Double-sleeve heat bridge preventing pipeline wall penetrating structure and construction method
By using the transmission cavity to fill foamed polyurethane in the double-sleeve heat-proof bridge pipeline through the wall structure, the problem of gaps affecting sound insulation and heat insulation is solved, and more efficient heat insulation and water insulation are achieved.
Patent Information
- Application Number
- CN202510274892.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-10
- Publication Date
- 2025-04-25
Smart Images

Figure CN119878928A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge pipeline wall penetration, and in particular to a double-sleeve heat-proof bridge pipeline wall penetration structure and a construction method. Background Art
[0002] Nearly zero energy buildings are the only way for my country's construction industry to achieve zero energy consumption. Nearly zero energy buildings have high requirements for the thermal performance of the envelope structure. The thermal bridge of the envelope structure must be dealt with during energy-saving design. Studies have shown that the proportion of heat consumption caused by thermal bridges in building envelope structures is gradually increasing, and the impact of thermal bridges on energy consumption in near-zero energy buildings far exceeds that of ordinary energy-saving buildings. For structural thermal bridges, a lot of research and analysis has been conducted in China;
[0003] However, during the laying process of the existing double-sleeve anti-thermal bridge pipeline wall penetration structure and construction method, foamed polyurethane is filled between the pipeline and the wall for buffering and sound insulation. However, the gap between the pipeline and the wall is small, which affects the coating effect and cannot completely cover the space between the pipeline and the wall. Complete coating requires a lot of time, which is time-consuming and labor-intensive and the effect is not good. Summary of the invention
[0004] The purpose of the present invention is to provide a double-sleeve anti-thermal bridge pipeline wall penetration structure and construction method, and to fill the reserved second filling cavity, the first groove and the second groove with foamed polyurethane through the transmission cavity. The filling can be squeezed and tightly fit the gap inside the double-sleeve anti-thermal bridge pipeline wall penetration structure and construction method. As the foamed polyurethane is filled, the buffering and sound insulation effects can be improved, and the filling buffering and sound insulation efficiency is high, which solves the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a double-sleeve anti-thermal bridge pipeline wall penetration structure, comprising an outer wall and a polystyrene outer plate attached to one side of the outer wall, an inner sleeve is penetrated through the middle position of the polystyrene outer plate and the outer wall, a wall penetration tube is penetrated through the interior of the inner sleeve, a first filling ring is arranged on the outside of the inner sleeve close to the polystyrene outer plate, an extension rod is extended from the first filling ring to the inside of the polystyrene outer plate, a limiting plate is arranged at one end of the extension rod, and a second filling cavity distributed in a surrounding manner is arranged between the limiting plate and the outer sleeve.
[0006] Preferably, the limiting plate is fixedly connected to one end of the extension rod by a first bolt, and the cross-section of the outer sleeve is L-shaped.
[0007] Preferably, there are four extension rods evenly distributed around, and the outsides of the four extension rods are each provided with a first groove, the first groove is communicated with the second filling cavity, and second grooves are recessed on both sides of the extension rod.
[0008] Preferably, a transmission cavity is provided through the interior of one of the extension rods, and the transmission cavity penetrates the extension rod from one side of the first filling ring and extends to the interior of the second filling cavity.
[0009] Preferably, a limiting block is provided on the outside of the outer sleeve facing the outside of the outer wall, and the limiting block is fixedly connected to the inside of the outer sleeve by a second bolt.
[0010] Preferably, a pre-compression expansion insulation block is arranged around the limiting block and the limiting plate.
[0011] Preferably, a second filling ring is provided on one side outside the transmission cavity, and the second filling ring is connected to the transmission cavity slot.
[0012] Preferably, a waterproof and breathable membrane is attached between the polystyrene outer panel and the outer wall.
[0013] Preferably, the outside of the wall-penetrating pipe is wrapped with hard polyurethane foam plastic, and third filling rings are arranged around both sides of the hard polyurethane foam plastic and the inner wall of the inner sleeve, and a first filling cavity is arranged between two of the third filling rings, and the material filled between the first filling cavity, the second filling cavity, the transmission cavity, the first groove and the second groove is foamed polyurethane.
