Method for integrating road construction, management and maintenance data and performing three-dimensional display
By integrating highway construction, operation and maintenance data and displaying it in three-dimensional space, the problem that traditional two-dimensional maps and data management methods are difficult to meet the needs of modern highway management is solved, and management efficiency and information sharing are improved.
Patent Information
- Application Number
- CN202510345709.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-24
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2045-03-24
AI Technical Summary
Traditional two-dimensional maps and data management methods are difficult to meet the needs of modern highway management, especially in terms of data integration, information sharing and visual display.
By integrating highway construction, operation and maintenance data, and visual display in three-dimensional space, the highway and its ancillary facilities are displayed using three-dimensional modeling and visualization technology to realize centralized management and sharing of data.
It improves the efficiency and accuracy of highway management, solves the problems of data dispersion and inconsistent format, realizes the standardization and unification of data, and provides timely and accurate information support.
Smart Images

Figure CN119861847A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of highway management, and in particular to a method for integrating highway construction, management and maintenance data and performing three-dimensional display. Background Art
[0002] With the rapid development of transportation infrastructure, highways, as an important mode of transportation, have become increasingly complex in terms of construction, management and maintenance. Traditional two-dimensional maps and data management methods can no longer meet the needs of modern highway management, especially in terms of data integration, information sharing and visualization.
[0003] In recent years, the informatization of highway management has become an inevitable trend in the development of the industry. The traditional highway management method has problems such as data dispersion and information islands, resulting in low management efficiency. By integrating highway construction, management and maintenance data and displaying them in three dimensions, centralized data management and sharing can be achieved, improving management efficiency.
[0004] With the increasing application of digital technology in the entire life cycle of highways, a large amount of data has been accumulated in highway construction and operation and maintenance management. However, due to the huge amount of data, the wide range of highways involved, and the data distributed in multiple systems, it is difficult to clearly and quickly display the highway environment and technical conditions in the traditional data chart method, thus affecting the efficiency of operation and maintenance management. Therefore, this application proposes a method for integrating highway construction, management and maintenance data and performing three-dimensional display to solve the above problems. Summary of the invention
[0005] In view of the deficiencies of the prior art, the present invention provides a method for integrating highway construction, management and maintenance data and displaying them in three dimensions, aiming to integrate highway construction data and operation and maintenance data and display them visually in three-dimensional space.
[0006] To achieve the above object, the present invention provides the following technical solution: a method for integrating highway construction, management and maintenance data and performing three-dimensional display, comprising the following steps:
[0007] S1. Import the highway completion information model in the construction phase into an information system that can analyze the completion information model. The highway completion information model should include a three-dimensional visualization model and relevant part information;
[0008] S2. According to the highway mileage in the operation and maintenance stage, the pavement coordinates and elevation data corresponding to all whole pile numbers are imported into the information system, and the pavement coordinates and elevation data include: the road centerline coordinate X, the road centerline coordinate Y, the left side coordinates X1 and Y1 of the first lane of the left width of the road, the left side coordinates X2 and Y2 of the second lane of the left width of the road, the right side coordinates X3 and Y3 of the second lane of the left width of the road, the left side coordinates X4 and Y4 of the first lane of the right width of the road, the right side coordinates X5 and Y5 of the first lane of the right width of the road, the right side coordinates X6 and Y6 of the second lane of the right width of the road, and the elevation h;
[0009] S3. According to the highway mileage in the operation and maintenance stage, the pile numbers and names of the 100-meter piles are imported into the information system;
[0010] S4. Enter operation and maintenance information;
[0011] S5. Establish a general program to obtain the approximate coordinates and elevation of a point on the road surface through the pile number and lane;
[0012] S6. Display the 100-meter pile in the three-dimensional model space;
[0013] S7. Displaying the road surface technical condition information in a masked manner in the three-dimensional model space;
[0014] S8. Display highway disease data in the three-dimensional model space;
[0015] S9. Display pavement maintenance data in three-dimensional model space.
[0016] Furthermore, in S2, the whole pile number is generally recorded at intervals of 20 meters.
