Anchor cable machine head, anchor cable trolley and construction method thereof

By designing the feed mechanism of the anchor cable head in the anchor cable trolley, the grouting pipe and anchor cable share one outlet, the problem of secondary positioning in the existing technology is solved and the construction efficiency is improved.

CN119801607APending Publication Date: 2025-04-11JIANGXI XINTONG MASCH MFG CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202510112830.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-24
Publication Date
2025-04-11

AI Technical Summary

Technical Problem

The existing anchor cable trolleys require secondary positioning during grouting and anchor cable installation, resulting in cumbersome construction process and inefficient efficiency.

Method used

An anchor cable head is designed with a feed mechanism that can regulate the grouting pipe and anchor cable, so that they share an outlet, so that only one positioning is required for grouting and anchor cable installation.

Benefits of technology

Grouting and anchor cable installation can be completed through one positioning, which significantly saves positioning time and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119801607A_ABST
    Figure CN119801607A_ABST
Patent Text Reader

Abstract

According to the anchor cable machine head, the anchor cable trolley and the construction method of the anchor cable machine head, the anchor cable machine head is provided with the operation opening, the operation opening is located at the outlet end of the feeding mechanism, the feeding mechanism is provided with the gathering pipe coaxial with the operation opening, and the feeding mechanism can guide any one of a grouting pipe or an anchor cable into the gathering pipe; when the anchor cable machine head works, the anchor cable machine head only needs to be aligned once, that is, the operation opening is aligned with the drill hole, and positioning does not need to be conducted again. Grouting and anchor cable installation can be achieved only by replacing a grouting pipe or an anchor cable entering the gathering pipe through the feeding mechanism, and therefore a large amount of secondary positioning time is saved, and operation efficiency is improved. The anchor cable trolley comprises the anchor cable machine head, after the corresponding construction method is adopted for the anchor cable trolley, only one-time positioning is needed in the actual use process, convenience and rapidness are achieved, and high construction efficiency is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of anchor cable trolleys, and in particular to an anchor cable head, an anchor cable trolley and a construction method thereof. Background Art

[0002] In the prior art, the anchor trolley has anchoring and grouting functions, wherein the anchor cables and grouting pipes are distributed and arranged. During actual use, the grouting pipe outlet needs to be aligned with the anchor hole for grouting. After the grouting is completed, the anchor cable outlet needs to be aligned with the anchor hole for anchor installation.

[0003] Therefore, in the existing anchor cable trolley, secondary positioning or separate operations are required to align the holes to be worked during grouting and anchor cable installation, so the construction process is relatively cumbersome and the construction efficiency is low. Summary of the invention

[0004] In view of this, in view of the technical problems that the anchor cable trolley grouting and anchor cable installation in the above-mentioned prior art require secondary positioning and the construction efficiency is low, the present application provides an anchor cable machine head, an anchor cable trolley and a construction method thereof, wherein the anchor cable machine head has a feeding mechanism for simultaneously regularizing the grouting pipe and the anchor cable, so that the grouting pipe and the anchor cable share one outlet, and only one positioning is required in actual use, and the construction method of the anchor cable trolley can improve the construction efficiency of the anchor cable trolley;

[0005] In a first aspect, the present application provides a cable anchor head, comprising:

[0006] An operating mechanism having an operating opening for aligning with the drill hole;

[0007] The feeding mechanism is arranged at the inlet end of the working mechanism, and the feeding mechanism is configured to guide the anchor cable or the grouting pipe into the working port.

[0008] Compared with the prior art, the anchor machine head provided in the present application is provided with an operating port, which is located at the outlet end of the feeding mechanism. The feeding mechanism is provided with a collecting pipe coaxially arranged with the operating port, and the feeding mechanism can guide any one of the grouting pipe or the anchor cable into the only operating port of the operating mechanism, so as to grout the borehole or install the anchor cable. Then, when the anchor machine head is operating, it only needs to be aligned once, that is, the operating port is aligned with the borehole, and there is no need to position it again. Grouting and anchor cable installation can be achieved by only replacing the grouting pipe or anchor cable entering the operating port with the feeding mechanism, thereby saving a lot of secondary positioning time and improving operating efficiency.