[0014] The present invention provides another technical solution: a construction method of a double-sleeve thermal bridge protection pipeline wall penetration structure, comprising the following steps:
[0015] S1: attaching a polystyrene outer plate to the outer wall of the outer wall, punching holes in the outer wall and the polystyrene outer plate, and at the same time, additionally digging a first groove around the punching position inside the polystyrene outer plate;
[0016] S2: Filling the outer sleeve in the outer wall, passing the inner sleeve through the through hole of the polystyrene outer plate and the inner wall, and filling the first filling ring into the gap between the inner sleeve and the polystyrene outer plate, so that the extension rod connected to the first filling ring extends to the first groove position inside the polystyrene outer plate;
[0017] S3: fix the limiting plate to one end of the extension rod by a first bolt, pre-compress the expansion insulation block to fit the limiting plate, and fix the limiting block to the side of the outer sleeve facing the outer wall by a second bolt, so that the limiting block is fixed toward the limiting plate;
[0018] S4: The transfer cavity is filled with foamed polyurethane, and the foamed polyurethane is continuously transferred and enters the second filling cavity, the first groove, and the internal gap of the second groove;
[0019] S5: Pass the wall-penetrating pipe wrapped with rigid polyurethane foam plastic through the inner sleeve, fill the third filling ring on both sides between the rigid polyurethane foam plastic and the inner sleeve, after filling one of the third filling rings, fill the foamed polyurethane into the first filling cavity, and fill the other third filling ring into the first filling cavity, squeeze the filler in the first filling cavity to further remove the gap.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] When assembling the double-sleeve heat-proof bridge pipeline wall-penetrating structure of the present invention, the foamed polyurethane can be transmitted to the second filling cavity through the transmission cavity. As the foamed polyurethane is transmitted, the foamed polyurethane inside the second filling cavity will actively push the outer sleeves and the limiting plates on both sides. While pushing the outer sleeves, the outer sleeves will move toward the pre-compression expansion insulation block and the limiting plate through the limiting block and squeeze the other side of the limiting plate. As the foamed polyurethane inside the transmission cavity is transmitted, the foamed polyurethane will fill the second filling cavity, the first groove and the second groove, and can directly fill the gaps inside the double-sleeve heat-proof bridge pipeline wall-penetrating structure and the construction method, avoiding the gaps affecting the stability of the double-sleeve heat-proof bridge pipeline wall-penetrating structure and the construction method. Completely filling the gaps can improve the heat insulation effect and water-proof effect after assembly, and there is no need for the sealing effect to make it difficult for the foamed polyurethane applied when the gap position is small to completely cover the required application position, which is convenient for the user to apply and improves the application efficiency and filling effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the overall external structure of the present invention;
[0023] Figure 2 It is a schematic diagram of the installation position of the limiting block of the present invention;
[0024] Figure 3 It is a cross-sectional view of the internal structure of the second filling cavity of the present invention;
[0025] Figure 4 For the present invention Figure 3 A partial enlarged view of the middle A area;
[0026] Figure 5 For the present invention Figure 3 A partial enlarged view of the middle B area;
[0027] Figure 6 It is a schematic diagram of the position relationship of the extension rod of the present invention.
[0028] In the figure: 1, polystyrene outer plate; 2, outer wall; 3, first filling ring; 4, second filling ring; 5, inner sleeve; 6, third filling ring; 7, hard polyurethane foam plastic; 8, wall-penetrating pipe; 9, outer sleeve; 10, limiting block; 11, pre-compression expansion insulation block; 12, first filling cavity; 13, extension rod; 14, limiting plate; 15, first bolt; 16, second bolt; 17, second filling cavity; 20, transmission cavity; 21, first groove; 22, second groove. DETAILED DESCRIPTION
[0029] The present invention is further described below in conjunction with specific embodiments.
[0030] Example 1
[0031] like Figure 1 and Figure 2 As shown, a double-sleeve anti-heat bridge pipeline wall penetration structure of this embodiment includes an outer wall 2 and a polystyrene outer plate 1 attached to one side of the outer wall 2, and a waterproof breathable membrane is attached between the polystyrene outer plate 1 and the outer wall 2. The waterproof breathable membrane can improve the effect of the polystyrene outer plate 1 after attachment, and improve the practical life and practical effect of the polystyrene outer plate 1 after attachment;
[0032] Among them, an inner sleeve 5 is provided through the middle position of the polystyrene outer plate 1 and the outer wall 2, and a wall-penetrating pipe 8 is provided inside the inner sleeve 5. Through the wall-penetrating pipe 8 and the inner sleeve 5, a double sleeve is penetrated through the wall. The penetration of the double sleeve can improve the heat release effect and avoid the transfer of heat.
