment can accurately manufacture components according to these parameters and produce components according to standardized components; Get the production results and the error threshold. The error threshold refers to the maximum error range allowed during the component production process. It is formulated based on multiple factors such as design specifications, material properties, and construction requirements, and is the acceptable deviation range during the production process.

[0064] The supply chain unit 302 is used to compare the production results with the error threshold. If it is determined that the threshold is exceeded, the component production is restarted, and monitoring data is obtained. The monitoring data is used to monitor the supply chain, which includes material procurement, transportation and storage.

[0065] In this module, the supply chain unit 302 compares the production result with the error threshold. If it is determined that the threshold is exceeded, the component production is repeated. For example, for a wall component, the design thickness is 200mm, and the error threshold may be set to ±1mm, that is, the actual thickness of the wall should be between 199mm and 201mm. Components exceeding this range will be judged as unqualified. Obtain monitoring data. Monitoring data is used to monitor the supply chain. Supply chain management has a huge impact on component production. Ensuring the smooth flow of raw materials, transportation, and storage can avoid production stagnation due to material shortages, delays, or damage. The supply chain includes material procurement, transportation, and storage. For example, the threshold set in the procurement link is that the material inventory is lower than the safety inventory. When a link exceeds the threshold, the supply chain management system will automatically adjust it.

[0066] For example, the material procurement department receives a warning from the supply chain monitoring system and finds that the steel bar inventory is about to fall below the safety inventory. It automatically generates a procurement instruction, notifies the purchaser to place orders in advance and adjust the supplier. At the same time, the transportation department also monitors that the transportation time of prefabricated components may be delayed due to traffic problems. By rearranging the transportation route and adding transportation vehicles, it ensures that the components arrive on time to avoid affecting the construction progress due to insufficient materials or transportation delays.

[0067] The re-planning unit 303 is used to obtain a supply chain threshold, which is the minimum requirement of the production plan, and compare the supply chain threshold with the monitoring data. If it is determined that the threshold is exceeded, the supply chain is re-planned.

[0068] In this module, the re-planning unit 303 obtains the supply chain threshold, which is the minimum requirement of the production plan and is used to determine whether the execution of a certain link in the supply chain meets the basic requirements of the production plan. The supply chain threshold is set based on historical data, production experience and demand forecast; For example, the material procurement threshold refers to the minimum purchase quantity of the required raw materials, the transportation threshold is the threshold of the transportation link, which usually involves transportation time, transportation distance and transportation capacity, and the storage threshold is the minimum quantity requirement for inventory; Compare the supply chain thresholds with the monitoring data. When the monitoring data shows that a certain link in the supply chain exceeds the preset threshold, immediate measures need to be taken to replan the supply chain to avoid affecting the overall production progress.

[0069] like Figure 8 As shown, as a preferred embodiment of the present invention, the energy module 400 includes: The energy demand unit 401 is used to obtain energy demand based on three-dimensional modeling, and the energy demand is the energy consumption limit of the station building.

[0070] In this module, the energy demand unit 401 obtains energy demand according to three-dimensional modeling, and uses energy analysis tools such as EnergyPlus to simulate based on the three-dimensional model of the station building, and calculates the energy consumption limit of the station building under different seasons and usage conditions. The energy consumption limit is affected by four factors: heat load, lighting load, ventilation load and equipment load; Heat load refers to the heat inflow and outflow of the station building, including heat conduction and radiation through walls, roofs, and windows, analyzing heating and cooling needs; lighting load refers to the energy demand for lighting inside the station building. It includes a combination of natural light and artificial lighting, as well as the energy efficiency of the lighting system; ventilation load refers to the energy consumed by the ventilation system of the station building; equipment load: the energy demand of the power equipment inside the station building, such as air conditioners, elevators, and computers.

[0071] The energy efficiency analysis unit 402 is used to obtain the energy efficiency analysis result of the current station building. The energy efficiency analysis is to simulate the energy performance of the station building through BIM. The energy performance simulation includes thermal performance, air conditioning load, lighting effect and energy consumption.

[0072] In this module, the energy efficiency analysis unit 402 obtains the energy efficiency analysis result of the current station building. The energy efficiency analysis is to simulate the energy performance of the station building through BIM. The energy efficiency analysis is a key step to ensure that the station building has lower energy consumption and higher comfort during operation. Energy performance simulation includes thermal performance, air conditioning load, lighting effect and energy consumption; thermal performance analysis focuses on factors such as heat conduction, heat radiation and heat convection of station buildings, and evaluates the heat load requirements of station buildings in different seasons; air conditioning load analysis focuses on calculating the air conditioning requirements of station buildings under different climatic conditions; lighting effect analysis evaluates the natural light conditions of station buildings in different seasons and times to ensure that there is enough daylight indoors, while avoiding excessive sunlight exposure that leads to reduced energy efficiency; energy consumption analysis is to calculate the total energy consumption of station buildings by comprehensively considering all energy use requirements of station buildings; Energy performance simulation of station buildings through BIM and energy efficiency analysis can help designers conduct a comprehensive station performance evaluation during the design phase, identify potential energy consumption problems in advance, and reduce energy waste through optimized design. For example, changing the facade material of the station building, optimizing the window design, adjusting the station building layout, and adopting an efficient air conditioning system can significantly improve the energy efficiency of the station building.

