Power grid operation safety management method and device, electronic equipment and storage medium
By acquiring and optimizing the execution plan of power grid tasks, the problems of data dispersion and information lag in the power grid operation safety management system are solved, and efficient and safe improvement of power grid operations are achieved.
Patent Information
- Application Number
- CN202411858636.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-17
- Publication Date
- 2025-04-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing power grid operation safety management system faces problems such as data dispersion and manual updates that cause information lag, data collection and integration time-consuming and error-prone, resulting in security decisions that may be based on outdated information and increase the risk of accidents.
By obtaining risk items and solutions when performing power grid tasks, collecting staff information, determining target personnel, sending execution plans, collecting job data, and optimizing execution plans based on the job data to improve job safety.
Estimate and reduce risks when performing power grid tasks, improve the safety and operational feasibility of power grid operations through real-time data collection and optimization of execution plans, and ensure the personal safety of staff.
Smart Images

Figure CN119809330A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid operation safety management, and in particular to a power grid operation safety management method, device, electronic equipment and storage medium. Background Art
[0002] With the continuous advancement of industrialization and urbanization, and the rapid development of the economy, the demand for electricity in various industries has shown a rigid growth trend. The power grid industry is becoming increasingly important for the development of human society. Safety management is an important topic that cannot be avoided in the development of the power grid industry. A good safety management system can help improve the efficiency of power grid work and reduce the risks of power grid operations.
[0003] Safety management data is often scattered in the record files of various departments or positions, and data updates rely on manual operations, which easily leads to information lags. When a comprehensive analysis of operational risks is required, the process of collecting and integrating these data is time-consuming and prone to errors. In the subsequent safety decision-making process, it is possible to make incorrect judgments on the safety status of the equipment based on outdated information, increasing the risk of accidents. Existing safety management systems usually face the following technical deficiencies: Safety management data is often scattered in the record files of various departments or positions, and data updates rely on manual operations, which easily leads to information lags. When a comprehensive analysis of operational risks is required, the process of collecting and integrating these data is time-consuming and prone to errors. In the subsequent safety decision-making process, it is possible to make incorrect judgments on the safety status of the equipment based on outdated information, increasing the risk of accidents. Summary of the invention
[0004] The present invention provides a power grid operation safety management method to solve the problem of power grid operation safety management.
[0005] In a first aspect, the present invention provides a method for managing power grid operation safety, comprising:
[0006] Obtain risk items and solutions when executing power grid tasks, and obtain implementation plans;
[0007] Collect personnel information of staff members;
[0008] Determine a target person who will perform the power grid task from the staff according to the personnel information;
[0009] Sending the execution plan to the target person so that the target person performs the power grid task;
[0010] Collecting operation data collected by the target personnel and sensors used by the target personnel in the process of performing the power grid task;
[0011] The execution plan corresponding to the power grid task is optimized based on the operation data.
[0012] In a second aspect, the present invention provides a power grid operation safety management device, comprising:
[0013] An execution plan acquisition module is used to acquire risk items and solutions when executing power grid tasks and obtain an execution plan;
[0014] A personnel information collection module is used to collect personnel information of staff members;
[0015] A target personnel determination module, used to determine the target personnel who will perform the power grid task from the staff according to the personnel information;
[0016] An execution plan sending module, used for sending the execution plan to the target person so that the target person can perform the power grid task;
[0017] An operation data collection module, used to collect the operation data collected by the target personnel and the sensors used by the target personnel in the process of performing the power grid task;
[0018] An execution plan optimization module is used to optimize the execution plan corresponding to the power grid task based on the operation data.
[0019] In a third aspect, the present invention provides an electronic device, the electronic device comprising:
[0020] at least one processor; and
[0021] a memory communicatively connected to the at least one processor; wherein,
[0022] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the power grid operation safety management method described in the first aspect of the present invention.
