Hydrogen scheduling method, device and system and computer readable storage medium

By obtaining and analyzing relevant electricity price and load data in the hydrogen-coupled fuel engine doping system of coal-fired hydrogen-coupled fuel engine, the production and utilization of hydrogen gas are optimized, the problem of efficient utilization of hydrogen gas and electricity is solved, the stability and economicality of power supply are achieved, and economic benefits are obtained by selling hydrogen gas.

CN119886633APending Publication Date: 2025-04-25HUADIAN ELECTRIC POWER SCI INST CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411816562.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

How to achieve efficient utilization of hydrogen and electricity, especially in the hydrogen doping system of coal-fired hydrogen-generated fuel engine, optimize the production and utilization of hydrogen to ensure the stability and economical power supply.

Method used

By obtaining the power cleaned load, kilowatt-hour cost, the first hydrogen production cost and the second hydrogen production cost, the electric load used by the coal-fired generator set for hydrogen production and the hydrogen production amount of the hydrogen production system, and the hydrogen production amount is used for hydrogen doping of the fuel engine to generate, store or sell power according to different conditions, so as to achieve the coordinated utilization of hydrogen and electricity.

Benefits of technology

On the premise of meeting the daily electricity, through the coupling of the hydrogen-doped system of the coal-fired hydrogen-generated fuel engine, efficient scheduling of hydrogen and power supply is achieved, the economy and reliability of the power plant are improved, and economic benefits are obtained by selling hydrogen.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119886633A_ABST
    Figure CN119886633A_ABST
Patent Text Reader

Abstract

The invention relates to a hydrogen scheduling method, device and system and a computer readable storage medium, and the hydrogen scheduling method comprises the steps: obtaining a clearing power load, the cost per kilowatt hour of a coal-fired generator set, a first hydrogen production cost electricity price of a gas turbine hydrogen-doped generator set, and a second hydrogen production cost electricity price of a hydrogen market; if the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the kilowatt-hour cost, determining the electrical load of the coal-fired generator set for hydrogen production according to the clear electrical load, and determining the hydrogen production amount of the hydrogen production system according to the electrical load; if the first hydrogen production cost electricity price is larger than or equal to the kilowatt-hour cost and the hydrogen production amount is smaller than or equal to the hydrogen doping threshold value of the gas turbine hydrogen-doped generator set, the hydrogen production amount is used for power generation of the gas turbine hydrogen-doped generator set; if the hydrogen production amount is larger than the hydrogen doping threshold value of the gas turbine hydrogen doping generator set, the hydrogen production amount is used for storage and power generation of the gas turbine generator set, and when the hydrogen production amount is smaller than or equal to the hydrogen doping threshold value again, the stored hydrogen production amount is used for power generation of the gas turbine generator set; if the first hydrogen production cost electricity price is smaller than the kilowatt-hour cost, the hydrogen production amount is used for selling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of hydrogen distribution, and in particular to a hydrogen scheduling method, device, system, computer equipment and computer-readable storage medium. Background Art

[0002] Hydrogen has good storage performance and can fully meet the requirements of long-term, cross-space and large-scale storage. At the same time, hydrogen can be flexibly converted into various forms of energy and can be applied to multiple industries. Electricity is one of the most important and most common forms of energy in modern society, and it is also an indispensable energy source for residents' lives and industrial production.

[0003] In modern energy systems, the combined dispatch of hydrogen and electricity can meet the living standards of residents and industrial needs, and can significantly improve the economy and reliability of power plants. In the field of power generation, coal is generally used as a raw material to produce hydrogen. Power plants can use hydrogen to obtain electricity, and then use hydrogen to burn in internal combustion engines to obtain electricity. In the field of power generation, how to achieve efficient use of hydrogen and electricity has become an urgent problem to be solved. Summary of the invention

[0004] The embodiments of the present application provide a hydrogen scheduling method, device, system and computer-readable storage medium to at least solve the problem of how to achieve efficient utilization of hydrogen and electric energy in the related art.

[0005] In a first aspect, an embodiment of the present application provides a hydrogen scheduling method, which is applied to a coal-fired power generation hydrogen production coupled with a gas turbine hydrogen blending system, wherein the coal-fired power generation hydrogen production coupled with a gas turbine hydrogen blending system includes a coal-fired generator set, a gas turbine hydrogen blending generator set and a hydrogen production system, and the method includes:

[0006] Obtain the clearing power load, the kilowatt-hour cost of coal-fired power generation units, the first hydrogen production cost electricity price of the gas turbine hydrogen-blended power generation unit, and the second hydrogen production cost electricity price of the hydrogen market. The first hydrogen production cost electricity price represents the electricity price required to prepare hydrogen with the same calorific value as the natural gas in the gas turbine hydrogen-blended unit, and the second hydrogen production cost electricity price represents the electricity price required to prepare hydrogen in the hydrogen market with the same hydrogen production volume as the hydrogen production system;

[0007] If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kWh, the electricity load of the coal-fired power generation unit used for hydrogen production is determined according to the clearing electricity load, and the hydrogen production capacity of the hydrogen production system is determined according to the electricity load;

[0008] If the first hydrogen production cost electricity price is greater than or equal to the kilowatt-hour cost, and the hydrogen production volume is less than or equal to the hydrogen blending threshold of the gas turbine hydrogen blending generator set, the hydrogen production volume is used for power generation by the gas turbine hydrogen blending generator set;

[0009] If the hydrogen production is greater than the hydrogen blending threshold of the gas turbine generator set, the hydrogen production is used for storage and gas turbine generator set power generation, and when the hydrogen production is less than or equal to the hydrogen blending threshold again, the stored hydrogen production is used for gas turbine generator set power generation;

[0010] If the first hydrogen production cost electricity price is less than the cost per kilowatt-hour, the hydrogen produced by the hydrogen production system will be sold.

[0011] In one embodiment, determining the hydrogen production amount of the hydrogen production system according to the electrical load includes:

[0012] Obtaining a hydrogen production threshold of the hydrogen production system, and determining an electric load threshold required by the hydrogen production system according to the hydrogen production threshold;

[0013] If the electricity load is greater than the electricity load threshold, the coal-fired power generation unit provides electricity to the hydrogen production system according to the electricity load threshold, and the hydrogen production capacity of the hydrogen production system is the hydrogen production threshold;

[0014] If the electric load is less than or equal to the electric load threshold, the coal-fired generator provides the current electric load to the hydrogen production system, and the hydrogen production system obtains the amount of hydrogen according to the electric load.

[0015] In one embodiment, the hydrogen produced by the hydrogen production system is used for sale, including:

[0016] Obtain hydrogen demand in the hydrogen market. If the hydrogen demand is greater than or equal to the hydrogen production, all hydrogen production will be sold;

[0017] If the hydrogen demand is less than the hydrogen production, the hydrogen production will be used for sale and storage. When the hydrogen demand is greater than or equal to the hydrogen production, the stored hydrogen will be used for sale.

