Rapid construction process for iron tower foundation
By adopting a rapid pit division system and a rapid pouring device in the construction of tower foundations, and using the cooperation of vibrating plates and rotating rods, the problems of delayed construction period and waste of concrete in traditional construction are solved, and efficient concrete pouring and construction process are accelerated.
Patent Information
- Application Number
- CN202510179023.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-18
- Publication Date
- 2025-04-11
AI Technical Summary
In the construction of traditional tower foundations, the use of pump trucks is limited by site conditions and it is difficult to effectively play a role in remote areas, resulting in delays in construction periods and waste of concrete. At the same time, the concrete is highly viscous and easily stuck inside the pouring bucket, causing inconvenience in construction.
The rapid pit division system and rapid casting device are adopted, including concrete pouring bucket, vibration disk, rotating rod and positioning block. The driving unit drives the conical gear to rotate, and drives the rotating rod and rotating disk to rotate simultaneously. The coordination of the positioning rod, impact block and return spring can cause vibration to the outer surface of the vibrating disk, prompting the concrete to move rapidly from the center to the surroundings and slide down the pouring bucket to achieve overall flow.
It improves the pouring speed, ensures uniform discharge of concrete, shortens construction time, improves construction efficiency, and is suitable for construction in remote areas.
Smart Images

Figure CN119800995A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of iron tower foundation construction, and in particular to a rapid construction process for an iron tower foundation. Background Art
[0002] At present, iron towers are widely used in the power transmission industry and the broadcasting and communication industry. The common iron tower foundation structure generally adopts a combination of piles and caps. The traditional iron tower foundation construction mainly includes two important processes: pit division and foundation pouring. The pit division usually relies on theodolite to use the tic-tac-toe method on site for measurement and positioning. For foundation pouring, the common method is to use a pump truck to transport and pour concrete.
[0003] However, the use of pump trucks is limited by site conditions and is difficult to play an effective role in remote areas, which can easily cause waste or delay construction. Therefore, a pouring bucket is generally installed at the front end of the forklift to transport and pour concrete. However, due to the high viscosity of concrete, the concrete is easily stuck in the pouring bucket during the pouring process, causing inconvenience to the construction. Therefore, improvements are now being made to the rapid construction process of the tower foundation. Summary of the invention
[0004] In view of the deficiencies of the prior art, the present application provides a rapid construction process for a tower foundation, which overcomes the deficiencies of the prior art and aims to solve the problems in the prior art.
[0005] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a rapid construction process for a tower foundation, including a rapid pit division system and a rapid pouring device, the rapid pouring device including a concrete pouring bucket, a vibrating plate fixedly installed inside the concrete pouring bucket through a connecting block, a rotating rod provided inside the vibrating plate, the rotating rod being movably connected to the vibrating plate through a bearing seat, a rotating plate fixedly installed on the upper end of the rotating rod, an inner wall of the vibrating plate located on both sides of the rotating plate fixedly connected with positioning blocks, two adjusting grooves symmetrically provided inside the rotating plate, a positioning rod fixedly connected inside the adjusting groove, an impact block rotatably sleeved on the outer surface of the positioning rod, the impact block being movably connected to the rotating plate through a reset spring, a placement box fixedly connected to the lower end of the vibrating plate, the lower end of the rotating rod located inside the placement box fixedly connected with a bevel gear 1, and a driving unit for driving the bevel gear 1 to rotate is provided inside the placement box.
[0006] By adopting the above technical solution, the driving unit is started to drive the bevel gear to rotate, and the bearing seat is set to enable the rotating rod to rotate flexibly inside the vibration plate, so that the rotating rod and the rotating plate fixedly installed on the upper end of the rotating rod are driven to rotate synchronously through the rotation of the bevel gear. Through the cooperation between the positioning rod, the impact block and the reset spring, the rotating plate will drive the impact block to hit the positioning block when it rotates, and the collision between the positioning block and the impact block will cause the outer surface of the vibration plate to vibrate, so that the concrete on the outer surface of the vibration plate moves quickly from the center to the surrounding area, and then slides down along the concrete pouring bucket to realize the overall flow of concrete, ensure that the concrete can be evenly discharged from the discharge port of the concrete pouring bucket, improve the pouring speed, and thus speed up the construction process.