[0023] In a fourth aspect, the present invention provides a computer-readable storage medium storing computer instructions, wherein the computer instructions are used to enable a processor to implement the power grid operation safety management method described in the first aspect of the present invention when executed.
[0024] The power grid operation safety management method provided by the embodiment of the present invention obtains risk items and solutions when executing power grid tasks to obtain an execution plan; collects personnel information of staff; determines the target personnel who execute the power grid task from the staff according to the personnel information; sends the execution plan to the target personnel so that the target personnel can execute the power grid task; collects the operation data collected by the target personnel and the sensors used by the target personnel in the process of executing the power grid task; and optimizes the execution plan corresponding to the power grid task based on the operation data. Before executing the power grid task, the risk items are estimated and the corresponding solutions are given, which can avoid or greatly reduce the risks encountered by the staff when executing the power grid task, collect data when executing the power grid task, and optimize the execution plan corresponding to the power grid task based on the operation data, further improve the safety during operation, greatly improve the feasibility of safe operation of power grid tasks, and ensure the personal safety of the staff.
[0025] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0027] Figure 1 is a flow chart of a power grid operation safety management method provided by Embodiment 1 of the present invention;
[0028] Figure 2 It is a structural schematic diagram of a power grid operation safety management device provided by Embodiment 2 of the present invention;
[0029] Figure 3 It is a schematic diagram of the structure of an electronic device provided in Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0030] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0031] Embodiment 1
[0032] Figure 1 This is a flowchart of a power grid operation safety management method provided in the first embodiment of the present invention. This embodiment is applicable to the situation of power grid operation safety management. The method can be executed by a power grid operation safety management device. The power grid operation safety management device can be implemented in the form of hardware and / or software. The power grid operation safety management device can be configured in an electronic device. Figure 1 As shown, the power grid operation safety management method includes:
[0033] S101. Obtain risk items and solutions when executing power grid tasks, and obtain an execution plan.
[0034] Most of the grid operations are related to electricity, and some grid operations are under high voltage or high current conditions. Therefore, grid operations have certain risks. Before executing grid tasks, staff need to have a full understanding of the operation risks and corresponding solutions. Specifically, the risk items and solutions when executing grid tasks can be determined based on historical grid task data or staff execution experience. In an optional embodiment, the method for generating grid tasks also includes: summarizing equipment and facility information, the use of equipment and facilities includes a general number, generating grid tasks based on task reference information, and the task reference information specifically includes weather and equipment regular inspection needs; weather includes temperature, precipitation, air pressure, wind speed, etc. The risks of each type of equipment and facilities in different weather are different. For example, when encountering severe weather such as strong winds and ice, the transmission line may have an abnormal situation of excessive sag. When encountering high temperature and drought weather, there may also be a fire warning at the same time. The distribution station may have an abnormal situation of high temperature operation. The distribution station near the forest also has a fire risk. Therefore, the equipment type of the grid equipment to be inspected can be determined according to the meteorological disaster warning information, and the corresponding grid task can be generated.
[0035] In an optional embodiment, risk items and solutions when executing a power grid task are obtained to obtain an execution plan, including: decomposing the power grid task into multiple subtasks according to the operation information of the power grid task, the operation information includes the operation process and required operation tools; for each subtask, determining the execution information of the subtask, the execution information includes the execution target, execution process and execution time; performing risk assessment on the subtask based on the task data corresponding to the historical power grid tasks to obtain risk items; for each risk item, determining the corresponding solution; summarizing the execution information, risk items and solutions of each subtask into an execution plan.
[0036] S102. Collect personnel information of staff members.
[0037] Personnel information may include certificate information, employee ID, and department, etc. Certificate information may include personal ID card, education certificate, degree certificate, professional title certificate, professional qualification certificate, and award certificate.
[0038] S103. Determine target personnel who will perform power grid tasks from the staff according to the personnel information.
[0039] That is, target personnel who have the execution authority to perform power grid tasks are identified from among the staff.