[0017] Furthermore, the step of entering the operation and maintenance information in S4 includes the following steps:
[0018] S4-1. Pavement technical condition: involving starting pile number, end pile number, route direction, technical grade, pavement type, section length, MQI, PQI, PCI, RQI, RDI, PBI, PWI, SRI, PSSI, SCI, BCI and TCI;
[0019] S4-2, highway disease data: involving number, reporting unit, reporter, urgency, diseased road section, stake number, GPS coordinates, route direction, disease type, length, width, area, cause analysis, treatment method, disease status, disease source, reviewer, review time and pictures;
[0020] S4-3. Pavement maintenance data: involving number, contract, road section, management unit, construction unit, construction project, notification date, completion date, urgency, pile number, width, construction reason, construction plan and requirements, planned project volume, reviewer, review time and schematic diagram.
[0021] Further, the establishment of the general program in S5 comprises the following steps:
[0022] S5-1, assuming that the point to be found is P0, the stake number is ZH, and it is at the edge of a lane on the highway;
[0023] S5-2, compare the pile numbers imported from ZH and S2 row by row in order, find the pile number interval where P0 is located and the corresponding lane position, and assume that the starting point of the pile number interval is P1, the corresponding pile number is St, and the end point is P2, the corresponding pile number is En. At this time, St <ZH<En;
[0024] S5-3, calculating the total length L of the pile number interval described in S5-1, L=En-St;
[0025] S5-4, calculate the distance D between P0 and the starting point, D=ZH-St;
[0026] S5-5, obtaining the coordinates and elevation data of P1 and P2 from the data imported in S2, the coordinates of point P1 are marked as Xp1 and Yp1, the elevation of point P1 is recorded as Hp1, the coordinates of point P2 are marked as Xp2 and Yp2, the elevation of point P2 is recorded as Hp2;
[0027] S5-6. Calculate the x coordinate Xp0 of point P0 by interpolation method, Xp0=Xp1+(Xp2-Xp1)*D / L;
[0028] S5-7, calculate the y coordinate Yp0 of point P0 by interpolation method, Yp0=Yp1+(Yp2-Yp1)*D / L;
[0029] S5-8. Use the interpolation method to calculate the elevation Hp0 of point P0, Hp0=Hp1+(Hp2-Hp1)*D / L.
[0030] Further, the display of the 100-meter pile in the three-dimensional model space in S6 includes the following steps:
[0031] S6-1, read the pile numbers and names of the 100-meter piles in S3 in sequence;
[0032] S6-2, using the general program in S5 to obtain the coordinates and elevation of the 100-meter pile;
[0033] S6-3. According to the coordinates and elevations obtained in S6-2, the 100-meter pile icon and the 100-meter pile name are loaded in the three-dimensional model space.
[0034] Furthermore, the step of displaying the road surface technical condition information in a masked manner in the three-dimensional model space in S7 includes the following steps:
[0035] S7-1, sequentially read the starting pile number, the end pile number, the route direction and the technical level information of the road section to be displayed in S4-1;
[0036] S7-2, determining the coordinates of the four corner points of the mask according to the starting pile number, the ending pile number, and the route direction, and the four corner points are respectively recorded as P1, P2, P3, and P4;
[0037] S7-3. Determine the color of the mask according to the technical level. The technical status is divided into five levels: excellent, good, medium, poor and bad. The colors of the mask are green, light green, yellow, orange and red.
[0038] S7-4, connect the four points P1, P2, P3, and P4 in sequence to form a rectangle, forming a mask area in the three-dimensional space, and the mask color is determined according to the color in S7-3.
