Separating type TBM synchronous lining construction device

By designing a separate TBM synchronous lining construction device, including a needle beam arch trolley, a steel bar trolley, a second lining trolley and a maintenance trolley, the problem of synchronous construction of TBM excavation and secondary lining is solved, and efficient construction efficiency and shortening of construction period is achieved.

CN119878237AActive Publication Date: 2025-04-25HUNAN PROVINCE YUANDONGCIDIANGAOKE CO LTD

Patent Information

Application Number
CN202510268611.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-07
Publication Date
2025-04-25
Estimated Expiration
2045-03-07

AI Technical Summary

Technical Problem

In the construction method of separate TBM synchronous lining, the distance between the TBM excavation palm surface and the secondary lining working surface is relatively large, which is difficult to meet relevant requirements. At the same time, the transportation of construction materials and equipment operation need to ensure that it does not affect the TBM construction, and the secondary lining formwork needs to be quickly changed to cross-section conversion.

Method used

A separate TBM synchronous lining construction device is designed, including needle beam arch trolley, steel bar trolley, second lining trolley and maintenance trolley. Through the operation of slitting the warehouse, various trolleys and transportation devices are not interfered with each other and improved construction efficiency.

Benefits of technology

The TBM excavation and secondary lining are synchronized, which shortens the construction period, improves construction efficiency, meets relevant requirements, and reduces manual operations through automated or semi-automated construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119878237A_ABST
    Figure CN119878237A_ABST
Patent Text Reader

Abstract

The invention relates to a separated TBM synchronous lining construction device which comprises a needle beam inverted arch trolley, a steel bar trolley, a secondary lining trolley and a maintenance trolley. Wherein the needle beam inverted arch trolley is used for short side wall lining, and the steel bar trolley is used for lifting and transporting steel bars and providing a mounting platform; the secondary lining trolley is used for pouring secondary lining concrete, so that the wall surface of the tunnel is stable and firm; the curing trolley is used for watering and curing secondary lining concrete; wherein the TBM synchronous lining construction area comprises a short side wall construction area, a reinforcing steel bar construction area, a side top arch construction area and a secondary lining maintenance area, the short side wall construction area is at least provided with more than two needle beam inverted arch trolleys, the reinforcing steel bar construction area is provided with at least more than two reinforcing steel bar trolleys, and the side top arch construction area is at least provided with more than two secondary lining trolleys. The low side wall construction area, the steel bar construction area and the side top arch construction area are all constructed in an alternate warehouse operation mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel construction, and in particular to a separated TBM synchronous lining construction device. Background Art

[0002] As an integrated mechanical, electrical, hydraulic, sensor and control construction equipment, TBM has the advantages of good construction environment, fast speed and low cost for long-distance construction, and is widely used. In the past, whether the slag was discharged by rail transportation or continuous belt conveyor during TBM construction, secondary mold lining was carried out after the TBM excavation was completed. It was impossible to achieve the simultaneous construction of TBM excavation and secondary mold lining, the construction period was long, and it was inconsistent with the construction principle of the New Austrian Tunneling Method. It was inconsistent with the requirements issued by the Ministry of Railways, the Ministry of Construction and other ministries and commissions that the distance between the secondary lining and the tunnel excavation face should not exceed the limit determined by the document specifications. Considering the construction safety, shortening the total construction period of the tunnel, and economy, the synchronous lining of the tunnel constructed by the TBM method has become an important development trend.

[0003] According to the different locations of the secondary synchronous lining equipment, the overall construction plan of synchronous lining mainly includes two types: integral type and separate type. In the integral type, the secondary synchronous lining equipment and the TBM rear supporting equipment are combined into a whole; in the separate type, the secondary synchronous lining equipment and the TBM rear supporting equipment are properly separated and maintain a reasonable distance.

[0004] However, there are many problems in the current construction method of separate TBM synchronous lining. For example, the distance between the TBM excavation face and the secondary lining working face is large, which does not meet the relevant requirements; construction material transportation, continuous belt conveyors, large-diameter ventilation hoses, etc. need to smoothly pass through the synchronous lining trolley and ensure smooth operation, etc. In particular, it must be ensured that no matter what working state the secondary lining operation is in, such as trolley shifting, formwork erection, pouring, maintenance, demoulding, etc., it will not affect the power supply, communication, ventilation, water supply and drainage, construction material transportation, and waste slag transportation required for TBM construction; the inner diameter of the section after lining of the TBM excavation section is 10.2m~10.6m, and there are multiple section radius changes. How to realize the rapid section change conversion of the secondary lining template is also a key issue.

[0005] Therefore, how to provide a construction device that can prevent various trolleys and transport devices from interfering with each other during the synchronous lining construction of a separated TBM, thereby improving construction efficiency and saving construction time is a technical problem that needs to be solved urgently in this field. Summary of the invention

[0006] In order to solve at least one or more of the above technical problems, the present invention provides a separate TBM synchronous lining construction device, which fundamentally solves the technical bottleneck of delayed lining construction, and also meets the requirements of the distance between the secondary lining and the excavation face promulgated by the state, thereby improving the comprehensive construction speed. The present invention provides a separate TBM synchronous lining construction device, comprising:

[0007] Needle beam arch trolley, steel bar trolley, secondary lining trolley, maintenance trolley, among which,

[0008] The needle beam inverted arch trolley is used for lining the short side walls;

[0009] The steel bar trolley is used for lifting and transporting steel bars and providing an installation platform;

[0010] The secondary lining trolley is used to pour secondary lining concrete to make the tunnel wall stable and strong;

[0011] The curing trolley is used for watering and curing the secondary lining concrete;

[0012] Among them, the TBM synchronous lining construction area includes the low side wall construction area, the steel bar construction area, the side top arch construction area, and the secondary lining maintenance area. The low side wall construction area is equipped with at least 2 needle beam arch trolleys, the steel bar construction area is equipped with at least 2 steel bar trolleys, and the side top arch construction area is equipped with at least 2 secondary lining trolleys. The low side wall construction area, the steel bar construction area, and the side top arch construction area are all constructed using the skip-bin operation method.

