Power station production business intelligent interaction platform
By designing an intelligent interactive platform for power station production business and using mobile terminals and intelligent technologies, the problem of power station production business processes that rely on manual management and data analysis is not intelligent, and efficient water level control and real-time data sharing are achieved, and production safety is improved.
Patent Information
- Application Number
- CN202411722629.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-28
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2044-11-28
AI Technical Summary
In the prior art, the power plant production business process relies on manual management, and the data analysis is not intelligent, resulting in inefficiency, inaccurate water level prediction, and lack of real-time sharing platform.
Design an intelligent interactive platform for power station production business, use mobile phones and other mobile terminals as carriers, combine intelligent technology development functions, establish a database, form a complete system from server to mobile terminal, and realize real-time sharing and intelligent analysis of data.
It improves the efficiency of power plant production business processes, achieves the accuracy of water level control, reduces manual participation, improves the safety of on-site work, and reduces the paper manual recording process.
Smart Images

Figure CN119788706A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of intelligent interaction technology, and in particular relates to an intelligent interaction platform for power plant production services. Background Art
[0002] In recent years, the pumped storage industry has been booming and has entered its golden period. However, the process of business intelligence is relatively slow. The monitoring data does not have the function of self-analysis and diagnosis. The mobile platform is also blank, and the business processing capabilities of the mobile terminal need to be developed urgently. In the current production and operation of power stations, the scheduling and water level prediction and control mainly rely on Excel for management and prediction. However, this traditional method is inefficient and does not have a self-checking function, which gradually reveals its limitations.
[0003] First, from the perspective of shift management, Excel only provides basic functions and is difficult to handle complex logic and automatic shift scheduling. The shift scheduling of power plants needs to consider many factors, such as the balance of employees' workload, rest time arrangements, and rapid response in emergency situations. These complex logical relationships often need to be implemented in Excel through tedious manual operations and multi-layer nested formulas, which is not only inefficient but also prone to errors.
[0004] Secondly, the original water level prediction results are often wrong. The water level control of the power station is directly related to the safe operation and power generation efficiency of the power station. However, the traditional prediction method of making Excel tables cannot accurately capture the complexity and nonlinear characteristics of water level changes. It cannot meet the precise needs of the power station for water level control.
[0005] Finally, the current production business processes of power plants are mostly executed by humans, with a large business volume, frequent calls to business data, and cumbersome processes. In addition, the data lacks intelligent analysis methods, and links related to production safety such as water level calculations require the participation of staff. At the same time, due to the limitations of the intranet, there is a lack of a real-time sharing platform for production business data.
[0006] Therefore, in order to solve the above problems and improve the efficiency of power plant business processes, it is necessary to design an intelligent interactive platform for power plant production business. Summary of the invention
[0007] The technical problem to be solved by the present invention is to solve the deficiencies in the prior art and design an intelligent interactive platform and system for power plant production business. This intelligent interactive platform for power plant production business uses mobile phones and other mobile terminals as carriers, uses existing intelligent technologies for functional development, and specifically designs data analysis functions suitable for different power plants. It also establishes a database, forming a complete system from the server to the mobile terminal, so that all kinds of on-site information can be transmitted to production personnel in real time, improving the safety of on-site work. It solves the problem that most of the current power plant production business processes are executed by people, the business volume is large, the business data is repeatedly called many times, and the process is cumbersome.
[0008] The solution adopted by the present invention to solve the technical problem is:
[0009] Intelligent interactive platform for power plant production business,
[0010] It is characterized in that
[0011] Including mobile APP,
[0012] The mobile APP includes:
[0013] A data exchange unit, which is used for the platform to connect to the intranet, the extranet and the data scheduling network;
[0014] A storage unit, which is used to store data sent by the data transmission unit, data generated during the use of the platform, and send historical storage data to be called to the central control unit;
[0015] A central control unit, the central control unit is connected to the display unit, the storage unit and the data exchange unit respectively, and is used to receive relevant data information sent by each of the units and adjust the corresponding operating parameters of each unit to corresponding values;
[0016] The central control unit is provided with a duty table module, a water level measurement module, an image recognition module, a grounding module, and a power module.