[0039] Further, the calculation method in S7-2 is:
[0040] S7-2-1. Determine the route direction;
[0041] S7-2-2. When the route direction is down, the position of point P1 is the starting pile number position, and is on the left side of the first lane of the left width of the road; the position of point P2 is the starting pile number position, and is on the right side of the second lane of the left width of the road; the position of point P3 is the ending pile number position, and is on the right side of the second lane of the left width of the road; the position of point P4 is the ending pile number position, and is on the left side of the first lane of the left width of the road;
[0042] S7-2-3. When the route direction is upward, the position of point P1 is the starting pile number position, and is on the left side of the first lane on the right side of the road. The position of point P2 is the starting pile number position, and is on the right side of the second lane on the right side of the road. The position of point P3 is the ending pile number position, and is on the right side of the second lane on the right side of the road. The position of point P4 is the ending pile number position, and is on the left side of the first lane on the right side of the road.
[0043] S7-2-4. According to the positions of the four points P1, P2, P3, and P4 determined in S7-2-2 and S7-2-3, use the general procedure of S5 to obtain the coordinates and elevations of the four points.
[0044] Furthermore, the display of the highway disease data in the three-dimensional model space in S8 includes the following steps:
[0045] S8-1, reading the highway disease pile number and disease data imported in S4-2;
[0046] S8-2, using the general procedure in S5 to obtain the coordinates and elevations of the highway disease;
[0047] S8-3, loading the highway disease icon and disease number in the three-dimensional model space according to the coordinates and elevations obtained in S8-2;
[0048] S8-4. Use the mouse to click on the disease icon generated in S8-3 to view more detailed disease information.
[0049] Furthermore, the display of the pavement maintenance data in the three-dimensional model space in S9 includes the following steps:
[0050] S9-1, reading the pavement maintenance data imported in S4-3;
[0051] S9-2, using the general procedure in S5 to obtain the coordinates and elevations of the pavement maintenance;
[0052] S9-3, loading the pavement maintenance icon and maintenance number in the three-dimensional model space according to the coordinates and elevations obtained in S9-2;
[0053] S9-4. Use the mouse to click the pavement maintenance icon generated in step S9-3 to view more detailed maintenance operation information.
[0054] Compared with the prior art, the present invention provides a method for integrating highway construction, management and maintenance data and performing three-dimensional display, which has the following beneficial effects:
[0055] 1. The method for integrating highway construction, management and maintenance data and displaying them in three dimensions, by adopting the above method steps, is convenient for integrating highway construction data and operation and maintenance data, and visually displaying them in three-dimensional space. Through three-dimensional modeling and visualization technology, the method can display the highway and its ancillary facilities in three-dimensional form, so that managers can intuitively understand the structure, layout and operation status of the highway, and improve the accuracy and efficiency of decision-making; by building a unified data standard and interface, the standardization and unification of highway construction, management and maintenance data are achieved, effectively solving the problems of data dispersion and inconsistent formats, and improving the integration and availability of data.
[0056] 2. The method of integrating highway construction, management and maintenance data and displaying them in three dimensions converts the pile numbers in the construction, management and maintenance data into coordinates through a coordinate and pile number conversion program, which is used for mask generation or icon positioning, and displays these data in a three-dimensional visualization manner; the mask will display different colors according to the different levels of road technical conditions; different icon positioning will be displayed according to different diseases or maintenance records; by utilizing advanced data processing technology and algorithms, this method can efficiently process massive highway construction, management and maintenance data, realize rapid integration and analysis of data, and provide managers with timely and accurate information support. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] Figure 1 A schematic diagram of the coordinates corresponding to lane edges in a method for integrating highway construction, management and maintenance data and performing three-dimensional display according to the present invention;
[0058] Figure 2A schematic diagram of icons and names of hundred-meter piles in a method for integrating highway construction, management and maintenance data and performing three-dimensional display according to the present invention;