[0040] Specifically, determining the target personnel for performing the power grid task from the staff according to the personnel information includes: obtaining the qualification information required for performing the power grid task; determining the target personnel for performing the power grid task from the staff according to the qualification information and the personnel information. That is, the personnel whose personnel information can match the qualification information can be used as the target personnel for performing the power grid task. When there are multiple target personnel to be selected, any one of them can be used as the final target personnel, or the final target personnel can be determined according to the availability of the target personnel.
[0041] S104: Send the execution plan to the target personnel so that the target personnel can perform the power grid task.
[0042] In an optional example, when sending the execution plan to the target person, it also includes: opening the operation authority for the target person's certificate information so that the target person can use the certificate information to perform operations; and opening the entry authority for the target person's work log.
[0043] In addition, in an optional example, a QR code can be generated for the personnel information of the target personnel and sent to the target personnel, including: reviewing the uploaded staff certificate information, generating independent QR codes for the staff who have passed the review, and synchronizing them to the mobile phone of the corresponding staff; classifying the staff information on the system, and opening the corresponding operation permissions according to their certificate information and work log content. The target personnel can use the QR code to call tools, or use the QR code as part of the operation permission information. When the target personnel are working, they need to enter the QR code, employee ID, etc. to obtain the operation permission. For example, some power grid equipment has access control or smart locks. To maintain the power grid equipment, it is necessary to open the access control or smart lock through the operation permission information, that is, to obtain the operation permission. By setting the operation permission, other staff can be prevented from entering dangerous areas or misoperating power grid equipment by mistake, which may cause personal danger or equipment loss.
[0044] In an optional example, when sending the execution plan to the target person, it also includes: opening the operation authority for the target person's certificate information so that the target person can use the certificate information to perform operations; and opening the entry authority for the target person's work log.
[0045] S105: Collecting operation data collected by the target personnel and sensors used by the target personnel during the execution of power grid tasks.
[0046] When performing power grid tasks, the target personnel can collect operation data by means of equipment input, text recording, etc. The target personnel can also use sensors to collect operation data. The sensors can be sensors of temperature, humidity, pressure, heart rate, current, voltage, etc. Sensors can also include temperature sensors, current sensors, and smoke sensors, which can collect equipment operation data and operating environment data in real time; when the equipment operation data and operating environment data exceed the safety threshold, the mobile terminal can be controlled to notify the staff performing the task. For the parts that can be completed by the system itself, including turning on the power-off mode and the fire extinguishing mode, the system will complete them by itself.
[0047] In an optional embodiment, when collecting the operation data collected by the target personnel and the sensors used by the target personnel in the process of performing the power grid task, it also includes: synchronously entering the operation data into the work log of the target personnel.
[0048] S106. Optimize the execution plan corresponding to the power grid task based on the operation data.
[0049] After obtaining the operation data, the current power grid task is completed. The operation data can represent the characteristic quantity of the risk item when executing the power grid task according to the execution plan. Therefore, the execution plan corresponding to the power grid task can be optimized based on the operation data, specifically including optimizing the solution corresponding to the risk item, and judging whether to increase the risk item based on the operation data.
[0050] For example, sensors can be temperature, humidity, pressure, heart rate and other sensors. The operational data collected by these sensors can characterize the physical condition of the target personnel when performing power grid tasks. Based on these data, it can be determined whether the current solution can ensure the personal safety of the target personnel.
[0051] The sensor can also be a smoke sensor, a current sensor, a voltage sensor, etc. Based on these data, it can be determined whether the current risk item has been detected in place and whether a new risk item needs to be added.