[0007] As a preferred technical solution of the present application, the driving unit includes a driving motor, which is fixedly mounted on the outer wall of the concrete pouring bucket. The output end of the driving motor passes through the concrete pouring bucket and is inserted into the interior of the placement box and is fixedly connected to a connecting rod, and the other end of the connecting rod is fixedly mounted with a bevel gear 2 that meshes with the bevel gear 1.
[0008] By adopting the above technical solution, the connecting rod is driven to rotate by the driving motor, and the rotation of the connecting rod drives the bevel gear 2 to rotate synchronously. Since the bevel gear 1 and the bevel gear 2 are meshed, the driving motor can drive the rotating rod and the rotating disk to rotate synchronously.
[0009] As a preferred technical solution of the present application, the number of the positioning blocks and the impact blocks are both two, and the positioning blocks and the impact blocks are at the same horizontal height.
[0010] By adopting the above technical solution, it is ensured that the rotating disk can drive the impact block to impact the positioning block during the rotation process.
[0011] As a preferred technical solution of the present application, fixing frames are symmetrically installed on the outer walls of both sides of the concrete pouring bucket, and the interior of the fixing frames is provided with plugging grooves for forklift forks to be plugged in.
[0012] By adopting the above technical solution, by providing a fixing frame and a plug-in slot, it is convenient for a forklift to plug the cargo fork into the plug-in slot, so as to fix the concrete pouring bucket on the front end of the forklift.
[0013] As a preferred technical solution of the present application, a base is fixedly installed at the bottom of the concrete pouring bucket, and sealing grooves are symmetrically provided on the outer walls on both sides of the concrete pouring bucket near the lower end, and sealing plates are slidably inserted into the interior of the sealing grooves. Hydraulic telescopic rods are fixedly installed on both sides of the sealing groove on the upper surface of the base, and the sealing plates are fixedly installed on the telescopic ends of the hydraulic telescopic rods.
[0014] By adopting the above technical solution, a base is provided to support the concrete pouring bucket to ensure that the concrete pouring bucket can be stably placed on the ground, and the sealing plate is driven by a hydraulic telescopic rod to move and adjust its position to open or close the concrete pouring bucket.
[0015] As a preferred technical solution of the present application, a splicing bin is provided on the top of the concrete pouring bucket, a groove is provided on the top of the concrete pouring bucket, and a protrusion is provided on the bottom of the splicing bin, and the protrusion is slidably inserted into the interior of the groove and adapted thereto.
[0016] By adopting the above technical solution, the splicing bin and the concrete pouring bucket are assembled together by setting grooves and protrusions, so that the capacity of the concrete pouring bucket can be increased according to actual usage conditions, thereby improving the applicability of the device.
[0017] As a preferred technical solution of the present application, both side outer walls of the concrete pouring bucket are fixedly connected with connecting piece 2 near the top position, and both side outer walls of the splicing bin are fixedly connected with connecting piece 1 corresponding to connecting piece 2 near the bottom position, and connecting piece 1 is threadedly connected to connecting piece 2 through fixing bolts.
[0018] By adopting the above technical solution, the connecting piece 1 and the connecting piece 2 are fixedly connected together by fixing bolts, ensuring that the splicing bin is fixedly installed on the concrete pouring bucket to prevent the two from loosening.
[0019] As a preferred technical solution of the present application, the rapid pit division system includes a GPS positioning device and a computer terminal, and the GPS positioning device is connected to the computer terminal signal via a wireless signal.
[0020] By adopting the above technical solution, by inputting relevant design parameters such as the coordinates of the center point of the tower base and the side length of the tower base into the computer terminal, the computer terminal calculates the coordinates of the sub-pits and transmits them wirelessly to the GPS positioning device, thereby achieving rapid and accurate positioning on site.