[0017] The duty table module is used to adjust and generate the duty table.
[0018] The water level calculation module is used to calculate the water level.
[0019] The image recognition module is used to recognize data on the image.
[0020] The grounding line module is used to feedback and update line related information.
[0021] The power module is used to generate a power report.
[0022] As a preferred embodiment of the present invention, the mobile APP at least includes a primary page, a secondary page and a tertiary page.
[0023] The first-level page is a login page, which at least includes an account input box, a password input box and a login button. After the staff enters the account and password, they click the login button to enter the second-level page.
[0024] The secondary page at least includes on-duty personnel information, a duty list button, a water level measurement button, a grounding wire button and a power button.
[0025] The three-level pages at least include a duty schedule page, a water level measurement page, a grounding line page and a power page.
[0026] The staff clicks the duty list button to enter the duty list page and edit and view the duty list through the duty list module;
[0027] The staff clicks the water level calculation button to enter the water level calculation page, and uses the water level calculation module to calculate and display the water level;
[0028] The staff clicks the grounding line button to enter the grounding line page and updates and views the line-related data through the grounding line module;
[0029] The staff clicks the power button to enter the power page, and generates and displays the power report through the power module.
[0030] As a preferred embodiment of the present invention, the water level calculation page at least includes a current water level input box, a pumping point input box, a power generation point input box, a post-pumping display box, and a post-power generation display box;
[0031] Enter the current water level and the number of pumping points, and the display box after pumping will show the predicted water level after pumping. Enter the current water level and the number of power generation points, and the display box after power generation will show the predicted water level after power generation.
[0032] As a preferred implementation mode of the present invention, the grounding line page at least includes a grounding line management page.
[0033] The grounding wire management page at least includes a grounding wire record list, a grounding wire selection button, an executor input box, an installation point input box, and a restorer input box.
[0034] The ground line selection button is used for the staff to select the line to be grounded;
[0035] The executor input box is used to input the staff who performs the grounding operation on the line;
[0036] The installation point input box is used to input the position of the line for grounding operation;
[0037] The restorer input box is used to input the personnel who performs the disconnection line grounding operation.
[0038] As a preferred implementation mode of the present invention, the grounding wire management page at least includes a grounding wire management button, a temporary measures button, a maintenance explanation button and an operation note button.
[0039] The staff clicks the temporary measures button to enter the temporary measures page;
[0040] The staff clicks the maintenance explanation button to enter the maintenance explanation page;
[0041] The staff clicks the Run Note button to enter the Run Note page;
[0042] The staff clicks the grounding wire management button on the non-grounding wire management page to re-enter the grounding wire management page.
[0043] The temporary measures page displays the operations performed by the staff on the line and the devices on the line;
[0044] The maintenance explanation page displays the maintenance data of the staff;
[0045] The operation record page displays data related to the line operation process.
[0046] As a preferred implementation of the present invention, the water level measurement module includes a calling module, and the calling module is used to call a third-party function curve tool.
[0047] As a preferred implementation of the present invention, the duty roster page includes the date and duty roster status, and the duty status is displayed in different colors.
[0048] As a preferred implementation manner of the present invention, the duty personnel information at least includes today's day shift duty personnel, today's mid-shift duty personnel and today's night shift duty personnel.
[0049] As a preferred embodiment of the present invention, the central control unit is also provided with an audit alarm module. After the duty roster situation on the duty roster page is changed, it is audited by the audit alarm module. After the audit is passed, the shift is completed, and an automatic alarm is triggered for unreasonable shift changes.
[0050] As a preferred embodiment of the present invention, the water level measurement module is provided with a water level measurement program.