[0009] Preferably, the feeding mechanism comprises a collecting pipe, a first guide pipe and a second guide pipe, wherein the first guide pipe is used to accommodate the anchor cable, and the second guide pipe is used to accommodate the grouting pipe;

[0010] Wherein, the outlet end of the first guide pipe and the outlet end of the second guide pipe are simultaneously connected to the inlet end of the collecting pipe;

[0011] The axes of the second guide tube and the collecting tube are on the same straight line, and the second guide tube is arranged obliquely to the first guide tube.

[0012] In this embodiment, by providing the first guide pipe and the second guide pipe, the grouting pipe and the anchor cable will not interfere with each other in the early stage and will not affect their respective feeding. Only one of them needs to enter the operating mechanism when approaching the operating mechanism, which effectively saves positioning time and is conducive to improving work efficiency; and the collecting pipe can provide a shared space for the anchor cable and the grouting pipe, and the collecting pipe is aligned with the operating port, so that the anchor cable or the grouting pipe can smoothly enter the only operating port of the operating mechanism from the collecting pipe, and the collecting pipe has guiding and collecting functions.

[0013] Preferably, the feeding mechanism further comprises a feeding assembly, wherein the feeding assembly is provided with a feeding channel for the grouting pipe to pass through;

[0014] The inlet end of the first guide pipe is connected to the outlet end of the feed channel, and the feed assembly is used to drive the grouting pipe to feed toward the first guide pipe.

[0015] In this embodiment, the feeding assembly can feed the grouting pipe, and the first guide pipe is connected to the outlet end of the feeding channel, so that the grouting pipe can smoothly enter the first guide pipe, so that the grouting pipe has a larger thrust to enter the collecting pipe through the first guide pipe.

[0016] Preferably, the operating mechanism comprises a bending assembly, and the bending assembly is used to bend the anchor cable;

[0017] Wherein, the bending assembly comprises a bending driving member and a bending member, the bending driving member is connected to the bending member, and the bending member is provided with a bending opening for the anchor cable to pass through;

[0018] Wherein, the bending driving member can drive the bending member to move so as to bend the anchor cable.

[0019] In this embodiment, the bending assembly can bend the anchor cable to meet the bending requirements of the anchor cable.

[0020] Preferably, the operating mechanism further comprises a shearing assembly, and the shearing assembly is used to shear the anchor cable;

[0021] Wherein, the shearing assembly includes a hydraulic shear and a bottom support, the bottom support is provided with a channel for the anchor cable to pass through, the working port is located at the end of the bottom support, and the hydraulic shear is used to shear the anchor cable in the bottom support.

[0022] In this embodiment, the shearing assembly is arranged between the working port and the collecting pipe, so that after the anchor cable is installed, the anchor cable can be cut to complete the installation.

[0023] Preferably, a flushing joint is provided at the inlet end of the operating mechanism, and the flushing joint is used to connect a water pipe joint to flush the outer wall of the grouting pipe;

[0024] There is a gap between the flushing joint and the feeding mechanism.

[0025] In this embodiment, the water pipe can be connected to the water inlet on the outer wall of the flushing joint. The liquid enters the water inlet channel from the water inlet and then flows out from the inner water outlet of the flushing joint, flushing around the grouting pipe, thereby increasing the probability of flushing away the mud and sand on the outside of the grouting pipe.

[0026] Preferably, the flushing joint comprises a water inlet, a water inlet channel and a water outlet, and the water inlet is connected with the water outlet through the water inlet channel;

[0027] The water inlet opens at the outside of the flushing joint, and the water outlet opens at the inside of the flushing joint.

[0028] In this embodiment, by arranging the water inlet on the outside of the flushing joint, it is convenient to connect to an external water source, and by arranging the water inlet on the inside of the flushing joint, the outside of the grouting pipe can be directly and effectively flushed.

[0029] Second aspect

[0030] The present application provides an anchor trolley, comprising the anchor head of any embodiment provided in the first aspect, the anchor head having a feeding mechanism for simultaneously arranging the grouting pipe and the anchor cable so that the grouting pipe and the anchor cable share one outlet, and only requires one positioning in actual use, which is convenient and quick, thereby improving the construction efficiency of the anchor trolley.