[0033] In addition, a first filling ring 3 is provided on the outer side of the inner sleeve 5 close to the polystyrene outer plate 1, and the first filling ring 3 can fill the gap between the inner sleeve 5 and the polystyrene outer plate 1 to improve the sealing effect;
[0034] In order to improve the filling effect of the first filling ring 3 and the precision of the fitting between the polystyrene outer plate 1 and the outer wall 2, an outer sleeve 9 is arranged around the outer sleeve 5 located at the outer wall 2, and an extension rod 13 is arranged on the first filling ring 3 to extend into the polystyrene outer plate 1, and a limiting plate 14 is arranged at one end of the extension rod 13, and the limiting plate 14 is fixedly connected to one end of the extension rod 13 by a first bolt 15, and the outer sleeve 9 can be prevented from falling off by the protruding limiting plate 14, and the cross-section of the outer sleeve 9 is L-shaped, and the outer sleeve 9 and the limiting plate 14 are relatively restricted to prevent falling off;
[0035] In order to avoid the formation of gaps inside the through-wall structure after the outer sleeve 9 and the limiting plate 14 are completely installed, as shown in FIG. Figure 3 and Figure 5As shown, a surrounding second filling cavity 17 is provided between the limiting plate 14 and the outer sleeve 9. When filling the second filling cavity 17 with filling material, the limiting plate 14 and the outer sleeve 9 can be squeezed, and the squeezing can avoid the generation of gaps inside the through-wall structure:
[0036] Among them, in order to facilitate the filling of the second filling cavity 17, the extension rod 13 is evenly distributed with four, and the outside of the four extension rods 13 is provided with a first groove 21, the first groove 21 is connected with the second filling cavity 17, and the material filled into the second filling cavity 17 will be filled into the first groove 21 as the material is continuously transmitted, and the extension rod 13 can be fixed by the first groove 21 to further fill the gap between the through-wall structures, and the two sides of the extension rod 13 are recessed with second grooves 22, and the recessed second grooves 22 can further improve the stability of the installation of the extension rod 13;
[0037] In addition, a transmission cavity 20 is provided inside one of the extension rods 13, and the transmission cavity 20 penetrates the extension rod 13 from one side of the first filling ring 3 and extends to the inside of the second filling cavity 17. The filling material can be squeezed through the transmission cavity 20 so that the material is completely filled into the second filling cavity 17, the second groove 22 and the first groove 21. The complete filling can avoid the formation of gaps in the double-sleeve thermal bridge pipeline wall penetration structure and affect the subsequent use;
[0038] In order to facilitate the restriction of the restriction plate 14 so that both sides of the restriction plate 14 are subjected to thrust, thereby improving the stability of the double-sleeve anti-heat bridge pipeline wall-penetrating structure when in use, a restriction block 10 is arranged on the outside of the outer sleeve 9 toward the outside of the outer wall 2, and the restriction block 10 is fixedly connected to the inside of the outer sleeve 9 by a second bolt 16, and the rotation of the second bolt 16 facilitates the fixation of the restriction block 10, and a pre-compression expansion insulation block 11 is arranged around the restriction block 10 and the restriction plate 14. After the material is filled in the second filling cavity 17, the outer sleeve 9 will be squeezed and move toward the polystyrene outer plate 1. The outer sleeve 9 is squeezed and moved laterally, and the restriction plate 14 will be squeezed from another direction by the restriction block 10. Both sides of the restriction plate 14 are squeezed, and as the filling material in the second filling cavity 17 is filled, the gap in the double-sleeve anti-heat bridge pipeline wall-penetrating structure can be avoided;
[0039] Among them, Figure 4 and Figure 6 As shown, a second filling ring 4 is provided on one side of the outside of the transmission cavity 20, and the second filling ring 4 is connected to the card slot of the transmission cavity 20. After the material is transferred to the second filling cavity 17, the second groove 22 and the first groove 21 through the transmission cavity 20 and completely filled, the filling material will fill the transmission cavity 20. Finally, the second filling ring 4 is inserted into the transmission cavity 20 to complete the restriction of the filling material. The filling of the material at the position of the first groove 21 can synchronously contact and offset the gap between the inner sleeve 5 and the polystyrene outer plate 1;
[0040] In order to fix the through-wall pipe 8 so that the through-wall pipe 8 is fixed inside the inner sleeve 5, the outside of the through-wall pipe 8 is wrapped with a hard polyurethane foam plastic 7, and third filling rings 6 are arranged around both sides of the hard polyurethane foam plastic 7 and the inner wall of the inner sleeve 5, and a first filling cavity 12 is arranged between the two third filling rings 6. A third filling ring 6 is pre-filled, and a material is filled on one side of the third filling ring 6 and the first filling cavity 12 between the inner sleeve 5 and the hard polyurethane foam plastic 7. After the material is completely filled, the last third filling ring 6 is inserted between the inner sleeve 5 and the hard polyurethane foam plastic 7 to achieve squeezing of the first filling cavity 12 and filling of the gap between the inner sleeve 5 and the hard polyurethane foam plastic 7.
