Motorized photovoltaic system capable of being quickly unfolded and folded and working method of motorized photovoltaic system

By designing a mobile rapid expansion and withdrawal photovoltaic system, using containers and foldable photovoltaic arrays combined with push-pull structures and storage frames, the rapid expansion and transfer of existing photovoltaic systems in plateaus, fields and other places has been solved, and the rapid expansion and storage has been achieved, and the handling and adaptability have been improved.

CN119787943AInactive Publication Date: 2025-04-08TIANJIN LANTIAN SOLAR TECH
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411812113.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-04-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The rapid expansion and transfer of existing photovoltaic systems in plateaus, fields and other places cannot meet the needs of power consumption, and the mobile photovoltaic systems have high requirements for the site and poor structural handling.

Method used

A motorized rapid expansion and removal photovoltaic system is designed, including a container, a top photovoltaic array, a foldable first and second photovoltaic arrays, a push-pull structure and a storage frame. Through the cooperation of the push-pull structure and a storage frame, the rapid expansion and storage of the photovoltaic array is achieved.

Benefits of technology

It realizes the rapid deployment and storage of the photovoltaic system, conveniently and quickly meets the power needs of the troops in different geographical locations, and at the same time reduces the requirements for the site and improves the handling of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119787943A_ABST
    Figure CN119787943A_ABST
Patent Text Reader

Abstract

The invention discloses a motorized rapid unfolding and folding photovoltaic system, which comprises a container, a top photovoltaic array, a first photovoltaic array, a second photovoltaic array, a push-pull structure, a first storage frame and a second storage frame, and is characterized in that the top photovoltaic array is mounted on the outer surface of a top plate of the container; the first photovoltaic array can be folded and stored in the first storage frame, the first storage frame is installed in the container, and when the first photovoltaic array is unfolded, the first photovoltaic array penetrates through a front door of the container to be laid out of the container; the second photovoltaic array can be folded and stored in the second storage frame, the second storage frame is slidably installed in the container through a push-pull structure, the second storage frame is parallel to the first storage frame when located in the container, and after the second storage frame slides out of the side door of the container, the second photovoltaic array is unfolded and laid outside the container. The first photovoltaic array is parallel to the first photovoltaic array. According to the motorized photovoltaic system capable of being unfolded and folded rapidly, unfolding and folding are convenient and rapid, and the photovoltaic array is arranged in the container and can be transported to any position to be used.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic systems, and in particular to a mobile fast deployment and withdrawal photovoltaic system and a working method thereof. Background Art

[0002] Photovoltaic systems are used to provide electrical energy to meet electricity demand. Currently, most conventional photovoltaic structures are fixed, which are time-consuming and labor-intensive to install and remove, and have many requirements for the installation site. This cannot meet the electricity needs of troops for rapid deployment, withdrawal and transfer in plateaus and the wild. There are also some mobile photovoltaic systems, but they have high requirements for the site and poor structural controllability. Summary of the invention

[0003] The purpose of the present invention is to provide a mobile fast deployment and withdrawal photovoltaic system to address the technical defects in the prior art.

[0004] Another object of the present invention is to provide a working method for the above-mentioned mobile rapid deployment and withdrawal photovoltaic system.

[0005] The technical solution adopted to achieve the purpose of the present invention is:

[0006] A mobile fast deployment photovoltaic system, comprising a container, a top photovoltaic array, a first photovoltaic array, a second photovoltaic array, a push-pull structure, a first storage frame, and a second storage frame, wherein the top photovoltaic array is installed on the outer surface of the top plate of the container;

[0007] The first photovoltaic array can be folded and stored in a first storage frame, the first storage frame is installed in the container, and when the first photovoltaic array is unfolded, it passes through the front door of the container and is laid outside the container;

[0008] The second photovoltaic array can be folded and stored in the second storage frame, and the second storage frame is slidably installed in the container through a push-pull structure. When the second storage frame is in the container, it is parallel to the first storage frame. After the second storage frame slides out from the side door of the container, the second photovoltaic array is unfolded and laid outside the container, and is parallel to the first photovoltaic array.

[0009] In the above technical solution, the push-pull structure includes two bases, a mobile frame, load-bearing rollers and positioning rollers. The two bases are installed on the inner surface of the container bottom plate at an interval and relative to each other. The load-bearing rollers and positioning rollers are installed in sequence at intervals on the opposite surfaces of the two bases. The positioning rollers are perpendicular to the load-bearing rollers. The mobile frame is slidably installed on the base. During the movement of the mobile frame, the positioning rollers and the load-bearing rollers are located on the mobile frame.

[0010] In the above technical solution, the push-pull structure also includes a wheeled leg, which is rotatably installed at the end of the movable frame. The height of the wheeled leg is adjustable. The wheeled leg includes a support wheel installed at the bottom. By rotating the wheeled leg and adjusting the height, the support wheel is in contact with the ground, thereby providing auxiliary support for the push-pull structure.