[0052] The power grid operation safety management method provided by the embodiment of the present invention obtains risk items and solutions when executing power grid tasks to obtain an execution plan; collects personnel information of staff; determines the target personnel who execute the power grid task from the staff according to the personnel information; sends the execution plan to the target personnel so that the target personnel can execute the power grid task; collects the operation data collected by the target personnel and the sensors used by the target personnel in the process of executing the power grid task; and optimizes the execution plan corresponding to the power grid task based on the operation data. Before executing the power grid task, the risk items are estimated and the corresponding solutions are given, which can avoid or greatly reduce the risks encountered by the staff when executing the power grid task, collect data when executing the power grid task, and optimize the execution plan corresponding to the power grid task based on the operation data, further improve the safety during operation, greatly improve the feasibility of safe operation of power grid operation, and ensure the personal safety of the staff.
[0053] In an optional embodiment, the sensor includes a sensor configured on the protective equipment, and the power grid operation safety management method also includes: detecting the wearing status and use of the protective equipment by the target personnel through the sensor configured on the protective equipment; if the wearing status is abnormal or the use is improper, an alarm is issued through the communication terminal of the target personnel.
[0054] For example, the target person associates with the sensor in the protective equipment by scanning the QR code. After the system recognizes the target person's QR code information, it monitors the wearing status and use of the protective equipment on the staff through the built-in sensor of the protective equipment. If the protective equipment is not worn or worn improperly, an alarm is issued through the staff's mobile phone to remind the staff to correct it. The staff's physiological data can also be monitored through the smart bracelet worn by the staff, including heart rate and blood pressure. Once the physical condition of the staff is abnormal, the mobile terminal notifies nearby staff to come and check the situation.
[0055] In an optional embodiment, the power grid operation safety management method further includes: generating safe operation cases for power grid tasks based on operation data for staff to review. With the update of laws and regulations, changes in industry standards and improvements in internal production processes of enterprises, the safety management system needs to be adjusted in a timely manner. However, traditional systems are slow to respond in this regard, resulting in companies not complying with new regulations in actual operations and facing compliance risks. Therefore, it is also possible to store laws and regulations related to power grid operations, industry knowledge, and typical operation cases, update operation cases regularly, perform intelligent analysis on the obtained operation data, and screen and store safe operation cases for learning.
[0056] Traditional safety training is mainly centralized classroom teaching or simple on-site demonstrations, and the training content and methods lack pertinence. Moreover, the assessment method after training is relatively simple, which cannot effectively test whether employees have truly mastered safety knowledge and skills. Based on this problem, it is also possible to intelligently analyze safety operation cases, sort out corresponding training materials and test question banks, and open them to staff for learning and use. Among them, training materials and test question banks can be provided in a targeted manner based on the personal information of the staff to enhance the safety operation awareness of the staff.
[0057] Embodiment 2
[0058] Figure 2 This is a schematic diagram of the structure of a power grid operation safety management device provided in Embodiment 2 of the present invention. Figure 2 As shown, the power grid operation safety management device includes:
[0059] An execution plan acquisition module 201 is used to acquire risk items and solutions when executing power grid tasks and obtain an execution plan;
[0060] A personnel information collection module 202 is used to collect personnel information of staff members;
[0061] A target personnel determination module 203 is used to determine the target personnel who will perform the power grid task from the staff according to the personnel information;
[0062] An execution plan sending module 204 is used to send the execution plan to the target person so that the target person can perform the power grid task;
[0063] The operation data collection module 205 is used to collect the operation data collected by the target personnel and the sensors used by the target personnel in the process of performing the power grid task;
[0064] The execution plan optimization module 206 is used to optimize the execution plan corresponding to the power grid task based on the operation data.
[0065] Optionally, the execution plan acquisition module 201 includes:
[0066] A task decomposition submodule, used to decompose the power grid operation into multiple subtasks according to the operation information of the power grid operation, wherein the operation information includes the operation process and the required operation tools;
[0067] An execution information acquisition submodule, for determining the execution information of each subtask, wherein the execution information includes an execution target, an execution process and an execution time;
[0068] A risk item acquisition submodule, used to perform risk assessment on the subtask based on task data corresponding to historical power grid operations to obtain risk items;
[0069] A solution acquisition submodule is used to determine a corresponding solution for each of the risk items;
[0070] The execution plan summarizing submodule is used to summarize the execution information, risk items, and solutions of each subtask into an execution plan.
