Supporting device for floor reinforcing mesh supporting and follow-up operation and construction method of supporting device

By designing a multi-functional stable support device, including a stable support frame, a stabilizing rod, a through sleeve and a removable hanging ring piece, the problems of unstable support of the floor steel reinforced mesh and insufficient safety at high altitude operations in the prior art are solved, and the dual effects of stable support of the steel reinforced mesh and safety at high altitude operations are achieved.

CN119777540APending Publication Date: 2025-04-08CHINA CONSTR EIGHT ENG DIV CORP LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202510052157.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-14
Publication Date
2025-04-08

AI Technical Summary

Technical Problem

During the construction process, the existing floor slab reinforced mesh support device has problems such as inclination, collapse, cumbersome operation and difficulty in meeting different complex structures and load requirements. It is also difficult to meet the safety needs of reinforced mesh support and subsequent high-altitude operations at the same time.

Method used

A multifunctional stable support device is designed, including a stabilizing support frame, a stabilizing rod, a through sleeve and a removable mount hanging ring piece. The stabilizing support frame supports two layers of steel mesh through a stabilizing rod and a through sleeve to prevent displacement; the through sleeve can be installed after concrete is poured to provide seat belt mount points for high-altitude operations.

Benefits of technology

Through the precisely designed stable support frame and through sleeve, the device ensures the position stability of the steel mesh, improves the quality of the floor structure, reduces the risk of rework, and provides safe and reliable mounting points for high-altitude operations, improving construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119777540A_ABST
    Figure CN119777540A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building decoration engineering construction, in particular to a supporting device for floor reinforcing mesh supporting and subsequent operation and a construction method thereof.The supporting device comprises a stable supporting frame which is located on a to-be-poured floor formwork and used for stably supporting two layers of reinforcing meshes arranged in parallel, and a stabilizing rod is arranged on the stable supporting frame; the stabilizer bar is provided with a penetrating sleeve matched with the stabilizer bar, and the penetrating sleeve penetrates through a floor formwork to be poured. During pouring, a plugging piece is arranged in the penetrating sleeve; when subsequent decoration engineering is carried out, a hanging ring piece can be installed on the penetrating sleeve. Through the unique structural design, stable supporting is provided in the concrete pouring stage, and safety guarantee is provided in the subsequent decoration stage. The three structural designs of the stable supporting frame provide different installation options so as to adapt to different construction site requirements. In addition, all the components of the device can be manufactured and connected in advance, the site construction process is simplified, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building decoration engineering construction, and in particular to a supporting device and a construction method thereof for supporting a floor steel mesh and subsequent operations. Background Art

[0002] In the field of modern construction, the construction quality of floor slabs is of vital importance, which is directly related to the safety, stability and durability of the entire building structure. Reasonable support of floor slab steel mesh is one of the key links to ensure the quality of floor slabs. There are many problems with the traditional floor slab steel support method. The simple supports used in the early days, such as the "J-shaped" stirrups, are prone to tilting and collapse during the construction process due to factors such as the movement of people, vibration during concrete pouring, and irregular binding, which will seriously affect the quality of the concrete floor slab.

[0003] There are also some existing steel bar support devices, which have certain supporting functions but are cumbersome to operate. And when supporting and adjusting the ends of the steel bars, it is very likely to cause a large height difference between the ends and the middle of the steel bars, which will affect the quality of the floor slab. On the other hand, with the development of building structure design, double-layer bidirectional steel mesh is more and more widely used in concrete floor slabs. However, in order to ensure that there is enough space between the upper and lower layers of steel mesh for concrete filling, a more stable and reliable support device is needed. Existing support devices are often difficult to meet the requirements in the construction of floor slabs with different complex structures and different load requirements.

[0004] At the same time, the demand for support structures varies at different stages of construction. In addition to the need for high-stability support during the steel mesh support stage, in some subsequent operations, such as decoration and renovation projects after the removal of the floor formwork, it may be necessary to use certain components in the floor structure to provide safety belt hanging points for high-altitude operations. The current support structure is difficult to meet the functional requirements of these different stages at the same time.