[0031] The third aspect

[0032] The present application provides an anchor cable trolley construction method, which is applied to the anchor cable trolley provided in the second aspect, and the construction method comprises:

[0033] Make sure there is no anchor cable in the collection pipe, and control the grouting pipe to enter the operating mechanism through the collection pipe;

[0034] After the grouting is completed, the grouting pipe is controlled to exit the collecting pipe;

[0035] Make sure there is no grouting pipe in the collection pipe, and control the anchor cable to enter the operating mechanism through the collection pipe;

[0036] After the anchor cable is installed, the operating mechanism is controlled to cut the anchor cable.

[0037] In this embodiment, by controlling the grouting pipes and anchor cables to stagger their entry into the collecting pipe, it can be ensured that the grouting pipes and anchor cables can operate accurately during operation.

[0038] Preferably, after the grouting is completed, the grouting pipe is controlled to withdraw from between the collecting pipes, and the flushing joint is controlled to connect to the water source to flush the outer wall of the grouting pipe;

[0039] During the installation of the anchor cable, the bending assembly is controlled to bend the anchor cable.

[0040] In this embodiment, after the grouting is completed, the water source is opened to flush the grouting pipe, so that the grouting pipe can be relatively clean after recovery; during the installation of the anchor cable, the bending assembly is controlled to bend the anchor cable, so that the anchor cable can have a bending angle, thereby enhancing the stability of the connection between the anchor cable and the drill hole. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a schematic diagram of the three-dimensional structure of the anchor cable head provided in one embodiment of the present application;

[0042] Figure 2 It is a schematic diagram of the top view of the structure of the anchor cable head provided in one embodiment of the present application;

[0043] Figure 3 yes Figure 2 A schematic diagram of a local A enlargement;

[0044] Figure 4 It is a three-dimensional structural schematic diagram of an operating mechanism provided in one embodiment of the present application;

[0045] Figure 5 It is a schematic diagram of the explosion structure of the operating mechanism provided in one embodiment of the present application;

[0046] Figure 6 It is a schematic flow chart of a construction method of an anchor cable trolley provided in one embodiment of the present application.

[0047] Reference numerals: 1. operating mechanism; 2. feeding mechanism; 3. telescopic arm; 4. anchor cable; 5. grouting pipe;

[0048] 11. Operation port; 12. Flushing joint; 13. Bending assembly; 14. Shearing assembly;

[0049] 121, water inlet; 122, water outlet; 131, bending drive member; 132, bending member; 133, bending opening; 134, mounting support; 141, bottom support; 142, hydraulic shear;

[0050] 21. Collection pipe; 22. First guide pipe; 23. Second guide pipe; 24. Third guide pipe; 25. Feed assembly; 26. Mounting seat; 251. Drive motor. DETAILED DESCRIPTION

[0051] In order to enable those skilled in the art to better understand the technical solution of the present disclosure, the present disclosure is described in detail, clearly and completely in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present disclosure and are not used to limit the present disclosure.

[0052] In the description of this application, if there is a description of first or second, it is only for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0053] Those skilled in the art should understand that, in the disclosure of the present application, the orientation or positional relationship indicated by terms such as "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", and "outside" are based on the orientation or positional relationship shown in the accompanying drawings, which are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the above terms should not be understood as limiting the present application.

[0054] The present application is further described in detail below in conjunction with the accompanying drawings. Figures 1 to 6 illustrate.

[0055] First aspect

[0056] The present application provides a cable anchor head, such as Figure 1 to Figure 2 As shown, it is provided with an operating mechanism 1, a telescopic arm 3 and a feeding mechanism 2. The telescopic direction of the telescopic arm 3 is parallel to the feeding direction. The operating mechanism 1 is arranged at the outlet end of the feeding mechanism 2. The telescopic arm 3 is connected to the operating mechanism 1 to drive the operating mechanism 1 to move along the feeding direction so as to precisely adjust the anchor machine head so that the operating port 11 on the operating mechanism 1 can be accurately aligned with the drill hole for grouting or anchor 4 installation.