[0018] In one embodiment, if the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kilowatt-hour, the method further includes:

[0019] If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kilowatt-hour, the electrical load of the coal-fired generator set is increased to generate electricity;

[0020] If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both lower than the cost per kilowatt-hour, the current electrical load of the coal-fired power generating unit is maintained to generate electricity.

[0021] In one embodiment, the first hydrogen production cost electricity price, the second hydrogen production cost electricity price and the hydrogen production cost electricity price satisfy the following configuration:

[0022]

[0023]

[0024] Among them, D JPis the first hydrogen production cost electricity price, H JP is the hydrogen price corresponding to the natural gas supply price, J C is the construction cost of the hydrogen production system, H R is the hydrogen production capacity of the hydrogen production system, S M is the life of the hydrogen production system, S H is the amount of water consumed by the hydrogen production system, S J is the local water supply price, D H is the unit power consumption for hydrogen production, J TR is the natural gas supply price, R T is the lower calorific value of natural gas, R H is the lower heating value of hydrogen, D P is the second hydrogen production cost electricity price, H J is the hydrogen price in the hydrogen market, M DC is the electricity cost, M H is the standard coal consumption of coal-fired power generation units, M J is the supply price of standard coal, B R The proportion of fuel costs in coal-fired power generation units.

[0025] In one embodiment, the clean-up electric load satisfies the following configuration:

[0026]

[0027] Among them, M aveF is the clearing load, M Lt is the clearing electricity of coal-fired power generation in each period, and t is the market time interval.

[0028] In one embodiment, the electrical load of the coal-fired power generation unit for hydrogen production meets the following configuration:

[0029] M KH =M maxF -M averF

[0030] Among them, MKH is the electrical load of the coal-fired power generation unit for hydrogen production, MmaxF is the maximum electrical load of the coal-fired power generation unit, and M aveF It is to clear the electrical load.

[0031] In a second aspect, an embodiment of the present application provides a hydrogen scheduling device, characterized in that it includes:

[0032] An acquisition module is used to obtain the clearing power load, the kilowatt-hour cost of coal-fired power generation units, the first hydrogen production cost electricity price of the gas turbine hydrogen-blended power generation unit, and the second hydrogen production cost electricity price of the hydrogen market. The first hydrogen production cost electricity price represents the electricity price required to prepare hydrogen with the same calorific value as the natural gas in the gas turbine hydrogen-blended unit, and the second hydrogen production cost electricity price represents the electricity price required to prepare hydrogen in the hydrogen market with the same hydrogen production volume as the hydrogen production system;

[0033] A production module, for determining the electric load of the coal-fired power generation unit for hydrogen production according to the clearing electric load if the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kWh, and determining the hydrogen production capacity of the hydrogen production system according to the electric load;

[0034] A power generation module, for using the hydrogen production amount for power generation by the gas turbine hydrogen production unit if the first hydrogen production cost electricity price is greater than or equal to the kilowatt-hour cost and the hydrogen production amount is less than or equal to the hydrogen mixing threshold of the gas turbine hydrogen production unit;

[0035] A storage module is used for storing the hydrogen produced and using the gas turbine generator set to generate electricity if the hydrogen produced amount is greater than the hydrogen blending threshold of the gas turbine generator set, and for using the stored hydrogen produced to generate electricity when the hydrogen produced amount is less than or equal to the hydrogen blending threshold again;

[0036] The selling module is used to sell the hydrogen production capacity of the hydrogen production system if the first hydrogen production cost electricity price is less than the cost per kilowatt-hour.

[0037] In a third aspect, an embodiment of the present application provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the hydrogen scheduling method as described in the first aspect above is implemented.

[0038] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the hydrogen scheduling method as described in the first aspect above.

[0039] A hydrogen scheduling method, device, system and computer-readable storage medium provided in the embodiments of the present application have at least the following technical effects.

[0040] Under the premise of meeting the daily power consumption, the power generation of coal-fired power generation units realizes the coupling of coal-fired power generation units, hydrogen production systems and gas turbine hydrogen-blended power generation units. Under the premise that the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both lower than the cost per kilowatt-hour, the coal-fired power generation units ensure the power supply while also providing power for the hydrogen production system. The hydrogen obtained by the hydrogen production system is used for power generation by gas turbine hydrogen-blended power generation units on the one hand, ensuring the power supply and alleviating the resource problem of only using natural gas for power generation. On the other hand, it is used for sale to obtain economic benefits. Through the coupling of coal-fired power generation units, hydrogen production systems and gas turbine hydrogen-blended power generation units, the dispatch of hydrogen is completed and the power supply of electric energy is guaranteed, thus realizing the efficient synergy of hydrogen and electric energy.

[0041] Details of one or more embodiments of the present application are set forth in the following drawings and description to make other features, objects, and advantages of the present application more readily apparent. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0043] Figure 1 is a flow chart of a hydrogen scheduling method according to an exemplary embodiment;

[0044] Figure 2 It is a process flow diagram of a coal-fired power generation hydrogen production coupled with a combustion engine hydrogen blending system according to an exemplary embodiment;

[0045] Figure 3 It is a schematic diagram of the internal structure of a coal-fired power generation hydrogen production coupled with a combustion engine hydrogen blending system according to an exemplary embodiment;

[0046] Figure 4 is a flow chart of a hydrogen scheduling method according to an exemplary embodiment;

[0047] Figure 5 is a block diagram showing a hydrogen scheduling device according to an exemplary embodiment;

[0048] Figure 6 is a block diagram of an electronic device according to an exemplary embodiment. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0050] Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. In addition, it can also be understood that although the efforts made in this development process may be complicated and lengthy, for ordinary technicians in this field related to the content disclosed in this application, some changes in design, manufacturing or production based on the technical content disclosed in this application are just conventional technical means, and should not be understood as insufficient content disclosed in this application.

[0051] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those of ordinary skill in the art that the embodiments described in this application may be combined with other embodiments without conflict.

[0052] Unless otherwise defined, the technical terms or scientific terms involved in this application should be understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "a", "a", "the" and the like involved in this application do not indicate a quantitative limitation, and may represent the singular or plural. The terms "include", "comprise", "have" and any of their variations involved in this application are intended to cover non-exclusive inclusions; for example, a process, method, system, product or device that includes a series of steps or modules (units) is not limited to the listed steps or units, but may also include steps or units that are not listed, or may also include other steps or units inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The "multiple" involved in this application refers to two or more. "And / or" describes the association relationship of associated objects, indicating that there may be three relationships, for example, "A and / or B" can represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the objects before and after are in an "or" relationship. The terms "first", "second", "third", etc. involved in this application are only used to distinguish similar objects and do not represent a specific ordering of the objects.

