Ship emergency power generation combined module, construction method and ship engine room

By designing an integrated ship emergency power generation combination module, the interference problem between emergency power generation equipment installation and thermal insulation construction is solved, and the advance assembly and commissioning of the emergency power generation system is realized, which improves the overall delivery progress of the ship.

CN119898448APending Publication Date: 2025-04-29JIANGNAN SHIPYARD (GRP) CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202510187944.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-20
Publication Date
2025-04-29

AI Technical Summary

Technical Problem

During the ship design process, there is interference between the installation of emergency power generation equipment and the insulation construction, resulting in hindering the construction progress and delaying the equipment installation, affecting the overall delivery progress.

Method used

A combined module of ship emergency power generation is designed to form a comprehensive unit similar to the ship's segmented form by integrating the cavity structure, emergency power generation equipment, fuel pipe system and cables to realize the advance assembly and debugging of the emergency power generation system.

Benefits of technology

Through early assembly and commissioning, conflicts between emergency power generation equipment installation and thermal insulation construction are avoided, the overall delivery cycle of the ship is shortened, and the assembly and commissioning progress is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119898448A_ABST
    Figure CN119898448A_ABST
Patent Text Reader

Abstract

The invention provides a ship emergency power generation combined module, a building method and a ship engine room, and the ship emergency power generation combined module comprises a cavity structure, emergency power generation equipment, a fuel pipe system and a cable. The cavity structure is an independent structure formed by splicing a bottom surface structure, a top surface structure and a side wall structure. The top surface structure is provided with a skylight used for hoisting emergency power generation equipment in and out, the top surface structure is provided with a lifting lug, the side wall structure is provided with a cabin penetrating piece used for a cable to pass through, and the side wall structure is provided with a watertight door; a ventilation device is mounted on the cavity structure; the emergency power generation equipment is mounted in the cavity structure; and the fuel piping system and the cable are laid in the cavity structure. According to the ship emergency power generation combined module, the ship emergency power generation equipment, the pipe system and the cable are integrally designed to form a comprehensive unit similar to a ship section form, so that the ship emergency power generation system can be assembled and debugged in advance, and the ship assembly and debugging progress can be integrally improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of ship emergency power generation systems, and in particular to a ship emergency power generation combination module, a construction method and a ship engine room. Background Art

[0002] Emergency generators and emergency power distribution systems are key emergency power support facilities for ships. When the main switchboard of the ship encounters emergencies such as power failure or tripping, they can provide power support for key equipment such as emergency lighting, ventilation, steering, fire pumps, etc., to ensure the basic safe operation of the ship. Their configuration and performance are important requirements that must be met in accordance with relevant standards during the ship design phase.

[0003] In the past ship design process, emergency power generation equipment, including emergency generators (emergency power generation body), emergency switchboards (emergency power generation combination panels), emergency transformers, emergency diesel cabinets, emergency fans and other components, were defined as the P stage (segment assembly stage) of the cabin sealing parts, and they needed to be installed in this stage. However, this arrangement exposed many problems during the installation process of the D stage (hull detailed installation stage).

[0004] Specifically, during the D phase, the cable laying operation and the cabin internal insulation construction interfered with each other, which hindered the construction progress. The positioning and installation of the emergency diesel tank also conflicted with the insulation coating of the bulkhead. In order to ensure the smooth submission of the bulkhead insulation installation project, the emergency diesel tank had to be disassembled and assembled twice, which consumed a lot of manpower and time.

[0005] In addition, the wiring of the trunk cables and main distribution switches in the unit module cable laying also interfered with the installation leveling cycle of the emergency power generation equipment. Many factors were intertwined, which eventually caused the production and installation of the emergency power generation equipment to be delayed after the ship was undocking, and the equipment installation integrity was not achieved as scheduled. This further caused the installation inspection and functional debugging cycle of the emergency power generation equipment to be delayed, which in turn had an adverse impact on the functional debugging of other important equipment such as emergency lighting and emergency steering gear, delaying the overall delivery progress and debugging process of the ship. Summary of the invention

[0006] The purpose of the present application is to provide a ship emergency power generation combination module, a construction method and a ship engine room, which integrates the ship emergency power generation equipment, piping and cables to form an integrated unit similar to the ship section form, thereby enabling early assembly and commissioning of the ship emergency power generation system, which helps to improve the overall progress of ship assembly and commissioning.