[0057] Specifically, Figure 1 to Figure 2As shown, the feeding mechanism 2 includes a collecting pipe 21, and the operating mechanism 1 is provided with a discharge channel. The discharge channel and the axis of the collecting pipe 21 are in the same straight line, and the end of the discharge channel away from the collecting pipe 21 is the operating port 11; the feeding mechanism 2 is used to regularly guide the anchor cable 4 and the grouting pipe 5, so that the anchor cable 4 and the grouting pipe 5 can be guided into the collecting pipe 21, and then enter the operating mechanism 1, enter the borehole from the only operating port 11 to install the grouting pipe 5 or the anchor cable 4, so that the anchor cable head only needs to be aligned once when operating, that is, the operating port 11 is aligned with the borehole, and there is no need to position it again. The feeding mechanism 2 only needs to replace the grouting pipe 5 or the anchor cable 4 entering the collecting pipe 21 to realize grouting and anchor cable 4 installation, thereby saving a lot of secondary positioning time and improving operating efficiency.

[0058] Among them, Figure 1 to Figure 2 , Figure 3 As shown, the feeding mechanism 2 includes a mounting seat 26 and a first guide tube and a second guide tube. The first guide tube 22 and the second guide tube 23 are fixedly arranged on the mounting seat 26. The first guide tube 22 and the second guide tube 23 are basically arranged on the same plane. The first guide tube 22 and the second guide tube 23 are both tubular structures. The first guide tube 22 is used to accommodate the anchor cable 4, and the second guide tube 23 is used to guide the grouting tube 5. Figure 3 As shown, the outlet end of the first guide pipe 22 and the outlet end of the second guide pipe 23 are connected to the inlet end of the collecting pipe 21 at the same time, and there is a gap between the inlet ends of the first guide pipe 22 and the second guide pipe 23, so that the grouting pipe 5 and the anchor cable 4 have their own feeding routes. The grouting pipe 5 and the anchor cable 4 do not interfere with each other in the early stage and do not affect their respective feeding. They only need to choose one to enter the operating mechanism 1 when approaching the operating mechanism 1, which effectively saves positioning time and is conducive to improving work efficiency.

[0059] Further, such as Figure 2 , Figure 3 As shown, the axis of the second guide tube 23 and the collecting tube 21 are on the same straight line, wherein the axis of the first guide tube 22 and the axis of the second guide tube 23 have an angle θ, wherein 10°≤θ≤14°, i.e., the second guide tube 23 is inclined to the feeding direction, and the second guide tube 23 can guide the grouting tube 5 to move toward the collecting tube 21, so that the anchor cable 4 does not need to be deflected at an angle during feeding, and only needs the grouting tube 5 to be deflected at a smaller angle, thereby ensuring that the grouting tube 5 and the anchor cable 4 enter the collecting tube 21 smoothly.

[0060] Among them, the angle θ can be set to any one of 10°, 11°, 12°, 13°, and 14° to ensure that the grouting pipe 5 and the anchor cable 4 do not interfere with each other in the early stage of feeding. When the operation requires, the grouting pipe 5 only needs to be offset at a smaller angle, thereby reducing the difficulty of the grouting pipe 5 entering the collecting pipe 21 and ensuring smooth operation.

[0061] In particular, if Figure 1 , Figure 2 As shown, the mounting seat 26 is a box-type structure as a whole, and the side end of the mounting seat 26 is connected to the telescopic wall, that is, the telescopic arm 3 can simultaneously drive the feeding mechanism 2 and the operating mechanism 1 to move along the feeding direction; wherein, the first guide tube 22 has a relatively long overall length, and the side end of the first guide tube 22 is fixedly connected to the side end of the mounting seat 26 away from the telescopic wall, and the inlet end of the second guide tube 23 is connected to the end face of the mounting seat 26 close to the operating mechanism 1; wherein, the feeding mechanism 2 also includes a feeding assembly 25, which is arranged on the mounting seat 26, and the feeding assembly 25 forms a feeding channel in the mounting seat 26 for the grouting pipe 5 to pass through, and the outlet end of the feeding channel is connected to the inlet end of the first guide tube 22, and the feeding assembly 25 can drive the grouting pipe 5 to feed toward the first guide tube 22, so that the grouting pipe 5 can smoothly enter the first guide tube 22, so that the grouting pipe 5 has a large thrust to enter the collecting pipe 21 through the first guide tube 22.