[0053] The coal-fired power generation hydrogen production coupled with gas turbine hydrogen blending system includes a coal-fired generator set, a gas turbine hydrogen blending generator set and a hydrogen production system. The coal-fired generator set uses coal as fuel and is a device that generates electricity by burning coal. The energy generated can be used to connect the electricity to the public power grid to meet the living needs of residents, and is also used to provide electricity to the hydrogen production system to produce hydrogen. The gas turbine hydrogen blending generator set is a power generation device that mixes hydrogen and traditional fuels (such as natural gas) in a gas turbine to convert the chemical energy of hydrogen and traditional fuels into electricity. The electricity generated is used to connect to the public power grid to meet the living needs of residents. The hydrogen production system uses water electrolysis technology to produce hydrogen. The coal-fired power generation hydrogen production coupled with gas turbine hydrogen blending system also includes a hydrogen storage system, which is used to store the hydrogen produced by the hydrogen production system.

[0054] Based on the above situation, the embodiments of the present application provide a hydrogen scheduling method, device, system and computer-readable storage medium.

[0055] In a first aspect, an embodiment of the present application provides a hydrogen scheduling method. Figure 1 is a flow chart of a hydrogen scheduling method according to an exemplary embodiment. Figure 1 As shown, the hydrogen scheduling method includes:

[0056] Step S101, obtaining the clearing power load, the kilowatt-hour cost of the coal-fired power generation unit, the first hydrogen production cost electricity price of the gas turbine hydrogen-blended power generation unit, and the second hydrogen production cost electricity price in the hydrogen market, wherein the first hydrogen production cost electricity price represents the electricity price required to prepare hydrogen with the same calorific value as the natural gas in the gas turbine hydrogen-blended unit, and the second hydrogen production cost electricity price represents the electricity price required to prepare hydrogen in the hydrogen market with the same hydrogen production capacity as the hydrogen production system.

[0057] The coal-fired power generation hydrogen production coupled with gas turbine hydrogen blending system also includes a data acquisition module, a data analysis module, a scheduling module and a monitoring module. The data acquisition module collects the clearing power load. The clearing power load is the total power load that needs to meet the market demand determined by the power market dispatching agency within a certain period of time, that is, the power load required by the market is exactly equal to the power load supplied. According to the clearing power load, the electric energy generated by the coal-fired power generation unit will first meet the clearing power load, and the remaining power load will be provided to the hydrogen production system. The hydrogen production system produces hydrogen according to the power load provided by the coal-fired power generation unit.

[0058] The data acquisition module collects the cleared electricity of coal-fired power generation in each period of the previous day and calculates the cleared electricity load to meet the following configurations:

[0059]

[0060] Among them, M aveF is the clearing load, M Lt is the cleared electricity of coal-fired power generation in each period, and t is the market time interval. Optionally, the market time interval includes 15 minutes, 20 minutes, and 25 minutes.

[0061] According to the clearing power load, the power load of the coal-fired power generation unit used for hydrogen production is determined, and the power load used for hydrogen production meets the following configuration:

[0062] M KH =M maxF -M averF

[0063] Among them, M KH is the electrical load of the coal-fired generator set used to produce hydrogen, M maxF is the maximum electrical load of the coal-fired generator set, M aveF It is to clear the electrical load.

[0064] The data acquisition module collects the standard coal consumption of coal-fired power generation units, the supply price of standard coal, and the proportion of fuel cost in coal-fired power generation units, and calculates the cost per kilowatt-hour of coal-fired power generation units through the data analysis module. The cost per kilowatt-hour satisfies the following formula:

[0065]

[0066] Among them, M DC is the electricity cost, M H is the standard coal consumption of coal-fired power generation units, M J is the supply price of standard coal, B R The proportion of fuel costs in coal-fired power generation units.

[0067] The data acquisition module collects the hydrogen capacity of the hydrogen production system, the life of the hydrogen production system, the water consumption of the hydrogen production system, the local water supply price, the unit hydrogen production power consumption of the hydrogen production system, and the construction cost of the hydrogen production system. The data analysis module calculates the first hydrogen production cost electricity price of the gas turbine hydrogen-blended generator set and the second hydrogen production cost electricity price of the hydrogen market.

[0068] The first hydrogen production cost electricity price of the gas turbine hydrogen-blended power generation unit represents the electricity price required to prepare hydrogen with the same calorific value as the natural gas in the gas turbine hydrogen-blended power generation unit. The first hydrogen production cost electricity price is an indicator to measure whether it is economical for the computer of the coal-fired power generation unit to be used to produce hydrogen, and the produced hydrogen enters the internal combustion engine for hydrogen blending and power generation. In the case that the gas turbine hydrogen-blended power generation unit only consumes natural gas for power generation, the consumed natural gas and the supply price of the consumed natural gas are obtained. According to the heat balance, the supply price of the consumed natural gas is converted into the price of hydrogen with the same calorific value. Then, according to the relationship between the hydrogen production cost and the electricity price, the hydrogen price is mapped to the first hydrogen production cost electricity price.

[0069] The relationship between hydrogen production cost and electricity price reflects the unit hydrogen production cost under different electricity prices. The relationship between hydrogen production cost and electricity price satisfies the following configuration:

[0070]

[0071] Among them, H DC is the unit hydrogen production cost, J C is the construction cost of the hydrogen production system, H R is the hydrogen capacity of the hydrogen production system, S M is the life of the hydrogen production system, S H is the water consumption of the hydrogen production system, S J is the local water supply price, D H is the unit power consumption of hydrogen production system, D J It's the price of electricity.

[0072] The supply price of the consumed natural gas is converted into the price of hydrogen with the same calorific value, and the price of hydrogen satisfies the following formula:

[0073]

[0074] Among them, H JP is the hydrogen price corresponding to the natural gas supply price, J TR is the supply price of natural gas, R T is the lower calorific value of natural gas, R H It is the lower calorific value of hydrogen.

[0075] According to the relationship between the above hydrogen production cost and electricity price, the first hydrogen production cost electricity price of the gas turbine hydrogen-blended generator set is obtained to meet the following configuration:

[0076]

[0077] Among them, D JP is the first hydrogen production cost electricity price, H JP is the hydrogen price corresponding to the natural gas supply price, J C is the construction cost of the hydrogen production system, H R is the hydrogen production capacity of the hydrogen production system, S M is the life of the hydrogen production system, S H is the amount of water consumed by the hydrogen production system, S J is the local water supply price, D H is the unit electricity consumption for hydrogen production,

[0078] The second hydrogen production cost electricity price of the hydrogen market represents the electricity price required for the hydrogen market to produce the same amount of hydrogen as the hydrogen production system. The second hydrogen production cost electricity price is an indicator to measure whether it is economical to use the electricity of coal-fired power generation units to produce hydrogen and sell it to the outside world. The data acquisition module collects the hydrogen price of the local hydrogen market, and obtains the second hydrogen production cost electricity price of the hydrogen market based on the relationship between the above hydrogen production cost and electricity price. The second hydrogen production cost electricity price meets the following configurations:

[0079]

[0080] Among them, D P is the second hydrogen production cost electricity price, H J is the hydrogen price in the hydrogen market, J C is the construction cost of the hydrogen production system, H R is the hydrogen production capacity of the hydrogen production system, S M is the life of the hydrogen production system, S H is the amount of water consumed by the hydrogen production system, S J It is the local water supply price.