[0005] How to solve the above technical problems is the subject faced by the present invention. Summary of the invention

[0006] In order to solve the shortcomings of the prior art, the present invention provides a multifunctional stable support device and construction method for floor steel mesh support and subsequent operations in building construction, which is rationally designed, safe and reliable, and aims to ensure the stability of the two layers of steel mesh during the construction process through a stable support frame, and at the same time provide safety belt hanging points for high-altitude workers through a through sleeve and a detachable hanging ring, thereby improving construction safety. The system combines the safety requirements of stable support, concrete pouring protection and high-altitude operations in subsequent decoration projects.

[0007] The technical solution adopted by the present invention to solve its technical problem is: a support device for floor steel mesh support and subsequent operations;

[0008] It comprises a stabilizing support frame located on the floor slab formwork to be poured and used for stabilizing and supporting two layers of steel meshes arranged parallel to each other, the stabilizing support frame is provided with a stabilizing rod, the stabilizing rod is provided with a through sleeve matched with the stabilizing rod, and the through sleeve penetrates the floor slab formwork to be poured;

[0009] During pouring, a plugging piece is provided in the through sleeve to prevent concrete from mixing in; during subsequent decoration works, the through sleeve may be installed with a hanging ring which cooperates with the through sleeve and is used to provide a safety belt hanging point for construction workers of the decoration project during high-altitude operations.

[0010] Three structural designs of stable support frames are preferably provided, as follows:

[0011] The first structure is as follows:

[0012] The stable support frame includes a top support rod in contact with the top steel mesh and arranged horizontally, the top support rod is provided with a first rod and a second rod arranged perpendicular to the top support rod, and the first rod is arranged parallel to the second rod;

[0013] The first rod and the second rod are provided with a stabilizing rod in contact with the bottom steel bar, and the stabilizing rod is arranged perpendicularly to the first rod, and the stabilizing rod is arranged perpendicularly to the top support rod;

[0014] The stabilizing rod is arranged in parallel with the first rod, and a connecting thread matched with the penetrating sleeve is arranged at the bottom end of the stabilizing rod.

[0015] Preferably, connecting sleeves connected to the first rod or the second rod or the stabilizing rod are provided at both ends and the center of the top support rod, and connecting screws cooperating with the connecting sleeves are provided at the top ends of the first rod, the second rod and the stabilizing rod.

[0016] Preferably, stabilizing sleeves are provided at both ends of the stabilizing rod, and a stabilizing connecting rod stably connected to another stabilizing support frame is provided in the stabilizing sleeve.

[0017] Preferably, the top support rod, the first rod, the second rod and the stabilizing rod form an M-shaped structural design of a stable support frame.

[0018] Preferably, the positions of the stabilizing rod, the first rod, the second rod and the top support rod are adjusted according to the specific needs of the construction site. For example, the stabilizing rod is located at one end of the top support rod, and the first rod and the second rod are respectively arranged at the other end of the top support rod and in the middle of the top support rod; the stabilizing rod is arranged at the center of the top support rod, and the first rod and the second rod are respectively arranged at both ends of the top support rod.

[0019] The second structure is as follows:

[0020] The stable support frame includes a stable base that is threadedly matched with the stable rod and in contact with the template to be cast, and a supporting base that is threadedly matched with the stable rod and used to support the top steel mesh is provided at the top end of the stable rod;

[0021] The supporting base is provided with a supporting groove that matches the steel bars in the top supporting steel mesh; the stabilizing rod is provided with a supporting sleeve that matches the stabilizing rod thread, and the supporting sleeve is provided with a supporting ring seat that contacts the bottom steel mesh.

[0022] The third structure is as follows:

[0023] The stabilizing support frame includes a vertical sleeve cooperating with the stabilizing rod, and a U-shaped lifting support rod is arranged on the vertical sleeve; the lifting support rod includes a vertical rod connected to the vertical sleeve, and lifting rods accompanied by the top and bottom layers of steel mesh are arranged at the top and bottom ends of the vertical rod; the lifting rod is provided with a lifting sleeve frame cooperating with the top steel mesh or the bottom steel mesh.

[0024] Preferably, the vertical rods are provided in a plurality of groups, and the plurality of groups of vertical rods are evenly arranged along the circumferential direction of the vertical sleeve.

