Dam curtain grouting hole equipment and construction process thereof
By designing a device for grouting dam curtains, the combination of shaking sliders and linkage kits is used to solve the problem of loss and difficulty in filling grouting materials in karst areas or large crack formations, achieving uniform screening of grouting materials and efficient mixing of mortars, and improving the forming quality of dam curtains.
Patent Information
- Application Number
- CN202510374001.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-27
- Publication Date
- 2025-04-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the dam curtain grouting process, especially in karst areas or in formations with large cracks, the loss of grouting materials and the difficulty in effectively filling have not been effectively solved, resulting in poor grouting uniformity and low stone screening efficiency, which affects the forming quality of the dam curtain.
A dam curtain grouting hole equipment is designed, including a support seat, a preparation processing box, a screening groove and a driving component. Through the cooperation of the jitter slider and a linkage kit, the stone is uniformly screened and mixed, ensuring the fluidity and molding quality of the mortar.
Through the use of this equipment, the uniformity and screening efficiency of grouting materials can be effectively improved, the fluidity and molding quality of the mortar can be ensured, the problems of loss of grouting materials and difficulty in filling are solved, and the construction quality of the dam curtain is improved.
Smart Images

Figure CN119877549A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy engineering, in particular to a dam curtain grouting hole device and a construction process thereof. Background Art
[0002] Dam anti-seepage curtain grouting is an important anti-seepage treatment technology in water conservancy projects. Generally speaking, dam curtain grouting uses pure cement grouting, and only special hole sections (hole sections with large grouting absorption) are grouted with mortar (such as epoxy resin, polyurethane, etc.).
[0003] There are two grouting methods in the prior art: top-down segmented grouting and bottom-up segmented grouting. Among them, top-down segmented grouting can better control the grouting quality, but the construction process is relatively complicated; bottom-up segmented grouting has higher construction efficiency, but the control requirements for grouting pressure are more stringent. At present, the general method is to use closed hole circulation and top-down segmented grouting.
[0004] However, during the grouting process of the prior art, in karst areas or in strata with large cracks, the problems of grouting material loss and difficulty in effective filling still need to be solved. Therefore, it is necessary to ensure the uniformity of grouting, and when the stones are screened, all fall on one place of the screening plate, which is prone to accumulation, affecting the screening speed and raw material purity, resulting in the subsequent mortar mixing effect being difficult to control, affecting the molding quality of the dam curtain. Summary of the invention
[0005] In view of the deficiencies of the prior art, the present invention provides a dam curtain grouting hole device and a construction process thereof, which solves the above technical problems; To achieve the above objectives, the present invention is implemented through the following technical solutions: The technical solution adopted by the present invention to solve its technical problems is: a dam curtain grouting hole equipment, including a support seat, a preparation and processing box is fixedly installed on the upper end of the support seat, a feed hopper is arranged on the upper end of the preparation and processing box, two horizontal plates are symmetrically fixedly installed inside the preparation and processing box, a separation component is installed between the two horizontal plates, the separation component includes a limiting groove symmetrically opened between the two horizontal plates, and a shaking slider slidably arranged on the inner side of the limiting groove, a plurality of protrusions used in conjunction with the shaking slider are arranged on the inner bottom end of the limiting groove, a screening groove is commonly connected between the two shaking sliders, a material dividing component is movably installed on the inner side of the screening groove, an adjustment component is arranged on the bottom end of the screening groove, a driving component is fixedly installed on one end of the preparation and processing box, and a traction component is rotatably installed on one end of the preparation and processing box.
[0006] Preferably, the front and rear ends of the preparation and processing box are fixedly connected with a plurality of fixed rods, and the outer surfaces of the fixed rods are slidably sleeved with sleeve blocks, and the sleeve blocks are fixedly connected with the screening grooves.