[0062] In this embodiment, the feed assembly 25 includes a drive motor 251 and a drive wheel, and the drive wheel is arranged in the mounting seat 26 to form a feed channel; the drive motor 251 is connected to the drive wheel, and the drive motor 251 is used to provide driving force to the drive wheel so that the grouting pipe 5 can be displaced along the feed direction under the rotation of the drive wheel.

[0063] It should be noted that, in the present embodiment, the feeding assembly 25 for driving the grouting pipe 5 is arranged at the inlet end of the first guide pipe 22, and the first guide pipe 22 for guiding the grouting pipe 5 is arranged to be inclined, so that the feeding drive of the grouting pipe 5 and the inclined movement of the grouting pipe 5 are integrated together, so that the grouting pipe 5 has a larger and more sufficient power for deflection, so as to smoothly enter the collecting pipe 21, thereby improving the operating smoothness and efficiency of the anchor machine head.

[0064] Further, such as Figure 1 , Figure 2 , Figure 3 As shown, the feeding mechanism 2 also includes a third guide pipe 24, which is arranged at the end of the feeding assembly 25 away from the first guide pipe 22, that is, the outlet end of the third guide pipe 24 is connected to the inlet end of the feeding channel, wherein the axis of the third guide pipe 24 is parallel to the axis of the second guide pipe 23, and the axis of the third guide pipe 24 is in the same straight line as the feeding channel, so that the grouting pipe 5 entering the feeding channel can be guided in a straight line, ensuring that the feeding action of the feeding assembly 25 on the grouting pipe 5 is correct, so as to ensure that the grouting pipe 5 can smoothly enter the collecting pipe 21.

[0065] On the basis of any of the above embodiments, the operating mechanism 1 is further expanded; Figures 1 to 4As shown, a flushing joint 12 is provided at the inlet end of the discharge channel. The flushing joint 12 has a feed port coaxially arranged with the feed channel. The grouting pipe 5 enters into the discharge channel through the flushing joint 12. The flushing joint 12 is used to connect a water pipe joint to flush the outer wall of the grouting pipe 5, so that the grouting pipe 5 can ensure better cleanliness when being withdrawn.

[0066] Among them, there is a gap between the flushing joint 12 and the outlet end of the collecting pipe 21 to provide space for placing the water pipe joint. At the same time, when the liquid flushes the mud on the grouting pipe 5, the mud can fall from the gap between the flushing joint 12 and the collecting pipe 21, preventing the mud from entering the collecting pipe 21.

[0067] Specifically, Figure 4 As shown, the flushing joint 12 is a hollow structure, and the flushing joint 12 includes a water inlet 121, a water inlet channel and a water outlet 122. The hollow part of the flushing joint 12 is the water inlet channel, and the water inlet 121 is connected with the water outlet 122 through the water inlet channel, that is, the water inlet 121 is open on the outside of the flushing joint 12, and the water pipe can be connected to the water inlet 121 on the outer wall of the flushing joint 12, and the water outlet 122 is open on the inside of the flushing joint 12; wherein, there are at least two water outlets 122, and the water outlets 122 are equidistantly spaced along the circumferential direction of the inner side wall of the flushing joint 12; in use, the liquid enters the water inlet channel from the water inlet 121, and then flows out from the inner water outlet 122 of the flushing joint 12, surrounding the grouting pipe 5 for flushing, thereby increasing the probability of flushing away the mud and sand on the outside of the grouting pipe 5.

[0068] In this embodiment, the number of water outlets 122 is four.

[0069] On the basis of any of the above embodiments, the operating mechanism 1 is further expanded; Figure 4 , Figure 5 As shown, the operating mechanism 1 includes a bending assembly 13, which is used to bend the anchor cable 4 so that the anchor cable 4 can form a bending angle, increase the friction of the anchor cable 4 in the drill hole, and make the installation of the anchor cable 4 in the drill hole more stable.