[0041] The material filled between the first filling cavity 12 , the second filling cavity 17 , the transmission cavity 20 , the first groove 21 and the second groove 22 is foamed polyurethane, which improves the waterproof effect, the heat insulation effect and the gap filling effect.
[0042] In order to further better explain the embodiment of the present invention, a construction method of a double-sleeve thermal bridge prevention pipeline wall penetration structure is also provided, comprising the following steps:
[0043] S1: When using the device and assembling and installing the double-sleeve thermal bridge protection pipeline wall penetration structure, the polystyrene outer plate 1 is attached to the outer wall of the outer wall 2, holes are punched in the outer wall 2 and the polystyrene outer plate 1, and a first groove 21 is additionally excavated around the punching position inside the polystyrene outer plate 1;
[0044] S2: The outer wall 2 is filled with an outer sleeve 9, the inner sleeve 5 is passed through the through holes inside the polystyrene outer plate 1 and the outer wall 2, and the first filling ring 3 is filled into the gap between the inner sleeve 5 and the polystyrene outer plate 1. The extension rod 13 connected to the first filling ring 3 will extend to the position of the first groove 21 inside the polystyrene outer plate 1;
[0045] S3: The limiting plate 14 is fixed to one end of the extension rod 13 by a first bolt 15, the pre-compression expansion insulation block 11 is attached to the limiting plate 14, and the limiting block 10 is fixed to the side of the outer sleeve 9 facing the outer wall 2 by a second bolt 16, so that the limiting block 10 is fixed toward the limiting plate 14;
[0046] S4: The transmission cavity 20 is filled with foamed polyurethane, and the foamed polyurethane is continuously transmitted and enters the second filling cavity 17, the first groove 21 and the second groove 22. The foamed polyurethane can fill the internal gap of the double-sleeve thermal bridge protection pipeline wall penetration structure;
[0047] S5: Pass the wall-penetrating pipe 8 wrapped with hard polyurethane foam plastic 7 through the inner sleeve 5, and fill the third filling rings 6 on both sides between the hard polyurethane foam plastic 7 and the inner sleeve 5. After filling one of the third filling rings 6, fill the foamed polyurethane into the first filling cavity 12, and fill the other third filling ring 6 into the first filling cavity 12, squeeze the filler in the first filling cavity 12, and further remove the gap in the double-sleeve thermal bridge protection pipeline wall penetration structure.
[0048] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0049] While the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that many changes, modifications, substitutions and variations can be made to the embodiments without departing from the principles and spirit of the invention.
Claims
1. A double-sleeve thermal bridge prevention pipeline wall penetration structure, comprising an outer wall (2) and a polystyrene outer plate (1) attached to one side of the outer wall (2), characterized in that: An inner sleeve (5) is provided through the middle of the polystyrene outer plate (1) and the outer wall (2), a wall-penetrating tube (8) is provided inside the inner sleeve (5), a first filling ring (3) is provided on the outer side of the inner sleeve (5) close to the polystyrene outer plate (1), an extension rod (13) is provided extending from the first filling ring (3) into the interior of the polystyrene outer plate (1), a limiting plate (14) is provided at one end of the extension rod (13), and a second filling cavity (17) is provided between the limiting plate (14) and the outer sleeve (9) and is circumferentially distributed.