[0013] Furthermore, the needle beam arch trolley comprises a needle beam portion, a beam frame portion and a cross plate portion, wherein the beam frame portion is a rectangular frame formed by connecting square tubes; after the needle beam portion passes through the beam frame portion, it is slidably arranged with the beam frame portion; the beam frame portion is a rectangular frame formed by connecting square tubes; the cross plate portion is recoverably fixed to the bottom end of the beam frame portion, and is extended along the length direction of the cross plate portion; the needle beam portion comprises a needle beam, at least two groups of needle beam bases and at least two groups of needle beam transverse movement mechanisms, wherein the needle beam is a double-web box-type structure welded by a panel and supporting ribs; the needle beam bases are arranged on the bottom surfaces of the two end sides of the needle beam, and are connected to the needle beam through a needle beam transverse movement mechanism; one end of the needle beam transverse movement mechanism is slidably fixed on the top end surface of the needle beam base, extending along the transverse direction of the needle beam, and the other end arranged oppositely is fixed to the needle beam as a whole, and is arranged to move together.

[0014] Furthermore, the needle beam transverse movement mechanism includes a base, a translation seat and a first telescopic cylinder, wherein the base is fixed on the top end surface of the needle beam base and extends along the width direction of the needle beam; the translation seat is slidably fixed to the needle beam base through one end of the base, and the other end oppositely arranged is connected to the needle beam as a whole, and the two are arranged to move together; one end of the first telescopic cylinder is fixed to the base, and the other end oppositely arranged is fixed to the translation seat as a whole, and the two are arranged to move together.

[0015] Furthermore, the needle beam arch trolley also includes a needle beam transverse movement mechanism and a needle beam lifting mechanism between the needle beams, one end of the needle beam lifting mechanism is fixed to the needle beam base through the needle beam transverse movement mechanism, and the other end oppositely arranged is fixed to the needle beam as a whole, and is retractable in the vertical direction.

[0016] Furthermore, the steel bar trolley includes a steel bar lifting trolley and a steel bar installation trolley arranged in front of the steel bar installation trolley, and the steel bar trolley is provided with a two-layer push-pull working platform.

[0017] Furthermore, the secondary lining trolley comprises a portal assembly, a variable diameter telescopic assembly, a lining template assembly and an extension assembly;

[0018] The lining formwork assembly comprises a plurality of arc-shaped formworks connected in sequence and detachably arranged on the periphery of the portal frame assembly;

[0019] The variable diameter telescopic assembly is arranged between the portal assembly and the lining formwork assembly, and its telescopic movement drives the lining formwork assembly to increase or decrease its diameter;

[0020] An extension assembly is used to be arranged at the notch of the lining formwork assembly when the diameter of the lining formwork assembly increases;

[0021] The lining template components are arranged in two groups symmetrically along the central axis of the lining trolley; among the adjacent connected arc templates, at least one pair of arc templates is detachably connected; and the extension component is detachably arranged between the adjacent detachable arc templates.

[0022] Furthermore, the separated TBM synchronous lining construction device also includes a support trolley, a transformer support trolley, a continuous belt conveyor, and a drag pump;

[0023] The support trolley is used to support the continuous belt conveyor, water pipes, cables, and air duct accessories during the construction process;

[0024] The transformer support trolley is used to drive the transformer and distribution cabinet accessories to move into the tunnel as the construction progresses, ensuring stable power supply in the tunnel.

[0025] The trailer pump is used to transport concrete for the secondary lining and is used in conjunction with the secondary lining trolley.

[0026] Furthermore, the separated TBM synchronous lining construction device also includes: a pipeline crossing device; the pipeline crossing device is used for crossing the pipeline.

[0027] Furthermore, the pipeline crossing device includes: a traveling support, a support seat arranged above the traveling support, and a stinger;

[0028] The walking support is arranged on the lifting and lowering moving device and moves relative to the moving device in the vertical direction;

[0029] The stinger rack is arranged above the support seat for sliding left and right, and is used for carrying the pipeline.

[0030] Furthermore, the separated TBM synchronous lining construction device also includes: a line crossing device; the line crossing device is used for crossing the line.

[0031] In this embodiment, a separate TBM synchronous lining construction device is provided, which is used in the separate TBM synchronous lining construction process. As the TBM advances, the low side wall construction area, the steel bar construction area, the side top arch construction area and the secondary lining maintenance area continue to follow the excavation face forward, and the corresponding needle beam arch trolley, steel bar trolley, secondary lining trolley and maintenance trolley advance with the work area, with clear division of labor. The distance between the TBM excavation face and the secondary lining working face can be kept constant to meet the relevant requirements. On the other hand, the TBM excavation and synchronous lining are carried out simultaneously, which can greatly shorten the downtime caused by waiting for lining. Various trolleys and transportation equipment are used to realize the automation or semi-automation of lining operations, reduce manual operations, and improve construction efficiency. Various trolleys and transportation devices do not interfere with each other when working, which improves construction efficiency and saves construction time. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without creative work. In the drawings, the same parts are marked with the same reference numerals. The drawings are not drawn according to the actual scale.