[0071] Optionally, the target person determination module 203 includes:
[0072] A qualification information determination submodule, used to obtain the qualification information required to perform the power grid operation;
[0073] The target personnel determination submodule is used to determine the target personnel who performs the power grid operation from among the staff based on the qualification information and the personnel information.
[0074] Optionally, the execution plan sending module 204 includes:
[0075] The operation authority opening submodule is used to open the operation authority to the certificate information of the target person, so that the target person can use the certificate information to perform the operation;
[0076] The entry permission opening submodule is used to open the entry permission to the work log of the target personnel.
[0077] Optionally, the power grid operation safety management device further includes:
[0078] The data synchronization module is used to collect the operation data collected by the target personnel and the sensors used by the target personnel during the execution of the power grid operation, and synchronously enter the operation data into the work log of the target personnel.
[0079] Optionally, the sensor includes a sensor configured on a protective device, and the power grid operation safety management device further includes:
[0080] A safety detection module, used to detect the wearing status and use of the protective equipment by the target person through sensors configured on the protective equipment;
[0081] The alarm module is used to send out an alarm through the communication terminal of the target person if the wearing state is abnormal or the use is improper.
[0082] Optionally, the power grid operation safety management device further includes:
[0083] A safety operation case generation module is used to generate a safety operation case of the power grid operation based on the operation data for staff to review.
[0084] In addition, the power grid operation safety management device also includes:
[0085] The basic file collection module is used to collect the certificate information required before the power grid operation is carried out to ensure that the staff carrying out the power grid operation meets the main requirements of the power grid operation; the certificate information includes personal ID card, education certificate, degree certificate, professional title certificate, professional qualification certificate, and award certificate;
[0086] The equipment and facility management module is used for information collection, management and maintenance of equipment and facilities to ensure the safe operation of equipment and facilities and reduce the risk of power grid operations; the equipment and facilities include electrical machinery and equipment, instruments and meters, and accessories;
[0087] The education and training module is used to store laws and regulations related to power grid operations, training and examination materials, and to store power grid operation cases for study by staff.
[0088] The operation risk assistance solution module is used to assist the main body of power grid operation to solve the problem after the risk occurs, so as to return the operation environment to normal or minimize the loss;
[0089] The task allocation and data collection module is used to allocate the tasks sent by the equipment and facility management module and the operation risk prevention module to the corresponding staff, collect the power grid operation data generated by the tasks, and feed back the corresponding data to the corresponding module.
[0090] The power grid operation safety management device provided in the embodiment of the present invention can execute the power grid operation safety management method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0091] Embodiment 3
[0092] Figure 3 A schematic diagram of the structure of an electronic device 40 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0093] like Figure 3 As shown, the electronic device 40 includes at least one processor 41, and a memory connected to the at least one processor 41, such as a read-only memory (ROM) 42, a random access memory (RAM) 43, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 41 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 42 or the computer program loaded from the storage unit 48 to the random access memory (RAM) 43. In the RAM 43, various programs and data required for the operation of the electronic device 40 can also be stored. The processor 41, the ROM 42, and the RAM 43 are connected to each other through a bus 44. An input / output (I / O) interface 45 is also connected to the bus 44.
[0094] A number of components in the electronic device 40 are connected to the I / O interface 45, including: an input unit 46, such as a keyboard, a mouse, etc.; an output unit 47, such as various types of displays, speakers, etc.; a storage unit 48, such as a disk, an optical disk, etc.; and a communication unit 49, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 49 allows the electronic device 40 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0095] The processor 41 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 41 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 41 executes the various methods and processes described above, such as a power grid operation safety management method.