2. A double-sleeve thermal bridge prevention pipeline wall penetration structure according to claim 1, characterized in that: The limiting plate (14) is fixedly connected to one end of the extension rod (13) via a first bolt (15), and the cross-section of the outer sleeve (9) is L-shaped.
3. A double-sleeve thermal bridge prevention pipeline wall penetration structure according to claim 2, characterized in that: Four extension rods (13) are evenly distributed around the extension rods. The outsides of the four extension rods (13) are all provided with first grooves (21), the first grooves (21) are connected to the second filling cavity (17), and second grooves (22) are recessed on both sides of the extension rod (13).
4. A double-sleeve thermal bridge prevention pipeline wall penetration structure according to claim 3, characterized in that: A transmission cavity (20) is provided inside one of the extension rods (13), and the transmission cavity (20) passes through the extension rod (13) from one side of the first filling ring (3) and extends to the inside of the second filling cavity (17).
5. A double-sleeve thermal bridge prevention pipeline wall penetration structure according to claim 4, characterized in that: A limiting block (10) is arranged on the outside of the outer sleeve (9) facing the outside of the outer wall (2), and the limiting block (10) is fixedly connected to the inside of the outer sleeve (9) via a second bolt (16).
6. A double-sleeve thermal bridge prevention pipeline wall penetration structure according to claim 5, characterized in that: A pre-compression expansion heat preservation block (11) is disposed around the limiting block (10) and the limiting plate (14).
7. A double-sleeve thermal bridge prevention pipeline wall penetration structure according to claim 6, characterized in that: A second filling ring (4) is provided on one side of the outside of the transmission cavity (20), and the second filling ring (4) is connected to the slot of the transmission cavity (20).
8. The double-sleeve thermal bridge prevention pipeline wall penetration structure according to claim 1 is characterized in that: A waterproof and breathable membrane is laminated between the polystyrene outer panel (1) and the outer wall (2).
9. A double-sleeve thermal bridge prevention pipeline wall penetration structure according to claim 7, characterized in that: The outside of the wall-penetrating tube (8) is wrapped with hard polyurethane foam plastic (7), and third filling rings (6) are arranged around both sides of the hard polyurethane foam plastic (7) and the inner wall of the inner sleeve (5), and a first filling cavity (12) is arranged between the two third filling rings (6), and the material filled between the first filling cavity (12), the second filling cavity (17), the transmission cavity (20), the first groove (21) and the second groove (22) is foamed polyurethane.
10. A construction method for a double-sleeve thermal bridge-proof pipeline wall-penetrating structure according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: attaching the polystyrene outer plate (1) to the outer wall of the outer wall (2), punching holes in the outer wall (2) and the polystyrene outer plate (1), and at the same time, additionally digging a first groove (21) around the punching position inside the polystyrene outer plate (1); S2: Filling the outer sleeve (9) inside the outer wall (2), inserting the inner sleeve (5) through the through holes inside the polystyrene outer plate (1) and the outer wall (2), and filling the first filling ring (3) into the gap between the inner sleeve (5) and the polystyrene outer plate (1), so that the extension rod (13) connected to the first filling ring (3) extends to the position of the first groove (21) inside the polystyrene outer plate (1); S3: fixing the limiting plate (14) to one end of the extension rod (13) by means of a first bolt (15), causing the pre-compression expansion insulation block (11) to fit the limiting plate (14), and fixing the limiting block (10) to the side of the outer sleeve (9) facing the outer wall of the outer wall (2) by means of a second bolt (16), so that the limiting block (10) is fixed toward the limiting plate (14); S4: the transfer cavity (20) is filled with foamed polyurethane, and the foamed polyurethane is continuously transferred and enters the internal gaps of the second filling cavity (17), the first groove (21), and the second groove (22); S5: A wall-penetrating tube (8) wrapped with a hard polyurethane foam plastic (7) is passed through the inner sleeve (5), and a third filling ring (6) is filled on both sides between the hard polyurethane foam plastic (7) and the inner sleeve (5). After one of the third filling rings (6) is filled, the foamed polyurethane is filled into the first filling cavity (12), and the other third filling ring (6) is filled into the first filling cavity (12). The filler in the first filling cavity (12) is squeezed to further remove the gap.