[0007] In the first aspect, a ship emergency power generation combination module is provided, including a cavity structure, emergency power generation equipment, a fuel pipe system, and a cable; the cavity structure is an independent integral structure formed by splicing a bottom structure, a top structure, and a side wall structure; a skylight for hoisting and exiting the emergency power generation equipment is opened on the top structure, and a lifting lug is provided on the top structure, a penetration piece for passing the cable is provided on the side wall structure, and a watertight door is installed on the side wall structure; a ventilation device is installed on the cavity structure; the emergency power generation equipment is installed in the cavity structure; the fuel pipe system and the cable are laid in the cavity structure.

[0008] In an practicable solution, the emergency power generation equipment of the ship emergency power generation combination module includes an emergency generator, an emergency switchboard, an emergency diesel cabinet and an emergency transformer;

[0009] Multiple equipment bases are installed on the bottom structure, and emergency generators, emergency distribution boards, emergency diesel cabinets and emergency transformers are fixedly installed on the equipment bases.

[0010] In an implementable solution, the ventilation device of the ship emergency power generation combination module includes an emergency fan and electric shutters, the emergency fan is installed on the top surface structure, and the electric shutters are installed on the side wall structure and close to the emergency generator.

[0011] In an practicable solution, a plurality of cable brackets and a plurality of pipe brackets are integrated and installed on the bottom surface structure and / or the side wall structure of the ship emergency power generation combination module. The pipe brackets are used to install and fix the fuel pipe system, and the cable brackets are used to install and fix the cables.

[0012] The emergency diesel cabinet is connected to the emergency generator through a fuel pipe system, the emergency generator is connected to the emergency switchboard through cables, and the emergency switchboard is connected to the emergency transformer through cables.

[0013] In an implementable solution, the ship emergency power generation combination module also includes a load cabinet, which is located outside the cavity structure and installed on the side wall structure. The emergency distribution board is electrically connected to the load cabinet through a cable passing through the cabin penetration piece, and the load cabinet is used to connect the load.

[0014] In an implementable solution, the cavity structure of the ship emergency power generation combination module is a hexahedral structure.

[0015] In an implementable solution, a side wall structure of the cavity structure of the ship emergency power generation assembly module is reserved with a welding structure for welding with other hull structures.

[0016] In the second aspect, a ship engine room is also provided, comprising the aforementioned ship emergency power generation combination module, wherein an emergency power generation installation position is provided in the engine room, and the ship emergency power generation combination module is hoisted to the emergency power generation installation position and then welded and fixed.

[0017] In a third aspect, a method for constructing a ship emergency power generation assembly module is also provided, comprising the following steps:

[0018] During the ship segment platform assembly phase, the ship emergency power generation module is assembled, including structural assembly, pipeline laying and cable laying;

[0019] After the ship emergency power generation module is assembled, structural inspection and functional debugging are carried out;

[0020] The ship is assembled in sections, and then the ship emergency power generation combination module is hoisted to the predetermined position of the engine room section for welding and fixing.

[0021] In an practicable solution, the heat insulation and insulating covering operation has been completed before the ship emergency power generation assembly module is hoisted to a predetermined position of the engine room section for welding and fixing.

[0022] Compared with the prior art, the beneficial effects of this application include at least:

[0023] The ship emergency power generation combination module provided by the present application accommodates and installs equipment, pipes and cables related to ship emergency power generation through an independent cavity structure, so that the ship emergency power generation combination module of the present application is equivalent to the segmented structure of a ship, so that the assembly and debugging of emergency power generation equipment, pipes, cables, etc. can be carried out at the segmented assembly platform stage. In the subsequent segmented assembly stage, after the internal insulation construction of the engine room is completed, it is only necessary to hoist the ship emergency power generation combination module of the present application as a whole to the predetermined position of the engine room for installation, so that the installation of emergency power generation equipment, pipes and cables will not conflict with the insulation coating operation. Since the ship emergency power generation combination module of the present application has been debugged when it is hoisted, it will not affect the debugging of other electrical equipment of the ship, which is conducive to ensuring the overall delivery schedule and debugging process of the ship. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0025] Figure 1 It is a structural schematic diagram of a ship emergency power generation combination module according to an embodiment of the present application.

