All-meat secant pile and construction method
By adopting a fully choked pile structure with positioning piles, biting piles and drill rod limiting devices, the problems of cumbersome processes, waste of materials and insufficient biting stiffness in the existing construction technology are solved, and more efficient and accurate construction results are achieved.
Patent Information
- Application Number
- CN202411768282.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-04
- Publication Date
- 2025-04-15
AI Technical Summary
The existing construction technology of all-meat bite piles has problems such as cumbersome processes, waste of materials, and insufficient bite stiffness, which limits its wide application in the industry.
The fully occluded pile structure is adopted that includes positioning piles with notches on both sides, multiple notches on one side and drill rod limiting devices. Accurate positioning and vertical construction is achieved by filling the partition plate and drill rod limiting sleeve, simplifying the process and improving construction efficiency.
It effectively solves the problems of cumbersome construction processes, waste of materials and insufficient bite capacity, reduces construction costs, and improves construction efficiency and precision control.
Smart Images

Figure CN119824892A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pile foundation construction, and in particular to a full-interlocking pile and a construction method. Background Art
[0002] The interlocking pile is a kind of enclosure structure with good water-stopping and supporting functions. It has the advantages of flexible layout, small hole depth limit, high construction efficiency, small impact on the surrounding environment and low construction cost. It is widely used in foundation engineering of bridges, building construction and underground structures. There are three main types of interlocking piles: plain-plain interlocking, meat-vegetarian interlocking and meat-meat interlocking. Compared with the former two, meat-meat interlocking piles have better water-stopping and supporting capabilities, and are more suitable for the design and construction of foundation pits with poor geological conditions, deep foundation pits and greater horizontal forces. However, the complex construction process, high construction cost and difficulty in precision control of meat-meat interlocking piles restrict the wide application of meat-meat interlocking piles in the industry.
[0003] The general construction method of meat-vegetable interlocking piles is: after the guide wall construction is completed, construct the A (vegetable) piles first, and then construct the B (vegetable) piles. The construction of the B piles is completed after the initial setting of the A pile concrete and before the final setting. When constructing the B piles, the concrete of the intersecting parts of the adjacent A piles needs to be cut off to achieve interlocking.
[0004] The invention with Chinese patent publication number CN111519611A discloses a method for constructing interlocking piles that can laterally connect steel cages. Connectors that are vertically plugged into adjacent steel cages are arranged in two A-type pile holes to enhance the lateral stability between adjacent concrete piles.
[0005] The invention patent with Chinese patent publication number CN103266600 discloses an interlocking pile of a full-reinforced pile and a construction method thereof. A full-revolving drilling rig is used to drill holes, a square steel cage is added to the plain pile, and PVC pipes are fixed on both sides of the square steel cage. During the construction of the circular reinforced concrete, a part of the PVC pipe is cut off to connect the circular steel cage concrete pile and the square steel cage concrete pile together, thereby improving the support capacity of the entire interlocking pile.
[0006] The above invention technology realizes the construction of full-interlocking piles by setting connecting parts or square steel cages between two circular steel cage pile bodies and then casting the pile body. The existing full-interlocking pile construction technology has the characteristics of material waste, insufficient interlocking stiffness, and complicated procedures. It is urgent to innovate a full-interlocking pile and construction method that is easy to implement in engineering. Summary of the invention
[0007] On one hand, the present invention provides a full-grain bite pile, which can effectively solve the problems of cumbersome construction process, waste of materials and insufficient bite capacity of the full-grain bite pile. On the other hand, the present invention provides a construction method of the full-grain bite pile.