[0021] The rapid construction process of the tower foundation, the process steps are as follows: S1: Input the design parameters of the tower base into the computer terminal and start the automatic calculation program to generate the pit coordinates; S2: Use GPS positioning equipment to calibrate the location of the sub-pits on site to ensure accurate coordinates; S3: Transport the prefabricated formwork and steel bars to the site and install them according to the marked points to ensure they are firm and reliable; S4: Fix the concrete pouring bucket to the front end of the forklift and check whether the connection is tight; S5: After the forklift transports the concrete pouring bucket loaded with concrete to the designated position, the remote-controlled hydraulic telescopic rod adjusts the position of the sealing plate to open the discharge port of the concrete pouring bucket, and starts the driving unit to drive the rotating rod and the rotating disk to rotate synchronously. When the rotating disk rotates, it drives the impact block to hit the positioning block. The collision between the positioning block and the impact block causes the outer surface of the vibration plate to vibrate, causing the concrete on the outer surface of the vibration plate to move quickly from the center to the surroundings, and then slide down along the concrete pouring bucket to achieve the overall flow of concrete, ensuring that the concrete can be evenly discharged from the discharge port of the concrete pouring bucket; S6: After pouring is completed, clean the concrete pouring bucket in time to prevent the concrete from solidifying and affecting the next use.
[0022] Compared with the prior art, the present invention has the following beneficial effects: 1. In the present invention, the bevel gear 1 is driven to rotate by starting the driving unit, and the bearing seat is provided so that the rotating rod can rotate flexibly inside the vibration plate, so that the rotating rod and the rotating plate fixedly installed on the upper end of the rotating rod are driven to rotate synchronously by the rotation of the bevel gear 1. Through the cooperation between the positioning rod, the impact block and the return spring, the rotating plate drives the impact block to hit the positioning block when rotating, and the collision between the positioning block and the impact block causes the outer surface of the vibration plate to vibrate, so that the concrete on the outer surface of the vibration plate moves quickly from the center to the surroundings, and then slides down along the concrete pouring bucket to realize the overall flow of concrete, ensure that the concrete can be evenly discharged from the discharge port of the concrete pouring bucket, improve the pouring speed, and thus speed up the construction process.
[0023] 2. In the present invention, by providing a fixing frame and a plug-in slot, it is convenient for a forklift to plug the cargo fork into the plug-in slot, so as to fix the concrete pouring bucket on the front end of the forklift.
[0024] 3. In the present invention, a base is provided to support the concrete pouring bucket to ensure that the concrete pouring bucket can be stably placed on the ground, and the sealing plate is driven to move by a hydraulic telescopic rod to adjust its position, so as to open or close the concrete pouring bucket.
[0025] 4. In the present invention, by providing grooves, protrusions, fixing bolt connector 1 and connector 2, the splicing bin is fixedly installed on the concrete pouring bucket, so that the capacity of the concrete pouring bucket can be increased according to actual usage conditions, thereby improving the applicability of the device.
[0026] With reference to the following description and the accompanying drawings, specific embodiments of the present invention are disclosed in detail, indicating the manner in which the principles of the present invention may be employed. It should be understood that the embodiments of the present invention are not limited in scope thereby. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: Figure 1 This is a schematic diagram of the overall device structure of this application; Figure 2 This is a schematic diagram of the structure of the concrete pouring bucket of this application; Figure 3 This is a schematic diagram of the internal structure of the concrete pouring bucket of this application; Figure 4 This is a schematic diagram of the structure of the vibration plate of the present application; Figure 5 This is a schematic diagram of the internal structure of the vibration plate of the present application; Figure 6 This is a schematic diagram of the internal structure of the rotating disk of the present application; Figure 7 This is a schematic diagram of the disassembly of the concrete pouring bucket and the splicing bin of the present application; Figure 8 This is a schematic diagram of the structure of the GPS positioning device of this application; Fig. 9 This is a schematic diagram of the construction process of this application.