[0059] Figure 3 A schematic diagram of the technical status of a method for integrating highway construction, management and maintenance data and performing three-dimensional display according to the present invention;
[0060] Figure 4 A schematic diagram of mask positioning in a method for integrating highway construction, management and maintenance data and performing three-dimensional display according to the present invention;
[0061] Figure 5 A schematic diagram of highway diseases in a method for integrating highway construction, management and maintenance data and performing three-dimensional display according to the present invention;
[0062] Figure 6 The present invention is a schematic diagram of maintenance operations in a method for integrating highway construction, management and maintenance data and performing three-dimensional display. DETAILED DESCRIPTION
[0063] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0064] See also Figures 1 to 6 In this embodiment, a method for integrating highway construction, management and maintenance data and performing three-dimensional display includes the following steps:
[0065] S1. Import the highway completion information model in the construction phase into an information system that can analyze the completion information model. The highway completion information model should include a three-dimensional visualization model and relevant part information;
[0066] S2. According to the highway mileage in the operation and maintenance stage, the road surface coordinates and elevation data corresponding to all the whole pile numbers are imported into the information system. The road surface coordinates and elevation data include: road centerline coordinate X, road centerline coordinate Y, left side coordinates X1 and Y1 of the first lane on the left side of the road, left side coordinates X2 and Y2 of the second lane on the left side of the road, right side coordinates X3 and Y3 of the second lane on the left side of the road, left side coordinates X4 and Y4 of the first lane on the right side of the road, right side coordinates X5 and Y5 of the first lane on the right side of the road, right side coordinates X6 and Y6 of the second lane on the right side of the road, and elevation h;
[0067] S3. According to the highway mileage in the operation and maintenance stage, the pile numbers and names of the 100-meter piles are imported into the information system;
[0068] S4. Enter operation and maintenance information;
[0069] S5. Establish a general program to obtain the approximate coordinates and elevation of a point on the road surface through the pile number and lane;
[0070] S6. Display the 100-meter pile in the three-dimensional model space;
[0071] S7. Displaying the road surface technical condition information in a masked manner in the three-dimensional model space;
[0072] S8. Display highway disease data in the three-dimensional model space;
[0073] S9. Display pavement maintenance data in three-dimensional model space.
[0074] Specifically, in S2, a record of the whole pile number is generally registered every 20 meters.
[0075] In this embodiment, entering the operation and maintenance information in S4 includes the following steps:
[0076] S4-1. Pavement technical condition: involving starting pile number, end pile number, route direction, technical grade, pavement type, section length, MQI, PQI, PCI, RQI, RDI, PBI, PWI, SRI, PSSI, SCI, BCI and TCI;
[0077] S4-2, highway disease data: involving number, reporting unit, reporter, urgency, diseased road section, stake number, GPS coordinates, route direction, disease type, length, width, area, cause analysis, treatment method, disease status, disease source, reviewer, review time and pictures;
[0078] S4-3. Pavement maintenance data: involving number, contract, road section, management unit, construction unit, construction project, notification date, completion date, urgency, pile number, width, construction reason, construction plan and requirements, planned project volume, reviewer, review time and schematic diagram.
[0079] In this embodiment, establishing a general program in S5 includes the following steps:
[0080] S5-1, assuming that the point to be found is P0, the stake number is ZH, and it is at the edge of a lane on the highway;
[0081] S5-2, compare the pile numbers imported from ZH and S2 row by row in order, find the pile number interval where P0 is located and the corresponding lane position, and assume that the starting point of the pile number interval is P1, the corresponding pile number is St, and the end point is P2, the corresponding pile number is En. At this time, St <ZH<En;
[0082] S5-3, calculate the total length L of the pile number interval in S5-1, L=En-St;
[0083] S5-4, calculate the distance D between P0 and the starting point, D=ZH-St;
[0084] S5-5, obtaining the coordinates and elevation data of P1 and P2 from the data imported in S2, the coordinates of point P1 are marked as Xp1 and Yp1, the elevation of point P1 is recorded as Hp1, the coordinates of point P2 are marked as Xp2 and Yp2, the elevation of point P2 is recorded as Hp2;
[0085] S5-6. Calculate the x coordinate Xp0 of point P0 by interpolation method, Xp0=Xp1+(Xp2-Xp1)*D / L;
[0086] S5-7, calculate the y coordinate Yp0 of point P0 by interpolation method, Yp0=Yp1+(Yp2-Yp1)*D / L;
[0087] S5-8. Use the interpolation method to calculate the elevation Hp0 of point P0, Hp0=Hp1+(Hp2-Hp1)*D / L.
