A construction climbing frame
By designing flexible and mobile vision sensors and dust spraying systems, combined with convenient equipment maintenance methods, the problems of incomplete monitoring of construction crawlers, dust pollution and equipment maintenance difficulties are solved, and comprehensive monitoring and environmental improvement of the construction site are achieved.
Patent Information
- Application Number
- CN202510029653.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-08
- Publication Date
- 2025-04-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The monitoring of existing construction climbing frames is difficult to cover all aspects and different locations in full and real-time. Dust pollution during the construction process affects the air quality and operating environment, and it is difficult to repair monitoring equipment failures.
A construction climbing frame consisting of multiple attachment support and longitudinal horizontal rods is designed to realize the flexible movement of vision sensors through the displacement mechanism and monitoring mechanism, combine the spraying mechanism and the fan to reduce the dust concentration, and quickly replace the faulty equipment through convenient disassembly.
It realizes comprehensive and real-time monitoring of the construction site, reduces dust pollution, ensures high availability and rapid maintenance of monitoring equipment, and improves construction safety management and environmental quality.
Smart Images

Figure CN119777573A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building engineering, in particular to a construction climbing frame. Background Art
[0002] With the continuous improvement of urbanization, in order to improve the utilization rate of urban space, the demand for building higher-level floors is increasing. When building high-rise buildings, construction climbing frames are often used to operate the outer layer of the building; The existing construction climbing frame uses an attachment support to fix the guide rail. The guide rail is usually set vertically and is closely connected to the building structure. It serves as a guide device for the climbing frame to rise and fall. The frame system includes vertical poles, horizontal poles, diagonal poles, etc. The vertical poles and horizontal poles are fixed to each other to ensure that the frame will not loosen or deform during the lifting process. For an existing construction scaffolding, firstly, building construction is a complex and dynamically changing process. The flow of personnel, material handling, and conversion of construction techniques at the construction site will cause the risk points to change constantly. In the past, the monitoring of construction scaffolding was mostly fixed at fixed points, which made it difficult to comprehensively and real-time cover the conditions of all links and different locations of the construction. Secondly, a large amount of dust will be generated during the construction process. For example, during the construction of the main structure, cement dust will float during the mixing and pouring of concrete, and debris will be generated during the cutting and handling of masonry materials such as bricks and blocks. Metal dust will be generated during the processing of steel bars, etc., which will affect the air quality on site and the work of construction workers. Finally, traditional monitoring mechanisms are generally fixed to the scaffolding structure by a large number of bolts, welding or embedded installation. When the monitoring equipment fails, maintenance personnel face many difficulties. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention provides a construction climbing frame, which solves the following problems: first, in the past, construction climbing frames were mostly monitored at fixed points, making it difficult to comprehensively and real-time cover all aspects of the construction and different locations; second, a large amount of dust will inevitably be generated during the construction process, affecting the on-site air quality and the work of construction workers; and third, when the monitoring equipment fails during the use of the climbing frame, it is difficult to repair it, affecting the monitoring effect and construction safety management.
[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions: a construction climbing frame, comprising a plurality of attachment supports and a plurality of longitudinal horizontal bars, wherein the plurality of attachment supports are fixed to a wall by anchor bolts, a climbing frame guide rail is arranged on the outer side of the attachment supports, a plurality of groups of supporting cross bars are arranged between the climbing frame guide rail and the plurality of longitudinal horizontal bars, a connecting assembly is arranged on the inner side of the longitudinal horizontal bars, the longitudinal horizontal bars are connected to a displacement mechanism through the connecting assembly, a monitoring mechanism is arranged on the displacement mechanism, a walkway board is arranged on the supporting cross bars, a spraying mechanism is arranged on the walkway board, and a material lifting mechanism is arranged on one group of the supporting cross bars; The connecting component includes a plurality of mounting columns, which are longitudinally arranged and respectively arranged on the inner sides of longitudinal horizontal rods at both ends. A removal key is provided on each of the mounting columns, and a blocking cap is provided at one end of the mounting column away from the longitudinal horizontal rod. The removal key is slidably connected to a mounting block, and the mounting block is connected to a mounting plate via a connecting shaft, and a fixing component is provided inside the mounting block.