[0026] In the figure: 101, bottom structure; 102, top structure; 103, side wall structure; 104, watertight door; 105, lifting lug; 106, welding structure; 2, emergency generator; 3, emergency switchboard; 4, emergency diesel cabinet; 5, emergency transformer; 6, emergency fan; 7, skylight; 8, electric shutter; 9, fuel pipe system; 10, cable; 11, equipment base; 12, load cabinet. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0028] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0029] like Figure 1 As shown, an embodiment of the present application provides a ship emergency power generation combination module, including a cavity structure, an emergency power generation equipment, a fuel pipe system 9, and a cable 10. The cavity structure is an independent integral structure formed by splicing a bottom surface structure 101, a top surface structure 102, and a side wall structure 103. A skylight 7 for hoisting and exiting the emergency power generation equipment is provided on the top surface structure 102, and a lifting lug 105 is provided on the top surface structure 102. A through-hole for the passage of the cable 10 is provided on the side wall structure 103 (not shown in the figure), and a watertight door 104 is installed on the side wall structure 103. A ventilation device is installed on the cavity structure, the emergency power generation equipment is installed in the cavity structure, and the fuel pipe system 9 and the cable 10 are laid in the cavity structure.

[0030] The ship emergency power generation combination module provided by the present application accommodates and installs equipment, pipes and cables related to ship emergency power generation through an independent cavity structure, so that the ship emergency power generation combination module of the present application is equivalent to the segmented structure of a ship, so that the assembly and debugging of emergency power generation equipment, pipes, cables, etc. can be carried out at the segmented assembly platform stage. In the subsequent segmented assembly stage, after the internal insulation construction of the engine room is completed, it is only necessary to hoist the ship emergency power generation combination module of the present application as a whole to the predetermined position of the engine room for installation, so that the installation of emergency power generation equipment, pipes and cables will not conflict with the insulation coating operation. Since the ship emergency power generation combination module of the present application has been debugged when it is hoisted, it will not affect the debugging of other electrical equipment of the ship, which is conducive to ensuring the overall delivery schedule and debugging process of the ship.

[0031] In summary, the ship emergency power generation combination module of the present application integrates the equipment, piping and cables of the ship emergency power generation to form a comprehensive unit similar to the form of a ship section, thereby enabling the early assembly and commissioning of the ship emergency power generation system, which helps to improve the overall progress of ship assembly and commissioning.

[0032] In one embodiment, if Figure 1 As shown, the cavity structure can be a hexahedral structure, which is a cubic cavity structure formed by welding six steel plates on the top, bottom, left, right, front and back. The skylight 7 can be pre-opened on the top surface structure 102, and then a sealable door that can be opened and closed is installed as the skylight 7 to facilitate the hoisting of emergency power generation equipment. The watertight door 104 can be pre-opened on the top surface structure 102 as a manhole structure, and then the watertight door 104 that can be opened and closed is installed on the manhole structure as a passage for personnel to enter and exit the cavity structure.

[0033] In one embodiment, if Figure 1 As shown, the emergency power generation equipment at least includes an emergency generator 2, an emergency switchboard 3, an emergency diesel tank 4 and an emergency transformer 5. A plurality of equipment bases 11 are installed on the bottom structure 101, and the emergency generator 2, the emergency switchboard 3, the emergency diesel tank 4 and the emergency transformer 5 are fixedly installed on the equipment base 11.

[0034] In one embodiment, if Figure 1 As shown, the ventilation device includes an emergency fan 6 and an electric shutter 8. The emergency fan 6 is installed on the top surface structure 102, and is used to allow external air to flow into the space inside the cavity structure to meet the required cooling air volume. The electric shutter 8 is installed on the side wall structure 103 and close to the emergency generator 2, and can release the heat generated in the internal space to the outside when the emergency generator 2 is driven.