[0028] In the figure: 1. concrete pouring bucket; 2. vibrating plate; 3. positioning block; 4. rotating plate; 5. adjusting groove; 6. positioning rod; 7. impact block; 8. reset spring; 9. connecting block; 10. rotating rod; 11. bearing seat; 12. bevel gear one; 13. driving unit; 131. driving motor; 132. connecting rod; 133. bevel gear two; 14. placing box; 15. hydraulic telescopic rod; 16. sealing plate; 17. base; 18. sealing groove; 19. plug-in groove; 20. fixing frame; 21. groove; 22. splicing bin; 23. protrusion; 24. connecting piece one; 25. fixing bolt; 26. connecting piece two; 27. GPS positioning device. DETAILED DESCRIPTION
[0029] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0030] like Figure 1 - Figure 7As shown, the rapid construction process of the iron tower foundation provided by the present embodiment includes a rapid pit division system and a rapid pouring device, the rapid pouring device includes a concrete pouring bucket 1, a vibrating plate 2 is fixedly installed inside the concrete pouring bucket 1 through a connecting block 9, a rotating rod 10 is arranged inside the vibrating plate 2, the rotating rod 10 is movably connected to the vibrating plate 2 through a bearing seat 11, a rotating plate 4 is fixedly installed on the upper end of the rotating rod 10, the inner wall of the vibrating plate 2 is located on both sides of the rotating plate 4 and is fixedly connected with positioning blocks 3, the interior of the rotating plate 4 is symmetrically provided with two adjusting grooves 5, the interior of the adjusting groove 5 is fixedly connected with a positioning rod 6, the outer surface of the positioning rod 6 is rotatably sleeved with an impact block 7, the impact block 7 is movably connected to the rotating plate 4 through a reset spring 8, the lower end of the vibrating plate 2 is fixedly connected with a placement box 14, the lower end of the rotating rod 10 is located inside the placement box 14 and is fixedly connected with a bevel gear 12, the interior of the placement box 14 is provided with A driving unit 13 for driving the bevel gear 12 to rotate is provided. When in use, the bevel gear 12 is driven to rotate by starting the driving unit 13. The bearing seat 11 is provided so that the rotating rod 10 can rotate flexibly inside the vibration plate 2, so that the rotating rod 10 and the rotating plate 4 fixedly installed on the upper end of the rotating rod 10 can be driven to rotate synchronously through the rotation of the bevel gear 12. Through the cooperation between the positioning rod 6, the impact block 7 and the return spring 8, the rotating plate 4 will drive the impact block 7 to hit the positioning block 3 when rotating. The collision between the positioning block 3 and the impact block 7 causes the outer surface of the vibration plate 2 to vibrate, so that the concrete on the outer surface of the vibration plate 2 moves quickly from the center to the surrounding area, and then slides down along the concrete pouring bucket 1 to realize the overall flow of concrete, ensure that the concrete can be evenly discharged from the discharge port of the concrete pouring bucket 1, improve the pouring speed, and thus speed up the construction process.
[0031] In this embodiment, if Figure 3-5 As shown, the driving unit 13 includes a driving motor 131, which is fixedly mounted on the outer wall of the concrete pouring bucket 1. The output end of the driving motor 131 passes through the concrete pouring bucket 1 and is inserted into the interior of the placement box 14 and is fixedly connected to a connecting rod 132. The other end of the connecting rod 132 is fixedly mounted with a bevel gear 2 133 meshing with the bevel gear 1 12. When in use, the driving motor 131 drives the connecting rod 132 to rotate, and the rotation of the connecting rod 132 drives the bevel gear 2 133 to rotate synchronously. Since the bevel gear 12 and the bevel gear 2 133 are meshed, the driving motor 131 can drive the rotating rod 10 and the rotating disk 4 to rotate synchronously.
[0032] In this embodiment, if Figure 2 and 6 As shown, the number of the positioning block 3 and the impact block 7 are both set to two, and the positioning block 3 and the impact block 7 are at the same horizontal height. When in use, it is ensured that the rotating disk 4 can drive the impact block 7 to impact the positioning block 3 during the rotation process.