[0033] Figure 1 It is a schematic diagram of an embodiment of a TBM synchronous lining construction area of ​​a separate TBM synchronous lining construction device of the present invention;

[0034] Figure 2 A schematic diagram of an embodiment of a needle beam inverted arch trolley of a separated TBM synchronous lining construction device of the present invention;

[0035] Figure 3 It is a partial structural schematic diagram of another embodiment of the needle beam inverted arch trolley of the separated TBM synchronous lining construction device of the present invention.

[0036] Figure 4 A schematic diagram of an embodiment of a pipeline crossing device of a separated TBM synchronous lining construction device of the present invention;

[0037] Figure 5 It is a schematic diagram of an embodiment of a line crossing device of a separated TBM synchronous lining construction device of the present invention. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] It should be noted that when an element is referred to as being "fixed on" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element at the same time. When an element is referred to as being "connected to" another element, it may be directly connected to the other element or there may be an intermediate element at the same time.

[0040] It should also be noted that if the embodiments of the present invention involve directional indications, such as up, down, left, right, front, back, etc., then the directional indication is only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly. In addition, if the embodiments of the present invention involve descriptions of "first, second", "S1, S2", "step one, step two", etc., then such descriptions are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of indicated technical features or indicating the execution order of the method, etc. Those skilled in the art can understand that anything that does not violate the gist of the invention under the technical concept of the invention should be included in the protection scope of the present invention.

[0041] The present invention provides a separated TBM synchronous lining construction device, comprising:

[0042] Needle beam arch trolley, steel bar trolley, secondary lining trolley, maintenance trolley, among which,

[0043] The needle beam inverted arch trolley is used for lining the short side walls;

[0044] The steel bar trolley is used for lifting and transporting steel bars and providing an installation platform;

[0045] The secondary lining trolley is used to pour secondary lining concrete to make the tunnel wall stable and strong;

[0046] The curing trolley is used for watering and curing the secondary lining concrete.

[0047] Among them, reference Figure 1The TBM synchronous lining construction area includes the low side wall construction area, the steel bar construction area, the side top arch construction area, and the secondary lining maintenance area. The low side wall construction area is equipped with at least 2 needle beam arch trolleys, the steel bar construction area is equipped with at least 2 steel bar trolleys, and the side top arch construction area is equipped with at least 2 secondary lining trolleys. The low side wall construction area, the steel bar construction area, and the side top arch construction area are all constructed using the skip-bin operation method.

[0048] In this embodiment, the separated TBM synchronous lining construction device includes: a needle beam arch trolley, a steel bar trolley, a secondary lining trolley, and a maintenance trolley, which respectively correspond to the low side wall construction area, the steel bar construction area, the side top arch construction area, and the secondary lining maintenance area of ​​the synchronous lining construction area for construction. The specific construction process is as follows: first, prefabricated invert blocks are laid, transport tracks and symmetrical turnouts are set up, and then in the low side wall construction area, a needle beam inverted arch trolley is used to tie the low side wall reinforcement and lining the low side wall. The needle beam inverted arch trolley is provided with a demoulding cylinder for lining the low side wall; then, the needle beam inverted arch trolley moves forward to the next construction position, and in the reinforcement construction area, the reinforcement trolley receives the processed reinforcement transported by the transport vehicle, and is responsible for lifting and transporting the reinforcement and providing a binding and installation platform for the secondary lining reinforcement. After the binding and installation of the secondary lining reinforcement is completed, the reinforcement trolley moves forward to the next construction position; in the side top arch construction area, the secondary lining trolley cooperates with the pump truck to pour secondary lining concrete at the second lining reinforcement binding position of the tunnel section, so as to make the tunnel wall stable and strong; finally, in the secondary lining maintenance area, the maintenance trolley is used to regularly water and maintain the secondary lining concrete to prevent concrete cracking. As the TBM advances, the low side wall construction area, steel bar construction area, side arch construction area and secondary lining maintenance area continue to advance with the excavation face. The corresponding needle beam arch trolley, steel bar trolley, secondary lining trolley and maintenance trolley advance with the work area. The division of labor is clear. The distance between the TBM excavation face and the secondary lining working face can be kept constant to meet the relevant requirements. On the other hand, TBM excavation and synchronous lining are carried out at the same time, which can greatly shorten the downtime caused by waiting for lining. Various trolleys and transportation equipment are used to realize the automation or semi-automation of lining operations, reduce manual operations, and improve construction efficiency. Various trolleys and transportation devices do not interfere with each other when working, which improves construction efficiency and saves construction time.