[0088] In this embodiment, displaying the 100-meter pile in the three-dimensional model space in S6 includes the following steps:
[0089] S6-1, read the pile numbers and names of the 100-meter piles in S3 in sequence;
[0090] S6-2, using the general program in S5 to obtain the coordinates and elevation of the 100-meter pile;
[0091] S6-3. According to the coordinates and elevations obtained in S6-2, the 100-meter pile icon and the 100-meter pile name are loaded in the three-dimensional model space.
[0092] In this embodiment, displaying the road surface technical condition information in a masked manner in the three-dimensional model space in S7 includes the following steps:
[0093] S7-1, sequentially read the starting pile number, the end pile number, the route direction and the technical level information of the road section to be displayed in S4-1;
[0094] S7-2, determining the coordinates of the four corner points of the mask according to the starting pile number, the ending pile number, and the route direction, and the four corner points are respectively recorded as P1, P2, P3, and P4;
[0095] S7-3. Determine the color of the mask according to the technical level. The technical status is divided into five levels: excellent, good, medium, poor and bad. The colors of the mask are green, light green, yellow, orange and red.
[0096] S7-4, connect the four points P1, P2, P3, and P4 in sequence to form a rectangle, forming a mask area in the three-dimensional space, and the mask color is determined according to the color in S7-3.
[0097] Specifically, the calculation method in S7-2 is:
[0098] S7-2-1. Determine the route direction;
[0099] S7-2-2. When the route direction is down, the position of point P1 is the starting pile number position, and is on the left side of the first lane of the left width of the road; the position of point P2 is the starting pile number position, and is on the right side of the second lane of the left width of the road; the position of point P3 is the ending pile number position, and is on the right side of the second lane of the left width of the road; the position of point P4 is the ending pile number position, and is on the left side of the first lane of the left width of the road;
[0100] S7-2-3. When the route direction is upward, the position of point P1 is the starting pile number position, and is on the left side of the first lane on the right side of the road. The position of point P2 is the starting pile number position, and is on the right side of the second lane on the right side of the road. The position of point P3 is the ending pile number position, and is on the right side of the second lane on the right side of the road. The position of point P4 is the ending pile number position, and is on the left side of the first lane on the right side of the road.
[0101] S7-2-4. According to the positions of the four points P1, P2, P3, and P4 determined in S7-2-2 and S7-2-3, use the general procedure of S5 to obtain the coordinates and elevations of the four points.
[0102] In this embodiment, displaying the highway disease data in the three-dimensional model space in S8 includes the following steps:
[0103] S8-1, reading the highway disease pile number and disease data imported in S4-2;
[0104] S8-2, using the general procedure in S5 to obtain the coordinates and elevations of the highway disease;
[0105] S8-3, loading the highway disease icon and disease number in the three-dimensional model space according to the coordinates and elevations obtained in S8-2;
[0106] S8-4. Use the mouse to click on the disease icon generated in S8-3 to view more detailed disease information.
[0107] In this embodiment, displaying the pavement maintenance data in the three-dimensional model space in S9 includes the following steps:
[0108] S9-1, reading the pavement maintenance data imported in S4-3;
[0109] S9-2, using the general procedure in S5 to obtain the coordinates and elevations of the pavement maintenance;
[0110] S9-3, loading the pavement maintenance icon and maintenance number in the three-dimensional model space according to the coordinates and elevations obtained in S9-2;
[0111] S9-4. Use the mouse to click the pavement maintenance icon generated in step S9-3 to view more detailed maintenance operation information.
[0112] Working principle of the present invention:
[0113] The present invention provides a method for integrating highway construction, management and maintenance data and performing three-dimensional display. Through a coordinate and pile number conversion program, the pile numbers in the construction, management and maintenance data are converted into coordinates for mask generation or icon positioning, and these data are displayed in a three-dimensional visualization manner. According to different levels of road technical conditions, the mask will display different colors; according to different diseases or maintenance records, different icon positioning will be displayed.