[0008] The first aspect of the present invention provides a full-body interlocking pile, including a positioning pile with notches on both sides, a plurality of interlocking piles with notches on one side, a joint pile and a drill rod limiting device. A plurality of the interlocking piles are provided at both ends of the positioning pile, and the interlocking piles at the ends are connected through the joint piles to realize that the positioning pile, the plurality of the interlocking piles and the joint pile form a closed structure. The drill rod limiting device includes a drill rod limiting sleeve and a filling partition, and the filling partition is respectively arranged on the positioning pile and the interlocking pile. The drill rod limiting sleeve is used to be sleeved on the drill rod of the drilling rig, and the shape of the drill rod limiting sleeve is the same as the shape of the filling partition.
[0009] The full-meat bite pile, preferably, the filling partition is provided with a positioning protrusion and a positioning arc plate, and the positioning protrusion is arranged on the positioning arc plate.
[0010] The fully-engaging pile, preferably, the drill rod limiting sleeve comprises a drill rod collar, a limiting clamp and a limiting protrusion, the drill rod collar is provided with the limiting clamp, the limiting clamp is provided with the limiting protrusion, the drill rod collar is sleeved on the drill rod of the drilling rig, the limiting clamp has the same structure as the positioning arc plate, and the limiting protrusion has the same structure as the positioning protrusion.
[0011] The second aspect of the present invention provides a full-body bite pile, including a positioning pile with notches on both sides, a plurality of bite piles with notches on one side and a drill rod limiting device, wherein the plurality of bite piles are arranged in sequence along the center line of the positioning pile to achieve the arrangement of the positioning pile and the plurality of bite piles along a straight line, the drill rod limiting device includes a drill rod limiting sleeve and a filling partition, the filling partition is respectively arranged on the positioning pile and the bite pile, the drill rod limiting sleeve is used to be sleeved on the drill rod of the drilling rig, and the shape of the drill rod limiting sleeve is the same as the shape of the filling partition.
[0012] The full-meat bite pile is preferably provided with a positioning protrusion and a positioning arc plate on the filling partition, and the positioning protrusion is arranged on the positioning arc plate.
[0013] The fully-engaging pile, preferably, the drill rod limiting sleeve comprises a drill rod collar, a limiting clamp and a limiting protrusion, the drill rod collar is provided with the limiting clamp, the limiting clamp is provided with the limiting protrusion, the drill rod collar is sleeved on the drill rod of the drilling rig, the limiting clamp has the same structure as the positioning arc plate, and the limiting protrusion has the same structure as the positioning protrusion.
[0014] The third aspect of the present invention provides a construction method of a full-cage occlusal pile, comprising the full-cage occlusal pile, and the construction method specifically comprises the following steps:
[0015] Surveying and laying out, guiding wall construction;
[0016] The positioning piles are constructed by full sleeve and full rotary drilling rig;
[0017] Installing a filling partition on the pile hole of the positioning pile, hanging the steel cage of the positioning pile, pouring concrete, and after the concrete pouring is completed and finally set, pulling out the filling partition to form a gap in the shape of the filling partition;
[0018] A drill rod limiting sleeve is installed on the rotary drilling rig, and positioning is achieved by using the gap between the drill rod limiting sleeve and the filling partition shape, so that the verticality is ensured when the rotary drilling rig is used to construct the occlusal pile drilling operation;
[0019] Install a filling partition on the pile hole of the occlusal pile, hang the steel cage of the occlusal pile, pour concrete, and after the concrete pouring is completed and finally set, pull out the filling partition to form a gap in the shape of the filling partition, use the rotary drilling rig to continue the occlusal pile drilling operation and ensure the verticality during installation;
[0020] Repeat the installation of multiple interlocking piles until the interlocking piles at the end need to be connected, and then use the rotary drilling rig to construct the closure piles. After the drilling is completed, the holes are cleaned and the steel cage of the closure piles is hoisted, and concrete is poured. After the concrete is poured and finally set, the gap in the shape of the filling partition is formed.