[0005] Preferably, the fixing assembly comprises a plurality of blocking blocks, the plurality of blocking blocks are slidably connected to the inside of the mounting block, a fixing spring is arranged between the blocking block and the inside of the mounting block, and a connecting pin is arranged at the outer end of the blocking block.
[0006] Preferably, the displacement mechanism includes a plurality of sliding rods, wherein the plurality of longitudinally arranged sliding rods are arranged between mounting plates in a connecting assembly, a slider is slidably connected to the sliding rod, a displacement motor is arranged at the bottom of the slider, a worm gear is fixedly connected to the output end of the displacement motor, and the worm gear is meshingly connected to a worm.
[0007] Preferably, the monitoring mechanism includes a mounting platform, the mounting platform is arranged on a slider in the displacement mechanism, a visual sensor is arranged on the mounting platform, a load sensor is arranged on the supporting cross bar, a mist dispersion component is arranged on the mounting platform, and the visual sensor and the load sensor transmit the collected data to a central control system.
[0008] Preferably, the mist dispersion assembly comprises an installation cabin, the installation cabin is arranged on a mounting platform, and a fan is arranged inside the installation cabin.
[0009] Preferably, the spraying mechanism includes a mounting frame, the mounting frame is arranged on the walkway board, a spraying pipe is arranged on the mounting frame, a plurality of transversely arranged atomizing spray heads are arranged on the spraying pipe, the spraying pipe is connected to the output end of the water pump through a water pipe, and the input end of the water pump is connected to the water tank through a water pipe.
[0010] Preferably, the material lifting mechanism includes a placing rod, the placing rod is arranged on the supporting cross bar, an electric hoist is arranged on the placing rod, and the output end of the electric hoist is connected to a hook through a guide rope.
[0011] Preferably, a plurality of protective nets are arranged between the plurality of longitudinal horizontal rods through a splicing mechanism, and a horizontal protective flap is connected to the inner side of the walkway board through a hinge.
[0012] Preferably, the splicing mechanism includes a plurality of plug-in rods, the plurality of the plug-in rods are arranged on the longitudinal horizontal rods, the plug-in rods are slidably connected with plug-in plates, and the plug-in plates are arranged on the left and right sides of the protective net.
[0013] Preferably, the central control system includes: Acquisition module: It is used to transmit the data collected by the visual sensor and the load sensor to the central control system; Analysis module: It analyzes the data collected in the central control system through the data processing unit; Drive module: It drives the displacement motor, fan and water pump through the analyzed information.
[0014] The present invention provides a construction climbing frame, which has the following beneficial effects: 1. The present invention uses a displacement mechanism and the meshing relationship of a worm gear and a displacement motor to enable the slider to slide on the slide rod, and the slider can drive the mounting platform to move, thereby allowing the visual sensor to break free from the limitation of a fixed point. When the visual sensor is obstructed by environmental factors such as dust, on the one hand, a spraying mechanism is used to spray water mist and dust to reduce dust, and on the other hand, a fan in the mounting cabin is used to blow away nearby dust, thereby improving the monitoring environment and ensuring that the visual sensor can work continuously and effectively, maintaining stable monitoring of different positions and links, and avoiding the situation where monitoring data is missing or inaccurate due to environmental interference like traditional fixed monitoring, thereby further enhancing the comprehensiveness and effectiveness of monitoring.
[0015] 2. In the present invention, when dust is generated during construction, the water pump can pump out water from the water tank and transport it to the spray pipe on the mounting frame, and then spray out fine water mist through the atomizing spray head. The water mist can fully contact with the dust particles floating in the air, so that the dust particles increase in weight after absorbing the water mist, and then accelerate the sedimentation, effectively reducing the amount of dust suspended in the air, reducing the dust concentration at the construction site, and improving the overall air quality.