[0033] In this embodiment, if Figure 2 As shown, fixing frames 20 are symmetrically installed on the outer walls of both sides of the concrete pouring bucket 1, and the interior of the fixing frames 20 is provided with a plug-in slot 19 for the forklift fork to be plugged in. When in use, by setting the fixing frames 20 and the plug-in slot 19, it is convenient for the forklift to plug the fork into the plug-in slot 19, so as to fix the concrete pouring bucket 1 on the front end of the forklift.
[0034] In this embodiment, if Figure 2 and 3 As shown, a base 17 is fixedly installed at the bottom of the concrete pouring bucket 1, and sealing grooves 18 are symmetrically provided on the outer walls of both sides of the concrete pouring bucket 1 near the lower end. Sealing plates 16 are slidably inserted into the sealing grooves 18. Hydraulic telescopic rods 15 are fixedly installed on the upper surface of the base 17 on both sides of the sealing grooves 18. The sealing plates 16 are fixedly installed on the telescopic ends of the hydraulic telescopic rods 15. The concrete pouring bucket 1 is supported by providing the base 17 to ensure that the concrete pouring bucket 1 can be stably placed on the ground. The sealing plates 16 are driven by the hydraulic telescopic rods 15 to move and adjust their positions to open or close the concrete pouring bucket 1.
[0035] In this embodiment, if Figure 7 As shown, a splicing bin 22 is provided on the top of the concrete pouring bucket 1, a groove 21 is provided on the top of the concrete pouring bucket 1, and a protrusion 23 is provided on the bottom of the splicing bin 22. The protrusion 23 is slidably inserted into the interior of the groove 21 and adapted thereto. When in use, the splicing bin 22 and the concrete pouring bucket 1 are assembled together by providing the groove 21 and the protrusion 23, so that the capacity of the concrete pouring bucket 1 can be increased according to actual usage conditions, thereby improving the applicability of the device.
[0036] In this embodiment, if Figure 7 As shown, both side outer walls of the concrete pouring bucket 1 are fixedly connected with connecting pieces 26 near the top, and both side outer walls of the splicing bin 22 are fixedly connected with connecting pieces 24 corresponding to the connecting pieces 26 near the bottom. The connecting pieces 1 24 are threadedly connected with the connecting pieces 2 26 via fixing bolts 25. When in use, the connecting pieces 1 24 and the connecting pieces 2 26 are fixedly connected together via the fixing bolts 25 to ensure that the splicing bin 22 is fixedly installed on the concrete pouring bucket 1 to prevent the two from loosening.
[0037] In this embodiment, if Figure 8As shown, the rapid pit division system includes a GPS positioning device 27 and a computer terminal. The GPS positioning device 27 is connected to the computer terminal signal via a wireless signal. When in use, by inputting relevant design parameters such as the coordinates of the center point of the tower base and the side length of the tower base into the computer terminal, the computer terminal calculates the pit division coordinates and transmits them to the GPS positioning device 27 via wireless, thereby achieving rapid and accurate positioning on site.
[0038] like Fig. 9 As shown, the rapid construction process of the tower foundation provided in this embodiment has the following steps: S1: Input the design parameters of the tower base into the computer terminal and start the automatic calculation program to generate the pit coordinates; S2: Use GPS positioning equipment 27 to calibrate the location of the sub-pits on site to ensure accurate coordinates; S3: Transport the prefabricated formwork and steel bars to the site and install them according to the marked points to ensure they are firm and reliable; S4: Fix the concrete pouring bucket 1 to the front end of the forklift and check whether the connection is tight; S5: After the forklift transports the concrete pouring bucket 1 loaded with concrete to the designated position, the remote-controlled hydraulic telescopic rod 15 adjusts the position of the sealing plate 16 to open the discharge port of the concrete pouring bucket 1, and starts the driving unit 13 to drive the rotating rod 10 and the rotating disk 4 to rotate synchronously. When the rotating disk 4 rotates, it drives the impact block 7 to impact the positioning block 3. The collision between the positioning block 3 and the impact block 7 causes the outer surface of the vibration disk 2 to vibrate, causing the concrete on the outer surface of the vibration disk 2 to move quickly from the center to the surroundings, and then slide down along the concrete pouring bucket 1 to achieve the overall flow of the concrete, ensuring that the concrete can be evenly discharged from the discharge port of the concrete pouring bucket 1; S6: After pouring is completed, the concrete pouring bucket 1 is cleaned in time to prevent the concrete from solidifying and affecting the next use.