[0051] Compared with the prior art, the present invention has the following beneficial effects:
[0052] 1. The present invention provides an intelligent interactive platform for power station production business, a hydropower station business interactive platform with mobile phones and other mobile terminals as carriers, uses existing intelligent technologies for functional development, and specifically designs data analysis functions suitable for different power stations, and establishes a database, forming a complete system from the server to the mobile terminal. A sharing platform for business and production information is established, which reduces various paper-based manual processes including shift handovers, and is energy-saving and environmentally friendly. Some process management processes are displayed on the mobile phone APP, so that various on-site information can be transmitted to production personnel in real time, improving the safety of on-site work.
[0053] 2. The present invention has independently developed and designed a water level measurement program according to the law of water level changes in power stations, and designed a water level calculation page on the mobile phone APP, which is specifically a window screen that is convenient for personnel to calculate. Users only need to input a small amount of data to clearly obtain the target value. The program collects a large amount of data based on the actual water level changes, and designs corresponding functions in different water level elevation ranges to make the calculation results closer to reality.
[0054] 3. The designed water level measurement program can accurately realize water level control, which greatly reduces the pressure of on-duty personnel in controlling power generation / pumping plans.
[0055] 4. The designed shift schedule is concise, convenient and easy to understand, and the staff can check the duty status of the most recent working day in real time.
[0056] 5. The image recognition function of the image recognition module and the report generation software based on the image recognition function eliminate the need for manual processing of business data, greatly improving accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] Figure 1 A physical schematic diagram of the duty schedule page of the power plant production business intelligent interactive platform proposed by the present invention;
[0058] Figure 2 A physical schematic diagram of the water level measurement page of the power plant production business intelligent interactive platform proposed by the present invention;
[0059] Figure 3 A physical schematic diagram of the grounding line management page of the power plant production business intelligent interactive platform proposed by the present invention;
[0060] Figure 4 A physical schematic diagram of the temporary measures page of the intelligent interactive platform for power plant production business proposed by the present invention;
[0061] Figure 5 This is a physical schematic diagram of the power generation page of the power plant production business intelligent interactive platform proposed by the present invention;
[0062] Figure 6This is a physical schematic diagram of the material search page of the power plant production business intelligent interactive platform proposed by the present invention;
[0063] Figure 7 This is a physical schematic diagram of the first-level page of the power plant production business intelligent interactive platform proposed in the present invention. DETAILED DESCRIPTION
[0064] The specific implementation of the present invention is described below in conjunction with the accompanying drawings and embodiments:
[0065] It should be noted that the structures, colors, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification so that people familiar with this technology can understand and read them, and are not used to limit the conditions under which the present invention can be implemented. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.
[0066] At the same time, in the description of the present invention, it should be understood that the terms "one end", "the other end", "middle", "upper", "one side", "top", "inside", "front", "center", "both ends" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0067] In addition, the terms "first", "second", "third" and "fourth" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first", "second", "third" and "fourth" may explicitly or implicitly include at least one of such features.
[0068] In the present invention, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances.
[0069] like Figure 1-Figure 7The intelligent interactive platform for power station production business of the present invention includes a mobile phone APP, which is a hydropower station business interactive platform based on mobile phones and other mobile terminals. It uses existing intelligent technologies such as crawlers, image recognition and voice recognition to develop functions, designs various data analysis functions suitable for different power stations in a targeted manner, and establishes a database, forming a complete system from the server to the mobile terminal.
[0070] A shared platform for business and production information has been established, reducing all kinds of paper-based manual processes including shift handovers, and realizing some process management while implementing a mobile platform, so that all kinds of on-site information can be transmitted to production personnel in real time, improving the safety of on-site work.
[0071] Preferably, the intelligent interactive platform for power plant production business of the present invention can access the data of various types of equipment PLCs for summary analysis and various types of modeling, truly realizing a handheld power plant on a mobile phone APP; in addition, the mobile phone itself is a powerful platform, and it is updated quickly and has more and more functions, and it is more convenient to develop various functions using mobile phone software.
