Curtain wall gluing construction method
By using fixtures and pressing wheels of auxiliary curtain wall glue tools to extrude and level the weatherproof glue in the prior art, the problems of long technical intervals and unstable finished product quality in the existing technology are solved, and construction efficiency and finished product quality are improved.
Patent Information
- Application Number
- CN202510113401.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-24
- Publication Date
- 2025-04-11
AI Technical Summary
There are problems of long technical intervals and unstable finished product quality in the existing curtain wall caulking and glueing operations, which affect construction efficiency and finished product quality.
A construction method for curtain wall glue is adopted, including pasting textured paper in the gaps of the curtain wall, using fixtures and pressing wheels of auxiliary curtain wall glue tools to squeeze and level the weatherproof adhesive, and tearing off the textured paper after the construction is completed.
This method achieves convenient assembly and disassembly, improved efficiency and strong adaptability, omits the scraper leveling steps and technical intervals, and survives in one go, improving the quality of the finished product.
Smart Images

Figure CN119801286A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of curtain wall and door and window construction, and in particular to a curtain wall gluing construction method. Background Art
[0002] In the existing housing construction process, the steps for caulking and gluing curtain walls and exterior windows are usually: paste masking tape → gluing → scraper to level the surface of weathering glue → tear off masking tape. Since silicone weathering glue takes a relatively long time to harden and dry, it takes more than 4 hours of technical interval to tear off the masking tape, otherwise it will cause unevenness at the joint between the seam glue and the curtain wall; and since silicone weathering glue has high viscosity, the operation must be completed in one go in this order, otherwise it will cause unevenness on the surface of the caulking glue, seriously affecting the quality of the finished product. The existing caulking and gluing operations have relatively low efficiency and unstable finished product quality during the construction process, and there is room for further optimization of efficiency and improvement of finished product quality. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a construction method for curtain wall caulking, which has the advantages of easy assembly and disassembly, safe use, and a wide range of applications. It can effectively solve the problems of long technical intervals and unstable finished product quality in the existing curtain wall caulking operations.
[0004] To achieve this technical purpose, the present invention adopts the following scheme: The present invention provides a curtain wall glue construction method, comprising the following steps: S1. Paste masking tape at the gaps of the curtain wall; S2. Put the fixture of the auxiliary curtain wall glue-applying tool on the glue outlet of the weather-resistant glue gun, place the weather-resistant glue gun above the curtain wall gap, place the pressing wheel of the auxiliary curtain wall glue-applying tool at the curtain wall gap, move the weather-resistant glue gun along the curtain wall gap and squeeze the weather-resistant glue, and drive the pressing wheel to squeeze and flatten the surface of the squeezed weather-resistant glue; S3. Remove the masking tape after the construction is completed.
[0005] Compared with the prior art, the present invention has the following beneficial effects: ①Easy to assemble and disassemble: The overall structure is simple, and it is a single component, which is easy to assemble and disassemble. One person can complete the assembly and disassembly of the device; ② Improved efficiency: Omit the existing "scraper leveling" step and technical intervals, and complete the work in one go; ③ Strong adaptability: The device is easy to use and the operation method is easy to master. It is only an optimization of the original process.
[0006] Furthermore, the clamp is composed of two semi-annular clamps, and the pressure wheel is connected to the clamp through two pressure wheel rollers. The pressure wheel roller is a bow-shaped structure, one end of the pressure wheel roller is rotatably connected to the pressure wheel, and the other end of the pressure wheel roller is rotatably connected to the semi-annular clamp.
[0007] Furthermore, the two semi-annular clamps are connected by a spring hinge, and the spring hinge is arranged at one end close to the pressing wheel. The arrangement of the spring hinge enables the two semi-annular clamps to clamp the glue gun.
[0008] Furthermore, a handle is provided on the semi-circular fixture. When applying glue, the construction worker operates the glue gun with one hand and holds the handle with the other hand, so that the auxiliary tool is stable and the quality of the glue application is guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 This is a schematic diagram of the structure of a tool for assisting curtain wall gluing according to an embodiment of the present invention; Figure 2 This is a diagram showing the use status of a tool for assisting curtain wall gluing according to an embodiment of the present invention; The markings in the figure are: 1, clamp; 101, semi-circular clamp; 2, pressure wheel; 3, pressure wheel roller; 4, handle; 5, weather-resistant glue gun. DETAILED DESCRIPTION
[0010] In order to fully understand the purpose, features and effects of the present invention, the present invention is described in detail through the following specific implementation methods, but the present invention is not limited thereto.