[0025] A construction method of a support device for floor steel mesh support and subsequent operations, comprising the following steps:

[0026] A: Prefabrication and pre-connection stage;

[0027] Prefabricate the stabilizing support frame, stabilizing rod, through-sleeve and reusable safety belt hanging ring in advance according to the design requirements;

[0028] Assemble stable support frames of different structures according to their design methods;

[0029] At the same time, the stabilizer bar and the through sleeve are pre-connected;

[0030] B: Floor slab formwork laying and hole reservation stage;

[0031] During the laying of the floor slab formwork, the holes should be accurately reserved in advance according to the diameter of the through sleeve at the bottom where the safety belt hanging point is required;

[0032] C: Steel mesh construction and support frame installation stage

[0033] Tie up the steel mesh at the bottom of the floor slab and install the pre-connected stabilizing support frame, stabilizing rod and through-sleeve in place. Use a plugging piece to seal the bottom of the through-sleeve to prevent concrete clogging;

[0034] D: Concrete pouring stage;

[0035] During the pouring of floor slab concrete, the support structure composed of a stable support frame and a stable rod stably supports the two layers of steel mesh to prevent the steel mesh from being displaced due to the impact force and lateral pressure generated by the flow of concrete.

[0036] E: The stage of dismantling the formwork frame and installing the hanging rings;

[0037] After the floor slab concrete reaches a certain strength, the formwork frame is removed;

[0038] When performing other indoor high-altitude operations, screw the reusable hanging ring into the through-sleeve to ensure that the hanging ring is firmly installed;

[0039] F: Seat belt fastening and use stage;

[0040] When construction workers are working at height, they buckle the safety belt onto the reusable hanging ring installed in the through-sleeve to ensure their safety.

[0041] G: The stage of recycling and turnover of hanging rings;

[0042] After the work at height is completed, the hanging eye will be removed from the through sleeve, cleaned and inspected before being put back into use for the next construction.

[0043] The steel mesh construction and support frame installation phase includes the following steps:

[0044] C1: The bottom steel mesh construction and support frame installation stage;

[0045] Start tying the steel mesh at the bottom layer of the floor slab;

[0046] Install the pre-connected stabilizing support frame, stabilizing rod and through-sleeve to the appropriate position. During the installation process, ensure that the positional relationship between the stabilizing support frame and the steel mesh meets the design requirements, the through-sleeve on the stabilizing rod accurately penetrates the reserved hole at the bottom of the floor slab formwork, and the bottom of the straight threaded sleeve is firmly sealed with a plugging piece to prevent the concrete from clogging the inside of the sleeve during the subsequent concrete pouring;

[0047] C2: Top layer steel mesh binding stage;

[0048] After the bottom layer of steel mesh is tied and the support frame is installed, the top layer of the floor slab steel mesh is tied to ensure that the spacing and parallelism of the two layers of steel mesh meet the design standards;

[0049] The multifunctional stable support device of the present invention ensures the precise position of the upper and lower layers of steel mesh before and after pouring concrete by designing a precisely designed stable support frame, a stable rod, and a through sleeve. In particular, the stable support frame with an M-shaped structure design, which is composed of a top support rod, a first rod, a second rod, and a stable rod, forms a stable frame, effectively preventing the displacement or deformation of the steel mesh. This design not only improves the overall quality of the floor structure, but also reduces the risk of rework caused by the position deviation of the steel mesh.

[0050] The stable support frame in the present invention is made of high-strength materials, and the components are combined together by threaded connection or integral molding, which greatly enhances the rigidity and bearing capacity of the system. For example, the top support rod, the first rod, the second rod and the stabilizing rod can be integrally molded or formed by bending, which not only simplifies the assembly process, but also ensures the firmness of each connection point, thereby providing reliable support guarantee for large or heavy floor construction.

[0051] The present invention makes installation at the construction site simple and quick by prefabricating and connecting all components in advance. In addition, the design of the through sleeve allows it to be closed with a plugging piece before concrete pouring, avoiding the blockage problem that may occur in traditional methods and simplifying subsequent cleaning work. More importantly, after the formwork frame is dismantled and other high-altitude operations are completed, the reusable safety belt hanging ring can be directly screwed into the through sleeve, providing safety support for the decoration project, further shortening the construction period and improving construction efficiency.

[0052] The through sleeve in the present invention is a permanent embedded part, which can provide a reliable safety belt hanging point for construction workers during the subsequent decoration project. This feature significantly improves the safety of high-altitude operations and reduces the possibility of accidents. At the same time, since the hanging ring is detachable and reusable, it can also be flexibly adjusted according to needs to meet the construction requirements of different stages, reflecting the versatility and flexibility of the device.