[0072] The promotion of the mobile APP will enable the establishment of an independent Internet platform for power station business outside the intranet, which will provide a better ecosystem. At the same time, the mobile APP can also be implemented in the intranet, and its stored database can also be used as an interface for the Internet of Things after the mobile APP is promoted.
[0073] The mobile APP includes a data exchange unit, a storage unit and a central control unit. The data exchange unit realizes the connection between the mobile APP and the power station related network, the storage unit stores the relevant data of the power station lines, tools and related operations, and the central control unit realizes the functions of the mobile APP such as duty table adjustment and water level prediction.
[0074] The data exchange unit is used to connect the platform to the intranet, extranet and data dispatching network to achieve data transmission;
[0075] The storage is used to store the data sent by the data transmission unit, the data generated during the use of the platform, and send the historical storage data to be called to the central control unit; collect and organize a large amount of data and establish a database;
[0076] The central control unit is connected to the display unit, storage unit and data interaction unit respectively, to receive relevant data information sent by each unit and adjust the corresponding operating parameters of each unit to the corresponding values; according to the instructions input by the staff, it mobilizes the internal modules, makes corresponding updates, realizes corresponding functions, and displays the corresponding page on the mobile phone.
[0077] The central control unit is equipped with a duty list module, a water level measurement module, an image recognition module, a grounding wire module, and a power module.
[0078] The duty roster module realizes functions such as generation of duty roster, adjustment of duty roster, one-click shift change by dragging shifts, and automatic process review.
[0079] The water level measurement module calculates the expected water level based on the existing water level, power generation or pumping points manually input by the staff, thereby realizing the water level measurement function.
[0080] The image recognition module recognizes images and converts them into reports.
[0081] The grounding wire module receives the relevant information input by the staff and organizes and displays it.
[0082] The power module processes the data detected by the energy meter and generates power reports.
[0083] The duty roster module is used to adjust and generate the duty roster, and make corresponding changes based on the operations performed on the duty roster by the staff.
[0084] The water level measurement module is used to measure the water level. Specifically, a water level measurement program was developed and designed based on the water level change law of the power station. At the same time, a window screen was designed on the mobile phone APP to facilitate personnel calculation. Users only need to enter a small amount of data to clearly obtain the target value. The water level measurement program collects a large amount of data based on the actual water level changes, and designs corresponding functions in different water level elevation ranges, so that the calculation results are closer to the actual data.
[0085] The image recognition module is used to identify data on the image. After the image recognition module recognizes the data, it automatically generates a report. Specifically, according to the mobile APP operation requirements, a report generation software based on the image recognition data table was designed to reduce the manual data filling process. The local recognition function of the image recognition module eliminates the need for manual processing of business data, greatly improving accuracy.
[0086] The grounding wire module is used to feedback and update line-related information. For example, before work, it will be displayed that a certain line has been installed or removed by a certain staff at a certain location during a certain period of time. The staff needs to enter relevant information when installing or removing the grounding wire of a certain line. The grounding wire module automatically captures the time and generates new records to ensure that each installation or removal of the grounding wire is recorded in the mobile APP for subsequent staff to view. The staff can check the current status of the line in time to ensure the real-time nature of the poem and improve work efficiency.
[0087] The power module is used to generate power reports for staff to view.
[0088] The intelligent interactive platform for production business of the device of the present invention reduces a large number of manual participation links, realizes the precise real-time control of water level by operating personnel, greatly reduces the on-duty pressure of shift personnel, integrates daily operation, and integrates various types of information that should be shared in real time on the production line, establishes a production data and information sharing platform, reduces paper process links and manual procedures for shift handovers, and gives front-line employees the ability to grasp on-site information in real time. At the same time, the use of mobile phone APP implementation makes the software highly scalable, and functions such as personnel positioning, emergency alarm, and auxiliary material retrieval can be developed in succession in the later stage, which greatly improves the backward situation of the intelligent level of the production line business of pumped storage power stations and enriches the information sharing channels of pumped storage business.