[0114] The specific implementation methods described above mainly describe the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected, and the scope of the present invention to be protected is defined by the attached claims and their equivalents.
Claims
1. A method for integrating highway construction, management and maintenance data and performing three-dimensional display, characterized in that: The following steps are involved: S1. Import the highway completion information model in the construction phase into an information system that can analyze the completion information model. The highway completion information model should include a three-dimensional visualization model and relevant part information; S2. According to the highway mileage in the operation and maintenance stage, the pavement coordinates and elevation data corresponding to all whole pile numbers are imported into the information system, and the pavement coordinates and elevation data include: the road centerline coordinate X, the road centerline coordinate Y, the left side coordinates X1 and Y1 of the first lane of the left width of the road, the left side coordinates X2 and Y2 of the second lane of the left width of the road, the right side coordinates X3 and Y3 of the second lane of the left width of the road, the left side coordinates X4 and Y4 of the first lane of the right width of the road, the right side coordinates X5 and Y5 of the first lane of the right width of the road, the right side coordinates X6 and Y6 of the second lane of the right width of the road, and the elevation h; S3. According to the highway mileage in the operation and maintenance stage, the pile numbers and names of the 100-meter piles are imported into the information system; S4. Enter operation and maintenance information; S5. Establish a general program to obtain the approximate coordinates and elevation of a point on the road surface through the pile number and lane; S6. Display the 100-meter pile in the three-dimensional model space; S7. Displaying the road surface technical condition information in a masked manner in the three-dimensional model space; S8. Display highway disease data in the three-dimensional model space; S9. Display pavement maintenance data in three-dimensional model space.
2. A method for integrating highway construction, management and maintenance data and performing three-dimensional display according to claim 1, characterized in that: In the S2, the whole pile number is generally recorded once every 20 meters.
3. The method for integrating highway construction, management and maintenance data and performing three-dimensional display according to claim 1, characterized in that: The step of entering the operation and maintenance information in S4 includes the following steps: S4-1. Pavement technical condition: involving starting pile number, end pile number, route direction, technical grade, pavement type, section length, MQI, PQI, PCI, RQI, RDI, PBI, PWI, SRI, PSSI, SCI, BCI and TCI; S4-2, highway disease data: involving number, reporting unit, reporter, urgency, diseased road section, stake number, GPS coordinates, route direction, disease type, length, width, area, cause analysis, treatment method, disease status, disease source, reviewer, review time and pictures; S4-3. Pavement maintenance data: involving number, contract, road section, management unit, construction unit, construction project, notification date, completion date, urgency, pile number, width, construction reason, construction plan and requirements, planned project volume, reviewer, review time and schematic diagram.
4. The method for integrating highway construction, management and maintenance data and performing three-dimensional display according to claim 1, characterized in that: The establishment of the general program in S5 comprises the following steps: S5-1, assuming that the point to be found is P0, the stake number is ZH, and it is at the edge of a lane on the highway; S5-2, compare the pile numbers imported from ZH and S2 row by row in order, find the pile number interval where P0 is located and the corresponding lane position, and assume that the starting point of the pile number interval is P1, the corresponding pile number is St, and the end point is P2, the corresponding pile number is En. At this time, St <ZH<En; S5-3, calculating the total length L of the pile number interval described in S5-1, L=En-St; S5-4, calculate the distance D between P0 and the starting point, D=ZH-St; S5-5, obtaining the coordinates and elevation data of P1 and P2 from the data imported in S2, the coordinates of point P1 are marked as Xp1 and Yp1, the elevation of point P1 is recorded as Hp1, the coordinates of point P2 are marked as Xp2 and Yp2, the elevation of point P2 is recorded as Hp2; S5-6. Calculate the x coordinate Xp0 of point P0 by interpolation method, Xp0=Xp1+(Xp2-Xp1)*D / L; S5-7, calculate the y coordinate Yp0 of point P0 by interpolation method, Yp0=Yp1+(Yp2-Yp1)*D / L; S5-8. Use the interpolation method to calculate the elevation Hp0 of point P0, Hp0=Hp1+(Hp2-Hp1)*D / L.