[0011] In the above technical solution, second guide rails are arranged at intervals on the mobile frame, and the length direction of the second guide rails is perpendicular to the moving direction of the mobile frame; the second photovoltaic array is folded and slidably installed on the second guide rail, and a second external guide rail is stored in the container. When the second photovoltaic array needs to be unfolded, the second external guide rail is attached to the second guide rail, and the second photovoltaic array is unfolded and laid on the second external guide rail.

[0012] In the above technical solution, the mobile frame includes two U-shaped channel steels, which are arranged opposite to each other, with their openings facing back to back and opposite to the base. Each U-shaped channel steel is slidably installed on a base. During the movement of the mobile frame, the load-bearing rollers and positioning rollers are located in the U-shaped channel steels to realize the push-pull sliding of the mobile frame on the base.

[0013] In the above technical solution, the bottom of the second storage frame is installed on the mobile frame and is located above the second guide rail. Side clamping devices are provided at both ends of the second storage frame along the length direction. The side clamping devices located at both ends clamp the second photovoltaic array in a folded state within the second storage frame; a top clamping device is installed on the inner surface of the top of the container, and the top clamping device contacts the top of the second photovoltaic array in a folded state to fasten the second photovoltaic array in the second storage frame.

[0014] In the above technical solution, side clamping devices are provided at both ends of the first storage frame along the length direction. The side clamping devices at both ends clamp the first photovoltaic array in a folded state in the first storage frame, and the top of the first photovoltaic array is fastened in the first storage frame through the top clamping device. Two first guide rails are arranged at intervals below the first storage frame. The first guide rails are installed on the inner surface of the container bottom plate. When the first photovoltaic array is in a folded state, its bottom is slidably installed on the first guide rail. A first external guide rail is stored in the container. When the first photovoltaic array needs to be unfolded, the first external guide rail is attached to the first guide rail, and the first photovoltaic array is laid on the first external guide rail.

[0015] In the above technical scheme, the first photovoltaic array and the second photovoltaic array have the same structure, and both include photovoltaic components, photovoltaic frame groups, casters, eye screws, shoulder screws and clips. The photovoltaic components are installed on the photovoltaic frame groups, and two casters are installed on the two opposite side surfaces of the photovoltaic frame groups. The eye screws are installed at intervals on the other two side surfaces of the photovoltaic frame group, and the shoulder screws are installed at intervals on one of the other two side surfaces. Clips are provided on the other of the other two side surfaces. Multiple photovoltaic frame groups are rotatably connected in sequence, and the casters are provided at the rotational connection between two adjacent photovoltaic frame groups.

[0016] In the above technical solution, the photovoltaic frame group includes two photovoltaic frames, and the two photovoltaic frames are rotatably connected together by hinges. A sleeve roller is installed on each photovoltaic frame between the two photovoltaic frames to assist the first photovoltaic array and the second photovoltaic array to run on the external guide rail. The shoulder screw is installed on one of the photovoltaic frames, and the clip is installed under the other photovoltaic frame by screws. When the first photovoltaic array and the second photovoltaic array are in a folded state, the clip is clamped on the shoulder screw.

[0017] In the above technical scheme, the top clamping device and the side clamping device have the same structure, and both include a rotating connecting shaft, a first gear, a second gear, a lead screw, a nut, a fixed frame, a lead tube, a connecting frame, a moving rod, a pin shaft and a crank. One side of the moving rod can contact the folded photovoltaic array during movement, and two connecting frames are installed at intervals on the side opposite to the side. Each of the connecting frames is fixed to a lead tube. The rotating connecting shaft is passed through the two lead tubes, and a pin shaft is installed at each of the two ends. A crank shaft is installed at the end of one of the pin shafts. A first gear fixed on the rotating connecting shaft is arranged in the internal cavity of each lead tube. The second gear meshes with the first gear, is located in the internal cavity of the lead tube, and is fixed to the end of the lead screw. The lead screw is located in the lead tube and fixedly connected to the lead tube. The nut is installed in the fixed frame and rotatably connected to the lead screw. The fixed frame is sleeved in the lead tube, and the end protrudes out of the lead tube.

[0018] In the above technical solution, the end of the fixed frame of the side clamping device protrudes out of the guide tube and is installed at the end of the second storage frame; the end of the fixed frame of the top clamping device protrudes out of the guide tube and is installed on the inner surface of the top of the container.