[0011] It should be noted that when an element is referred to as being "fixed to" or "set on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" or "laid on" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0012] It should be understood that the orientation or position relationship indicated by terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0013] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.
[0014] See also Figure 1 and Figure 2The present invention provides a curtain wall glue construction method, comprising the following steps: S1. Paste masking tape at the gaps of the curtain wall; S2. Put the clamp 1 on the glue outlet of the weathering glue gun 5, place the weathering glue gun 5 above the gap of the curtain wall, and place the pressure wheel 2 at the gap of the curtain wall. The construction worker operates the weathering glue gun 5 with one hand to move along the gap of the curtain wall and squeeze the weathering glue in, and holds the handle 4 with one hand. The auxiliary tool is stable, and the weathering glue gun 5 drives the pressure wheel 2 to squeeze and flatten the surface of the squeezed weathering glue; S3. Remove the masking tape after the construction is completed.
[0015] The tool for assisting the curtain wall glue application includes a clamp 1 and a pressure wheel 2. The clamp 1 is composed of two semi-circular clamps 101, which are connected by a spring hinge. The spring hinge is arranged at one end close to the pressure wheel 2. The arrangement of the spring hinge makes the clamp 1 structure stable and can clamp the weather-resistant glue gun 5 when in use. The spring hinge and the installation method of the spring hinge are both prior art and will not be described in detail here. The middle diameter of the pressure wheel 2 is larger and the diameters on both sides are smaller, which is convenient for the pressure wheel 2 to flatten the weather-resistant glue in the gap of the curtain wall. The pressure wheel 2 is connected to the clamp 1 through two pressure wheel rollers 3. The pressure wheel 2 and the pressure wheel roller 3 are detachably connected. The pressure wheel roller 3 is an arched structure. One end of the pressure wheel roller 3 is rotatably connected to the pressure wheel 2, and the other end of the pressure wheel roller 3 is rotatably connected to the semi-circular clamp 101. The pressure wheel roller 3 can be any existing material, such as metal or non-metal, and can be selected according to the needs of use. In the present embodiment, the pressure wheel roller 3 is made of plastic. The semi-circular clamp 101 is also provided with a handle 4 for assisting stability. When using the tool to apply glue, the construction worker operates the weather-resistant glue gun 5 with one hand and holds the handle 4 with the other hand to assist in stabilizing the tool and ensure the quality of the glue application.
[0016] Compared with the prior art, the present invention has the following beneficial effects: ①Easy to assemble and disassemble: The overall structure is simple, and it is a single component, which is easy to assemble and disassemble. One person can complete the assembly and disassembly of the device; ② Improved efficiency: Omit the existing "scraper leveling" steps and technical intervals, and complete the work in one go; ③ Strong adaptability: The device is easy to use and the operation method is easy to master. It is only an optimization of the original process.
[0017] Finally, it should be noted that the above are only preferred embodiments of the present invention. Of course, those skilled in the art can make changes and modifications to the present invention. If these modifications and variations fall within the scope of the claims of the present invention and their equivalent technologies, they should be considered to be within the scope of protection of the present invention.
Claims
1. A curtain wall glue construction method, characterized in that: The following steps are involved: S1. Paste masking tape at the gaps of the curtain wall; S2. The fixture (1) of the auxiliary curtain wall glue application tool is mounted on the glue outlet of the weathering glue gun (5). The weathering glue gun (5) is placed above the gap of the curtain wall. The pressing wheel (2) of the auxiliary curtain wall glue application tool is placed at the gap of the curtain wall. The weathering glue gun (5) moves along the gap of the curtain wall and squeezes the weathering glue, driving the pressing wheel (2) to squeeze and flatten the surface of the squeezed weathering glue. S3. Remove the masking tape after the construction is completed.
2. The curtain wall glue construction method according to claim 1, characterized in that: The clamp (1) is composed of two semi-annular clamps (101); the pressure wheel (2) is connected to the clamp (1) via two pressure wheel rollers (3); the pressure wheel rollers (3) are of an arched structure; one end of the pressure wheel rollers (3) is rotationally connected to the pressure wheel (2); and the other end of the pressure wheel rollers (3) is rotationally connected to the semi-annular clamp (101).
3. The curtain wall glue construction method according to claim 2, characterized in that: The two semi-annular clamps (101) are connected via a spring hinge, and the spring hinge is arranged at one end close to the pressing wheel (2).
4. The curtain wall glue construction method according to claim 1, characterized in that: The clamp (1) is provided with a handle (4).