5. The method for integrating highway construction, management and maintenance data and performing three-dimensional display according to claim 1, characterized in that: The display of the 100-meter pile in the three-dimensional model space in S6 includes the following steps: S6-1, read the pile numbers and names of the 100-meter piles in S3 in sequence; S6-2, using the general program in S5 to obtain the coordinates and elevation of the 100-meter pile; S6-3. According to the coordinates and elevations obtained in S6-2, the 100-meter pile icon and the 100-meter pile name are loaded in the three-dimensional model space.
6. The method for integrating highway construction, management and maintenance data and performing three-dimensional display according to claim 1, characterized in that: The step of displaying the road surface technical condition information in a masked manner in the three-dimensional model space in S7 includes the following steps: S7-1, sequentially read the starting pile number, the end pile number, the route direction and the technical level information of the road section to be displayed in S4-1; S7-2, determining the coordinates of the four corner points of the mask according to the starting pile number, the ending pile number, and the route direction, and the four corner points are respectively recorded as P1, P2, P3, and P4; S7-3. Determine the color of the mask according to the technical level. The technical status is divided into five levels: excellent, good, medium, poor and bad. The colors of the mask are green, light green, yellow, orange and red. S7-4, connect the four points P1, P2, P3, and P4 in sequence to form a rectangle, forming a mask area in the three-dimensional space, and the mask color is determined according to the color in S7-3.
7. The method for integrating highway construction, management and maintenance data and performing three-dimensional display according to claim 1, characterized in that: The calculation method in S7-2 is: S7-2-1. Determine the route direction; S7-2-2. When the route direction is down, the position of point P1 is the starting pile number position, and is on the left side of the first lane of the left width of the road; the position of point P2 is the starting pile number position, and is on the right side of the second lane of the left width of the road; the position of point P3 is the ending pile number position, and is on the right side of the second lane of the left width of the road; the position of point P4 is the ending pile number position, and is on the left side of the first lane of the left width of the road; S7-2-3. When the route direction is upward, the position of point P1 is the starting pile number position, and is on the left side of the first lane on the right side of the road. The position of point P2 is the starting pile number position, and is on the right side of the second lane on the right side of the road. The position of point P3 is the ending pile number position, and is on the right side of the second lane on the right side of the road. The position of point P4 is the ending pile number position, and is on the left side of the first lane on the right side of the road. S7-2-4. According to the positions of the four points P1, P2, P3, and P4 determined in S7-2-2 and S7-2-3, use the general procedure of S5 to obtain the coordinates and elevations of the four points.
8. The method for integrating highway construction, management and maintenance data and performing three-dimensional display according to claim 1, characterized in that: The display of highway disease data in the three-dimensional model space in S8 includes the following steps: S8-1, reading the highway disease pile number and disease data imported in S4-2; S8-2, using the general procedure in S5 to obtain the coordinates and elevations of the highway disease; S8-3, loading the highway disease icon and disease number in the three-dimensional model space according to the coordinates and elevations obtained in S8-2; S8-4. Use the mouse to click on the disease icon generated in S8-3 to view more detailed disease information.
9. The method for integrating highway construction, management and maintenance data and performing three-dimensional display according to claim 1, characterized in that: The display of the pavement maintenance data in the three-dimensional model space in S9 includes the following steps: S9-1, reading the pavement maintenance data imported in S4-3; S9-2, using the general procedure in S5 to obtain the coordinates and elevations of the pavement maintenance; S9-3, loading the pavement maintenance icon and maintenance number in the three-dimensional model space according to the coordinates and elevations obtained in S9-2; S9-4. Use the mouse to click the pavement maintenance icon generated in step S9-3 to view more detailed maintenance operation information.
Citation Information
Patent Citations
Visual road maintenance decision making system
CN107153928A
Highway maintenance informatization management system
CN108037723A
BIM-based pavement disease analysis and display method and system
CN111553017A
Highway evaluation and maintenance decision informatization system
CN112381251A
Traffic maintenance object display method and system
CN113449225A