[0073] The renewable energy unit 403 is used to compare the current station energy efficiency analysis result with the energy demand. If the analysis result is less than the energy demand, the renewable energy design is increased.

[0074] In this module, the renewable energy unit 403 compares the current station energy efficiency analysis results with the energy demand to evaluate whether the energy efficiency of the existing station design can meet the predetermined energy consumption limit. If the energy efficiency analysis result of the station is lower than the energy demand of the station, then adding renewable energy design becomes an effective means to improve the energy performance of the station; When the energy efficiency result of the station building obtained through energy efficiency analysis is less than the energy demand of the station building, it means that the existing design of the station building may not be able to meet the prescribed standards or targets in terms of energy consumption. The shortfall can be compensated by adding renewable energy design to enhance the energy self-sufficiency of the station building while reducing dependence on traditional energy. For example, solar photovoltaic panels can be installed on the roof to convert solar energy into electricity.

[0075] In one embodiment, a computer device is provided, the computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the following steps are implemented: Acquire station building design data, wherein the station building design data includes components, and perform three-dimensional modeling according to the station building design data; Acquire the station building component library data, obtain standardized components through the station building component library data, modular design is composed of standardized components, and the component size, component position and component connection method of the standardized components are determined through modular design, and the modular design is visualized; Acquisition and processing stage: produce components according to standardized components, compare production results with error thresholds, and re-produce components if it is determined to exceed the threshold; compare supply chain thresholds with monitoring data, and re-plan the supply chain if it is determined to exceed the threshold; Obtain energy demand based on three-dimensional modeling, obtain the energy efficiency analysis results of the current station building, compare the energy efficiency analysis results of the current station building with the energy demand, and if the analysis result is less than the energy demand, increase the renewable energy design.

[0076] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the processor performs the following steps: Acquire station building design data, wherein the station building design data includes components, and perform three-dimensional modeling according to the station building design data; Acquire the station building component library data, obtain standardized components through the station building component library data, modular design is composed of standardized components, and the component size, component position and component connection method of the standardized components are determined through modular design, and the modular design is visualized; Acquisition and processing stage: produce components according to standardized components, compare production results with error thresholds, and re-produce components if it is determined to exceed the threshold; compare supply chain thresholds with monitoring data, and re-plan the supply chain if it is determined to exceed the threshold; Obtain energy demand based on three-dimensional modeling, obtain the energy efficiency analysis results of the current station building, compare the energy efficiency analysis results of the current station building with the energy demand, and if the analysis result is less than the energy demand, increase the renewable energy design.

[0077] It should be understood that, although each step in the flow chart of each embodiment of the present invention is shown in sequence according to the indication of the arrow, these steps are not necessarily performed in sequence according to the order indicated by the arrow. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be performed in other orders. Moreover, at least a portion of the steps in each embodiment may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and the execution order of these sub-steps or stages is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.

[0078] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0079] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0080] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

[0081] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A BIM-based prefabricated station building design optimization method, characterized in that: The method comprises: Acquire station building design data, wherein the station building design data includes components, and perform three-dimensional modeling according to the station building design data; Acquire the station building component library data, obtain standardized components through the station building component library data, modular design is composed of standardized components, and the component size, component position and component connection method of the standardized components are determined through modular design, and the modular design is visualized; Acquisition and processing stage: produce components according to standardized components, compare production results with error thresholds, and re-produce components if it is determined to exceed the threshold; compare supply chain thresholds with monitoring data, and re-plan the supply chain if it is determined to exceed the threshold; Obtain energy demand based on three-dimensional modeling, obtain the energy efficiency analysis results of the current station building, compare the energy efficiency analysis results of the current station building with the energy demand, and if the analysis result is less than the energy demand, increase the renewable energy design.

2. According to the BIM-based prefabricated station building design optimization method according to claim 1, it is characterized in that: The steps of obtaining station building component library data, obtaining standardized components through the station building component library data, modular design through standardized components, determining component size, component position and component connection method of the standardized components through modular design, and visualizing the modular design specifically include: Acquire station building component library data, where the station building component library data is created through BIM technology, and obtain standardized components through the station building component library data; Obtaining a modular design, wherein the modular design is a prefabricated, reusable large-scale assembly, the modular design is composed of standardized components, and the component size, component location and component connection method of the standardized components are determined by the modular design; The modular design is visualized as a component three-dimensional model, and the visualization result is sent to the terminal.