[0089] like Figure 1-7 As shown, the mobile APP contains at least a first-level page, a second-level page and a third-level page. You enter the second-level page through the first-level page, and click on the second-level page to jump to the corresponding third-level page. Operations are performed according to the information displayed on the pages at each level. In addition, other technical secondary school pages are also set up, and the pages are designed according to the optimal process after actual testing.
[0090] like Figure 7 As shown in the figure, the first-level page is the login page, which contains at least an account input box, a password input box and a login button. After the staff enters the account and password, they click the login button to enter the second-level page. In addition, the verification process or identity selection button can be set, and the functions and permissions given to the on-site staff and back-end management personnel to log in are also set accordingly to ensure that the mobile APP functions are more complete and sufficient to support the operation of the power station business.
[0091] The secondary page contains at least the duty personnel information, duty table button, water level measurement button, grounding line button and power button. The duty personnel information displays the duty information of the day in an intuitive and concise manner. After completing the login process, the staff can see the current duty status and confirm the staff currently on duty; the duty table button, water level measurement button, grounding line button and power button allow the staff to complete the page jump, and they can jump to the corresponding page by clicking.
[0092] like Figure 1-5 As shown, the three-level page includes at least a duty list page, a water level measurement page, a grounding line page and a power page, and detailed operations are performed through the above pages.
[0093] Specific:
[0094] The staff clicks the duty list button to enter the duty list page and edit and view the duty list through the duty list module;
[0095] The staff clicks the water level calculation button to enter the water level calculation page, and uses the water level calculation module to calculate and display the water level;
[0096] The staff clicks the grounding line button to enter the grounding line page and updates and views the line-related data through the grounding line module;
[0097] The staff clicks the power button to enter the power page, and generates and displays the power report through the power module.
[0098] The water level calculation page contains at least the current water level input box, the pumping point input box, the power generation point input box, the display box after pumping and the display box after power generation; input the current water level and the water level to be consumed to estimate the subsequent water level.
[0099] During specific operations, enter the current water level in the current water level input box, enter the number of pumping points in the pumping point number input box, and the display box after pumping will show the predicted water level after the corresponding number of pumping points. Enter the current water level in the current water level input box, enter the number of power generation points in the power generation point number input box, and the display box after power generation will show the predicted water level after the corresponding number of power generation points.
[0100] The specific calculation process is completed by the water level calculation program designed by the water level calculation module. The water level calculation program designed by the water level calculation module can accurately realize water level control, which greatly reduces the pressure on the on-duty personnel to control the power generation / pumping plan.
[0101] The grounding wire page at least includes a grounding wire management page, and specific operations are performed through the grounding wire management page.
[0102] The grounding wire management page at least includes a grounding wire record list, a grounding wire selection button, an executor input box, an installation point input box and a restorer input box. The grounding wire record list is used to display the current grounded line and its grounding-related information. The grounding wire selection button, the executor input box, the installation point input box and the restorer input box are used to input new line grounding-related information to ensure that staff can view the line grounding status in real time.
[0103] These events are related to the safety of the entire factory operation. All front-line personnel should be able to check them quickly and at any time and be notified at the first time. This should rely on mobile platforms. We cannot always emphasize that people should take the initiative to understand, but we must also simplify the channels of understanding and mobilize people's enthusiasm. Before any work starts, it should not rely solely on the control of a few people, and at the same time, it is also necessary to reduce the difficulty for the work leader to understand the on-site situation.
[0104] The button for selecting the grounding line is used for the staff to select the line to be grounded. The line information is provided by the network connected to the mobile phone APP and can be directly imported. The staff can click the button to scroll and select. The scrolling selection method is adopted to avoid incorrect input during input, which leads to the mismatch between the actual situation during on-site work and the information displayed on the mobile phone.
[0105] The Executor input box is used to input the staff who performs the grounding operation on the line; the Restorer input box is used to input the staff who disconnects the line from the ground. Ensuring that each grounding operation and restoration operation has a clear executor makes it easier to trace the responsibility when problems arise, which helps ensure the accuracy and safety of the operation.