[0016] 3. In the present invention, the mounting block slides into the mounting column, the fixing spring releases the elastic potential energy, and the blocking block pops out to fix the monitoring device connected by the connecting shaft and the mounting plate. When taking it out, the mounting block only needs to continue to slide, and the mounting column can be slid out through the removal key. This convenient disassembly method is convenient for quickly replacing the faulty monitoring equipment with spare equipment on site, thereby minimizing the duration of monitoring interruption, ensuring that the monitoring work during the construction process can be carried out continuously, avoiding the inability to timely grasp the construction safety status due to the long-term lack of monitoring data, effectively reducing the impact on the construction progress, and ensuring that the construction can proceed in an orderly manner as planned. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A perspective view of the present invention; Figure 2 It is a top view schematic diagram of the present invention; Figure 3 It is a right side schematic diagram of the present invention; Figure 4 It is a schematic diagram of the disassembly of the connection assembly of the present invention; Figure 5 It is a schematic diagram of the displacement mechanism and the monitoring mechanism of the present invention; Figure 6 is a schematic diagram of the spraying mechanism of the present invention; Figure 7 is a schematic diagram of the splicing mechanism of the present invention; Figure 8 It is a flow chart of the central control system of the present invention.
[0018] Among them, 1. Attachment support; 2. Climbing frame guide rail; 3. Support crossbar; 4. Longitudinal horizontal bar; 5. Walkway board; 6. Horizontal protection flap; 7. Protection net; 8. Connection assembly; 801. Mounting column; 802. Take-out key; 803. Blocking cap; 804. Mounting block; 805. Blocking block; 806. Connecting pin; 807. Fixing spring; 808. Connecting shaft; 809. Mounting plate; 9. Displacement mechanism; 901. Sliding rod; 902. Worm; 903. Sliding block; 904. Worm wheel; 905. Displacement motor; 1 0. Monitoring mechanism; 1001. Mounting table; 1002. Visual sensor; 1003. Load sensor; 1004. Mounting cabin; 1005. Fan; 11. Spraying mechanism; 1101. Mounting frame; 1102. Spraying pipe; 1103. Atomizing spray head; 1104. Water pump; 1105. Water tank; 12. Material lifting mechanism; 1201. Placement rod; 1202. Electric hoist; 1203. Guide rope; 1204. Hook; 13. Splicing mechanism; 1301. Plug-in rod; 1302. Plug-in board. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the specification of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] Please refer to the attached Figure 1 -Attached Figure 3The embodiment of the present invention provides a construction climbing frame, including multiple attachment supports 1 and multiple longitudinal horizontal bars 4. The multiple attachment supports 1 are fixed to the wall by anchor bolts. Climbing frame guide rails 2 are arranged on the outer sides of the attachment supports 1. Multiple groups of supporting cross bars 3 are arranged between the climbing frame guide rails 2 and the multiple longitudinal horizontal bars 4. The attachment supports 1 are the key connecting components between the climbing frame and the wall of the building. They undertake the important mission of safely and stably transferring the weight of the entire climbing frame and various loads generated during the construction process to the building structure. The longitudinal horizontal bars 4 play the role of lateral connection and support in the structural system of the climbing frame. They cooperate with each other to provide the necessary basic framework for the subsequent installation of other components and the operation of construction personnel, ensuring that the climbing frame can maintain good structural integrity and stability under different construction conditions. The main function of the climbing frame guide rail 2 is to provide precise guidance for the lifting process of the climbing frame, ensuring that the climbing frame can run smoothly along a predetermined trajectory when rising or descending along the facade of the building, avoiding unstable phenomena such as deviation and shaking, and the supporting cross bars 3 are used to enhance the stability and bearing capacity of the overall structure of the climbing frame.