[0007] Preferably, the material dividing assembly includes a material dividing mesh plate movably arranged on the inner side of the screening groove, and a clamping slot opened on the two side walls of the screening groove, and a limiting block is slidably arranged on the inner side of the clamping slot, and both limiting blocks are rotatably connected to the material dividing mesh plate, and the bottom end of the material dividing mesh plate is rotatably connected to a top rod.
[0008] Preferably, the adjustment assembly includes a sleeve arranged at the bottom end of the screening groove, and a limit block slidably arranged on the inner side of the sleeve, the upper end of the limit block is fixedly connected to the sleeve, the limit block is rotatably connected to the top rod, the bottom end of the sleeve is opened with a bottom opening, the bottom end of the limit block is fixedly connected to an L-shaped rod interlaced with the bottom opening, and a hydraulic push rod is fixedly installed at one end of the preparation processing box, and the protruding end of the hydraulic push rod is fixedly connected to the L-shaped rod.
[0009] Preferably, the driving assembly includes a driving motor fixedly mounted at one end of the preparation and processing box, and a second bevel gear fixedly mounted on the output end of the driving motor. A temperature control box is provided inside the preparation and processing box, and a mixing assembly is fixedly mounted on the inner side of the temperature control box.
[0010] Preferably, the mixing assembly includes a mixing drum obliquely fixedly installed inside the temperature control box, and a mixing plate rotatably installed inside the mixing drum, the output shaft of the driving motor is fixedly connected to the central axis of the mixing plate, a sealing door is rotatably installed at one end of the mixing drum, and a discharge bridge used in conjunction with the mixing drum is fixedly connected to one end of the temperature control box.
[0011] Preferably, the traction assembly includes a rotating shaft rotatably mounted on one end of the preparation and processing box, and a traction plate fixedly mounted on one end of the rotating shaft, and the other end of the rotating shaft is fixedly mounted with a first bevel gear, and the first bevel gear is meshed and matched with the second bevel gear.
[0012] Preferably, the upper end of the traction disc is rotatably connected to a traction rod, one end of the preparation processing box is provided with a through opening corresponding to the traction rod, one end of the traction rod is rotatably connected to a linkage kit, and the linkage kit is rotatably connected to one end of the screening groove.
[0013] Preferably, a discharge port is provided at the bottom end of the screening groove, a transfer hopper corresponding to the discharge port is interspersed inside the preparation and processing box, and a discharge pipe used in conjunction with the transfer hopper is fixedly connected to one end of the preparation and processing box.
[0014] Preferably, a material distribution hopper is fixedly installed inside the preparation and processing box, an inlet corresponding to the material distribution hopper is opened at the upper end of the temperature control box, and the L-shaped rod and the material distribution hopper are movably arranged to intersect each other.
[0015] The present invention also provides a construction process for a dam curtain grouting hole device, and the construction steps of the process are as follows: S1. The lifting monitoring hole is installed before grouting construction; S2. The lifting hole is drilled using XY-2B geological drilling rig with diamond rotary drilling, the drilling diameter is 76mm, and the hole is drilled all the way to the bottom. After drilling, the lifting observation device is installed; S3. During the flushing of borehole cracks, water pressure test and grouting using grouting hole equipment, the lifting deformation observation should be carried out and detailed records should be made; S4. After the grouting work of the unit project is completed, the deformation observation hole is lifted and sealed.