[0049] Preferably, reference Figure 2 and Figure 3The needle beam arch trolley includes a needle beam portion 10, a beam frame portion 20 and a cross plate portion 30, wherein the beam frame portion 20 is a rectangular frame formed by connecting square tubes; after the needle beam portion 10 passes through the beam frame portion 20, it is slidably arranged with the beam frame portion 20; the beam frame portion 20 is a rectangular frame formed by connecting square tubes; the cross plate portion 30 is recyclably fixed to the bottom end of the beam frame portion 20, and is extended along the length direction of the cross plate portion 30; the needle beam portion 10 includes a needle beam 11, at least two sets of needle beam bases 12 and at least two sets of needle beam transverse movement mechanisms 14, wherein the needle beam 11 is a double-web box-type structure formed by welding a panel and a supporting rib The needle beam base 12 is arranged on the bottom surface of the two end sides of the needle beam 11, and is connected to the needle beam 11 through a needle beam transverse movement mechanism 14; one end of the needle beam transverse movement mechanism 14 is slidably fixed on the top surface of the needle beam base 12, extending along the transverse direction of the needle beam 11, and the other end relatively arranged is fixed to the needle beam 11 as a whole, and is arranged to move together; thus, through the needle beam transverse movement mechanism extending along the transverse direction of the needle beam and slidingly arranged with the needle beam base, the position adjustment of the entire needle beam part in the transverse direction can be realized extremely conveniently, and then the needle beam arch trolley can be adjusted at different process positions, which greatly improves the construction efficiency.

[0050] In addition, in order to improve the stability of the needle beam inverted arch trolley after assembly at the tunnel construction site, the broken side surface of the needle beam base 12 away from the farthest end of the needle beam 11 is set as an arc side surface. Tracks are set on the top and bottom surfaces of the needle beam 11 in the height direction to reduce the friction between the beam frame 20 when sliding.

[0051] Specifically, Figure 2 As shown, the needle beam transverse movement mechanism 14 includes a base 141, a translation seat 142 and a first telescopic cylinder 143, wherein the base 141 is fixed on the top surface of the needle beam base and extends along the width direction of the needle beam 11; the translation seat 142 is slidably fixed to the needle beam base 12 through one end of the base 141, and the other end oppositely arranged is connected to the needle beam 11 as a whole and moves together; one end of the first telescopic cylinder 143 is fixed on the base 141, and the other end oppositely arranged is fixed to the translation seat 142 as a whole and moves together. Therefore, under the drive of the first telescopic cylinder 143, the translation seat 142 drives the needle beam 11 to slide along the transverse direction of the needle beam 11, thereby realizing the position adjustment of the needle beam 11 in its width direction.

[0052] Optionally, in order to adjust the position of the needle beam portion 10 in the height direction, a needle beam lifting mechanism 13 is further included between the needle beam transverse movement mechanism 14 and the needle beam 11, one end of the needle beam lifting mechanism 13 is fixed to the needle beam base 12 through the needle beam transverse movement mechanism 14, and the other end oppositely arranged is fixed to the needle beam 11 as a whole, and is retractably arranged in the vertical direction. Preferably, the needle beam lifting mechanism 13 is retractably fixed to the end side surface of the short side of the needle beam 11. Furthermore, the needle beam lifting mechanism 13 includes a needle beam lifting sleeve 131, a needle beam guide rod 132 and a needle beam lifting cylinder 133, wherein the bottom end of the needle beam guide rod 132 is fixed on the top surface of the needle beam transverse movement mechanism 14, and the other end arranged oppositely extends upward along the vertical direction; the needle beam lifting sleeve 131 is sleeved on the outer peripheral side of the needle beam guide rod 132, and is fixed as a whole with the needle beam 11, and is arranged to move together; the needle beam lifting cylinder 133 is embedded in the internal cavity of the needle beam guide rod 132, one end of which is fixed on the needle beam transverse movement mechanism 14, and the other end arranged oppositely is telescopically fixed to the needle beam 11. Therefore, through the needle beam lifting cylinder telescopically arranged with the needle beam, the needle beam can be conveniently adjusted and controlled in the height direction as required.

[0053] In summary, the needle beam portion provided in the above embodiment, under the drive of the first telescopic cylinder, the translation seat drives the needle beam to slide along the lateral direction of the needle beam, thereby realizing the position adjustment of the needle beam in its width direction; through the needle beam lifting cylinder telescopically arranged with the needle beam, the needle beam can be conveniently adjusted and controlled in the height direction as needed, and then the position optimization and adjustment of the needle beam portion in the operation process can be realized, which has a wider range of applicable scenarios and significantly improves the construction efficiency.

[0054] Preferably, the steel bar trolley equipment includes a steel bar lifting trolley and a steel bar installation trolley arranged in front of the steel bar installation trolley, and the steel bar trolley is provided with a two-layer push-pull working platform.

[0055] In this embodiment, the steel bar trolley equipment includes a steel bar lifting trolley and a steel bar installation trolley arranged in front of the steel bar installation trolley; the function of the steel bar lifting trolley is to lift the steel bars in the transport vehicle onto the steel bar lifting trolley and store them on the platform on the steel bar lifting trolley, which plays the role of transferring and temporarily storing steel bars; the steel bar installation trolley is a workplace for operators to make, tie and install steel bars; the steel bar trolley is provided with a two-layer push-pull working platform, and the push-pull structure can greatly save space, making the steel bar trolley structure more compact, providing more working platforms for the steel bar trolley without affecting the movement of the trolley.