[0035] In one embodiment, a plurality of cable brackets (not shown in the figure) and a plurality of pipe brackets (not shown in the figure) are integrated and installed on the bottom surface structure 101 and / or the side wall structure 103. The pipe brackets are used to install and fix the fuel pipe system 9, and the cable brackets are used to install and fix the cables 10. The emergency diesel tank 4 is connected to the emergency generator 2 through the fuel pipe system 9, the emergency generator 2 is connected to the emergency switchboard 3 through the cable 10, and the emergency switchboard 3 is connected to the emergency transformer 5 through the cable 10.

[0036] In one embodiment, if Figure 1 As shown, the ship emergency power generation combination module can also include a load cabinet 12, which is located outside the cavity structure and installed on the side wall structure 103. The emergency distribution board 3 is electrically connected to the load cabinet 12 through the cable 10 passing through the cabin penetration piece, and the load cabinet 12 is used to connect the load.

[0037] In one embodiment, if Figure 1 As shown, a side wall structure 103 of the cavity structure is reserved with a welding structure 106 for welding with other hull structures. The welding structure 106 can be a steel plate structure extending integrally along one side of the side wall structure 103, or a plurality of protrusions can be provided as the welding structure 106.

[0038] The embodiment of the present application also provides a ship engine room, including the aforementioned ship emergency power generation combination module, an emergency power generation installation position is provided in the engine room, and the ship emergency power generation combination module is hoisted to the emergency power generation installation position and then welded and fixed.

[0039] The present application also provides a method for constructing the aforementioned ship emergency power generation assembly module, comprising the following steps:

[0040] During the ship segment platform assembly stage, the ship emergency power generation module is assembled, including structural assembly, pipeline laying and cable laying; structural assembly is to splice and weld the bottom surface structure 101, the top surface structure 102 and the side wall structure 103 to form a cavity structure, and then install skylights, watertight doors, etc., and then hoist the emergency power generation equipment into the cavity structure for installation and fixation, lay the relevant fuel pipe system, lay cables, etc.;

[0041] After the ship emergency power generation module is assembled, the structural inspection and functional debugging are carried out; the structural inspection mainly checks whether the equipment is installed firmly, whether the fuel pipe system is installed correctly and without leakage, whether the cable is laid correctly, etc.; the functional inspection mainly tests the relevant electrical equipment to ensure the normal function of each function;

[0042] The ship is assembled in sections, and then the ship emergency power generation combination module is hoisted to the predetermined position of the engine room section for welding and fixing.

[0043] Among them, the thermal insulation and insulating wrapping operation has been completed before the ship's emergency power generation combination module is hoisted to the predetermined position of the engine room section for welding and fixing.

[0044] In summary, the technical solution of the ship emergency power generation combination module of the present application systematically solves the problems of process conflicts, secondary disassembly and assembly, and debugging delays in the installation process of traditional ship emergency power generation equipment through modular integrated design and construction process optimization. The core principle is to integrate key equipment such as emergency generators, distribution boards, diesel cabinets, transformers, etc. into an independent cavity structure to form a complete functional unit that can be pre-assembled on a segmented platform. The cavity structure preferably adopts a hexahedral design with the bottom, top and side walls spliced ​​together. The lifting ears on the top support the overall lifting of the equipment after pre-installation. The side wall penetration cables are sealed inside and outside, and the ventilation device (emergency fan + electric shutters) can ensure the heat dissipation requirements of the equipment by adding sensor linkage control.

[0045] This design transfers the cable laying and piping laying of emergency equipment, which were originally scattered in the D stage (detailed hull installation stage), and the outfitting of emergency power generation equipment in the P stage (segment assembly stage), to the B platform stage (segment stage), thus avoiding the mutual interference between the cable laying and insulation construction of the emergency power generation system in the traditional process.

[0046] For example, the fuel pipes and cables are pre-fixed with brackets and functional tests in the cavity structure. After being hoisted to the engine room, only the cavity structure needs to be welded and fixed without further operation, thus eliminating the problem of secondary disassembly and assembly caused by the insulation construction of the bulkhead. In addition, the modular construction method ensures the integrity of equipment installation through structural inspection and functional debugging (such as ventilation system air volume verification and emergency power generation joint debugging test) at the stage of segmented platforms, synchronizes the equipment inspection and load equipment debugging cycle, and ultimately shortens the overall delivery cycle of the ship.