[0081] By obtaining the cost per kilowatt-hour, the first hydrogen production cost electricity price and the second hydrogen production cost electricity price, we can better measure the use of electricity generated by coal-fired power generation units for different purposes, and uniformly map the prices spent for different purposes into electricity prices, so that we can compare them with the fluctuating grid-connected electricity prices, thereby guiding the operation of coal-fired power generation units and gas turbine hydrogen-blended units.

[0082] Step S102: If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kilowatt-hour, determine the electricity load of the coal-fired power generation unit for hydrogen production according to the clearing electricity load, and determine the hydrogen production capacity of the hydrogen production system according to the electricity load.

[0083] If the first hydrogen production cost electricity price is greater than or equal to the cost per kilowatt-hour, it means that the price of natural gas combustion in the gas turbine hydrogen generator set is greater than the price of hydrogen produced by the hydrogen production system for combustion and power generation in the gas turbine hydrogen generator set. If the second hydrogen production cost electricity price is greater than or equal to the cost per kilowatt-hour, it means that if hydrogen from the hydrogen market is used to generate electricity for the gas turbine hydrogen generator set, the price of hydrogen from the hydrogen market is greater than the price of hydrogen used for combustion and power generation in the gas turbine hydrogen generator set. When the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kilowatt-hour, the hydrogen produced by the hydrogen production system is used to complete the power generation of the gas turbine hydrogen generator set. Therefore, the hydrogen production system produces hydrogen according to the electrical load provided by the coal-fired generator set. The specific contents include:

[0084] Step S100: Acquire a hydrogen production threshold of the hydrogen production system, and determine an electric load threshold required by the hydrogen production system according to the hydrogen production threshold.

[0085] There is a maximum limit to the hydrogen produced by the hydrogen production system through water electrolysis. The maximum amount of hydrogen that can be produced in the hydrogen production system is obtained, that is, the hydrogen production threshold. Based on the hydrogen production threshold, the electrical load required for the hydrogen production system to produce the maximum amount of hydrogen is obtained, and the electrical load required for producing the maximum amount of hydrogen is used as the electrical load threshold.

[0086] Step S200: If the electric load is greater than the electric load threshold, the coal-fired power generation unit provides power to the hydrogen production system according to the electric load threshold, and the hydrogen production amount of the hydrogen production system is the hydrogen production threshold.

[0087] The electric load provided by the coal-fired generator set to the hydrogen production system is compared with the electric load threshold of the hydrogen production system. If the electric load provided by the coal-fired generator set to the hydrogen production system is greater than or equal to the electric load threshold of the hydrogen production system, the coal-fired generator guarantees the clearing electric load, and the remaining electric load is the electric load threshold of the hydrogen production system, that is, the coal-fired generator set generates electricity according to the sum of the clearing electric load and the electric load threshold of the hydrogen production system, and uses the electric load threshold to produce hydrogen in the hydrogen production system to obtain the hydrogen production threshold. For example, the electric load provided by the coal-fired generator set to the hydrogen production system is M KH, the electric load threshold of the hydrogen production system is (H R ×D H ), if M KH ≥(H R ×D H ), then the coal-fired power generation unit will (H R ×D H ) of electrical load is provided to the hydrogen production system. The hydrogen production system is based on (H R ×D H ) to produce hydrogen, and the amount of hydrogen is the hydrogen production threshold.

[0088] Step S300: If the electric load is less than or equal to the electric load threshold, the coal-fired generator provides the current electric load to the hydrogen production system, and the hydrogen production system obtains hydrogen according to the electric load.

[0089] The electric load provided by the coal-fired generator set to the hydrogen production system is compared with the electric load threshold of the hydrogen production system. If the electric load provided by the coal-fired generator set to the hydrogen production system is less than the electric load threshold of the hydrogen production system, the coal-fired generator set will still provide the current electric load to the hydrogen production system to produce hydrogen. The hydrogen production system produces hydrogen according to the current electric load. For example, the electric load provided by the coal-fired generator set to the hydrogen production system is M KH , the electric load threshold of the hydrogen production system is (H R ×D H ), if M KH <(H R ×D H ), then the coal-fired power generation unit will be M KH The electricity load is provided to the hydrogen production system. KH The electrical load is used to produce hydrogen.

[0090] In addition, the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kilowatt-hour, indicating that it is more economical to use the hydrogen produced by the hydrogen production system for power generation in the gas turbine hydrogen blending system. Therefore, the power generation of the coal-fired generator set is increased to obtain more electrical load for the hydrogen production system to produce hydrogen.

[0091] If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both lower than the cost per kilowatt-hour, it means that the hydrogen production of the hydrogen production system is not economical for use in the gas turbine hydrogen blending system to generate electricity. Therefore, the current power generation of the coal-fired generator set is maintained.

[0092] The coal-fired power generation unit will provide the generated electricity load to the public power grid first to meet the needs of residents' lives, and then use the remaining electricity load to produce hydrogen in the hydrogen production system. If the remaining electricity load is greater than the electricity load threshold of the hydrogen production system, it means that the generated electricity load is too much, and the coal-fired power generation unit will produce according to the clearing electricity load and the electricity load threshold. If the remaining electricity load is less than the electricity load threshold of the hydrogen production system, it means that the current electricity load can both meet the needs of residents' lives and enable the hydrogen production system to work to produce hydrogen, and the coal-fired power generation unit will maintain the current electricity load for production.

[0093] Step S103: If the first hydrogen production cost electricity price is greater than or equal to the cost per kilowatt-hour, and the hydrogen production amount is less than or equal to the hydrogen blending threshold of the gas turbine hydrogen blending generator set, the hydrogen production amount is used for power generation by the gas turbine hydrogen blending generator set.

[0094] The first hydrogen production cost electricity price is greater than or equal to the kilowatt-hour cost, indicating that the price of natural gas combustion in the gas turbine hydrogen generator set is greater than the price of hydrogen produced by the hydrogen production system for combustion and power generation in the gas turbine hydrogen generator set. The hydrogen blending threshold of the gas turbine hydrogen generator set is the maximum amount of hydrogen that can enter the gas turbine hydrogen generator set to replace natural gas for combustion and power generation. The hydrogen produced by the hydrogen production system is all used for combustion and power generation in the gas turbine hydrogen generator set.

[0095] When the first hydrogen production cost price is greater than or equal to the cost per kilowatt-hour and the hydrogen production of the hydrogen production system is less than or equal to the hydrogen blending threshold of the gas turbine hydrogen-blended generator set, the hydrogen produced by the hydrogen production system enters the gas turbine hydrogen-blended generator set for power generation, replacing part of the natural gas combustion, thereby alleviating the problem of insufficient natural gas resource supply. On the other hand, the electricity generated by the gas turbine hydrogen-producing generator set is also connected to the public power grid to meet the electricity load of residents' living needs, further strengthening the guarantee of power supply.