[0016] Beneficial effects of the present invention: The present invention puts the mixed material from the feed hopper into the screening groove, turns on the driving motor, drives the traction plate to rotate, drives the traction rod to move continuously, thereby drives the linkage kit to move continuously and then pulls the screening groove to move, so that the shaking slider is driven to move continuously in the limit groove. Under the action of the protrusion, the shaking slider is continuously shaken up and down during the movement, so that the stone material can be continuously swung and shaken to be spread out. At the same time, when the screening groove moves, the sleeve block is driven to slide back and forth in the fixed rod, and the stability is better. The present invention enables the materials to drop from the material distribution mesh plate into the material distribution hopper below the screening groove, and the materials dropped into the material distribution hopper enter the temperature control box from the material inlet for temperature control to prevent the materials from agglomerating due to excessively low temperature, and then enter the mixing barrel for mixing treatment, so that the mixing plate continuously mixes the material powder and the forming agent, accelerates the preparation efficiency, and ensures the fluidity of the mortar after mixing, which is beneficial to the fluidity of the mortar preparation and avoids agglomeration affecting the preparation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0018] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present invention; Figure 2 It is a schematic diagram of the structure of the present invention from another external perspective; Figure 3 It is a schematic cross-sectional structure diagram of the preparation and processing box of the present invention; Figure 4 It is a schematic diagram of a half-section structure of a preparation and processing box of the present invention; Figure 5 It is a schematic diagram of the structure of the material distribution component and the regulating component of the present invention; Figure 6 It is a schematic diagram of the multi-component structure of the present invention; Figure 7 It is a schematic diagram of the top view structure of the present invention; Figure 8 For the present invention Figure 5 The enlarged structural diagram at A in the middle; Fig. 9 It is a construction process flow chart of the present invention; In the figure: 1. Preparation and processing box; 2. Support seat; 551. Separation component; 552. Material distribution component; 553. Drive component; 554. Mixing component; 555. Adjustment component; 556. Traction component; 3. Feed hopper; 4. Discharge pipe; 5. Drive motor; 6. Rotating shaft; 7. First bevel gear; 8. Traction plate; 9. Traction rod; 10. Through port; 11. Hydraulic push rod; 12. Temperature control box; 13. Mixing barrel; 14. Sealing door; 15. Discharge Bridge; 16, feeding port; 17, dividing hopper; 18, screening groove; 19, second bevel gear; 20, top rod; 21, dividing mesh plate; 22, mixing plate; 23, L-shaped rod; 24, sleeve block; 25, cross plate; 26, limit groove; 27, protrusion; 28, shaking slider; 29, slot; 30, limit block; 31, sleeve; 32, limit block; 33, bottom mouth; 34, transfer hopper; 35, discharge port; 36, fixed rod; 37, linkage kit. DETAILED DESCRIPTION
[0019] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0020] Embodiment 1: A dam curtain grouting hole device of the present invention, such as Figure 1-Figure 8As shown, it includes a support base 2, a preparation and processing box 1 is fixedly installed on the upper end of the support base 2, a feed hopper 3 is arranged on the upper end of the preparation and processing box 1, two horizontal plates 25 are symmetrically fixedly installed inside the preparation and processing box 1, a separation component 551 is installed between the two horizontal plates 25, and the separation component 551 includes a limit groove 26 symmetrically opened between the two horizontal plates 25, and a shaking slider 28 slidably arranged inside the limit groove 26, a plurality of protrusions 27 used in conjunction with the shaking slider 28 are arranged at the inner bottom end of the limit groove 26, a screening groove 18 is commonly connected between the two shaking sliders 28, and the front and rear parts of the preparation and processing box 1 are connected to each other. The ends are fixedly connected with a plurality of fixed rods 36, the outer surfaces of the fixed rods 36 are slidably sleeved with sleeve blocks 24, the sleeve blocks 24 are fixedly connected with the screening grooves 18, and the bottom ends of the screening grooves 18 are provided with adjustment components 555. One end of the preparation and processing box 1 is fixedly installed with a driving component 553, and the driving component 553 includes a driving motor 5 