[0019] In the above technical scheme, stop brackets are installed at the top of the ends of the first external guide rail and the second external guide rail. When the first photovoltaic array is in an unfolded state, the casters at the ends of the first photovoltaic array contact the stop bracket to prevent the first photovoltaic array from sliding out of the external guide rail; when the second photovoltaic array is in an unfolded state, the casters at the ends of the second photovoltaic array contact the stop bracket to prevent the second photovoltaic array from sliding out of the external guide rail; when the first photovoltaic array is unfolded, two rows of first external guide rails are arranged at the bottom, and positioning tubes are arranged at the ends of the two first external guide rails. The spacing between the two first external guide rails is measured and adjusted by using the slots on the positioning tubes. After adjustment, the positioning tubes are placed at the ends of the first external guide rails to play a limiting role. When the second photovoltaic array is unfolded, two rows of second external guide rails are arranged at the bottom, and positioning tubes are also arranged at the ends of the two second external guide rails. The spacing between the two second external guide rails is measured and adjusted by using the slots on the positioning tubes. After adjustment, the positioning tubes are placed at the ends of the second external guide rails to play a limiting role. The positioning tube is located at the outer end of the stop bracket, and a leveling device is stored in the container. When the first photovoltaic array and the second photovoltaic array are in an unfolded state, the leveling device is respectively installed at the bottom of the first external guide rail and the second external guide rail, and the height of the leveling device is adjustable.

[0020] Another aspect of the present invention also includes a working method of the mobile rapid deployment and withdrawal photovoltaic system, comprising the following steps:

[0021] Unfolding process:

[0022] Step 1, open the container, take out the first outer guide rail, the second outer guide rail and the leveling device;

[0023] Step 2: Loosen the top clamping device, pull the second photovoltaic array, the second storage frame and the push-pull structure out of the container, rotate the wheeled legs on the push-pull structure until the support wheels face downward, adjust the support wheels to contact the ground and keep the push-pull structure horizontal, and continue to pull the push-pull structure to the limit position so that it is completely outside the container;

[0024] Step 3, plug the first external guide rail into the first guide rail, plug the second external guide rail into the second guide rail, and install a leveling device at the bottom of the first external guide rail and the second external guide rail, and adjust the height of the leveling device so that the first external guide rail is level with the first guide rail, and the second external guide rail is level with the second guide rail;

[0025] Step 4, use the positioning tube to check whether the distance between the two first outer guide rails is equal to the distance between the two first guide rails, and at the same time check whether the distance between the two second outer guide rails is equal to the distance between the two second guide rails. If not, adjust the distance between the first outer guide rails and the distance between the second outer guide rails respectively. If they are equal, install the positioning tube at the ends of the first outer guide rail and the second outer guide rail, and install the stop bracket.

[0026] Step 5, loosen the side clamping device, turn the buckle, open the connection between the buckle and the shoulder screw, pull the first photovoltaic array, lay it outside the container, and then unfold the second photovoltaic array in the same way.

[0027] Retraction process: The retraction process is opposite to the deployment process. Finally, the first photovoltaic array and the second photovoltaic array are stored in a container, and the container is placed in a transport vehicle for transportation.

[0028] Compared with the prior art, the present invention has the following beneficial effects:

[0029] The mobile fast deployment and withdrawal photovoltaic system of the present invention is convenient and quick to deploy and withdraw, and the photovoltaic array is placed in a container and can be transported to any location for use. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is a schematic diagram of a mobile rapid deployment photovoltaic system in an deployed state;

[0031] Figure 2 This is a schematic diagram of a mobile rapid deployment photovoltaic system in a folded state;

[0032] Figure 3 This is a schematic diagram of a mobile rapid deployment photovoltaic system in a folded state;

[0033] Figure 4 It is a schematic diagram of push-pull structure;

[0034] Figure 5 It is a schematic diagram of the photovoltaic array structure;

[0035] Figure 6 This is a schematic diagram of the photovoltaic array in folded state;

[0036] Figure 7 Schematic diagram of the buckle structure;

[0037] Figure 8 It is a schematic diagram of the photovoltaic frame structure;

[0038] Fig. 9 is a schematic diagram of a clamping device;

[0039] Fig.10 is a cross-sectional view of the clamping device;

[0040] Fig.11 It is a schematic diagram of the local structure.

[0041] Among them, 1: container, 2: top photovoltaic array, 3: first photovoltaic array, 301: photovoltaic module, 302: photovoltaic frame group, 303: caster, 304: lifting eye screw, 305: shoulder screw, 306: buckle, 307: slot, 308: hinge, 309: sleeve roller, 3010: photovoltaic frame, 3011: double 6-shaped profile, 3012: 6-shaped profile, 3013: slot, 4: push-pull structure, 401: base, 402: mobile frame, 403: load-bearing roller, 404: positioning roller, 405: wheeled leg, 406: U-shaped channel steel, 5: second photovoltaic array, 6: first storage frame Frame, 601: fixed bracket, 602: movable blocking tube, 7: second storage frame, 8: side clamping device, 801: rotating connecting shaft, 802: first gear, 803: second gear, 804: lead screw, 805: nut, 806: fixed frame, 807: guide tube, 808: connecting frame, 809: moving rod, 8010: crank, 8011: pin shaft 9: top clamping device, 10: second external guide rail, 11: first external guide rail, 12: stop bracket, 13: positioning tube, 14: leveling device, 15: front door, 16: U-shaped pin, 17: first guide rail, 18: second guide rail, 19: side door. DETAILED DESCRIPTION