[0021] A fourth aspect of the present invention provides a construction method of a full-cage occlusal pile, comprising the full-cage occlusal pile, and the construction method specifically comprises the following steps:
[0022] Surveying and laying out, guiding wall construction;
[0023] The positioning piles are constructed by full sleeve and full rotary drilling rig;
[0024] Installing a filling partition on the pile hole of the positioning pile, hanging the steel cage of the positioning pile, pouring concrete, and after the concrete pouring is completed and finally set, pulling out the filling partition to form a gap in the shape of the filling partition;
[0025] A drill rod limiting sleeve is installed on the rotary drilling rig, and positioning is achieved by using the gap between the drill rod limiting sleeve and the filling partition shape, so that the rotary drilling rig maintains verticality during the construction of the bite pile drilling operation;
[0026] Install a filling partition on the pile hole of the interlocking pile, hang the steel cage of the interlocking pile, pour concrete, and after the concrete is poured and finally set, pull out the filling partition to form a gap in the shape of the filling partition, use the rotary drilling rig to continue to construct the interlocking pile and maintain the verticality during installation until all the interlocking piles are installed.
[0027] The beneficial effects are:
[0028] The bite pile construction method provided by the present invention adopts a full-sleeve full-rotation drilling rig only when positioning the positioning pile, and the bite pile and the joint pile can be constructed by a rotary drilling rig, and the construction cost is low.
[0029] The filling partition provided by the present invention can be circulated and utilized, and effectively solves the problems of concrete waste and pile cutting causing quality defects of the pile body.
[0030] The filling partition and the drill rod limiting sleeve provided by the present invention can realize the precision control of the drilling process of the rotary drilling rig, and effectively solve the problem that the interlocking pile is easy to deviate during the drilling process of the rotary drilling rig.
[0031] The occlusal pile provided by the present invention has a simple structure, is convenient to construct and has a good precision control effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1-1 It is the structural schematic diagram of the positioning pile;
[0033] Figure 1-2 It is a schematic diagram of the structure of the occlusal pile;
[0034] Figure 1-3 This is a structural diagram of the closure pile;
[0035] Figure 2-1 It is a schematic diagram of the structure of the positioning steel cage;
[0036] Figure 2-2 It is a structural schematic diagram of the interlocking steel cage;
[0037] Figure 2-3 It is a structural schematic diagram of the joint steel cage;
[0038] Figure 3 It is a schematic diagram of the occlusal pile guide wall of the present invention;
[0039] Figure 4 is a schematic diagram of the structure of the filling partition;
[0040] Figure 5 It is a structural schematic diagram of a drill pipe limiting casing;
[0041] Figure 6 is a layout diagram of the occlusal pile structure in Example 1;
[0042] Figure 7 It is a schematic diagram of the construction process of the positioning pile in Example 1;
[0043] Figure 8-1 Schematic diagram of the construction process of the first occlusal pile in Example 1;
[0044] Figure 8-2 Schematic diagram of the construction process of the second interlocking pile in Example 1;
[0045] Fig. 9 The schematic diagram of the construction process of the closure pile in Example 1 is as follows;
[0046] Fig.10 This is a schematic diagram of the occlusal pile forming of C in Example 1;
[0047] Fig.11 This is a schematic diagram of the occlusal pile forming of C in Example 2;
[0048] Fig.12 This is a layout diagram of the interlocking pile structure of Example 3.