[0070] Specifically, Figure 4 , Figure 5As shown, the operating mechanism 1 also includes a mounting support 134, which includes a top plate and a side plate, and a space for mounting the bending assembly 13 is formed in the mounting support 134; the flushing joint 12 is arranged on the side plate of the mounting support 134 close to the collecting pipe 21; the bending assembly 13 includes a bending drive member 131 and a bending member 132, the top of the bending drive member 131 is fixedly connected to the mounting support 134, the driving end of the bending drive member 131 is connected to the bending member 132, and the bending member 132 is provided with a bending opening 133 for the anchor cable 4 to pass through. Under normal conditions, the axis of the bending opening 133 is in the same straight line as the axis of the discharge channel, and the anchor cable 4 enters the bending opening 133 after passing through the flushing joint 12, and then passes through the operating opening 11;

[0071] Among them, an opening is provided at the bottom of the mounting support 134, and the bending drive member 131 can drive the bending member 132 to move toward the opening direction, so that the bottom of the bending member 132 exceeds the bottom of the mounting support 134. Since the anchor cable 4 passes through the bending opening 133, the anchor cable 4 can be driven to move during the movement of the bending member 132 to achieve the bending of the anchor cable 4.

[0072] In the embodiment, the feeding direction is parallel to the horizontal plane, and the driving direction of the bending driving member 131 on the bending member 132 is parallel to the vertical direction, that is, perpendicular to the feeding direction, so as to form a bending angle on the anchor cable 4.

[0073] In this embodiment, the bending driving component 131 is a cylinder-type driving component.

[0074] On the basis of any of the above embodiments, the operating mechanism 1 is further expanded; Figure 4 , Figure 5 As shown, the operating mechanism 1 further includes a shearing assembly 14 , which is located between the operating port 11 and the collecting pipe 21 , and is disposed at the side end of the bending assembly 13 away from the collecting pipe 21 , and is used to shear the anchor cable 4 .

[0075] Specifically, the shearing assembly 14 includes a hydraulic shear 142 and a bottom support 141. The hydraulic shear 142 is arranged at the upper end of the bottom support 141. The side end of the bottom support 141 is fixedly connected to the mounting support 134. The bottom support 141 has a channel for the anchor cable 4 or the grouting pipe 5 to pass through. The operating port 11 is the opening at the front end of the bottom support 141. At the same time, the bottom support 141 has a space for accommodating the hydraulic shear 142. The hydraulic shear 142 can cut the anchor cable 4 in the discharge channel.

[0076] Among them, the shearing component 14 is arranged at the front end of the bending component 13, so that after the anchor cable 4 is inserted into the hole of the previous anchor cable 4 and installed, the shearing component 14 cuts the anchor cable 4, and the remaining bent part of the anchor cable 4 can enter the next drill hole, thereby improving the installation stability of the anchor cable 4 and the drill hole.

[0077] It should be noted that, in the present application, the discharge channel is formed by the channel of the bottom support 141 , the mounting support 134 and the flushing joint 12 .

[0078] Second aspect

[0079] The present application provides an anchor trolley, comprising an anchor head in any embodiment provided in the first aspect, the anchor head having a feeding mechanism 2 for simultaneously arranging a grouting pipe 5 and an anchor cable 4, so that the grouting pipe 5 and the anchor cable 4 share an outlet, and only requires one positioning in actual use, which is convenient and quick, thereby improving the construction efficiency of the anchor trolley.

[0080] The anchor cable trolley of the present application is used as follows:

[0081] First, before feeding the grouting pipe 5, the anchor cable 4 is completely retracted into the first guide pipe 22, and the space of the collecting pipe 21 is completely left for the grouting pipe 5. The grouting operation is completed through the reel of the grouting pipe 5 and the feeding mechanism 2 of the grouting pipe 5. The bending assembly 13 and the shearing assembly 14 do not work, and the path is fully open, which does not affect the passage of the grouting pipe 5. After the grouting is completed, the water valve flushing switch on the vehicle is turned on, and water begins to flush the outer wall of the grouting pipe 5. The feeding assembly 25 reversely rotates the drive motor 251 to complete the retraction of the grouting pipe 5.