fixedly installed at one end of the preparation and processing box 1, and a second bevel gear 19 fixedly sleeved at the output end of the driving motor 5. One end of the preparation and processing box 1 is rotatably installed with a traction component 556, and the traction component 556 includes a rotating shaft 6 rotatably installed at one end of the preparation and processing box 1, and a fixedly sleeved at one end of the rotating shaft 6. The traction plate 8 and the other end of the rotating shaft 6 are fixedly sleeved with a first bevel gear 7, which is meshed and matched with the second bevel gear 19. The upper end of the traction plate 8 is rotatably connected with a traction rod 9. One end of the preparation and processing box 1 is provided with a through opening 10 corresponding to the traction rod 9. One end of the traction rod 9 is rotatably connected with a linkage kit 37, which is rotatably connected to one end of the screening groove 18. The crushed stone mixture is put into the feed hopper 3, and the put-in material enters the screening groove 18 in the preparation and processing box 1. The personnel turn on the switch of the drive motor 5 from the external controller. After the drive motor 5 is running, the output shaft drives the second bevel gear 19 rotates, and the first bevel gear 7 is driven to rotate with the rotation of the second bevel gear 19. When the first bevel gear 7 rotates, it drives the rotating shaft 6 to rotate, so that the traction plate 8 is driven to rotate and the traction rod 9 is driven to move continuously in the through port 10. The movement of the traction rod 9 drives the linkage kit 37 to move continuously. After the linkage kit 37 moves, the screening groove 18 is pulled to move. When the screening groove 18 moves, the shaking slider 28 is driven to move continuously in the limit groove 26. Under the action of the protrusion 27, the shaking slider 28 is continuously shaken up and down when it moves, which is conducive to continuously swinging and shaking the incoming stone material, thereby improving the uniformity and efficiency of screening.
[0021] Embodiment 2: Based on Embodiment 1, Figure 1 , Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 8As shown, a material distribution component 552 is movably installed inside the screening groove 18, and the material distribution component 552 includes a material distribution mesh plate 21 movably arranged inside the screening groove 18, and a clamping groove 29 opened on the two side walls of the screening groove 18, and a limiting block 30 is slidably arranged inside the clamping groove 29. The two limiting blocks 30 are both rotatably connected to the material distribution mesh plate 21, and the bottom end of the material distribution mesh plate 21 is rotatably connected to the top rod 20. The adjustment component 555 includes a sleeve 31 arranged at the bottom end of the screening groove 18. , and a limit block 32 slidably arranged on the inner side of the sleeve 31, the upper end of the limit block 32 is fixedly connected with the sleeve 31, the limit block 32 is rotatably connected with the top rod 20, the bottom end of the sleeve 31 is provided with a bottom opening 33, the bottom end of the limit block 32 is fixedly connected with an L-shaped rod 23 interlaced with the bottom opening 33, a hydraulic push rod 11 is fixedly installed at one end of the preparation processing box 1, the extended end of the hydraulic push rod 11 is fixedly connected with the L-shaped rod 23, and a discharge port 3 is provided at the bottom end of the screening groove 18 5. A transfer hopper 34 corresponding to the discharge port 35 is interspersed inside the preparation and processing box 1. A discharge pipe 4 used in conjunction with the transfer hopper 34 is fixedly connected to one end of the preparation and processing box 1. After a predetermined working time, a person turns on the switch of the hydraulic push rod 11 from an external controller. After the hydraulic push rod 11 operates, it contracts and drives the L-shaped rod 23 to move. After the L-shaped rod 23 moves, it drives the limit block 32 to slide smoothly in the bottom port 33. When the limit block 32 slides, it pushes the top rod 20 to move. The push of the push rod 20 drives the dividing mesh plate 21 to move, and after the movement of the dividing mesh plate 21, the limiting block 30 is driven to slide on the inner side of the slot 29. As the push of the push rod 20 is applied, the dividing mesh plate 21 begins to rotate around the limiting block 30. After the limiting block 30 rotates to a certain angle, the screened stone impurity particles are discharged, so that they fall from the discharge port 35 to the transfer hopper 34, and then are discharged from the discharge pipe 4 to the outside of the device for processing, which is beneficial to the automatic cleaning of the impurity particles after screening.