[0049] In the figure:
[0050] 1. Positioning pile; 2-1. First occlusal pile; 2-2. Second occlusal pile;
[0051] 2-3, N-1th occlusal pile; 2-4, Nth occlusal pile;
[0052] 3. Joint pile; 4. Steel cage of positioning pile; 5. Steel cage of interlocking pile; 6. Steel cage of joint pile;
[0053] 7. Guide wall; 8. Filling partition; 8-1. Positioning arc plate; 8-2. Positioning protrusion;
[0054] 9. Drill pipe limiting casing; 9-1. Drill pipe collar; 9-2. Limiting clamping ring; 9-3. Limiting protrusion. DETAILED DESCRIPTION
[0055] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0056] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "setting", and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0057] Example 1
[0058] like Figure 1-1 , Figure 1-2 , Figure 1-3 , Figure 2-1 , Figure 2-2 , Figure 2-3 and Figure 6 As shown, a full-mesh interlocking pile comprises a positioning pile 1 with notches on both sides, a plurality of first interlocking piles 2-1, second interlocking piles 2-2 ... Nth interlocking piles 2-4 with notches on one side, a joint pile 3 and a drill rod limiting device, wherein the first interlocking pile 2-1, the second interlocking pile 2-2 ... Nth interlocking pile 2-4 are provided at both ends of the positioning pile 1, and the Nth interlocking pile 2-4 at the end is connected by the joint pile 3 to realize that the positioning pile 1, the plurality of the interlocking piles and the joint pile 3 form a closed structure, the drill rod limiting device comprises a drill rod limiting sleeve 9 and a filling partition 8, the filling partition 8 is respectively arranged on the positioning pile 1 and the interlocking pile, and the drill rod of the drilling rig is provided with a drill rod limiting sleeve 9, and the shape of the drill rod limiting sleeve 9 is the same as that of the filling partition 8.
[0059] Among them, the positioning pile 1, the first interlocking pile 2-1, the second interlocking pile 2-2...the Nth interlocking pile 2-4, and the closure pile 3 are respectively reinforced piles, the steel cage 4 of the positioning pile is double-crescent-shaped, the steel cage 5 of the interlocking pile is single-crescent-shaped, and the pile steel cage of the closure pile is circular.
[0060] like Figure 4 and Figure 5 As shown, a positioning protrusion 8-2 and a positioning arc plate 8-1 are provided on the filling partition 8, and the positioning protrusion 8-2 is arranged on the positioning arc plate 8-1.
[0061] The drill pipe limiting sleeve 9 includes a drill pipe collar 9-1, a limiting clamping ring 9-2 and a limiting protrusion 9-3. The drill pipe collar 9-1 is provided with a limiting clamping ring 9-2, and the limiting clamping ring 9-2 is provided with a limiting protrusion 9-3. The drill pipe collar 9-1 is sleeved on the drill pipe of the drilling rig, the structure of the limiting clamping ring 9-2 is the same as the positioning arc plate 8-1, and the structure of the limiting protrusion 9-3 is the same as the positioning protrusion 8-2.
[0062] Among them, the positioning arc plate 8-1, the positioning protrusion 8-2, the drill pipe collar 9-1, the limiting clamp ring 9-2 and the limiting protrusion 9-3 are all made of steel plates. The positioning arc plate 8-1 and the positioning protrusion 8-2 are formed into one by welding, and the drill pipe collar 9-1, the limiting clamp ring 9-2 and the limiting protrusion 9-3 are formed into one by welding.
[0063] Example 2
[0064] like Figure 3 , Figure 7 , Figure 8-1 , Figure 8-2 , Fig. 9 and Fig.10 As shown, a construction method of a full-cage bite pile includes a full-cage bite pile as described in Example 1, specifically comprising the following steps:
[0065] S1: Survey and lay out, guide wall 7 construction.
[0066] S2: Use full sleeve and full rotary drilling rig to construct positioning piles.
[0067] Specifically: the full sleeve and full rotary drilling rig are put in place, and positioning pile 1 is constructed. During the process, the verticality of positioning pile 1 is strictly controlled to ensure that the deviation is no more than 2‰ and no more than 500mm.
[0068] S3: Install the filling partition 8 on the pile hole of the positioning pile, hang the steel cage 4 of the positioning pile, pour concrete, and pull out the filling partition 8 after the concrete pouring is completed and finally set, so as to form a gap in the shape of the filling partition.
[0069] Specifically, after the hole is formed and qualified, the hole is cleaned, the steel cage 4 and the filling partition 8 of the positioning pile are lowered, and concrete is poured. After the concrete pouring is completed and the final setting, the filling partition 8 is pulled out to form a gap in the shape of the filling partition.