[0042] The present invention is further described in detail below in conjunction with specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0043] Example 1

[0044] like Figure 1-Figure 11 As shown, a mobile fast deployment photovoltaic system includes a container 1, a top photovoltaic array 2, a first photovoltaic array 3, a second photovoltaic array 5, a push-pull structure 4, a first storage frame 6 and a second storage frame 7. The top photovoltaic array 2 is installed on the outer surface of the top plate of the container 1 to increase the overall power generation;

[0045] The first photovoltaic array 3 can be folded and stored in the first storage frame 6, and the first storage frame 6 is installed in the container 1. When the first photovoltaic array 3 is unfolded, it passes through the front door 15 of the container 1 and is laid outside the container 1;

[0046] The second photovoltaic array 5 can be folded and stored in the second storage frame 7. The second storage frame 7 is slidably installed in the container 1 through the push-pull structure 4. When the second storage frame 7 is located in the container 1, it is parallel to the first storage frame 6. The second storage frame 7 is opened from the side door 19 (such as Figure 1 After the right door (shown as the door on the right side) slides out, the second photovoltaic array 5 is unfolded and laid outside the container 1, and is arranged in parallel with the first photovoltaic array 3 (the first photovoltaic array 3 laid outside the container 1).

[0047] like Figure 4 As shown, specifically, the push-pull structure 4 includes two bases 401, a mobile frame 402, a load-bearing roller 403, a positioning roller 404 and a pulley leg 405. The two bases 401 are arranged opposite to each other at intervals and are installed on the inner surface of the bottom plate of the container 1 by bolts. The load-bearing rollers 403 and the positioning rollers 404 are installed in sequence on the opposite surfaces of the two bases 401 at intervals. The positioning rollers 404 are perpendicular to the load-bearing rollers 403. The mobile frame 402 is slidably installed on the base 401. During the movement of the mobile frame 402, the positioning rollers 404 and the load-bearing rollers 403 are located on the mobile frame 402. The load-bearing rollers 403 can provide the mobile frame 402 with an upward supporting force, as well as an upper and lower limiting function. The positioning rollers 404 limit the mobile frame 402 in a direction perpendicular to the load-bearing rollers 403; the pulley leg 405 is rotatably installed on the At the end of the mobile frame 402, the height of the wheeled leg 405 is adjustable, and the wheeled leg 405 includes a support wheel installed at the bottom. When the push-pull structure is pulled out of the container 1, the support wheel is in contact with the ground by rotating the wheeled leg 405 and adjusting the height, so as to provide auxiliary support for the push-pull structure 4; second guide rails 18 are arranged at intervals on the mobile frame 402 (the number of guide rails is 2 in this embodiment), and the length direction of the second guide rail 18 is perpendicular to the moving direction of the mobile frame 402; when the second photovoltaic array 5 is in a folded state, its bottom is slidably installed on the second guide rail 18 (and stored in the second storage frame 7 at the same time), and a second external guide rail 10 is stored in the container 1. When the second photovoltaic array 5 needs to be unfolded, the second guide rail 18 is attached to the second external guide rail 10 along its length direction, and the second photovoltaic array 5 is laid on the second external guide rail 10.

[0048] Furthermore, the mobile frame 402 includes two U-shaped channel steels 406, which are arranged opposite to each other, with their openings facing back to back and opposite to the base 401. Each U-shaped channel steel 406 is slidably installed on a base 401. During the movement of the mobile frame 402, the load-bearing rollers 403 and the positioning rollers 404 are located in the U-shaped channel steels 406 to realize the push-pull sliding of the mobile frame 402 on the base 401.