[0022] Embodiment 3: Based on Embodiment 1, Figure 1 , Figure 3 , Figure 4 and Figure 6As shown, a temperature control box 12 is arranged inside the preparation and processing box 1, and a mixing assembly 554 is fixedly installed on the inner side of the temperature control box 12. The mixing assembly 554 includes a mixing drum 13 fixedly installed obliquely inside the temperature control box 12, and a mixing plate 22 rotatably installed inside the mixing drum 13. The output shaft of the driving motor 5 is fixedly connected to the central axis of the mixing plate 22. A sealing door 14 is rotatably installed at one end of the mixing drum 13. A discharge bridge 15 used in conjunction with the mixing drum 13 is fixedly connected to one end of the temperature control box 12. A distribution hopper 17 is fixedly installed inside the preparation and processing box 1. A feeding port 16 corresponding to the distribution hopper 17 is provided at the upper end of the temperature control box 12. The L-shaped rod 23 is movably arranged to be interlaced with the distribution hopper 17. Under the continuous screening operation of the groove 18, qualified stone mortar materials are screened and fall from the dividing mesh plate 21 into the dividing hopper 17 below the screening groove 18. The materials falling into the dividing hopper 17 enter the temperature control box 12 from the inlet 16 for temperature control to prevent the entering materials from agglomerating due to too low temperature, and then enter the mixing barrel 13 for mixing. Then, under the operation of the driving motor 5, the output shaft drives the central axis of the mixing plate 22 to rotate, so that the mixing plate 22 continuously mixes the material powder and the forming agent, speeds up the preparation efficiency, and ensures the fluidity of the mixed mortar. After mixing, the personnel open the sealing door 14 to allow the mixed fluid mortar to be discharged through the discharge bridge 15 for use, which is beneficial to ensure the mixing quality.
[0023] like Fig. 9 As shown, the present invention also provides a construction process of a dam curtain grouting hole device, which is used for construction of a dam curtain grouting hole device, and the construction steps of the process are as follows: S1. The lifting monitoring hole is installed before grouting construction; S2. The lifting hole is drilled using XY-2B geological drilling rig with diamond rotary drilling, the drilling diameter is 76mm, and the hole is drilled all the way to the bottom. After drilling, the lifting observation device is installed; S3. During the flushing of borehole cracks, water pressure test and grouting using grouting hole equipment, the lifting deformation observation should be carried out and detailed records should be made; S4. After the grouting work of the unit project is completed, the deformation observation hole is lifted and sealed.
[0024] The above detailed process is as follows Fig. 9 As shown, the hole position is measured first, and the slurry water-cement ratio table is according to Table 1 below. The arrangement of all drill holes is strictly in accordance with the design requirements. Steel pipes are embedded during the construction of the anti-seepage wall. The position of the embedded pipe is measured and verified before construction. The hole position meets the design regulations and requirements. The deviation between the opening hole position of this curtain grouting and the design position is no more than 10cm.
[0025] The drilling is done using an XY-2 geological drilling rig in combination with a diamond drill bit and clean water drilling.
[0026] The drilling is done using a geological rotary drill rig combined with a diamond drill bit, and the curtain grouting hole diameter is φ76mm.
[0027] The deviation between the drilling hole position and the design position shall not exceed 10cm. The drilling depth shall be based on the design depth, and the final hole depth shall be 5m below the relatively impermeable layer (q≤5Lu). If the requirement of q≤5Lu cannot be met, the grouting depth shall be deepened to 5m below q≤5Lu on the basis of the design hole depth. The actual depth, hole position and hole inclination of each drilling hole shall be recorded.
[0028] During the drilling process, keep detailed records of the drilling operations (including the color of the drilling flushing water, water pressure, drilling pressure, core sample length and other factors that can fully reflect the characteristics of the rock or concrete).
[0029] (1) To ensure that the hole inclination requirements are met during construction, the following measures are taken: ① After the drill rod of the drilling rig is aligned with the center of the hole, use a level ruler with an accuracy of 2‰ to adjust the vertical axis in two directions (front, back, left, and right) to be vertical. The deviation rate of the vertical axis of the drilling rig shall not exceed 2‰.
[0030] ② Use ground anchor bolts to connect to the construction platform to fix the drilling rig to prevent displacement during construction.