[0070] The pebble layer in the positioning pile 1, the first interlocking pile 2-1, the second interlocking pile 2-2, ... the Nth interlocking pile 2-4 and the closure pile 3 is grouted by double-liquid grouting technology, and the grouting sequence should be from the outside to the middle to ensure the grouting effect.
[0071] S4: Install a drill rod limiting sleeve 9 on the rotary drilling rig, and use the gap between the drill rod limiting sleeve 9 and the filling partition 8 of step S3 to achieve positioning, so that the rotary drilling rig maintains verticality during the construction of the interlocking pile drilling operation.
[0072] Specifically, the rotary drilling rig is put in place, a drill rod limiting sleeve 9 is installed at the end of the drill rod of the rotary drilling rig, the drill rod limiting sleeve 9 is engaged with the gap in the shape of the filling partition of the constructed positioning pile 1, and the first interlocking pile 2-1 is constructed.
[0073] S5: Install the filling partition 8 on the pile hole of the interlocking pile, hang the steel cage 5 of the interlocking pile, pour concrete, and pull out the filling partition 8 after the concrete pouring is completed and finally set to form a gap in the shape of the filling partition 8, use the rotary drilling rig to continue to construct the interlocking pile and maintain the verticality during installation.
[0074] Among them, Figure 8-1 As shown, step S4 is the step of installing the first engagement pile 2-1. Figure 8-2 As shown, step S5 is to install the second occlusal pile 2-2, and step S5 is repeated until the third occlusal pile...the N-1th occlusal pile 2-3 and the Nth occlusal pile 2-4 are installed.
[0075] S6: Repeat the installation of multiple interlocking piles until the interlocking piles at the end need to be connected, and use the rotary drilling rig to construct the closure piles. After the drilling is completed, the holes are cleaned and the steel cage of the closure piles is suspended, and concrete is poured. After the concrete is poured and finally set, the gap in the shape of the filling partition is formed.
[0076] Specifically, the rotary drilling rig is put in place, the drill rod limiting casing 9 is engaged with the gap in the shape of the filling partition 8 of the constructed positioning pile, the closure pile 3 is constructed, the hole is cleaned after the hole is qualified, the pile reinforcement cage 6 of the closure pile is lowered, concrete is poured, and the construction of the closure pile 3 is completed.
[0077] Example 2
[0078] like Fig.11 As shown, different from Example 1, there are two positioning piles 1 and two closure piles 3, the two positioning piles 1 are positioned separately, and then a plurality of interlocking piles are arranged at both ends of the two positioning piles 1, and the adjacent interlocking piles are connected by the two closure piles 3.
[0079] Example 3
[0080] like Figure 1-1 , Figure 1-2 , Figure 2-1 , Figure 2-2 and Fig.12 As shown, a full-mesh bite pile includes a positioning pile 1 with notches on both sides, a plurality of first bite piles 2-1, a second bite pile 2-2...Nth bite piles 2-4 with notches on one side and a drill rod limiting device. A plurality of the bite piles are arranged in sequence along the center line of the positioning pile 1 to achieve that the positioning pile 1 and the first bite pile 2-1, the second bite pile 2-2...Nth bite pile 2-4 are arranged in a straight line. The drill rod limiting device includes a drill rod limiting sleeve 9 and a filling partition 8. The filling partition 8 is respectively arranged on the positioning pile 1 and the bite pile. A drill rod limiting sleeve 9 is provided on the drill rod of the drilling rig. The shape of the drill rod limiting sleeve 9 is the same as that of the filling partition 8.
[0081] like Figure 4 and Figure 5 As shown, a positioning protrusion 8-2 and a positioning arc plate 8-1 are provided on the filling partition 8, and the positioning protrusion 8-2 is arranged on the positioning arc plate 8-1.