[0049] Furthermore, the bottom of the second storage frame 7 is installed on the mobile frame 402, and side clamping devices 8 are provided at both ends of the second storage frame 7 along the length direction. The side clamping devices 8 located at both ends clamp the second photovoltaic array 5 in a folded state in the second storage frame 7; a top clamping device 9 is installed on the inner surface of the top of the container 1, and the top clamping device 9 is shared by the first photovoltaic array 3 and the second photovoltaic array 5. The top clamping device 9 contacts the top of the second photovoltaic array 5 in a folded state, and fastens the second photovoltaic array 5 in the second storage frame 7. Similarly, side clamping devices 8 are provided at both ends of the first storage frame 6 along the length direction, and the side clamping devices 8 located at both ends The clamping device 8 clamps the first photovoltaic array 3 in a folded state in the first storage frame 6, and the top of the photovoltaic array 3 is fastened in the first storage frame 6 by the top clamping device 9. Two first guide rails 17 are arranged at intervals below the first storage frame 6. The first guide rails 17 are installed on the inner surface of the bottom plate of the container 1. When the first photovoltaic array 3 is in a folded state, its bottom is slidably installed on the first guide rail 17 (and stored in the first storage frame 6 at the same time). The first external guide rail 11 is stored in the container 1. When the first photovoltaic array 3 needs to be unfolded, the first external guide rail 11 is attached to the first guide rail 17, and the first photovoltaic array 3 is laid on the first external guide rail 11.

[0050] Specifically, Figure 5-Figure 8As shown, the first photovoltaic array 3 and the second photovoltaic array 5 have the same structure, each of the photovoltaic arrays includes a photovoltaic component 301, a photovoltaic frame group 302, a caster 303, a lifting eye screw 304, a shoulder screw 305 and a buckle 306, the photovoltaic component 301 is installed on the photovoltaic frame group 302, two casters 303 are installed on the opposite sides of the photovoltaic frame group 302, and the lifting eye screws 304 are installed at intervals on the other two sides of the photovoltaic frame group 302 (when the photovoltaic array is unfolded, the lifting eye screws 304 are used to bolt the wire rope to connect the wire rope to the ground The photovoltaic array is further stabilized by anchor bolts, the shoulder screw 305 is arranged on one of the other two side surfaces, and the buckle 306 is arranged on the other of the other two side surfaces, and the plurality of photovoltaic frame groups 302 are rotatably connected in sequence, and the casters 303 are arranged at the rotation connection of two adjacent photovoltaic frame groups 302, when the first photovoltaic array 3 is unfolded, the casters 303 are slidably installed on the first external guide rail 11, and when the second photovoltaic array 5 is unfolded, the casters 303 are slidably installed on the second external guide rail 10; when the first photovoltaic array 3 is unfolded, the casters 303 are slidably installed on the second external guide rail 10; when the first photovoltaic When the array 3 is folded and retracted into the first storage frame 6, the caster 303 at the bottom thereof is slidably mounted on the first guide rail 17. When the second photovoltaic array 5 is retracted into the second storage frame 7, the caster 303 at the bottom thereof is slidably mounted on the second guide rail 18. The photovoltaic frame group 302 includes two photovoltaic frames 3010, which are rotatably connected together by hinges 308. A sleeve roller 309 is installed on each photovoltaic frame 3010 between the two photovoltaic frames 3010 to assist the photovoltaic array in running on the first external guide rail or the second external guide rail. , the shoulder screw 305 is installed on one of the photovoltaic frames 3010, and the buckle 306 is rotatably installed on the other photovoltaic frame 3010 through a screw (a shoulder screw in this embodiment). When each photovoltaic array is in a folded state, the buckle 306 is clamped on the shoulder screw 305 to make the folded state of each photovoltaic array more stable; specifically, a clamping groove 307 is provided at the other end of the buckle 306. When each photovoltaic array is in a folded state, the buckle 306 located on a photovoltaic frame group 302 is clamped on the shoulder screw 305 through the clamping groove 307.

[0051] Furthermore, the photovoltaic frame 3010 includes a 6-shaped profile 3012, a double 6-shaped profile 3011 and an auxiliary bracket, the auxiliary bracket plays a structural reinforcement role for the photovoltaic frame, and a slot for plugging the photovoltaic module 301 is formed between the adjacent 6-shaped profiles 3012 and the double 6-shaped profiles 3011, and the photovoltaic module 301 is embedded in the slot 3013. When the photovoltaic module 301 needs to be repaired or replaced, it only needs to remove the profile on the side of the caster 303, and the photovoltaic module 301 can be pulled out or inserted.

[0052] Specifically, Figure 9-10 As shown, the top clamping device 9 and the side clamping device 8 have the same structure, and each clamping device includes a rotating connecting shaft 801, a first gear 802, a second gear 803, a lead screw 804, a nut 805, a fixed frame 806, a lead tube 807, a connecting frame 808, a moving rod 809, a crank 8010 and a pin 8011. One side of the moving rod 809 is opposite to one of the photovoltaic arrays, and can contact one of the photovoltaic arrays in a folded shape during the movement. Two connecting frames 808 are installed at intervals on the other side opposite to the side. The lead tube 807 is fixed on the side of the connecting frame 808 opposite to the moving rod 809. The rotating connecting shaft 801 is installed on the two lead tubes. The guide tube 807 has a pin shaft 8011 installed at each of its two ends, and a crank 8010 is installed at the end of one of the pin shafts 8011. A first gear 802 fixedly mounted on the rotating connecting shaft 8011 is arranged in the internal cavity of each guide tube 807. The second gear 803 is meshed with the first gear 802 and is located in the internal cavity of the guide tube 807. The second gear 803 is fixedly mounted on the end of the lead screw 804. The lead screw 804 penetrates into the guide tube 807 and is fixedly connected to the lead tube. The nut 805 is installed in the fixed frame 806 and is rotatably connected to the lead screw 804. The fixed frame 806 is sleeved in the guide tube 807, and the end protrudes out of the guide tube 807.