[0096] In some embodiments, the power grid operation safety management method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 48. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 40 via the ROM 42 and / or the communication unit 49. When the computer program is loaded into the RAM 43 and executed by the processor 41, one or more steps of the power grid operation safety management method described above may be performed. Alternatively, in other embodiments, the processor 41 may be configured to execute the power grid task safety management method in any other appropriate manner (e.g., by means of firmware).
[0097] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0098] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0099] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0100] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0101] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0102] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0103] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0104] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A power grid operation safety management method, characterized in that: include: Obtain risk items and solutions when executing power grid tasks, and obtain implementation plans; Collect personnel information of staff members; Determine a target person who will perform the power grid task from the staff according to the personnel information; Sending the execution plan to the target person so that the target person performs the power grid task; Collecting operation data collected by the target personnel and sensors used by the target personnel during the execution of the power grid task; The execution plan corresponding to the power grid task is optimized based on the operation data.
2. The power grid operation safety management method according to claim 1, characterized in that: The step of obtaining risk items and solutions when executing power grid tasks and obtaining an execution plan includes: Decomposing the power grid task into a plurality of subtasks according to the operation information of the power grid task, wherein the operation information includes the operation process and the required operation tools; For each of the subtasks, determining execution information of the subtask, the execution information including an execution target, an execution process and an execution time; Performing risk assessment on the subtask based on task data corresponding to historical power grid tasks to obtain risk items; Determine a corresponding solution for each of the risk items; The execution information, risk items, and solutions of each subtask are summarized into an execution plan.
3. The power grid operation safety management method according to claim 1, characterized in that: Determining a target person who performs the power grid task from among the staff according to the personnel information includes: obtaining qualification information required to perform said grid task; A target person who is to perform the power grid task is determined from among the staff based on the qualification information and the personnel information.
4. The power grid operation safety management method according to claim 1, characterized in that: When sending the execution plan to the target person, it also includes: Opening the operating authority to the target person's certificate information so that the target person can use the certificate information to perform operations; The target personnel's work log entry permission is opened.
5. The power grid operation safety management method according to claim 4, characterized in that: When collecting the operation data collected by the target personnel and the sensors used by the target personnel in the process of performing the power grid task, it also includes: The operation data is synchronously entered into the work log of the target personnel.
6. The power grid operation safety management method according to any one of claims 1 to 5, characterized in that: The sensor includes a sensor configured on a protective device, and the method further includes: Detecting the wearing status and usage of the protective equipment by the target person through sensors configured on the protective equipment; If the wearing state is abnormal or the usage is improper, an alarm will be issued through the communication terminal of the target person.
7. The power grid operation safety management method according to any one of claims 1 to 5, characterized in that: Also includes: A safety operation case for the power grid task is generated based on the operation data for staff to review.
8. A power grid operation safety management device, characterized in that: include: An execution plan acquisition module is used to acquire risk items and solutions when executing power grid tasks and obtain an execution plan; A personnel information collection module is used to collect personnel information of staff members; A target personnel determination module, used to determine the target personnel who will perform the power grid task from the staff according to the personnel information; An execution plan sending module, used for sending the execution plan to the target person so that the target person can perform the power grid task; An operation data collection module, used to collect the operation data collected by the target personnel and the sensors used by the target personnel in the process of performing the power grid task; An execution plan optimization module is used to optimize the execution plan corresponding to the power grid task based on the operation data.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the power grid operation safety management method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the power grid operation safety management method according to any one of claims 1 to 7 when executed.
Citation Information
Patent Citations
Power device operation, maintenance and monitoring method
CN108960362A
Industrial field remote data monitoring and analysis system
CN113219876A
Field operation personnel safety management and control method and device and storage medium
CN113627897A
Comprehensive management and control method and device for field operation safety, and storage medium
CN113673959A
Safety protection device with comprehensive safety monitoring function and protection method
CN113877092A