[0082] The drill pipe limiting sleeve 9 includes a drill pipe collar 9-1, a limiting clamping ring 9-2 and a limiting protrusion 9-3. The drill pipe collar 9-1 is provided with a limiting clamping ring 9-2, and the limiting clamping ring 9-2 is provided with a limiting protrusion 9-3. The drill pipe collar 9-1 is sleeved on the drill pipe of the drilling rig, the structure of the limiting clamping ring 9-2 is the same as the positioning arc plate 8-1, and the structure of the limiting protrusion 9-3 is the same as the positioning protrusion 8-2.
[0083] Example 4
[0084] like Fig.12 As shown, a construction method of a full-cage bite pile includes a full-cage bite pile as shown in Example 3, specifically the following steps:
[0085] S1: Survey and lay out, guide wall 7 construction.
[0086] S2: Use full sleeve and full rotary drilling rig to construct positioning piles.
[0087] Specifically: the full sleeve and full rotary drilling rig are put in place, and positioning pile 1 is constructed. During the process, the verticality of positioning pile 1 is strictly controlled to ensure that the deviation is no more than 2‰ and no more than 500mm.
[0088] S3: Install the filling partition 8 on the pile hole of the positioning pile, hang the steel cage 4 of the positioning pile, pour concrete, and pull out the filling partition after the concrete pouring is completed and finally set to form a gap in the shape of the filling partition.
[0089] Specifically, after the hole is formed and qualified, the hole is cleaned, the steel cage 4 and the filling partition 8 of the positioning pile are lowered, and concrete is poured. After the concrete pouring is completed and the final setting, the filling partition 8 is pulled out to form a gap in the shape of the filling partition.
[0090] S4: Install a drill rod limiting sleeve on the rotary drilling rig, and use the drill rod limiting sleeve and the space in the shape of the partition filled in step S3 to achieve positioning, so that the rotary drilling rig maintains verticality during the construction of the interlocking pile drilling operation.
[0091] Specifically, the rotary drilling rig is put in place, a drill rod limiting sleeve 9 is installed at the end of the drill rod of the rotary drilling rig, and the drill rod limiting sleeve 9 is engaged with the gap in the shape of the partition filled in step S3 to construct the first interlocking pile 2-1.
[0092] S5: Install the filling partition 8 on the pile hole of the interlocking pile, hang the steel cage 5 of the interlocking pile, pour concrete, and pull out the filling partition 8 after the concrete is poured and finally set to form a gap in the shape of the filling partition 8, use the rotary drilling rig to continue to construct the interlocking pile and maintain the verticality during installation until all the interlocking piles are installed.
[0093] Wherein, step S4 is the step of installing the first engagement pile 2-1. Figure 8-2 As shown, step S5 is to install the second occlusal pile 2-2, and step S5 is repeated until the third occlusal pile...the N-1th occlusal pile 2-3 and the Nth occlusal pile 2-4 are installed.
[0094] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A full-vegetarian bite pile, characterized in that: It includes positioning piles with notches on both sides, multiple bite piles with notches on one side, joint piles and drill rod limiting devices. Multiple bite piles are provided at both ends of the positioning piles. The bite piles at the ends are connected through the joint piles to realize that the positioning piles, multiple bite piles and the joint piles form a closed structure. The drill rod limiting device includes a drill rod limiting sleeve and a filling partition. The filling partition is respectively arranged on the positioning pile and the bite pile. The drill rod limiting sleeve is used to be sleeved on the drill rod of the drilling rig. The shape of the drill rod limiting sleeve is the same as that of the filling partition.
2. The full-vegetarian bite pile according to claim 1 or 2, characterized in that: The filling partition is provided with a positioning protrusion and a positioning arc plate, and the positioning protrusion is arranged on the positioning arc plate.
3. The full-vegetarian bite pile according to claim 2, characterized in that: The drill rod limiting sleeve comprises a drill rod collar, a limiting clamp and a limiting protrusion. The drill rod collar is provided with the limiting clamp, and the limiting clamp is provided with the limiting protrusion. The drill rod collar is sleeved on the drill rod of the drilling rig, the limiting clamp has the same structure as the positioning arc plate, and the limiting protrusion has the same structure as the positioning protrusion.