[0053] The present invention particularly emphasizes the effective use of resources and environmental protection. On the one hand, the stable support frame and its auxiliary components are made of recyclable materials, which conforms to the concept of green building; on the other hand, the reusable safety belt hanging ring realizes the recycling of resources and reduces the generation of waste. In addition, the optimized design and efficient construction process also indirectly reduce energy consumption and environmental impact.

[0054] The present invention takes into account the specific needs of different construction sites and provides three different stable support frame structure design solutions, including an M-shaped structure, a threaded support base, and a vertical sleeve with a U-shaped lifting support rod. These designs can better adapt to floor slabs of various shapes and sizes, and can find suitable solutions for both small residential projects and large commercial buildings. At the same time, the flexible component layout and adjustment mechanism also provide more options for complex and changing construction conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 It is a schematic diagram of the three-dimensional structure of the preferred embodiment 1 of the present invention;

[0056] Figure 2 It is a schematic diagram of the three-dimensional structure of the preferred embodiment 2 of the present invention;

[0057] Figure 3 It is a three-dimensional structural schematic diagram of the preferred embodiment 3 of the present invention.

[0058] Among them, the accompanying drawings are marked as: 100, stable support frame; 110, top support rod; 111, first rod; 112, second rod; 113, connecting thread; 114, connecting sleeve; 115, connecting screw; 116, stable sleeve; 117, stable support rod; 118, stable connecting rod; 120, stable base; 121, supporting base; 122, supporting groove; 123, supporting sleeve; 124, supporting ring seat; 130, vertical sleeve; 131, lifting support rod; 132, vertical rod; 133, lifting rod; 134, lifting sleeve; 200, stable rod; 300, through sleeve; 400, hanging ring; 410, screw connecting rod; 420, lifting ring. DETAILED DESCRIPTION

[0059] Embodiment 1

[0060] See also Figures 1 to 3 As shown, a support device for supporting a floor steel mesh and subsequent operations includes a stable support frame 100 located on a floor formwork to be cast and used to stably support two layers of steel meshes arranged parallel to each other, a stabilizing rod 200 is arranged on the stable support frame 100, a through sleeve 300 matched with the stabilizing rod 200 is arranged on the stable rod 200, and the through sleeve 300 penetrates the floor formwork to be cast;

[0061] During pouring, a plugging piece is provided in the through sleeve 300 to prevent concrete from mixing in; during subsequent decoration works, the through sleeve 300 may be installed with a hanging ring 400 which cooperates with the through sleeve 300 and is used to provide a safety belt hanging point for the construction workers of the decoration project during high-altitude operations.

[0062] In general, the stabilizing support frame 100 serves as the skeleton of the entire system. It provides support for the upper and lower layers of steel mesh, ensures the accuracy and stability of the position of the steel mesh, and solves the problem of possible displacement of the steel mesh in traditional methods. The stabilizing rod 200 not only connects the stabilizing support frame 100 and the steel mesh, but also fixes it on the template through the through sleeve 300, ensuring the overall stability of the template; the through sleeve 300 reserves space for the subsequent safety belt hanging point. The plugging piece is used to prevent concrete from entering the through sleeve 300 during pouring, keeping the inside of the sleeve clean, so as to facilitate the subsequent installation of the hanging ring 400. The hanging ring 400 provides a safe and reliable hanging point for high-altitude workers, increases construction safety, and at the same time, due to its detachability, it realizes the recycling of resources.

[0063] Furthermore, the blocking member may be a blocking cap matched with the through sleeve 300, and the blocking member may also be a blocking member shrunk from an adhesive tape or a packaging bag;

[0064] Furthermore, the hanging ring member 400 includes a screw connecting rod 410 threadedly matched with the through sleeve 300 , and a hanging ring 420 is provided on the screw connecting rod 410 .