[0053] When the end of the fixed frame 806 of the side clamping device 8 protrudes out of the lead tube 807 and is installed at both ends of the first storage frame 6 and the second storage frame 7; the end of the fixed frame 806 of the top clamping device 9 protrudes out of the lead tube 807 and is connected to the inner surface of the top of the container 1. The crank 8010 is rotated, and the rotating connecting shaft 801 follows, driving the first gear 802 to rotate, the second gear 803 follows, and the lead screw 804 connected to the second gear 803 rotates. Since the fixed frame 806 is limited, the moving rod 809 moves and contacts a photovoltaic array in a folded state, fastening the first photovoltaic array 3 to the first storage frame 6, and fastening the second photovoltaic array 5 to the second storage frame 7.

[0054] A leveling device 14 is stored in the container 1, and the leveling device 14 includes a tray and a height adjustment structure. When each photovoltaic array is deployed, the leveling device 14 is installed at the bottom of the external rail (the first external rail or the second external rail) so that the first external rail is at the same height as the first rail 17, and the second external rail is at the same height as the second rail 18. The first external rail 11 and the second external rail 10 have the same structure. Each external rail is a rectangular tube nested tube structure. The two external rails are connected by a sleeve and a U-shaped pin 16. At the same time, the tray of the leveling device is connected to each external rail by the U-shaped pin 16. Fig.11 As shown. The bottom of the height adjustment structure of the leveling device is flat to increase the contact area with the ground and improve the overall stability. The height adjustment structure itself is adjustable in height. By adjusting its own height, the external guide rail is kept horizontal, so that each photovoltaic array can be laid better.

[0055] A stop bracket 12 is installed at the top of the end of each external guide rail. When each photovoltaic array is in an unfolded state, the caster 303 at its end contacts the stop bracket 12 to prevent the photovoltaic array from sliding off the external guide rail. Two rows of external guide rails are arranged at the bottom of each photovoltaic array. When the external guide rails are assembled, the slot of the positioning tube 13 is used to check whether the spacing between the corresponding two rows of external guide rails is consistent with the spacing between the two first guide rails 17 (or the two second guide rails 18). If not, adjust the spacing between the two rows of external guide rails. After the adjustment, the positioning tube 13 is installed at the end of the two rows of guide rails to further improve the structural stability. The positioning tube 13 is located at the outer end of the stop bracket 12, and the positioning tube 13 is fixed to the external guide rail by bolts.

[0056] Furthermore, the first storage frame 6 and the second storage frame 7 have the same structure, and each storage frame includes a fixed bracket 601 and a movable retaining tube 602. The movable retaining tube 602 can be removed from the fixed bracket 601. When the photovoltaic array needs to be unfolded, the movable retaining tube 602 can be removed.

[0057] Example 2

[0058] This embodiment provides a working method of the mobile rapid deployment and withdrawal photovoltaic system described in Embodiment 1, specifically comprising the following steps:

[0059] Unfolding process:

[0060] Step 1: open the front door 15 and the side door 19 of the container 1, and take out the first outer guide rail 11, the second outer guide rail 10 and the leveling device 14.

[0061] Step 2, loosen the top clamping device 9, pull the second photovoltaic array 5, the second storage frame 7 and the push-pull structure 4 out of the container 1, rotate the wheeled legs 405 on the push-pull structure 4 until the support wheels face downward, adjust the support wheels to contact the ground and make the push-pull structure 4 as horizontal as possible, and continue to pull the push-pull structure 4 to the limit position so that it is completely outside the container;

[0062] Step 3, insert the first external guide rail 11 into the first guide rail 17, insert the second external guide rail 10 into the second guide rail 18, and install the leveling device 14 at the bottom of the first external guide rail 11 and the second external guide rail 10, embed the first external guide rail 11 and the second external guide rail 10 into the tray of the leveling device 14, adjust the height of the leveling device 14, make the first external guide rail 11 and the first guide rail 17 level at the same time, the second external guide rail 10 and the second guide rail 18 level at the same time.