[0106] By recording the information of the executor and restorer, we can clearly understand the executor and execution time of each operation, which increases the transparency of the operation. It helps the supervisory and management to better understand the on-site operation situation and make timely decisions.
[0107] The installation point input box is used to enter the location of the line grounding operation; ensuring that the location of each grounding operation can be accurately recorded. It is crucial for subsequent maintenance, inspection and troubleshooting, because knowing the exact location of the grounding point can greatly save time and resources.
[0108] The grounding wire management page also includes at least a grounding wire management button, a temporary measures button, a maintenance explanation button and an operation note button. By setting multiple buttons to set corresponding pages, the function of the mobile APP is increased.
[0109] The staff clicks the temporary measures button to enter the temporary measures page and perform corresponding operations on the temporary measures page;
[0110] The staff clicks the maintenance explanation button to enter the maintenance explanation page and performs corresponding operations on the maintenance explanation page;
[0111] The staff clicks the Run Note button to enter the Run Note page and perform corresponding operations through the Run Note page.
[0112] The staff clicks the grounding wire management button on the non-grounding wire management page to re-enter the grounding wire management page.
[0113] The temporary measures page displays the operations performed by staff on the line and the devices on the line, which facilitates subsequent maintenance and repair work.
[0114] The maintenance briefing page displays the staff's maintenance data, making it easy for staff to find maintenance-related matters from previous years.
[0115] The operation notes page displays data related to the line operation process, making it easier for staff to find line-related information.
[0116] The water level measurement module includes a calling module, which is used to call a third-party function curve tool to predict the water level.
[0117] The duty schedule page contains the date and the duty schedule, which intuitively shows which shift the staff needs to work on which day. It is simple and convenient, adapting to the intelligent interactivity of existing mobile phones. The schedule is an intelligent scrolling schedule, which is convenient for personnel to view shifts. Staff can slide to view their duty status and directly drag to change shifts.
[0118] The duty status is displayed in different colors. The shifts that staff need to be on duty are indicated in green. When changing shifts, the shifts that need to be on duty can be dragged to other shifts. The shift changes color before changing shifts to show that the staff on the current shift do not need to be on duty.
[0119] The duty personnel information includes at least the day shift duty personnel, the mid-shift duty personnel and the night shift duty personnel of the day. According to the actual duty situation, the information of each shift is displayed in detail to facilitate the staff to search and modify.
[0120] When the night shift and the next day's day shift have the same staff on duty, the duty roster page displays the risk of continuous shifts, reminding the scheduling staff to adjust the duty roster.
[0121] Managers can see the shifts and total number of all on-duty personnel, the number of adjustments, and make overall adjustments.
[0122] The central control unit is also equipped with an audit alarm module. When the duty roster on the duty roster page is changed, it will be audited through the audit alarm module. After the audit is passed, the shift change will be completed. If the shift change is unreasonable, an automatic alarm will be triggered to remind the scheduling personnel to make adjustments.
[0123] The water level measurement module sets up a water level measurement program, which collects a large amount of data based on the actual water level changes and designs corresponding functions in different water level elevation ranges to make the calculation results closer to reality.
[0124] like Figure 7 As shown, you can also set up a material search page and a corresponding material search module. There are many spare parts for front-line defect elimination. They are sorted into the warehouse. The staff can view the quantity and status of spare parts in real time for easy query.
[0125] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of the present invention.
[0126] Many other changes and modifications may be made without departing from the concept and scope of the present invention.It should be understood that the present invention is not limited to the specific embodiments, and the scope of the present invention is defined by the appended claims.
Claims
1. Intelligent interactive platform for power plant production business, It is characterized in that Including mobile APP, The mobile APP includes: A data exchange unit, which is used for the platform to connect to the intranet, the extranet and the data scheduling network; A storage unit, which is used to store data sent by the data transmission unit, data generated during the use of the platform, and send historical storage data to be called to the central control unit; A central control unit, the central control unit is connected to the display unit, the storage unit and the data exchange unit respectively, and is used to receive relevant data information sent by each of the units and adjust the corresponding operating parameters of each unit to corresponding values; The central control unit is provided with a duty table module, a water level measurement module, an image recognition module, a grounding module and a power module. The duty table module is used to adjust and generate the duty table. The water level calculation module is used to calculate the water level. The image recognition module is used to recognize data on the image. The grounding line module is used to feedback and update line related information. The power module is used to generate a power report.