[0096] Step S104: if the hydrogen production amount is greater than the hydrogen blending threshold of the gas turbine hydrogen blending generator set, the hydrogen production amount is used for storage and gas turbine generator set power generation, and when the hydrogen production amount is less than or equal to the hydrogen blending threshold again, the stored hydrogen production amount is used for gas turbine generator set power generation.

[0097] If the first hydrogen production cost electricity price is greater than or equal to the cost per kWh, and the hydrogen production of the hydrogen production system is greater than the hydrogen blending threshold of the gas turbine hydrogen-blending generator set. The hydrogen production of the hydrogen production system is greater than the hydrogen blending threshold, which means that the hydrogen production still has some hydrogen on the premise of meeting the power generation of the hydrogen-producing generator set. The hydrogen production of the hydrogen production system is divided into two branches for processing. The first branch uses the hydrogen production for power generation by the gas turbine hydrogen-blending generator set. The second branch transfers the remaining hydrogen to the hydrogen storage system for storage. For example, the hydrogen blending threshold of the gas turbine hydrogen-producing generator set is V max , the hydrogen production capacity of the hydrogen production system is H L , when V max≤H L , then V in the hydrogen production max The hydrogen produced enters the gas turbine hydrogen-blended generator set for power generation, H L -V max The amount of hydrogen is stored in the hydrogen storage system.

[0098] When the hydrogen production capacity of the hydrogen production system is again less than the hydrogen blending threshold of the gas turbine hydrogen blending generator set, all the hydrogen produced by the hydrogen production system will be used for power generation by the gas turbine hydrogen blending generator set, and the hydrogen in the hydrogen storage system will also enter the gas-fired hydrogen production generator set for power generation, to ensure that the gas turbine hydrogen production generator set can generate electricity with the maximum amount of hydrogen blending, thereby increasing the combustion of hydrogen and reducing the combustion of natural gas, thereby alleviating the problem of natural gas shortage, and at the same time, the electrical load generated by the gas turbine hydrogen blending generator set will be connected to the public power grid to ensure power supply.

[0099] Step S105: If the first hydrogen production cost electricity price is less than the cost per kilowatt-hour, the hydrogen production capacity of the hydrogen production system is sold.

[0100] When the first hydrogen production cost price is less than the kilowatt-hour cost price, it means that the use of gas turbine hydrogen generator sets to generate electricity using natural gas combustion is more economical than the use of hydrogen production system to generate electricity using hydrogen. Therefore, the gas turbine hydrogen generator set uses natural gas combustion to generate electricity, and does not introduce the hydrogen production system.

[0101] The data acquisition module collects the hydrogen demand of the local hydrogen market. If the hydrogen demand of the hydrogen market is greater than or equal to the hydrogen production of the hydrogen production system, the hydrogen production of the hydrogen production system will be sold entirely to obtain economic benefits.

[0102] If the hydrogen demand in the hydrogen market is less than the hydrogen production of the hydrogen production system, it means that the hydrogen market is in a saturated state. Therefore, part of the hydrogen production of the hydrogen production system is used for sale to obtain some economic benefits, and the other part of the hydrogen production is stored in the hydrogen storage system. When the hydrogen demand in the hydrogen market is greater than or equal to the hydrogen production of the hydrogen production system, the stored hydrogen is used for sale.

[0103] The hydrogen produced by the hydrogen production system is sold, which expands the business channels for selling hydrogen to the outside world, thereby improving the flexibility of the coal-fired power generation hydrogen production coupled with the gas turbine hydrogen blending system. The hydrogen produced by the hydrogen production system can be used for power generation by the gas turbine hydrogen blending generator set and can also be sold. Selling hydrogen to the outside world also alleviates the operating pressure of the enterprise and brings economic benefits.

[0104] The monitoring module in the coal-fired power generation hydrogen production coupled gas turbine hydrogen blending system is used to comprehensively monitor the operation of the coal-fired power generation hydrogen production coupled gas turbine hydrogen blending system, and the issued commands are sent to the control module. The control module adjusts the operation of the coal-fired generating set, the hydrogen production system, the gas turbine hydrogen blending generating set and the hydrogen storage system according to the above-mentioned hydrogen scheduling method.

[0105] Figure 2 is a process flow diagram of a coal-fired power generation hydrogen production coupled with a combustion engine hydrogen blending system according to an exemplary embodiment. Figure 2 As shown, the coal-fired power generation hydrogen production coupled with gas turbine hydrogen blending system includes a coal-fired generator set, a water electrolysis hydrogen production system, a gas turbine generator set and a hydrogen storage system. The electricity generated by the coal-fired generator set is used to access the public power grid and is provided to the water electrolysis hydrogen production system so as to prepare hydrogen by the water electrolysis hydrogen production system. The prepared hydrogen is used for hydrogen blending power generation by the gas turbine generator set and storage in the hydrogen storage system. The gas turbine generator set uses hydrogen to generate electricity and connects the generated electricity to the public power grid to ensure power supply. The hydrogen stored in the hydrogen storage system can be used to sell hydrogen to the outside world, and can also provide hydrogen to the gas turbine generator set for hydrogen blending power generation.

[0106] Figure 3 FIG. 1 is a schematic diagram of the internal structure of a coal-fired power generation hydrogen production coupled with a combustion engine hydrogen blending system according to an exemplary embodiment. Figure 3 As shown in the figure, the coal-fired power generation hydrogen production coupled with gas turbine hydrogen blending system includes a data acquisition module, a data analysis module, a scheduling module and a monitoring module. The data acquisition module collects data from the local hydrogen market, the raw material supply market, the electricity day-ahead market, the coal-fired generator set, the hydrogen production system, the hydrogen storage system and the gas turbine generator set. The data analysis module analyzes the collected data and transmits the analysis results to the scheduling module. The scheduling module adjusts the coal-fired generator set, the hydrogen production system, the hydrogen storage system and the gas turbine generator set, and transmits the adjusted content to the monitoring module. The monitoring module monitors the scheduling module according to the adjusted content to avoid errors in the scheduling module.

[0107] Figure 4 is a flow chart of a hydrogen scheduling method according to an exemplary embodiment. Figure 4 As shown, the coal-fired power generation unit generates electricity at an average clearing load and transmits it to the public power grid. Under the premise of meeting the clearing load, if the first hydrogen production cost electricity price is less than the cost per kilowatt-hour or the second hydrogen production cost electricity price is less than the cost per kilowatt-hour, the electric load of the coal-fired power generation unit is all used to access the public power grid and is not used for the hydrogen production system to produce hydrogen. If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than the cost per kilowatt-hour, and the electric load provided by the coal-fired power generation unit to the hydrogen production system is greater than or equal to the electric load threshold of the hydrogen production system, the hydrogen production system produces hydrogen according to the maximum electric load threshold. If the electric load provided by the coal-fired power generation unit to the hydrogen production system is less than the electric load threshold of the hydrogen production system, hydrogen is produced according to the electric load provided by the coal-fired power generation unit to the hydrogen production system.