[0082] All grouting pipes 5 are retracted into the second guide pipe 23, and the space of the collection pipe 21 is fully reserved for the anchor cable 4. When the anchor cable 4 is in operation, the entire anchor cable 4 feeding operation is completed through the anchor cable 4 reel and the anchor cable 4 feeding mechanism 2 on the vehicle. When the anchor cable 4 is inserted, the bending assembly 13 is driven from time to time to bend and deform the anchor cable 4. When the anchor cable 4 is inserted to the bottom of the hole, the shearing assembly 14 is driven to complete the cutting of the anchor cable 4.

[0083] Repeat the above operation to carry out the anchor cable 4 construction operation of the next borehole.

[0084] The third aspect

[0085] The present application provides a method for constructing an anchor cable trolley. Figure 6 As shown, it includes the following steps:

[0086] Step 1: Determine that there is no anchor cable 4 in the collecting pipe 21, and control the grouting pipe 5 to enter the operating mechanism 1 through the collecting pipe 21;

[0087] Step 2: After the grouting is completed, the grouting pipe 5 is controlled to exit the collecting pipe 21;

[0088] Step 3: Determine that there is no grouting pipe 5 in the collecting pipe 21, and control the anchor cable 4 to enter the operating mechanism 1 through the collecting pipe 21;

[0089] Step 4: After the anchor cable 4 is installed, the operating mechanism 1 is controlled to shear the anchor cable 4 .

[0090] In this embodiment, it is necessary to ensure that when the anchor trolley is working, either the grouting pipe 5 or the anchor cable 4 exists in the collecting pipe 21, or both do not exist, so as to ensure that the grouting pipe 5 and the anchor cable 4 will not interfere with each other in the collecting pipe 21, and then ensure that the only working port 11 of the operating mechanism 1 can only be used for either the grouting pipe 5 or the anchor cable 4 to operate, so as to ensure the smooth operation of the anchor trolley; at the same time, by controlling the grouting pipe 5 and the anchor cable 4 to enter the working port 11 through the collecting pipe 21 at an offset to operate the drilling hole, the anchor trolley of the present application only needs to be aligned once after adopting this construction method, that is, the working port 11 is aligned with the drilling hole, and there is no need to position it again. The feeding mechanism 2 only needs to replace the grouting pipe 5 or the anchor cable 4 entering the collecting pipe 21 to realize grouting and installation of the anchor cable 4, thereby saving a lot of secondary positioning time and improving operating efficiency.

[0091] Furthermore, in step 2, after the grouting is completed, the grouting pipe 5 is controlled to withdraw from between the collecting pipes 21 , and the flushing joint 12 is controlled to connect to the water source to flush the outer wall of the grouting pipe 5 .

[0092] In this embodiment, after grouting is completed, the water valve flushing switch on the vehicle is turned on, and water begins to flush the outer wall of the grouting pipe 5. The feed assembly 25 reversely rotates the drive motor 251 to complete the retraction of the grouting pipe 5, so that the retracted grouting pipe 5 is clean and tidy.

[0093] Further, after step three and before step four, during the installation of the anchor cable 4, the bending assembly 13 is controlled to bend the anchor cable 4.

[0094] In this embodiment, during the installation of the anchor cable 4, the bending assembly 13 is driven from time to time to bend and deform the anchor cable 4 so that the anchor cable 4 can form a bending angle, increase the friction of the anchor cable 4 in the drill hole, and make the installation of the anchor cable 4 in the drill hole more stable.

[0095] It should be noted that the various embodiments of the present application can be arbitrarily combined into a new embodiment if the solutions do not conflict and the technical solutions can coexist.

[0096] The present application is described in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the present application and its core ideas. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of the present application.

Claims

1. A cable anchor head, characterized in that: include: An operating mechanism (1) having an operating opening (11) for aligning with a drill hole; The feeding mechanism (2) is arranged at the inlet end of the working mechanism (1), and the feeding mechanism (2) is configured to guide the anchor cable (4) or the grouting pipe (5) into the working port (11).