[0047] When the inventor actually applies the technical solution of the present application to the construction of a certain type of ship, the technical solution of the ship emergency power generation combination module of the solution greatly saves the dock mooring test cycle through modular integrated design and construction process optimization, which can reduce the mooring cycle by 4 to 5 days and reduce the expenditure ratio by about 20%.

[0048] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A ship emergency power generation module, characterized in that: It includes a cavity structure, emergency power generation equipment, a fuel pipe system (9), and a cable (10); The cavity structure is an independent integral structure formed by splicing a bottom surface structure (101), a top surface structure (102) and a side wall structure (103); The top surface structure (102) is provided with a skylight (7) for hoisting the emergency power generation equipment in and out, and the top surface structure (102) is provided with a lifting lug (105), the side wall structure (103) is provided with a cabin penetration for the cable (10) to pass through, and the side wall structure (103) is installed with a watertight door (104); A ventilation device is installed on the cavity structure; The emergency power generation equipment is installed in the cavity structure; The fuel pipe system (9) and the cable (10) are laid in the cavity structure.

2. The ship emergency power generation combined module according to claim 1, characterized in that: The emergency power generation equipment comprises an emergency generator (2), an emergency switchboard (3), an emergency diesel tank (4) and an emergency transformer (5); A plurality of equipment bases (11) are installed on the bottom surface structure (101), and the emergency generator (2), the emergency switchboard (3), the emergency diesel cabinet (4) and the emergency transformer (5) are fixedly installed on the equipment base (11).

3. The ship emergency power generation combined module according to claim 2, characterized in that: The ventilation device comprises an emergency fan (6) and an electric shutter (8), wherein the emergency fan (6) is installed on the top surface structure (102), and the electric shutter (8) is installed on the side wall structure (103) and close to the emergency generator (2).

4. The ship emergency power generation combined module according to claim 2, characterized in that: A plurality of cable brackets and a plurality of pipe system brackets are integrally mounted on the bottom surface structure (101) and / or the side wall structure (103), wherein the pipe system brackets are used to install and fix the fuel pipe system (9), and the cable brackets are used to install and fix the cables (10); The emergency diesel tank (4) is connected to the emergency generator (2) via a fuel pipe system (9), the emergency generator (2) is connected to the emergency switchboard (3) via a cable (10), and the emergency switchboard (3) is connected to the emergency transformer (5) via a cable (10).

5. The ship emergency power generation combined module according to claim 4, characterized in that: It also includes a load electric cabinet (12), which is located outside the cavity structure and installed on the side wall structure (103); the emergency distribution board (3) is electrically connected to the load electric cabinet (12) after the cable (10) passes through the cabin penetration member; and the load electric cabinet (12) is used to connect a load.

6. The ship emergency power generation combined module according to any one of claims 1 to 5, characterized in that: The cavity structure is a hexahedral structure.

7. The ship emergency power generation combined module according to claim 6, characterized in that: The side wall structure (103) on one side of the cavity structure is reserved with a welding structure (106) for welding with other hull structures.

8. A ship engine room, characterized in that: It comprises the ship emergency power generation combination module according to any one of claims 1 to 7, wherein a power generation installation position is provided in the engine room, and the ship emergency power generation combination module is hoisted to the power generation installation position and then welded and fixed.

9. A method for constructing a ship emergency power generation assembly module according to any one of claims 1 to 7, characterized in that: The following steps are involved: During the ship segment platform assembly stage, the ship emergency power generation assembly module is assembled, including structure assembly, pipeline laying and cable laying; After the ship emergency power generation module is assembled, structural inspection and functional debugging are carried out; The ship is assembled in sections, and then the ship emergency power generation combination module is hoisted to the predetermined position of the engine room section for welding and fixing.

10. The method for constructing a ship emergency power generation assembly module according to claim 9, characterized in that: Before the ship's emergency power generation module was hoisted to the predetermined position of the engine room section for welding and fixing, the thermal insulation and insulating coating work had been completed.

Citation Information

Cited By

  • Ship skid type emergency generator room and construction method thereof

    CN120553022A