[0056] More preferably, the steel bar trolley includes a support frame, a walking part, and a steel bar conveying part, wherein the walking part is arranged at the bottom end of the support frame and moves with the support frame; the steel bar conveying part is fixed on the support frame and can be rotated relative to the support frame; the steel bar conveying part includes a placement platform, a top platform and a transfer device, the placement platform is horizontally fixed on the support frame and extends along the length direction of the support frame; the top platform is fixed on the placement platform and extends along the length direction of the support frame; the transfer device is arranged between the placement platform and the top platform, and the switching setting of the lifting of the steel bar can be realized between the placement platform and the top platform. Thus, by the transfer device arranged between the placement platform and the top platform, the lifting of the steel bar between the placement platform and the top platform can be realized extremely conveniently, and then the steel bar can be flexibly disposed of during the construction process, and the space utilization rate of the steel bar trolley supporting the TBM synchronous lining can be effectively utilized. While realizing the transfer, it has the function of temporary storage, and can provide a place for pre-processing of steel bar production, binding and installation, which greatly shortens the construction period and significantly improves the construction efficiency.

[0057] Preferably, the secondary lining trolley comprises a portal assembly, a variable diameter telescopic assembly, a lining template assembly and an extension assembly;

[0058] The lining formwork assembly comprises a plurality of arc-shaped formworks connected in sequence and detachably arranged on the periphery of the portal frame assembly;

[0059] The variable diameter telescopic assembly is arranged between the portal assembly and the lining formwork assembly, and its telescopic movement drives the lining formwork assembly to increase or decrease its diameter;

[0060] An extension assembly is used to be arranged at the notch of the lining formwork assembly when the diameter of the lining formwork assembly increases;

[0061] The lining template components are arranged in two groups symmetrically along the central axis of the lining trolley; among the adjacent connected arc templates, at least one pair of arc templates is detachably connected; and the extension component is detachably arranged between the adjacent detachable arc templates.

[0062] In this embodiment, a secondary lining trolley is provided, which can quickly and adaptively adjust the diameter of the lining trolley according to the actual situation of the tunnel currently under construction by setting a lining template assembly composed of several arc templates, a variable diameter telescopic assembly, and an extension assembly to increase its scope of use. Compared with the traditional method, when encountering a variable diameter situation, it is necessary to redesign and manufacture a new synchronous lining transport trolley to transport it to the construction site, which will greatly improve construction efficiency and reduce manpower, financial resources and time waste.

[0063] Preferably, the mast assembly comprises: a mast body, a stand and a telescopic member of the stand;

[0064] The gantry body is arranged on the track at the bottom of the tunnel;

[0065] A stand is detachably arranged on the mast body;

[0066] The telescopic member of the platform is arranged between the platform and the door frame body.

[0067] In this embodiment, the portal assembly includes a portal body and a platform, and a platform telescopic member is added between the two. When the diameter of the secondary lining trolley increases or decreases, the portal body located below remains stationary, and the platform telescopic member arranged between the portal body and the platform is extended or retracted, so that the platform located above rises or falls accordingly, ensuring that the corresponding center of the lining formwork assembly rises or falls, so that the overall skeleton of the portal assembly adapts to the change in the diameter of the secondary lining trolley, so as to better support and carry other components, and at the same time adapt to the change in the force angle caused by the change in the diameter of the lining formwork assembly, so as to improve the force condition of the entire portal assembly.

[0068] More preferably, the door frame assembly further includes a first adjusting member and / or a second adjusting member;

[0069] A first adjusting member is detachably mounted between the gantry body and the stand;

[0070] The second adjusting member is detachably installed between the stand and the lining formwork assembly.

[0071] In this embodiment, after the telescopic component has completed its telescopic extension, since the lining formwork assembly itself is very heavy, if the telescopic component continues to bear the gravity of the lining formwork assembly for a long time, the telescopic performance of the telescopic component will be damaged, and even the telescopic component will be damaged, causing the second lining trolley to be unusable. Therefore, a second adjusting member is added to the contact position between the gantry and the lining formwork assembly, and the second adjusting member is used to bear the gravity of the lining formwork assembly, which can increase the service life of the second lining trolley; at the same time, the distance adjusted by the second adjusting member is adapted to the change in the diameter of the tunnel variable section, and the telescopic change of the telescopic component is no longer used to adapt to the change in the diameter of the tunnel variable section, which can improve the accuracy of the diameter change.

[0072] Preferably, the separated TBM synchronous lining construction device further comprises a belt support trolley, a transformer support trolley, a continuous belt conveyor, and a drag pump;

[0073] The belt support trolley is used to support the continuous belt conveyor, water pipes, cables, and air duct accessories during the construction process;

[0074] The transformer support trolley is used to drive the transformer and distribution cabinet accessories to move into the tunnel as the construction progresses, ensuring stable power supply in the tunnel.

[0075] The trailer pump is used to transport concrete for the secondary lining and is used in conjunction with the secondary lining trolley.

[0076] In this embodiment, a support trolley, a transformer support trolley, a continuous belt conveyor and a drag pump are added to the separated TBM synchronous lining construction device. Because the trolleys work in a skipping manner, there is a certain distance between the synchronous lining equipment, and the continuous belt conveyor, water pipes, cables and air ducts installed in the distance lack support points. Therefore, it is necessary to set a belt support trolley between the synchronous lining equipment to eliminate the adverse effects on the power supply, communication, ventilation, water supply and drainage, and waste transportation required for TBM construction; the continuous belt conveyor is responsible for uninterruptedly transporting construction waste such as slag to the outside of the tunnel, To meet the needs of construction; the transformer support trolley is used to drive the transformer and distribution cabinet accessories to move into the tunnel as the construction progresses, ensuring stable power supply in the tunnel; more preferably, the transformer support trolley is provided with a transformer shock-absorbing component to reduce the impact of vibration generated by tunnel construction on electrical equipment of the transformer and distribution cabinet accessories, and improve the stability of power supply and distribution of the transformer and distribution cabinet accessories; the drag pump is used in conjunction with the secondary lining trolley to transport concrete for the secondary lining and complete the pouring of the secondary lining; more preferably, the drag pump is a monorail drag pump, which can greatly reduce the occupancy of the transportation track.