[0065] Embodiment 2:

[0066] See also Figure 1 Based on the structure of the first embodiment, the stable support frame 100 is further described as follows:

[0067] The stable support frame 100 includes a top support rod 110 that is in contact with the top steel mesh and is horizontally arranged, and the top support rod 110 is provided with a first rod 111 and a second rod 112 that are vertically arranged to the top support rod 110, and the first rod 111 and the second rod 112 are arranged in parallel;

[0068] The first rod 111 and the second rod 112 are provided with a stabilizing rod 117 in contact with the bottom steel bar, and the stabilizing rod 117 is vertically arranged with the first rod 111, and the stabilizing rod 117 is vertically arranged with the top support rod 110;

[0069] The stabilizing rod 200 is arranged in parallel with the first rod 111 , and a connecting thread 113 matching with the through sleeve 300 is arranged at the bottom end of the stabilizing rod 200 .

[0070] Preferably, connecting sleeves 114 connected to the first rod 111 or the second rod 112 or the stabilizing rod 200 are provided at both ends and the center of the top support rod 110, and connecting screws 115 cooperating with the connecting sleeves 114 are provided at the top ends of the first rod 111, the second rod 112 and the stabilizing rod 200.

[0071] Preferably, stabilizing sleeves 116 are provided at both ends of the stabilizing rod 200 , and a stabilizing link 118 stably connected to another stabilizing support frame 100 is provided in the stabilizing sleeve 116 .

[0072] Preferably, the top support rod 110 , the first rod 111 , the second rod 112 and the stabilizing rod 200 form an M-shaped structural design of the stabilizing support frame 100 .

[0073] Preferably, the top support rod 110 , the first rod 111 , the second rod 112 and the stabilizing rod 200 are integrally formed, and the stabilizing rod 200 is integrally formed with the first rod 111 or the second rod 112 .

[0074] Preferably, the stabilizing rod 200 is formed by bending the first rod 111 or the second rod 112 .

[0075] Preferably, according to the specific needs of the construction site, the positions of the stabilizing rod 200, the first rod 111, the second rod 112 and the top support rod 110 are adjusted. For example, the stabilizing rod 200 is located at one end of the top support rod 110, and the first rod 111 and the second rod 112 are respectively arranged at the other end of the top support rod 110 and in the middle of the top support rod 110; the stabilizing rod 200 is arranged at the center of the top support rod 110, and the first rod 111 and the second rod 112 are respectively arranged at both ends of the top support rod 110.

[0076] Specifically, the top support rod 110 serves as the top support of the support frame, bears the gravity of the upper steel mesh, and is used to provide a connection point with other rods to transfer the force to other rods. The first rod 111 and the second rod 112 are used to connect the top support rod 110 and the stabilizing rod 200 to form a support structure, thereby transferring the force of the top support rod 110 and providing a connection point for the stabilizing rod 200. The stabilizing rod 200 is used to directly contact and support the lower steel mesh, thereby bearing and dispersing the gravity of the lower steel mesh, and is connected to the through sleeve 300 through the connecting sleeve 114. The connecting sleeve 114 and the connecting screw 115 are used to achieve a reliable connection between the rods. Function: Provide a firm connection to ensure the integrity of the support structure. The stabilizing sleeve 116 is used to connect adjacent stable support frames 100 to further enhance the overall stability of the support structure and form a continuous support system. The M-shaped structural design is designed to provide a stable support structure and effectively disperse the force, thereby utilizing the stability principle of the triangle to improve the bearing capacity and anti-deformation ability of the support structure. One-piece molding and bending molding are used to simplify the production process, improve product strength, reduce connection points, and improve the integrity and reliability of the structure. In addition, the support frame can be flexibly arranged according to the actual situation on site. Function: Adapt to different construction needs and improve the versatility of the device.

[0077] Embodiment three:

[0078] See also Figure 2 Based on the structure of the first embodiment, the stable support frame 100 is further described as follows:

[0079] The stabilizing support frame 100 includes a stabilizing base 120 threadedly matched with the stabilizing rod 200 and in contact with the formwork to be cast, and a supporting base 121 threadedly matched with the stabilizing rod 200 and used to support the top steel mesh is provided at the top of the stabilizing rod 200;

[0080] The supporting base 121 is provided with a supporting groove 122 that cooperates with the steel bars in the top supporting steel mesh; the stabilizing rod 200 is provided with a supporting sleeve 123 that threadably cooperates with the stabilizing rod 200, and the supporting sleeve 123 is provided with a supporting ring seat 124 that contacts the bottom steel mesh.