[0063] Step 4, use the positioning tube 13 to check whether the distance between the two first external guide rails 11 is equal to the distance between the two first guide rails 17, and at the same time check whether the distance between the two first external guide rails 11 is equal to the distance between the two first guide rails 17. If not, adjust the distance between the first external guide rails 11 and the distance between the second external guide rails 10. If they are equal, install the positioning tube at the ends of the first external guide rails 11 and the second external guide rails 10, and install the stop bracket 12.

[0064] Step 5, loosen the side clamping device 8, remove the movable retaining tube 602, rotate the buckle 306, open the connection between the buckle 306 and the shoulder screw 305, pull the first photovoltaic array 3, and lay it outside the container 1. Then unfold the second photovoltaic array 5 in the same way.

[0065] Withdrawal process: The withdrawal process is the opposite of the expansion process.

[0066] The above is only a preferred embodiment of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A mobile fast deployment photovoltaic system, characterized in that: It includes a container, a top photovoltaic array, a first photovoltaic array, a second photovoltaic array, a push-pull structure, a first storage frame, and a second storage frame, wherein the top photovoltaic array is installed on the outer surface of the top plate of the container; The first photovoltaic array can be folded and stored in a first storage frame, the first storage frame is installed in the container, and when the first photovoltaic array is unfolded, it passes through the front door of the container and is laid outside the container; The second photovoltaic array can be folded and stored in a second storage frame, and the second storage frame is slidably installed in the container through a push-pull structure. When the second storage frame is in the container, it is parallel to the first storage frame. After the second storage frame slides out from the side door of the container, the second photovoltaic array is unfolded and laid outside the container, and is parallel to the first photovoltaic array.

2. The mobile rapid deployment and withdrawal photovoltaic system according to claim 1 is characterized in that: The push-pull structure includes two bases, a mobile frame, load-bearing rollers, positioning rollers and wheeled legs. The two bases are relatively arranged and installed on the inner surface of the container bottom plate. The load-bearing rollers and positioning rollers are installed in sequence on the opposite surfaces of the two bases. The positioning rollers are perpendicular to the load-bearing rollers. The mobile frame is slidably installed on the base. During the movement of the mobile frame, the positioning rollers and the load-bearing rollers are located on the mobile frame. The wheeled legs are rotatably installed at the end of the mobile frame, and the height of the wheeled legs is adjustable.

3. The mobile rapid deployment and withdrawal photovoltaic system according to claim 2 is characterized in that: Second guide rails are arranged at intervals on the mobile frame, and the length direction of the second guide rails is perpendicular to the moving direction of the mobile frame; the second photovoltaic array is folded and slidably installed on the second guide rail, and a second external guide rail is stored in the container. When the second photovoltaic array needs to be unfolded, the second external guide rail is attached to the second guide rail, and the second photovoltaic array is unfolded and laid on the second external guide rail.

4. The mobile rapid deployment and withdrawal photovoltaic system according to claim 3 is characterized in that: The bottom of the second storage frame is installed on the mobile frame and is located above the second guide rail. Side clamping devices are provided at both ends of the second storage frame along the length direction. The side clamping devices located at both ends clamp the second photovoltaic array in a folded state within the second storage frame; a top clamping device is installed on the inner surface of the top of the container. The top clamping device contacts the top of the second photovoltaic array in a folded state to fasten the second photovoltaic array in the second storage frame.

5. The mobile rapid deployment and withdrawal photovoltaic system according to claim 4 is characterized in that: Side clamping devices are provided at both ends of the first storage frame along the length direction. The side clamping devices at both ends clamp the first photovoltaic array in a folded state in the first storage frame, and the top of the first photovoltaic array is fastened in the first storage frame through the top clamping device; two first guide rails are arranged at intervals below the first storage frame, and the first guide rails are installed on the inner surface of the bottom plate of the container. When the first photovoltaic array is in a folded state, its bottom is slidably installed on the first guide rail, and a first external guide rail is stored in the container. When the first photovoltaic array needs to be unfolded, the first external guide rail is mounted on the first guide rail, and the first photovoltaic array is laid on the first external guide rail.

6. The mobile rapid deployment and withdrawal photovoltaic system according to claim 1, characterized in that: The first photovoltaic array and the second photovoltaic array have the same structure, and both include photovoltaic components, photovoltaic frame groups, casters, eye screws, shoulder screws and clips. The photovoltaic components are mounted on the photovoltaic frame groups, and two casters are mounted on opposite side surfaces of the photovoltaic frame groups. The eye screws are installed at intervals on the other two side surfaces of the photovoltaic frame groups, and the shoulder screws are installed at intervals on one of the other two side surfaces. Clips are arranged on the other of the other two side surfaces. Multiple photovoltaic frame groups are rotatably connected in sequence, and the casters are arranged at the rotational connection between two adjacent photovoltaic frame groups.