[0077] Preferably, reference Figure 4 The separated TBM synchronous lining construction device also includes: a pipeline crossing device; the pipeline crossing device is used for crossing the pipeline.

[0078] In this embodiment, a pipeline crossing device is added to the separated TBM synchronous lining construction device. During the movement of the needle beam arch trolley, the steel bar trolley, the secondary lining trolley, and the maintenance trolley, the pipeline crossing device is used to cross the pipeline. If the traditional method is adopted, various fixed supports such as mounting brackets are set on the tunnel wall to support various pipelines and lines. Since various trolleys often need to move up and down, left and right, and forward and backward, the fixed supports and the pipelines set on the fixed supports will interfere with the movement of the trolley. At this time, the fixed supports and the pipelines set on the fixed supports need to be removed to meet the needs of the trolley moving up and down, left and right, and forward and backward. The above-mentioned various situations will greatly waste time, manpower, and material resources, and also seriously affect the continuity and efficiency of construction. The use of the pipeline crossing device for pipeline crossing can avoid interference with the pipeline during the movement of various trolleys, and there is no need to dismantle the fixed supports such as mounting brackets. At the same time, the pipeline is supported, which improves the continuity and efficiency of construction and greatly saves time, manpower, and material resources.

[0079] Specifically, refer to Figure 4 The pipeline crossing device includes: a traveling support 21, a support base 22 arranged above the traveling support 21, and a stinger 23;

[0080] The traveling support 21 is arranged on the lifting and lowering moving device and moves relative to the moving device in the vertical direction;

[0081] The stinger 23 is slidably disposed on the support seat 22 to support the pipeline.

[0082] In this embodiment, a pipeline crossing device is provided, and the stinger is used to carry the pipeline, provide support for the pipeline and enable the mobile device to move up and down, front and back, left and right. The pipeline carried on the stinger will not affect the movement of the mobile device. For example, taking the construction of the second lining trolley in the tunnel as an example, it needs to move up and down, front and back, left and right in the tunnel. The second lining trolley can be used as a mobile device, which can be raised and lowered on the traveling bracket, and the traveling bracket is set on the tunnel track, and the pipeline for tunnel construction is set on the stinger; 1. When the second lining trolley needs to move up and down, relative movement can occur on the traveling bracket. That is to say, when the second lining trolley moves up and down, the second lining trolley slides up and down relative to the traveling bracket, keeping the horizontal height of the pipeline carried in the upper stinger rack unchanged; for example, the pipeline crossing device is installed on the lining trolley, and the traveling bracket on the pipeline crossing device passes through the sliding hole of the bottom longitudinal beam of the lining trolley portal frame, and slides up and down relative to the bottom longitudinal beam of the lining trolley; at this time, the pipeline carried in the stinger rack does not move; 2. When the second lining trolley moves forward and backward on the tunnel, it can drive the traveling bracket to move forward and backward, and then drive the stinger rack to move forward and backward. The stinger rack also moves forward and backward relative to the pipeline, and the pipeline installed on the stinger rack does not move, and does not interfere with the forward and backward movement of the lining trolley; 3. When the second lining trolley moves left and right on the tunnel, it can drive the traveling bracket to move left and right, and then drive the support seat to slide left and right relative to the stinger rack. Since the weight of the pipeline itself is very large, and the friction force generated by the support seat relative to the stinger rack is very small, the stinger rack and the pipeline on the stinger rack do not move, and do not interfere with the left and right movement of the lining trolley. In summary, the pipeline crossing device can support the pipeline while preventing the pipeline from being affected by the up and down, front and back, left and right movements of the lining trolley; under the action of this pipeline crossing device, the device for fixing the pipeline does not need to be disassembled during the operation of various trolleys, thereby reducing pipeline wear, improving project quality, and reducing manual labor intensity.

[0083] Preferably, reference Figure 4 A support roller 211 is provided below the walking support 21; preferably, the support roller 211 is arranged at the position of the pipeline to be installed so as to be movable forward, backward, left and right;

[0084] More preferably, the upper end of the walking bracket 21 is rotatably connected to the right end of the support seat 22. For example, a telescopic member 212 is provided above the walking bracket 21;

[0085] The first end of the telescopic member 212 is hinged to the traveling support 21 , and the second end is hinged to the supporting seat 22 .

[0086] In this embodiment, several embodiments of the walking bracket 21 are provided, and a bracket roller is provided at the bottom to improve walking convenience; the upper end is rotatably connected to the right end of the support seat, and a telescopic member connected to the support seat is added to the walking bracket. Under the telescopic effect of the telescopic member, the support seat is pushed to rotate clockwise or counterclockwise around the rotation connection with the walking bracket, thereby increasing the adjustable range of the support seat and improving the applicable scope of the pipeline crossing device. Optionally, the telescopic member is a structure with a telescopic function, such as a telescopic screw or a telescopic cylinder or a telescopic oil cylinder, etc., which is not limited to the attached drawings.