[0108] When the hydrogen production system produces hydrogen according to the electrical load provided by the coal-fired generator set and obtains the hydrogen production volume, if the first hydrogen production cost electricity price is greater than or equal to the cost per kilowatt-hour, and the hydrogen blending threshold of the gas turbine hydrogen blending generator set is greater than or equal to the hydrogen production volume, the hydrogen production volume will be used entirely for gas turbine hydrogen blending power generation. If the hydrogen blending threshold of the gas turbine hydrogen blending generator set is less than the hydrogen production volume, the hydrogen production volume equal to the hydrogen blending threshold will be used for gas turbine hydrogen blending generator set power generation, and the remaining hydrogen production volume will be transmitted to the hydrogen storage system for storage. When the hydrogen blending threshold is greater than the hydrogen production volume again, the hydrogen stored in the hydrogen storage system will be used for gas turbine hydrogen blending generator set power generation.

[0109] If the first hydrogen production cost electricity price is less than the kilowatt-hour cost and the demand in the hydrogen market is greater than or equal to the hydrogen production capacity of the hydrogen production system, all the hydrogen production capacity will be sold to the outside. If the demand in the hydrogen market is less than the hydrogen production capacity of the hydrogen production system, the hydrogen production capacity equal to the demand will be sold to the outside, and the remaining hydrogen production capacity will be transmitted to the hydrogen storage system for storage. When the demand in the hydrogen market is greater than or equal to the hydrogen production capacity again, the stored hydrogen will be sold to the outside.

[0110] In summary, the hydrogen scheduling method provided in the embodiment of the present application, through the coupling between the coal-fired generator set, the hydrogen production system and the gas turbine hydrogen-blended generator set in the coal-fired power generation and hydrogen-blended gas turbine system, determines the hydrogen production amount of the hydrogen production system and the purpose of the hydrogen production amount based on the comparison of the cost per kilowatt-hour, the first hydrogen production cost electricity price and the second hydrogen production cost electricity price. Based on the comparison result, it is determined whether the hydrogen production amount is used for power generation by the gas turbine hydrogen-blended generator set or for selling hydrogen to the outside. If it is used for power generation by the gas turbine hydrogen-blended generator set, the power supply can be further guaranteed by transmitting the obtained electric energy to the public power grid, thereby realizing the efficient use of hydrogen and electric energy. If it is used for external sale, the economic benefit is improved by the hydrogen production amount.

[0111] In a second aspect, an embodiment of the present application provides a hydrogen scheduling device. Figure 5 FIG. 1 is a block diagram showing a hydrogen scheduling device according to an exemplary embodiment. Figure 5 As shown, the hydrogen scheduling device includes:

[0112] An acquisition module is used to obtain the clearing power load, the kilowatt-hour cost of coal-fired power generation units, the first hydrogen production cost electricity price of the gas turbine hydrogen-blended power generation unit, and the second hydrogen production cost electricity price of the hydrogen market. The first hydrogen production cost electricity price represents the electricity price required to prepare hydrogen with the same calorific value as the natural gas in the gas turbine hydrogen-blended unit, and the second hydrogen production cost electricity price represents the electricity price required to prepare the hydrogen production volume in the hydrogen market;

[0113] A production module, for determining the electric load of the coal-fired power generation unit for hydrogen production according to the clearing electric load if the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kWh, and determining the hydrogen production capacity of the hydrogen production system according to the electric load;

[0114] A power generation module, for using the hydrogen production amount for power generation by the gas turbine hydrogen production unit if the first hydrogen production cost electricity price is greater than or equal to the kilowatt-hour cost and the hydrogen production amount is less than or equal to the hydrogen mixing threshold of the gas turbine hydrogen production unit;

[0115] A storage module is used for storing the hydrogen produced and using the gas turbine generator set to generate electricity if the hydrogen produced amount is greater than the hydrogen blending threshold of the gas turbine generator set, and for using the stored hydrogen produced amount to generate electricity for the gas turbine generator set when the hydrogen produced amount is less than or equal to the hydrogen blending threshold again;

[0116] The selling module is used to sell the hydrogen production capacity of the hydrogen production system if the first hydrogen production cost electricity price is less than the cost per kilowatt-hour.

[0117] In summary, the hydrogen scheduling device provided by the present application realizes the coupling of coal-fired power generation units, hydrogen production systems and gas turbine hydrogen-blended power generation units under the premise that the power generation of coal-fired power generation units meets the daily power clearing requirements. Under the premise that the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both lower than the cost per kilowatt-hour, the coal-fired power generation units ensure the power supply while also providing power for the hydrogen production system. The hydrogen obtained by the hydrogen production system is used for power generation by gas turbine hydrogen-blended power generation units on the one hand, which ensures the power supply and alleviates the resource problem of only using natural gas for power generation. On the other hand, it is used for sale to obtain economic benefits. Through the coupling of coal-fired power generation units, hydrogen production systems and gas turbine hydrogen-blended power generation units, the scheduling of hydrogen and the guarantee of power supply of electric energy are completed, thereby achieving the efficient synergy of hydrogen and electric energy.

[0118] In one embodiment, in the production module, determining the electrical load of the coal-fired power generation unit for hydrogen production, and determining the hydrogen production amount of the hydrogen production system according to the electrical load includes:

[0119] An acquisition unit, used to acquire a hydrogen production threshold of the hydrogen production system, and determine an electric load threshold required by the hydrogen production system according to the hydrogen production threshold;

[0120] The first production unit is used for, if the electric load is greater than the electric load threshold, the coal-fired power generation unit provides the hydrogen production system according to the electric load threshold, and the hydrogen production amount of the hydrogen production system is the hydrogen production threshold;

[0121] The second production unit is used for when the electric load is less than or equal to the electric load threshold, the coal-fired generator provides the current electric load to the hydrogen production system, and the hydrogen production system obtains the amount of hydrogen according to the electric load.

[0122] In one embodiment, in the selling module, the hydrogen production of the hydrogen production system is used for selling, including:

[0123] The first sales unit is used to obtain the hydrogen demand in the hydrogen market. If the hydrogen demand is greater than or equal to the hydrogen production, the entire hydrogen production will be sold;

[0124] The second selling unit is used to sell and store the produced hydrogen if the hydrogen demand is less than the produced hydrogen, and to sell the stored hydrogen when the hydrogen demand is greater than or equal to the produced hydrogen.

[0125] In one embodiment, in the production module, if the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kilowatt-hour, it also includes:

[0126] An electric load increasing module is used to increase the electric load of the coal-fired generator set to generate electricity if the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kilowatt-hour;

[0127] The electric load maintenance module is used to maintain the current electric load of the coal-fired power generation unit to generate electricity if the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both less than the cost per kilowatt-hour.