3. The BIM-based prefabricated station building design optimization method according to claim 1 is characterized in that: The acquisition and processing link includes producing components according to standardized components, comparing the production results with the error threshold, reproducing the components if it is determined to exceed the threshold, and comparing the supply chain threshold with the monitoring data. If it is determined to exceed the threshold, replanning the supply chain, specifically including: Obtaining a processing link, wherein the processing link includes component production and supply chain, producing components according to standardized components, obtaining production results, and obtaining an error threshold, wherein the error threshold is the maximum error allowed in the production process; Compare the production results with the error threshold, and if it is determined that the threshold is exceeded, re-produce the component and obtain monitoring data, which is used to monitor the supply chain, including material procurement, transportation and storage; Obtain a supply chain threshold, which is the minimum requirement for the production plan, and compare the supply chain threshold with the monitoring data. If it is determined to exceed the threshold, re-plan the supply chain.

4. According to the BIM-based prefabricated station building design optimization method of claim 1, it is characterized in that: The energy demand is obtained according to the three-dimensional modeling, the energy efficiency analysis result of the current station is obtained, and the energy efficiency analysis result of the current station is compared with the energy demand. If the analysis result is less than the energy demand, the step of adding renewable energy design specifically includes: Obtaining energy demand based on three-dimensional modeling, where the energy demand is the energy consumption limit of the station building; Obtain the energy efficiency analysis results of the current station building. The energy efficiency analysis is to simulate the energy performance of the station building through BIM. The energy performance simulation includes thermal performance, air conditioning load, lighting effect and energy consumption; Compare the current station building energy efficiency analysis results with the energy demand. If the analysis result is less than the energy demand, increase the renewable energy design.

5. According to the BIM-based prefabricated station building design optimization method of claim 4, it is characterized in that: The renewable energy design includes solar panels and wind power generation.

6. A BIM-based prefabricated station building design optimization system, characterized in that: The system comprises: A data acquisition module, which acquires station building design data, wherein the station building design data includes components, and performs three-dimensional modeling according to the station building design data; Standardization module, obtains station building component library data, obtains standardized components through station building component library data, modular design is composed of standardized components, component size, component position and component connection method of standardized components are determined through modular design, and modular design is visualized; Processing module, obtains processing links, produces components according to standardized components, compares production results with error thresholds, and re-produces components if it is determined to exceed the threshold, compares supply chain thresholds with monitoring data, and re-plans the supply chain if it is determined to exceed the threshold; The energy module obtains energy demand based on three-dimensional modeling, obtains the energy efficiency analysis results of the current station building, and compares the energy efficiency analysis results of the current station building with the energy demand. If the analysis result is less than the energy demand, renewable energy design is added.

7. The BIM-based prefabricated station building design optimization system according to claim 6 is characterized in that: The standardization module includes: The standardization unit obtains station building component library data, wherein the station building component library data is created by BIM technology, and obtains standardized components through the station building component library data; Modular units, obtaining modular designs, wherein the modular designs are prefabricated, reusable large-scale components, the modular designs are composed of standardized components, and the component sizes, component positions, and component connection methods of the standardized components are determined by the modular designs; The visualization unit performs visualization processing on the modular design, wherein the visualization processing is a three-dimensional model of the component, and sends the visualization processing result to the terminal.

8. The BIM-based prefabricated station building design optimization system according to claim 7 is characterized in that: The processing module comprises: A processing unit obtains a processing link, wherein the processing link includes component production and supply chain, performs component production according to standardized components, obtains production results, and obtains an error threshold, wherein the error threshold is a maximum error allowed in the production process; The supply chain unit compares the production results with the error threshold, and if it is determined that the error exceeds the threshold, the component production is restarted, and monitoring data is obtained. The monitoring data is used to monitor the supply chain, which includes material procurement, transportation and storage; The re-planning unit obtains a supply chain threshold, which is the minimum requirement for the production plan, and compares the supply chain threshold with the monitoring data. If it is determined that the threshold is exceeded, the supply chain is re-planned.

9. The BIM-based prefabricated station building design optimization system according to claim 8 is characterized in that: The energy module comprises: An energy demand unit, which obtains energy demand based on three-dimensional modeling, wherein the energy demand is the energy consumption limit of the station building; Energy efficiency analysis unit, which obtains the energy efficiency analysis result of the current station building. The energy efficiency analysis is to simulate the energy performance of the station building through BIM. The energy performance simulation includes thermal performance, air conditioning load, lighting effect and energy consumption; Renewable energy unit, compare the current station energy efficiency analysis results according to the energy demand. If the analysis result is less than the energy demand, increase the renewable energy design.

10. The BIM-based prefabricated station building design optimization system according to claim 9 is characterized in that: The renewable energy design includes solar panels and wind power generation.

Citation Information

Patent Citations

  • Fabricated building house type modular design method based on BIM

    CN114462118A

  • Error elimination method for full-prefabricated assembly type machine room

    CN115033970A

  • Modularized house building construction method based on big data

    CN116662409A

  • Village and town integrated energy service effect evaluation method and system

    CN117575343A

  • Digital intelligent green building design evaluation method and system

    CN119026985A

Cited By

  • Bridge data conversion method and system of BIM and finite element model

    CN121302520A