[0021] Please refer to the attached Figure 4 and attached Figure 5 , a connecting component 8 is arranged on the inner side of the longitudinal horizontal rod 4, and the connecting component 8 includes a plurality of mounting columns 801, and the plurality of mounting columns 801 are arranged longitudinally and are respectively arranged on the inner side of the longitudinal horizontal rod 4 at both ends, and a removal key 802 is arranged on each of the mounting columns 801, and a blocking cap 803 is arranged at one end of the mounting column 801 away from the longitudinal horizontal rod 4, and the removal key 802 is slidably connected with a mounting block 804, and the mounting block 804 is connected with a mounting plate 809 through a connecting shaft 808, and a fixing component is arranged inside the mounting block 804, and the mounting column 801 is intended to provide an accurate and reliable basic support point for the connection of the subsequent monitoring mechanism 10, thereby constructing a stable and orderly connection structure; the removal key 802 is the key to removing the mounting block 804, and the connecting shaft 808 ensures that the connection between the mounting block 804 and the mounting plate 809 is firm and flexible, laying a solid foundation for the effective operation of the subsequent displacement mechanism 9; The fixing assembly includes a plurality of blocking blocks 805, which are slidably connected to the inside of the mounting block 804, a fixing spring 807 is arranged between the blocking block 805 and the inside of the mounting block 804, a connecting pin 806 is arranged at the outer end of the blocking block 805, the blocking block 805 can cooperate with the blocking cap 803 to limit the mounting block 804 on the mounting column 801, and the connecting pin 806 can make the blocking block 805 enter the mounting block 804 so that the mounting block 804 can be removed; The longitudinal horizontal rod 4 is connected to a displacement mechanism 9 through a connecting assembly 8. The displacement mechanism 9 includes a plurality of sliding rods 901. The plurality of longitudinally arranged sliding rods 901 are arranged between mounting plates 809 in the connecting assembly 8. A slider 903 is slidably connected to the sliding rod 901. A displacement motor 905 is arranged at the bottom of the slider 903. A worm gear 904 is fixedly connected to the output end of the displacement motor 905. The worm gear 904 is meshingly connected to the worm 902. The slider 903 slidably connected to the sliding rod 901 serves as a key component for carrying and transmitting motion. The worm gear 904 forms a precise meshing connection with the worm 902, which can efficiently convert the rotational motion of the displacement motor 905 into the linear motion of the slider 903.
[0022] Please refer to the attached Figure 2 and attached Figure 5 The displacement mechanism 9 is provided with a monitoring mechanism 10, which includes a mounting platform 1001, which is provided on a slider 903 in the displacement mechanism 9, a visual sensor 1002 is provided on the mounting platform 1001, a load sensor 1003 is provided on the supporting crossbar 3, and a mist dispersing component is provided on the mounting platform 1001. The visual sensor 1002 and the load sensor 1003 transmit the collected data to the central control system, and the mounting platform 1001 can move accurately as the slider 903 slides on the slide bar 901. The mounting platform 1001 is subsequently installed on the central control system. The various monitoring equipment on the climbing frame provide a stable and flexibly adjustable load-bearing platform. The visual sensor 1002 can clearly capture the image information of the construction area, such as the operating status of the construction workers, the stacking of building materials, and the construction progress and quality status of the building facade. The load sensor 1003 can accurately sense the load acting on the supporting crossbar 3. Whether it is the dead weight of the construction materials, the active load of the construction workers, or the additional load caused by external factors such as wind load, it can be detected in a timely and accurate manner, providing key data support for judging the structural stress state of the climbing frame. The mist dispersion component includes an installation cabin 1004, which is arranged on the installation platform 1001. A fan 1005 is arranged inside the installation cabin 1004. The installation cabin 1004 provides an installation place for the fan 1005. The fan 1005 creates a clear and unobstructed observation environment for the visual sensor 1002, ensuring that it can stably and accurately collect image data, improve the reliability and effectiveness of monitoring, avoid monitoring errors or failures caused by environmental factors, and further improve the overall performance and practicality of the construction climbing frame monitoring system.