[0087] Preferably, reference Figure 4 A cylindrical tug 221 is arranged above the support seat 22, and a through hole is arranged in the center of the cylindrical tug 221; a stinger rack roller 234 is arranged below the shell of the stinger rack 23, corresponding to the position of the through hole; the stinger rack roller 234 is slidably arranged in the through hole of the cylindrical tug 221.

[0088] In this embodiment, a cylindrical tug with a through hole in the center is added to the support seat, and a stinger roller is added under the stinger shell. Figure 4 The roller of the stinger frame slides left and right in the through hole of the cylindrical tugboat, so that the stinger frame can slide left and right with the supporting seat. The structure is simple and easy to implement.

[0089] More preferably, ear plates 222 are provided at both ends of the cylindrical tug, and the ear plates 222 are fixedly provided on the support seat 22, which can improve the structural strength of the cylindrical tug 221 and avoid structural deformation due to the heavy weight of the pipeline. More preferably, limiting ears 235 are provided at both ends of the stinger roller 234, and the limiting ears 325 are fixedly connected to the shell 231; the minimum width of the limiting ears at both ends is greater than the diameter of the through hole on the cylindrical tug; on the one hand, it plays a role in enhancing the structural strength of the stinger roller and avoiding structural deformation due to the heavy weight of the pipeline; on the other hand, it plays a role in limiting the sliding stroke of the stinger and the support plate to the left and right.

[0090] Preferably, reference Figure 4 The stinger 23 includes a shell 231 and a receiving chamber 232; the stinger 23 is slidably arranged on the support seat 22 through the shell 231. It is worth noting that the structure and shape of the shell 231 can be set arbitrarily, and the receiving chamber formed is not limited to a closed structure, as long as there is a position for placing the pipeline, it can be a receiving chamber.

[0091] More preferably, stinger rack rollers are provided on the inner side and / or the bottom of the shell 231 of the stinger rack 23.

[0092] In this embodiment, several preferred embodiments of the stinger 23 are provided, and the pipeline is carried by the accommodating cavity to further provide protection for the pipeline. More preferably, stinger rollers are added to the inner side or / and the bottom of the housing 231 of the stinger 23. When the mobile device moves forward and backward, the pipeline placed in the stinger and the inner wall of the stinger roll relative to each other through the stinger rollers, which greatly reduces the friction and avoids pipeline wear. It can be understood that the number, diameter and spacing of the stinger rollers can be arbitrarily set by those skilled in the art according to the length of the stinger and the diameter of the pipeline.

[0093] Preferably, the separated TBM synchronous lining construction device further includes: a line crossing device; the line crossing device is used for crossing the line.

[0094] In this embodiment, a pipeline crossing device is added to the separated TBM synchronous lining construction device. During the movement of trolley equipment such as the needle beam invert trolley, the steel bar trolley, the secondary lining trolley, the maintenance trolley, or other transportation equipment, the line crossing device is used to cross the line.

[0095] If the traditional method is adopted, various fixed supports such as mounting brackets are installed on the tunnel wall to support various lines. Since various trolleys often need to move up and down, left and right, and forward and backward, the fixed supports and the lines installed on the fixed supports will interfere with the movement of the trolleys. At this time, the fixed supports and the lines installed on the fixed supports need to be removed to meet the needs of the trolleys to move up and down, left and right, and forward and backward. The above-mentioned situations will greatly waste time, manpower, and material resources, and also seriously affect the continuity and efficiency of construction. The use of line crossing devices to cross the lines can avoid interference with the lines during the movement of various trolleys, and there is no need to remove fixed supports such as mounting brackets. At the same time, the lines are supported, which improves the continuity and efficiency of construction and greatly saves time, manpower, and material resources.

[0096] Preferably, reference Figure 5 , the line crossing device includes: a support assembly 31, a guide assembly 32, a first roller assembly 33 and a second roller assembly 34;

[0097] The guide assembly 32 is arranged at both ends of the support assembly 31;

[0098] A first roller assembly 33 is horizontally arranged in the middle of the supporting assembly 31;

[0099] The second roller assembly 34 is vertically disposed on the side of the supporting assembly 31 .

[0100] In this embodiment, a line crossing device is provided. After being guided by the guide assembly at the front end of the support assembly, various lines can conveniently enter the line crossing device. On the one hand, the line is laid on the first roller assembly in the middle of the support assembly, so that during the movement of the trolley, the moving line can roll on the first roller assembly to greatly reduce the friction of the line and avoid line wear; on the other hand, the line head larger than the line is attached to the second roller assembly on the side of the support assembly, so that during the movement of the trolley, the line head larger than the line can also roll on the second roller assembly, further reducing the friction of the line head and avoiding line head wear; finally, the output is guided by the guide assembly at the end of the support device. Overall, the line crossing device in this embodiment can support and conveniently move various lines, reduce the convenience of the line and the line head passing on the mounting bracket without disassembly, so that the line and the line connector with a larger diameter than the line can be laid forward with various trolleys, improve the laying efficiency, reduce the wear of the line and the line head, improve the engineering quality, and reduce the labor intensity.