[0039] The working principle of the present invention is as follows: when using the rapid construction process of the iron tower foundation of the present application, the forklift fork is inserted into the insertion slot 19, the concrete pouring bucket 1 is fixed to the front end of the forklift, and after the forklift transports the concrete pouring bucket 1 loaded with concrete to the specified position, the remote-controlled hydraulic telescopic rod 15 adjusts the position of the sealing plate 16 to open the discharge port of the concrete pouring bucket 1, and the driving motor 131 is started to drive the connecting rod 132 to rotate, and the connecting rod 132 rotates to drive the bevel gear 133 to rotate synchronously. Since the bevel gear 12 and the bevel gear 133 are meshed, the bevel gear 12 can be driven to rotate by the driving motor 131, and the bearing seat 11 is set to make the rotating rod 10 can rotate flexibly inside the vibration plate 2, so that the rotating rod 10 and the rotating plate 4 fixedly installed on the upper end of the rotating rod 10 can be rotated synchronously through the rotation of the bevel gear 12. Through the cooperation between the positioning rod 6, the impact block 7 and the return spring 8, the rotating plate 4 will drive the impact block 7 to hit the positioning block 3 when rotating. The collision between the positioning block 3 and the impact block 7 makes the outer surface of the vibration plate 2 vibrate, causing the concrete on the outer surface of the vibration plate 2 to move quickly from the center to the surroundings, and then slide down along the concrete pouring bucket 1 to realize the overall flow of concrete, ensure that the concrete can be evenly discharged from the discharge port of the concrete pouring bucket 1, improve the pouring speed, and thus speed up the construction process.
[0040] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0041] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0042] The present invention has been described above in conjunction with specific embodiments, but it should be clear to those skilled in the art that these descriptions are exemplary and are not intended to limit the scope of protection of the present invention. Those skilled in the art may make various modifications and variations to the present invention based on the spirit and principles of the present invention, and these modifications and variations are also within the scope of the present invention.
Claims
1. A rapid construction process for a tower foundation, including a rapid pit division system and a rapid pouring device, characterized in that: The rapid pouring device comprises a concrete pouring bucket (1), a vibrating plate (2) being fixedly mounted inside the concrete pouring bucket (1) via a connecting block (9), a rotating rod (10) being arranged inside the vibrating plate (2), the rotating rod (10) being movably connected to the vibrating plate (2) via a bearing seat (11), a rotating plate (4) being fixedly mounted on the upper end of the rotating rod (10), positioning blocks (3) being fixedly connected to the inner wall of the vibrating plate (2) at both sides of the rotating plate (4), and two symmetrically arranged inner surfaces of the rotating plate (4) An adjusting groove (5), wherein a positioning rod (6) is fixedly connected inside the adjusting groove (5), an impact block (7) is rotatably sleeved on the outer surface of the positioning rod (6), and the impact block (7) is movably connected to the rotating disk (4) via a return spring (8); a placement box (14) is fixedly connected to the lower end of the vibration disk (2); a bevel gear 1 (12) is fixedly connected to the lower end of the rotating rod (10) located inside the placement box (14); and a driving unit (13) for driving the bevel gear 1 (12) to rotate is arranged inside the placement box (14).