7. The mobile rapid deployment and withdrawal photovoltaic system according to claim 6 is characterized in that: The photovoltaic frame group includes two photovoltaic frames, and the two photovoltaic frames are rotatably connected together by hinges. A sleeve roller is installed on each photovoltaic frame between the two photovoltaic frames, the shoulder screw is installed on one of the photovoltaic frames, and the buckle is installed under the other photovoltaic frame. When the first photovoltaic array and the second photovoltaic array are in a folded state, the buckle is clamped on the shoulder screw.

8. The mobile rapid deployment and withdrawal photovoltaic system according to claim 1, characterized in that: The top clamping device and the side clamping device have the same structure and both include a rotating connecting shaft, a first gear, a second gear, a lead screw, a nut, a fixed frame, a lead tube, a connecting frame, a moving rod, a pin shaft and a crank handle. One side of the moving rod can contact the folded photovoltaic array during movement. Two connecting frames are installed at intervals on the side opposite to the side. Each of the connecting frames is fixed to a lead tube. The rotating connecting shaft is passed through the two lead tubes, and a pin shaft is installed at each of the two ends. A crank handle is installed at the end of one of the pin shafts. A first gear fixed to the rotating connecting shaft is arranged in the internal cavity of each lead tube. The second gear meshes with the first gear, is located in the internal cavity of the lead tube, and is fixed to the end of the lead screw. The lead screw is located in the lead tube and fixedly connected to the lead tube. The nut is installed in the fixed frame and rotatably connected to the lead screw. The fixed frame is sleeved in the lead tube, and the end protrudes out of the lead tube. The end of the fixed frame of the side clamping device protrudes out of the guide tube and is installed at the end of the second storage frame or the first storage frame; the end of the fixed frame of the top clamping device protrudes out of the guide tube and is installed on the inner surface of the top of the container.

9. The mobile fast deployment and withdrawal photovoltaic system according to claim 5, characterized in that: Stop brackets are installed at the top of the ends of the first external guide rail and the second external guide rail. When the first photovoltaic array is in an expanded state, the casters located at the end of the first photovoltaic array contact the stop bracket; when the second photovoltaic array is in an expanded state, the casters located at the end of the second photovoltaic array contact the stop bracket; when the first photovoltaic array is expanded, two rows of first external guide rails are arranged at the bottom, and positioning tubes are arranged at the ends of the two first external guide rails; when the second photovoltaic array is expanded, two rows of second external guide rails are arranged at the bottom, and positioning tubes are also arranged at the ends of the two second external guide rails, and the positioning tubes are located at the outer ends of the stop bracket; a leveling device is stored in the container, and when the first photovoltaic array and the second photovoltaic array are in an expanded state, the leveling devices are respectively installed at the bottom of the first external guide rail and the second external guide rail, and the height of the leveling device is adjustable.

10. The working method of the mobile fast deployment and withdrawal photovoltaic system according to any one of claims 1 to 9, comprising the following steps: Unfolding process: Step 1, open the container, take out the first outer guide rail, the second outer guide rail and the leveling device; Step 2: Loosen the top clamping device, pull the second photovoltaic array, the second storage frame and the push-pull structure out of the container, rotate the wheeled legs on the push-pull structure until the support wheels face downward, adjust the support wheels of the wheeled legs to contact the ground and keep the push-pull structure horizontal, and continue to pull the push-pull structure to the limit position so that it is completely outside the container; Step 3, plug the first external guide rail into the first guide rail, plug the second external guide rail into the second guide rail, and install a leveling device at the bottom of the first external guide rail and the second external guide rail, and adjust the height of the leveling device so that the first external guide rail is level with the first guide rail, and the second external guide rail is level with the second guide rail; Step 4, using a positioning tube to check whether the distance between the two first outer guide rails is equal to the distance between the two first guide rails, and at the same time check whether the distance between the two second outer guide rails is equal to the distance between the two second guide rails. If not, adjust the distance between the first outer guide rails and the distance between the second outer guide rails respectively. If they are equal, install the positioning tube at the ends of the first outer guide rail and the second outer guide rail, and install a stop bracket; Step 5, loosen the side clamping device, turn the buckle, open the connection between the buckle and the shoulder screw, pull the first photovoltaic array, lay it outside the container, and then unfold the second photovoltaic array in the same way; Retraction process: The retraction process is opposite to the deployment process. Finally, the first photovoltaic array and the second photovoltaic array are stored in a container, and the container is placed on a transport vehicle for transportation.

Citation Information

Patent Citations

  • Hand-operated elevation type tank transportation loading and unloading frame

    CN101475102A

  • Container type photovoltaic support structure

    CN109842363A

  • Photovoltaic module with frame

    CN111585509A

  • Photovoltaic power supply cabin device and power supply equipment

    CN114866009A

  • Portable photovoltaic array generator set container and use method thereof

    CN115800898A