[0101] The above-mentioned embodiments only express several implementation methods of the present invention, and the description is relatively specific and detailed. The combination of its technical effects and technical features will not be repeated here, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A separate TBM synchronous lining construction device, characterized by: It includes needle beam inverted arch trolley, steel bar trolley, secondary lining trolley and maintenance trolley, among which: The needle beam inverted arch trolley is used for lining the short side walls; The steel bar trolley is used for lifting and transporting steel bars and providing an installation platform; The secondary lining trolley is used to pour secondary lining concrete to make the tunnel wall stable and strong; The curing trolley is used for watering and curing the secondary lining concrete; Among them, the TBM synchronous lining construction area includes the low side wall construction area, the steel bar construction area, the side top arch construction area, and the secondary lining maintenance area. The low side wall construction area is equipped with at least 2 needle beam arch trolleys, the steel bar construction area is equipped with at least 2 steel bar trolleys, and the side top arch construction area is equipped with at least 2 secondary lining trolleys. The low side wall construction area, the steel bar construction area, and the side top arch construction area are all constructed using the skip-bin operation method.

2. The separated TBM synchronous lining construction device according to claim 1 is characterized in that: The needle beam arch trolley includes a needle beam part, a beam frame part and a cross plate part, wherein the beam frame part is a rectangular frame formed by connecting square tubes; after the needle beam part passes through the beam frame part, it is slidably arranged with the beam frame part; the beam frame part is a rectangular frame formed by connecting square tubes; the cross plate part is recoverably fixed to the bottom end of the beam frame part, and is extended along the length direction of the cross plate part; the needle beam part includes a needle beam, at least two groups of needle beam bases and at least two groups of needle beam transverse movement mechanisms, wherein the needle beam is a double-web box-type structure welded by a panel and supporting ribs; the needle beam bases are arranged on the bottom surfaces of the two end sides of the needle beam, and are connected to the needle beam through a needle beam transverse movement mechanism; one end of the needle beam transverse movement mechanism is slidably fixed on the top end surface of the needle beam base, extending along the transverse direction of the needle beam, and the other end arranged oppositely is fixed to the needle beam as a whole, and is arranged to move together.

3. The separated TBM synchronous lining construction device according to claim 2 is characterized in that: The needle beam transverse movement mechanism includes a base, a translation seat and a first telescopic cylinder, wherein the base is fixed on the top end surface of the needle beam base and extends along the width direction of the needle beam; the translation seat is slidably fixed to the needle beam base through one end of the base, and the other end oppositely arranged is connected to the needle beam as a whole and is arranged to move together; one end of the first telescopic cylinder is fixed on the base, and the other end oppositely arranged is fixed to the translation seat as a whole and is arranged to move together.

4. The separated TBM synchronous lining construction device according to claim 2 or 3, characterized in that: The needle beam arch trolley also includes a needle beam transverse movement mechanism and a needle beam lifting mechanism between the needle beams. One end of the needle beam lifting mechanism is fixed to the needle beam base through the needle beam transverse movement mechanism, and the other end oppositely arranged is fixed to the needle beam as a whole and is retractable in the vertical direction.

5. The separated TBM synchronous lining construction device according to claim 1 is characterized in that: The steel bar trolley comprises a steel bar lifting trolley and a steel bar installation trolley arranged in front of the steel bar installation trolley, and the steel bar trolley is provided with a two-layer push-pull working platform.

6. The separated TBM synchronous lining construction device according to claim 1 is characterized in that: The secondary lining trolley comprises a portal assembly, a variable diameter telescopic assembly, a lining template assembly and an extension assembly; The lining formwork assembly comprises a plurality of arc-shaped formworks connected in sequence and detachably arranged on the periphery of the portal frame assembly; The variable diameter telescopic assembly is arranged between the portal assembly and the lining formwork assembly, and its telescopic movement drives the lining formwork assembly to increase or decrease its diameter; An extension assembly is used to be arranged at the notch of the lining formwork assembly when the diameter of the lining formwork assembly increases; The lining template components are arranged in two groups symmetrically along the central axis of the lining trolley; among the adjacent connected arc templates, at least one pair of arc templates is detachably connected; and the extension component is detachably arranged between the adjacent detachable arc templates.

7. The separated TBM synchronous lining construction device according to claim 1 is characterized in that: It also includes support trolleys, transformer support trolleys, continuous belt conveyors, and drag pumps; The support trolley is used to support the continuous belt conveyor, water pipes, cables, and air duct accessories during the construction process; The transformer support trolley is used to drive the transformer and the accessories of the power distribution cabinet to move into the tunnel as the construction progresses, so as to ensure stable power supply in the tunnel; The trailer pump is used to transport concrete for the secondary lining and is used in conjunction with the secondary lining trolley.

8. The separated TBM synchronous lining construction device according to claim 1 is characterized in that: Also includes: Pipeline crossing device; The pipeline crossing device is used for crossing the pipeline.

9. The separated TBM synchronous lining construction device according to claim 8 is characterized in that: The pipeline crossing device comprises: a traveling support, a supporting seat arranged above the traveling support and a stinger; The walking support is arranged on the lifting and lowering moving device and moves relative to the moving device in the vertical direction; The stinger rack is arranged above the support seat for sliding left and right, and is used for carrying the pipeline.

10. The separated TBM synchronous lining construction device according to claim 1, characterized in that: Also includes: Line crossing device; The line crossing device is used for crossing the line.

Citation Information

Patent Citations

  • Hydropower station diversion tunnel inclined shaft upper and lower bent section concrete lining device

    CN113279784A

  • TBM construction tunnel full-circle synchronous lining trolley and construction method

    CN116357341A

  • AUPR576501A0

Cited By

  • Tunnel bottom arch concrete lining trackless slip form device

    CN120556946A

  • A trackless sliding formwork device for tunnel bottom arch concrete lining

    CN120556946B