[0023] Please refer to the attached Figure 1 -Attached Figure 2 and attached Figure 6A walkway board 5 is arranged on the supporting cross bar 3, and a horizontal protective flap 6 is connected to the inner side of the walkway board 5 through a hinge. A spraying mechanism 11 is arranged on the walkway board 5, and the spraying mechanism 11 includes a mounting frame 1101, and the mounting frame 1101 is arranged on the walkway board 5. A spraying pipe 1102 is arranged on the mounting frame 1101, and a plurality of laterally arranged atomizing spray heads 1103 are arranged on the spraying pipe 1102. The spraying pipe 1102 is connected to the output end of the water pump 1104 through a water pipe, and the input end of the water pump 1104 is connected to the water tank 1105 through a water pipe. The walkway board 5 can accommodate construction workers to carry necessary tools and small equipment to pass freely, and the horizontal protective flap 6 is flipped down to a suitable position to form an effective horizontal protective barrier to prevent construction workers from accidentally falling. Or tools, materials and other items slide down to the bottom, to ensure the safety of personnel and facilities under the construction area, the mounting frame 1101 provides a stable and firm support platform for the spray pipe 1102, the atomizing spray head 1103 can efficiently convert the liquid medium delivered from the water pump 1104 into tiny droplets, the water pump 1104 serves as the power core of the spraying mechanism 11, the water tank 1105 is used to store the liquid medium required for the spraying operation, through the operation of the water pump 1104, the liquid medium in the water tank 1105 is pressurized and delivered to the spray pipe 1102, and then sprayed out through the atomizing spray head 1103, to achieve effective spraying operation on the construction site, to achieve the environmental adjustment purposes such as dust reduction and moisturizing, to improve the quality and safety of the construction environment, and to promote the smooth development of environmental protection construction.
[0024] Please refer to the attached Figure 2 -Attached Figure 3 A material lifting mechanism 12 is arranged on one group of supporting cross bars 3, and the material lifting mechanism 12 includes a placing rod 1201, and the placing rod 1201 is arranged on the supporting cross bar 3. An electric hoist 1202 is arranged on the placing rod 1201, and the output end of the electric hoist 1202 is connected with a hook 1204 through a guide rope 1203. The placing rod 1201 not only provides a stable installation platform for the electric hoist 1202, but also its own horizontality and straightness are precisely adjusted to ensure that the electric hoist 1202 can smoothly lift or lower materials along a predetermined trajectory during operation, reduce safety hazards caused by equipment shaking or deviation, and improve the accuracy and reliability of material lifting operations. As an efficient and convenient material lifting power equipment, the electric hoist 1202 drives the guide rope 1203 to be retracted and released through the forward and reverse operations of the electric hoist 1202, thereby realizing the vertical lifting movement of the hook 1204 and the hung material.
[0025] Please refer to the attached Figure 1 and attached Figure 7There are multiple protective nets 7 between the multiple longitudinal horizontal rods 4 through a splicing mechanism 13. The splicing mechanism 13 includes multiple plug-in rods 1301. The multiple plug-in rods 1301 are arranged on the longitudinal horizontal rod 4. The plug-in rods 1301 are slidably connected with plug-in plates 1302. The plug-in plates 1302 are arranged on the left and right sides of the protective net 7. The protective net 7 can effectively prevent construction workers, tools, and building materials from accidentally falling from a high place on the climbing frame. The protective net 7 with the plug-in plates 1302 is brought close to the plug-in rods 1301 on the longitudinal horizontal rod 4, so that the plug-in plates 1302 are slidably inserted along the axial direction of the plug-in rods 1301. This sliding connection method is cleverly designed, allowing a certain degree of installation adjustment margin so as to overcome slight deviations caused by manufacturing errors or construction deformations during the actual installation process. After the protective net 7 is installed in place, it can ensure that the protective net 7 will not easily fall off or shift from the plug-in rod 1301 through a special locking structure or friction force, thereby achieving stable splicing and reliable fixation of the protective net 7 between multiple longitudinal horizontal rods 4, forming a complete, continuous and tight protection network, effectively blocking various falling risks and ensuring the integrity and stability of the construction safety environment.