[0081] Specifically, the stabilizing base 120 contacts the formwork, provides the bottom support of the support frame, and then transmits the force of the support frame to the formwork, and provides a connection point for the stabilizing rod 200. The stabilizing rod 200 is used to connect the stabilizing base 120 and the supporting base 121 and the supporting sleeve 123 to transmit force and provide a height adjustment function. The supporting base 121 is used to support the upper steel mesh, provide a contact surface with the steel bars, and prevent the steel bars from sliding. The supporting groove 122 cooperates with the steel bars to prevent the steel bars from sliding and improve the stability of the support. The supporting sleeve 123 and the supporting ring seat 124 are used to support the lower steel mesh, thereby providing a contact surface with the steel bars to prevent the steel bars from sliding.

[0082] Embodiment four:

[0083] See also Figure 3 Based on the structure of the first embodiment, the stable support frame 100 is further described as follows:

[0084] The stabilizing support frame 100 includes a vertical sleeve 130 cooperating with the stabilizing rod 200, and a U-shaped lifting support rod 131 is arranged on the vertical sleeve 130; the lifting support rod 131 includes a vertical rod 132 connected to the vertical sleeve 130, and lifting rods 133 accompanied by the top and bottom layers of steel mesh are arranged at the top and bottom ends of the vertical rod 132; the lifting rod 133 is provided with a lifting sleeve 134 cooperating with the top steel mesh or the bottom steel mesh.

[0085] Preferably, the vertical rods 132 are provided in a plurality of groups, and the plurality of groups of vertical rods 132 are evenly arranged along the circumferential direction of the vertical sleeve 130 .

[0086] Specifically, the vertical sleeve 130 cooperates with the stabilizing rod 200 to provide the main structure of the support frame, and then provides a connection point for the lifting support rod 131; the lifting support rod 131, the vertical rod 132, the lifting rod 133 and the lifting sleeve 134 are used to lift the upper and lower layers of the steel mesh. The coordinated cooperation of these structures provides a contact surface with the steel bars to prevent the steel bars from sliding and transmits force to the vertical sleeve 130. In addition, the design of multiple groups of vertical rods 132 is used to improve the stability of the support, which is mainly to disperse the force and prevent the support frame from tilting.

[0087] A construction method of a support device for floor steel mesh support and subsequent operations, comprising the following steps:

[0088] A: Prefabrication and pre-connection stage;

[0089] Prefabricate the stabilizing support frame 100, the stabilizing rod 200, the through sleeve 300 and the reusable safety belt hanging ring 400 in advance according to the design requirements;

[0090] The stable support frames 100 of different structures are assembled according to their design methods. For example, in the first structure, the stable rod 200 is connected to the first rod 111 and the second rod 112 through the connecting sleeve 114 and the connecting screw 115 on the top support rod 110; in the second structure, the stable rod 200 is screwed into the stable base 120, the supporting base 121 is screwed on the top of the stable rod 200, and the supporting sleeve 123 is installed; for the third structure, the vertical rod 132 of the lifting support rod 131 is connected to the vertical sleeve 130, and the lifting sleeve 134 is installed;

[0091] At the same time, the stabilizing rod 200 and the through sleeve 300 are pre-connected, for example, the through sleeve 300 is installed at the connecting thread 113 at the bottom of the stabilizing rod 200;

[0092] B: Floor slab formwork laying and hole reservation stage;

[0093] During the laying of the floor slab formwork, a hole is accurately reserved in advance at the bottom surface where the safety belt hanging point is required according to the diameter of the through sleeve 300;

[0094] C: Steel mesh construction and support frame installation stage

[0095] Tie up the steel mesh at the bottom of the floor slab, and install the pre-connected stabilizing support frame 100, stabilizing rod 200 and through-sleeve 300 in place. Use a plugging piece to block the bottom of the through-sleeve 300 to prevent concrete clogging;

[0096] D: Concrete pouring stage;

[0097] The pouring of floor slab concrete is carried out. During the pouring process, the support structure composed of the stabilizing support frame 100 and the stabilizing rod 200 stably supports the two layers of steel meshes to prevent the steel meshes from being displaced due to the impact force, lateral pressure and other factors generated by the flow of concrete;

[0098] E: Dismantling of the formwork frame and installation of the 400 hanging rings;

[0099] After the floor slab concrete reaches a certain strength, the formwork frame is removed;

[0100] When performing other indoor high-altitude operations, the reusable hanging ring 400 is screwed into the inside of the through sleeve 300 to ensure that the hanging ring 400 is firmly installed;

[0101] F: Seat belt fastening and use stage;

[0102] When the construction workers are working at height, they buckle the safety belt onto the reusable hanging ring 400 installed in the through sleeve 300 to ensure the safety of the construction workers.