2. The rapid construction process for the tower foundation according to claim 2 is characterized in that: The drive unit (13) comprises a drive motor (131), the drive motor (131) being fixedly mounted on the outer wall of the concrete pouring bucket (1), the output end of the drive motor (131) passing through the concrete pouring bucket (1) and plugged into the interior of the placement box (14) and fixedly connected to a connecting rod (132), the other end of the connecting rod (132) being fixedly mounted with a bevel gear 2 (133) meshing with the bevel gear 1 (12).
3. The rapid construction process for the iron tower foundation according to claim 1 is characterized in that: The number of the positioning blocks (3) and the impact blocks (7) is two, and the positioning blocks (3) and the impact blocks (7) are at the same level.
4. The rapid construction process for the iron tower foundation according to claim 1 is characterized in that: Fixed frames (20) are symmetrically mounted on the outer walls of both sides of the concrete pouring bucket (1), and a plug-in slot (19) for plugging in a forklift fork is provided inside the fixed frame (20).
5. The rapid construction process for the iron tower foundation according to claim 1 is characterized in that: A base (17) is fixedly mounted on the bottom of the concrete pouring bucket (1), sealing grooves (18) are symmetrically formed on the outer walls of both sides of the concrete pouring bucket (1) near the lower end, sealing plates (16) are slidably inserted into the interior of the sealing grooves (18), hydraulic telescopic rods (15) are fixedly mounted on the upper surface of the base (17) on both sides of the sealing grooves (18), and the sealing plates (16) are fixedly mounted on the telescopic ends of the hydraulic telescopic rods (15).
6. The rapid construction process for the iron tower foundation according to claim 1 is characterized in that: The top of the concrete pouring bucket (1) is provided with a splicing bin (22), the top of the concrete pouring bucket (1) is provided with a groove (21), the bottom of the splicing bin (22) is provided with a convex block (23), and the convex block (23) is slidably inserted into the interior of the groove (21) and adapted thereto.
7. The rapid construction process for the iron tower foundation according to claim 6 is characterized in that: The outer walls of both sides of the concrete pouring bucket (1) are fixedly connected to a second connecting piece (26) near the top, and the outer walls of both sides of the splicing bin (22) are fixedly connected to a first connecting piece (24) corresponding to the second connecting piece (26) near the bottom, and the first connecting piece (24) is threadedly connected to the second connecting piece (26) via fixing bolts (25).
8. The rapid construction process for the iron tower foundation according to claim 1 is characterized in that: The rapid pit division system comprises a GPS positioning device (27) and a computer terminal, wherein the GPS positioning device (27) is connected to the computer terminal signal via a wireless signal.
9. The rapid construction process for the iron tower foundation according to claim 1, characterized in that: The process steps are as follows: S1: Input the design parameters of the tower base into the computer terminal and start the automatic calculation program to generate the pit coordinates; S2: Use GPS positioning equipment (27) to calibrate the location of the sub-pits on site to ensure accurate coordinates; S3: Transport the prefabricated formwork and steel bars to the site and install them according to the marked points to ensure they are firm and reliable; S4: Fix the concrete pouring bucket (1) to the front end of the forklift and check whether the connection is tight; S5: After the forklift transports the concrete pouring bucket (1) loaded with concrete to the designated position, the remote-controlled hydraulic telescopic rod (15) adjusts the position of the sealing plate (16) to open the discharge port of the concrete pouring bucket (1), and starts the driving unit (13) to drive the rotating rod (10) and the rotating disk (4) to rotate synchronously. When the rotating disk (4) rotates, it drives the impact block (7) to impact the positioning block (3). The collision between the positioning block (3) and the impact block (7) causes the outer surface of the vibration disk (2) to vibrate, causing the concrete on the outer surface of the vibration disk (2) to move rapidly from the center to the surroundings, and then slide down along the concrete pouring bucket (1), thereby realizing the overall flow of the concrete and ensuring that the concrete can be evenly discharged from the discharge port of the concrete pouring bucket (1); S6: After pouring is completed, the concrete pouring bucket (1) is cleaned in time to prevent the concrete from solidifying and affecting the next use.