[0026] Please refer to the attached Figure 8 , the central control system includes: Collection module: used to transmit the data collected by the visual sensor 1002 and the load sensor 1003 to the central control system; Analysis module: It analyzes the data collected in the central control system through the data processing unit; Driving module: It drives the displacement motor 905, the fan 1005 and the water pump 1104 through the analyzed information.
[0027] Working principle: According to the construction drawings and the shape of the building, determine the installation position of the vertical main frame at the bottom of the building. After the attachment support 1 is fixed to the wall by anchor bolts, install the climbing frame guide rail 2 to the attachment support 1. The supporting crossbar 3 connects the climbing frame guide rail 2 and the longitudinal horizontal bar 4 through the anti-slip buckle. The plug-in plate 1302 of the protective net 7 is aligned with the plug-in rod 1301, and the plug-in rod 1301 is inserted into the plug-in plate 1302. The protective net 7 is fixed to the longitudinal horizontal bar 4. Then the construction personnel can walk on the walkway board 5 and flip the horizontal protective flap 6 to block the sliding guide rail and the wall. , slide the mounting block 804 into the mounting column 801. During the sliding process, when the blocking block 805 hits the blocking cap 803, the blocking block 805 is stored in the mounting block 804. At this time, the extrusion fixing spring 807 is squeezed. When the mounting block 804 slides to the middle section of the mounting column 801, the fixing spring 807 releases its elastic potential energy, and the blocking block 805 pops out, fixing the displacement mechanism 9 connected by the connecting shaft 808 and the mounting plate 809. Then the visual sensor 1002 on the mounting platform 1001 observes the construction layer. When the visual sensor 1002 is blocked, the central control system will pump the water pump. 1104 is started. After the water pump 1104 is started, the water in the water tank 1105 is pumped out and the pumped water is transported to the spray pipe 1102 on the mounting frame 1101. The atomizing spray head 1103 on the spray pipe 1102 sprays water mist. The dust generated during the construction process combines with the water mist. The fan 1005 in the installation cabin 1004 is started to blow away the dust near the visual sensor 1002. The displacement motor 905 is started to rotate the worm gear 904. Through the meshing relationship between the worm gear 904 and the worm 902, the slider 903 slides on the slide bar 901, and the slider 903 drives The mounting platform 1001 moves to adjust the monitoring position of the visual sensor 1002. The visual sensor 1002 and the load sensor 1003 feed back the monitoring information to the construction personnel. During construction, the required raw materials are placed on the hook 1204, and the electric hoist 1202 pulls the guide rope 1203 to transport the raw materials to the construction layer. When the construction layer needs to be replaced, the mounting block 804 slides onto the removal key 802, and then the mounting block 804 drives the removal key 802 to move into the blocking cap 803, and then the mounting ring can be removed from the mounting column 801, and the monitoring mechanism 10 can be removed at this time.
[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction climbing frame, comprising a plurality of attachment supports (1) and a plurality of longitudinal horizontal rods (4), characterized in that: A plurality of the attachment supports (1) are fixed to the wall by anchor bolts, a climbing frame guide rail (2) is arranged on the outer side of each of the attachment supports (1), a plurality of groups of support cross bars (3) are arranged between the climbing frame guide rail (2) and the plurality of the longitudinal horizontal bars (4), a connection assembly (8) is arranged on the inner side of the longitudinal horizontal bar (4), the longitudinal horizontal bar (4) is connected to a displacement mechanism (9) via the connection assembly (8), a monitoring mechanism (10) is arranged on the displacement mechanism (9), a walkway plate (5) is arranged on the support cross bar (3), a spraying mechanism (11) is arranged on the walkway plate (5), and a material lifting mechanism (12) is arranged on one group of the support cross bars (3); The connection assembly (8) comprises a plurality of mounting columns (801), the plurality of mounting columns (801) being arranged longitudinally and respectively arranged on the inner side of the longitudinal horizontal bars (4) at both ends, each mounting column (801) being provided with a removal key (802), a blocking cap (803) being provided at one end of the mounting column (801) away from the longitudinal horizontal bar (4), the removal key (802) being slidably connected to a mounting block (804), the mounting block (804) being connected to a mounting plate (809) via a connecting shaft (808), and a fixing assembly being provided inside the mounting block (804).