[0128] In one embodiment, the first hydrogen production cost electricity price, the second hydrogen production cost electricity price and the hydrogen production cost electricity price in the acquisition module meet the following configurations:

[0129]

[0130] Among them, D JP is the first hydrogen production cost electricity price, H JP is the hydrogen price corresponding to the natural gas supply price, J C is the construction cost of the hydrogen production system, H R is the hydrogen production capacity of the hydrogen production system, S M is the life of the hydrogen production system, S H is the amount of water consumed by the hydrogen production system, S J is the local water supply price, D H is the unit power consumption for hydrogen production, J TR is the natural gas supply price, R T is the lower calorific value of natural gas, R H is the lower heating value of hydrogen, D P is the second hydrogen production cost electricity price, H J is the hydrogen price in the hydrogen market, M DC is the electricity cost, M H is the standard coal consumption of coal-fired power generation units, M J is the supply price of standard coal, B R The proportion of fuel costs in coal-fired power generation units.

[0131] In one embodiment, the clearing power load in the acquisition module satisfies the following configuration:

[0132]

[0133] Among them, M aveFis the clearing load, M Lt is the clearing electricity of coal-fired power generation in each period, and t is the market time interval.

[0134] In one embodiment, the electrical load of the coal-fired power generation unit in the acquisition module for hydrogen production satisfies the following configuration:

[0135] M KH =M maxF -M averF

[0136] Among them, M KH is the electrical load of the coal-fired generator set for hydrogen production, MmaxF is the maximum electrical load of the coal-fired generator set, M aveF It is to clear the electrical load.

[0137] In summary, the hydrogen scheduling device provided in the present application, through the coupling between the coal-fired generator set, the hydrogen production system and the gas turbine hydrogen-blended generator set in the coal-fired power generation and hydrogen-blended gas turbine system, determines the hydrogen production amount of the hydrogen production system and the purpose of the hydrogen production amount based on the comparison of the cost per kilowatt-hour, the first hydrogen production cost electricity price and the second hydrogen production cost electricity price. Based on the comparison result, it is determined whether the hydrogen production amount is used for power generation by the gas turbine hydrogen-blended generator set or for selling hydrogen to the outside. If it is used for power generation by the gas turbine hydrogen-blended generator set, the power supply can be further guaranteed by transmitting the obtained electric energy to the public power grid, thereby realizing the efficient use of hydrogen and electric energy. If it is used for external sale, the economic benefit is improved by the amount of hydrogen produced.

[0138] It should be noted that the hydrogen scheduling device provided in this embodiment is used to implement the above-mentioned implementation mode, and the description has been made and will not be repeated. As used above, the terms "module", "unit", "subunit", etc. can implement a combination of software and / or hardware for a predetermined function. Although the device described in the above embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0139] In a third aspect, an embodiment of the present application provides an electronic device, Figure 6 FIG. 1 is a block diagram of an electronic device according to an exemplary embodiment. Figure 6 As shown, the electronic device may include a processor 81 and a memory 82 storing computer program instructions.

[0140] Specifically, the processor 81 may include a central processing unit (CPU), or an application specific integrated circuit (ASIC), or may be configured to implement one or more integrated circuits of the embodiments of the present application.

[0141] Among them, the memory 82 may include a large-capacity memory for data or instructions. By way of example and not limitation, the memory 82 may include a hard disk drive (HDD), a floppy disk drive, a solid-state drive (SSD), a flash memory, an optical disk, a magneto-optical disk, a magnetic tape, or a universal serial bus (USB) drive, or a combination of two or more of these. Where appropriate, the memory 82 may include a removable or non-removable (or fixed) medium. Where appropriate, the memory 82 may be inside or outside the data processing device. In a specific embodiment, the memory 82 is a non-volatile memory. In a specific embodiment, the memory 82 includes a read-only memory (ROM) and a random access memory (RAM). Where appropriate, the ROM may be a mask-programmed ROM, a programmable ROM (Programmable Read-Only Memory, PROM for short), an erasable PROM (Erasable ProgrammableRead-Only Memory, EPROM for short), an electrically erasable PROM (Electrically Erasable ProgrammableRead-Only Memory, EEPROM for short), an electrically alterable ROM (Electrically Alterable Read-Only Memory, EAROM for short) or a flash memory (FLASH) or a combination of two or more of these. Under appropriate circumstances, the RAM can be a static random access memory (SRAM) or a dynamic random access memory (DRAM), wherein the DRAM can be a fast page mode dynamic random access memory (FPMDRAM), an extended data output dynamic random access memory (EDODRAM), a synchronous dynamic random access memory (SDRAM), etc.

[0142] The memory 82 may be used to store or cache various data files required for processing and / or communication, as well as possible computer program instructions executed by the processor 81 .

[0143] The processor 81 implements any one of the hydrogen scheduling methods in the above embodiments by reading and executing computer program instructions stored in the memory 82.

[0144] In one embodiment, the hydrogen scheduling device may further include a communication interface 83 and a bus 80. Figure 6 As shown, the processor 81, the memory 82, and the communication interface 83 are connected via a bus 80 and communicate with each other.

[0145] The communication interface 83 is used to implement communication between the modules, devices, units and / or equipment in the embodiment of the present application. The communication port 83 can also implement data communication with other components such as: external devices, image / data acquisition equipment, databases, external storage, and image / data processing workstations.

[0146] The bus 80 includes hardware, software or both, and couples the components of the hydrogen scheduling device to each other. The bus 80 includes but is not limited to at least one of the following: a data bus, an address bus, a control bus, an expansion bus, and a local bus. By way of example and not limitation, bus 80 may include an Accelerated Graphics Port (AGP) or other graphics bus, an Extended Industry Standard Architecture (EISA) bus, a Front Side Bus (FSB), a Hyper Transport (HT) interconnect, an Industry Standard Architecture (ISA) bus, an InfiniBand interconnect, a Low Pin Count (LPC) bus, a memory bus, a Micro Channel Architecture (MCA) bus, a Peripheral Component Interconnect (PCI) bus, a PCI-Express (PCI-X) bus, a Serial Advanced Technology Attachment (SATA) bus, a Video Electronics Standards Association Local Bus (VLB) bus, or other suitable buses or a combination of two or more of these. Where appropriate, bus 80 may include one or more buses. Although embodiments of the present application describe and illustrate a particular bus, the present application contemplates any suitable bus or interconnect.

[0147] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a program stored thereon, and when the program is executed by a processor, the hydrogen scheduling method provided in the first aspect is implemented.

[0148] The readable storage medium may include but is not limited to: a portable disk, a hard disk, a random access memory, a read-only memory, an erasable programmable read-only memory, an optical storage device, a magnetic storage device or any suitable combination of the above.

[0149] In a possible implementation, the present invention can also be implemented in the form of a program product, which includes a program code. When the program product is run on a terminal device, the program code is used to enable the terminal device to execute the steps of the hydrogen scheduling method provided in the first aspect.

[0150] The program code for executing the present invention may be written in any combination of one or more programming languages, and may be executed entirely on a user device, partially on a user device, as an independent software package, partially on a user device and partially on a remote device, or entirely on a remote device.