[0031] ③ During construction, the stability of the drilling rig and the plumbness of the drilling rig's vertical axis should be checked frequently, and combined with the inclination measurement results, measures such as lengthening the thicker-diameter drill tools and appropriately controlling the drilling pressure should be taken to prevent the borehole from deviating beyond the standard.
[0032] ④ During the drilling process, check the angle of the vertical axis at any time and adjust it at any time.
[0033] ⑤ During drilling, strictly control the deviation of hole depth within 20m.
[0034] (2) During the construction, hole inclination measurements were carried out at each grouting section using a KXP-1 inclinometer.
[0035] When flushing the borehole, the grouting hole section uses pressurized water to flush the hole wall and cracks before grouting until the return water is clean, which lasts for 10 minutes. The thickness of the residual deposit in the hole after flushing is no more than 20cm. The flushing pressure is 80% of the grouting pressure of this section and is not more than 1.0MPa.
[0036] During the water pressure test, the curtain grouting holes are tested in sections from top to bottom. The pilot hole and the inspection hole are tested by single-point water pressure, and the other curtain grouting hole sections are tested by simple water pressure before grouting. The water pressure test pressure is 80% of the grouting pressure of the section and is not greater than 1.0Mpa. The water pressure is 20 minutes, and the pressure flow is measured every 5 minutes. The final flow value is taken as the calculated flow.
[0037] During the construction of pilot holes and inspection holes, cores are drilled and taken from the grouting pilot holes and inspection holes, and they are uniformly numbered, packed with labels, and a borehole column chart is drawn and a core description is performed according to the coring order. The water pressure test of each section of the pilot hole and inspection hole is carried out at 80% of the grouting pressure, and the necessary data must be recorded, including hole number, section length, pressure gauge elevation, groundwater level elevation, water pressure pressure, flow rate, water pressure time and permeability.
[0038] The grouting construction steps are as follows: (1) The curtain grouting under the longitudinal reinforcement body adopts the "curtain grouting first section top hole closing, top-down, segmented circulation method" grouting, and the distance between the grouting pipe and the bottom of the hole is no more than 0.5m during grouting.
[0039] (2) The grouting of the first section (orifice pipe section) is carried out by the plug method. During grouting, the grouting plug is set in the concrete at a distance of 0.3 m from the concrete bottom plate.
[0040] (3) After the first section is grouted, it should be left to set for 24 hours. If there is no water gushing out of the hole mouth of the remaining sections, it is generally not necessary to wait for setting after the grouting is completed, and the next section of drilling and grouting can be carried out directly.
[0041] Pre-buried orifice pipe Curtain grouting is carried out through pre-buried steel pipes in the anti-seepage wall, with a pipe spacing of 2.0m and an orifice pipe diameter of 110mm.