2. A construction climbing frame according to claim 1, characterized in that: The fixing assembly comprises a plurality of blocking blocks (805), the plurality of blocking blocks (805) being slidably connected to the inside of the mounting block (804), a fixing spring (807) being arranged between the blocking block (805) and the inside of the mounting block (804), and a connecting pin (806) being arranged at the outer end of the blocking block (805).
3. A construction climbing frame according to claim 1, characterized in that: The displacement mechanism (9) comprises a plurality of sliding rods (901), wherein the plurality of longitudinally arranged sliding rods (901) are arranged between mounting plates (809) in the connection assembly (8), wherein a slider (903) is slidably connected to the sliding rods (901), a displacement motor (905) is arranged at the bottom of the slider (903), an output end of the displacement motor (905) is fixedly connected to a worm gear (904), and the worm gear (904) is meshingly connected to a worm (902).
4. A construction climbing frame according to claim 1, characterized in that: The monitoring mechanism (10) comprises a mounting platform (1001), wherein the mounting platform (1001) is arranged on a slider (903) in the displacement mechanism (9), a visual sensor (1002) is arranged on the mounting platform (1001), a load sensor (1003) is arranged on the supporting crossbar (3), and a mist dispersion component is arranged on the mounting platform (1001), wherein the visual sensor (1002) and the load sensor (1003) transmit collected data to a central control system.
5. A construction climbing frame according to claim 4, characterized in that: The mist dispersion assembly comprises an installation cabin (1004), wherein the installation cabin (1004) is arranged on a mounting platform (1001), and a fan (1005) is arranged inside the installation cabin (1004).
6. A construction climbing frame according to claim 1, characterized in that: The spraying mechanism (11) comprises a mounting frame (1101), the mounting frame (1101) being arranged on a walkway board (5), a spraying pipe (1102) being arranged on the mounting frame (1101), a plurality of laterally arranged atomizing spraying heads (1103) being arranged on the spraying pipe (1102), the spraying pipe (1102) being connected to an output end of a water pump (1104) via a water pipe, and an input end of the water pump (1104) being connected to a water tank (1105) via a water pipe.
7. A construction climbing frame according to claim 1, characterized in that: The material lifting mechanism (12) comprises a placing rod (1201), wherein the placing rod (1201) is arranged on the supporting cross bar (3), an electric hoist (1202) is arranged on the placing rod (1201), and an output end of the electric hoist (1202) is connected to a hook (1204) via a guide rope (1203).
8. A construction climbing frame according to claim 1, characterized in that: A plurality of protective nets (7) are arranged between the plurality of longitudinal horizontal bars (4) via a splicing mechanism (13), and a horizontal protective flap (6) is connected to the inner side of the walkway board (5) via a hinge.
9. A construction climbing frame according to claim 8, characterized in that: The splicing mechanism (13) comprises a plurality of plug-in rods (1301), the plurality of plug-in rods (1301) being arranged on the longitudinal horizontal rod (4), the plug-in rods (1301) being slidably connected to plug-in plates (1302), and the plug-in plates (1302) being arranged on the left and right sides of the protective net (7).
10. A construction climbing frame according to claim 4, characterized in that: The central control system comprises: Collection module: used for transmitting the data collected by the visual sensor (1002) and the load sensor (1003) to the central control system; Analysis module: It analyzes the data collected in the central control system through the data processing unit; Driving module: It drives the displacement motor (905), the fan (1005) and the water pump (1104) through the analyzed information.