[0151] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0152] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A hydrogen scheduling method, characterized in that: The method is applied to a coal-fired power generation hydrogen production coupled with a gas turbine hydrogen blending system, wherein the coal-fired power generation hydrogen production coupled with a gas turbine hydrogen blending system comprises a coal-fired generator set, a gas turbine hydrogen blending generator set and a hydrogen production system, and the method comprises: Obtaining the clearing power load, the kilowatt-hour cost of the coal-fired power generation unit, the first hydrogen production cost electricity price of the gas turbine hydrogen-blended power generation unit, and the second hydrogen production cost electricity price of the hydrogen market, wherein the first hydrogen production cost electricity price represents the electricity price required to prepare hydrogen with the same calorific value as the natural gas in the gas turbine hydrogen-blended power generation unit, and the second hydrogen production cost electricity price represents the electricity price required to prepare hydrogen in the hydrogen market with the same hydrogen production capacity as the hydrogen production system; If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kWh, the electricity load of the coal-fired power generation unit for hydrogen production is determined according to the clearing electricity load, and the hydrogen production capacity of the hydrogen production system is determined according to the electricity load; If the first hydrogen production cost electricity price is greater than or equal to the kilowatt-hour cost, and the hydrogen production amount is less than or equal to the hydrogen blending threshold of the gas engine hydrogen blending generator set, the hydrogen production amount is used for power generation by the gas engine hydrogen blending generator set; If the hydrogen production amount is greater than the hydrogen blending threshold of the gas engine hydrogen blending generator set, the hydrogen production amount is used for storage and power generation by the gas engine generator set, and when the hydrogen production amount is less than or equal to the hydrogen blending threshold again, the stored hydrogen production amount is used for power generation by the gas engine generator set; If the first hydrogen production cost electricity price is less than the cost per kilowatt-hour, the hydrogen production of the hydrogen production system will be sold.

2. The hydrogen scheduling method according to claim 1, characterized in that: The step of determining the hydrogen production amount of the hydrogen production system according to the electrical load comprises: Acquiring a hydrogen production threshold of the hydrogen production system, and determining an electric load threshold required by the hydrogen production system according to the hydrogen production threshold; If the electric load is greater than the electric load threshold, the coal-fired power generation unit provides the electric load to the hydrogen production system according to the electric load threshold, and the hydrogen production amount of the hydrogen production system is the hydrogen production threshold; If the electric load is less than or equal to the electric load threshold, the coal-fired generator provides the current electric load to the hydrogen production system, and the hydrogen production system obtains the amount of hydrogen according to the electric load.

3. The hydrogen scheduling method according to claim 1, characterized in that: The method of selling the hydrogen produced by the hydrogen production system comprises: Obtaining the hydrogen demand of the hydrogen market, and if the hydrogen demand is greater than or equal to the hydrogen production, selling all of the hydrogen production; If the hydrogen demand is less than the hydrogen production amount, the hydrogen production amount is used for sale and storage; when the hydrogen demand is greater than or equal to the hydrogen production amount, the stored hydrogen is used for sale.

4. The hydrogen scheduling method according to claim 1, characterized in that: If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kilowatt-hour, the method further includes: If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kilowatt-hour, increasing the electrical load of the coal-fired power generation unit to generate electricity; If the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both lower than the cost per kilowatt-hour, the current electrical load of the coal-fired power generation unit is maintained to generate electricity.

5. The hydrogen scheduling method according to claim 1, characterized in that: The first hydrogen production cost electricity price, the second hydrogen production cost electricity price and the hydrogen production cost electricity price satisfy the following configuration: Among them, D JP is the first hydrogen production cost electricity price, H JP is the hydrogen price corresponding to the natural gas supply price, J C is the construction cost of the hydrogen production system, H R is the hydrogen production capacity of the hydrogen production system, S M is the life of the hydrogen production system, S H is the amount of water consumed by the hydrogen production system, S J is the local water supply price, D H is the unit power consumption for hydrogen production, J TR is the natural gas supply price, R T is the lower calorific value of natural gas, R H is the lower heating value of hydrogen, D P is the second hydrogen production cost electricity price, H J is the hydrogen price in the hydrogen market, M DC is the electricity cost, M H is the standard coal consumption of coal-fired power generation units, M J is the supply price of standard coal, B R The proportion of fuel costs in coal-fired power generation units.

6. The hydrogen scheduling method according to claim 1, characterized in that: The clearing power load meets the following configuration: Among them, M aveF is the clearing load, M Lt is the clearing electricity of coal-fired power generation in each period, and t is the market time interval.

7. The hydrogen scheduling method according to claim 6, characterized in that: The electrical load of the coal-fired generator set for hydrogen production meets the following configuration: M KH =M maxF -M averF Among them, M KH is the electrical load of the coal-fired generator set for hydrogen production, MmaxF is the maximum electrical load of the coal-fired generator set, M aveF It is to clear the electrical load.

8. A hydrogen dispatching device, characterized in that: include: An acquisition module is used to acquire the clearing power load, the kilowatt-hour cost of the coal-fired power generation unit, a first hydrogen production cost electricity price of the gas turbine hydrogen-blended power generation unit, and a second hydrogen production cost electricity price in the hydrogen market, wherein the first hydrogen production cost electricity price represents the electricity price required to prepare hydrogen with the same calorific value as the natural gas in the gas turbine hydrogen-blended power generation unit, and the second hydrogen production cost electricity price represents the electricity price required to prepare hydrogen in the hydrogen market with the same hydrogen production capacity as the hydrogen production system; A production module, configured to determine the electric load of the coal-fired power generation unit for hydrogen production according to the clearing electric load, and determine the hydrogen production amount of the hydrogen production system according to the electric load, if the first hydrogen production cost electricity price and the second hydrogen production cost electricity price are both greater than or equal to the cost per kWh; A power generation module, configured to use the hydrogen production amount for power generation by the gas engine hydrogen production set if the first hydrogen production cost electricity price is greater than or equal to the kilowatt-hour cost and the hydrogen production amount is less than or equal to the hydrogen production threshold of the gas engine hydrogen production set; A storage module, for storing and using the hydrogen production for power generation by the gas engine generator set if the hydrogen production is greater than the hydrogen blending threshold of the gas engine hydrogen blending generator set, and for using the stored hydrogen production for power generation by the gas engine generator set when the hydrogen production is less than or equal to the hydrogen blending threshold again; A selling module is used to sell the hydrogen production capacity of the hydrogen production system if the first hydrogen production cost electricity price is less than the electricity cost.

9. An electronic device, characterized in that: The invention comprises a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the hydrogen scheduling method as claimed in any one of claims 1 to 7 when executing the computer program.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the hydrogen scheduling method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Nash negotiation-based hydrogen-doped gas comprehensive energy multi-microgrid optimization scheduling method

    CN116050585A

  • Optimized scheduling method for hydrogen-mixed natural gas-power coupling system

    CN116644928A

  • Electricity-gas-hydrogen series-parallel integrated energy system optimization scheduling method considering seasonal hydrogen storage

    CN117937621A

  • AU2019101043A4