[0103] G: The stage of recycling and reusing the 400 hanging ring parts;

[0104] After the high-altitude operation is completed, the hanging ring 400 is removed from the through sleeve 300, and after cleaning and inspection, it is put into circulation for the next construction.

[0105] The steel mesh construction and support frame installation phase includes the following steps:

[0106] C1: The bottom steel mesh construction and support frame installation stage;

[0107] Start tying the steel mesh at the bottom layer of the floor slab;

[0108] Install the pre-connected stable support frame 100, stable rod 200 and through sleeve 300 to the appropriate position. During the installation process, ensure that the positional relationship between the stable support frame 100 and the steel mesh meets the design requirements, the through sleeve 300 on the stable rod 200 accurately penetrates the reserved hole at the bottom of the floor slab formwork, and the bottom of the straight thread sleeve is firmly sealed with a plugging piece to prevent the concrete from clogging the inside of the sleeve during the subsequent concrete pouring;

[0109] C2: Top layer steel mesh binding stage;

[0110] After the bottom layer of steel mesh is tied and the support frame is installed, the top layer of steel mesh on the floor is tied to ensure that the spacing and parallelism of the two layers of steel mesh meet the design standards.

[0111] Technical features not described in the present invention can be achieved through or by adopting existing technologies and will not be described in detail here. Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention should also fall within the scope of protection of the present invention.

Claims

1. A support device for floor steel mesh support and subsequent operations, characterized in that: The invention comprises a stabilizing support frame (100) located on a floor slab formwork to be cast and used for stabilizing and supporting two layers of steel meshes arranged parallel to each other, the stabilizing support frame (100) being provided with a stabilizing rod (200), the stabilizing rod (200) being provided with a through sleeve (300) cooperating with the stabilizing rod (200), and the through sleeve (300) penetrating the floor slab formwork to be cast; During pouring, a plugging piece is provided in the through sleeve (300) to prevent concrete from mixing in; during subsequent decoration works, the through sleeve (300) can be installed with a hanging ring (400) that cooperates with the through sleeve (300) and is used to provide a safety belt hanging point for construction workers of the decoration works during high-altitude operations.

2. A support device for floor steel mesh support and subsequent operations as claimed in claim 1, characterized in that: The stable support frame (100) comprises a top support rod (110) in contact with the top steel mesh and arranged horizontally, the top support rod (110) is provided with a first rod (111) and a second rod (112) arranged perpendicular to the top support rod (110), and the first rod (111) and the second rod (112) are arranged in parallel; The first rod (111) and the second rod (112) are provided with a stabilizing rod (117) in contact with the bottom steel bar, and the stabilizing rod (117) is arranged perpendicularly to the first rod (111), and the stabilizing rod (117) is arranged perpendicularly to the top support rod (110); The stabilizing rod (200) is arranged in parallel with the first rod (111), and a connecting thread (113) matching with the penetrating sleeve (300) is arranged at the bottom end of the stabilizing rod (200).

3. A support device for floor steel mesh support and subsequent operations as claimed in claim 2, characterized in that: Connecting sleeves (114) connected to the first rod (111) or the second rod (112) or the stabilizing rod (200) are provided at both ends and the center of the supporting rod (110), and connecting screws (115) cooperating with the connecting sleeves (114) are provided at the top ends of the first rod (111), the second rod (112) and the stabilizing rod (200).

4. A support device for floor steel mesh support and subsequent operations as claimed in claim 2, characterized in that: Stabilizing sleeves (116) are provided at both ends of the stabilizing rod (200), and a stabilizing connecting rod (118) stably connected to another stabilizing support frame (100) is provided in the stabilizing sleeve (116).

5. A support device for floor steel mesh support and subsequent operations as claimed in claim 2, characterized in that: The top support rod (110), the first rod (111), the second rod (112) and the stabilizing rod (200) form an M-shaped structural design of a stabilizing support frame (100).