4. A full-vegetarian bite pile, characterized in that: It includes positioning piles with notches on both sides, multiple bite piles with notches on one side and a drill rod limiting device. The multiple bite piles are arranged in sequence along the center line of the positioning piles to achieve the arrangement of the positioning piles and the multiple bite piles in a straight line. The drill rod limiting device includes a drill rod limiting sleeve and a filling partition. The filling partition is respectively arranged on the positioning pile and the bite pile. The drill rod limiting sleeve is used to be sleeved on the drill rod of the drilling rig, and the shape of the drill rod limiting sleeve is the same as the shape of the filling partition.
5. The full-body bite pile according to claim 4, characterized in that: The filling partition is provided with a positioning protrusion and a positioning arc plate, and the positioning protrusion is arranged on the positioning arc plate.
6. The full-vegetarian bite pile according to claim 5, characterized in that: The drill rod limiting sleeve comprises a drill rod collar, a limiting clamp and a limiting protrusion. The drill rod collar is provided with the limiting clamp, and the limiting clamp is provided with the limiting protrusion. The drill rod collar is sleeved on the drill rod of the drilling rig, the limiting clamp has the same structure as the positioning arc plate, and the limiting protrusion has the same structure as the positioning protrusion.
7. A construction method of a full-grain bite pile, characterized in that: The construction method comprises the following steps: Surveying and laying out, guiding wall construction; The positioning piles are constructed by full sleeve and full rotary drilling rig; Installing a filling partition on the pile hole of the positioning pile, hanging the steel cage of the positioning pile, pouring concrete, and after the concrete pouring is completed and finally set, pulling out the filling partition to form a gap in the shape of the filling partition; A drill rod limiting sleeve is installed on the rotary drilling rig, and positioning is achieved by using the gap between the drill rod limiting sleeve and the filling partition shape, so that the verticality is ensured when the rotary drilling rig is used to construct the occlusal pile drilling operation; Install a filling partition on the pile hole of the occlusal pile, hang the steel cage of the occlusal pile, pour concrete, and after the concrete pouring is completed and finally set, pull out the filling partition to form a gap in the shape of the filling partition, use the rotary drilling rig to continue the occlusal pile drilling operation and ensure the verticality during installation; Repeat the installation of multiple interlocking piles until the interlocking piles at the end need to be connected, and then use the rotary drilling rig to construct the closure piles. After the drilling is completed, the holes are cleaned and the steel cage of the closure piles is hoisted, and concrete is poured. After the concrete is poured and finally set, the gap in the shape of the filling partition is formed.
8. A construction method of a full-grain bite pile, characterized in that: The construction method comprises the full-cage interlocking pile according to any one of claims 4 to 6, and specifically comprises the following steps: Surveying and laying out, guiding wall construction; The positioning piles are constructed by full sleeve and full rotary drilling rig; Installing a filling partition on the pile hole of the positioning pile, hanging the steel cage of the positioning pile, pouring concrete, and after the concrete pouring is completed and finally set, pulling out the filling partition to form a gap in the shape of the filling partition; A drill rod limiting sleeve is installed on the rotary drilling rig, and positioning is achieved by using the gap between the drill rod limiting sleeve and the filling partition shape, so that the rotary drilling rig maintains verticality during the construction of the bite pile drilling operation; Install a filling partition on the pile hole of the interlocking pile, hang the steel cage of the interlocking pile, pour concrete, and after the concrete is poured and finally set, pull out the filling partition to form a gap in the shape of the filling partition, use the rotary drilling rig to continue to construct the interlocking pile and maintain the verticality during installation until all the interlocking piles are installed.
Citation Information
Patent Citations
Construction method of secant pile capable of being transversely connected with reinforcement cages
CN111519611A