[0042] Table 1 is the water-cement ratio of the slurry
[0043] When the present invention is used, the user first operates to put the crushed stone mixture from the feed hopper 3, and the put-in material enters the screening groove 18 in the preparation and processing box 1. The personnel turn on the switch of the drive motor 5 from the external controller. After the drive motor 5 is running, the output shaft drives the second bevel gear 19 to rotate, and the first bevel gear 7 is driven to follow the rotation under the rotation of the second bevel gear 19. When the first bevel gear 7 rotates, it drives the rotating shaft 6 to rotate, so that the traction plate 8 is driven to rotate and the traction rod 9 is driven to continuously move in the through port 10. Under the movement of the traction rod 9, the linkage kit 37 is driven to continuously move. After the linkage kit 37 moves, the screening groove 1 is pulled. 8 is movable, and when the screening groove 18 moves, it drives the shaking slider 28 to move continuously in the limit groove 26. Under the action of the protrusion 27, the shaking slider 28 shakes up and down continuously when it moves, so that the incoming stone materials are constantly swung and shaken. At the same time, when the screening groove 18 moves, it drives the sleeve block 24 to slide back and forth in the fixed rod 36, which has better stability. Under the continuous screening operation of the screening groove 18, qualified stone mortar materials are screened and fall from the material distribution mesh plate 21 to the material distribution hopper 17 below the screening groove 18. The materials falling into the material distribution hopper 17 enter the temperature control box 12 from the feed inlet 16 for temperature control to prevent the temperature from being too high. If the material is too low, it will cause the material to agglomerate, and then enter the mixing barrel 13 for mixing. Then, under the operation of the driving motor 5, the output shaft drives the central axis of the mixing plate 22 to rotate, so that the mixing plate 22 continuously mixes the material powder and the molding agent, speeds up the preparation efficiency, and ensures the fluidity of the mixed mortar. After mixing, the personnel open the sealing door 14, so that the mixed fluid mortar material is discharged through the discharge bridge 15 for use, and the stone powder is continuously screened through the separation component 551. After working for a predetermined time, the personnel turn on the switch of the hydraulic push rod 11 from the external controller. After the hydraulic push rod 11 is operated and retracted, it drives the L-shaped rod 23 to move. After the profile rod 23 moves, it drives the limit block 32 to slide smoothly in the bottom opening 33, and when the limit block 32 slides, it pushes the top rod 20 to move, and the material dividing mesh plate 21 is driven to move under the push of the top rod 20. After the movement of the material dividing mesh plate 21, it drives the limit block 30 to slide on the inner side of the slot 29. With the push of the top rod 20, the material dividing mesh plate 21 begins to rotate around the limit block 30. After the limit block 30 rotates to a certain angle, the screened stone impurity particles are discharged, so that they fall from the discharge port 35 to the transfer hopper 34, and then are discharged from the discharge pipe 4 to the outside of the device for processing, and then the direction of the hydraulic push rod 11 is operated to reset the material dividing mesh plate 21.
[0044] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A dam curtain grouting hole device, comprising a support base (2), a preparation and processing box (1) is fixedly mounted on the upper end of the support base (2), a feed hopper (3) is arranged on the upper end of the preparation and processing box (1), two transverse plates (25) are symmetrically fixedly mounted inside the preparation and processing box (1), characterized in that: A separation component (551) is installed between the two transverse plates (25), and the separation component (551) comprises a limit groove (26) symmetrically arranged between the two transverse plates (25), and a shaking slider (28) slidably arranged inside the limit groove (26), and a plurality of protrusions (27) used in conjunction with the shaking slider (28) are arranged at the inner bottom end of the limit groove (26), a screening groove (18) is commonly connected between the two shaking sliders (28), a material separation component (552) is movably installed inside the screening groove (18), and an adjustment component (555) is arranged at the bottom end of the screening groove (18), a driving component (553) is fixedly installed at one end of the preparation and processing box (1), and a traction component (556) is rotatably installed at one end of the preparation and processing box (1).
2. A dam curtain grouting hole device according to claim 1, characterized in that: The front and rear ends of the preparation and processing box (1) are fixedly connected to a plurality of fixed rods (36), and sleeve blocks (24) are slidably sleeved on the outer surfaces of the fixed rods (36), and the sleeve blocks (24) are fixedly connected to the screening grooves (18).
3. A dam curtain grouting hole device according to claim 1, characterized in that: The material distribution assembly (552) comprises a material distribution mesh plate (21) movably arranged inside the screening groove (18), and a clamping groove (29) provided on the two side walls of the screening groove (18), a limiting block (30) being slidably arranged inside the clamping groove (29), and both of the limiting blocks (30) being rotatably connected to the material distribution mesh plate (21), and a top rod (20) being rotatably connected to the bottom end of the material distribution mesh plate (21).