6. A support device for floor steel mesh support and subsequent operations as claimed in claim 1, characterized in that: The stabilizing support frame (100) comprises a stabilizing base (120) threadedly matched with the stabilizing rod (200) and in contact with the formwork to be cast; a supporting base (121) threadedly matched with the stabilizing rod (200) and used to support a top layer of steel mesh is provided at the top end of the stabilizing rod (200); The supporting base (121) is provided with a supporting groove (122) that cooperates with the steel bars in the top supporting steel mesh; the stabilizing rod (200) is provided with a supporting sleeve (123) that is threadedly matched with the stabilizing rod (200), and the supporting sleeve (123) is provided with a supporting ring seat (124) that contacts the bottom steel mesh.

7. A support device for floor steel mesh support and subsequent operations as claimed in claim 1, characterized in that: The stabilizing support frame (100) comprises a vertical sleeve (130) cooperating with the stabilizing rod (200), and a U-shaped lifting support rod (131) is arranged on the vertical sleeve (130); the lifting support rod (131) comprises a vertical rod (132) connected to the vertical sleeve (130), and lifting rods (133) accompanied by top and bottom layers of steel mesh are arranged at the top and bottom ends of the vertical rod (132); the lifting rod (133) is provided with a lifting sleeve (134) cooperating with the top steel mesh or the bottom steel mesh.

8. A support device for floor steel mesh support and subsequent operations as claimed in claim 7, characterized in that: The vertical rods (132) are arranged in a plurality of groups, and the plurality of groups of vertical rods (132) are evenly arranged along the circumferential direction of the vertical sleeve (130).

9. A construction method of the support device according to claim 1, characterized in that: The steps include: A: Prefabrication and pre-connection stage; Prefabricate the stabilizing support frame, stabilizing rod, through-sleeve and reusable safety belt hanging ring in advance according to the design requirements; Assemble stable support frames of different structures according to their design methods; At the same time, the stabilizer bar and the through sleeve are pre-connected; B: Floor slab formwork laying and hole reservation stage; During the laying of the floor slab formwork, the holes should be accurately reserved in advance according to the diameter of the through sleeve at the bottom where the safety belt hanging point is required; C: Steel mesh construction and support frame installation stage Tie up the steel mesh at the bottom of the floor slab and install the pre-connected stabilizing support frame, stabilizing rod and through-sleeve in place. Use a plugging piece to seal the bottom of the through-sleeve to prevent concrete clogging; D: Concrete pouring stage; During the pouring of floor slab concrete, the support structure composed of a stable support frame and a stable rod stably supports the two layers of steel mesh to prevent the steel mesh from being displaced due to the impact force and lateral pressure generated by the flow of concrete. E: The stage of dismantling the formwork frame and installing the hanging rings; After the floor slab concrete reaches a certain strength, the formwork frame is removed; When performing other indoor high-altitude operations, screw the reusable hanging ring into the through-sleeve to ensure that the hanging ring is firmly installed; F: Seat belt fastening and use stage; When construction workers are working at height, they buckle the safety belt onto the reusable hanging ring installed in the through-sleeve to ensure their safety. G: The stage of recycling and turnover of hanging rings; After the work at height is completed, the hanging eye will be removed from the through sleeve, cleaned and inspected before being put back into use for the next construction.

10. A construction method of the multifunctional stable support device according to claim 1, characterized in that: The steel mesh construction and support frame installation phase includes the following steps: C1: The bottom steel mesh construction and support frame installation stage; Start tying the steel mesh at the bottom layer of the floor slab; Install the pre-connected stabilizing support frame, stabilizing rod and through-sleeve to the appropriate position. During the installation process, ensure that the positional relationship between the stabilizing support frame and the steel mesh meets the design requirements, the through-sleeve on the stabilizing rod accurately penetrates the reserved hole at the bottom of the floor slab formwork, and the bottom of the straight threaded sleeve is firmly sealed with a plugging piece to prevent the concrete from clogging the inside of the sleeve during the subsequent concrete pouring; C2: Top layer steel mesh binding stage; After the bottom layer of steel mesh is tied and the support frame is installed, the top layer of steel mesh on the floor is tied to ensure that the spacing and parallelism of the two layers of steel mesh meet the design standards.

Citation Information

Patent Citations

  • Stirrup for building construction

    CN217897019U

  • Constructing method of reinforced concrete structure

    JP1995317188A

  • Concrete slab construction method, reinforcement material support tool used in concrete construction, binding pin tool and lightening buried body

    JP2005282008A