2. The anchor cable head according to claim 1, characterized in that: The feeding mechanism (2) comprises a collecting pipe (21), a first guide pipe (22) and a second guide pipe (23), wherein the first guide pipe (22) is used to accommodate the anchor cable (4), and the second guide pipe (23) is used to accommodate the grouting pipe (5); Wherein, the outlet end of the first guide pipe (22) and the outlet end of the second guide pipe (23) are simultaneously connected to the inlet end of the collecting pipe (21); The axis of the second guide tube (23) and the axis of the collecting tube (21) are on the same straight line, and the second guide tube (23) is arranged obliquely with respect to the first guide tube (22).

3. The cable anchor head according to claim 2, characterized in that: The feeding mechanism (2) further comprises a feeding assembly (25), wherein the feeding assembly (25) is provided with a feeding channel for the grouting pipe (5) to pass through; The inlet end of the first guide pipe (22) is connected to the outlet end of the feed channel, and the feed assembly (25) is used to drive the grouting pipe (5) to feed in the direction of the first guide pipe (22).

4. The anchor cable head according to claim 1, characterized in that: The operating mechanism (1) comprises a bending assembly (13), and the bending assembly (13) is used to bend the anchor cable (4); The bending assembly (13) comprises a bending driving member (131) and a bending member (132); the bending driving member (131) is connected to the bending member (132); and the bending member (132) is provided with a bending opening (133) for the anchor cable (4) to pass through. Wherein, the bending driving member (131) can drive the bending member (132) to move so as to bend the anchor cable (4).

5. The cable anchor head according to claim 1, characterized in that: The operating mechanism (1) further comprises a shearing assembly (14), wherein the shearing assembly (14) is used to shear the anchor cable (4); The shearing assembly (14) comprises a hydraulic shear (142) and a bottom support (141); a passage for the anchor cable (4) to pass through is provided in the bottom support (141); the working opening (11) is located at the end of the bottom support (141); and the hydraulic shear (142) is used to shear the anchor cable (4) in the bottom support (141).

6. The cable anchor head according to claim 1, characterized in that: The inlet end of the operating mechanism (1) is provided with a flushing joint (12), and the flushing joint (12) is used to connect a water pipe joint to flush the outer wall of the grouting pipe (5); There is a gap between the flushing joint (12) and the feeding mechanism (2).

7. The anchor cable head according to claim 6, characterized in that: The flushing joint (12) comprises a water inlet (121), a water inlet channel and a water outlet (122), and the water inlet (121) is connected to the water outlet (122) through the water inlet channel; The water inlet (121) opens on the outside of the flushing joint (12), and the water outlet (122) opens on the inside of the flushing joint (12).

8. An anchor cable trolley, comprising the anchor cable head according to any one of claims 1 to 7.

9. An anchor cable trolley construction method, using the anchor cable trolley as claimed in claim 8, characterized in that: The construction method comprises: Determine that there is no anchor cable (4) in the collecting pipe (21), and control the grouting pipe (5) to enter the operating mechanism (1) through the collecting pipe (21); After the grouting is completed, the grouting pipe (5) is controlled to exit the collecting pipe (21); Determine that there is no grouting pipe (5) in the collecting pipe (21), and control the anchor cable (4) to enter the operating mechanism (1) through the collecting pipe (21); After the anchor cable (4) is installed, the operating mechanism (1) is controlled to shear the anchor cable (4).

10. The anchor cable trolley construction method according to claim 9, characterized in that: After the grouting is completed, the grouting pipe (5) is controlled to withdraw from between the collecting pipes (21), and the flushing joint (12) is controlled to connect to the water source to flush the outer wall of the grouting pipe (5); During the installation of the anchor cable (4), the bending assembly (13) is controlled to bend the anchor cable (4).

Citation Information

Patent Citations

  • Drilling, anchoring and grouting combined construction device and anchor cable construction method

    CN110847168A

  • Drilling, grouting and anchoring integrated combined arm and anchor cable trolley

    CN118815519A

  • Grouting pipe cleaning device

    CN221086615U