4. A dam curtain grouting hole device according to claim 1, characterized in that: The adjustment assembly (555) comprises a sleeve (31) arranged at the bottom end of the screening groove (18), and a limit block (32) slidably arranged inside the sleeve (31); the upper end of the limit block (32) is fixedly connected to the sleeve (31); the limit block (32) is rotatably connected to the top rod (20); a bottom opening (33) is formed at the bottom end of the sleeve (31); the bottom end of the limit block (32) is fixedly connected to an L-shaped rod (23) interlaced with the bottom opening (33); a hydraulic push rod (11) is fixedly installed at one end of the preparation treatment box (1); and the protruding end of the hydraulic push rod (11) is fixedly connected to the L-shaped rod (23).
5. A dam curtain grouting hole device according to claim 4, characterized in that: The drive assembly (553) comprises a drive motor (5) fixedly mounted on one end of the preparation and processing box (1), and a second bevel gear (19) fixedly sleeved on the output end of the drive motor (5); a temperature control box (12) is arranged inside the preparation and processing box (1), and a mixing assembly (554) is fixedly mounted on the inner side of the temperature control box (12).
6. A dam curtain grouting hole device according to claim 5, characterized in that: The mixing assembly (554) comprises a mixing barrel (13) fixedly mounted obliquely inside a temperature control box (12), and a mixing plate (22) rotatably mounted inside the mixing barrel (13); an output shaft of the drive motor (5) is fixedly connected to a central axis of the mixing plate (22); a sealing door (14) is rotatably mounted on one end of the mixing barrel (13); and a discharge bridge (15) used in conjunction with the mixing barrel (13) is fixedly connected to one end of the temperature control box (12).
7. The dam curtain grouting hole equipment according to claim 5, characterized in that: The traction assembly (556) comprises a rotating shaft (6) rotatably mounted on one end of the preparation processing box (1), and a traction plate (8) fixedly mounted on one end of the rotating shaft (6); a first bevel gear (7) is fixedly mounted on the other end of the rotating shaft (6); the first bevel gear (7) is meshed and matched with a second bevel gear (19).
8. The dam curtain grouting hole equipment according to claim 7, characterized in that: The upper end of the traction disc (8) is rotatably connected to a traction rod (9), one end of the preparation and processing box (1) is provided with a through opening (10) corresponding to the traction rod (9), one end of the traction rod (9) is rotatably connected to a linkage kit (37), and the linkage kit (37) is rotatably connected to one end of the screening groove (18).
9. The dam curtain grouting hole equipment according to claim 1, characterized in that: A discharge port (35) is provided at the bottom end of the screening groove (18), a transfer hopper (34) corresponding to the discharge port (35) is inserted into the interior of the preparation and processing box (1), and a discharge pipe (4) used in conjunction with the transfer hopper (34) is fixedly connected to one end of the preparation and processing box (1).
10. The dam curtain grouting hole equipment according to claim 5, characterized in that: A material distribution hopper (17) is fixedly installed inside the preparation and processing box (1), and an inlet (16) corresponding to the material distribution hopper (17) is provided at the upper end of the temperature control box (12), and the L-shaped rod (23) is movably arranged to intersect with the material distribution hopper (17).
11. A construction process for a dam curtain grouting hole device, using the dam curtain grouting hole device according to any one of claims 1 to 10 for construction, characterized in that: The construction process comprises the following steps: S1. The lifting monitoring hole is installed before grouting construction; S2. The lifting hole is drilled using XY-2B geological drilling rig with diamond rotary drilling, the drilling diameter is 76mm, and the hole is drilled all the way to the bottom. After drilling, the lifting observation device is installed; S3. During the flushing of borehole cracks, water pressure test and grouting using grouting hole equipment, the lifting deformation observation should be carried out and detailed records should be made; S4. After the grouting work of the unit project is completed, the deformation observation hole is lifted and sealed.
Citation Information
Patent Citations
Screening device for grain processing
CN109954656A
Combined type frozen rock area mineral mining machine with screening and separating functions
CN115095321A
Dam curtain grouting system and construction method thereof
CN117605035A
Sediment screening and washing device for concrete pole production
CN119327718A
Building vibratory screen apparatus
CN208275740U