2. The power plant production business intelligent interactive platform according to claim 1, It is characterized in that The mobile APP at least includes a primary page, a secondary page and a tertiary page. The first-level page is a login page, which at least includes an account input box, a password input box and a login button. After the staff enters the account and password, they click the login button to enter the second-level page. The secondary page at least includes on-duty personnel information, a duty list button, a water level measurement button, a grounding wire button and a power button. The three-level pages at least include a duty schedule page, a water level measurement page, a grounding line page and a power page. The staff clicks the duty list button to enter the duty list page and edit and view the duty list through the duty list module; The staff clicks the water level calculation button to enter the water level calculation page, and uses the water level calculation module to calculate and display the water level; The staff clicks the grounding line button to enter the grounding line page and updates and views the line-related data through the grounding line module; The staff clicks the power button to enter the power page, and generates and displays the power report through the power module.
3. The power plant production business intelligent interactive platform as claimed in claim 2, It is characterized in that The water level calculation page at least includes a current water level input box, a pumping point input box, a power generation point input box, a post-pumping display box, and a post-power generation display box; Enter the current water level and the number of pumping points, and the display box after pumping will show the predicted water level after pumping. Enter the current water level and the number of power generation points, and the display box after power generation will show the predicted water level after power generation.
4. The power plant production business intelligent interactive platform according to claim 2, It is characterized in that The grounding line page at least includes a grounding line management page. The grounding wire management page at least includes a grounding wire record list, a grounding wire selection button, an executor input box, an installation point input box, and a restorer input box. The ground line selection button is used for the staff to select the line to be grounded; The executor input box is used to input the staff who performs the grounding operation on the line; The installation point input box is used to input the position of the line for grounding operation; The restorer input box is used to input the personnel who performs the disconnection line grounding operation.
5. The power plant production business intelligent interactive platform according to claim 4, It is characterized in that The grounding line management page at least includes a grounding line management button, a temporary measures button, a maintenance explanation button and an operation note button. The staff clicks the temporary measures button to enter the temporary measures page; The staff clicks the maintenance explanation button to enter the maintenance explanation page; The staff clicks the Run Note button to enter the Run Note page; The staff clicks the grounding wire management button on the non-grounding wire management page to re-enter the grounding wire management page. The temporary measures page displays the operations performed by the staff on the line and the devices on the line; The maintenance explanation page displays the maintenance data of the staff; The operation record page displays data related to the line operation process.
6. The power plant production business intelligent interactive platform according to claim 1, It is characterized in that The water level measurement module includes a calling module, and the calling module is used to call a third-party function curve tool.
7. The power plant production business intelligent interactive platform according to claim 2, It is characterized in that The duty roster page includes the date and duty roster schedule, and the duty status is displayed in different colors.
8. The power plant production business intelligent interactive platform according to claim 2, It is characterized in that The duty personnel information at least includes today's day shift duty personnel, today's mid-shift duty personnel and today's night shift duty personnel.
9. The power plant production business intelligent interactive platform according to claim 7, It is characterized in that The central control unit is also provided with an audit alarm module. After the duty roster situation on the duty roster page is changed, it is audited through the audit alarm module. After the audit is passed, the shift change is completed, and an automatic alarm is triggered if the shift change is unreasonable.
10. The power plant production business intelligent interactive platform according to claim 1, It is characterized in that The water level calculation module is provided with a water level calculation program.
Citation Information
Patent Citations
Scheduling operation information rapid transmission system based on mobile internet
CN110400040A
Intelligent power station unattended monitoring method and system
CN118394005A
Control device for hydroelectric power station
JP2009217389A